MAHANAGAR TELEPHONE NIGAM LIMITED Tender Document For INVITATION FOR APPOINTMENT OF CONTRACTORS FOR LAYING OF TELEPHONE CABLES BY TRENCHING, CABLE LAYING, PULLING OF CABLES THROUGH DUCTS, CABLE LAYING BY TRENCH L.ESS METHOD AND ALLIED WORKS IN JURISDICTION OF MTNL DELHI T.E.No: AGM (MPL)/PIJF Cable Laying /2018-19/01 Price Rs. 2360/-per set (Inclusive of 18% GST) O/O AGM (MPL) CSD COMPOUND NETAJI NAGAR . 0

Upload: others

Post on 02-Aug-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

MAHANAGAR TELEPHONE NIGAM LIMITED

Tender Document

For

INVITATION FOR APPOINTMENT OF CONTRACTORS FOR LAYING OF TELEPHONE CABLES BY TRENCHING, CABLE LAYING, PULLING OF CABLES THROUGH DUCTS, CABLE LAYING BY TRENCH L.ESS METHOD AND ALLIED

WORKS IN JURISDICTION OF MTNL DELHI

T.E.No: AGM (MPL)/PIJF Cable Laying /2018-19/01

Price Rs. 2360/-per set(Inclusive of 18% GST)

O/O AGM (MPL) CSD COMPOUND NETAJI NAGARNEW. DELHI-110023.

.

0

Page 2: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

DISCLAIMER

The information contained in this tender or subsequently provided to bidder(s) whether verbally or in documentary or any other form by or on behalf of Mahanagar Telephone Nigam Limited (MTNL), is provided to the bidder(s) on the terms and conditions set out in this tender and such other terms and conditions subject to which such information is provided.

This tender is not an agreement and is neither an offer nor invitation by MTNL to the prospective bidders or any other person. The purpose of this tender is to provide interested parties with information that may be useful to them in making their techno-commercial and financial offers pursuant to this tender.

MTNL make no representation or warranty and shall have no liability to any person, including any applicant or bidder under any law, statute, rules or regulations or tort, principles of restitution or unjust enrichment or otherwise for any loss, damages, cost or expense which may arise from or be incurred or suffered on account of anything contained in this tender or otherwise, including the accuracy, adequacy, correctness, completeness or reliability of the tender and any assessment, assumption, statement or information contained therein or deemed to form part of this tender or arising in any way in the tender process.

MTNL also accepts no liability of any nature whether resulting from negligence or otherwise howsoever caused arising from reliance of any applicant or bidder upon the statements contained in this tender.

Any information/documents including information/documents pertaining to this tender or subsequently provided to applicant(s) or bidder(s) and/or successful bidder AND information/ documents relating to the tender process; the disclosure of which is prejudicial and/or detrimental to, or endangers, the implementation of Appointment of Contractors for Laying of Telephone Cables by Trenching, Cable Laying, Pulling of Cables Through Ducts, Cable Laying by Trench Less Method and Allied Works, IS NOT SUBJECT TO DISCLOSURE AS PUBLIC INFORMATION/ DOCUMENTS.

Note:

INSTRUCTIONS TO BIDDERS

The Tender shall be submitted through e-tendering system on website http://www.tcil-india-electronictender.com through TCIL, a Government of India Undertaking. Your offer complete in all respects as per enclosed documents must be submitted latest by 15.00 Hrs of ----------------.

The “Instructions to Bidder” and “General (Commercial) Conditions” are applicable for this Tender. However, the clauses mentioned in the “Special Conditions” & “Technical Specifications” will supersede the General (Commercial) Conditions, wherever there is a conflict.

Tender bids shall be opened on line at 12.00 Hrs. on next day i.e. -------. The representatives of the bidders may attend the bid opening either online after logging on to the TCIL’s e-Tendering System portal or at MTNL premises along with Letter of authorization for attending bid opening at following address:-.

Address:O/O AGM (MPL)MTNL CSD Compound Netaji Nagar New Delhi -110023Phone No. o11-26881552 Email ID: [email protected]

1

Page 3: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

CONTENTS

S.NO. Title Section Page No.1. Check List Annexure-A 3-42. Notice Inviting Tender (NIT) I 5-63. Instructions to bidders II 7-224. General (Commercial) conditions of contract III 23-325. Special conditions IV 33-346. Schedule of requirements V 35

7. Specification for Telephone Cable Laying by Trenching and Trench less Technology

VI 36-43

8. Schedule of Base Rates Annexure-I 44-48

9. Brief Description of items of Base Rates Annexure-II 49-54

Part A : Techno-Commercial Bid 55

10. Form ‘A’ and Information about tenderer VII 56-5711. Bid Security Performa VIII 5812. Letter of Authorization for Attending Bid

OpeningIX 59

13. Clause by clause compliance and declaration of deviation

Annexure-B 60

14. Close Relative Declaration Annexure-C 6115. Declaration regarding black listing Annexure-D 6216. Specimen form of Solvency certificate from the

scheduled bankAnnexure-E 63

Part B: Financial Bid 64

17. Bid Form and Performa for Tenderer’s Quotation

X 65-67

18. Electronic Clearing Service (Model mandate Form)

Annexure-III 68

Part C: Document to be submitted at the time of award of work. 69

19. Performa for Performance Bank Guarantee and STORE SECURITY BANK GUARANTEE

XI 70-73

20. Agreement Performa XII 74-87Part-D: Rules and regulations for the contractors 88

21. Road Maintenance and inter utility code of conduct

Annexure-1 89-94

22. Safety Code Annexure-2 95-9823. Model rules Annexure-3 99-10324. Contractor’s labour regulations Annexure-4 104-108

PART-E: Monitoring and Co-ordination Committee 109 25. High Power Monitoring Committee Annexure-a 110

26. M.C.D. Co-ordination Committee Annexure-b 111 27. N.D.M.C. Co-ordination Committee Annexure-c 112 28. PWD (Delhi Administration) Co-ordination

CommitteeAnnexure-d 113

29. Integrity Pact Performa XIII 114-119PART -F Special instructions to Bidders for e-Tendering XIV 120-125

2

Page 4: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Annexure-ACheck List

This check list should be the cover page of the original techno-commercial bid.While submitting the bid, bidders are required to check/clearly mention whether they have submitted copies of the following documents or whichever is required as per terms and conditions of bid document. Reason(s) for non-submission of any document is to be clearly mentioned.

S.No

ITEM Yes/NO

1. All the pages of application and enclosures have been duly numbered and signed by authorized signatory .The total no. of pages in the bid are to be indicated here

2. The covers of the bids are properly sealed as per clause 14, Section-II Yes/No3. Bid Security as per clause 12, Section-II has been submitted. Yes/No

4. Bid Security or NSIC Certificate/MSME certificate as per clause 12, Section-II has been submitted.

Yes/No

5. Cost of tender document or copy of NSIC Certificate / MSME Registration Certificate as per Clause 8, Section-I has been submitted.

Yes/No

6. Latest and valid NSIC/MSME certificate duly certified by NSIC/MSME authorities as per clause no. 10.1(v) of section-II.

Yes/No

7. The Financial Bid has been submitted in a separate sealed envelope as per clause 8,9,10 and 14 of section-II and the rates have been quoted in accordance with specified format/details in the Tender Document form as per Section-X Pt-I,Pt-II and Annexure-I &III.

Yes/No

8. (a) Ownership of HDD machine of Min. capacity of 07(Seven) tones or more and it shall be able to pull cable/pipe of 200 meter length in one stretch. Following documentary evidences to this effect has been enclosed along with the bid as per clause No. 10 of Section–II. (i) Commercial Invoice.(ii) Bills of Lading.(iii) Customs Bill of Entry.(iv) Custom Clearance Receipt.(v) Manufacturer’s Document in support of required pull-back capacity

In case of PSUs, the HDD machine on lease basis is permissible. The Photocopy of the agreement made on stamp paper duly attested by Notary has been submitted in this regard.

The documentary evidence of HDD machine, if already furnished against OF Cable laying tender - existing or under finalisation in MTNL Delhi unit, shall not be considered i.e. bidder should have another HDD machine in such a case.

Yes/No

9. Documentary evidence of Ownership/ lease of GPRS machine with a capacity to detect underground utilities up to 3 (Three) meters or more. In case the bidder has GPRS machine on lease basis, a photo copy of the agreement made on stamp paper duly attested by Notary as per clause –10 of Section-II.

Yes/No

10. An undertaking that smaller HDD machine(s) to carry out work in small lanes/lengths shall be arranged by the firm as per requirements well in time and without delaying the work schedule as per clause-10 of Section-II.

Yes/No

11. (i) Documents showing turnover for last three financial years i.e. 2014-2015 , 2015-2016 and 2016-2017 has been submitted as per clause-10 of Section-II.

Yes/No

(ii) Certified/audited copy of Balance Sheet or Annual Report of turnover of Rs.72,00,000.00 during last three financial years (put together) and more than Rs.24,00,000.00 during last financial year i.e. 2016-17 has been submitted as per clause-10 of Section-II.

Yes/No

12. Current dated (i.e. after date of issue of NIT) Solvency certificate in Original in the format enclosed at Annexure-E for an amount of not less than Rs 24,00,000.00 (Rs Twenty four lacs Only) from any Nationalized or Scheduled Bank has been submitted as per clause-10 of Section-II.

Yes/No

13. A declaration that the firm would get itself registered with Competent Authority under the Contract Labour (Regulation and Abolition) Act, 1970 in reference to MTNL as a principal

Yes/No

3

Page 5: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

employer within 15 days of award of work has been submitted as per clause-10 of Section-II.14.A cert Certificate of satisfactory completion of at least 30 Kms of PIJF/OF Cable/ HDPE Pipe laying

work using trench less technology (HDD machine) individually or put together, during the last three years i.e. 2014-15 ,2015-16, 2016- 2017 or for 15 Kms during last year i.e. 2016-17 from MTNL / BSNL / DoT / Govt. PSU or any licensed Telecom Service Provider. The certificate shall

be issued by an Officer not below the rank of DGM in case of MTNL/BSNL and by Purchase Order/Work Order issuing authority in other cases has been submitted as per clause-10 of

Section-II.

Yes/No

15. Documentary evidence regarding registration of the firm with EPF/RPF Commissioner along with an undertaking that within 7 (Seven) days of the close of every month the firm will submit to MTNL a statement showing the recoveries of contributions in respect of employees with certificate that the same have been deposited with EPF/RPF Commissioner has been submitted as per clause-10 of Section-II.

Yes/No

16. Attested copy of valid WCT issued by NCT Delhi has been submitted as per clause-10 of Section-II

Yes/No

17. Attested copy of valid GST Registration Certificate has been submitted as per clause-10 of Section-II.

Yes/No

18. Copy of valid Goods and Service Tax Registration No. (GSTIN) as per clause-10.1(xiv)(a), Section-II, has been submitted Or mention as unregistered dealer.

Yes/No

19. If bidder has opted Composition Scheme under GST, a declaration in this regard has been submitted by bidder in bid document as per clause-10.1(xiv) (b), Section-II.

Yes/No

20. A declaration that the bidder has not been blacklisted / debarred from any Government or Public Sector Organisation/Public Bodies/Municipalities, etc. as per format given in Annexure-D has been submitted as per clause-35 of Section-II

Yes/No

21. An undertaking to the effect “That I / We have studied & understood all the terms and conditions as well as work description given in the Tender document and the same are acceptable to me/us and I/ We agree to abide by the same” has been submitted as per clause –10 of Section-II

Yes/No

22. An undertaking that the contractor shall arrange more HDD machine/s and other required resources / manpower as per actual requirement to complete the total allotted work in 6 (Six) months and ensure monthly output accordingly considering 2 months as gestation period, 3 to 4 months monsoon period, etc has been submitted as per clause-10 of Section-II.

Yes/No

23. Information regarding local address (Delhi and/or satellite towns viz. Gurgaon, Noida, Faridabad & Ghaziabad) with necessary infrastructure to execute the works has been submitted as per clause-10 of Section-II.

Yes/No

24.Relati Relationship certificate as per format given in Annexure-C has been submitted as per clause 33 of section-II.

Yes/No

25. Clause–by-clause compliance of the tender including Section-VI (Specifications); Section-III (Commercial Conditions); Section-IV (Special Conditions); Annexure-I (Road maintenance and inter utility code of conduct); Annexure-2 (Safety code); Annexure-3 (Model rules) and Annexure-4(Contractor’s labour regulations) as per format given at Annexure-B

Yes/No

26. Attested copy of Partnership Deed in case of Partnership Firm, and Article & Memorandum of Association and Certificate of Incorporation in case of a company has been submitted

Yes/No

27. In case of any Indian firm collaborating with a foreign company. i) Approval of RBI. ii) Last Annual Report plus Balance Sheet of both firms.

iii) Details of Indian agent who will be responsible for enforcement of contractual obligations have been submitted as per clause No. 10 of Section-II.

Yes/No

28. In case of a foreign Co. i) JV agreement. ii) MOU iii) ISO certificate for Trench less technology have been submitted as per clause No. 10 of Section-II.

Yes/No

29. ISO Certificate for Trench less technology, if any has been submitted as per clause-10 of Section-II

Yes/No

30.(i) Three-specimen signature duly attested & latest photo of person authorized to sign,

execute and act in respect of the bid on behalf of the firm has been submitted. Yes/No

(ii) General Power of Attorney duly notarized in case of partnership firm and resolution of Board of Directors in case of company, authorizing the person for signing the tender documents has been submitted as per clause No. 10 of Section-II

Yes/No

31. Before submission of bids, for latest amendments/information on this tender, the website http://www.tcil-india-electronictender.com has been seen as per clause 5 and 6 of section-II

Yes/No

32. Documentary evidence regarding the financial, technical and production capability necessary to perform the contract details as per Form “A” as per clause 10.2 of section-II has been submitted

Yes/No

4

Page 6: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

33. Documents establishing the conformity of his bid to the bid document as per clause 11.1 section-II has been submitted

Yes/No

34. Documentary evidence of the goods and services conformity to the bid documents as per clause 11.2section-II has been submitted

Yes/No

35. Bid validity for 150 days from the date of opening of bids as per clause 13 of section-II has been submitted

Yes/No

36. Whether EMD is valid for 180 days from date of opening of tender. Yes/No37. ECS Mandate Form as per format given in Annexure-III has been submitted. Yes/No

38. Pass phrase for both Technical & Financial bids in separate sealed envelopes has been submitted offline.

Yes/No

39. The MOU (Integrity Pact) pursuant to Clause 11.1 (xxi) Section II as per format given in Section XIII of tender document has been submitted. If the Contractor is a partnership firm or a consortium, this agreement must be signed by all partners or consortium members.

Yes/No

* strike out which ever is not applicable.

SECTION-INOTICE INVITING TENDER

T.E.No: AGM (MPL/ PIJF Cable Laying /2018-19/01

1.Description of Work: (Approximate) for laying of Telephone cables by trenching and trench less technology, pulling of cables through ducts and allied works: -Item Grou

pAREA Tentative Qty of

work Approximate cost of work (Rs in lakh.)

EMD (in Rs.)

Turnover( in Rs )

1 - G.M.(Development)

TrenchingAnd Allied Works

7.43 Kms

150

1.6 Lacs

72 Lacs during last three financial years (put together) i.e.2014-15,2015-16,2016-17

andmore than 24 Lacs during last financial year 2016-17.

Trench less- And Allied Works

50.66Kms

Duct pulling

42.35 Km

2.

Gro

up-I G.M. (TY)

Maintenance work60.00

3. GM (East) 14.00

4. GM West) 28.20 Group total 102.20

5.

Gro

up-

II

GM (NP)Maintenance work

51.586. GM (BCP) 26.57. Group total 78.08

8. GM (North) Maintenance work 58.11

5

Page 7: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Grou

p-III9. GM (Central) 10.00

Group Total 68.11

TOTAL398.39 say 4 Crs

1.6 Lacs

NOTE:

a. The maintenance work cannot be quantified in advance and it may vary on actual and need basis.

b. The quantity indicated against development work for award is only estimation and actual award of work may vary depending upon prevailing factors and circumstances.

c. No bidder shall have any claim for award of any specific quantity, including quantity indicated in the bid document.

d. It is mandatory for the contractor to quote for all items mentioned in Annexure-I otherwise his/her bid will be rejected.

Bid Security in the form of Bank Guarantee issued by any Nationalized/ Scheduled Bank in India valid for 180 days from the date of opening of bid, of Rs. 1,60,000/-

6

Page 8: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(one Lacs sixty thousand) need to be submitted by the bidder. The Bid Security shall be submitted before the scheduled date and time of opening of the bids in o/o AGM (MPL) CSD Compound Netaji Nagar New Delhi. A scan copy of the bid security shall be uploaded along with the Techno-Commercial bid.

The cost of tender document can be paid off line in the form of DD/Pay order of Rs. 2360.00 in favor of AO(Cash) MM ,MTNL, CSD Compound Netaji Nagar New Delhi -110023 before scheduled date and time of opening of bids in o/o AGM (MPL) CSD Compound Netaji Nagar New Delhi. However, the bidders (Small Scale Units) who are registered with National Small Scale Industries Corporation (NSIC) UNDER SINGLE POINT REGISTRATION SCHEME for the tendered items, whose monitory limit is more than the procurement value, are exempted from payment of tender document Fee on submission of current verified NSIC registration certificate.

Bid security in the form of Demand Draft or Bank Guarantee or copy of valid NSIC Certificate/MSME Registration Certificate (if applicable) shall be submitted before the scheduled date and time of opening of the bid to AGM (MPL) MTNL, CSD Compound Netaji Nagar New Delhi-110023 without which the bid shall be rejected summarily.

A scanned copy of the bid security in the form of Bank Guarantee or Demand Draft/ valid NSIC Certificate/MSME Registration Certificate (if applicable) shall be uploaded along with Techno-Commercial bid.

1. The bid without tender fee shall not be entertained. 2 The techno-commercial bids shall be opened on the stipulated date and in case of the date failing on any holiday or in case of unforeseen contingencies, the bid shall be opened on the next working day at the same time without any further notice. The Financial bids of only technically qualified bidders will be opened on a later day based on the scrutiny of the techno-commercial bids.

3 Any indication of cartelization on the part of bidder may entail disqualification in this tender and further participation will be barred for another two years in MTNL along with forfeiture of EMD/ Bid Security

4 MTNL also reserves the right to cancel/reject the tender without assigning any reason, whatsoever.

5 The bidders shall give e-mail address in addition to Telephone Numbers and address for Correspondence for inclusion in the contract.

Asstt. Genl. Manager (MPL) CSD Compound, Netaji Nagar,

New Delhi-23.Email ID: [email protected]

Phone – 011-26881552

7

Page 9: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Section-IIINSTRUCTIONS TO BIDDERS

A. INTRODUCTION1. DEFINITIONS:

a) “The Purchaser” means the Mahanagar Telephone Nigam Limited, New Delhi.b) “The Bidder” means the individual or firm who participates in this tender and submits its bid.

c) “The Supplier”or “the Contractor’ means the successful Bidder(s) (individual or firm) supplying the goods/providing services under the Contract.

d) “The Goods” means all the equipment, machinery, and/or other materials, which the supplier is required to supply/provide to the purchaser under the Contract.

e) “The Purchaser Order (P.O)” means the order placed by the Purchaser, after the acceptance of LOI by the Supplier, duly signed by the Purchaser including all attachments and appendices thereto and all documents incorporated by reference therein. The P.O along with the LOI and bid documents constitutes the Contract.

f) “The Contract Price” means the price payable to the Supplier/Contractor under the Purchase Order for the full and proper performance of its contractual obligations.

g) The “Letter of Intent (LOI)” means the intention of Purchaser to place the Purchase Order on the Supplier.

h) “Validation” is a process through which the equipments/system is tested to ascertain its performance against set standards as per tender specification in MTNL Telecom Network.

i) The term “Contract” means the documents forming the tender and acceptance thereof and the formal agreement enacted between MTNL and the Contractor together with work order and other documents referred to therein including these conditions, the specifications, designs, drawings and instructions issued from time to time by the Engineer-in-charge and all these documents taken together shall be deemed to form one contract and shall be complementary to one another, (and known as "Tendered Documents") which will include the contract herein after referred to.

j) “Nigam” means MTNL i.e. Mahanagar Telephone Nigam Limited, having its registered office at 5th Floor, Mahanagar Door Sanchar Sadan, 9, CGO Complex, Lodhi Road, New Delhi-110003 or other Administrative offices authorized to deal on its behalf posted in any of the offices of MTNL and shall include MTNL's successors and assignees

k) “Performance Guarantee / Security Deposit Guarantee / Security deposit” shall mean guarantee from any of the Nationalized / Scheduled Bank, for the due and satisfactory performance of the Contract and safe custody of MTNL stores which the Contractor shall submit at the time of signing Contract.

l) “Extension” means the time granted by Nigam.m) “Date of commencement of work” refers to the date of commencement as mentioned in

work order or the actual date of receipt of work order by the Contractor, whichever is later.

n) “Due date of completion” shall be the date after expiry of completion time from commencing day. It should be noted that the time saved in one work order cannot be transferred to any other work order. The duration for completion of work shall be:

(i) Time specified in the work order.(ii) Extension of time granted, if any.

o) Jurisdiction of Nigam: Area under limits of MTNL Delhi.p) The term “Services” shall mean the performance of any of the items of work enumerated

in schedule of services including such auxiliary, additional and incidental duties services and operations as may be indicated by the MTNL or any person authorized by MTNL on its behalf.

q) Words, term and expressions not specifically defined herein or in Tender Documents shall have the same meaning assigned to them in the Sale of Goods Act, 1930 or the Indian Contract Act, 1872 or the General Clauses Act, 1897 as the case may be. Head notes are for convenience purpose only and shall not affect the interpretation or construction of any provision hereof/bid documents.r) “Civic Authority” means the public utility agencies like South/East/North Delhi Municipal Corporation / PWD/ CPWD/ Railways/ DDA/ MES/ Traffic Police / Flood Control / NDMC/ Local Bodies / Any other agencies.

2. ELIGIBILITY OF BIDDERS

The Bidders should meet all the following eligibility conditions: -

(I) The Bidder can be an individual, sole proprietorship, company, partnership firm or a Limited Liability Partnership (LLP) firm. An applicant bidder being a consortium of two or more entities is not eligible to participate in the bid. However, any bidder being a consortium of two or more

8

Page 10: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

entities and having worked together previously and meeting the eligibility criteria stipulated herein may participate in the bidThe Bidder must own an HDD machine, in its name or in the name of the firm, of minimum capacity of 07 Seven) tones and shall be able to pull cable/pipe of 200M length in one stretch. Following documentary evidences to this effect are required to be enclosed along with the bid – (i) Commercial Invoice.(ii) Bills of Lading.(iii) Customs Bill of Entry.(iv) Custom Clearance Receipt.(v) Manufacturer’s Document in support of required pull-back capacity

In case of PSUs, the HDD machine on lease basis is permissible. The Photocopy of the agreement made on stamp paper of appropriate value duly attested by Notary is required to be furnished in this regard.

The documentary evidence of HDD machine, if already furnished against OF Cable laying tender - existing or under finalisation in MTNL Delhi unit, shall not be considered i.e. Bidder should have another HDD machine in such a case.

(II). The bidder must have an experience of PIJF/OF Cable/ HDPE Pipe laying using trenchless technology (HDD machine) for at least 30 (thirty) Kms., individually or put together, during the last three years i.e. 2014-15,2015-16,2016-17 or for 15 Kms. during last year i.e. 2016 -17. A certificate of satisfactory completion of work (30 kms or 15 kms as the case may be) from MTNL / BSNL / DoT / Govt. PSU or any licensed Telecom Service Provider shall be enclosed with the bid. The certificate shall be issued by an Officer not below the rank of DGM in case of MTNL/BSNL and by Purchase Order/Work Order issuing authority in other cases.

(III). (i) The Bidder shall have to arrange smaller HDD machine(s) to carry out work in small lanes/lengths. An undertaking is to be furnished by bidder that such HDD machine(s) shall be arranged as per requirements well in time and without delaying the work schedule.

(ii) The Bidder shall have to arrange suitable HDD machine(s) to carry out work in rocky area. .An undertaking is to be furnished by bidder that such HDD machine(s) shall be arranged as per requirements well in time and without delaying the work schedule.

(IV). The GPRS machine with a capacity to detect underground utilities up to 3 (Three) meters or more shall be available with the Bidder either on ownership or lease basis. Documentary evidence of ownership shall be enclosed along with the bid. In case the bidder has GPRS machine on lease basis then it will have to furnish photo copy of the lease agreement made on stamp paper of appropriate value, duly attested by Notary.

(V). The bidder shall have turnover of Rs.72,00,000.00 (Seventy two lakhs only) during last three financial years (put together) i.e.2014-15, 2015-16 &2016-17 and more than Rs. 24,00,000.00 (Rs. Twenty Four lakhs only) during last financial year i.e. 2016-17.This shall be supported by documents showing Turnover for last three financial years and certified/audited copy of Balance Sheet or Annual Report.

(VI). The bidder will have to furnish solvency certificate in the format enclosed at Annexure-E for an amount of not less than Rs. 24,00,000.00 (Rs. Twenty Four lakhs only) from any Nationalised or Scheduled Bank. This shall be of current date (i.e. after date of issue of NIT) and to be submitted in original.MTNL give relaxation w.r.t condition of turnover and prior experience in to all Starts-ups {whether Micro & Small Enterprise (MSEs)or otherwise} subject to meeting of quality and technical specifications in accordance with relevant provisions of tender requirement

(VII) The bidders will have to furnish documentary evidence regarding registration of the firm with EPF/RPF Commissioner along with an undertaking that within 7 (Seven) days of the close of every month the firm will submit to the Purchaser a statement showing the recoveries of contributions in respect of employees with certificate that the same have been deposited with EPF/RPF Commissioner.

(VIII) An undertaking is to be furnished by the bidder that he would get himself registered with Competent Authority under the Contract Labour (Regulation and Abolition) Act, 1970 in reference to Purchaser as a principal employer within 15 (Fifteen) days of award of work.

(IX) The bidder should have valid WCT (GST) issued by NCT Delhi and a copy of the same need to be submitted. In case the bidder is not having the same, the same should be applied before tender opening date and the proof may be submitted with the techno-commercial bid.

(X) The bidder should have valid GST Registration Certificate and a copy of the same need to be submitted.

(XI) The bidder should not have been blacklisted / debarred from any Government or Public Sector Organisation/Public Bodies/Municipalities, etc. A declaration shall have to be furnished by the bidder in this respect along with the bid.

9

Page 11: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(XII) Considering 2 (two) months as gestation period, 3 (three) to 4 (four) months monsoon period, etc., the bidder should have resources to complete the total allotted work in 6 (Six) months and monthly output has to be ensured accordingly. The Contractor shall arrange more HDD machine/s and other required resources / manpower as per actual requirement to cope up with the work. An undertaking is to be furnished by the bidder in this respect along with the bid

(XIII). The bidder should have a local address (Delhi and/or satellite towns viz. Gurgaon, Noida, Faridabad & Ghaziabad) with necessary infrastructure to execute the works.

(XIV) The bidder must submit an undertaking to the effect “That I / We have studied & understood all the terms and conditions as well as work description given in the Tender document and the same are unconditionally acceptable to me/us and I/ we agree to abide by the same.”

3. COST OF BIDDINGThe bidder shall be responsible to bear all costs associated with the preparation and submission of their bid and their participation in the tender process. The Purchaser will in no case, be responsible or liable for such costs, regardless of the conduct or outcome of the bidding process.

