MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 1 Oil types: Planholders have indicated they carry oil groups 1-4 MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) Technical Manual Description: The following is for planning purposes only. The technical manual includes equipment appropriate for the operating environment and adequate to meet the WAC planning standards for recovery and storage through the forty-eight hour time frame. Technical Manual Planning Standard: San Juan County Plan Holder(s) Covered by the Manual: Vessel planholders maintaining a vaild Service Agreement with MSRC. Worst Case Discharge: Planholders have provided a worst case discharge volume of 813,000 bbls; per WAC 173-182-370, this translates to a planning requirement for 60,000 barrels of EDRC recovery and 96,000 barrels of storage through 48 hours. Updates and Distribution This Technical Manual correlates MSRC resources to Planholder recovery and storage planning requirements. It is a planning document and, per WAC 173-182-349, does not bind MSRC or Planholders to the use of specific tactics during a spill or drill, or guarantee what will occurr in a real spill event. Information is subject to change. Technical Manual Planning Assumptions Workboats will be used only once. Vessels and boom for GRPs are not represented in the technical manual. The focus of the manual is the recovery and storage systems. Assumptions as to mobilization times, estimated recovery capability (EDRC ratings), etc. are based on WAC. Training Level of Personnel Described in the Recovery and Storage Tactics Response Personnel hold current 8, 24 or 40 hour HAZWOPER certification in compliance with 29 CFR 1910.120 and WAC 296-824- 300. Where required by USCG regulation, personnel that have vessel crewing assignments and responsibilities hold appropriate USCG Merchant Mariner Licenses and Endorsements.

Upload: others

Post on 04-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 1

Oil types: Planholders have indicated they carry oil groups 1-4

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370)

Technical Manual Description: The following is for planning purposes only. The technical manual includes equipment appropriate for the operating environment and adequate to meet the WAC planning standards for recovery and storage through the forty-eight hour time frame.

Technical Manual Planning Standard: San Juan CountyPlan Holder(s) Covered by the Manual: Vessel planholders maintaining a vaild Service Agreement with MSRC.

Worst Case Discharge: Planholders have provided a worst case discharge volume of 813,000 bbls; per WAC 173-182-370, this translates to a planning requirement for 60,000 barrels of EDRC recovery and 96,000 barrels of storage through 48 hours.

Updates and Distribution This Technical Manual correlates MSRC resources to Planholder recovery and storage planning requirements. It is a planning document and, per WAC 173-182-349, does not bind MSRC or Planholders to the use of specific tactics during a spill or drill, or guarantee what will occurr in a real spill event. Information is subject to change.

Technical Manual Planning AssumptionsWorkboats will be used only once.

Vessels and boom for GRPs are not represented in the technical manual. The focus of the manual is the recovery and storage systems.

Assumptions as to mobilization times, estimated recovery capability (EDRC ratings), etc. are based on WAC.

Training Level of Personnel Described in the Recovery and Storage Tactics Response Personnel hold current 8, 24 or 40 hour HAZWOPER certification in compliance with 29 CFR 1910.120 and WAC 296-824-300. Where required by USCG regulation, personnel that have vessel crewing assignments and responsibilities hold appropriate USCG Merchant Mariner Licenses and Endorsements.

Page 2: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 2

WAC Planning Standard MSRC Capability

Needed to Meet WAC Planning

StandardWAC Planning

Standard MSRC Capability

Needed to Meet WAC Planning

Standard

Hour 6 12,500 34,567 0 12,500 77,324 0

Hour 12 36,000 50,407 0 54,000 77,796 0

Hour 24 48,000 60,974 0 96,000 103,696 0

Hour 48 60,000 60,974 0 96,000 103,696 0

System Type ETA (hours) Planning Hour Recovery StorageRecovery (w/ storage) 2 6 6000 276

Recovery (w/ storage) 3 6 10567 14000

Recovery (w/ storage) 3 12 12000 1362

Recovery (w/ storage) 4 12 6000 286

Storage 5 12 0 38000

Storage 5 12 0 23400

Recovery (w/ storage) 8 12 15840 276

Storage 12 12 0 196

Storage 13 24 0 11900

Recovery (w/ storage) 19 24 10567 14000

Note: ETAs, rated recovery capability (EDRC) and storage estimated in accordance with WAC or as otherwise approved by WADOE.

