MTI ENGINEERING ORGANISATIONAL PROFILE 1 2017/01/07 Revision 01 (Template Revision Date: 2016/03/02) Head Office P.O. Box 306, Carletonville, South Africa, 2500 Tel: +27 (0)18 786 1210 Fax: +27 (0)18 788 4341 Email: [email protected] GPS co-ordinates: SOUTH 26º 20, 917 EAST 27º 24, 975 Vat.No.: 4200105429 Reg.No.: 1988/05995/07

Upload: lediep

Post on 06-Feb-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

MTI

ENGINEERING ORGANISATIONAL

PROFILE

12017/01/07 Revision 01 (Template Revision Date: 2016/03/02)

Head Office

P.O. Box 306, Carletonville,

South Africa, 2500

Tel: +27 (0)18 786 1210

Fax: +27 (0)18 788 4341

Email: [email protected]

GPS co-ordinates:

SOUTH 26º 20, 917

EAST 27º 24, 975

Vat.No.: 4200105429

Reg.No.: 1988/05995/07

Our Vision:To be the preferred partner of choice for turnkey projects in the mining and

construction industry through the provision of world class metal and engineering services.

Our Mission:

We will achieve our vision through continuous interaction with our customers providing safe and high quality products and services.

Values:

• Honesty

• Trustworthiness

• Commitment

• Customer satisfaction

• Teamwork

• Employee wellbeing

2017/01/07 2

VISION & MISSION

MTI Engineering, trading as Mine-Tech Industries was established in 1988 to offer its clients

reliable, high quality and cost effective mechanical, electrical and civil products and services.

Over the years MTI Engineering has established itself as the preferred supplier of structural and

civil engineering services to the mining industry.

MTI Engineering offers its clients structural and civil design services and detailing, steel

fabrication, site erection and project management.

MTI Engineering is devoted to the continuous development and growth of its employees,

products and services and a culture of quality, is engendered through leadership, training and

communication.

Company Overview

32017/01/07

2017/01/07 4

Management Structure

Operations Director

Johan SchoemanCorporate Services

Director

Jacel Visagie

Financial

Supervisor

Elisme

Schoeman

Director

Jonas Maxolo (& Workers Trustee)

Health &

Safety

Officer

Uil Marx

Estimator

Patrick

Welman

Logistics’

Controller

Rassie vd

Berg

Area Manager

Tommy Palmer

Site Manager

Ettiene

Fourie

2017/01/07 5

Accident Analysis

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

LTI 7 3 2 4 6 3 2 2 1

Reportable 2 3 1 0 1 2 1 1

Fatal 0 0 0 0 0 0

0

1

2

3

4

5

6

7

8

2017/01/07 6

Injury Frequency Rates

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

LTIFR 35,5 12,8 8,1 9,1 13,3 7,6 5,6 9,5 3,8

RIFR 10,1 12,8 4,1 0,0 2,2 5,1 2,8 3,2 0,0

FIFR 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0

LTIFR BENCHMARK 21 15 10 7 7 7 6 6 6 1

RIFR BENCHMARK 9 7 5 3 3 3 3 3 3 0

FIFR BENCHMARK 0 0 0 0 0 0 0 0 0 0

0,0

5,0

10,0

15,0

20,0

25,0

30,0

35,0

40,0

Rat

es p

er 1

00

00

00

man

ho

urs

wo

rked

MTI Engineering is a level 8 Empowering Supplier in terms of the

government gazetted code of good practice on B-BBEE.

The Company is committed to the empowerment of HDI and is

committed to all the elements of the B-BBEE Act. MTI Engineering

has a 26% HDI employee trust.

BBBEE certificate available on request.

2017/01/07 7

BEE

2017/01/07 8

Photo Gallery

AngloGold Ashanti – Ice Plant Structure

Anglo Platinum – Vent Ducting

2017/01/07 9

Photo Gallery

South Deep – Backfill Plant South Deep – Backfill Plant

2017/01/07 10

Photo Gallery

Ekurhuleni Municipality – Pedestrian Bridge Letseng Diamonds – Conveyor System

South Deep – Cip Tank Gold Fields – 800nb Pipe Line

2017/01/07 11

Photo Gallery

Xstrata Rhovan – 3CR12 Barren Tank

Technicrete – Brick Plant (Witbank)

Sibanye Gold Kloof - Overland Conveyor Head

Pulleys

2017/01/07 12

Photo GalleryXstrata Rhoven - MC7 Conveyor and Feed Chute

System

Sibanye Gold Kloof - Overland Conveyor

2017/01/07 13

Photo Gallery

Driefontein – 1.5 Megaliter Water Tank Driefontein - CSP Project

2017/01/07 14

Photo GallerySibanye Gold Kloof -

Growth Project & Growth Plant Upgrade for Gold Recovery from Rock Dump

2017/01/07 15

Photo Gallery

Growth Project & Growth

Plant Upgrade for Gold

Recovery from Rock Dump

Sibanye Gold Kloof -

2017/01/07 16

Photo Gallery

Vehicle Fleet

Vehicle Fleet:

MTI Engineering’s fleet

consist of one JCB Loadall

540-170, a HINO 13-237F

with a 3ton HIAB crane,

Maxus V80, Datsun Go and

six Toyota Hilux bakkies.