B. THE BID DOCUMENT:4. BID DOCUMENT:4.1 The Goods required, bidding procedures and contract terms are prescribed in the bid

document. The bid document include:-

S.NO. Title Section1. Check List Annexure-A2. Notice Inviting Tender (NIT) I3. Instructions to bidders II4. General (Commercial) conditions of contract III5. Special conditions IV6. Schedule of requirements V

7. Specification for Telephone Cable Laying by Trenching and Trench less Technology

VI

8. Schedule of base rates Annexure-I

9. Brief Description of items of Base Rates Annexure-II

10. Form ‘A’ and Information about tenderer VII11. Bid Security Performa VIII12. Letter of Authorization for Attending Bid

OpeningIX

13. Clause by clause compliance and declaration of deviation

Annexure-B

14. Close Relative Declaration Annexure-C15. Declaration regarding black listing Annexure-D16. Specimen form of Solvency certificate from the

scheduled bankAnnexure-E

17. Bid Form and Performa for Tenderer’s Quotation

X

18. Electronic Clearing Service (Model mandate Form)

Annexure-III

19. Performa for Performance Bank Guarantee and STORE SECURITY BANK GUARANTEE

XI

20. Agreement Performa XII21. Road Maintenance and inter utility code of

conductAnnexure-1

22. Safety Code Annexure-223. Model rules Annexure-324. Contractor’s labour regulations Annexure-4

25. High Power Monitoring Committee Annexure-a

26. M.C.D. Co-ordination Committee Annexure-b 27. N.D.M.C. Co-ordination Committee Annexure-c 28. PWD (Delhi Administration) Co-ordination

CommitteeAnnexure-d

10

Page 12: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

4.2 The Bidder is expected to examine all instructions, forms, terms and conditions in the Bid Document. Failure to furnish, complete information required as per the bid document or submission of bids not substantially responsive to the bid document in every respect will be at the bidder’s risk and may result in rejection of the bid.

5. CLARIFICATION ON BID DOCUMENTS:5.1 Prospective bidders requiring any clarification on the bid documents shall notify the Purchaser

on line by using the e-tendering site of TCIL. The Purchaser shall endeavour to respond in writing to any request for the clarification on the bid documents, which it receives latest by but not later than 12 (Twelve) days prior to the date of opening of the tender. However, the Purchaser reserves the right not to respond to any question or provide any clarification, in its sole discretion, and nothing contained herein shall be taken or read as compelling or requiring the Purchaser to respond to any question or to provide any clarification. Copies of the query (without identifying the source) and clarifications by the Purchaser shall be posted on Purchaser’s website for information of all the prospective bidders.

5.2 Any clarification issued by the Purchaser in response to query raised by prospective bidders shall form an integral part of bid documents and it may amount to an amendment of the relevant clauses of the bid documents.

5.1 The clarification, if any, can also be downloaded from TCIL e-Tendering system website & bidder is expected to see TCIL e-Tendering system website for clarification before submitting the bid. The Purchaser reserves the right for rejection of bids if the bids are submitted without taking into account these amendments/clarifications. Further, bidder will be fully responsible for downloading of the tender document and amendments for their completeness.

6. AMENDMENT OF BID DOCUMENTS6.1 At any time, prior to the date of submission of bids, the purchaser may, for any reason,

whether at his own initiative or in response to a clarification requested by a prospective bidder, modify the bid document by amendments.

6.2 The amendments, if any, shall be part of bid documents and shall be displayed on the TCIL ETS website and these amendments will be binding on all the bidders. No separate communication would be given to the prospective bidders.

6.3 In order to give prospective bidders reasonable time in which to take the amendments into account in preparing their bids or for any other reason, the Purchaser may, at its discretion, extend the deadline for the submission of bids suitably.

C. PREPARATION OF BIDS.

7. DOCUMENTS COMPRISING THE BID:7.1 The bid prepared by the bidder shall comprise the following components:

(i) Techno-commercial bid

a) Documentary evidence establishing in accordance with clause 2 & 10 indicating that the bidder is eligible to bid and is qualified to perform the Contract if his bid is accepted.

b) Bid Security furnished in accordance with clause 12.c) A clause-by-clause compliance of the goods/services offered as per clause 11.2 (b).d) A copy of Bid Form (Section-X, Part-I) and Performa for tender quotation (Section-X, Part-II)

with all relevant portion duly filled (without mentioning Rates) must be enclosed with Techno-Commercial bid along with ECS form (Annexure-III).

(ii) Financial bid:A bid form and price schedule as. per financial bid form completed in accordance with clauses 8,9 and 10.

7.2 LANGUAGE OF THE BID:The Bid prepared by the Bidder and all correspondence and documents relating to the bid exchanged by the bidder and the Purchaser shall be written in ENGLISH language, provided that any printed literature furnished by the bidder may be written in another language but it is to be accompanied by an English translation of its pertinent passage (s) duly signed and verified as true English translation. The responsibility for the correctness of the translation will be solely and completely on the bidder and Purchaser shall not be responsible for any loss caused due to error in translation whatsoever. In such cases, for the purpose of interpretation of the bid, the English translation shall only govern.

11

Page 13: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

8. BID FORM:The bidder shall complete the Bid form and the appropriate price schedule in the format furnished in the bid documents.

9. BID PRICES9.1 The bidder shall quote the Rates as % (present) above or below the Schedule of base Rates at

Annexure-I OR at the same rates indicated in the Schedule of Rates at Annexure-I. A bid submitted with an adjustable price quotation will be treated as non-responsive and rejected.

9.2 The Contract shall remain in force for a period of one year from the date on which first agreement is entered into. The rates finalized shall remain firm and valid for the work order issued during this period of 1 (one) year.

9.3 If there is any sudden change/reduction in the statutory levies taxes including due to introduction of new Taxes etc. during the Contract period the benefit shall be passed on to the Purchaser. However, in case of increase in statutory levies, taxes etc. the impact will be borne by the Contractor.

9.4 Rates shall be quoted in figures and words without any errors, over-writings or corrections. The rates so quoted shall be inclusive of all taxes and levies.

10 DOCUMENTS ESTABLISHING BIDDER’S ELIGIBILITY AND QUALIFICATION 10.1 The bidder shall furnish, as part of the bid documents establishing the bidder’s eligibility, the

following documents or which ever is required as per terms and conditions of bid documents:- I) Ownership of HDD machine of Min. capacity of 07 (Seven) tones or more and it shall be able to

pull cable/pipe of 200 meter length in one stretch. Following documentary evidences to this effect are required to be enclosed along with the bid – (i) Commercial Invoice.(ii) Bills of Lading.(iv) Customs Bill of Entry.(v) Custom Clearance Receipt.(vi) Manufacturer’s Document in support of required pull-back capacity In case of PSUs, the HDD machine on lease basis is permissible. The Photocopy of the

agreement made on stamp paper of appropriate value duly attested by Notary is required to be furnished in this regard.

The documentary evidence of HDD machine, if already furnished against OF Cable laying tender - existing or under finalisation in MTNL Delhi unit, shall not be considered i.e. bidder should have another HDD machine in such a case.

II) Documentary evidence of Ownership/ lease of GPRS machine with a capacity to detect underground utilities up to 3 (Three) meters or more. In case the

bidder has GPRS machine on lease basis, a photo copy of the agreement made on stamp paper of appropriate value duly attested by Notary.

III) The bidder shall have to arrange smaller HDD machine(s) to carry out work in small lanes/lengths. An undertaking is to be furnished by bidder that such HDD machine(s) shall be arranged as per requirements well in time and without delaying the work schedule.

(ii) The bidder shall have to arrange suitable HDD machine(s) to carry out work in rocky area. An undertaking is to be furnished by bidder that such HDD machine(s) shall be arranged as per requirements well in time and without delaying the work schedule.

IV) Copy of I.T. Returns filled and copy of certified/audited Balance Sheet along with Profit & Loss account or Annual Report for last three financial years i.e. 2014-15, 2015-16 & 2016-17 showing Turnover for last three financial years i.e. Rs.72,00,000.00 (Seventy Two lakhs only) during last three financial years (put together) i.e. 2014-15, 2015-16 & 2016-17 and more than Rs. 24,00,000.00 (Rs. Twenty Four lakhs only) during last financial year i.e. 2016-17. Current dated (i.e. after date of issue of NIT) Solvency Certificate in Original in the format enclosed at Annexure-E for an amount of not less than Rs. 24,00,000.00 (Rs. Twenty Four lakhs only) from any Nationalized or Scheduled Bank.

V) A declaration cum undertaking that the bidder would get himself registered with Competent Authority under the Contract Labour (Regulation and Abolition) Act, 1970 in reference to Purchaser as a principal employer within 15 (Fifteen) days of award of work.

VI) A certificate of satisfactory completion of at least 30 Kms of PIJF/OF Cable/ HDPE Pipe laying work using trench less technology (HDD machine), individually or put together, during the last three years i.e 2014-15, 2015-16 & 2016-17 or for 15 Kms during last year i.e. 2016-17 from MTNL / BSNL / DoT / Govt. PSU or any licensed Telecom Service Provider. The certificate shall be issued by an Officer not below the rank of DGM in case of MTNL/BSNL and by Purchase Order/Work Order issuing authority in other cases.

VII) Documentary evidence regarding registration of the bidder with EPF/RPF Commissioner along with an undertaking that within 7 (Seven) days of the close of every month the firm will submit to Purchaser a statement showing the recoveries of contributions in respect of employees with certificate that the same have been deposited with EPF/RPF Commissioner.

VIII) Copy of valid WCT (GST) issued by NCT Delhi. 12

Page 14: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

IX) Attested copy of valid GST Registration Certificate. X) An undertaking that the bidder has not been blacklisted / debarred from any Government or

Public Sector Organisation/Public Bodies/Municipalities, etc as per format given in Annexure-D.

XI) An undertaking that the Contractor shall arrange more HDD machine/s and other required resources / manpower as per actual requirement to complete the total allotted work in 6 (Six) months and ensure monthly output accordingly considering 2 (Two) months as gestation period, 3 (Three) to 4 (Four) months monsoon period, etc.

XII) Information regarding local address (Delhi and/or satellite towns viz. Gurgaon, Noida, Faridabad & Ghaziabad) with necessary infrastructure to execute the works as per Section-VII (Part-I and Part-II)

(XIII) The bidder should have valid PAN No. and copy of the same need to be submitted. (XIV) (a) The bidder should have valid Goods and Service Tax Identification Number (GSTIN)

and copy of the same need to be submitted or mention as unregistered dealer. If bidder has opted Composition Scheme under GST, it should be clearly mentioned by bidder in bid document.

In case the bidder intend to supply goods and services from multiple state locations then Goods and Services Tax Identification Number (GSTIN) of all the states where from the supplies are planned to be made should be provided.

(b) In case the bidder is registered under composite scheme, then bidder has to submit declaration to this effect along with bid document. After submission of bid, if bidder either become ineligible for composition scheme (Business turnover cross the specified limit as mentioned under GST ACT) or voluntarily opt out of composition scheme then he should submit such declaration to MTNL immediately on occurrence of this event along with proof of approval from GST authorities in this regard.

(XV)(a) A declaration that the bidder has not been blacklisted/ debarred from any Government or Public Sector Organization/ Public Bodies/ Municipalities/ GST Authorities, etc. (as per format given in Annexure-D.

(b) In case the supplier gets black-listed during the tenure of MTNL contract, then in such cases the vendor will indemnify to MTNL for any loss of eligible GST credit as quoted in the bid. Further in such cases MTNL reserve the right to revise the unit price in such a manner that total cost to MTNL post GST creditable amount remain the same after taking into account the loss of GST eligible credit amount.

XVI) Declaration regarding relationship as per format given in Annexure-C XVII) Clause by clause compliance of the tender including Section-VI (Specifications); Section-III

(Commercial Conditions); Section-IV (Special Conditions); Annexure-I (Road maintenance and inter utility code of conduct); Annexure-2 (Safety code); Annexure-3(Model rules) and Annexure-4(Contractor’s labour regulations) as per format at Annexure -B.

XVIII) Incorporation related documents: Attested copy of partnership deed in case of partnership firm, and Article & Memorandum of Association and certificate of incorporation in case of a company. Copy of registered deed in case of LLP; and registration documents like GST, PAN etc. in case of individual/sole proprietorship.a) In case of any Indian firm collaborating with a foreign company.

i) Approval of RBI.ii) Last Annual Report plus Balance Sheet of both firms.

iii) Details of Indian agent who will be responsible for enforcement of contractual obligations.

b) In case of a foreign Company.i) JV agreement.ii) MOUiii) ISO certificate for Trenchless technology.iv) Certificate confirming that the foreign company can do business in India.

This certificate should either be self certified or duly executed by a qualified Chartered Accountant

XIX) Three-specimen signature duly attested & latest photo of person authorized to sign, execute and act in respect of the bid on behalf of the bidder. The bidder shall submit General Power of Attorney duly notorised in case of partnership firm and resolution of Board of Directors in case of company, authorizing the person for signing the tender documents.

XX) Latest and valid NSIC certificate/ MSME Registration certificate duly certified by NSIC/MSME authorities

XXI) The tender is covered under the Integrity Pact Programme. The bidders participating in the tender shall sign an MOU with the Purchaser as per the MOU document given in

13

Page 15: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Section XIII of the tender document. The bidders can send their grievances to the Independent External Monitors through the Nodal Officer on the following address:DE (Pers), MTNL, CONodal Officer-Independent External Monitoring Cell (IEMC)6th Floor, Mahanagar Door Sanchar Sadan,9, CGO Complex, Lodhi Road, New Delhi-110003.Tel. No. 011-24322529, Fax No. 011-24325576, E-Mail: [email protected] addresses of IEMs are given below:1. [email protected], 2. [email protected], 3. [email protected]

Note: - The documents shall be submitted in sequence sought for in Para (I) to (XIX) and be properly indexed.

10.2 (i) The bidder shall furnish documentary evidence that he has the financial, technical and sufficient manpower capability necessary to perform the contract details to be submitted as per Form “A”.

(ii) The bidder shall submit Annual Report and /or a certificate from its bankers as evidence that he has financial capability to perform the Contract.

11. DOCUMENTS ESTABLISHING GOOD’s CONFORMITY TO BID DOCUMENTS:11.1 Pursuant to clause, 7, the bidder shall furnish, as part of its bid, documents establishing the

conformity of his bid to the bid document of all goods and services, which he proposes to provide under the Contract.

11.2 a) The documentary evidence of the goods and services conformity to the bid documents may be in the form of literature, drawings, data and bidder shall furnish a detailed description of goods with essential technical and performance characteristics.

b) A clause-by-clause compliance of the tender including Section-VI (Specifications); Section-III (Commercial Conditions); Section-IV (Special Conditions); Annexure-I (Road maintenance and inter utility code of conduct); Annexure-2 (Safety code); Annexure-3(Model rules) and Annexure-4 (Contractor’s labour regulations) shall be given as per format given at Annexure-B. A bid without clause-by-clause compliance shall not be considered.

For purposes of compliance to be furnished, pursuant to clause 11.2 (b) above, the bidder shall note that the standards for workmanship, material & equipment and reference to brand names or catalogue number designated by the Purchaser in its Technical Specifications are intended to be descriptive only and not restrictive.

12. BID SECURITY:12.1 Pursuant to clause 7, the bidder shall furnish, EMD with its tender bid in the form of:

a) Irrevocable and Unconditional Bank Guarantee (issued by Nationalized / Scheduled Bank) valid for 180 (One Hundred and Eighty) days or such other period as may be required by the Purchaser, from the date of opening of the tender, of the amount Rs.1,60,000.00(1.6Lacs) .

ORb) A Demand Draft for an amount of Rs 1,60,000.00(1.6Lacs) drawn on any of the

Nationalized / Scheduled Bank payable at Delhi in favour of Accounts Officer ( Cash)MM, MTNL, NEW DELHI.

No other forms of bid security other than aforesaid would be accepted. However, the bidder (small scale units) who are registered with National Small Scale Industries Corporation UNDER SINGLE POINT REGISTRATION SCHEME are exempted from payment of bid security up to the amount equal to their monetary limit. In case of bidders having monetary limit as “No LIMIT”, “WITHOUT LIMIT”, or “MORE THAN Rs. 50 LAKHS”, the exemption will be limited to Rs.50, 00,000/- (Rupees Fifty Lakhs) only. A Proof regarding current registration with NSIC for the TENDERED ITEMS will have to be attached along with the bid. For details of return/adjustment and forfeiting refer to clause 12.5, 12.6 and 12.7 below.

The scanned copy of the Bank Guarantee for bid security and NSIC certificate shall be enclosed by the bidder in its bid and original copy of the Bank Guarantee shall be submitted to AGM (MPL), CSD Compound, Netaji Nagar, New Delhi-110023, before scheduled date and time of opening of the bids.

14

Page 16: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

12.2 Any tender not accompanied with the above prescribed bid Security SHALL BE REJECTED FORTHWITH.

12.3 No interest whatsoever will be paid on the bid Security while it is in the custody of MTNL DELHI UNIT.

12.4 The bid Security of unsuccessful bidder will be discharged/ refunded after final acceptance of the tender and within reasonable time, but not later than six (6) months from the date of opening of tender. The applicants / bidders may by specific instructions in writing to the Purchaser to give the name and address of the person in whose favour the demand draft / bankers cheque shall be drawn by the Purchaser for refund of bid security, failing which it shall be drawn in the name of unsuccessful bidder and shall be mailed to the address given in the Techno-Commercial bid

12.5 The bid Security of successful bidder will not be adjusted towards Security Deposit if it is in the form of Bank Guarantee.

NOTE:- The MSEs (Micro & Small Enterprises) units/bidders registered with MSME bodies shall be given exemption from payment of Bid Security deposit provided the tendered item is listed in the Registration Certificate of MSME, subject to following:-

(a) A proof regarding current registration for the tendered items will have to be attached along with bid.(b) The enlistment certificate issued by MSME bodies should be current & valid on the date of opening of bid.

The scanned copy of the Bank Guarantee for bid security and NSIC certificate shall be enclosed by the bidder in its bid and original copy of the Bank Guarantee shall be submitted to AGM (MPL), CSD Compound, Netaji Nagar, New Delhi-110023, before scheduled date and time of opening of the bids.

12.6 This bid Security will be forfeited by MTNL Delhi Unit under any one or all of the following circumstances: a) Any case of false statement and / or submission of false document by the bidder are

detected.b) The bidder withdraws its tender offer after opening of the Tender.c) The successful bidder delays or fails to deposit the security deposit money as detailed in

clause No. 4 of Section-III.d) The successful bidder fails to execute the Agreement (as detailed in Section-XII) within

the stipulated time or delays the commencement of any work allocated to him under or pursuant to the Contract.

e) In case of cartelisation.f) In case the bidder makes breach of condition mentioned in Para 33.g) In case of 12.6 b) & c) above, the bidder shall debarred from participation in the MTNL’s

future tender for said item for next two years in addition to forfeiture of EMD. The bidder will not approach the Court against the decision of MTNL in this regard.

h) (i) If the bidder is found to use forged, tempered or manipulated documents at any stage ; or (ii) If the bidder is found to be involved into cartel information.

Note:-In all above cases the bidder will not be eligible to participate in any tender of MTNL for One year from the date of issue of APO to successful bidder(s). The bidder will not approach the court against the decision of MTNL in this regard.

12.7. The bid security is required to protect the Purchaser against the risk of bidder’s conduct, which would warrant the security’s forfeiture, pursuant to Para 12.6.

12.8 Adjustment of any amount payable to the bidder and or earnest money/bid security paid in respect of any other bid shall not be accepted in lieu of payment of earnest money for this bid and such bid shall be treated as non-responsive.

12.9 The successful bidder’s bid security will be discharged upon the bidder’s acceptance of the Letter of Intent (LOI) satisfactorily pursuant to the clause 27 and furnishing the performance security.

13. PERIOD OF VALIDITY OF BIDS 13.1 Bid shall remain valid for 150 (One Hundred and Fifty) days from the date of opening of bids

prescribed by the Purchaser pursuant to clause 19.1. A bid valid for a shorter period shall be rejected by the Purchaser being non-responsive.

13.2 In exceptional circumstances, the Purchaser may request the consent of the bidder for an extension to the period of bid validity. The request and the response thereto shall be made in writing. The bid security provided under clause 12 shall also be suitably extended. The bidder may refuse the request without forfeiting his bid security. A bidder accepting the request and granting extension will not be permitted to modify his bid.

14. FORMAT AND SIGNING OF BID14.1 The bid shall be typed or printed, numbered sequentially and digitally signed by the bidder or a person or persons duly authorized to bind the bidder to the Contract. An index of various

15

Page 17: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

documents and page no where it is available, shall be given. The letter of authorization shall be indicated by written power-of-attorney. The copy of power-of-attorney shall be enclosed along with the bid and original power of attorney shall be submitted along with bid security to AGM (MPL), CSD Compound, Netaji Nagar, New Delhi-110023, before opening of bids.

14.2 Individual signing the bid or other documents connected with the Contract shall indicate the full name below the signature and must specify whether he is signing as:

Sole proprietor of the firm or constituted attorney of sole proprietor.ii) A partner of the firm, if it is a partnership firm,ii) Constituted attorney of the firm, if it is a company.iv) In case of (ii) above a copy of the partnership agreement and general power of

attorney in both cases, i.e. i) & ii) above, attested by a notary public, or affidavit on stamped paper of appropriate value given by all the partners admitting execution of the partnership agreement or the General Power of Attorney duly notarized should be furnished.

v) In case of partnership firms, where not authority to refer dispute concerning the business of the partnership has been conferred on any partner, the tender offer and all other related documents should be signed by every partner, of the firm.

vi) A person signing the tender form or any other documents forming part of the contract on behalf of another shall be deemed to warrant that he has authority to sign, such documents and if, on enquiry it appears that the person has not authority to do so, the Purchaser may without prejudice to other civil and criminal remedies, cancel the Contract and make or authorise execution of Contract/intended contract, at the risk and cost of such person and hold the signatory liable to the Purchaser for all costs, and damages arising from the cancellation of the Contract including any loss which the Purchaser may have on account of execution of Contract/intended contract.

vii) Conditional bids will be summarily rejected.viii) Concealment and / or furnishing of wrong or incomplete information by the bidder

/Contractor .shall render him/them liable to be removed from the approved list of Contractor and further debar him/them from further contract (s) and also forfeiture of bid security etc.

ix) No applicant/bidder shall submit more than one bid for the purposes herein contained.x) The Technical bid should not contain any indication of the price. In case an indication

of the price quoted is included in the Technical bid, the quotation will be rejected without any reference to the bidder. No correspondence will be entertained in this regard. The bids should be neatly presented. Corrections, if any, should be duly authenticated with full signature of the authorised person who is signing the bid, failing which the bid is liable to be rejected.

D. SUBMISSION OF BIDS15.1 Bids along with documents as indicated in clause 7 shall be digitally submitted in the format

prescribed by the Purchaser. The Supporting documents shall be suitably mapped along with the format.

15.2 Tender Opening: Tender will be opened online by the designated tender opening committee of MTNL on the schedule date and time of opening of the bids. The representative of the bidders may attend the bid opening either online after Logging on to the TCIL ETS Portal or at MTNL premises along with letter of authorization for attending bid opening.

16. SUBMISION OF BIDS:16.1 Bids must be received by the Purchaser at the address specified under Para 15.2 not later than

the date and time specified in NIT.16.2 The Purchaser may at its discretion, extend this deadline for the submission of bids by

amending the bid documents in accordance with clause 6 in which case all rights and obligations of the Purchaser and bidders previously subject to the deadline will thereafter be subject to the deadline as extended.

17 LATE BIDS: E-Tendering system is date and time locked. The system will not accept any bid after the

scheduled date and time of submission of the bids.18. MODIFICATION AND WITHDRAWAL OF BIDS:18.1 The bidder may modify or withdraw its bid after submission prior to the deadline

prescribed for submission of bids.18.2 No bid shall be modified subsequent to the deadline for submission of bids.18.3 In case of withdrawal of bid after deadline for submission of bid, the bidder shall be debarred

from participation in MTNL’s future tender for the said item for next two years in addition to forfeiture of bid security. The bidder will not approach the court against the decision of MTNL in this regard.

E. BID OPENING AND EVALUATION:16

Page 18: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

19. OPENING OF BIDS BY PURCHASER.19.1The Purchaser shall open bids on due date & time as per NIT. The bidders representative

(Maximum two) who choose to attend and will be physical present at MTNL premises, shall sign in an attendance register. Authority letter to this effect shall be submitted by the bidders before they are allowed to participate in bid opening. Technical bids shall be opened first and financial bids of only those bidders who qualify in the Technical bid evaluation shall be opened at a later date under intimation to qualified bidders only, provided bid security and other clauses/conditions are met by the qualified bidders

19.2 If the date fixed for opening of bids, is subsequently declared as holiday by MTNL, a revised date of opening will be notified. However, in absence of such notification, the bids will be opened on next working day, time and venue remaining unaltered.

20. CLARIFICATION OF BIDS:To assist in the examination, evaluation and comparison of bids, the Purchaser may, at its sole discretion ask the bidder for the clarification in respect of its bid in writing and the response thereof shall also be allow in writing. Such clarification(s) shall be provided within the time specified by the Purchaser for this purpose. However, no Post Bid clarification at the initiative of the bidder shall be entertained. If any bidder does not provide clarification(s) sought by the Purchaser within the prescribed time, its bid shall be liable to be rejected. In case, the bid is not rejected, the Purchaser may proceed to evaluate the bid by construing the particulars requiring clarification to the best of its understanding and the bidder shall be barred from subsequently questioning such interpretation by the Purchaser.

20.1 The Purchaser does not bind itself to accept the lowest or any tender and reserves to itself the right to accept the whole or any part of the tender and of altering the quantities offered and bidder shall supply the same at the rate quoted.

20.2 If terms and conditions in the acceptance for tender (Purchase Order) are in conflict with terms and conditions outlined herein (Invitation to Tender), it is to be understood that those in the acceptance of tender (Purchase Order) will govern. In the event of any ambiguity or discrepancy, the same shall be explained and adjusted by the Purchaser.

20.3 The Purchaser shall have the right to cancel the Contract wholly or in part in case he is obliged to do so on account of any decline, diminution, curtailment or stoppage of the works and in that event, this will be mutually discussed and settled depending upon the status of the Contract.

20.4 During the period of Contract, if so desired by the Purchaser, the bidder shall visit the Purchaser at such place as may be prescribed by the Purchaser for discussions on design matter, progress, expediting etc. at his cost.

21. PRELIMINARY EVALUATION:

21.1 The Purchaser shall evaluate the bids after the preliminary check as explained in para-14. Thereafter the Purchaser shall carry out detailed evaluation of the substantially responsive bids. The Purchaser shall evaluate the bids to determine whether they are complete, whether any computational errors have been made, whether required sureties have been furnished, whether the documents have been properly signed and whether the bids are generally in order.

21.2 Arithmetical errors shall be rectified on the following basis. If there is a discrepancy; between words and figures, the amount in words shall prevail. If the Supplier/Contractor does not accept the correction of the errors, his bid will be rejected.

21.3 Prior to the detailed evaluation, pursuant to clause 22, the Purchaser will determine the substantial responsiveness of each bid to the bid documents for purposes of these clauses. A substantially responsive bid is one which conforms to all the terms and conditions of the bid documents without services deviations. The Purchaser’s determination of bid’s responsiveness is to be based on the contents of the bid itself without recourse to extrinsic evidence.

21.4 A bid determined as substantially non-responsive will be rejected by the Purchaser and shall not, subsequent to the bid opening, be made responsive by the bidder by correction of the non-conformity.

21.5 The Purchaser may waive any minor infirmity or non-conformity or Irregularity in a bid, which does not constitute a material deviation, provided such waiver does not prejudice or affect the relative ranking of any bidder. The documents which falls under minor infirmity & does not affect the relative ranking or substantive responsiveness of the bidders shall be identified by TEC and called from the bidders.

21.6 If a firm quotes ‘Nil’ charges/ consideration, the bid shall be treated as non- responsive and will not be considered”.Note: A firm may quote ‘Nil’ charges for certain item(s) in the break up, but must have a financial consideration at over all bid level.

17

Page 19: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

22. EVALUATON AND COMPARISON OF SUBSTANTIALLY RESPONSIVE BIDS:

22.1 The Purchaser shall evaluate in detail and compare the bids previously determined to be substantially responsive pursuant to clause 21.

22.2 The bidders shall be required to offer the schedule of prices in the prescribed Financial bid form as % (above or below the Schedule of Rates at Annexure-I) OR at the same rates indicated in the Schedule base Rates at Annexure-I.as per Section X part-II .

23. CONTACTING THE PURCHASER:

23.1 Subject to clause 20, no bidder shall try to influence the Purchaser on any matter relating to its bid, from the time of the bid opening till the time, the Contract is awarded.

23.2 Any effort by a bidder to influence the Purchaser in the Purchaser’s bid evaluation, bid comparison or Contract award decisions may result in the rejection of the bid.

F AWARD OF CONTRACT:

24. PLACEMENT OF ORDER 24.1 The Purchaser may consider placement of order for commercial services on those bidders

whose offers have been found technically, commercially and financially acceptable and whose services have been type approved/ validated by the Purchaser or its authorized agency/agencies. The Purchaser reserves the right to propose counter offer price(s) against price(s) quoted by any bidder.