System Name

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370)

RECOVERY/STORAGE SUMMARYRecovery Storage

SYSTEM RECOVERY/STORAGE

OREGON RESPONDER

ARCTIC TERN

WC PARK RESPONDER

SHEARWATER

OSRB 380

ROYAL TERN

WESTERN GULL

OSRB KITTIWAKE

OSRB PELICAN

BUSTER #4

Page 3: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 3

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

PRC/ dedicated 2990 OSRV OSRV2 ROYAL TERN Skimmer,JBF 6000 276 0 3 Anacortes WA In Water

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

PRC/ dedicated 2981 Vessel WB3 TEAL Work Boat, 36' 0 0 0 2 Anacortes WA In WaterPRC/ dedicated 7491 Vessel WB3 CASCADE Work Boat, 36' 0 0 0 2 Port Angeles WA In WaterPRC/ dedicated 2982 Boom B2

TEAL, Boom, Kepner 20" 0 0 1500 0 Anacortes WA TEAL

Night Operations (describe how this system is capable to support night ops): This recovery system is capable of night operations using vessel lighting and vessel-based thermal infrared camera. Night operations are subject to safety, weather and other considerations.

San Juan County Technical Manual - (6 hour) - Recovery System Detail Recovery System ROYAL TERN

Tactic purpose and description: The purpose of this tactic is on-water recovery of oil in an open water operating environment. This tactic assumes the OSRV2 ROYAL TERN will be enhanced by the WB3 TEAL and WB3 CASCADE using two 300' legs of B2 boom in a V formation. To promote the ability for continuous recovery operations, the tactic assumes that recovered oil is off loaded to available on-water storage. See Storage Systems OSRB 380, OSRB KITTIWAKE, & OSRB PELICAN.

Operating environment: Open Water waves 0-6 ft.

Oil type skimmer is optimized for: Group 2-4

Minimum number of response personnel for a 12 hour shift (also list 24 hour shift if the system conducts night operations): Estimated at 7/14, subject to circumstances at hand.

Recovery Device Detail

Associated Vessel and Boom Detail

Page 4: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 4

Transit speeds (only list if an alternative was granted by Ecology): Estimate for ROYAL TERN 9 kts, TEAL 25 kts, CASCADE 18 kts

San Juan County Technical Manual - (6 hour) - Recovery System Detail Recovery System ROYAL TERN

Offloading Detail Offloading narrative and pump rate description: The recovery system may be offloaded to available storage system barge when the temporary storage associated with ROYAL TERN is full. Transfer pump on the skimmer may be used. Transfer rate estimated at 12 bbl/min.

Mobilization Detail Mobilization method for recovery device (land/water): WaterMobilization method for each workboat with onboard boom (land/water): Water

Time for the entire system to arrive onscene (mobilization for all resources detailed above): Estimated at 2 hours (assuming 1 hour MOB for dedicated vessels per WAC 173-182-350(3)). Subject to weather, safety and other factors.

Support resources for mobilization: None required Support resources for deployment: None required

Equipment Photographs

CASCADE TEAL ROYAL TERN

Page 5: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 5

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

PRC/ dedicated 7527 OSRV OSRV1

WC PARK RESPONDER Skimmer, Transrec 10567 14000 0 10 Port Angeles WA In Water

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

PRC/ dedicated 7531 Vessel WB3

WC PARK RESPONDER, 15-1 Workboat 32' 0 0 0 2 Port Angeles WA Ship

PRC/ dedicated 7523 Boom B1

WC PARK RESPONDER, Boom 67" 0 0 1320 0 Port Angeles WA Ship

Night Operations (describe how this system is capable to support night ops): This recovery system is capable of night operations using vessel lighting and vessel-based X-band radar and thermal infrared camera. Night operations are subject to safety, weather and other considerations.

San Juan County Technical Manual - (6 hour) - Recovery System Detail Recovery System WC PARK RESPONDER

Tactic purpose and description: The purpose of this tactic is on-water recovery of oil in an open water operating environment. This tactic assumes the OSRV1 WC PARK RESPONDER will be enhanced by the WB3 15-1 using a 660' leg of B1 boom in a J formation. To promote the ability for continuous recovery operations, the tactic assumes that recovered oil is off loaded to available on-water storage. See Storage Systems OSRB 380, OSRB KITTIWAKE, & OSRB PELICAN.