Workshop Facilities:

Combined workspace in excess of 1790m²

equipped with

a 10 ton, 5 ton and 2 ton overhead crane and

two 3 ton electric crawls. Other equipment

includes plate rollers, bending brake, punch and

shears, magnetic base drill, milling machines,

vertical boring mill, pedestal drill and grinder etc.

2017/01/07 17

Project History-Milestones

Project: Kao Mine Plant Upgrade Project

Client: Storm Mountain Diamonds - Lesotho

Project Value: R 46 595 124.87 (Forty six million rand)

Execution Date: Current

Project: New Coarse Final Recovery Plant

Client: Letseng Diamonds - Lesotho

Project Value: R 7 000 000.00 (Seven million rand)

Execution Date: March 2015 – September 2015

Project: Refrigeration Plant

Client: BBE Projects - Driefontein

Project Value: R 6 000 000.00 (Six million rand)

Execution Date: April 2015 – October 2015

Project: 1.5 Megaliter Water Tank

Client: Sibanye Gold - Driefontein

Project Value: R 4000 000.00 (Four million rand)

Execution Date: March 2015 – Sept 2015

Project: Brick Plant

Client: Technicrete - Witbank

Project Value: R2 000 000.00 (Two million rand)

Execution Date: January 2014 – March 2014

Project: Overland Conveyor – Manufacturing & installation

Client: Sibanye Gold - Kloof

Project Value: R20 000 000.00 (Twenty million rand)

Execution Date: October 2012 – March 2014

Project: Solid Ice Plant

Client: Mponeng – Anglo Gold

Project Value: R 7 000 000.00 (Seven million rand)

Execution Date: April 2013 – January 2014

2017/01/07 18

Project History-Milestones

Project: Merensky Upgrade – Structural steel, tanks and pipework

Client: Impala - Rustenburg

Project Value: R10 000 000.00 (Ten million rand)

Execution Date: February 2013 – July 2013

Project: MC7 Conveyor – Conveyor and feed chute system

Client: Xstrata - Rhovan Rustenburg

Project Value: R10 000 000.00 (Ten million rand)

Execution Date: November 2012 – August 2013

Project: Growth Plant Upgrade (“upstage” gold recovery from

rock dump)

Client: Sibanye Gold - Kloof

Project Value: R10 000 000.00 (Ten million rand)

Execution Date: February 2012 – Jun 2012

Project: Growth Project (gold recovery from rock dump)

Client: Sibanye Gold - Kloof

Project Value: R5 000 000.00 (Five million rand)

Execution Date: September 2011 – January 2012

Project: Conveyor System – Conveyor and feed chute system

Client: Letseng Diamonds - Lesotho

Project Value: R7 000 000.00 (Seven million rand)

Execution Date: December 2009 – October 2010

Project: Filter Building – Structural steel and sheeting

Client: Vametco - Brits

Project Value: R4 000 000.00 (Four million rand)

Execution Date: February 2009 – August 2009

Project: Waste Loading Station–Conveyor, feed chute &

pumping system

Client: Harmony Mine - Randfontein

Project Value: R15 000 000.00 (Fifteen million rand)

Execution Date: March 2008 – February 2009

MTI Engineering Contact Details

PO BOX 306 Tel: (018) 786-1210

Carletonville, Fax: (018) 788-4341

2500 Email: [email protected]

16 Kleim Street,

Industrial Area,

Carletonville

Work done for:

• Sibanye Gold Xstrata Rhovan

• ADP Projects (Pty) Ltd Thyssenkrupp/ Polysius

• Corobrick Aveng Grinaker

• Concor Technicrete MDM Engineering

• Impala Platinum Evraz Vametco

• Howden Process Compressor Lonmin Platinum

• Nola De Beers

• Anglogold Zinc Corp – Kumba Resources

• Harmony Master Drilling

• Pilanesberg Platinum Mines Gold Fields

2017/01/07 19

Contact Us / List of Vendors