24.2 The Purchaser has the exclusive right to distribute the work between Contractors in any manner that Purchaser may decide and no claim shall lie against the Purchaser by reason of such distribution of work. In the instant case quantum of the work and likely distribution is as follows:

Item AREA Tentative Qty of work

Approximate cost of work( Rs. In Lac)

Distribution

1 G.M. (Development) Trenching & Allied works

7.43 Kms

150 L-1 would get 20% and balance among 9 bidders lower in ranking in inverse ratio of their quote

Trench less- And Allied Works

50.66 Kms

Duet Pulling

42.35 Kms

2.Group-I

G.M. (TY) Maintenance work 60 L1 27%L2 26%L3 24%

L4 23%

3. GM(East) Maintenance work 144. GM (West) Maintenance work 28.20

Group Total

102.20

5.Group-II

GM (NP) Maintenance work 51.58

L5 35%

L6 33% L7 32%

6. GM (BCP) Maintenance work 26.5

Group Total 78.087.

Group-IIIGM (North) Maintenance work 58.11 L8 35%

L9 33% L10 32%

8. GM (Central) Maintenance work 10

Group Total 68.11

18

Page 20: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

a) The work of Development unit i.e. Item No. 1 unit will be distributed amongst 10 contractors only. L-1 bidder to be given 20 % quantity and balance to 9 bidders in inverse ratio of their quotes at L-I /Counter Offered Rates.

b) The work of maintenance shall be distributed as mentioned in above table against Areas amongst the 10 short listed Contractors for item No. 1 as per their ranking. However, in case of less number of bidders the Maintenance work shall be redistributed and this allocation by Purchaser shall be final & not challengeable.

c) In case extra maintenance work i.e. over & above as indicated in table, is to be awarded in any area, the same will be distributed as per the relative grading of the Contractors.

d) If there is more than one bidder at any position (L-1 to L-10), the Contractors who has executed maximum work of trenchless digging in MTNL, Delhi on authorization of MM Cell shall be preferred and ranking of the remaining bidder will be re-casted accordingly up to 10 bidders.

e) Deletedf) The allocation of work (depending on the ranking of bidder) by Purchaser will be final and not

challengeable. It is clarified that the allocation of work (including any quantity/portion of work) and site/location shall be exclusively determined by the Purchaser without reference to any request or preference of the Contractor in respect thereof.Purchaser Reserve its right to distribute the qty at any position in case of pooling up or clustering at one position or cartel formation.

g) The bidder shall be required to do the work of both, trenching and trench less. Hence he shall quote for all the items as per price schedule.

h) The work will be awarded to the bidders in phases and the work of subsequent phases will be given on satisfactory part/complete completion of the earlier work.

i) The techno-commercial bids will be evaluated first and bids, which are found techno-commercially compliant, and responsive, these will be short-listed. The financial bids of only these short listed bidders will be opened at a later date with due intimation to them.

j) The allocation of work to eligible bidders for cable laying through Trenchless method can be of any of the bore sizes depending up on the requirement of Purchaser and shall not be challengeable and irrevocable.

k) Any attempt of cartelisation will be very seriously viewed and any such move, of which Purchaser will be the Sole Judge, shall entail summary disqualification of the bidders concerned, their EMD/Bid Security shall be forfeited and they shall be debarred from future participation in MTNL tenders.

l) The contractor shall be obliged to execute any of the work assigned to them for which provision of rates exist in NIT.

m) In case of less than 10 bidders accepting L-1 rates, the distribution of work will be as below(i) In case of 2 bidders, L-1 will be given 70% & L-2 will be given 30% of tendered work(ii) In case of 3 bidders, L-1 will be given 50%, L-2 will be given 30% & L-3 will be given 20%

of tendered work(iii) In case of 4 bidders , L-1 will be given 40% and remaining bidders in inverse ratio of their

evaluated price(iv) In case of 5 to 9 bidders, L-1 will be given 30% and remaining bidders in inverse ratio of

their evaluated price(n) In case of other bidders except L-1, not accepting the Counter Offer/L-1 rates, then

L-1 bidder shall be bound to accept at least 70% of the total tendered work. The works beyond 70% can be awarded to L-1 bidder up to a period of 12 months from the date of issue of first P.O. on mutual consent.

24.3 Deleted. 24.4. AWARDING OF CABLE LAYING WORK BY TRENCHING & TRENCHLESS TECHNOLOGY

AND ITS EXECUTION:(i) All bidders must submit their financial bids in the format as given in Price schedule(ii) On the basis of rates and panel of Contractors finalized through this Tender, the various

Cable Laying work by Trenching and Trenchless Technology, execution units of MTNL Delhi Unit will issue separate Work Orders for each individual Cable Laying work.

(iii) Each Cable Laying work by Trenching and Trenchless Technology/Maintenance, Work Order will be controlled by an officer on behalf of MTNL, Delhi Unit, not below the rank of Sub-Divisional Engineer.

(iv) The Contractor will carry out the various phases of Cable Laying work by Trenching and Trenchless Technology as per the standards laid down in Section-VI.

(v) The Contractor will have to be registered under section 7 of Contract Labour (Regulation and Abolition) Act, 1970 if / when the Contractor engages more than the specified number of Labours in a day, as per the aforesaid section.

(vi) The Contractor must lay cable in the presence of a MTNL official /officer.(vii) All works shall at all times be open for supervision, inspection and measurement by the

Concerned SDE/DE and the officers of Acceptance Testing Unit and no work done by the Contractor shall be accepted without such supervision, inspection and measurement.

19

Page 21: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(viii) For recording the measurement of any work done by the Contractor, the prescribed Measurement Books of the Purchaser will be used.

(ix) The Purchaser reserves the right to suspend any of the scheduled item / items of work temporarily or permanently.

(x) The Contractor shall comply with the regulation and order of Police, Municipal Authorities and other regulations and orders relating to the work entrusted to the contractor.

(xi) The decision of Purchaser fro quantum of work shall be final and not challengable by any bidder.

(xii) It is clarified that in case the completion of allocated work exceeds the Contract period, the Contractor will complete the said work on the same terms and conditions within such timeline as may be specified by the Purchaser, unless otherwise agreed by the Purchaser

PURCHASER’S RIGHT TO VARY QUANTITIES 25.1 (i) The actual amount of maintenance work can not be quantified in advance and it may vary

on actual and need basis. (ii) The quantity indicated against development work for award is only estimation and actual

award of work may vary depending upon prevailing factors and circumstances.(iii) No bidder shall have any claim for award of any specific quantity, including quantity

indicated in the bid documents.(iv) The Purchaser will have the right to revise / change / amend the work order after the

allocation of work.25.2 In exceptional situation where the requirement is of emergent nature and it is

necessary to ensure continued works/services from the existing Contractors, the Purchaser reserves the right to place repeat order up to 50% of the value of the works and services contained in the running tender up to a period of 12 months from the date of issue of first PO at the same rate or a rate negotiated(downwardly) with the existing contractors considering the reasonability of the rates based on prevailing market conditions and the impact of reduction in duties and taxes etc.

25.3 Further, if required, an additional order for 50% of the value of works and services limited to 100% of the value of works and services contained in the running tender may be placed on the existing contractors at the same rate or a rate negotiated (downwardly) with the existing contractors considering the reasonability of the rates based on prevailing market conditions and the impact of reduction in duties and taxes etc. (with the approval of Board of MTNL)

26. PURCHASER’S RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS:The Purchaser does not bind itself to accept lowest or any other tender. Notwithstanding anything contained in this bid document, the Purchaser reserves the right to accept or reject any bid, and to annul the bidding process and reject all bids, at any time prior to award to Contract without assigning any reasons whatsoever and without thereby incurring any liability to the affected bidder or bidders on the grounds for the Purchaser’s action.

27. ISSUE OF LETTER OF INTENT (LOI).27.1 The issue of a Letter of Intent (LOI) shall constitute the intention of the Purchaser to enter into

Contract with the successful bidder.27.2 The successful bidder shall, within 14 (Fourteen) days of issue of the LOI give his

acceptance and submit his performance security in conformity with the Section-XI of the bid documents and as per the format specified by the Purchaser.

28. SIGNING OF THE CONTRACT: 28.1 Within three (3) days of deposit of the performance security, the successful bidders will

have to sign the Agreement as per SECTION-XII.28.2 The Contractor will have to bear all relevant expenses in connection with signing of the

Agreement including the purchase of Stamp Papers.29. ANNULMENT OF LETTER OF INTENT:

Failure of the successful bidder to comply with the requirement of clause 28 shall constitute sufficient ground for the annulment of the acceptance of the bid and forfeiture of the bid security in which event the Purchaser may make the offer to any other bidder at the sole discretion of the Purchaser or call for new bids.

30. Any one or more of the following actions / commissions shall result into outright rejection of bid.i) Any bid, received late without conclusive proof that it was delivered before the specified

closing time. ii) Any bid, unless exempted specifically, not accompanied by required earnest money and

insufficient amount of EMD. (iii) Any unsealed bid.

20

Page 22: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(iv) Any conditional bid.(v) Any bid in which rates have not been quoted in accordance with specified formats / details as specified in Tender Document.(vi) Any effort by a bidder to influence the Purchaser in the bids evaluation, bid’s

comparison or Contract award decision may also result in rejection of the bid.

(vii) Any bid with shorter validity period(viii) Any bid without ownership /Lease agreement of HDD Machine as per eligibility condition (ix) Any bid without lease agreement of GPRS machine as per eligibility condition.(x) Before outright Rejection of Bid by bid opening team for non-compliance of any of the

provisions mentioned in clause (i) to (ix) above and clause 2 of section(ii), the bidder may be given opportunity to explain its position; however, if the bidder is not satisfied with the decision of the Bid opening team, it can submit the representation to the Bid opening team immediately but in no case after closing of the tender process with full justification quoting specifically the violation of tender condition, if any.

31. Purchaser reserves the right to disqualify the contractor for a suitable period who habitually failed to carry out the work in time. Further, the Contractor’s whose performance is not satisfactory in the field in accordance with the specifications may also be disqualified for a suitable period as decided by the Purchaser in its sole discretion.

32. Purchaser reserves the right to blacklist a bidder for a suitable period in case he fails to honour his bid without sufficient grounds.

33. The bidder shall give a certificate that none of his/her near relatives defined below are working in MTNL. In case of proprietorship firm certificate will be given by the proprietor. For partnership firm certificate will be given by all the partners and in case of limited company by all the Directors of the company excluding Government of India/Financial institution nominees and independent non-Official part time Directors appointed by Govt. of India or the Governor of the state. Due to any breach of these conditions by the bidder the bid submitted by the bidder will be rejected and bid security will be forfeited at any stage whenever it is noticed and Purchaser will not be liable to pay any damage to the bidder for the said rejection of bid or forfeiture of security deposit. The bidder will also be debarred for further participation in the concerned unit.The near relatives for this purpose are defined as:-(a) Members of a Hindu undivided family.(b) They are husband and wife.(c) The one is related to the other in the manner as father, mother, son(s) & Son’s wife

(daughter in law), Daughter(s) and daughter’s husband (son in law), brother(s) and brother’s wife, sister(s) and sister’s husband (brother in law).

The format of the certificate is given at Annexure-C 34. Bidders are here by Cautioned that any attempt for cartel formation will be viewed

seriously and may at the discretions of Purchaser, leads to cancellation of tender. Purchaser in its sole discretion may decide to forfeit bid security of such bidders and black listing or debarring them besides taking other punitive measures. Decision of Purchaser in this regard shall be final and binding.

35. Bidder shall give a declaration regarding Black listed, banned or debarred in the format given at Annexure-D.

36. The successful bidder has to open its office in the locality covered by MTNL Delhi Unit and should be adequately equipped with telecom facilities.

37. No one connected with, or employed in the MTNL /DOT/BSNL shall be a partner / associated with the bidding Firm, nor shall any such person ever be admitted as a partner or to any interest in this Contract.

38. The Tender Document is not transferable.39. The Supplier and the Contractor are synonymous and shall include his / their legal successors

or assignees.40. Submission of a Tender will bind the bidder to the acceptance of all the terms and conditions

specified in the tender document. Nevertheless, each bidder must certify explicitly and unambiguously that he has studied & understood all the terms and conditions and work descriptions given in the Tender Documents and agrees to abide by the same.

41. Each page of the tender bid and accompanying document submitted must be signed and stamped by the bidder or his authorized representative.

42. Any tender not conforming to the Terms and Conditions and Specifications mentioned in the tender documents is liable to be rejected. In this case, only the bid security will be refunded.

43. Canvassing in any form is forbidden and will be a disqualification.44. The ED, MTNL, Delhi Unit, reserves the right to reject any or all the tenders bids without

assigning any reason whatsoever and is not bound to accept the lowest tender.45. JURISDICTION: It is clearly understood by the bidders that the court in the city of New Delhi

alone shall have the jurisdiction to entertain any application or other proceedings in respect of anything arising pursuant to and/or in connection with the tender, tender process and/or under

21

Page 23: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

this Contract and any award or awards made by the sole Arbitrator here-under shall be filled in the concerned courts in the city of New Delhi only.

46. Road maintenance and Inter Utility Code of conduct will be followed by the contractors.47. Purchaser reserves the right to reject abnormally lower and higher bids, based on the market

survey. The Purchaser is not bound to award contract at lowest price received in the tender and reserve the right to decide on fair and reasonable rate for the works and counter offer the same to successful bidder.

48. Sub-contracting of work by approved Contractor is not permitted without the prior approval of the Purchaser.

49. The contractor shall be obliged to execute any of the work assigned to them for which provision of rates exist in NIT.

50. The Purchaser reserve the right to assign laying of telephone cables by trenching, cable laying, pulling of cables through ducts, cable laying by trench less method and allied works of similar nature to any of the govt. agencies approved by BSNL or its own resources.

51. The Contract, if any, which may be awarded shall be governed by the terms and conditions of Contract as contained in the NIT and this tender document.

52. INFORMATION TO BE GIVEN BY BIDDERS: The bidders must furnish full, precise and accurate details in respect of information asked for and required to submit Registration of Contractor with Labour Officer as a Contractor. A Contractor is not allowed to undertake or execute and work through contract Labour without obtaining a valid Licence from the Licensing Office.

53. In case of Partnership firm, after a final decision about the tender is taken, the successful bidder shall produce original partnership deed within 7 (seven) days of the acceptance of tender, failing which the Purchaser will be entitled to cancel the Contract at the risk and cost of the bidder and the bid security/ Security Deposit (as the case may be) shall stand forfeited.

54. The bidders are not expected to make any post-tender modification of rates etc. Any clarification sought by the Purchaser also shall be in writing and reply shall also be received in writing.

55. Absurd / Abnormal rates will not be considered by the Purchaser.56. Any conditional discount will be taken as absolute discount.57. It shall be deemed that by submitting the bid, the bidder has:

(i) made a complete and careful examination of the bid document;(ii) received all relevant information requested from the Purchaser;(iii) accepted the risk of inadequacy, error or mistake in the information provided in the bid

document or furnished by or on behalf of the Purchaser; and(iv) agreed to be bound by the undertakings / declarations / certificates provided by it under

and in terms hereof.58. It shall be deemed that by submitting the bid, the bidder agrees and releases the Purchaser,

its employees, agents and advisers, irrevocably, unconditionally, fully and finally from any and all liability for claims, losses, damages, costs, expenses or liabilities in any way related to or arising from the exercise of any rights and / or performance of any obligations and/ or in connection with the bidding process, to the fullest extent permitted by applicable law, and waiver of any and all rights and / or claims it may have in this respect, whether actual or contingent, whether present in India or abroad.

59. The Purchaser shall not be liable for any omission, mistake or error in respect of any matter or thing arising out of or concerning or relating to the bid document and/or the bidding process, including any error or mistake therein or in any information or data given by the Purchaser.

60. Any information contained in the bid submitted by the bidder(s) shall not in any way be construed as binding on the Purchaser, its officers, employees, agents, successors or assigns, but shall be binding against the bidder if any Contract is subsequently awarded to it under the bidding process on the basis of such information.

61. The Purchaser reserves the right not to proceed with the bidding / tender process at any time without giving any notice or liability and to reject any or all bid(s) without assigning any reasons whatsoever.

62. All documents and other information supplied by the Purchaser or submitted by any bidder pursuant to this tender document shall remain or become the property of the Purchaser. The bidders are to treat all information as strictly confidential and shall not use it for any purpose other than for preparation and submission of their bids. The Purchaser will not return any bid or any information provided along therewith.

63. Save and except as provided in this bid document, the Purchaser shall not entertain any correspondence from any bidder in relation to the acceptance or rejection of any bid.

22

Page 24: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

64. Corrupt or Fraudulent Practices(a) The bidders and their respective officers, employees, agents and advisers shall

observe the highest standard of ethics during the bidding process. Notwithstanding anything to the contrary contained herein, the Purchaser may reject a bid without being liable in any manner whatsoever to the applicant/bidder if it determines that the applicant/bidder has, directly or indirectly or through an agent, engaged in corrupt practice, fraudulent practice, coercive practice, undesirable practice or restrictive practice in the bidding process.

(b) Without prejudice to the rights of the Purchaser under clause (a) above, if any bidder is found by the Purchaser to have directly or indirectly or through an agent, engaged or indulged in any corrupt practice, fraudulent practice, coercive practice, undesirable practice or restrictive practice during the bidding process, such bidder shall not be eligible to participate in any tender issued by the Purchaser during a period of 2 (two) years from the date such bidder is found by the Purchaser to have directly or indirectly or through an agent, engaged or indulged in any corrupt practice, fraudulent practice, coercive practice, undesirable practice or restrictive practice, as the case may be.

(c) For the purposes of this clause 64, the following terms shall have the meaning hereinafter respectively assigned to them:

i. “corrupt practice” means (i) the offering, giving, receiving, or soliciting, directly or indirectly, of anything of value to influence the actions of any person connected with the bidding process (for avoidance of doubt, offering of employment to, or employing, or engaging in any manner whatsoever, directly or indirectly, any official of the Purchaser who is or has been associated in any manner, directly or indirectly, with the bidding process or has dealt with matters concerning the Contract or arising therefrom, before or after the execution thereof, at any time prior to the expiry of one year from the date such official resigns or retires from or otherwise ceases to be in the service of the Purchaser, shall be deemed to constitute influencing the actions of a person connected with the bidding process); or (ii) engaging in any manner whatsoever, whether during the bidding process or after the issue of the letter of award (LOA) or after the execution of the Contract, as the case may be, any person in respect of any matter relating to the LOA or the Contract, who at any time has been or is a legal, financial or technical adviser of the Purchaser in relation to any matter concerning this bid document and/or the Contract;

ii. “fraudulent practice” means a misrepresentation or omission of facts or suppression of facts or disclosure of incomplete facts, in order to influence the bidding process;

iii. “coercive practice” means impairing or harming or threatening to impair or harm, directly or indirectly, any person or property to influence any person’s participation or action in the bidding process;

iv. “undesirable practice” means (i) establishing contact with any person connected with or employed or engaged by the Purchaser with the objective of canvassing, lobbying or in any manner influencing or attempting to influence the bidding process; and

v. “restrictive practice” means forming a cartel or arriving at any understanding or arrangement among applicants with the objective of restricting or manipulating a full and fair competition in the bidding process.

65. Interpretation: The instructions, terms and conditions mentioned in this Section II are to be read along with other provisions, terms and conditions stipulated elsewhere in the Tender document.

**************

23

Page 25: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Section-IIIGENERAL (COMMERCIAL) CONDITIONS OF CONTRACT

1. APPLICATION:The general conditions shall apply in all Contracts, made by the Purchaser for the procurement of Goods/Services.

2. STANDARDS:The Goods/Services supplied under the Contract shall conform to the standards mentioned in the technical specifications.

3. Deleted

4. PERFORMANCE SECURITY:4.1 As a security for due performance of the works entrusted to the Contractor under the Cable

Laying by Trenching and Trench less Technology Contract Agreement, successful Supplier shall have to deposit within 14 (Fourteen) days appropriate sum of money so as to make the Security Deposit 5% of value of work after adjustment of the bid security in case of E.M.D deposited in form of D.D.

The Security Deposit Money may be submitted in either of the following modes:a). By Demand draft drawn in favor of Accounts Officer (MM), MTNL, New Delhi.b). As irrevocable and unconditional Bank Guarantee from a Nationalized / Scheduled

Bank valid up to two (2) years from the date of agreement. It is clarified that the performance security / bank guarantee shall be the standalone document to the Contract. Notwithstanding anything mentioned to the contrary in the Contract, the Purchaser shall be at liberty to receive any payments /outstanding dues including penalties against the Contractor including upon any default or breach of obligations by the Contractor under the Contract and/or work order, from the performance security/ bank guarantee to satisfy its claims against the Contractor by way of imposition of penalty or otherwise, irrespective of any other remedy under the Contract or under law. In such an event, the Contractor shall be obligated to ensure that the performance security/ bank guarantee is restored to its original value within one (1) week from such invocation failing which the same shall be deemed as material breach by the Contractor and entitle the Purchaser to forthwith terminate the Contract.

However, the Suppliers (small scale units) who are registered with National Small Scale Industries Corporation UNDER SINGLE POINT REGISTRATION SCHEME are exempted from payment of performance security up to the amount equal to their monetary limit. In case of Suppliers having monetary limit as ‘NO LIMIT’ or without limit or more than Rs. 50,00,000/-(Rs. Fifty Lacs), the exemption will be limited to Rs.50, 00,000/- (Rupees Fifty Lakhs) only. A proof regarding current registration with NSIC for the TENDERED ITEMS will have to be attached along with the bid.

4.2 No interest will be paid on the bid security while it is in the custody of the Purchaser.

4.3 The Purchaser reserves the right to forfeit or adjust the whole or any part of the bid security for any money due to the Purchaser that cannot be recovered by the pending bills / claims of the Contractor or as a measure of penalty. In case of such forfeiture and/or adjustment, the Contractor shall have to deposit within one (1) week further security money forthwith for the full amount or an amount sufficient to make up the deficit as the case may be.

4.4 The said bid security or so much thereof as may not have been appropriated to the use of the Purchaser as penalty measure (described in detail in item - 12 below) will be returned to the Contractor after the expiry of the Contract on submission of ‘NO DEMAND/NO DUES CERTIFICATE’ and ‘ SUCCESSFUL COMPLETION OF WORK CERTIFICATE’ by the concerned Dy. G.M. However, the Purchaser may withhold such payment up to two (2) months from the date of receipt of ‘NO DEMAND/NO DUES CERTIFICATE’ and ‘SUCCESSFUL COMPLETION OF WORK CERTIFICATE’ for the purpose of verifying records so as to ensure that there is no recovery pending for any damages or dues.

4.5 If the successful bidder had previously held any Contract with and furnished security deposit to the Purchaser, the same shall not be adjusted against this tender and a fresh security deposit will be required to be furnished in accordance with the terms of this tender document and the same shall be valid for 24 months or till the Contract period, whichever is higher.

24

Page 26: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

4.6 In the event of premature termination of the Contract as envisaged in Clause 12 of Section-III or for any failure of Contractor of any of the contractual obligations then, without prejudice to other rights or remedies available to the Purchaser under the Contract or otherwise under law, the Purchaser shall have the right to forfeit the entire amount of P.G./ security deposit or appropriate P.G./ security deposit or any part thereof in or towards the satisfaction of any sum due to be claimed for any damages, losses, charges, expenses or costs that may be suffered or incurred by the Purchaser.

4.5 PERFORMANCE GUARANTEE/ SECURITY DEPOSIT FOR STOREa) In addition to the performance security, the Contractor shall also furnish an

irrevocable and unconditional additional bank guarantee (BG) of Rs. 16 lakhs to cover up the assets / stores of the Purchaser. This Bank Guarantee shall be a standalone document and shall be submitted by the Contractors within 14 (Fourteen) days of signing of the Contract. This Bank Guarantee shall be valid for 18 months and shall be returned/revoked only after clearance is given by unit officers of the area in which Contractor has performed the job. This BG will be submitted in the office of the concerned Project unit i.e. DGM (CC) and this BG will be kept valid for the period of Contract by the Project unit.

b) The Security Deposit will be subject to the terms and conditions given in Section-II to this tender and the Purchaser will not be liable for payment of any interest on the Security deposit or any depreciation thereof.

c) If the successful Supplier had previously held any Contract and furnished security deposit, the same shall not be adjusted against this tender and a fresh security deposit will be required to be furnished by the Supplier, which shall be valid for 18 months.

5. EXECUTION OF TIME LIMIT:The time period as stipulated in the Contract or LOI shall be deemed to be the essence of the Contract.

6. ACCEPTANCE, TESTING:

All items of work (including depth) will be subjected to Quality-Control Check to be performed by Acceptance/Testing Unit of MTNL New Delhi, as per the guidelines of MTNL New Delhi/BSNL/T&D circle. Item rejected will have to be re-done by the Contractor at his cost

7. THE PERIOD OF CONTRACT AND PROVISION OF EXTENSION

A. Period of Contract: The contract shall remain in force for a period of one year from the date on which first

agreement is entered into. The rates finalized shall remain firm and valid for the work order issued during this period of one year. The Purchaser shall reserve the right to terminate the Contract at any time during the currency without assigning any reason by giving 30 days notice in writing to the Contractor at his last known place of business. The Contractor shall not claim any compensation for such termination.

B. Provision of Extension (I) The Contract can be extended up to one year at the discretion of the Purchaser at the

existing terms & conditions. However, the existing rates will be applicable for all the Work Orders issued prior to the date of opening of financial bid of new tender, and this will be binding on the part of the Contractor. During the extension period, allocation of additional maintenance and development works will be made as per requirement and restricted to tender quantities as mentioned under schedule of requirement, section V. The period of PBG will have to be extended during the extension period.

(II) For all Work Orders issued on or after the opening of financial bids of the new tender, lower of the two rates, i.e. existing rate and rates finalized in the new tender, will be applicable and this will be on the basis of mutual consent. However, L-1 bidder of new tender, if already an existing Contractor shall be bound to execute all the work orders issued after opening of financial bids without demur at lower of the two rates i.e. existing rates and rates finalised in the new tender.

8. PAYMENT TERMS:8.1 Payment will be made only after clearance certificate from A/T team and made over to user.8.2 While submitting the bills the Contractor shall submit:-

(i)An undertaking that “I will pay GST (CGST/SGST/IGST/UTGST) to the respective GST Department.”(ii)Proof of deposit of “EPF/ESI of previous month(s) for the labourer employed”.(iii)Proof of deposit of GST (CGST/SGST/IGST/UTGST) of previous month(s) to the respective GST Department.

25

Page 27: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

8.3 For quoting charges / rates for different items of work, then Section-X itself has to be used. No separate charges other than those items indicated in Section-X will be payable to the Contractor.

8.4 All payments for works relating to laying of cables will be made as per the relevant category indicated in Section-X (Annexure-I) as approved by the Purchaser at same or counter offered rates. The length of cable laid excluding the length of cable left as overlap for future joints to be taken up by MTNL Delhi. Such overlap lengths will be indicated in the Measurement Book but excluded from the chargeable length of cable laid.

8.5 The Purchaser will pay to the Contractor for the work which the Contractor was called upon by any Authorized Officer on behalf of the Purchaser and which was satisfactorily done by the Contractor at the rates mentioned in Section-X(Annexure-I) as approved by the Purchaser at same or counter offered rates. For this purpose the Contractor must submit to the Construction Officer/SDE of MTNL Delhi unit his/their bill for the items of work done by him / them against a particular Work order at the approved rates to be specified in Contract order within 30 (thirty) days of the items of work covered by that work order having been satisfactorily completed by him/ them.

8.6 (a)The payment to Contractor’s will be subject to deduction of tax deducted at source of bill (s) the Purchaser will deduct on account of Income Tax (TDS), at the rate of 2.0% plus surcharge applicable from time to time or as may be fixed form by the Government of India from time to time on the gross amount of each bill passed for payment in accordance with the provision of Clause 194-C of Income Tax Act, 1961 as amended time to time. In addition to this Purchaser will also deduct work contract tax (TDS) at the rate of 2.0% + labour cess@1% or as may be fixed by Delhi state Govt. (GST Department Delhi) time to time on the gross amount of each bill passed for payment.