Operating environment: Open Water waves 0-6 ft.

Oil type skimmer is optimized for: Group 2-4

Minimum number of response personnel for a 12 hour shift (also list 24 hour shift if the system conducts night operations): Estimated at 12/20, subject to circumstances at hand.

Recovery Device Detail

Associated Vessel and Boom Detail

Page 6: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 6

Transit speeds (only list if an alternative was granted by Ecology): Estimate for WC PARK RESPONDER 12 kts

San Juan County Technical Manual - (6 hour) - Recovery System Detail Recovery System WC PARK RESPONDER

Offloading Detail Offloading narrative and pump rate description: The recovery system may be offloaded to available storage system barge when the temporary storage associated with the WC PARK RESPONDER is full. Transfer pump on the skimmer may be used. Transfer rate estimated at 33 bbl/min.

Mobilization Detail Mobilization method for recovery device with onboard boom (land/water): WaterMobilization method for each workboat: Water

Time for the entire system to arrive onscene (mobilization for all resources detailed above): Estimated at 3 hours (assuming 1 hour MOB for dedicated vessels per WAC 173-182-350(3)). Subject to weather, safety and other factors.

Support resources for mobilization: None required Support resources for deployment: None required

Equipment Photographs

15-1 WC PARK RESPONDER

Page 7: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 7

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

PRC/ dedicated 3104 OSRV OSRV1 SHEARWATER Skimmer,JBF 12000 1362 0 4 Port Angeles WA In Water

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

PRC/ dedicated 2983 Vessel WB3 OSPREY Work boat, 42' 0 0 0 2 Anacortes WA In WaterPRC/ dedicated 3005 Vessel WB3 EAGLE Work boat, 42' 0 0 0 2 Bellingham WA In WaterPRC/ dedicated 3105 Boom B2

SHEARWATER, Boom, Acme 30" 0 0 800 0 Port Angeles WA

SHEAR- WATER

Night Operations (describe how this system is capable to support night ops): This recovery system is capable of night operations using vessel lighting and vessel-based thermal infrared camera. Night operations are subject to safety, weather and other considerations.

San Juan County Technical Manual - (12 hour) - Recovery System Detail Recovery System SHEARWATER

Tactic purpose and description: The purpose of this tactic is on-water recovery of oil in an open water operating environment. This tactic assumes the OSRV1 SHEARWATER will be enhanced by the WB3 OSPREY and WB3 EAGLE using two 300' legs of B2 boom in a V formation. To promote the ability for continuous recovery operations, the tactic assumes that recovered oil is off loaded to available on-water storage. See Storage Systems OSRB 380, OSRB KITTIWAKE, & OSRB PELICAN.

Operating environment: Open Water waves 0-6 ft.

Oil type skimmer is optimized for: Group 2-4

Minimum number of response personnel for a 12 hour shift (also list 24 hour shift if the system conducts night operations): Estimated at 8/14, subject to circumstances at hand.

Recovery Device Detail

Associated Vessel and Boom Detail

Page 8: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 8

Transit speeds (only list if an alternative was granted by Ecology): Estimate for SHEARWATER 10 kts, EAGLE 19 kts, OSPREY 19 kts

San Juan County Technical Manual - (12 hour) - Recovery System Detail Recovery System SHEARWATER

Offloading Detail Offloading narrative and pump rate description: The recovery system may be offloaded to available storage system barge when the temporary storage associated with the SHEARWATER is full. Transfer pump on the skimmer may be used. Transfer rate estimated at 12 bbl/min.

Mobilization Detail Mobilization method for recovery device with onboard boom (land/water): WaterMobilization method for each workboat (land/water): Water

Time for the entire system to arrive onscene (mobilization for all resources detailed above): Estimated at 3 hours (assuming 1 hour MOB for dedicated vessels per WAC 173-182-350(3)). Subject to weather, safety and other factors.

