Slide 1 of 20 25.Feb.2007 by Stevan Picoll i DN607140 TI.04
On this document you can find the following slides:- Generic Location of the BTS Cabinets and Eltek Power Supply- Grounding and Bridge Kit- Location of the Plug In Units- TRX Cabling for 900 and 1800 BTS Cabinets- Entry Cable Standard
- DC and AC Cables- Synchronization Between Cabinets (Master and Slave)- Transmission and Cross-Connection Between Cabinets- Transmission Cable
Ultrasite BTS InstallationHand Book
(GSM 900 DCS 1800)Telecom ImplementationOn this document you can find:
- UltraSite BTS Outdoor Installation
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
2/20
TELECOM IMPLEMENTATION
Slide 2 of 20 25.Feb.2007 by Stevan Picoll i DN607140 TI.04
Generic Location of the Cabinets
Case 1 Case 2Feeder cables going to the left side Feeder cables going to the right side
ATTENTION: 1800 CABINET MIGHT NOT BE APPLICABLE FOR SOME CONFIGURATIONS(ROAD SITES)
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
3/20
TELECOM IMPLEMENTATION
Slide 3 of 20 25.Feb.2007 by Stevan Picoll i DN607140 TI.04
Fixing the CabinetsEnsure the Eltek Cabinet and BTS 900 has a distance (gap) of 1cm.
This gap is needed because the Eltek cabinet has somescrews blocking the opening of the 900 cabinet roof.
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
4/20
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
5/20
TELECOM IMPLEMENTATION
Slide 5 of 20 25.Feb.2007 by Stevan Picoll i DN607140 TI.04
Bridge Kit
ATTENTION: TWO CABINETS MIGHT NOT BE APPLICABLE FOR SOME CONFIGURATIONS(ROAD SITES)
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
6/20
TELECOM IMPLEMENTATION
Slide 6 of 20 25.Feb.2007 by Stevan Picoll i DN607140 TI.04
Location of the Plug-In Units (6+6+6 Configuration)
TRX 1 1800 SECTOR 1
TSDB
TRX 2 1800 SECTOR 1
TSDB
TRX 3 1800 SECTOR 1
TSDB
TRX 4 1800 SECTOR 1
TSDB
TRX 5 1800 SECTOR 2
TSDB
TRX 6 1800 SECTOR 2TSDB
TRX 7 1800 SECTOR 2
TSDB
TRX 8 1800 SECTOR 2
TSDB
TRX 9 1800 SECTOR 3TSDB
TRX 10 1800 SECTOR 3
TSDB
TRX 11 1800 SECTOR 3
TSDB
TRX 12 1800 SECTOR 3
TSDB
B
B
2F
B
B
2F
B
B
2F
B
B
2F
B
B
2F
B
B
2F
B
O
I A
F
X
C
RRI
P
W
SB
P
W
SB
M
2H
A
M
2
H
A
M2
H A
M
2H
A
DVDB
WCDA
WCDA
DVDB
WCDA
WCDA
TRX 1 900 SECTOR 1
TSGB
TRX 2 900 SECTOR 1
TSGB
TRX 3 900 SECTOR 2
TSGB
TRX 4 900 SECTOR 2
TSGB
TRX 5 900 SECTOR 3
TSGB
TRX 6 900 SECTOR 3TSGB
TRX 7 SPACE AVAILABLE
TRX 8 SPACE AVAILABLE
TRX 9 SPACE AVAILABLE
TRX 10 SPACE AVAILABLE
TRX 11 SPACE AVAILABLE
TRX 12 SPACE AVAILABLE
B
B
2F
B
B
2F
B
B
2F
BO
I
A
F
X
C
RRI
P
W
SB
M
2L
A
M
2
L
A
M
2
L
A
DVGA
DVGA
DVGA
DVDB
WCDA
WCDA
M
2
H
A
M
2
H
A
TRX 1 900 SECTOR 1
TSGB
900 SYSTEM1800 SYSTEM
BTS 1800 BTS 900
Plug-In Units can be installed only after BTS Grounding.
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
7/20
TELECOM IMPLEMENTATION
Slide 7 of 20 25.Feb.2007 by Stevan Picoll i DN607140 TI.04
TRX Cabling for 900 Sectors Example
This picture is applicable only for 6+6+6 Configuration
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
8/20
TELECOM IMPLEMENTATION
Slide 8 of 20 25.Feb.2007 by Stevan Picoll i DN607140 TI.04
Location of the Plug-In Units (2+2 or 2+2+2 Configuration)Plug-In Units can be installed only after BTS Grounding.