(b) Payment of GST shall be released on production of necessary supporting documents i.e. GST invoice. If the supplier fails to furnish necessary supporting documents i.e. GST invoice, the amount pertaining to such Duties/Taxes will not be paid. Tax amount will be payable to the supplier only after supplier declares the details of the invoices in its GSTR-1 and GSTR-3 and the same is reflected in GSTR-2A of MTNL on GSTN portal.

(c ) Wherever domestic reverse charge is applicable on MTNL or in case vendor is un-registered under GST Act, vendor shall not charge tax on invoice. It shall be the liability of MTNL to pay tax under reverse charge mechanism.

(d) No payment of GST shall be made to those bidders, who are either not registered for GST or who are registered under Composition Scheme of GST.

(e) If status of a bidder who was initially registered on GST under Composition Scheme at the time of submission of financial bid, subsequently his status changes to normal GST registered vendor any time during the period of contract, under such circumstance, his unit price will be discounted by the applicable Tax rate as applicable under the composition scheme. In such cases if the vendor furnishes necessary supporting documents regarding GST payment and which is also GST credit eligible amount to MTNL in such cases the GST payment will be reimbursed.

(f) Entire payment of invoice shall be paid by MTNL only after the credit of the GST portion in the invoice is selected in the GSTN portal i.e. the outward return in GSTR 1 is uploaded by the supplier by 10th of the subsequent month and duly reflected in MTNL account on GSTN portal.

8.7 The Contractor may use form ACE-10, to prepare his bills but for bills prepared by him/ them the payment is subject to submission of documents along with A/T report and made over to end user provided they comply with the following conditions (Documents):-

(a) The bills be submitted in triplicate, all copies being signed by the Contractor. The three copies must be marked ‘Original’, Duplicate’ and ‘Triplicate’ respectively.

(b) Details of the quantity and nature of each item of work done or material supplied as well as the stipulated rates be given.

(c) The dates of commencement and completion of the work or supply of material be mentioned. Measurement Book should be duly signed by the Contractor at the time of measurement and he will attach completion report duly signed by the Construction Officer/SDE based on the measurement book.

(d) The number and date of the Work Order be mentioned. 9. PRICES:

9.1(i) (a) Prices charged by the contractor for services performed under the contract shall not be higher than the prices quoted by the Contractor in his Bid or in the PO

26

Page 28: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(b) In the case of revision of non-Creditable Statutory Levies/Taxes during the finalization period of tender, the Purchaser reserves the right to ask for reduction in the prices. However, no increase shall be permitted. (ii) (a)The rates finalized shall remain firm and valid for the work order issued during the period of contract. Increase and decrease of non- Creditable Taxes will not affect the price during this period. The revision of Creditable Taxes (both increase & decrease) shall be allowed while reimbursing the same due to change in tax rate as per Government orders.

(b)Any increase in taxes and other statutory non creditable duties/ levies including due to introduction of new Taxes etc. during extension period shall be to the contractor’s account. However benefit of any decrease in these taxes/ duties shall be passed on to the Purchaser by the contractor. The revision of Creditable duties (both increase & decrease) shall be allowed while reimbursing the same during extension period.

9.2 (i) The bidder/ contractor should furnish the correct HSN classification under GST in the Price Schedule. If the credit for Duties and Taxes under CGST Act read with ITC rules is found to be not admissible at any stage subsequently owing to wrong furnishing of HSN code or any other reason, then the The bidder/ contractor will refund such non-admissible amount, if already paid along with penalty and interest, if any charged by the concerned authority.

(ii) In case the Duties & Taxes which are non- Creditable as per the quotes indicated in the Price Schedule by the The bidder/ contractor and subsequently at any stage it is found that Credit for such Duties & Taxes is admissible as per CGST Act read with ITC rules, then the The bidder/ contractor is to submit necessary documents in this regard which may enable the purchaser to avail the Input credit provided such credit is still available for the amount so paid as per CGST Act read with ITC rules. However, in case the input Credit is not available for this amount, then the the bidder/ contractor will refund the amount equivalent to such Duties & Taxes if already paid to them.

(iii) The purchaser reserves the right to ask the bidders to submit documentary proof confirming the correct HSN code from the GST authority where the HSN code furnished against the particular tendered item by different bidders differs from each other or the same is found apparently not furnished in accordance with GST notifications.

10. SUB-CONTRACTS:10.1 The bidder/the Contractor cannot assign/transfer or sub-contracts its interests/obligations

under the Contract without the prior written permission of the Purchaser.10.2 The Contractor shall notify the Purchaser in writing of all sub-contracts awarded under the

Contract if not already specified in its bid. Such notification, in its original bid or later shall not relieve the Contractor from any liability or obligation under the Contract.

11. LEVY OF Liquidated damages (L.D.)/PENALTIES11.1.1 For works other than maintenance (I) If the Contractor desires an extension of time (without LD penalty) for completion of

the work due to reasons beyond its control, it shall apply in writing to the concerned DE within 3 (three) days from the date of occurrence of such hindrance/reason.

(a). The DE can waive off the LD penalty up to a maximum period of 15 (fifteen) days in case he is fully satisfied with the reasons for delay.

(b). In case DE is of the opinion that waiver of LD penalty is justified for more than 15 (fifteen) days, approval of concerned DGM shall have to be taken.

(c ). After the opening of financial bid of the new tender, LD penalty waiver should be given only with the approval of the concerned GM.

The decision of DE/DGM/GM will be final and binding in this regard. (II) Delay in Start: If the Contractor fails to start the work within the specified period as per

Work Order (W.O.), without any valid reason, LD penalty shall be levied @ Rs.1,000/- (One Thousand) for each day of delay. If the delay exceeds 15 (fifteen) days, W.O. may also be cancelled forth with besides imposition of the LD penalty leviable.

(III) Delay in Execution/Completion: If the Contractor fails to execute the work within the specified time schedule as per W.O. or during the extended period (if any), LD penalty shall be levied @ Rs.1,500/- (One Thousand Five Hundred) for each day of delay.

(IV) LD Penalty shall be levied by DE to a maximum of 12% of respective W.O. (i.e. amount payable to Contractor) excluding GST and will be recorded on the bill.

(V) Concerned DGM may also take action to rescind the W.O. and get the non-executed portion of work done by any other Contractor/Agency or to have the defects removed/repaired by any other Contractor/Agency. In case excess expenditure is incurred beyond the approved rates, the same will be recovered from the defaulting Contractor and such defaulting Contractor shall be liable to pay the same without protest or demur.

27

Page 29: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

In case the Work Order is rescinded / cancelled due to any reason: a. LD Penalty will be imposed for an amount equal to 12% of the cost of Work Order.b. The Contractor’s allotment can be curtailed to the extent of the work (LKM / DELs) for

which Work Order has been cancelled/rescinded. Even if the Work Order has been cancelled in part, the full quantities as per the Work Order will be taken into account for this purpose.

c. In case decision is taken to curtail the defaulting Contractor’s allotment, whosoever will execute these works, it may be over and above his/her allotment. The decision of concerned DGM will be final in this regard.

d. In case more than two Work Orders have been cancelled / rescinded in respect of any Contractor, its allotment may be curtailed by 10% against each Work Order (cancelled/rescinded). This will be in addition to (a) & (b) above.

(V) If the Contractor fails to redress the trench properly i.e. ramming and consolidation of the trench and removing of surplus earth, road spoils within 48 hours of the completion of the work, then a penalty at the rate of 20% of the excavation of trenching charge on pro-rata basis shall be recovered straightway from the bill.

(VI) If the Contractor fails to provide adequate provision of barricading G.I. Sheet, Caution Sign Board, Red Light, etc. on site, then a penalty @ of 20% of the excavation charges on pro-rata basis shall be recovered from the bills.

(VII) The cable laying/pulling has to be done by using jack, failing which a penalty of Rs.1,000/- (One Thousand) will be imposed on each such occasion.

(VIII) Test pits/trench should be restored immediately after completion of work. The Contractor will be wholly responsible for any damage to life & property of any person due to delay in restoration work. If the pits are not restored as per specifications of local bodies in time, penalty of Rs. 2000/- (Two Thousand) per day for first day and Rs. 1000/- (One Thousand) per day for each subsequent day shall be imposed.

(IX) In cases of damage to the existing cable (PIJF/OF ) penalty (recovery) at following rates shall be imposed :-Rate of Penalty:OF:- (i) 12 Fiber Cable Rs. 5, 000/-(ii) 24 Fiber Cable Rs. 8, 000/-(iii) 48 Fiber Cable Rs.10, 000/-PIJF:- (i) Up to 100 pr. PIJF Cable Rs. 2, 000/-(ii) Above 100 to 800 pr. PIJF Cable Rs.3, 500/-(iii) Above 800 pr. PIJF Cable Rs.5, 000/-

(X) In case of damage to the PIJF/OF cable, the cost of the cable damaged (i.e. cost of replacement of cable) plus 20% overhead charges shall be recovered as penalty from the Contractor. In this regard, decision of the Purchaser shall be final and binding on the Contractor to pay.

(XI) In case of damage to ducted PIJF/OF cable, the cost of full cable length plus 20% overhead charges shall be recovered from the Contractor.

(XII) The LD charges/penalties shall be recovered from the amount due to the Contractor in the same or other W.O. or from the Security Deposit or from any other amount payable to the Contractor by the Purchaser.

(XIII) If break of conductor is noticed due to careless pulling of PIJF Cable then a penalty of Rs. 2000/- (Two Thousand) per break per conductor and Rs.5000/- (Five Thousand) per break per OF fibre shall be recovered as penalty from the Bills of Contractor. In case faulty pairs exceed 10% of size of cable cost, the Contractor has to pay full cost of cable plus 20% overhead charges.

Other Terms, Conditions and penalties for Maintenance Work:

1. The Contractor should commence the work at site within 2 hours of telephonic intimation to him (round the clock) without waiting for written Work Order. The covering written Work Order should follow telephonic intimation.

2. In case of failure to report within the stipulated time, a penalty of Rs.200/- (Two Hundred) per hour shall be levied. The maximum penalty on this default will be Rs.1,000/- (One Thousand) per occasion.

28

Page 30: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

3. In case the Contractor does not commence its assigned work within 4 hours of telephonic intimation, the Purchaser shall be at liberty to re-allot the work to other Contractor but a penalty of Rs.1000/- (One Thousand) shall be charged on the defaulting Contractor.

4. The amount of Work Orders cancelled of any Contractor shall be reduced from the tentative amount of work allotted to him, and on the other hand, this will be over and above the allotment of the Contractor who finally executes these Work Orders.

The penalty rates specified in Clause 11.1 above are acknowledged and accepted by the bidder and will not be questioned or contested by the bidder in case the penalty at the above rates are imposed or recovered by the Purchaser or its authorised person under any of the circumstances mentioned aforesaid or elsewhere in the Tender document.

It is clarified that in case any work allocated to the Contractor remains incomplete beyond the specified time and any loss or damage is caused to the Purchaser due to such incompletion of work, the Contractor shall be liable to pay damages to the Purchaser on actual basis or differential amount of penalty and actual loss, as the case may be.

Delay Register: For the purpose of imposing LD/penalty, record of delays/ penalty details shall be maintained in a register called “Delay Register”. All the entries should be signed by CO/DE and the Contractor. In case the Contractor does not sign the Delay Register, a show cause notice (by Registered / Speed Post) will be sent to the Contractor in this regard. In the event the Contractor fails to respond the show cause notice or if the response of the Contractor is not satisfactory, then the Delay Register shall be deemed to have been signed by the Contractor notwithstanding its failure to sign the same at the first instance.

11.2 Termination of Contract In case the works are not being performed satisfactorily either in quality of work or in terms of

rate of progress, due to the negligence / failure of the Contractor, action may be initiated by GM (MM) on recommendation of concerned GM for termination of contract on the following lines:

(i) In case LD penalty has been imposed for 30 (Thirty) days or more in any W.O. and the quantum of work affected (LKM / DELs) i.e. total work of such Work Orders exceeds 30% of allotment issued by MM Cell. The W.O. where LD penalty limit has gone to a maximum of 12%, in less than 30 (Thirty) days itself will also be accounted for this purpose.

(ii) In case LD / Penalty has been imposed for an amount of Rs.45,000/- or more in any W.O., and the quantum of work affected (LKM / DELs) i.e. total work of such Work Orders exceeds 30% of allotment issued by MM Cell.

(iii) In case the W.Os have been cancelled / rescinded in full or in part and the quantum of work affected (LKM / DELs) i.e. total work of such Work Orders exceeds 30% of allotment issued by MM Cell. If the partly executed W.O. gets rescinded due to the negligence / failure of Contractor, full quantity as per W.O. shall be taken into account.

(iv) For the W.Os falling in above three categories, if at any stage the quantum of work affected (LKM / DELs) i.e. total work of such Work Orders, exceeds 30% of allotment issued by MM Cell.

(v) Regarding maintenance work, in case the amount of penalty imposed exceeds 12% or more of the total financial limit (as per MM Cell), in two or more areas individually.

(vi) If the Contract gets terminated, the PBG/Security Deposit furnished by the Contractor will stand forfeited and the Contractor shall not be eligible to participate against the Tender in question in MTNL Delhi unit for such period as may be decided by the Purchaser. The termination of Contract under this clause shall be without prejudice to the right to impose penalty under Clause 11.1 above.

11.3 Blacklisting of Contractor:

Without prejudice to its rights under Clauses 11.1 and 11.2 above, the Purchaser shall be entitled to blacklist the Contractor upon occurrence of all or any of the following events:

(i) Any breach by the Contractor of any of the terms & conditions or refusal to carry out the work; and/or

(ii) If any fraud or fraudulent motive is detected in the Contractor’s actions with the Purchaser and / or;

(iii) If the Contractor demands undue changes not stipulated in the Contract, and/or;(iv) If any person connected with the Purchaser or any official drawing salary from the Purchaser

becomes in any way interested in the Contract, and/or;

29

Page 31: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(v) If the Contractor himself or any of his servants be guilty of fraud or attempt fraud in connection with the Contract or offer any bribe or gratuity to any person connected with the Purchaser or to any official drawing salary from the Purchaser and / or;

(vi) If the Contractor employs any outside agent to perform the Contract or assign, transfer or sub-contract any of its rights or obligations under the Contract without the prior written consent of the concerned DGM of MTNL.

In case the Contractor is blacklisted, the PBG/Security Deposit furnished by the Contractor will stand forfeited and the Contractor shall not be eligible to participate in any of the Tender in MTNL Delhi unit for such period as may be decided by the Purchaser.

11.4 In case at any stage, if it is found that the documents in support of qualification to tender conditions is forged or tampered with or manipulated to take undue advantage by the bidder/Contractor, then the concerned bidder shall be liable for forfeiture of Bid Security or

performance Security and/or debarring/blacklisting from participation in any of the tender of MTNL for at least one year.

12. FORCE MAJEURE:12.1 If at any time, during the continuance of the Contract, the performance in whole or in part by

either party of any obligation under the Contract be prevented or delayed by reason of:Any war or hostility

Acts of the public enemy, civil commotion, sabotage, explosions, Effects of floods, epidemics, quarantine restrictions, General Strikes and Bandhs, Acts of God.

Hereinafter referred to as EVENT, neither party shall, by reason of such EVENT, be entitled to terminate this Contract, nor shall either party have any claim for damages against the other in respect of such non-performance or delay in performance provided notice of happening, of any such EVENT is given by either party to the other within seven (7) days from the date of occurrence of the EVENT.

12.2 Work and deliveries under the Contract shall resume as soon as practicable after such EVENT has come to an end or ceased to exist. The decision of the Purchaser as to whether the situation has become normal or not, shall be final and conclusive.

12.3 However, if the performance in whole or part of any obligation under the Contract is prevented or delayed by reason of any such EVENT for a period exceeding sixty (60) days, either party may, at his/their option, terminate the Contract by giving a written notice to the other party.

12.4 It is clarified that the Contractors will not be responsible for delays, which may arise on account of reasons beyond their control. The decision of G.M. (TRANS) shall be the final in this regard. However, strikes by contractors’ labour on account of any dispute between the Contractors and their labour as to wages or otherwise will not be deemed to be a reason beyond the Contractors’ control and the Contractors shall be responsible for any loss or damage, which the Purchaser may suffer on this account.

13. TERMINATION FOR INSOLVENCY:The Purchaser may, at any time, terminate the Contract by giving written notice to the Contractor, without any compensation to the Contractor. If the Contractor becomes unwilling, bankrupt or otherwise insolvent as declared by the competent court provided that such termination will not prejudice or affect any right of action or remedy which has accrued or will accrue thereafter to the Purchaser.

14. DISPUTE RESOLUTION, ARBITRATION, APPLICATION LAW AND JURISDICTIONThe parties shall Endeavour to resolve any dispute the agreement through mutual discussions and negotiations.However, if, after thirty (30) days from the commencement of such negotiations the efforts to resolve all or any dispute through negotiations fails, then, such dispute of difference, whatsoever arising between the parties in respect of this Agreement shall be referred to Arbitration, unless the matter is time barred as per the limitation Act, in accordance with the following provisions.

(a) Matters to be arbitrated upon shall be referred to the sole Arbitrator where the total value of claims does not exceed Rs.20 crores. Beyond the claim limit of Rs.20 crores there shall be three Arbitrators.

(b) For this purpose the Purchaser shall publish a panel of Arbitrator, meeting the requirement of the Arbitration and Conciliation Act as amended from time to time consisting of eminent persons having wide experience in Telecom,

30

Page 32: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Telecom Finance Civil and Electrical fields. This panel will be of servings or retired officers of Government Departments or of Public Sector Undertakings of the rank of Joint Secretary to Govt. of India or above.

(c) For the disputes to be decided by the sole Arbitrator, the party invoking the Arbitration Clause shall submit a list of three Arbitrators from the aforesaid Panel alongwith the letter invoking the Arbitration. The other party shall convey its consent for one of the said Arbitrators from the said list within 15 days of receipt of such request.

(d) For the disputes to be decided by a panel of three Arbitrators, the party invoking the Arbitration Clause shall submit a one name from the aforesaid Panel, as its Nominees alongwith the letter invoking the Arbitration. The other party shall convey the name of its nominee from the aforesaid panel to the Party invoking the Arbitration, within 15 days of receipt of such request Both the nominated Arbitrators shall nominate a third Arbitrator from the aforesaid Panel, who shall act as the presiding Arbitration.

(e) The Arbitration and conciliation Act,1996, as amended from time to time, and its rules made thereunder shall be applicable. The Arbitration proceedings shall be held Delhi/Mumbai only.

(f) In the event of such as Arbitrator(s) to whom the matter is originally referred. being vacating his office or neglecting his work of being unable to act for any reason whatsoever, the new Arbitrator(s) shall be appointed after following the procedure as enumerated hereinabove. The person(s) so appointed shall be entitled to proceed from the stage at which it was left out by his predecessors.

(g) The Arbitration proceedings shall be in English language.(h) The law of land as promulgated/ modified/amended as replaced from time to time shall governed this agreement,

The agreement shall be subject to exclusive jurisdiction of courts at New Delhi/Mumbai.(i) No person other than the Empaneled Arbitrators of MTNL shall be appointed as an Arbitrator to adjudicate the

dispute.2. In all agreement /contracts to be entered into by MTNL with any other Central PSU or Central Government

Department/organization in respect of any of the matter pertaining to any of the sections/units of MTNL including Civil/Electrical, if there is to be an Arbitration agreement then such Arbitration agreement shall be as agreement to refer the dispute to the Permanent Machinery of Arbitration in the aegis of the Ministry of DPE, Government of India. The draft agreement to this effects will be as follow:-

ARBITRATION“In the event of any dispute or difference relating to the interpretation and application of the provisions of the contracts, such dispute or difference shall be referred by either party for Arbitration to sole arbitrator in the Department of Public Enterprises to be nominated by the Secretary to the Government of India in-charge of the Department of Public Enterprises. The Arbitration and Conciliation Act, 1996 shall not be applicable to the arbitration under clause. The award of the Arbitrator shall be binding upon the parties to the dispute, provided, however, any party aggrieved by such award may make a further reference for setting aside or revision of the award to the Law Secretary, Department of Legal Affairs, Ministry of Law & Justice, Government of India. Upon such reference the dispute shall be decided by the Law Secretary or the Special Secretary /Additional Secretary, when so authorised by Law Secretary, whose decision shall bind the parties finally and conclusively. The Parties to the dispute will share equally the cost of arbitration as intimated by the Arbitrator”

15. GOVERNING LAWS & JURISDICTION.

The Contract and construed in accordance with the Laws of India and the Courts at Delhi will have jurisdiction to entertain any dispute or claim arising under the Contract.

16. THE PURCHASE ORDER WHEN ISSUED TO THE SUCCESSFUL BIDDER CONSTITUTES

THE CONTRACT.

16.1 The Purchase Order when issued to the successful bidder constitutes the Contract with collateral support from NIT terms and conditions as well as formal agreement on stamped paper affixed with non judicial stamps, all of which finally form the contractual obligations to be adhered to, be performed by the successful bidder/Contractor and the non-performance of any or all of such obligations make the successful bidder/Contractor liable for consequential effects.

17. SET OFF:

Any sum of money due and payable to the Contractors (indicating P.G./security deposit returnable to them) under the Contract may be appropriated by the Purchaser and set-off against any claim of the Purchaser for the payment of any sum of money arising out of or under any other contract made by the Contractor with the Purchaser i.e. MTNL or such other person(s) contracting through the Purchaser.In case of Set off the claims by purchaser from dues of contractor against any other contract, the Purchaser reserves the right to recover the claims from the Invoices raised by the contractor for which the Credit Note shall be issued by the contractor, failing which the purchaser shall adjust the amount to be recovered from the pending payments by issuing an invoice/debit note for the corresponding amount, at the risk and cost to the contractor including applicable GST, if any.

31

Page 33: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

The bidders, who are given Work Orders, must give the details of the progress of work done against all the Work Orders every week on very first working day of the following week to Executive Officer, Controlling unit and the concerned Planning Branch of MTNL.

The bidder should furnish the name of his collaborator (if applicable), brand name, model no. and type of the products offered in this tender. The technical literatures of the products should also be submitted. No change in either technology or product shall be permitted after opening of bids.

MTNL reserves its rights to remove from list of approved suppliers / contractors or to ban business dealings if any bidder/contractor has been found to have committed misconduct and also to suspend business dealings pending investigation.

18.GST Invoice: Tax Invoice terms:

(a) All the details of contractor (name, address, GSTIN/ unregistered contractor, place of supply, SAC/ HSN code etc.) and other mandatory details shall be mentioned on the invoice.

(b) Invoice/DN/CN/Supplementary invoice/Receipt Voucher need to be issued in compliant format and timely within the time prescribed under GST law.

(c) In case of any deficient supply/ service, MTNL shall convey the same within a reasonable time to enable the contractor to issue credit note and take tax adjustment. In case contractor fails to raise credit note in time then MTNL shall be authorised to raise a debit note against such L.D. charges plus applicable GST. Such credit/debit note shall be issued before September 30 th of following end of financial year in which such supply/service was made.

(d) It would be the responsibility of the contractor to declare correct information on invoice and GSTN viz. the amount, the place of supply, rate of tax etc. In case, the eligibility of input tax credit is questioned or denied to MTNL on account of default by the contractor, the same would be recovered by MTNL from the contractor along with applicable interest and penalty, if any.

(e) Registered location of the both the parties i.e. MTNL and contractor should be mentioned in the agreement with GSTIN No. Further, contractor should raise invoices at the registered premise of MTNL for availing the credit.

(f) MTNL could at any time instruct the contractor to raise its invoices at a particular location of MTNL

(g) The contractor should raise invoices at the registered premise of MTNL for availing the credit and ensure that the place of supply/service as per GST law is same as registered premise. It shall be the responsibility of contractor to raise invoice within the prescribed timelines.19.GST compliances(a) It is the responsibility of the contractor to ensure that outward supply return (GSTR-1) would

be filed correctly. If not, then cost i.e. taxes, interest and/or penalty would be borne by contractor.

(b) Reporting of correct outward supply by contractor in the outward return (GSTR-1) is the responsibility of the contractor. The contractor needs to ensure the following points:

(i) Uploading appropriate invoice details on the GSTN within the stipulated time;(ii) Issuing GST compliant invoice / CN/ DN. PO/ Work Order issued by MTNL should be referred

by contractor for capturing information on the invoice.(iii) The contractor needs to pay the entire self-assessed tax on timely basis.(iv) Where invoice not uploaded or incorrect upload of invoicing detail on GSTN by contractor

then credit on such invoice will be given provisionally subject to matching. So, acceptance of changes made by MTNL on GSTN on account of non-upload or incorrect upload of details on GSTN w.r.t. the mis-match are required to be accepted by contractor within the time limit prescribed under the GST law. It should be noted that in case contractor does not accept such changes within the time limit prescribed under GST law, the loss of input tax credit , interest paid and penalty levied,(if any) would be recovered from the contractor.

(v) In case of mismatch because of contractor’s fault, prompt amendments must be made by the contractor else contractor would be required to indemnify MTNL for the losses of credit and interest paid due to mis-match.

32

Page 34: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(6) The contractor to issue all necessary documentation and perform all necessary compliances for MTNL to be eligible to claim the input tax credit of GST tax to them. In case MTNL is unable to claim the input tax credit, the amount w.r.t. GST charged by the contractor would be recovered from the contractor along with any applicable interest and/or penalty if any as applicable by GST law.

(7) A self-declaration along with evidence that the bidder/ contractor is not black listed by GST authorities. In case the contractor gets black-listed during the tenure of MTNL contract, then following indemnity clause No. 30 shall be applicable to ensure that no loss of credit is borne by MTNL due to a default of contractor.

20.Tax Indemnity clauseMTNL has the right to recover tax loss suffered by it due to any mis-declaration on invoice by the contractor along with any applicable interest and/or penalty if any as applicable by GST law.

21.Movement of goodsIt shall be contractor’s (registered under GST) responsibility to issue GST compliant E-way bill for movement of goods by way of supply or otherwise. As per GST law, E-way bill (wherever applicable) along with prescribed documents are to be carried by the person-in-charge of conveyance. In case contractor fails to issue E-way bill (wherever applicable) due to non-compliance or default or due to lack of diligence on his part, it shall indemnify MTNL for the consequential loss suffered by it, if any till the supplies are delivered in good condition.In case of movement of goods other than by way of supply (for instance return of goods sent by MTNL at contractor’s premises for repairs) from contractor’s premises to the registered premises of MTNL, vendor/contractor shall be required to move goods under a GST compliant delivery challan.

In case of procurement from unregistered vendor/ contractor, the contractor is required to select the transporter who can issue an E-way bill (wherever applicable) as per GST law. 18. PROTECTIVE CLAUSE: i) The Purchaser reserves the right to disqualify such bidders who have a record of not

meeting the contractual obligation in respect of previous or existing Contacts entered into with the Purchaser.

i)The Purchaser reserves the right to check the veracity of documents furnished / endorsed by the bidder. If upon such verification, any document/statement is found to be forged or wrong, the Purchaser shall be entitled to reject the bid submitted by the concerned bidder and forfeit its bid security / performance security and also blacklist the concerned bidder. Decision of the Purchaser in this regard will be final and binding on and not challengeable by, the bidder.

19. INDEMNITY

The Contractor shall except if and so far as the Contract provides otherwise, indemnify the Purchaser against all losses and claims in respect of injuries or damage to any person or material or physical damage to any property whatsoever which may arise out of or in consequence of the execution and maintenance of the works and against all claims, proceedings, damages, costs charges and expenses whatsoever in respect of or in relation thereto except any compensation or damages for or with respect to : -(a) The permanent use or occupation of land by the Works or any part thereof.(b) The right of the MTNL to execute the Works or any part thereof on, over, under in or

through any land.(c) Injuries or damage to persons or property which are the unavoidable result of the

execution or maintenance of the works in accordance with the Contract.(d) Injuries or damage to persons or property resulting from any act or neglect of the

Purchaser, his agents, servants or other contractors, not being employed by the Contractor.

20. Equal Remuneration Act:The Equal Remuneration Act, 1976, amongst others, casts obligation on the Employer to pay same remuneration to the male and female employees of the same category and not to make any discrimination in this respect. The provision of said Act shall have to be complied by the Contractor.

21. The contractor shall not employ any person below the age of 14 years. No female labour shall be employed in the limits of cantonment area.