Support resources for mobilization: None required Support resources for deployment: None required

Equipment Photographs

EAGLE OSPREY SHEARWATER

Page 9: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 9

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

PRC/ dedicated 3014 OSRV OSRV2 WESTERN GULL Skimmer,JBF 6000 286 0 3 Bellingham WA In Water

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

PRC/ dedicated 3129 Vessel WB3 AVOCET Work Boat, 36' 0 0 0 2 Seattle WA In WaterPRC/ dedicated 3097 Vessel WB3 MALLARD Work Boat, 38' 0 0 0 2 Port Angeles WA In WaterPRC/ dedicated 3098 Boom B2

MALLARD, Boom, Kepner 20" 0 0 1500 0 Port Angeles WA MALLARD

Night Operations (describe how this system is capable to support night ops): This recovery system is capable of night operations using vessel lighting and vessel-based thermal infrared camera. Night operations are subject to safety, weather and other considerations.

San Juan County Technical Manual - (12 hour) - Recovery System Detail Recovery System WESTERN GULL

Tactic purpose and description: The purpose of this tactic is on-water recovery of oil in an open water operating environment. This tactic assumes the OSRV2 WESTERN GULL will be enhanced by the WB3 AVOCET and WB3 MALLARD using two 300' legs of B2 boom in a V formation. To promote the ability for continuous recovery operations, the tactic assumes that recovered oil is off loaded to available on-water storage. See Storage Systems OSRB 380, OSRB KITTIWAKE, & OSRB PELICAN.

Operating environment: Open Water waves 0-6 ft.

Oil type skimmer is optimized for: Group 2-4

Minimum number of response personnel for a 12 hour shift (also list 24 hour shift if the system conducts night operations): Estimated at 7/14, subject to circumstances at hand.

Recovery Device Detail

Associated Vessel and Boom Detail

Page 10: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 10

Transit speeds (only list if an alternative was granted by Ecology): Estimate for WESTERN GULL 9 kts, AVOCET 25 kts, MALLARD 24 kts

San Juan County Technical Manual - (12 hour) - Recovery System Detail Recovery System WESTERN GULL

Offloading Detail Offloading narrative and pump rate description: The recovery system may be offloaded to available storage system barge when the temporary storage associated with WESTERN GULL is full. Transfer pump on the skimmer may be used. Transfer rate estimated at 12 bbl/min.

Mobilization Detail Mobilization method for recovery device (land/water): WaterMobilization method for each workboat with onboard boom (land/water): Water

Time for the entire system to arrive onscene (mobilization for all resources detailed above): Estimated at 4 hours (assuming 1 hour MOB for dedicated vessels per WAC 173-182-350(3)). Subject to weather, safety and other factors.

Support resources for mobilization: None required Support resources for deployment: None required

Equipment Photographs

MALLARD AVOCET WESTERN GULL

Page 11: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 11

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

PRC/ dedicated 7510 Storage TB2 OSRB, 380 Tank Barge 0 38000 0 2 Port Angeles WA In Water

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

LOI/ NON- dedicated LOI Tug TUG2 LOI >1,500 HP 0 0 0 6 Puget Sound WA In Water

Night Operations (describe how this system is capable to support night ops): This storage system is capable of night operations using onboard lighting. Night operations are subject to safety, weather and other considerations.

San Juan County Technical Manual - (12 hour) - Storage System Detail Storage System OSRB 380

Tactic purpose and description: The purpose of this tactic is to provide open water capable on-water storage capacity for recovered oily water. This tactic assumes the OSRB 380 will be deployed using a tug available under MSRC letter of intent.

Operating environment: Open Water waves 0-6 ft.

Oil type: Group 1-5

Minimum number of response personnel for a 12 hour shift (also list 24 hour shift if the system conducts night operations): Estimated at 2/4, subject to circumstances at hand.

Recovery Device Detail

Associated Vessel and Boom Detail

Page 12: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 12

Transit speeds (only list if an alternative was granted by Ecology): Estimate for OSRB 380 8kts

San Juan County Technical Manual - (12 hour) - Storage System Detail Storage System OSRB 380

Offloading Detail Offloading narrative and pump rate description: OSRB 380 may be offloaded to shoreside storage when full. Transfer pump on the barge may be used. Transfer rate estimated at 90 bbl/min unless the receiving facility has a limitation.

