msd total supplier performance and inventory …edge.rit.edu/edge/p16701/public/detailed design...

33
MSD Total Supplier Performance and Inventory Control Detailed Design Review Keleigh Bicknell, William Darlington, Alex Resnick, Brian Woodard

Upload: others

Post on 17-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

MSD Total Supplier Performance and Inventory ControlDetailed Design Review

Keleigh Bicknell, William Darlington, Alex Resnick, Brian Woodard

Page 2: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Overview● Overall Project Status● Current State vs. Project Plan● Updated Risk Assessment● Updates to Prototypes since last review● MSD II Plans - Week 1-5● Appendix

Page 3: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Overall Project StatusTIMELINE Continually completing tasks on schedule or ahead of schedule

BUDGETCurrently have spent ~14% of our budget. We will be purchasing a label maker prior to MSDII.

SCOPEPrimarily MSD 4th floor. Hope to do more with the ME machine shop, EE lab, and basement surplus in MSDII.

Page 4: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Project Plan vs. Current StateOriginal Plan

● Paperless Purchase Form● Tool Database● Surplus Database● Streamlined Loan Out Procedure

Current State

★ Paperless Purchase Form○ Integrated Order Tracking○ Team and Guide email notifications

★ Tool Database○ SKUs○ Categorized Tools

★ Streamlined Loan Out Procedure○ Paperless○ Usage reports○ Automated return reminders

★ Budget Management Tool★ Testing Prototypes

Page 5: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Updated Risk Assessment● Adjusted Likelihood Score

○ Card Swipe doesn’t work■ Reduced from 1 to 0: Can use

RIT Student ID #○ MSD Employees do not like new

system■ Reduced from 2 to 1: Continual

communication through design process

● Added two Risks○ Students block emails from website

■ Reduced from 2 to 0: Provide email preference setting

○ Guide is out of office■ Likelihood of 1: Assign a backup

guide to approve after 48 hours

Page 6: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Prototype Changes & RevisionsChanges Since Last Review

● Purchasing○ Email functionality for each milestone○ Email preferences○ Reporting functionality○ List of Vendors

● Tool Loan Out○ Added search for tool by keyword○ Added email functionality to Tools Out Report○ Developed the Tool History Report

Plans for Next Semester

● Purchasing○ Surplus/Tool inventory list○ User testing & Revisions

● Tool Loan Out○ Import the actual tool list○ Import the active student list○ User testing & Revisions

Page 7: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Overall Plans for MSD II● Usability Testing

○ Students○ Employees

● Tool Database● Barcode and 5S MSD Tools● Surplus Database● 5S Surplus● Training and Maintenance Documentation● Beta Testing● Full Implementation

Page 8: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

MSD II Weeks 1-5 Preliminary Outline

Page 9: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

MSD II Prototype Testing Plan

Page 10: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

MSD II Prototype Training Plan

Page 11: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Questions?

Page 12: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Appendix

A summary of the work completed for the Preliminary Design Review, Systems Design Review, Sub System Design Review, and Preliminary Design Review. Spanning Weeks 1 - 15 of MSDI.

Page 13: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Team Roles

From Left: Alex Resnick, Brian Woodard, William Darlington, Keleigh Bicknell

Page 14: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Project Background - Current State● Over 300 students participate in Senior Design every year● Students design, build & test their solution to a design problem● Each team has a budget that can be used to purchase materials

○ Paper process - requires guide’s signature and MSD office sign off

● The MSD office has tools available for students to borrow○ Paper process - challenging to keep students accountable and track tool wear

● The machine shop offers tools and machines for students to use○ No schedule for the machines so students often have to wait○ Over the last 5 years - have ordered over 200 tape measures (no accountability)○ Lots of resources available that student’s don’t know exist so they purchase duplicates

Page 15: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Problem Statement Break Down

Page 16: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Customer Requirements

Page 17: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Engineering Requirements

Page 18: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Engineering & Customer Requirements Matrix

Page 19: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

PurchasingFunctional Decomposition

Top Level Functions

Page 20: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Inventory Functional Decomposition

Page 21: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Purchasing Functional Decomposition

Page 22: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

System Architecture

Page 23: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Benchmarking

Page 24: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Morphological Chart

Page 25: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Concept Development

Five design concepts were generated through use of the morphological chart. The concept development matrix highlights the primary functions of the system and the design option for each concept displayed on the left.

Page 26: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Concept Selection

Page 27: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Purchasing Process Map

Page 28: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Tool Loan Out Process Map

Page 29: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Prototype Testing Plan

Page 30: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Stakeholder TestingDiscussed prototypes with 5 RIT MSDI students and received feedback:

● Requested all team members receive purchasing update emails● State that tools are available but loaned out and quantity usually available● Could we implement a tool dropbox for returning tools when office is

busy?● Implement a “Search” feature so it’s easy to find exactly which tool you are

looking for● Send Budget sheet after orders are placed/received

Page 31: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Survey ResultsComments and Concerns

● Communicate discounts and shipping cost.● Tracking and order confirmation● Cost summary sheets

Time to Approve (days)

<1 1-2 2-5 >5

Email 0 5 1 1

Signature 6 3 1 2

Page 32: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Current State Analysis Tool Loan Out

Page 33: MSD Total Supplier Performance and Inventory …edge.rit.edu/edge/P16701/public/Detailed Design Documents...MSD Total Supplier Performance and Inventory Control Detailed Design Review

Process Expert FeedbackIndustrial EngineersAlec JarvieSuggested additional functionality to update the class list in the prototypes directly from Oracle. In addition, suggested performing spot audits weekly to eliminate one large audit at the end of each semester.

Tim GallmanRequested the tool loan out prototype includes a visual confirmation that the tool was loaned out / returned successfully. Also suggested creating non-admin type queries so students can search what tools they have out as an individual as well as a team as a whole. Robin BorkholderPushed the team to consider how the program could be backed up. What will happen if we lose a day of data. Also suggested a cage area for damaged tools. Potentially could benchmark a R&D company for surplus storage.

Industry SpecialistsMSCOpportunity to utilize a tool vending machine or carousel if RIT commits to an annual sales amount with the company. Received information from MSC pertaining to RIT sales history to determine whether the contract would be in the department's best interest.

GraingerMet with two representatives from Grainger to discuss their vending machine opportunities. Similar to MSC, however the annual sales commitment is less.Emailed the Rochester representative to see if it would be possible to benchmark their facility from an inventory management perspective. Have not received an email back.

Supply PointRequested a slightly damaged machine to test to avoid signing a contract with MSC. Supply Point will not work with us, and instead directed us back to MSC.