22. COMPENSATION FOR LOSS, DAMAGE, ETC.:

33

Page 35: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

22.1 Any loss or damage of Departmental Stores while in the custody of the Contractor shall have to be made good by the Contractor.

22.2 If during execution of Cable Laying by Trenching and Trench less Technology/Maintenance work as mentioned in Section-I or on completion thereof,a) Any damage is caused to any existing underground service lines, telephone cables

including cables being laid,b) There is damage caused to any property of a third party. c) Injury / loss occurs to any person because of any lack of proper precaution on the part of

the Contractor.The Contractor will be responsible for the same and the Contractor will have to compensate for such damage / injuries / losses.

22.3 In case the Purchaser has to incur any expenditure to repair such damages or to compensate for such injuries / losses, the amount plus 5% (five percent only) processing charge, will be recovered from the dues/bills of the Contractor or from the Security Deposit or both.

22.4 In every case, in which by virtue of the Provisions of Workmen’s Compensation Act, the Purchaser is obliged to pay Compensation to a workman employed by the CONTRACTOR in charge of execution of the Cable Laying by Trenching and Trench less Technology/maintenance work, thePurchaser will be entitled to recover from CONTRACTOR the amount of compensation so paid plus 5% (five percent only) processing charge.

22. LIABILITY FOR LABOUR AND/OR PERSONNEL ENGAGED BY THE CONTRACTORS (i) All labour and/or personnel employed by the Contractors shall be engaged by them as their

own employees/workmen in all respects implied or expressed. (ii) The responsibility to comply with the provisions of the various Labour Laws of the country

such as Factories Act, 1948, Workmen’s Compensation Act 1923, Employees Provident Act 1952, Maternity Benefit Act 1961, Contract Labour (Regulation & Abolition) Act 1970, Payment of Wage Act 1936, the Minimum Wages Act 1948 Payment of Gratuity Act 1972, Equal Remuneration Act 1976 or any other Act, to the extent they are applicable to their establishment /works/workmen will be that of the

Contractors. Contractor should comply with the above Acts scrupulously. In the event of violation or default to do so, it may lead to:(a) Termination of Contract. (b) Recovery of outstanding made from the performance security or any other payment due to the Contractor.

(iii) The Contractor shall indemnify the Purchaser against all payments, claims and liabilities whatsoever incidental or direct, arising out of or for compliance with or enforcement of the provisions of the above said Acts or similar other labour legislations as they are at present or as they would stand modified from time to time, to the extent they are applicable to the establishments/works in MTNL.

(iv) The Divisional Engineer, MTNL concerned shall have the right to deduct from any money due to the Contractor, any sum required or estimated to be required for making good the loss suffered by a worker or workers by reason of non-fulfillment of the conditions of the Contract for the benefit or believed to be for the benefit of the workers, non -payment of wages or of deductions made from his or their wages, etc. which are not authorized or justified by the terms of the Contract or non-observance of the Rules, Regulations and / or Acts or by way of fulfillment of any obligations on the part of the Contractors for strict observance of the provisions of the aforesaid Laws.

34

Page 36: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Section-IV SPECIAL CONDITIONS

1. The special conditions shall supplement the 'Instructions to the Bidders' as contained in Section II & "General (Commercial) Conditions of the Contract' as contained in Section III and wherever there is a conflict, the provisions herein shall prevail over those in Section II and Section III.

2. The bank guarantee for bid security as prescribed in clauses 12.1 of Section II of the bid document shall be submitted along with the bids in a separate cover. The bank guarantee so submitted shall be as per the format given in Section VIII on prescribed judicial paper with stamps of proper value and should contain full address of the issuing branch of the bank with its telephone number and FAX number. This cover should be super scribed as “BID SECURITY FOR TENDER No. …………………………. Issued on ……...

3 (i) The Purchaser shall reserve the right or discretion in deciding the ratio and no. of Contractors on whom the order shall be placed finally and shall take to this in exceptional circumstances on recorded reasons. However, distribution is to be made normally as per para 24, section-II.

(ii) In the event of any of the eligible bidder(s) not agreeing to work or not being considered by the Purchaser for ordering the work, interse ranking of the bidders below the aforesaid bidder(s) will be recast to fill up the vacated slot(s). This will be done to ensure that the number of bidders performing the work remains same as earlier.

4. Technical bid shall be opened and examined first and financial bids of only techno-commercially eligible bidders shall be opened on later date.

5. A copy of financial bid without prices should form part of techno- commercial bid.

6. In case of any discrepancy between words and figures, the amount indicated in words will prevail.7. It may be noted that if there is any discrepancy in the NIT published in news paper and eligibility,

terms & conditions stipulated in the tender document, the terms & conditions mentioned in tender document will prevail.

8. The complete eligibility shall be considered only at the time of evaluation of techno-commercial bids. Even opening of financial bid also does not confer any special right on the bidder to claim for award of Contract or work order.

9. Canvassing in any form is forbidden and will lead to disqualification

35

Page 37: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

10. The genuineness of all the documents and information is the responsibility of the bidder. If at a later date, even after placement of P.O. it is found that any document / information furnished by the bidder is incorrect or incomplete the Purchaser shall be entitled to terminate the Contract and take further action against the bidder.

11. If any fraud on misappropriation of funds /materials is detected at any stage, the Purchaser shall

be entitled to terminate the Contract and take further action against the bidder.

12. Different firms or Companies having any common Partner(s) or Director (s) are not permitted to Quote for more than one offer. In case more than one offer received from such bidders, than all such offers except-with lowest quote shall be rejected summarily.

13. In case of any discrepancy in the translation of any document between English and other languages, the English translation shall prevail.

14. The lowest price/counter offered price shall be given for ordering. 15. Bidders are required to submit Bank Account Details as per ECS (Model Mandate Form) enclosed

as Annexure-III

16. Any increase in taxes and other statutory duties /levies after the expiry of the delivery date shall be to the Contractor’s account. However benefit of any decrease in duties/levies/ basic price of lead shall be passed on to the Purchaser by the Contractor.

17. In case more than one offer/bid for tendered work is received from the same bidder then all such offers/bids shall be rejected summarily.

18. The bidders shall submit a hard copy of the bid also before the date and time of submission of the bids. The hard copy shall be referred only in case TCIL e-Tendering System does not function properly. In the event of any discrepancy between the hard copy and the soft copy submitted online, the soft copy shall govern/prevail.

19. The expected volume of work given in the tender in Section-V is based on pure approximation and is furnished as general information to the tender for quoting the rates. The Purchaser will not be responsible for any loss or profit due to any increase or decrease in volume of work.

20. The Small Scale Industries registered with National Small Scale Industries Corporation (NSIC) for the tendered item under single point registration scheme and desirous of claiming concessions available to such units inclusive of bid security should submit their latest NSIC certificates and documents in respect of their monetary limit and financial capability duly certified by NSIC.

The MSEs (Micro & Small Enterprises) units/bidders registered with MSME bodies shall be given exemption from payment of Bid Security deposit provided the tendered item is listed in the Registration Certificate of MSME, subject to following:-

(a) A proof regarding current registration for the tendered items will have to be attached along with bid.

(b) The enlistment certificate issued by MSME bodies should be current & valid on the date of opening of bid.

21. The vendor shall take care of all statutory requirements /Provisions of payments of wages act, labour act, PF etc. The firm must have registration with PF & ESI Authorities and under labour contract act 1970 and has to provide a certificate to MTNL in this regard. The vendor shall strictly comply with provisions of labors laws applicable from time to time.

22.Timely payment of wages by the vendor as per minimum wages act (including admissible PF /ESI /Bonus etc)to the staff is of utmost importance for satisfactory & trouble free field operations.

36

Page 38: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Section -V SCHEDULE OF REQUIREMENTS.

T.E.No: AGM (MPL)/PIJF Cable Laying /2018-19/01

1. Description of Work: (Approximate) for laying of Telephone cables by trenching and trench less technology, pulling of cables through ducts and allied works:

37

Page 39: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

No te: 1. The actual amount of maintenance work cannot be quantified in advance and it

may vary on actual and need basis.

Item Group

AREA Tentative Qty of work Approximate cost of work (Rs in lakh.)

1 - G.M.(Development)

Trenching& allied works

7.43 Kms

150

Trench lessAnd Allied Works

50.66 Kms

Duct Pulling 42.35 Kms

2.

Grou

p-I

G.M. (TY)Maintenance work

60.003. GM (East) 14.004. GM (West) 28.20 Group total 102.20

5.

Gro

up-II

GM (NP)

Maintenance work

51.586. GM (BCP)

26.5

Group total 78.08

7.

Grou

p-III

GM {North)

Maintenance work58.11

8. GM (Central) 10.00

Group Total 68.11

TOTAL 398.39 say 4 Crs

38

Page 40: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

2. The quantity indicated against development work for award is only estimation and actual award of work may vary depending upon prevailing factors and circumstances.

3. No bidder shall have any claim for award of any specific quantity, including quantity indicated in the bid document.

4 It is mandatory for the contractor to quote for all items mentioned in Annexure-I otherwise his bid will be rejected.

DATED--------------------------------. SIGNATURE OF SUPPLIER.

Section-VI

Specifications

Specification for Telephone Cable Laying by Trenching and Trench less Technology

T.E.No: AGM (MPL)/PIJF Cable Laying /2018-19/01

1. Approximate Work of cable laying by Trenching and Trench less Technology, pulling of cables through ducts and allied works in Development and Areas under the Jurisdiction of MTNL,Delhi.

Item Group

AREA Tentative Qty of work Approximate cost of work (Rs in lakh.)

1 - G.M.(Development)

Trenching& allied works

7.43 Kms

149

Trench lessAnd Allied Works

50.66 Kms

Duct Pulling 42.35 Kms

2.

Grou

p-I

G.M. (TY)Maintenance work

60.003. GM (East) 14.004. GM (West) 28.15 Group total 102.15

5.

Gro

up-II

GM (NP)

Maintenance work

51.586. GM (BCP)

26.5

Group total 78.08

7.

Grou

p-III

GM {North)

Maintenance work58.07

8. GM (Central) 10.00

Group Total 68.07

TOTAL 397.3 say 4 Crs

39

Page 41: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Note: The Note: - The length consists of road/rail/canal crossing with or without HDPE pipe

and also laying along road with or without HDPE pipe. Total length may vary depending on progress of work.

VOLUME OF WORK: Subject as herein after mentioned, MTNL do not guarantee any definite volume of work or any particular pattern of service at any time or throughout the period of the contract. The mere mention of any item of work in this contract does not by itself confer a right on the contractors to demand that the work relating to all or any item thereof should necessarily or exclusively be entrusted to them. MTNL will also have the exclusive right to appoint one or more contractors for any or all the services mentioned hereunder and to divide the work as between such contractors in any manner that MTNL may decide and no claim shall lie against MTNL by reason of such division of work.

2. SERVICES TO BE PERFORMED BY THE CONTRACTORS 2.1 Road Cutting Permission

(a). Latest utility code of conduct of MCD for procedure for road cuts of MCD shall be adhered strictly.

(b). The contractor will arrange Road cutting permission from MCD/PWD/CPWD/Railways/DDA/MES/Traffic Police /Flood Control /NDMC/ Local Bodies / Any other agencies for that necessary authorization help will be given by MTNL. Whereas taking permission will be primarily responsibility of contractor and delay if any on this account will be contractors responsibility MTNL New Delhi will pay only restoration charges raised by such bodies.

2.2. LAYING OF CABLES/PIPES (A) Laying by trenching: (a) Trenching includes taking pilot pits at every 50 mtr. or less along the route to a

depth 30 cm. more than the standard depth to assess the presence of underground 40

Page 42: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

utilities / services, marking the route of the trench with rope and white `Chuna', actual trenching and stacking the excavated earth properly on both sides of the trench. No extra charges shall be claimed for taking pilot pits and marking the trench route. Digging of trenches should be made at standard depths of 1.0 meters and 1.5 metres The depths may vary in places where underground pipes, electric mains come in the way, or in places specially required by the Mahanagar Telephone Nigam Limited due to any other reason. In such cases payment would be made as per the item 7 of schedule of rate.

Variations in the standard depths of the trenches (i.e.1.0 meter & 1.5 meters & in width 0.3 to 0.5 mts. are permissible only with the prior approval of the Divisional Engineers. Wherever there is variation the standard depths,. a specific certificate to the effect should be obtained on the bill from the Divisional Engineer in charge.

(b) Ramming and consolidation of trench will be done in layers. After backfilling the trench

for a depth of 20 cms, the soil should be rammed, watered and consolidated. This procedure should be followed for every 20 cms of depth. The trenches should be kept open till pressure testing & the cables are examined by the officers of Mahanagar Telephone MTNL Limited, and the acceptance- testing unit.

( c) Laying cables at depths less than 1.0 mtr. is not permissible In case, where 1.0 mtrs. depth could not be obtained due to physical constraints or other unavoidable circumstances, the work in such places should be carried out only with the prior approval of the Divisional Engineer. The payment in such cases will be made as per item of schedule of rates.

(d) If the trenches are found settled by more than 1” afterwards within 1 year, the contractor is to make up again with full compaction by re-backfilling/ completion without any extra cost. If contactor fails to do so then MTNL will be at liberty to get it done from outside at risk and cost of the contractor.

2.2 (B) Laying by Trench less Technology - a. General Work Description:

Laying of cables of different types and sizes, in general including some or all of the following activities: Making arrangement for Horizontal Boring for cable only. Making horizontal inserting casing pipe and laying cable through it , Providing of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing

of pipes. Lifting of cable from the cable store. Transportation of cables, empty cable drums and related store to & from the Central

Store Depot/ Construction Officers Cable’s store/ Transmission Store located in Delhi / Noida will be the responsibility of the contractor.

Closing of Pits within 24 Hours after completion of work as per specification of the local bodies and to obtain satisfactory slip after restoration of work from local bodies. If the pit is found open more than 24 Hours the construction –in-charge will impose penalty as per penalty clause.

Splicing of cables. b. Horizontal Boring and insertion of casing pipe: -

Horizontal Boring and inserting casing pipe (material - HDPE of pressure rating 4kg/cm2) along road and under railway/road/canals/streams crossing in all type of soil at prescribed depth, including all civil works. Supply of all tested lifting tools and tackles other required equipment and consumable, labour etc. and making all such necessary arrangements are under vendor’s scope. Total job has to be completed within time schedule mentioned in work order. The contractor shall supply as build drawing detailing the location, distance from any fixed structure, depth at every 5Meter in level and location of Joint on soft as well as hard copy.

c. In this system of Cable Laying by Trench less Technology following job specifications should be maintained:i) Guided boring/drilling technology is to be used.

ii) GPR result will be handed over to Concerned Divisional Engineer / Construction-in-charge in soft copy/ a hard copy.

iii) The depth of boring should be such as to clear any underground utilities/obstacles. However, in no case the depth of boring be less than 1.7 m, from the road surface.

41

Page 43: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

iv) In Horizontal and Vertical boring, the system should be capable of going up to 10 meters below the ground level.

v) In a shift of 8 hrs. at least 300 meter of drilling longitudinal or 3 to 4 road crossings should be possible.

vi) As far as possible cable should be laid in drum length and cutting of cable should be avoided while laying along road.

vii) To access the pull back capacity the diagram of combination and actual number of pipe to be pulled shall be decided by Concerned Divisional Engineer / Construction-in-charge.

d. Ground penetrating Radar survey and damage to Telephone Cable and other underground services.

i) The contractor should collect all available information regarding underground services and take necessary care to protect them. He should also have sufficient arrangements to identify and protect such underground services.

ii) The contractor shall carry out ground penetrating radar survey along the proposed cable route at his own cost to identify the underground services and for setting out the rules as directed by Construction Officer. The Construction Officer shall provide route map to the contractor if available for plotting the existing utilities and setting the route for horizontal drilling.

e. Laying of Cable - The cable laying work includes, handling of cable drums, paying out

cables, laying cables in trenches or on bridges or on other structures, or through G.I. Pipes, RCC/HDPE pipes, tunnels or in ducts as required, fitting of pipes on/under the bridges for drawing cables, putting soft earth under/above the cables, placing warning bricks or stone slabs or RCC slabs over the cables as required. While laying the contractor should leave the cable ends (with one meter overlap) at a place free from obstacles to enable jointing works to be done at a later date.

f. LIFTING OF CABLE.

1 The Cable in drums will be handed over to the Contractor at cable stores. The Contractor is to lift the store from the store depot to the working site.

2 Guarding at work site to done by the Contractor.3 At the time of laying, Jack and Wheel should be used so that the cable is not damaged.4 In case of HDPE pipe, the Contractor will do jointing of pipe.5 The Contractor is to make arrangements of water and power at the site of work.6 Permission for laying to be taken by the Contractor from appropriate authorities.

7. It is the responsibility of contractor for Digging of test pit and restoration of the pits up to compacted back filling. The MCD/NDMC/PWD/Local bodies’ bills will be paid by the MTNL for doing final restoration to bring it to original surface. However Contractor shall obtain the necessary permission for digging/road cutting from these bodies without any extra cost.

2.2 ( C) Laying of Cables/Pipes by Buckey Metho d: In addition to laying of cables/pipes by HDD machine and trenching methods, Buckey method is also recommended where laying of cable by HDD or trenching method is not feasible and this has to be adopted with the prior approval of GM on case by case basis.

2.3 . All other works mentioned in Annexure-II (Description of the items of works included in the Scheduled of base rates).

2.4 DISPOSAL OF EMPTY CABLE DRUMS AFTER LAYING OF CABLE. The contractor has to dispose of the empty cable drums on its own and the cost of empty cable

drums will be recovered from Contractor’s bills as shown below:(i) 1200 prs. & above Rs.1,000/-(ii) 400 prs. to 800 prs. Rs. 600/-(iii) 50 prs. to 200 prs. Rs. 300/-(iv) 10 prs. to 20 prs. Rs. 200/-(v) OF cable drums Rs. 150/-

3 Standards for the Services to be performed by the Contractors: The Contractor shall be able to carry out the work as per the standard given below: - (A) STANDARD FOR TRENCHING:

i) Digging of all surfaces other than set stones, concrete beds, carriageways and rocky surfaces.... 1600 mtrs. Minimum per day.

ii) Digging of surfaces of set stones, concrete bed and carriage ways 800 mtrs. minimum per day.

iii) Digging of rocky surfaces - 200 mtrs. minimum per day. (B) STANDARD FOR TRENCHLESS: The output of the contractor is expected at least 300 meters for a shift of 8 hrs. (C) STANDARD, FOR CABLE LAYING:

(i) Laying single cable in an acceptance tested trench 3200 meters per day. 42

Page 44: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(ii)Laying additional cables in same trench or pulling Cable in Duct 3200 mtrs. per day per cable.

(D) The trenching & laying standards mentioned under (a) & (b) above have been fixed taking into consideration the time required for digging trenches, laying cables, and other allied / incidental operations. The contractor shall strictly adhere to the standards. The date of completion will be specifically mentioned in each work order by the MTNL based on the standard stipulated above. While fixing the date of completion, 7 days of tolerance period will also be allowed by SDE concerned.

(E) To ensure good progress during execution of works and to cause minimum inconvenience to the public, the Contractor shall not dig trenches of more than 400 mtrs.at a stretch for a particular work at a time. He shall cause to lay the cable and close the trenches expeditiously. In case of laying up to two cables in a trench by digging surfaces other than set stones, concrete bed, carriage ways and rocky surfaces, the Contractor shall not keep a trench (of maximum 400 mtrs. stretch) open for more than 6 days. In case of laying up to two cables in a trench, by digging set stones, concrete bed and carriage ways, the Contractor shall not keep a trench (of maximum 400 mtrs. stretch) open for more than 9 days. However, if primary cables of 3 or more are to be laid in a trench, the Contractor shall be permitted to keep the trench (of Maximum 400 mtrs. stretch) open up to the number of days calculated as per the standard given above depending upon the number of cables to be laid in that trench, but not exceeding 3 weeks in any case. If cables are to be laid by digging rocky surfaces, the contractor shall not keep a trench (of maximum 400 mtrs. stretch) open more than 3 weeks.

(F) Extension of time: If the Contractor desires an extension of time (without LD penalty) for completion of the work due to reasons beyond its control, it shall apply in writing to the concerned DE within 3 (three) days from the date of occurrence of such hindrance/reason. (i) The DE can waive off the LD penalty up to a maximum period of 15 days in case he is

fully satisfied with the reasons for delay.(ii) In case DE is of the opinion that waiver of penalty LD is justified for more than 15 days,

approval of concerned DGM shall have to be taken.(iii) After the opening of financial bid of the new tender, penalty LD waiver should be given

only with the approval of the concerned GM. The decision of DE/DGM/GM will be final and binding in this regard.

4. RECOVERY OF CABLES: The contractor shall have to recover cables from underground, whenever he is called upon

to do so by the Mahanagar` Telephone Nigam Limited, Delhi. The contractor shall coil the recovered cables in lengths of 50 mtrs. or more and arrange for the transportation to the local construction store dump indicated in the work order. In all routes where recoveries of cable are proposed simultaneously with laying of new cables, the recovery shall be done first.

5. Diagram of laid CablesDiagram of duly laid cables along with location of joints (marked in three dimension). One soft copy and three hard copies to be supplied by the contractor to the MTNL.

6. DUTIES AND RESPONSIBILITIES OF THE CONTRACTORS. (i) The contractors shall carry out all items of services assigned or entrusted to them by the

Dy.G.M. (Const.) or an officer acting on his behalf and shall abide by all instructions issued to them from time to time by the said officer. They shall render the services to the satisfaction of the Deputy G.M. (Const.) or an officer acting on his behalf together with such auxiliary and incidental duties, services and operations as may be indicated by the said officer(s) and are not inconsistent with the terms and conditions of the contract. Remuneration for all auxiliary and incidental duties and services not specifically provided for in the schedule of rates for services shall be deemed to be included in the remuneration provided for various services specifically mentioned is the schedule. The contractors shall always be bound to act with reasonable diligence and in a business like manner and to use such skill as they possess in the conduct of their activities.

(ii) The contractors shall engage competent and adequate staff and labour to the satisfaction of the DGM (Construction) or an officer acting on his behalf for ensuring efficient handling and transport of cables etc., and furnishing correct and up to date position/ information /progress of work/statements and accounts. The contractor shall be responsible for good conduct of their employees and shall compensate MTNL for losses arising from neglect, carelessness, want of skill, or misconduct of themselves, their servants, or agent or representative. The DGM (Const.) shall have the right to ask for dismissal of any employee of the contractor, who in his opinion, is hampering the smooth execution of the work and his

43

Page 45: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

decision regarding losses caused by the neglect and misconduct etc.,of the contractor, their servants, or agents, or representatives, shall be final and binding on the contractor.

(iii) Road cutting permissionThe contractor will arrange Road cutting permission from

MCD/PWD/CPWD/Railways/DDA/MES/Traffic Police /Flood Control /NDMC/ Local Bodies / any other agencies for that necessary authorization help will be given by MTNL.

(iv) It is obligatory for the contractor to have supervisor at all sites of work wherever he is doing trenching, cable laying & trench less work etc.

(v) The Contractor on receipt of work order shall intimate the Dy. G.M. (C.C.) or an Officer authorized to act on his behalf, the name of the one or more responsible representative (s) authorized to act on their behalf in day to day working of the Contract. It shall be the duty of those representatives to call at the office of the Divl. Engineer or an officer acting on his behalf and generally to remain in touch with them, to obtain information about the programme of work and change if any.

(vi) The Contractors shall take adequate steps and necessary precautions to avoid wastage and damage to cables etc. during the loading / unloading of truck/carts/any other transport vehicle at the work sites or any other loading/unloading point. The Contractors shall be liable for any loss which MTNL may suffer on account of their not being properly handled. The decision of the Dy. G.M. (MM) regarding such loss shall be final and binding on the Contractors.

(vii) The contractor will, during the period of this contract, or until this contract is terminated, carry out at his own expenses by means of labourers and digging / cable pulling tools, winches, caution boards, barricades, pumps, generators, rodding device for ducts etc. and all trenching cable laying and cable pulling through manholes and ducts and other connected works as described in the tender notice.

The contractor shall promptly carry out all works referred to above within the time specified in the work order. Therefore the work shall be proceeded with all due diligence.

(viii) The contractor shall execute all the items of works mentioned in the work order for each work in the most efficient and workmanship manner both in terms of quantity and quality in strict accordance with the instructions given to him from time to time by MTNL.

(ix) All works, whether in course of execution or executed in pursuance of the contract shall at all times be open to inspection and supervision of the MTNL. The trenches dug by the contractor shall not unless specifically directed, be covered up before inspection and measurement by the MTNL. If any defects in the said works or any damage to other utilities like MCDs etc. are discovered during the currency or on expiry of the contract the contractor shall forthwith repair and remedy the same at his own cost in such manner and within such time as may be directed by the MTNL.

In case the defects are of such nature that it is in the opinion of the MTNL not possible to repair, the contractor shall do the work once again afresh to the entire satisfaction of MTNL without any additional charges.

After laying cable / HDPE pipe etc. and before backfilling the trenches the contractor as directed by MCD and certificate of that effect should also be taken.

(x) The contractor has to inform the concerned authority of other utilities in writing to inspect the site to see that no damage has been done to their utilities. A certificate is to be obtained to that effect from the concerned authorities by the contractor. If the contractor does not intimate concerned authority to arrange inspection and concerned authority reports any damage to their utility at later date, the same will be borne by the contractor. In case any surplus earth is there, it should be disposed off. The contractor shall not charge any extra amount for traveling or O.T. allowances for the persons employed by him. He shall not be entitled to get compensation for any damage or losses that may suffer in the course of execution of work. He will not be entitled to get any extra amount for the loss or deterioration of materials used by him.

(xi) The contractor shall be wholly and solely responsible for the proper preservation and safe custody of all the materials handed over to him in the course of execution of works under the contract till the work is completed in all respects according to the terms & conditions and is made over to the ultimate user. A faithful account of all the material used in the work should be submitted to the MTNL. The contractor shall be liable to return all the materials found to be surplus or remained unused within two weeks of completion of work.

(xii) The contractors shall be liable for all costs, damages charges and expenses suffered or incurred by the MTNL and other utilities or private property due to the contractor's negligence and unworkmanship like performance of any service under the contract or breach of terms thereof or their failure to carry out the work with a view to avoid damages, and for all damages or losses occasioned to MTNL or in particular to any property or plant belonging to MTNL or other utilities or private property due to any act whether negligent or otherwise of the contractors themselves or their

44

Page 46: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

employees. The damages are like damage to MTNL underground cable, curbstone etc., electrical cable, water pipes, traffic signs and signals, damage to private property and their equipment. The details of all damages caused by contractor shall be entered in a registered called `damage register’ which is maintained at the office of S.D.E. concerned. This should be signed by JTO/SDE and contractor.

(xiii) The cost of such repairs which includes overhead charges (not exceeding 25% of the cost of repairs) will be recovered from the contractor. The decision of the concerned Dy.G.M. regarding such failure of the contractors and their liability for the losses etc., suffered by MTNL shall be final and binding on the contractors.

(xiv) That the contractors will keep a proper record for the work allotted and the work executed against the quantity assigned by MM Cell for which payment is liable to be paid. No payment will be liable to be paid for the work done beyond the allotted quantity by MM Cell.

(xv) The contractor will be responsible for proper temporary reinstatement of surface after the cable is laid so that no damage occurs to the vehicles or pedestrians passing by. Any damage occurring to any person or his/her life or property or authority, shall be made good by the Contractor. He should also arrange to install trench barricades, traffic road signs, reflectors, information boards, warning signals, and red lamps at night, at the ends and sides of the trenches as per standard and maintain them properly. Surplus earth and road spoils must be removed within 48 hours of the completion of the work to the satisfaction of the local authorities concerned.

(xvi) The contractor shall comply with police, municipal and other regulations and orders relating to such works outlined in the Inter utility Code of Conduct at Annexure –1.

(xvii) The contractor should be having a valid license under the Contract Labour (R&A) Act 1970,and the Contract Labour (R&A) Rules before the commencement of the work and shall continue to have a valid license until the completion of the contract.

(xviii) The contractor shall pay to the labour employed by him either directly or through sub contractors, wages not less than the "fair" wages, if any, or the "minimum rates of wages", if any out or as per the provisions of the Contract Labour (R&A) Act and the Contract Labour (R&A) Rules wherever applicable,

(xix) The Contractor shall submit by the 5th and 20th of every month to the Dy.G.M. (Concerned) a statement showing following items in respect of the second half of the preceding month and the fist half of current month respectively.