Mobilization Detail Mobilization method for storage device (land/water): WaterMobilization method for tug (land/water): Water

Time for the entire system to arrive onscene (mobilization for all resources detailed above): Estimated at 5 hours (assuming 3 hour MOB for non-dedicated tug per WAC 173-182-350(3)). Subject to weather, safety and other factors.

Support resources for mobilization: None required Support resources for deployment: A non-dedicated tug may be used to tow OSRB 380.

Equipment Photographs

OSRB 380

Page 13: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 13

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

PRC/ dedicated 3112 Storage TB2 OSRB, KITTIWAKE Tank Barge 0 23400 0 2 Bellingham WA Barge

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

LOI/ NON- dedicated LOI Tug TUG2 LOI >1,500 HP 0 0 0 6 Puget Sound WA In Water

Oil type: Group 1-5

Minimum number of response personnel for a 12 hour shift (also list 24 hour shift if the system conducts night operations): Estimated at 2/4, subject to circumstances at hand.

Recovery Device Detail

Associated Vessel and Boom Detail

Night Operations (describe how this system is capable to support night ops): This storage system is capable of night operations using onboard lighting. Night operations are subject to safety, weather and other considerations.

San Juan County Technical Manual - (12 hour) - Storage System Detail Storage System OSRB KITTIWAKE

Tactic purpose and description: The purpose of this tactic is to provide open water capable on-water storage capacity for recovered oily water. This tactic assumes the OSRB KITTIWAKE will be deployed using a tug available under MSRC letter of intent.

Operating environment: Open Water waves 0-6 ft.

Page 14: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 14

Time for the entire system to arrive onscene (mobilization for all resources detailed above): Estimated at 5 hours (assuming 3 hour MOB for non-dedicated tug per WAC 173-182-350(3)). Subject to weather, safety and other factors.

Support resources for mobilization: None required Support resources for deployment: A non-dedicated tug may be used to tow OSRB KITTIWAKE.

Equipment Photographs

Transit speeds (only list if an alternative was granted by Ecology): Estimate for OSRB KITTIWAKE 8 kts

San Juan County Technical Manual - (12 hour) - Storage System Detail Storage System OSRB KITTIWAKE

Offloading Detail Offloading narrative and pump rate description: OSRB KITTIWAKE may be offloaded to shoreside storage when full. Transfer pump on the barge may be used. Transfer rate estimated at 45 bbl/min unless the receiving facility has a limitation.

Mobilization Detail Mobilization method for storage device (land/water): WaterMobilization method for tug (land/water): Water

OSRB KITTIWAKE

Page 15: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 15

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

PRC/ dedicated 3108 OSRV OSRV2 ARCTIC TERN Skimmer, JBF 276 0 3 Neah Bay WA In WaterPRC/ dedicated 7528

Skimmer Portable SK1 ARCTIC TERN

Skimmer, STRESS Weir 15840 0 0 0 Neah Bay WA

ARCTIC TERN

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

PRC/ dedicated 3099 Vessel WB3 LOON Work Boat, 38' 0 0 0 2 Neah Bay WA In WaterPRC/ dedicated 3140 Vessel WB3 COOT Work Boat, 36' 0 0 0 2 Tacoma WA In WaterPRC/ dedicated 3100 Boom B2

LOON, Boom, Kepner 20" 0 0 1500 0 Neah Bay WA LOON

San Juan County Technical Manual - (12 hour) - Recovery System Detail Recovery System ARCTIC TERN

Operating environment: Open Water waves 0-6 ft.

Oil type skimmer is optimized for: Group 2-4

Minimum number of response personnel for a 12 hour shift (also list 24 hour shift if the system conducts night operations): Estimated at 7/14, subject to circumstances at hand.

Tactic purpose and description: The purpose of this tactic is on-water recovery of oil in an open water operating environment. This tactic assumes the OSRV2 ARCTIC TERN will be enhanced by the WB3 LOON and WB3 COOT using two 300' legs of B2 boom in a V formation. To promote the ability for continuous recovery operations, the tactic assumes that recovered oil is off loaded to available on-water storage. See Storage Systems OSRB 380, OSRB KITTIWAKE, & OSRB PELICAN.

