mti engineeringmtiengineering.co.za/wp-content/uploads/2017/01/mti-organisational... · mti...
TRANSCRIPT
MTI
ENGINEERING ORGANISATIONAL
PROFILE
12017/01/07 Revision 01 (Template Revision Date: 2016/03/02)
Head Office
P.O. Box 306, Carletonville,
South Africa, 2500
Tel: +27 (0)18 786 1210
Fax: +27 (0)18 788 4341
Email: [email protected]
GPS co-ordinates:
SOUTH 26º 20, 917
EAST 27º 24, 975
Vat.No.: 4200105429
Reg.No.: 1988/05995/07
Our Vision:To be the preferred partner of choice for turnkey projects in the mining and
construction industry through the provision of world class metal and engineering services.
Our Mission:
We will achieve our vision through continuous interaction with our customers providing safe and high quality products and services.
Values:
• Honesty
• Trustworthiness
• Commitment
• Customer satisfaction
• Teamwork
• Employee wellbeing
2017/01/07 2
VISION & MISSION
MTI Engineering, trading as Mine-Tech Industries was established in 1988 to offer its clients
reliable, high quality and cost effective mechanical, electrical and civil products and services.
Over the years MTI Engineering has established itself as the preferred supplier of structural and
civil engineering services to the mining industry.
MTI Engineering offers its clients structural and civil design services and detailing, steel
fabrication, site erection and project management.
MTI Engineering is devoted to the continuous development and growth of its employees,
products and services and a culture of quality, is engendered through leadership, training and
communication.
Company Overview
32017/01/07
2017/01/07 4
Management Structure
Operations Director
Johan SchoemanCorporate Services
Director
Jacel Visagie
Financial
Supervisor
Elisme
Schoeman
Director
Jonas Maxolo (& Workers Trustee)
Health &
Safety
Officer
Uil Marx
Estimator
Patrick
Welman
Logistics’
Controller
Rassie vd
Berg
Area Manager
Tommy Palmer
Site Manager
Ettiene
Fourie
2017/01/07 5
Accident Analysis
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
LTI 7 3 2 4 6 3 2 2 1
Reportable 2 3 1 0 1 2 1 1
Fatal 0 0 0 0 0 0
0
1
2
3
4
5
6
7
8
2017/01/07 6
Injury Frequency Rates
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
LTIFR 35,5 12,8 8,1 9,1 13,3 7,6 5,6 9,5 3,8
RIFR 10,1 12,8 4,1 0,0 2,2 5,1 2,8 3,2 0,0
FIFR 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0
LTIFR BENCHMARK 21 15 10 7 7 7 6 6 6 1
RIFR BENCHMARK 9 7 5 3 3 3 3 3 3 0
FIFR BENCHMARK 0 0 0 0 0 0 0 0 0 0
0,0
5,0
10,0
15,0
20,0
25,0
30,0
35,0
40,0
Rat
es p
er 1
00
00
00
man
ho
urs
wo
rked
MTI Engineering is a level 8 Empowering Supplier in terms of the
government gazetted code of good practice on B-BBEE.
The Company is committed to the empowerment of HDI and is
committed to all the elements of the B-BBEE Act. MTI Engineering
has a 26% HDI employee trust.
BBBEE certificate available on request.
2017/01/07 7
BEE
2017/01/07 10
Photo Gallery
Ekurhuleni Municipality – Pedestrian Bridge Letseng Diamonds – Conveyor System
South Deep – Cip Tank Gold Fields – 800nb Pipe Line
2017/01/07 11
Photo Gallery
Xstrata Rhovan – 3CR12 Barren Tank
Technicrete – Brick Plant (Witbank)
Sibanye Gold Kloof - Overland Conveyor Head
Pulleys
2017/01/07 12
Photo GalleryXstrata Rhoven - MC7 Conveyor and Feed Chute
System
Sibanye Gold Kloof - Overland Conveyor
2017/01/07 14
Photo GallerySibanye Gold Kloof -
Growth Project & Growth Plant Upgrade for Gold Recovery from Rock Dump
2017/01/07 15
Photo Gallery
Growth Project & Growth
Plant Upgrade for Gold
Recovery from Rock Dump
Sibanye Gold Kloof -
2017/01/07 16
Photo Gallery
Vehicle Fleet
Vehicle Fleet:
MTI Engineering’s fleet
consist of one JCB Loadall
540-170, a HINO 13-237F
with a 3ton HIAB crane,
Maxus V80, Datsun Go and
six Toyota Hilux bakkies.