(a) The number of labourers employed by him.(b) Their working hours.(c) The wages paid to them.(d) The accidents that occurred during the said fortnight showing the

circumstances under which they occurred and the extent of damage injury caused by them.

(e) The number of female workers who have been allowed Maternity Benefit and the amount paid to them.

(f) Welfare amenities provided to the labour as per Rule 40(1 detail be furnished.(g) Register is to be maintained by the Contractor in Form-XII (Rule-74).(h) Notice has to be displayed rate of Wages, Hour of work, wage period, Date of

Payments of Wages. Name and Address of the inspector having jurisdiction and Date of payment of unpaid wages to be displayed in English & in Hindi and in local language understood by Majority of worker in conscious place (Rule-81).

(i) Copies of Notice required to be displayed under rule 81 has been sent to inspector {Rule 81(2)}.

(j) Return in Form VI-B has to be submitted to the Inspector (Rule 81 (3) ). (k) Half yearly return in form XXI - V and Annual Return in Form- XXV (in duplicate)

has to be sent to the Registering officer (Rule 82). (l) Register is to be maintained in Form XIII (Rule 75)(m) Contractor has issued Employment card in Form- XIV to each worker (Rule 76). (n) Wages register etc. is being maintained as per (Rule-78).(o) An undertaking that EPF/ESI of the labourers employed against this contract has

been deposited to the concerned authorities. (xx) The Contractor should ensure:- a) that the wages are paid in time as per payment of Wages act.

b) that wages paid are not less than the minimum wages. c) that provisions of PF act are complied with.

(xxi) Before closing the trenches, the contractors have to give notice to the officer in- charge for test checking the depth of trench, brick laying (i.e longitudinally or transversally) and laying

45

Page 47: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

of cable lengths, pipelines etc. and all these aspects are to be got tested/checked as per norms by SDE/JTO concerned being the supervisory officer of the work and further test checks as per existing norms to be carried out by other

higher supervisory officers shall also be got done by the contractors and in case the trench is closed without any such test check, the contractor is liable to get it reopened at his cost and got test checked without claiming any extra expenditure and is also liable to be warned by the officer concerned.

(xxii) Safe custody of the materials (Cables) etc. supplied to the contractor by the department. shall be the responsibility of the contractor. Any loss of material due to theft, damage, wastage or for any other reason shall be recoverable from the bills relating to work concerned or any other works being carried out by him for MTNL. The materials once passes by the department to the contractor for work purposes shall be deemed to be in the safe custody of the contractor until and unless the same is installed /laid and acceptance tested or returned unutilized with full details of account of utilization.

(xxiii) The contractor is totally and uncompromisingly responsible for ensuring safety and security of cables/pipes already laid or existing pertaining to MTNL or any other department while digging the trench and the contractor is liable for any damage and recovery of compensation thereafter.

(xxiv) The contractor should meet the requirement of monitoring and protecting the existing utilities and site feature.

The contractor should verify and confirm on site the location of all utilities before commencement of any work. He should prepare a detailed utility map along the pipeline route and submit a copy to the department / engineer. He should also submit a detail plan on how he proposes to monitor the utilities and other structures to ensure that it would not be affected during the work. The contractor shall also plan well ahead and submit details to the client of any traffic diversion or utility diversion required during the execution of the work. Contractor from the relevant authorities before commencement of work shall also obtain the necessary approval for such diversions.

(xxv) The contractor should commence the work at site within 2 hours of telephonic intimation to him (round the clock) without waiting for written Work Order. The covering written Work Order should follow telephonic intimation.

(xvi) SUPPLY OF STORES and TOOLS AND THEIR SAFE CUSTODY:

(A.) For each Work Order, the Construction officer/SDE, MTNL Delhi Unit will arrange to provide the CONTRACTOR:

a) Cables to be laid - in general, this will be supplied in cable drums. b) HDPE pipes, coupler, end cap, Rubber Cock - The Department will supply these

items. But the Contractors will do jointing job by these items. c) Sealing of Pipes by heating to be done by contractor,

(B.) Generally, the cables in drums and other Departmental Stores required for execution of a Work Order would be handed over and delivered to the CONTRACTOR at the Circle / Division. Store Dump/Depot for which the CONTRACTOR will have to give a proper receipt.

(C.) For all stores handed over and delivered to the CONTRACTOR, the CONTRACTOR shall be wholly responsible for: -

a) Transportation to work site, b) Proper care (Insurance to be done by the contractor) and c) Safe custody of stores during execution of the works till the work is complete in all

respects according to the terms and condition of the Work Order. (D) The CONTRACTOR must return the stores found in excess after completion of work

Order with an account of the stores issued and utilized. (E) The CONTRACTORS should use caution board and red lights at the site to avoid

accident. (F) The CONTRACTOR must make necessary arrangements for safe custody of his tools / gadgets.

7. The Divisional Engineer(concerned) should ensure that equal remunerations is paid by the

contractor to Men and Women worker for same work of similar nature and Contractor Should maintains Register In Form `D'.

8. In every case in which by virtue of the provision of sub-section (1) of Section 12 of the Workmen's Compensation Act, 1923, MTNL is obliged to pay compensation to a workmen employed by the contractor in execution of the contract, MTNL will recover from the contractor the amount of the compensation so paid and without prejudice to the rights of MTNL under subsection (s) of Section 12 of the said Act. MTNL shall be at liberty to recover such amount or any part thereof by deducting it from the security deposit or from any sum due by MTNL to the contractor whether under this contract or otherwise

46

Page 48: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

9. (a) The successful tenderer should ensure compliance of obligation pertaining to various provisions regarding amenities and benefits as prescribed under Contract Labour (Regulation and Abolition) Act, 1970 and Contract Labour (Regulation and Abolition ) Rules.

(b) The tenderer should ensure that annual returns as prescribed under the said act be submitted within time to the prescribed authority in the prescribed form.

10. Under depth permission for any type of work shall be given by DGM and above rank officer only.

11. The trench less work in rocky soil/hard soil shall be done by the Contractor only after getting approval from ED, Delhi, MTNL.

12. SPECIFICATIONS FOR MATERIAL

1. BRICKS Conventional FPS

Nominal Size Actual Size 9” x 4 ½” x 3” 9” x 4 3/8" x 2 3/4 “

The normal size of the conventional bricks is (22.9 x 11.2 x 7.5 cms) 9” x 4 1/2" x 3”. The permitted tolerance in size for bricks of class `B' is + 8%. These bricks have a crushing strength of 200 Kilograms per square centimeter (200 Kgs/Cm2) with a tolerance of + 8%. Slight distortion and irregular corner's shall be permitted.

2. Red Stone Slabs The size of the red stone slabs normally to be used shall be as below: i) 600 mm x 225 mm x 38 mm ii) 600 mm x 450 mm x 38 mm iii) 300 mm x 450 mm x 38 mm iv) 150 mm x 450 mm x 38 mm v) 50 mm x 610 mm x 38 mm

3. RCC Split/Semi circular spun pipes 150 mm & 250 mm internal diameter 25 mm thick and one meter long

a) RCC split spun pipe 150 mm I/D 1:2:3 (1 cement, 2 Coarse sand, 3 grit of 3/8 " i.e.

10 mm size) volume controlled concrete, with reinforcement 0.6 kg. mild a steel bent in semi circular ends, welded to longitudinal m.s bars electrically and 0.15 kg hard drawn wire bound circumferentially forming reinforcement cage.

b) RCC split spun pipes 250 mm I/D

1:2:3 (1 cement, 2 coarse sand and 3 grit 3/8" (10 mm) size by volume controlled concrete) with reinforcement 0.650 Kg. mild steel bent in semi circular ends welded to longitudinal m.s. bars electrically and 0.250 Kg. hard drawn wire bound circumferentially

forming reinforcement cage. Aggregate i.e. sand grit conforming to IS-383-1970 concrete conforming to IS-456 of

1964. Mild steel conforming to IS 432 Part I of 1966 and hard drawn wire conforming to IS 432 Part-II of 1966.

4. & 5. RCC Pipes

Specifications of RCC spun pipes ISI marked and jointing of RCC pipes.

RCC pipes should be ISI marked and conforming to ISI specification no.458/1971 table II class NP two light duty non-pressure of sizes 150 mm dia, 250 mm dia and 300 mm dia. If two or more lengths of RCC pipes are to be laid, collars will joint these with port-land cement coarse sand mixture ratio 1:6 by volume.

6. Sand for filling work

Sand to be used may be obtained from riverbeds or from pits.

SIGNATURE OF CONTRACTOR.47

Page 49: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(STAMP)DATED--------------------------------.

48

Page 50: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

ANNEXURE-IS.No. Description of Work

Unit Basic Rate in Rs

1. (I) Horizontal Boring after GPR along with PIJF cable laying for along across the road at the min depth of 1.65 meter. GPR is to be done by the contractor prior to start of the work and results after analysis to be supplied to DE in charge in hard and soft copies. Normally HDPE pipe should not be laid in trenchless technology for PIJF cable and cable should be directly pulled in bores. How ever whenever same is required to be done, approval of concerned GM may be taken

 

(a) i. Bore size up to 145 mm (All types of soil except Rock) Meter 265.00 ii. Rocky soil/hard rock Meter 1645.00 b) i. Bore size up to 200mm to 300mm (All type of soil except Rock) Meter 345.60

ii. Rocky soil/hard rock Meter 1645.00Note: The trench less work in rocky soil/hard rock shall be done with the approval of ED, Delhi MTNL.

1. (II) Laying of Cables/Pipes by Buckey Method: In addition to laying of cables/pipes by HDD machine and trenching methods, Buckey method is also recommended where laying of cable by HDD or trenching method is not feasible and this has to be adopted with the prior approval of GM on case by case basis.

Meter 127.00

2. Excavating trenches of different sizes for laying of cables in all type of soils (except rocks) and covering the laid cables with soil (free from stones and sharp edged objects) received from excavations, in layers not exceeding 15/20 cm in depth consolidating each deposited layer by ramming, watering & leveling etc. including disposal of surplus excavated earth/material to the dumping ground as per the direction of Engineer-in-charge.

 

 A Top & bottom WIDTH 0.30 M and Depth 1.00 M Meter 80.96B Top & bottom WIDTH 0.45 M and depth 1.50 Meter Meter 182.18

‘X’ –The trench less work in rocky soil/hard soil shall be done by the Contractor only after getting approval from ED, Delh

3(a) Extra for over and above on item no.2 for dismantling rocky soil.     I)Top & bottom WIDTH 0.30 M and Depth 1.00 M Meter 80.96  ii)Top & bottom WIDTH 0.45 M and depth 1.50 Meter Meter 182.18

b) Dismantiong rocks by hydraulic breaker and removing from site and back filling and compacting soft soil.

Per cubic metre 270.00

4 (I) Reduction for less depth in trench excavation for every LAYER of 20cm or part there of

20 % reduction of relevant rates may be made for less depth in trenches for every 20 Cms or part thereof.

(ii) Extra for additional depth in trench excavation for every layer of 20 cm or part thereof

For additional depths the rates on pro rata will be allowed with the approval of the DGM concerned.

Extra with all trenches in case where RCC pipes are to be laid.

Width of the trenches where RCC pipes are to be laid (2 or more lengths) the width shall be similar of the collar of RCC pipe & 30 cm. Is permissible and it shall be paid on Pro rata basis of the rates admissible.

5 Cost of fixing RCC pipes with RCC collar/S & S type hume pipe at a rate of Mtr 

  150 mm mtr 2.40  250 mm Mtr 4.80  300 mm Mtr 7.206 Cost of fixing GI Pipe in position.   I) Up to 5 cms. Dia Mtr 2.40  ii) 4” dia ( 10 cms.) and above. Mtr 4.807 Laying cables in trenches as per specifications given below.

49

Page 51: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

a) All cables of 5 Prs. Mtr 1.20b) All cables above 10 prs. Up to 50 pairs. Mtr 2.40c) All cables above 50 prs. Up to 200 pairs. Mtr 4.80d) All cables above 200 prs.Up to 400 pairs. Mtr 7.20e) All cables above 400 prs. Up to 1200 pairs. Mtr 14.40f) All cables above 1200 prs. Mtr 19.20

8 Recovery of cables from trenches incules carefully cleaning mud or earth particles from the cable, winding the cable on the empty cable drum, packing the durm with planks and transporting it to the store of the SDE/COC concerned

a) all cable up to 200 prs. Mtr 4.00b) all cable up to 200 prs. Up to 400 prs. Mtr 6.60c) cables above 400 and up to 1200 prs Mtr 10.60d) Cables above 1200 prs Mtr 14.609 Cleaning and providing working environment in manhole for prepration of

joints. Per manhole 360.00

10 Cleaning of joints proving and smoothing of duct pipe mandrilling. (See Para 12 of Annexure- I A-2 for details)

1.2011 Pulling of pilot rope though duct pipe Per mtr

per pipe  0.2512 Pulling the cable through duct, including cables of equivalent diameter, as

per specifications given below.  a) All cable up to 200 prs. Mtr 6.00b) All cable above200 prs.up to 400 prs. Mtr 10.80c) All Cable above400 prs.up to 1200 prs. Mtr 19.20d) All Cable above 1200 prs. & above Mtr 24.0013 Laying with HDPE pipe with subscrers, putting nylon rope in pipe and sign

writing in white paint. 3.6014 Complete Laying of cable inside subscriber premises including trenching

etc. for all types of soils and for all type of cable.28.80

15 Recovery of the cable from Duct.  a) All cable up to 200 prs. Mtr 9.00b) All cable above200 prs.up to 400 prs. Mtr 16.00c) All Cable above400 prs.up to 1200 prs. Mtr 20.00d) All Cable above 1200 prs. & above Mtr 23.0016 Repairing due to chokinga) Digging the trench along the duct to reach the faulty pipe as per Schedule

of Rate of the cable trenching and ducting in Annexure-II (A-I)b) Repair/ replace the chocked pipe (including cost of the PVC pipe replaced)

110 mm dia PVC pipe.  I) For Pipe length Per Mtr 150.00ii)

For SocketPer socket 40.00

iii)For Labour per duct bore repaired

Per duct bore 90.00

17 Erection of DP Post Per Post 200.00 (Prior permission of GM concerned is required)    

18 Erection of Pillar Plinth    for 1200 pairs Per Plinth 3000.00for 2400 pairs Per Plinth 3500.00for 1600 pairs Per Plinth 3200.00for 2000 pairs Per Plinth 3400.00for 4000 pairs Per Plinth 5200.00

19 Vertical extension of Pillar    

50

Page 52: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

for 1200 pairs Per Pillar 2000.00for 2400 pairs Per Pillar 2500.00

20 Coupling of pillars (Up to 2 m) Per Pillar 1200.00(Prior permission of Concerned G.M. may be taken.)

21 Providing and laying cement concrete 1:2:4 (1 Cement 2 coarse 4 Graded stone aggregate of 20 mm nominal size) in theft prone / ramp/ gates/wheel guard of bridge/culvert over the pipe/ in the trenches for protection. Item includes cost of equipment, cost of material, standard curring, Shuttering etc. (Approval of concerned DGM/AM is required for this item)

Per Cu. Mtr

4500.00

22 Painting and sign writing.    I) Painting with smoke gray paint. Per Pillar 600.00ii) Sign writing ( letter) size 2 to 4 Per letter 1.00iii) Sign writing ( letter) size 6 to 8 Per letter 1.00iv) Sign writing ( letter) size 10 to 12 Per letter 1.00v) Logo painting Type-I Per logo 1.00Vi Logo painting Type-II Per logo 1.50Vii Logo painting Type-III Per logo 1.75viii) Logo painting Type-IV Per logo 2.00ix) Logo painting Type-VI Per logo 2.50x) Painting in luminous paint. Per DP 10.00xi) Painting in white synthetic enamel paint. Per DP 10.00

These rates are inclusive of cost of the paint and other relevant materials together with labour charges for the work conveyance and all levies and taxes etc. and these will not be enhanced during the contracted period of one year. The paints to be used for these works will be as per IS-2932 specification and the work shall be supervised directly by the user unit.

23. Supply& Fixing of cable identification collars Rate per 100 Pcs.  

I) Size 4 Cms.   20.00ii) Size 10 to 15 Cms.   50.00iii) Size 15 to 20 Cms.   75.00iv) Size 20 to 25 Cms.   85.00v) Size 25 to 30 Cms.   100.0024 Sealing of Duct Bores. Per bore 125.0025 Earthing of new pillar Per Pillar 250.0026 Installation of Pillar DP including casting of CC base of size(30 cm.x 45

cmx 10 cm) having CC in ratio of (1:2:4) along with making of pits fixing at sites.

Per pillar D.P

500.00

27 Fixing of G.I. Pipe DP’s Per Pipe 29.0028 Cable Pulling in G.I. Pipe of DP’s.    

I) 5 Pair. Per Pipe 20.00ii) 10 Pair. Per Pipe 29.00iii) 20 Pair. Per Pipe 40.00

29 Laying 5 Pair cable from Pillar DP’s to DP’s at subscribers’ premises & fixing of identification collar and clamping at an interval of 50 Cms. in case of laying on wall.

Per meters

0.75

30 Removal of DP Posts with DP’S Per Post 110.0031 Removal of DP Posts without DP’S Per Post 100.0032 As per prevailing min. wages act

SCHEDULE OF RATES OF MATERIALS

51

Page 53: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Sl.No. Material Basic Rate in Rs 1. Brick Class B quality 1,000 Rs.4500.00 (Rupees Four Thousand Five Hundred only) 2. Red stone Slab : Rs. 180/- per Sq.Mtr. (40 mm thickness)

3. Split pipe/semi circular spun pipe Size Rate a) 150 mm dia Rs.150.00 per metre b) 250 mm dia Rs.180.00 per metre 4. R.C.C. Pipe ISI marked Size Rate a) 150 mm dia Rs. 210/- per metre b) 250 mm dia Rs.260/- per metre c) 300 mm dia Rs.300/- per metre (One collar of appropriate size will be supplied free of cost along with each pipe) 5. R.C.C. pipe S&S type (Spigots & socketed) ISI marked. Size Rate a) 250 mm dia Rs.300.00 per metre b) 300 mm dia Rs.350.00 per metre (One rubber ring shall be provided free along with each RCC pipe) Note: Description of material given in Annexure-II.

52

Page 54: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

SCHEDULE OF RATES FOR TRANSPORTATION OF CABLE DRUMS WITH CABLE ROLLED THEREON (LOCAL)

53

Page 55: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

S.No. Items of work Unit Rates  Carriage of stores      5 Prs Per km per drum 12.00  10 to 100 Pairs. Per km per drum 24.00  200 to 600 Pairs. Per km per drum 60.00  800 Pairs & above. Per km per drum 90.00       

2 Handling Charges: The work includes the handling of cable drum upto 100 meters from the point of loading / unloading. It includes loading andunloading.

a) Cable drum above 800 pairs with crane. Per drum 600.00

b) Cable drum of 200 pairs to 800 pairs with chain pully.

Per drum 450.00

c) Cable drum below 200 pairs. Per drum 270.00

  Note- 1: Loading and unloading shall be taken as one operation. In case either loading or unloading only is being carried out the rate will be 50 %.

   Note- 2: Loading and unloading and / or transportation charges will be paid once only

if distance is more than 5 Kms. The charges for first 5 Km will be made inadmissible. The rate is inclusive of bringing back empty drums from site to COC store.

   Note 3: Handling charges will be paid in respect of only those drums, which are to be

transported and not in respect of those drums that are only rearranged. No handling charges shall be paid for handling extra drums in cable store of unit officers.

   Note 4 Stores of construction officer cables are in NCT Delhi and NOIDA. For NOIDA

the contractor will not be paid any thing extra except Toll Tax paid if any (Original receipt of Toll Tax paid is to be enclosed with claim).

 

Annexure IIBRIEF DESCRIPTION OF THE ITEMS OF WORKS INCLUDED

IN THE SCHEDULE OF UNIT RATES

The jobs described herein are as per details given in terms and conditions of NIT. contractor will quote a single percentage above or below up to two places of decimals for trenching &

54

Page 56: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

cable laying work, supply of material and transportation of stores separately. The percentage quoted will be applicable on all the rates and material which may be supplied for execution of this contract. It means charges payable for all items including material will be above or below the rates specified in this schedule by the same percentage only. The quotations i.e, percentage above or below will be mentioned on this Annexure only at the place provided and contractor will sign all pages in token of having noted these rates correctly.

It should be clearly understood that MTNL is not bound to award works in respect of all items

specified in the schedule of rates. MTNL will award work in respect of those items only which are necessary in view of MTNL.Contractor will not have any claim to refuse work on this account. MTNL has option to procure material either from contractor or from other sources. However, contractor will not be bound to supply the material in respect of those works, which have not been awarded to him.

1. I. HORIZONTAL BORING AFTER GPR AND PIJF CABLE LAYING

This work involves horizontal boring through HDD machine after GDR survey and laying of PIJF cables. Normally HDPE pipe should not be laid in trenchless technology for laying of PIJF Cable. However, whenever same is required to be done, approval of concerned G.M shall be taken. The depth of boring should be such as to clear any underground utilities/obstacles. In no case depth of boring should be less than 1.7m from road surface. The contractor shall be responsible for lifting of store from store depot to working site. He is also to make arrangements of water and power at site. Permission of laying shall be taken by contractor. The contractor shall give record of depth at the interval of 5 meters. At the time of laying, Jack and Wheel should be used so that the cable is not damaged. The contractor will be responsible for digging of test pit and restoration of pits upto compacted back filling.

II. Laying of Cables/Pipes by Buckey Method: In addition to laying of cables/pipes by HDD machine and trenching methods, Buckey method is also recommended where laying of cable by HDD or trenching method is not feasible and this has to be adopted with the prior approval of GM on case by case basis.

2. TRENCHING IN ALL TYPES OF SOIL:

This item involves excavation for trenches in all types of soil, ramming of bottom and dressing of the sides covering the' cables with consolidated thick layer of 15 cm of soft earth which should be free from stone or other sharp objects and afterwards back-filling of the trenches in layers not exceeding 20 cm. each, ramming and watering, de-watering of water coming from source, and protecting the existing services like, telephone cables, electric cables, water lines, sewer lines etc., pilot trenching, fencing, lighting, watching, till the closure of the trench, stacking of serviceable material, if any, and disposal of surplus excavated material up to dumping ground. The Contractor shall have to provide shoring, wherever necessary in case the depth of trench is more than 1.0 m.

3. EXCAVATION IN FOOTPATH:

This item includes excavation for trenches in all types of soil, ramming of bottom and dressing of the sides, dismantling of stone pavements and cement concrete covering of the cables with consolidated thick layer of 15 cm. of soft earth which should be free from stone or lather sharp objects and afterwards backfilling of trenches in layers not exceeding 20 cm each ramming and watering, dewatering of water coming from any source, and protecting the existing services like telephone cables, electric cables, sewer lines, water lines,etc.,pilot trenching, fencing, lighting, watching, till the closure of the trench, stacking of serviceable material and disposal . The contractor shall have to provide shoring wherever necessary in case the depth of trench is more than 1.0 m.

4. EXCAVATION IN ASPHALTIC SURFACE:

This item includes excavation for trenches in all types of soil, ramming of bottom and dressing of the sides, dismantling of water bound macadam and asphaltic concrete covering the cables with consolidated thick layer of 15 cm of soft earth which should be free from stone or other sharp objects and afterwards backfilling of trenches in layers not exceeding 20 cm each ramming and watering, dewatering of water coming from any source, and protecting the existing services like telephone cables, electric cables, sewer lines, water lines, etc. pilot trenching, fencing, Lighting, watching, till closure of the trench, stacking of serviceable material and disposal of the surplus excavated material up to dumping ground. The

55

Page 57: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

contractor shall have to provide shoring wherever necessary in case the depth of trench is more than 1.0 m.

56

Page 58: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

5. EXCAVATION IN CEMENT CONCRETE / RCC ROADS:

This item involves excavation of trenches in all types of soil, ramming of bottom and dressing of the sides, dismantling of cement concrete with or without reinforcement and sub-base covering of the cables with consolidated thick layer of 15 cm of soft earth which should be free from stone or other sharp objects and afterwards back-filling of the trenches in layers not exceeding 20 cm thick each ramming and watering, dewatering of water coming from any source, and proving dewatering of water coming from any source, and protecting the existing services like, telephone cables, electric cables, sewer lines, water lines, etc., pilot trenching, fencing, lighting, watching, till the closure of the trench, stacking of serviceable excavated material, if any, and disposal of surplus excavated material up to dumping ground . The contractor shall have to provide shoring wherever necessary in case the depth of trench is more than 1.0 m.

(a) This item includes the cutting and removal of steel bars from the RCC structure.

6. EXCAVATION IN ROCKY SOIL :

This item includes excavation in rocky soil (where blasting is not permitted) requiring chiseling, covering of the cables with consolidated thick layer of 15 cm of soft earth which should be free from stone or other sharp objects and afterwards back-filling of trenches with suitable excavated earth in layers not exceeding 20 cm each ramming and watering, dewatering of water coming from any source, and protecting the existing services like, telephone cables, electric cables, sewer lines, water lines, etc.,pilot fencing, lighting, watching, till the closure of the trench, stacking of serviceable material, if any, and disposal of surplus excavated material, if any, and disposal of surplus excavated material up to dumping ground. The contractor shall have to provide shoring wherever necessary in case the depth of trench is more than 1.0 m.

7. Same as Item No. 2

8 & 9. LAYING OF GI PIPES/R.C.C. PIPES:

This item includes cost of labour for laying, jointing and fixing of the pipes in position, with collars, etc. complete. G.I pipes shall be used when depth is between 40 to 50 cms. And over bridge/ flyovers RCC pipes shall be used in case of Nalla, Culverts and under bridge.

10 LAYING OF CABLES IN TRENCHES:

This item involves transportation (including loading, unloading of Cable drums) from construction/maintenance Store Depot of S.D.E. issuing the work order to the work site, mounting them on the jack and spindle at appropriate position for each unwinding putting cable rollers in the trench at a regular interval of 20 M, length and after laying the cable removing the cable rollers from the trench and empty cable drum from the jack and spindle and finally taking back the empty drums to the store concerned. Cable laying has to be done in the presence of MTNL representative. Additional details in respect of this work are as below

10.1 Laying of cables work includes:

i) Preparation of 5 cms. high soft bed for laying of armoured cable or any other cable. The bed should be prepared of soft soil excavated from trenches, free from stones. In case of rocky surfaces sand required for bed will be provided by contractor. No extra payment will be made for sand.

ii) Laying/Paying/pulling of cables in trenches or bridges or other cable structure/s or

through G.I. Pipes or through other pipes or tunnels or cable ducts, provides for the purpose.

iii) Fixing of identification collars: This item involves fixing of collars to get over the

laid cables at a interval of two meters apart (colour / inscriptions to be approved by MTNL before hand). After fixing the collars getting them checked by MTNL representative.

57

Page 59: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

iv) Straightening of cables and adjusting them on the center of the trench and arranging them at equal distance without any criss-cross.This item involves collecting identification collars from the stores, fixing the collars over the laid cables at a regular interval of 2.0 mtrs.and after fixing the collars, getting them checked by MTNL representative.

v) Covering of cable with soft soil, free from stone made available from excavated earth from the trenches, up to 15 CMs height. In case of rocky soil sand without any extra payment will be arranged by contractor.

vi) Placing of bricks /stone slabs/ split pipes /RCC slabs over laid cables as protection. This item involves placing of warning bricks/baked tiles/ Kaccha path stones longitudinally over the soft earth positioned above the cable so as to protect it from direct hits, covering the entire distance for which the cable has been laid Approximately 4,000 bricks shall be placed for every kilometer of the cable. No gap should be left between the bricks. An elevation of the trench is shown for illustration on Annexure-I(A-II ) Para–14 Page 48

10.2 This item involves placing them over the soft earth positioned above the cable so as to protect it from direct hits . The cable drums will be handed over to the cable contractor at the store godown of concerned COC. The contractor will be required to transport cable drums from store godown to work sites. Transportation of cable drums up toL 5.0 kms distance will not be paid. Transportation for more than 5.0kms will be paid at the approved rates as per Annexure II (c). Counting of distance for transportation will be on the basis of drum length laid. Distance between near end of the cable laid and godown will be basis for payment of transportation charges. It means charges for transportation of each cable drum will be calculated cable drum wise. This transportation charge will include the element of loading and unloading of cable drums whether done once or more than once before actual laying. Loading and unloading of cable drums will be done by crane or chain pulley arrangement. Chain pulley arrangement will be permissible for cable drums of 10 prs. to 400 prs. only. Normal permissible route shall be followed for transportation of cable drums. In case longer route is to be followed then specific permission of work Awarding authority is required.