Night Operations (describe how this system is capable to support night ops): This recovery system is capable of night operations using vessel lighting and vessel-based thermal infrared camera. Night operations are subject to safety, weather and other considerations.

Recovery Device Detail

Associated Vessel and Boom Detail

Page 16: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 16

Equipment Photographs

Mobilization Detail Mobilization method for recovery device (land/water): WaterMobilization method for each workboat with onboard boom (land/water): WaterTransit speeds (only list if an alternative was granted by Ecology): Estimate for ARCTIC TERN 9 kts, LOON 24 kts, COOT 25 kts

Time for the entire system to arrive onscene (mobilization for all resources detailed above): Estimated at 8 hours (assuming 1 hour MOB for dedicated vessels per WAC 173-182-350(3)). Subject to weather, safety and other factors.

Support resources for mobilization: None required

Offloading Detail

Support resources for deployment: None required

Offloading narrative and pump rate description: The recovery system may be offloaded to available storage system barge when the temporary storage associated with ARCTIC TERN is full. Transfer pump on the skimmer may be used. Transfer rate estimated at 12 bbl/min.

San Juan County Technical Manual - (12 hour) - Recovery System Detail Recovery System ARCTIC TERN

COOT LOON ARCTIC TERN

Page 17: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 17

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

PRC/ dedicated 31075 Boom B2

Buster #4, System B Buster #4 0 196 200 0 Everett WA On Trailer

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

NON- dedicated VOO Vessel WB3 Workboat Workboat 0 0 0 2 Puget Sound WA In WaterNON- dedicated VOO Vessel WB3 Workboat Workboat 0 0 0 2 Puget Sound WA In Water

Night Operations (describe how this system is capable to support night ops): This storage system is capable of night operations using lighting and navigation equipment of VOO vessels. Night operations are subject to safety, weather and other considerations.

San Juan County Technical Manual - (12 hour) - Storage System Detail Storage System BUSTER #4

Tactic purpose and description: The purpose of this tactic is to provide open water capable on-water collection and storage capacity for recovered oil. This tactic assumes the Buster will be deployed using two workboats capable of towing unit astern. To promote the ability for continuous recovery operations, the tactic assumes that collected oil is off loaded to available on-water storage.

Operating environment: Open Water waves 0-6 ft.

Oil type: Group 2-4

Minimum number of response personnel for a 12 hour shift (also list 24 hour shift if the system conducts night operations): Estimated at 4/8, subject to circumstances at hand.

Recovery Device Detail

Associated Vessel and Boom Detail

Page 18: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 18

Transit speeds (only list if an alternative was granted by Ecology): n/a

San Juan County Technical Manual - (12 hour) - Storage System Detail Storage System BUSTER #4

Offloading Detail Offloading narrative and pump rate description: Buster may be offloaded to on-water storage when full. Transfer pump options vary. Transfer rate estimated at 10-90 bbl/min.

Mobilization Detail Mobilization method for Buster (land/water): LandMobilization method for each workboat (land/water): Water

Time for the entire system to arrive onscene (mobilization for all resources detailed above): Estimated at 12 hours (assuming 3 hour MOB for non-dedicated vessels per WAC 173-182-350(3)). Subject to weather, safety and other factors.

Support resources for mobilization: PRC/dedicated truck. Support resources for deployment: Two non-dedicated workboats (VOO) may be used to deploy Buster.

Equipment Photographs

BUSTER #4

Page 19: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 19

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

PRC/ dedicated 3016 Storage TB2 OSRB, PELICAN Tank Barge 0 11900 0 2 Tacoma WA Barge

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

LOI/ NON- dedicated LOI Tug TUG2 LOI >1,500 HP 0 0 0 6 Puget Sound WA In Water

Oil type: Group 1-5

Minimum number of response personnel for a 12 hour shift (also list 24 hour shift if the system conducts night operations): Estimated at 2/4, subject to circumstances at hand.

Recovery Device Detail

Associated Vessel and Boom Detail

Night Operations (describe how this system is capable to support night ops): This storage system is capable of night operations using onboard lighting. Night operations are subject to safety, weather and other considerations.