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
9/20
TELECOM IMPLEMENTATION
Slide 9 of 20 25.Feb.2007 by Stevan Picoll i DN607140 TI.04
TRX Cabling for 900 Sectors
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
10/20
TELECOM IMPLEMENTATION
Slide 10 of 20 25.Feb.2007 by Stevan Picol li DN607140 TI.04
TRX Cabling for 1800 Sectors
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
11/20
TELECOM IMPLEMENTATION
Slide 11 of 20 25.Feb.2007 by Stevan Picol li DN607140 TI.04
Entry Cable Standards
ATTENTION: 1800 CABINET MIGHT NOT BE APPLICABLE FOR SOME CONFIGURATIONS
(ROAD SITES)
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
12/20
TELECOM IMPLEMENTATION
Slide 12 of 20 25.Feb.2007 by Stevan Picol li DN607140 TI.04
1 2 3
Entry Cable Kit How to Use1 When installing Feeder cable, layer 1 must be cut off 2 When installing MW Cable (RG223) DO NOT cut any layer 3 When installing metal pipe, layer 1 or 1 and 2 can be cut4 Never leave a hole if there is no cable or pipe
WRONG
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
13/20
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
14/20
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
15/20
TELECOM IMPLEMENTATION
Slide 15 of 20 25.Feb.2007 by Stevan Picol li DN607140 TI.04
Synchronization Cable UUHANot applicable when only one cabinet is in use
BTS 1800 SLAVE BTS 900 - MASTER
OUTPUTOUTPUT
INPUTINPUT
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
16/20
TELECOM IMPLEMENTATION
Slide 16 of 20 25.Feb.2007 by Stevan Picol li DN607140 TI.04
Synchronization Cable UUHA
During the commissioning, in the Hardware Configuration , for Cabinet Properties,select Use autodetected Clock Synchronization between BTS Cabinets . Not applicable when only one cabinet is in use
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
17/20
TELECOM IMPLEMENTATION
Slide 17 of 20 25.Feb.2007 by Stevan Picol li DN607140 TI.04
BTS 1800 SLAVE BTS 900 - MASTER
Transmission and Cross-Connection Between Cabinets
Not applicable when only one cabinet is in use
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
18/20
TELECOM IMPLEMENTATION
Slide 18 of 20 25.Feb.2007 by Stevan Picol li DN607140 TI.04
Transmission Cable
WRONG
1 Organize MW Cable ins ide of the BTS2 1 or 2 loops are allowed and recommended inside of the BTS3 Labels must be fixed on the cables (Far End Site Code)4 Dummy plates must be ins talled when TX cards are not.
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
19/20
TELECOM IMPLEMENTATION
Slide 19 of 20 25.Feb.2007 by Stevan Picol li DN607140 TI.04
BTS End D9 Male PC End D9 Female
Pin No. 2, LMP In Pin No. 3, Transmitted Data
Pin No. 3, LMP Out Pin No. 2, Received Data
Pin No., Ground Pin No. 5, Ground
Commissioning Cable
-
8/9/2019 MTN - TI - BTS Installation Handbook - DN607140 TI.04.pdf
20/20
TELECOM IMPLEMENTATION
Slide 20 of 20 25.Feb.2007 by Stevan Picol li DN607140 TI.04
EDGE ACTIVATIONFor EDGE Activation, the only thing to be done is to set the ABIS ALLOCATION PROPERLY
1 3 5 7 1 3 5 7 1 3 5 70 0 01 1 1 1 1 1 1 1 1 1 1 1 1 1 12 1 1 1 1 2 1 1 1 1 2 1 1 1 13 2 2 2 2 3 2 2 2 2 3 2 2 2 24 2 2 2 2 4 2 2 2 2 4 2 2 2 25 3 3 3 3 5 3 3 3 3 5 3 3 3 36 3 3 3 3 6 3 3 3 3 6 3 3 3 37 4 4 4 4 7 4 4 4 4 7 4 4 4 48 4 4 4 4 8 4 4 4 4 8 4 4 4 49 5 5 5 5 9 5 5 5 5 9 5 5 5 5
10 5 5 5 5 10 5 5 5 5 10 5 5 5 511 6 6 6 6 11 6 6 6 6 11 6 6 6 612 6 6 6 6 12 6 6 6 6 12 6 6 6 613 13 13 7 7 7 714 14 14 7 7 7 7
15 15 15 8 8 8 816 16 16 8 8 8 817 17 17 9 9 9 918 18 18 9 9 9 919 19 19 10 10 10 1020 20 20 10 10 10 1021 21 EDAP 2, 4, 6 21 11 11 11 1122 22 EDAP 2, 4, 6 22 11 11 11 1123 EDAP 2, 4 23 EDAP 2, 4, 6 23 12 12 12 1224 EDAP 2, 4 24 EDAP 2, 4, 6 24 12 12 12 12
25 1 1 2 2 25 1 1 2 2 25 1 1 2 226 3 3 4 4 26 3 3 4 4 26 3 3 4 427 27 5 5 6 6 27 5 5 6 628 28 7 7 8 8 28 7 7 8 829 29 9 9 10 10 29 9 9 10 1030 30 11 11 12 12 30 11 11 12 1231 31 31
TCHs TRXSIG OMUSIG EDAP
Abis allocation for the 1800 BTSAbis allocation for the 900 BTS (2+2+2)Abis allocation for the 900 BTS (2+2 Road Sites)