11. RECOVERY OF THE CABLES FROM TRENCH

This item involves lifting the cable, which has been specifically identified by MTNL. representative from the trench and putting in on the surface or footpath, carefully cleaning mud or earth particles from the cable, winding the cable on the empty cable drum, packing the drum planks and transporting it to the store of the S.D.E./C.O.C. Concerned.

12. CLEANING & PROVIDING WORKING ENVIRONMENT FOR PREPARATION OF JOINTS

This item includes testing the manhole for presence of any poisonous gas, clearing the poisonous gases from the manhole by using exhaust fan, compressed air or both, pumping out the water in case it is there, removing mud or other waster materials to make the environment of manhole good for human working and providing adequate light and exhaust fan during working and providing adequate light and exhaust fan during working by having a generator and flame proof electric filling to avoid any explosion of underground gases.

13. CLEANING, PROVIDING AND SMOOTHENING OF DUCT PIPE This item involves preparing the duct for pulling the cable and to ensure that the duct is

clean and free from obstructions. This can be done by following methods.

. (i) Rodding the duct: This can be done either by sectional conduit rods or by high tensile steel rod sections of 2 cm length or by continuous PVC pipe.

(ii) Clearing and proving the duct: This is done by means of nylon brush and if necessary by steel wire or fiber brush and rubber disk or Hessian swab. Tube shovel can also be used for clearing the duct. Proving of duct is done by passing a proving mandril of 90 mm dia and 300 mm length. After clearing, the duct should be flushed with water after this operation is over the manhole should be cleaned for waste material and other rubbish etc.

58

Page 60: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Wherever necessary, it is better to check the smoothness of the duct pipe by passing through duct a dummy piece of cable of about 20 m length having pulling eyes at both ends and checking for any sharp cutting mark on the cable.

In case of failure of duct pipe in the smoothening attempt, further instructions from SDE

concerned should be sought. . 14 PULLING OF PILOT ROPE THROUGH DUCT PIPE

Th.is involves putting pilot rope through the allotted pipe if the rope does not already exist. One of the methods is by using a float ball and trying nylon rope and pumping the water in the duct pipe. Any other suitable method can also be used.

After this operation is over the manhole should be cleared of water and cleaned for waste materials, mud and other rubbish etc.

15 PULLING OF CABLE THROUGH DUCT

This item involves transporting of cable drum of required size from construction / maintenance store depot of S.D.E. to the work site, mounting them on jack and spindle at appropriate position for easy unwinding or lay all the cable on a tarpaulin on the ground in form of 8 having radius not less than nine times the diameter/of the cable or as the case may be, putting steel scaffolding as per the requirements inside the manhole, mounting cable guides, pullies, rollers etc. inside and outside the manhole, putting the cable hauling

rope using pilot rope, attaching the hauling rope to appropriate anti twisting device which in turn is connected to slip grip/epoxy resin bonded hauling eye which is fixed to the end of the cable and then pulling the cable carefully by keeping a constant communication between all members of cable pulling parties by using communication equipment as mentioned in technical specification. The tension in the cable should not exceed the limit specified at the time of pulling the cable. Also a uniform hauling speed of 30 m/min. should be maintained.

Use of approved lubricants e.g. liquid, powder, petroleum jelly etc. to reduce the pulling tension can be considered while pulling the cable.

Cable will be tested for pressure holding before and after pulling the cable and if the

cable does not hold the pressure in the duct this will indicate that a damage has occurred while pulling the cable and contractor will be held responsible.

After the cable is pulled through the duct the steel scaffolding etc. should be removed and

empty drums should be transported back to the store concerned within three days of its paying out/laying out.

Cable pulling should be done in the presence of MTNL Representative.

ELEVATION OF TRENCH DUG FOR LAYING CABLES IN 1 METER DEEP TRENCH Earth or Road Surface

- - - -- - --- --- - --

-- - - - - -- -- -- ------ - - - - - { Back filled soft earth should be free from

- - - - - - - -- - - - - - { Stones or hard objects, fully rammed in

- - - - - -- - - - - - - - - { Layers of 20 cms each. - - -- - - -- ---- - --- -- - - - - - - - - - - -- --- -

Cables - - - - -- -- ----- ---- -

- ----- -- --- - - -- - - - {Minimum distance of cable - - - -- -- - -- - ---- -- { from wall is = 5 cm

- - -- - - - -- -- -- - ----- 5 cm soft soil or sand below cables

Note: Diagram not to scale.

16. LAYING OF HDPE PIPE AND ACCESSORIES 59

Stone Slab

1 m

eter

Page 61: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

After trenching is over, HDPE pipes, sockets, spacers and nylon rope should be collected

from the stores. The three spacers are used for 5 m length of HEPE pipe. The soft soil should be put and compacted between the layers of HDPE pipes and over the top layer 15cm soft soil should be laid. The pipes should be sign written with white paint supplied by the contractor. The nylon rope should be put in the pipes simultaneously.

17. COMPLETE LAYING OF CABLE INSIDE SUBSCRIBER PREMISES:

The work involves laying of cable inside subscriber premises including trenching etc. upto DP Box. 18. RECOVERY OF THE CABLE FROM DUCT.

This item involves pulling the duct cable, which has been specifically identified by the MTNL representative from the duct manhole very carefully using proper tools like rollers, pulleys etc. and winding the cable on the empty cable drum, packing the drum with planks and transporting it to the store of the SDE/COC concerned. This item also includes cleaning and providing working environment inthe manhole, including de-watering at the time of recovery of cable from the duct and transportation of empty cable drum from COC/SDE cable store or any other specified place to the site.

19. REPAIRING/REPLACING THE CHOKED PVC CABLE PIPE IN DUCT ROUTE:

This item involves digging a pit at the choked point of duct route to reach the blocked ducted point. The earthwork done in this regard is to be paid in cubic meters.After reaching the blocked duct, all the spare ducts are to be checked for being completely through and fit for mandrel testing and those which are found choked, are to be repaired. Payment is to be made for per duct bore repaired as indicated in schedule of rates. MTNL may supply the material from it’s store or may ask the contract to arrange for it as well.

20. DP POST ERECTION: -

The works involved here are to receive A4BC tubes, Socket & sole plate from the COC stores or any other specified place by the COC concerned to the site tent and installation within 5 km radius from the site tent, making hole 3 feet deep at the specified places & fixing the post exact vertically, consolidation & ramming of surface to hold the post firmly with sole plate at the depth of 3 feet keeping vent hole 1 feet above the ground level. No separate cost of transportation will be made

21. PILLAR PLINTH INSTALLATION :-

Making of pit sized 1.5 m x 1 m x1.5 m for pillars up to 2400 pr. and a pit size 2 mtr. x 2 mtr. x 1.5 mtr. up to 4000 prs. in all type of soil in any location. Cement concrete (1:5:10) footing 1.5 m x 1m x 0.3m. or 2 m x 2 m x 1.5 m as the case may be shuttering and fixing of PVC pipes, bends & MS.rods. RCC work include bending and placing in position cold twisted iron bars of o.5" dia.25 kg. in 1200 pair pillar 35 kg. in 1600 pair, 50kg in 2000 pair & 2400 pair and 100 kg. in 4000 pair pillar. Providing PVC pipes and bends as per direction of Engineer-in- charge. Cement concrete plinth foundation footing in 1:2:4 (1 cement :2 coarse sand:4 graded stone of aggregate of 4 cm nominal size). Plastering it by 1.4 mix (1 cement:4 coarse sand). Curing will be done as per requirement and guarding for 3 days. Providing and fixing bolts with nuts and washers as specified by Engineer-in-charge.

Transportation, cartage and supervision included in the rates.

22. VERTICAL EXTENSION OF PILLAR: -

The 1200/2400 pairs size pillars are required to be extended vertically with the sheet of same gauge as of the pillar (18 SWG). The pillar is to be extended vertically by 1.5 feet with width & length as that of pillar. The includes removing of roof, fixing of the fabricated EXTENSION with the gas welding at the site. The EXTENSION will have door & locking arrangemnet.The refixing of roof also. Inside the extension provision of galvanized iron frame with proper C.T.box fixing arrangement as per the size of the pillar. Finishing & painting of the portion extended vertically base rates for 1200 pair for making provision of 3 extra CT boxes. Painting will include red oxide primer paint & finishing with smoke gray paint (IS:2932).

23 COUPLING OF PILLARS: -

60

Page 62: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Coupling will be done with side pillar by 100 mm dia. MS pipe of 18 SWG. This will be welded on both side painting in smoke gray paints (after red oxide primer) IS: 2932. The transportation, cartage and supervision is also included in this activity.

24 & 25 As per Annexure-I

26. PVC IDENTIFICATION COLLARS: -

The PVC strips of 20 different colours of various lengths as specified in Annexure - IID (Page -2) having width 1.25 c.m. and thickness 1 m.m. at edges 2 m.m. approx. Embossing of letters and figures giving sizes of cables etc.is to be done. There should be three holes of 3 m.m. dia. at each end at distance of 2.5 c.m. Nylon thread of 2 m.m. dia. and 100 m.m. long with each strip, virgin material is required to be used for manufacturing the PVC strips and certificate to this effect is required to be given. Tolerance up to 5% of specified size is permissible.

27. SEALING OF DUCT BORES:-

Sealing of Duct Bore to be done with Poly insulated compound as per TEC specification G/CDS-02/0/DEC 91 (Old No. TEC BOD 91).

28. EARTHING OF NEW PILLARS

A small pit of 2.1 meter depth should be dug up adjacent to the pillar plinth for providing earth coil. A GI wire coil made of 0.5 meter of wire should be placed in the pit and this wire should be extended on the top so that about 3.5 meter length is left near the entry holes in the plinth for termination by the cable splicer. This also includes the cost of G.I. wire of 18 gauge 3 strands.

29 INSTALLATION OF PILLAR DP INCLUDING CASTING OF CEMENT CONCRETE BASES, MAKING

PITS AND FIXING AT SITE. To receive lower frame, middle and upper portion of Mini Pillar DP along with J-bolt from the COC stores or any other specified place by the COC concerned to the site tent and installation within 5 Km radius from the site tent, making pits of size (45cm x 60cm), 60 cm deep at the specified places and casting of CC Base of size (30cm x 45cm x 10cm) with J-bolt arrangement (cement concrete 1:2:4), 1 Cement, 2 coarse and 5 store of aggregate of 4 cm nominal size and plastering it by 1:4 mixture (1 cement, 4 coarse sand), putting CC Base in pit and then fixing of lower frame, middle frame, upper frame with washer nut bolts and refilling of pits, as per specifications.

30 FIXING OF GI PIPE, CLAMPING OF CABLES AND FIXING OF DPsTo receive clamps, rowel plugs, screws and GI Pipe from C O C’s store or any other specified place as specified by COC concerned and transporting them to the site tent. Clamping of the cables with clamps on the walls leaving sufficient coil of cable for termination in the DP. Fixing of GI pipe at a height of 8 feet from ground level and fixing of DPs on subscriber’s premises.

Jointing of G.I. Pipes. This includes: -

i) The inside of the sockets and the screwed ends of the pipe must be oiled and sweared with white or red lead.

ii) It should be wrapped around with a few turns of fine-spun yard round the screwed and of the pipe.

iii) The end shall then be tightly screwed in the socket with the pipe wrench. iii) Any thread exposed after jointing should be painted with anticorrosive paint to

prevent corrosion.

31 CABLE PULLING IN THE GI PIPE OF DPsTo pull the cable coil left on the site through the GI pipe already clamped on the wall and termination of 5/10/20 pair cable as the case may be.

32 LAYING OF 5 PAIR CABLE FROM PILLAR DP TO SUBSCRIBER’S PREMISES.

This works involves laying 5 pairs cable from pillar DP to DP at subscriber premises in trench along the wall and fixing of identification collars/clamping on the wall at an internal of two meters.

33 REMOVAL OF DP POSTS WITH DP.61

Page 63: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

To carefully dismount the DP and GI pipe erected on the post and remove them carefully so that they are not damaged in the process and then digging a pit around the post to be removed up to such a depth that the sole plate is fully exposed. Carefully removing the post material from the location. Back filling, consolidation and ramming of the surface from where the post is removed and clearing the site of all unwanted material/debris. Transportation of the recovered post material, DP and GI pipe from the site to the stores of COC/SDE (Cable)/SDE (P) or any other specified location.

34 REMOVAL OF DP POSTS WITHOUT DPDigging a pit around the post to be removed up to such a depth that the sole plate is fully exposed. Carefully removing the post material from the location. Back-filling, consolidation and ramming of the surface from where the post is removed and clearing the site of all unwanted material/debris. Transportation of the recovered post material from the site to the stores of COC/SDE(Cable)/SDE(OP) or any other specified location.

35 SUPPLY OF DAILY RATED MAZDOOR:

This is to meet the casual sporadic requirements rising temporarily sometimes for unforeseen situation on per day basis for skilled and unskilled labourer categories.

PART - A (Techno – Commercial Bid)

62

Page 64: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

SECTION: VII

Part-IFORM “A”

T.E.No: AGM (MPL)/PIJF Cable Laying /2018-19/01

I. 1. Name of Tenderer2. Location3. Address4. Telephone NO./Mobile No.5. Name of the Managing Director.6. Name of the actual signatory to the tender.7. FAX Number8. e-mail address

9. GST Regn. No.

II. Capacity (Product wise).

1. Licensed capacity (as per Industrial Licence)2. Installed capacity as on date3. Fully equipped capacity for throughput4. Total Number of pages of tender offered and its enclosures. Pages.5. Indicate infrastructure to be provided by MTNL.

(Power/Light/Space etc.)

III. Brief of facilities available for training, recruitment and quality support team.

IV. Whether services offered conform to particulars and specification quoted in the tender schedule and subsequent amendment (if any). If not, details of deviations must be stated here.

V. Here state specifically whether the price tendered by you is to the best of your knowledge and beliefs not more than the price which is permissible for you to charge from a private purchaser for the same class and description of services under the provision of any law for the time being in force. If not, state the reason and the margin of profit included.

VI Name & Constitution of tendering firm, if the firm is registered undera) The Indian companies act, 1913.b) The Indian partnership Act, 1931.c) Any other act. If so please give details if any please give the names of partners.

63

Page 65: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

SECTION: VII

Part-II

INFORMATION ABOUT BIDDER (To be submitted along with the Tender)1. Name of the Firm :

2. Local Address:3. Registered Address:

4. Contact Phone Number (s) ( Land line and Mobile ) :

5. (i) Fax Number :

(ii) E-mail address:6. Sole Proprietary Co. or Partnership Firm / Pvt. Ltd. Co.7. Name of Sole Proprietor orNames of Partners / Directors

8. Name of person authorized to negotiate and execute Contract Agreement and the capacity in which he is authorized.

9. Permanent Income Tax A/C No.

10. GST No.

11.Name of Bankers and full address12. Whether The Firm is a: (i) Central Govt. Undertaking? (ii) State Govt. Undertaking?

13. Engaged in the Business of Cable Laying by Trenching & Trenchless Technology since when?14. Company Profile indicating Level of Expertise available, with supporting reference (May attach Extra Sheet).15. Annual Turnover for last Three(3) years.Quantity of Work-wise+ in number of executed Work Order+ the Bill Amount.16. A list (with full addresses) of prominent organizations where the bidding Firm have undertaken similar jobs.(Please attach extra sheet as required)

17. Organizational Change18. Photograph of Proprietors and I-Cards to authorized persons at site.

(Signature of bidder/ContractorDate or person authorized in this behalf)

64

Page 66: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

SECTION -VIII

PROFORMA FOR BANK GUARANTEE FOR BID GUARANTEE (To be stamped in accordance with the Stamp Act)

B.G. NO. : --------------- DATE OF ISSUE : ---------------

VALID UPTO : ---------------

Tender Enquiry No.: AGM (MPL)/PIJF Cable Laying /2018-19/01

Ref:------------------------------------To,MAHANAGAR TELEPHONE NIGAM LIMITEDO/O AGM (MPL) CSD Compound Netaji NagarNew Delhi-110023.Whereas .................................. (hereinafter called “the Bidder”) has submitted its bid dated............for the supply of ........................ vide Tender No……………………........... The terms of the said Tender required the Bidder to submit bid security of Rs. _________ by way of bank guarantee. KNOW ALL MEN by these presents that WE ........................................... having our registered office at .................(hereinafter called “the Bank”) at the request of the Bidder, are bound unto MAHANAGAR TELEPHONE NIGAM LIMITED (hereinafter called “the Purchaser”) in the sum of Rs. ................... for which payment will and truly to be made to the said Purchaser, the Bank binds itself, its successors and assigns by these present.THE CONDITIONS of the obligation are:1. If the Bidder withdraws his bid during the period of bid validity specified by the Bidder

on the Bid form Or

2. If any case of false statement and / or submission of false document by the Bidder are detected.Or

3. If any case of Cartelization is detected.Or

4. If any case of breach of the condition mentioned in Section II by the bidderOr

5. If the Bidder, having been notified of the acceptance of his bid by the Purchaser during the period of bid validity,(a) Fails or refuses to execute the Agreement (as detailed in Section XII) with in the

stipulated time.Or

(b) Fails or refuses to furnish the Performance Security, in accordance with clause 4 Section III.

We irrevocably and unconditionally undertake to pay to the Purchaser upto the above mentioned amount upon receipt of its first written demand, without the Purchaser having to substantiate its demand, provided that in its demand, the Purchaser will note that the amount claimed by it is due to it owning to the occurrence of one or more of the conditions, specifying the occurred condition or conditions.This guarantee shall not be affected by any change in the constitution of or by any such reason or by winding up of the Bidder or any merger, amalgamation or absorption of the Bidder with or into any other company or companies.This guarantee is a standalone document and is in addition to and not in substitution for any other guarantee executed/to be executed by the Bank in favour of the Purchaser on behalf of the Bidder.This guarantee will remain in force as specified in clauses 12 of section II of the Bid Document upto and including THIRTY (30) days after the Period of bid validity and any demand in respect thereof should reach the Bank not later than the specified date/dates.

Signature of the Bank Authority.

NameSigned in Capacity of

Name & Signature of witness Full address of BranchAddress of witness Tel No. of Branch

65

Page 67: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Fax No. of Branch

N.B.: Full Address of the Branch of Bank from where confirmation is to be taken with Telephone & FAX Number.

SECTION –IX LETTER OF AUTHORISATION FOR ATTENDING BID OPENING

(In the office of AGM (MPL), CSD Compound Netaji NagarNew Delhi-110023, before date of bid opening)

Subject: Authorization for attending bid opening on ---/---/2018 for opening of : T.E.No: AGM (MPL)/PIJF Cable Laying /2018-19/01

Following persons are hereby authorized to attend the bid opening for the tender mentioned above on behalf of------------------------------------------------------------------------------------------------------(bidder) in order of preference given below:-

Order of Preference_____________Name___________________Specimen Signature

I.

II.

AlternateRepresentative.Signature of Bidder OROfficer authorized toSign. The bid documentsOn behalf of the bidder.Note:

1. Maximum of two representatives will be permitted to attend bid opening. In cases where it is restricted to one, first preference will be allowed. Alternate representative will be permitted when regular representatives are not able to attend.

2. Permission for entry to the hall where bids are opened may be refused in case authorization as prescribed above is not received.

66

Page 68: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Annexure-B(Strike-off whatever is not applicable)

Clause-by-Clause Compliance Certificate

T.E.No: AGM (MPL)/PIJF Cable Laying /2018-19/01 It is to certify that the tender document is carefully read & understood and all the sections and clauses including Section-VI (Specifications); Section-III (Commercial Conditions); Section-IV (Special Conditions); Annexure-I (Road maintenance and inter utility code of conduct); Annexure-2 (Safety code); Annexure-3 (Model rules) and Annexure-4 (Contractor’s labour regulations) are complied unconditionally & unequivocally. There is no deviation from the terms & conditions of the tender.

(Sign. of the bidder/Authorised signatory with seal)

OR

Declaration of Deviation (If any)T.E.No: AGM (MPL)/PIJF Cable Laying /2018-19/01

It is to certify that the tender document is carefully read & understood and all the sections and clauses including Section-VI (Specifications); Section-III (Commercial Conditions); Section-IV (Special Conditions); Annexure-I (Road maintenance and inter utility code of conduct); Annexure-2 (Safety code); Annexure-3 (Model rules) and Annexure-4 (Contractor’s labour regulations) are complied unconditionally & unequivocally except the following deviations from the terms & conditions of the tender.

A)

B)

C)

D)

Signature of the authorized Signatory with seal

* Strike off whichever is not applicable.

ANNEXEURE - C (CLOSE RELATIVE DECLARATION)67

Page 69: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

T.E.No: AGM (MPL)/PIJF Cable Laying /2018-19/01

“I…………..s/o…….……r/o…………….. hereby certify that none of my relative(s) as defined in the tender document is/are employed in MTNL unit as per details given in tender document. In case at any stage, it is found that the information given by me is false/incorrect, MTNL shall have the absolute right to take any action as deemed fit/without any prior intimation to me.”

Station (Signature of bidder/Contractor)Date or person authorised in this behalf)

Note: The bidder should give a certificate that none of his/her near relatives are working in MTNL. In case of proprietorship firm certificate will be given by the proprietor. For partnership firm certificate will be given by all the partners and in case of limited company by all the Directors of the company excluding Government of India/Financial institution nominees and independent non-Official part time Directors appointed by Govt. of India or the Governor of the state.

68

Page 70: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

ANNEXEURE - D

T.E.No: AGM (MPL)/PIJF Cable Laying /2018-19/01

DECLARATION

I __________________________son of/wife of Sh____________________and Proprietor/ Director/ Partner/ Authorized Signatory of M/s____________________do hereby solemnly affirm and declare as under: -

1. That I am the sole Proprietor/Director/Partner/Authorized Signatory of M/s________________________

2. That I state & declare that the above firm M/s _______________________________________________

is not debarred and/or blacklisting by any department of Central Govt./State Govt./PSU/Public bodies/Municipalities/GST Authorities on the date of opening of tender.

In case the above declaration is found to be incorrect or wrong, the contract, if awarded to the firm shall be terminated immediately and the firm shall liable to be blacklisted/debarred for future works/contract with MTNL. Any such action shall however be without prejudice to MTNL’s right under the law.

Signature of Proprietor/Director/Partner/Authorized Signatory(Sh./Smt./Miss_____________________

Note: - The signatory should not affect any variation in the text of declaration. Declaration in any other form shall not be acceptable and render the tenderer for disqualification of the tender/bid.

ANNEXEURE - E

69

Page 71: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(SPECIMEN FORM OF SOLVENCY CERTIFICATE FROM THE SCHEDULED BANK)

T.E.No: AGM (MPL)/PIJF Cable Laying /2018-19/01

This is to certify that to the best of our knowledge __________________________ ** _____________________________*** _________________________________ a customer of our bank in respectable and can be treated as good for my engagement up to a limit of Rs. _______________________________ (Rs.________________________________________________) .

This certificate is issued without any guarantee or responsibility on the bank or any of the officers.

Manager Bank

* Here indicated name of the individuals or the firm.** Here name of the sole proprietor in case of a sole proprietorship concern or names or partners

in case of partnership concern as per Bank’s record, should be indicated.*** Here indicated the address of the customer as per Bank record.

Note : This certificate may be issued on the letter head of the bank and addressed to G.M. (HQ-O), MTNL, New Delhi in a Sealed Cover.

70

Page 72: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Financial Bid

71

Page 73: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

SECTION-XPART-I

BID FORM

T.E.No: AGM (MPL)/PIJF Cable Laying /2018-19/01

To, The Asstt. General Manager (MPL) Mahanagar Telephone Nigam Limited CSD Compound Netaji Nagar New Delhi-110023

Dear Sir,

1. Having examined the conditions of contract and specifications including addenda Nos.____________________ the receipt of which is hereby duly acknowledged, We, undersigned, offer to supply and deliver ____________________________________ in conformity with the said drawings, conditions of contract and specifications for the sum shown in the schedule of prices attached herewith and made part of this bid.

2. We, undertake, if our bid is accepted, to commence deliveries within ( ) months and to complete delivery of all the items specified in the contract within ( ) months calculated from the date of issue of your purchase order.

3. If our bid is accepted, we will obtain the performance guarantee of a scheduled bank for a sum of @ 5% of the contract value for the due performance of the contract.

4. We agree to abide by this bid for a period of ________ days from the date fixed for bid opening and it shall remain binding upon us and may be accepted at an y time before the expiration of that period.

5. Until a formal purchase order of contract is prepared and executed, this bid together with your written acceptance thereof in your notification of award shall constitute a binding contract between us.

6. Bid submitted by us is properly sealed and prepared so as to prevent any subsequent alteration and replacement.

7. We understand that you are not bound to accept the lowest or any bid, you may receive. Dated this __________________ day of ____________________2018

Name and signature______________________ In the capacity of________________________ Duly authorized to sign the bid for and behalf of ____________________ Witness_____________________ Address____________________ Signature_____________________

72

Page 74: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

SECTION-XPART-II

(PROFORMA FOR TENDERER'S QUOTATION) TENDER TO BE OPENED

T.E.No: AGM (MPL)/PIJF Cable Laying /2018-19/01

This is to be used as a Performa. It should be typed / Photocopied, completed and submitted in a separate sealed cover. Clause14.4 of Section-II may be referred.

TENDERER'S TELEGRAPHIC ADDRESS ______________________

TENDERER'S TELEPHONE No.:____________________________Mobile No. FAX No.:______________________________________________ E-mail Address_________________________________________

FROM

__________________________________

__________________________________

__________________________________ To The Asst. General Manager (MPL) Mahanagar Telephone MTNL Limited,

CSD Compound Netaji Nagar New Delhi-110023 Dear Sir,

I/We submit the sealed tender for appointment as contractor for trenching, cable laying, pulling cables through duct, erection of DP Posts, erection of Pillar Plinth, Painting & Sign writing, Plugging of duct Bores and allied works.

1. I/We have thoroughly examined and understood instruction to tenderers terms

and conditions of contract given in the invitation to tenderer and those contained in the general conditions of contract and its appendices, and annexure and agree to abide by them. I/We offer to work in MTNL New Delhi at the rates given below :- I/ We offer to work in MTNL, Delhi at the rates as ________ % (percentage) of the MTNL Schedule of Base Rates as per Annexure-I.

EXAMPLE:

If the bidder wants to offer as Then the bidder should fill

in the financial bid as

At same rates given in the MTNL Schedule of Base Rates as at Annexure-I.

100

At 10% above the rates given in the MTNL Schedule of Base Rates as at Annexure-I

110

At 10% below the rates given in the MTNL Schedule of Base Rates as at Annexure-I.

90

73

Page 75: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

It is confirmed that the rates quoted above are inclusive of packing, forwarding, freight and insurance or any other incidental charges etc. in case of materials to be supplied except GST (CGST/SGST/IGST/UTGST) in case of works to be executed. GST will be charged extra on work amount at applicable rates. In case the bidder is registered under composite scheme then no GST shall be payable. Bidder should make declaration in bid document with regard to being a Composition Dealer under GST. The bidder shall mention in the invoice prominently that it is under composition scheme under GST,ACT 2017.

NOTE: For DP post erection material/posts will be supplied by the department.

Strike off whichever is not applicable.

2. I/We agree to keep the offer open for acceptance up to and inclusive of the date under clause 13 of Section-II. I/We shall be bound by communication of acceptance of the offer dispatched within the time.

3. Bank Guarantee/Demand Draft/Pay Order No.________________drawn on _________ dated _________ for Rs._________________________ is enclosed as Earnest Money with Technical and commercial bid.

4. I / We do hereby declare that the entries made in the tender and appendices attached therein are true and also that I/We shall be bound by the act of my/our duly constituted attorney Shri __________________whose signature is appended here to in the space specified for the purpose and of any other person who in future may be appointed be me/ us in his stead to carry on the business of the concern, whether any intimation of such change, is given to MTNL or not.

