MTI Power provides - shop/field machining; shop/field
orbital welding; shop/field manual welding; preheat,
post-heat, and post weld heat treatment; NDE; leak
detection; erection, disassemble, and maintenance on
machinery; industrial construction/maintenance staff
augmentations; as well as; sales/rentals of MTI Power
designed/manufactured machining/welding equipment.
Making Tough Ingenious
1
![Page 2: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/2.jpg)
George Sandora President
45 Years Experience
Andria Sandora VP Finance and Administration
11 Years Experience
Mike Simundza VP Operations
30 Years Experience
Executive Management
2
![Page 3: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/3.jpg)
Objective Deliver each/every MTI Power product and service
in full/complete compliance with all applicable:
contracts, design drawings, codes, schedules,
standards, statutes, processes, and safety
procedures.
3
![Page 4: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/4.jpg)
Corporate Background Since the founder/owner of MTI Power, Mr. George
Sandora, is focused almost entirely on the needs/well
being of his customers; it is an absolute fact that the
entire MTI Power organization shall be: easy to contact,
quick to respond, and fast to fix … all concerns/problems
that occur.
4
![Page 5: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/5.jpg)
Typical Power Generation
Customers • AMEC Foster Wheeler
• American Electric Power
• Bechtel
• Exelon
• Hayes
• Kiewit
• Power Maintenance
and Constructors
• Siemens
• TEI Construction
• URS Corporation
5
![Page 6: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/6.jpg)
Typical Midstream Pipeline
Customers • US Pipeline
• Michels Corporation
6
• Matrix NAC
• Minnesota Limited LLC
![Page 7: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/7.jpg)
Past Steam Generator
Replacement Work • Almaraz Nuclear
• Braidwood Nuclear
• Byron Nuclear
• Calvert Cliffs Nuclear
• Shearon Harris Nuclear
• Donald C. Cook Nuclear
• Farley Nuclear Plant
• HP Robinson Nuclear
• Indian Point Energy Center
• Kori Nuclear
• North Anna Nuclear
• Point Beach Nuclear
• St. Lucie Nuclear
• Turkey Point Nuclear
7
![Page 8: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/8.jpg)
Previous Retrofit Work • Donald C. Cook Nuclear
• Susquehanna Nuclear
8
![Page 9: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/9.jpg)
Common Forced Outage and
Maintenance Tasks Completed • CO2 piping
• Expansion joints
•Gland steam piping
•High pressure turbine piping
• Hydrogen control system
• Hydrogen filter
• Hydrogen piping
• Installation of dry cask
storage containers
9
![Page 10: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/10.jpg)
Common Forced Outage and
Maintenance Tasks Completed • Installation of Mitsubishi
transformers
• Lift oil pumps
• LP expansion joints
• LP rotor replacement
• Lube oil piping
• Security system installation
• Upgrade 765KV and 354 KV
transmission lines
• Weld overlay
10
![Page 11: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/11.jpg)
Certifications MTI Power holds The National Board of Boiler and
Pressure Vessel Inspectors “NB” mark and
“R” SYMBOL; as well as; MTI Power possesses the
ASME “PP” mark, ASME “S” mark, and ASME “U” mark.
11
![Page 12: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/12.jpg)
Certification MTI Power is currently strengthening our “Quality System
Manual” in preparation for the MTI Power application to
The National Board of Boiler and Pressure Vessel
Inspectors “NR” SYMBOL.
12
![Page 13: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/13.jpg)
Safety MTI Power currently has an Experience Modification
Rating (i.e., EMR or ratio of actual losses to expected losses
over a rolling three year period average) of 0.71 or
“excellent”.
13
![Page 14: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/14.jpg)
Safety However, Workers’ Compensation Claims and
OSHA Recordable are separate subjects. In part, because it
is very possible to have an OSHA Recordable Rate over the
national average and also have an EMR below 1.0;
MTI Power has provided additional safety related
information and statistics.
14
![Page 15: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/15.jpg)
Safety
The North American Industry Classification System
(i.e., NAICS) Lost-Time Injury Rate (i.e., LTIR) for
MTI Power employment size is 1.4.
MTI Power LTIR is 0.0
15
![Page 16: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/16.jpg)
Safety The NAICS Total Recordable Incident Rate (i.e., TRIR) for
MTI Power employment size is 4.1
MTI Power TRIR is 0.0
16
![Page 17: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/17.jpg)
Signatory
MTI Power is a signatory to the:
General Presidents’ Project Maintenance Agreement,
National Maintenance Agreement,
United Association National Specialty Agreement, and
National Construction Agreement.
17
![Page 18: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/18.jpg)
Core Team MTI Power keeps a mainstay workforce of highly skilled
machinists, welders, pipefitters, and millwrights. These
direct labor personnel are supported by very
knowledgeable/very experienced frontline supervision.
Additionally, MTI Power has project managers, field
superintendents, and field coordinators ready to
meet/overcome shop/site challenges. 18
![Page 19: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/19.jpg)
Project Management MTI Power routinely works with our customers; as well as;
the customers Architects and Engineers to reduce required
construction time/job cost using “value engineering”.
19
![Page 20: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/20.jpg)
Facilities MTI Power’s headquarters is near Chicago in Marseilles,
Illinois. This resource includes a 40,000 square foot
manufacturing facility containing over 300 shop/field
milling/welding machines … ready to serve our customers.
MTI Power also has a regional office located in Melbourne,
Florida.
20
![Page 21: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/21.jpg)
Foreign Work Locations MTI Power has successfully served our clients in Germany,
Mexico, Peru, Saint Croix, Saudi Arabia, South Korea,
Thailand, Trinidad, United Arab Emirates, United Kingdom,
and United States.
21
![Page 22: MTI Power Presentation R6 Dated 02-09-2016](https://reader033.vdocument.in/reader033/viewer/2022042907/587ad8731a28ab542b8b4a53/html5/thumbnails/22.jpg)
For the MTI Power Team …
Thank You!
Thank You!
22