San Juan County Technical Manual - (24 hour) - Storage System Detail Storage System OSRB PELICAN

Tactic purpose and description: The purpose of this tactic is to provide open water capable on-water storage capacity for recovered oily water. This tactic assumes the OSRB PELICAN will be deployed using a tug available under MSRC letter of intent.

Operating environment: Open Water waves 0-6 ft.

Page 20: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 20

Time for the entire system to arrive onscene (mobilization for all resources detailed above): Estimated at 13 hours (assuming 3 hour MOB for non-dedicated tug per WAC 173-182-350(3)). Subject to weather, safety and other factors.

Support resources for mobilization: None required Support resources for deployment: A non-dedicated tug may be used to tow OSRB PELICAN.

Equipment Photographs

Transit speeds (only list if an alternative was granted by Ecology): Estimate for OSRB PELICAN 8 kts

San Juan County Technical Manual - (24 hour) - Storage System Detail Storage System OSRB PELICAN

Offloading Detail Offloading narrative and pump rate description: OSRB PELICAN may be offloaded to shoreside storage when full. Transfer pump on the barge may be used. Transfer rate estimated at 52 bbl/min unless the receiving facility has a limitation.

Mobilization Detail Mobilization method for storage device (land/water): WaterMobilization method for tug (land/water): Water

OSRB PELICAN

Page 21: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 21

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

PRC/ dedicated 7518 OSRV OSRV1

OREGON RESPONDER Skimmer, Transrec 10567 14000 0 10 Astoria OR In Water

OwnershipwrrlID or other ID Resource Kind Type Indentification Specifications

Recovery EDRC

Liquid Storage Boom People Home Base State Staging

PRC/ dedicated 7522 Vessel WB3

OREGON RESPONDER, 16-1 Workboat 32' 0 0 0 2 Astoria OR Ship

PRC/ dedicated 7514 Boom B1

OREGON RESPONDER, Boom 67" 0 0 1320 0 Astoria OR Ship

Night Operations (describe how this system is capable to support night ops): This recovery system is capable of night operations using vessel lighting and vessel-based X-band radar and thermal infrared camera. Night operations are subject to safety, weather and other considerations.

San Juan County Technical Manual - (24 hour) - Recovery System Detail Recovery System OREGON RESPONDER

Tactic purpose and description: The purpose of this tactic is on-water recovery of oil in an open water operating environment. This tactic assumes the OSRV1 OREGON RESPONDER will be enhanced by the WB3 16-1 using a 660' leg of B1 boom in a J formation. To promote the ability for continuous recovery operations, the tactic assumes that recovered oil is off loaded to available on-water storage. See Storage Systems OSRB 380, OSRB KITTIWAKE, & OSRB PELICAN.

Operating environment: Open Water waves 0-6 ft.

Oil type skimmer is optimized for: Group 2-4

Minimum number of response personnel for a 12 hour shift (also list 24 hour shift if the system conducts night operations): Estimated at 12/20, subject to circumstances at hand.

Recovery Device Detail

Associated Vessel and Boom Detail

Page 22: MSRC PAC/NW Region Technical Manual - San Juan County … › ecy › ezshare › sppr › Preparedness › ... · 2018-01-25 · Response Personnel hold current 8, 24 or 40 hour

MSRC PAC/NW Region Technical Manual - San Juan County Planning Standard (WAC 173-182-370) 22

Transit speeds (only list if an alternative was granted by Ecology): Estimate for OREGON RESPONDER 12 kts

San Juan County Technical Manual - (24 hour) - Recovery System Detail Recovery System OREGON RESPONDER

Offloading Detail Offloading narrative and pump rate description: The recovery system may be offloaded to available storage system barge when the temporary storage associated with the OREGON RESPONDER is full. Transfer pump on the skimmer may be used. Transfer rate estimated at 33 bbl/min.

Mobilization Detail Mobilization method for recovery device with onboard boom (land/water): WaterMobilization method for each workboat: Water

Time for the entire system to arrive onscene (mobilization for all resources detailed above): Estimated at 19 hours (assuming 1 hour MOB for dedicated vessels per WAC 173-182-350(3)). Subject to weather, safety and other factors.

Support resources for mobilization: None required Support resources for deployment: None required

Equipment Photographs

16-1 OREGON RESPONDER