Workshop Facilities:
Combined workspace in excess of 1790m²
equipped with
a 10 ton, 5 ton and 2 ton overhead crane and
two 3 ton electric crawls. Other equipment
includes plate rollers, bending brake, punch and
shears, magnetic base drill, milling machines,
vertical boring mill, pedestal drill and grinder etc.
2017/01/07 17
Project History-Milestones
Project: Kao Mine Plant Upgrade Project
Client: Storm Mountain Diamonds - Lesotho
Project Value: R 46 595 124.87 (Forty six million rand)
Execution Date: Current
Project: New Coarse Final Recovery Plant
Client: Letseng Diamonds - Lesotho
Project Value: R 7 000 000.00 (Seven million rand)
Execution Date: March 2015 – September 2015
Project: Refrigeration Plant
Client: BBE Projects - Driefontein
Project Value: R 6 000 000.00 (Six million rand)
Execution Date: April 2015 – October 2015
Project: 1.5 Megaliter Water Tank
Client: Sibanye Gold - Driefontein
Project Value: R 4000 000.00 (Four million rand)
Execution Date: March 2015 – Sept 2015
Project: Brick Plant
Client: Technicrete - Witbank
Project Value: R2 000 000.00 (Two million rand)
Execution Date: January 2014 – March 2014
Project: Overland Conveyor – Manufacturing & installation
Client: Sibanye Gold - Kloof
Project Value: R20 000 000.00 (Twenty million rand)
Execution Date: October 2012 – March 2014
Project: Solid Ice Plant
Client: Mponeng – Anglo Gold
Project Value: R 7 000 000.00 (Seven million rand)
Execution Date: April 2013 – January 2014
2017/01/07 18
Project History-Milestones
Project: Merensky Upgrade – Structural steel, tanks and pipework
Client: Impala - Rustenburg
Project Value: R10 000 000.00 (Ten million rand)
Execution Date: February 2013 – July 2013
Project: MC7 Conveyor – Conveyor and feed chute system
Client: Xstrata - Rhovan Rustenburg
Project Value: R10 000 000.00 (Ten million rand)
Execution Date: November 2012 – August 2013
Project: Growth Plant Upgrade (“upstage” gold recovery from
rock dump)
Client: Sibanye Gold - Kloof
Project Value: R10 000 000.00 (Ten million rand)
Execution Date: February 2012 – Jun 2012
Project: Growth Project (gold recovery from rock dump)
Client: Sibanye Gold - Kloof
Project Value: R5 000 000.00 (Five million rand)
Execution Date: September 2011 – January 2012
Project: Conveyor System – Conveyor and feed chute system
Client: Letseng Diamonds - Lesotho
Project Value: R7 000 000.00 (Seven million rand)
Execution Date: December 2009 – October 2010
Project: Filter Building – Structural steel and sheeting
Client: Vametco - Brits
Project Value: R4 000 000.00 (Four million rand)
Execution Date: February 2009 – August 2009
Project: Waste Loading Station–Conveyor, feed chute &
pumping system
Client: Harmony Mine - Randfontein
Project Value: R15 000 000.00 (Fifteen million rand)
Execution Date: March 2008 – February 2009
MTI Engineering Contact Details
PO BOX 306 Tel: (018) 786-1210
Carletonville, Fax: (018) 788-4341
2500 Email: [email protected]
16 Kleim Street,
Industrial Area,
Carletonville
Work done for:
• Sibanye Gold Xstrata Rhovan
• ADP Projects (Pty) Ltd Thyssenkrupp/ Polysius
• Corobrick Aveng Grinaker
• Concor Technicrete MDM Engineering
• Impala Platinum Evraz Vametco
• Howden Process Compressor Lonmin Platinum
• Nola De Beers
• Anglogold Zinc Corp – Kumba Resources
• Harmony Master Drilling
• Pilanesberg Platinum Mines Gold Fields
2017/01/07 19
Contact Us / List of Vendors