5 The following documents are enclosed along with this tender duly filled and signed. a) Document - I _______________________________________ b) Document - II _______________________________________ c) Document - III _______________________________________ d) Document - IV _______________________________________ e) Document - V _______________________________________ f) Document - VI _______________________________________ Signature of Constituted Attorney

Yours faithfully (Signature of Tenderer)

(Capacity in which signing) along with seal

*NOTE: (1) If the discrepancy exists between fig. & words, in quotations above. The amount in

words will prevail.(2) Only one language either Hindi or English shall be used in quotations. (3) Absurd / Abnormal rates will not be considered by MTNL

Name and address of Attorney Name: ________________________ Address: ________________________

________________________ Date: ________________________

Signatures of witness.. …………………….Name…………………….

Address……………………………………….. ………………………………………..

Date

ANNEXURE-III

74

Page 76: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

MAHANAGAR TELEPHONE NIGAM LIMITEDDELHI TELEPHONES, NEW DELHI

ELECTRONIC CLEARING SERVICE (CREDIT CLEARING)(MODEL MANDATE FORM)

(To receive payment through Credit Clearing Mechanism)

1. Contractor’s Name-2. PAN No –3. GST No.-4. Particulars of Bank Account-

a) Bank Name-b) Branch Name-c) Address-d) Telephone-e) 9 digit code Number of

the Bank & Branch(Appearing on the MICR chequeissued by the Bank)

f) Account Type-(S.B.Account/Current Account or Cash credit with code 10/11/19)

g) Ledger No/Ledger Folio No.(As appearing on the cheque Book)

h) RTGS No./NEFT/IFSC CODEIn lieu of Bank Certificate to be obtained as under, Please attach a Bank cancelled Cheque or photocopy of a cheque or front page of your Savings Bank passbook issued by your Bank for verification of the above particulars

2. Date of Effect-

I hereby declare that the particulars given above are correct and complete. If the transaction is delayed or not effected at all for reasons of incomplete information or incorrect information . I wouldn’t hold user in question responsible. I have read the option invitation letter and agree to discharge responsibility expected of me as a participant under the scheme.

Date- Signature Of the Supplier

Certified that the particulars furnished above are correct as per our records.

Signature of the Authorized Official of the Bank

With Bank Seal

75

Page 77: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Part – C

(Documents to be submitted at the time of award of work)

Section-XI.Part-I

B.G. NO. : --------------------

76

Page 78: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

DATE OF ISSUE :--------------------VALID UPTO : --------------------P.O.NO. : -------------------

-PERFORMANCE BANK GUARANTEE

This DEED OF GUARANTEE IS MADE ON THIS ________________________________ DAY OF _______________________ between the Mahanagar Telephone MTNL Limited (MTNL) (which expression shall unless excluded by or repugnant to the context include his successors and assigned of the one part and ____________________________________________________________________ hereinafter. Called the Bank (which expression shall unless excluded by or repugnant of the context include its successors and assignees) of the part.WHEREAS MAHANAGAR TELEPHONE MTNL LIMITED accepted the Tender of _____________________________________________________________________ hereinafter called the Contractor to execute work of Mahanagar Telephone MTNL Limited as per work Order No. dated ___________ (hereinafter referred to as the said work Order).AND WHEREAS THE work Order provides that Contractor shall furnish irrevocable and unconditional Bank Guarantee to the extent of 5% of the value of the order as and by way of security for the due observance and performance of the terms and conditions of the Work Order.AND WHEREAS at the request of the Contractor the Bank has agreed to execute these presents.

NOW THE DEED WITNESSED AND IT IS HEREBY AGREED AND DECLARED BY AND between the parties here to as follows:1. The bank hereby irrevocably and unconditionally guarantees to the Mahanagar

Telephone MTNL Limited that the Contractor shall render all necessary and efficient services may be required to be rendered by the Contractor in connection with and / or for the performance of the said work order and further guarantees that the work which shall be done by the Contractor under the said work order shall be actually performing the WORK required of it to the satisfaction of the MTNL and shall be free form any defects arising from faulty materials, designs and workmanship, such as commission of the equipment inadequate quantity of materials, inadequate contract protection, deficiencies in Circuit Design and / or otherwise, whatsoever and in the event of the contractor’s failing or neglecting to render necessary falling to give satisfactory performance or proving not free from deficiencies or defects as herein before mentioned and in the said work order and particularly warranty clause mentioned therein, the Bank shall indemnify and keep the MTNL indemnified to the extend of

___________________ against any loss or damage that may be caused to or suffered by the MTNL by reason of any breach by the contractor of any of the aforesaid terms and conditions and the contractor of any of the aforesaid terms and conditions and the Bank further undertakes it pay to the MTNL, such sum not exceeding __________ on demand and without any contest, protest and demur in the event of contractor’s failure to perform and discharge the aforesaid several duties and obligations on his part to be observed and performed under the work order and / or deficiencies and defects in the satisfactory performance of the work.

2. The decision of the MTNL as to whether the Contractor has failed to or neglected to perform, or discharge his duties and obligations as aforesaid and / or whether the work are free from deficiencies and defect and are capable or performing the work required and as to the amount payable to the MTNL, by the Bank herein shall be final and binding on the Bank.

3. The liability of the Bank under this Guarantee shall be as Principal Debtor.4. The guarantee herein contained shall remain in full force and effect during the period

that would be taken for performance of the aforesaid terms of the said work order and it shall continue to be enforceable till _____________________ months after the work have been taken over, all the dues of the MTNL under or by virtue of the said Work Order have been fully paid and its claim certified or discharged or till it is certified by the MTNL that the terms and conditions of the said Work Order have been fully and

77

Page 79: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

properly carried out by the said contractor and a NO DEMAND CERTIFICATE submitted to this effect by the contractor.

5. The Bank further agrees that the Guarantee herein contained shall remain in full fore and effect for a period of TWO YEARS from the date hereof and also that the extension of this guarantee will be provided for by the Bank for such period beyond the said period of TWO YEARS as the MTNL may feel necessary in this behalf. Provided further that if any claim accrues or arises against the Bank Before the expiry of the said TWO YEARS or and extension thereof, the same shall be enforceable against the Bank before the expiry of the said TWO YEARS or a extension thereof, the same shall be enforceable against the Bank notwithstanding the fact the same is enforced after the said period of TWO YEARS OR ANY extension thereof.

6. The Guarantee herein contained shall not be affected or discharged by any chance in the constitution of the contractor of the Bank and shall be continuing one.

7. The MTNL has fullest liberty without affecting the Guarantee to postpone for any time and from time to time any of the followers exercisable but it against the contractor and either no enforce on forbear any of the terms and conditions of the said Work Order and the bank shall not be released from its liability under this guarantee by any exercise by the MTNL of the liberty with reference to the matter referred aforesaid or by reason of time being given to the contractor or any other forbearance, act, of the commission on the part of the MTNL, or any indulgence by the MTNL to be contractor or by other matter or thing whatsoever which under the law relating to Sureties shall but for this provision have the effect of so releasing the Bank from its such liability.

8. Notwithstanding anything to the contrary, the decision of MTNL as to whether the said Contractors has / have made any default or defaults and the amount or amounts to which MTNL is entitled thereof will be binding on the Bank and the Bank shall not be entitled to ask MTNL to establish its claim or claims under this guarantee but will pay the same on demand without any protest or demur and without any recourse to MTNL.

9. This guarantee shall continue to hold good until the expiry of the guarantee period including any extension.

10. The neglect or forbearance of MTNL in enforcing any payment of the money, the payment whereof is intended to be hereby secured, or the giving of time, by MTNL for the payment thereof shall in no way absolve the Bank from its liability hereunder.

11. This guarantee is a standalone document and is in addition to and not in substitution for any other guarantee executed/to be executed by the Bank in favour of the Purchaser on behalf of the Bidder.

12. This guarantee will not be affected or discharged due to the change in the constitution of the Bank or the Contractor(s)/supplier(s).

13. The Bank undertakes not to invoke this Guarantee during its currency except with the previous consent of the MTNL in writing.

IN WITNESS WHEREOF the parties have executed these presents the day and year therein above writing.

Witness

1. Signature :Name:Official Address (Signature)

Name(Designation with Bank Stamp)

2. Signature :Name:

78

Page 80: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Official Address Attorney as per Power of Attorney No. Date : ………

N.B. The Bank Guarantee shall be from the State Bank of India or any scheduled Bank of India.

Section-XIPart-II

STORE SECURITY BANK GUARANTEE PERFORMA {To be submitted to GM(Development)/GM(Area)}

This DEED OF GUARANTEE IS MADE ON THIS_________________ DAY OF______Between the Mahanagar Telephone Limited (MTNL)(which expression shall unless excluded by or repugnant to the context includes his successors and assigned of the one part and ____________________________________________________________hereinafter. Called the Bank (which expression shall unless excluded by or repugnant of the context include its successors and assignees) of the part.

WHEREAS MAHANAGAR TELEPHONE NIGAM LIMITED accepted the tender of _______________________________hereinafter called the Contractor to execute work of Mahanagar Telephone Nigam Limited as per work order No.___________ dated_________(hereinafter referred to as the said work order).

AND WHEREAS THE work order provides that Contractor shall furnish irrevocable and unconditional Bank Guarantee to the extent of Rs.____________________in relation to Section-II of the General Terms and Conditions of the NIT as and by way of security for the stores issued to the contractor.

AND WHEREAS at the request of the contractor the Bank has agreed to execute these presents.

NOW THE DEED WITNESSED AND IT IS HEREBY AGREED AND DECLARED BY AND between the parties here to as follows: -

1. The bank hereby irrevocably and unconditionally guarantees to the Mahanagar Telephone Nigam Limited that the contractor shall take due care for the security of the store issued to the contractor for work of PIJF cable laying against the above tender and the Bank shall indemnify and keep the MTNL indemnified to the extent of __________________caused to or suffered by the MTNL on account as store or reason of any breach by the contractor of any of the aforesaid terms and conditions and the Bank further undertakes it, to pay to the MTNL, such sum not exceeding___________ on demand and without contest, protest, demur or proof and without reference or recourse to MTNL, in the event of contractor’s failure to perform and discharge the aforesaid several duties and obligations on his part to be observed and performed under the work order.

2. The decision of the MTNL with regard to assessment of any loss of damage that may be caused to or suffered as to whether the contractor has failed to or neglected to perform, or discharge his duties and obligations as aforesaid as to the amount payable to the MTNL, by the Bank herein shall be final and binding on the Bank.

3. The liability of the Bank under this Guarantee shall be as Principal Debtor.

4. The guarantee herein contained shall remain in full force and effect during the period that would be taken for performance of the aforesaid terms of the said work order and it shall continue to be enforceable till _______18__________ months after the work have been taken over, all the dues of the MTNL under or by virtue of the said work order have been fully paid and its claim certified or discharged or till it is certified by the MTNL that the terms and conditions of the said work order have been fully and

79

Page 81: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

properly carried out by the said contractor and a NO DEMAND CERTIFICATE submitted to this effect by the contractor.

5. The Bank further agrees that the Guarantee herein contained shall remain in full fore and effect for a period of Eighteen Months from the date hereof and also that the extension of this guarantee will be provided for by the Bank for such period beyond the said period of Eighteen Months as the MTNL feel necessary in this behalf. Provided further that if any claim accrues or arises against the Bank Before the expiry of the said Eighteen Months or and extension thereof, the same shall be enforceable against the bank before the expiry of the said Eighteen Months or a extension thereof, the same shall be enforceable against the bank notwithstanding the fact the same is enforced after the said period of Eighteen Months OR ANY extension thereof.

6. The Guarantee herein contained shall not be affected or discharged by any chance in the constitution of the contractor of the bank and shall be continuing one.

7. The MTNL has fullest liberty without affecting the guarantee to postpone for any time and from time to time any of the followers exercisable but it against the contractor and either no enforce on forbear any of the terms and conditions of the said work order and the bank shall not be released from its liability under this guarantee by any exercise by the MTNL of the liberty with reference to the matter referred aforesaid or by reason of time being given to the contractor or any other forbearance, act, of the commission on the part of the MTNL, or any indulgence by the MTNL to be contractor or by other matter or thing whatsoever which under the law relating to Sureties shall but for this provision have the effect of so releasing the bank from its such liability.

8. Notwithstanding anything to the contrary, the decision of MTNL as to whether the said Contractors has / have made any default or defaults and the amount or amounts to which MTNL is entitled thereof will be binding on the Bank and the Bank shall not be entitled to ask mtnl to establish its claim or claims under this guarantee but will pay the same on demand without any protest or demur and without any recourse to MTNL.

9. This guarantee shall continue to hold good until the expiry of the guarantee period including any extension.

10. The neglect or forbearance of MTNL in enforcing any payment of the money, the payment whereof is intended to be hereby secured, or the giving of time, by MTNL for the payment thereof shall in no way absolve the Bank from its liability hereunder.

11. This guarantee is a standalone document and is in addition to and not in substitution for any other guarantee executed/to be executed by the Bank in favour of the Purchaser on behalf of the Bidder

12. The bank undertakes not to invoke this guarantee during its currency except with the previous consent of the MTNL in writing.

IN WITNESS WHEREOF the parties have executed these presents the day and year therein above writing.Witness

1. Signature : (Signature)Name :Official Address

(Designation with Bank Stamp)

2. SignatureNameOfficial Address

Attorney as per Power of Attorney No.

80

Page 82: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Date_________

81

Page 83: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

SECTION-XIISAMPLE FORMAT OF AGREEMENT

to be entered by the Successful Bidder with MTNL Delhi Unit

An Agreement made this .......................... day of ............................. ....................... .............................. between ........................................……………….Hereinafter referred to as the CONTRACTOR (which expression shall unless repugnant to the context or subject thereof, mean and include his / its legal successors and permitted assignees) of the ONE PART AND THE MAHANAGAR TELEPHONE MTNL LTD, Registered Office at Maha Nagar Door Sanchar Sadan 5TH Floor, 9CGO Complex Lodhi Road New Delhi 110003 represented by Deputy General Manager (MPL) having his office at CSD Compound Netaji Nagar, New Delhi-110 023 (hereinafter referred to as the MTNL which expression shall, unless repugnant to the context or subject thereof, mean and include his / its legal successors and permitted assignees) of the other part.

WHEREAS in or about [--/--/2018] MTNL had invited bids from interested parties for appointment of contractors for laying of Telephone Cables by Trenching, Cable Laying, Pulling of Cables Through Ducts, Cable Laying by Trench Less Method and Allied Works, Vide tender notice No. T.E.No: AGM (MPL)/PIJF Cable Laying /2018-19/01 dated [--/--/2018] (hereinafter referred to as “Tender”)

AND WHEREAS the CONTRACTOR has fulfilled the requirements and conditions regarding capacity, qualification, status etc. as mentioned in Section-I of the Tender in respect of the work in question.

AN WHEREAS the CONTRACTOR has offered to execute the work of trenching, Cable Laying by Trenching & Trenchless Technology and other connected works in respect of zone (s) __________________ as fully set out in Section-I the Tender on the terms and conditions hereinafter contained as well as in Section-I & II of the Tender.

AND WHEREAS the CONTRACTOR has in accordance with the terms of the Tender furnished security for a sum of Rs....... (5% of value of Contract) after adjustment of bid security/Earnest Money Deposit for due performance of the work in question as well as of the Contract herein which has been duly accepted by the MTNL.

Now those present witness and it is hereby agreed and declared by and between the parties to those presents as follows: -

1. The CONTRACTOR will, during the period of this Contract, that is to say, from ............. to.............. or until this Contract shall be terminated by such notice as is hereinafter mentioned, whichever is earlier, safely carryout by means of labourers employed at his own expense and by means of tools, implements equipments etc., to be arranged by him to his laboureres at his own expense, all Trenching, Cable Laying by Trenching and Trench less Technology, maintenance works and other connected works as described in the said Section-I of the Tender.

2. For the purpose of this Agreement, the Construction Officer/S.D.E. includes the Officer under whose signature the work- order is issued and any other officer authorized by the Divisional Engineer of that area.

3. The CONTRACTOR shall abide by the rules and conditions laid down in the scheduled annexed to this Agreement as Section-I and Section-II and such other rules and regulations as may be framed from time to time by the Executive Director, MTNL Delhi Unit on behalf of MTNL.

4. The CONTRACTOR shall promptly carry out all the works relating to Cable Laying by Trenching and Trench less Technology and maintenance work referred to in Clause -- 1 above whenever called upon by the MTNL or by any of the persons mentioned in Clause --1 above within the jurisdiction of the MTNL, Delhi Unit and within the time as will be specified to by the MTNL or by any of the person mentioned in Clause -- 1 hereof at the time of issuing Work Order for each individual work.

82

Page 84: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

5. The CONTRACTOR shall execute all the items of works mentioned in the order for each work in most efficient and workman - like manner. As regards materials and labour, in every respect it must be in strict accordance with the instructions given to him from time to time by the officer mentioned in Clause - 2 above or the Construction Officer/SDE.

6. The work shall, throughout the stipulated period, be proceeded with all due diligence and the time allowed for completing the work as entered in the work order shall strictly be observed by the CONTRACTOR. The time in this respect shall be deemed to be the essence of the Contract on the part of the CONTRACTOR.

7. If the CONTRACTOR fails to carry out any of his obligations under this Agreement and as mentioned in Sections- I and II, penalty or recovery at the rates as prescribed at Section-III of the Tender document shall be imposed on the CONTRACTOR by any of the officers mentioned in clause --2 above.

8. The Contractor’s heirs or representatives or successors or assignees, shall with the consent in writing from the Executive Director, MTNL Delhi Unit, will have the right to continue to perform the duties or engagements of the CONTRACTOR under the Contract in case of his death or physical incapacity or any other eventuality.

9. The CONTRACTOR shall not, assign, transfer or sub-contract this Agreement or any part hereof to any third party(ies) without the previous consent in writing of the Executive Director of the MTNL Delhi Unit being first obtained.

10. If the CONTRACTOR desires to transfer or assign his / its business to any other person, persons or Company, the CONTRACTOR shall make it one of the terms and stipulations of the Contract of transfer of his / properties and business to such other person or Company that such other person or Company shall, provided the Executive Director of the MTNL, Delhi Unit consents to the same, continue to perform the duties or engagements of the CONTRACTOR under this Agreement and be subject to his/its liabilities there under.

11. The CONTRACTOR hereby covenants and declares that no one connected with or in the employment of the Department of Telecommunication/ MTNL is nor shall any person ever be admitted as a partner or to any interest in this Agreement.

12. The aforesaid Security Deposit of Rupees ___________ (viz. 5% of Contract value) furnished by the CONTRACTOR shall be retained by the MTNL as security for the faithful performance by the CONTRACTOR of all the obligations and covenants herein contained and on the CONTRACTOR’s part to be observed or performed. However, if the CONTRACTOR fails to perform, satisfactorily fulfill, keep and observe all or any of its covenants, conditions or agreements contained herein, and/or the work order, then unless the same is already forfeited, the Executive Director, MTNL Delhi Unit will have the power to retain, appropriate or invoke, the whole or any part of the security deposit to the use of MTNL absolutely as and when by way of damages and / or other dues and that without reference to the relative importance of the particular breach or breaches of Contract which might have given occasion for such retention, appropriation or invocation and whether the MTNL may have sustained as containable pecuniary damages by such breach or breaches as aforesaid or not. In the case of such retention, appropriation or invocation of the whole or part of the security deposit, the CONTRACTOR shall forthwith restore the security deposit for the full amount or an amount sufficient to make up the deficit as the case may be within seven (7) working days from such retention or appropriation failing which the same shall be deemed as material breach by the Contractor and entitle the Purchaser to forthwith terminate the Contract. It is clarified that the appropriation / invocation of the security deposit shall be without prejudice to any other remedy available to MTNL under the Agreement or law.

In addition to the aforesaid security deposit, the CONTRACTOR shall also furnish an irrevocable and unconditional bank guarantee (BG) of Rs. [.] lacs (Rupees [.] Lacs) to cover up the assets / stores of MTNL. This bank guarantee shall be a standalone document and shall be submitted by the Contractors within 21 (twenty one) days of signing of this Agreement. This bank guarantee shall be valid for 18 months and shall

83

Page 85: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

be returned/ revoked only after clearance is given by unit officer of the area in which CONTRACTOR has performed the job. This bank guarantee will be submitted in the office of any of the DGM (transmission) nominated by G.M. (Transmission) and this bank guarantee will be kept valid for the period of contract (including Extension Period if any) by the concerned DGM (Transmission).

13. The security deposit or so much thereof as may not have been appropriated to the use of the MTNL under clause - 12 above will be returned to the CONTRACTOR after the expiry/termination of the Agreement on submission of ‘NO DEMAND’ Certificate by the CONTRACTOR thereafter. The MTNL may withhold such payment up to two (2) months from the date of receipt of ‘NO DEMAND’ Certificate from the CONTRACTOR for the purpose of verifying records as to ensure that there is no recovery pending for any damages.

14. That the MTNL will pay to the CONTRACTOR for the work which the CONTRACTOR was called upon by the MTNL or any of the officers mentioned in Clause - 2 above and which was satisfactorily done by the CONTRACTOR at the rates mentioned in Section-X (Annexure-I) of the Tender. For this purpose the CONTRACTOR should submit to the Executive Director, MTNL Delhi unit his / their bill for the items of work done by him / them against a particular work order at the rates specified in Section-X (Annexure-I) of the Tender, within 30(thirty) days of the items of work covered by that work order having been satisfactorily completed by him / them.

15. The CONTRACTOR hereby declares that the contracted rates are all inclusive of service tax, other Govt levies and all other charges for performance of contract.

16. The bill submitted by the CONTRACTOR will ordinarily be payable within two (2) months of the date of receipt thereof by the MTNL.

17. In case the bill is not submitted within thirty (30) days, the claim for settlement of bill within stipulated time and damages etc. caused on account of any late settlement will not be entertained by the MTNL.

18. The payments against the bills raised by the CONTRACTOR shall be subject to the deduction of tax deducted at source (TDS) at the rate as may be fixed from time to time by the Government of India on the gross amount of each bill passed for payment in accordance with the provision of Clause 194-c of Income -Tax Act, 1973. Also, suitable deduction will be made for the empty cable drums disposed off by the CONTRACTOR.

19. The CONTRACTOR may use form ACE-10, to prepare his bills but bills prepared by him is subject to submission of documents along with A/T report and made over to end user provided they comply with the following conditions.

a) The bills be submitted in triplicate, all copies being signed by the CONTRACTOR/ its authorized signatory, the three copies may be marked “Original”, “Duplicate” and “Triplicate” respectively.

b) Details of the Quantity and nature of each item of work done or material supplied as well as the stipulated rates be given.

c) The dates of commencement and completion of the work or supply of materials be mentioned. Measurement Book should be duly signed by the CONTRACTOR/its authorized signatory at the time of measurement and he will attach completion report duly signed by the Construction Officer / SDE based on the measurement book.

d) The number and date of the Work Order be mentioned.20. In the event of any penal action as mentioned in Item - 11 of Section-III of the Tender,

being adopted, the CONTRACTOR shall have no claim whatsoever for compensation for any loss or damage sustained by him by reason of his having purchased or procured any materials or entered into arrangement or made any advance on account of or with the view of the execution of the work or the performance thereof.

21. In the event of MTNL exercising the powers mentioned in the Item – 11 of Section-III of the Tender, the Construction Officer/SDE may, if he so desires, take possession of all or any of the tools, plants materials and stores in or upon the works on the site thereof or belonging to the CONTRACTOR, or procured by him and intended to be used for the execution of the work or any part thereof paying or allowing for the same any amount at Contract rates or in case of this not being applicable at current market rate to be certified by any of the said officers, or in the alternative request the CONTRACTOR or

84

Page 86: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

his agents and servants to remove such tools, plants materials or stores within a time specified and in the event of the CONTRACTOR failing to comply with this requisition, any of the said officers may remove them at the CONTRACTOR’S expenses and sell them by public auction or private sale on account of the CONTRACTOR and on his risk and responsibility and certificate of any of the said officers as to the expenses of any such removal and the amount of the proceeds and expenses of any such sale shall be final and conclusive against the CONTRACTOR.

22. The ED, MTNL Delhi Unit, reserves the right to carry out any Cable Laying by Trenching and Trenchless Technology work and maintenance work, in part or whole, without entrusting the same to the existing CONTRACTOR. However, in that event the CONTRACTOR will not be held liable to pay the difference of cost to the MTNL in case it exceeds the cost of the work executed by the CONTRACTOR, or any difference if the cost in that event becomes less than the cost that would have been incurred as per Contract rates be claimed by the CONTRACTOR.

23. The CONTRACTOR hereby agrees to fulfill all the commitments made in its response to the Tender with regards the suitability, performance, technical capacity and other specifications mentioned therein. Without prejudice to the aforesaid, it is represented by the CONTRACTOR that all works / services will be performed in a professional manner by its personnel.

24. The CONTRACTOR hereby agrees to execute and to provide MTNL with all such documents that may be required by MTNL from time to time including the provision of the security deposit, the Integrity Pact, etc.

25. The CONTRACTOR also hereby assures MTNL of the quality, suitability and the warranties of all the works / services provided / supplied under or pursuant to the Agreement.

26. It is accepted by MTNL that the CONTRACTOR may appoint certain third parties as sub-contractors to perform some works/services under this Agreement. It is agreed by the parties that any appointment of third parties by the CONTRACTOR shall only be confirmed with prior written approval of the Executive Director of the MTNL Delhi Unit which must be requested by the CONTRACTOR at least 15 (fifteen) days in advance of such a need and which approval shall not be unreasonably withheld.

27. If third parties are appointed as sub-contractors to perform some works / services under this Agreement, then the CONTRACTOR shall at all times remain principally liable towards MTNL and that there shall be no exception to their liability under this Agreement. The CONTRACTOR will also remain at the sole point of contact regarding all the works / services during the term of this Agreement.

28. If MTNL at any point of time expresses any concerns to the CONTRACTOR regarding any third party sub-contractor, then the CONTRACTOR will comply with the requirements of MTNL forthwith; which may include the direction by MTNL to remove the said sub-contractor, etc.

29. If any property of either party is to be used by the other party for purposes of provision of works / services under this Agreement, then the said party (owning the property) will grant a limited right to use to the other party for the specific purpose and term of this Agreement only. The aforesaid license to use shall be restricted for the specific purpose and term of this Agreement and shall not involve any need for the payment of consideration as this Agreement shall form part and basis of valid consideration for such purposes. Further, if any property is created during the course of this Agreement (wherein proprietary rights accrue in the said property to MTNL), then all such property shall be owned exclusively by MTNL and the CONTRACTOR shall only have the limited right of use of the same only under this Agreement and not otherwise. Notwithstanding the aforesaid, the CONTRACTOR agrees not to use any trademark or service mark of MTNL unless the same is under written consent of MTNL.

85

Page 87: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

30. If the CONTRACTOR shall die or suffer from physical or any other incapacity before the expiry of this Contract the MTNL or any of the officers mentioned in clause -2 thereof may at his sole discretion, either immediately terminate this Agreement or require the successors / heirs or assignees or the legal representatives of the CONTRACTOR to carry out the same for such period not exceeding three Calendar months or as the MTNL and the said offices may require.

31. Any notice required to be given under these presents may be given by delivering to or leaving the same with the CONTRACTOR at the address given above or by

posting letter addressed to the CONTRACTOR at the said address and shall be deemed to be served at the time of such delivery or at the time of leaving the same with the CONTRACTOR or in cases of posting at the time when the letter would have reached the CONTRACTOR in the ordinary course by post.

32. The Contractor shall abide by the following provisions of extension of rate contract: (i) The contract can be extended upto 12 months at the existing terms & conditions.

However, the existing rates will be applicable for all the Work Orders issued prior to the date of opening of financial bid of new tender, and this will be binding on the part of the contractor.

(ii) For all Work Orders issued on or after the opening of financial bids of the new tender, lower of the two rates, i.e. existing rate and rates finalized in the new tender, will be applicable and this will be on the basis of mutual consent.

33. CONFIDENTIALITY AND NON-DISCLOSURE

33.1 The CONTRACTOR shall maintain in strict confidence, and agrees not to disclose to any third party, except as necessary for the performance of this Agreement when authorized by MTNL in writing, Confidential Information that the CONTRACTOR receives from MTNL and/or any of its authorised person. “Confidential Information” means: all non-public information of a competitively sensitive nature concerning the MTNL including, but not limited to, this Agreement; trade secrets and any other non-public information (whether in writing or retained as mental impressions) concerning research and development; present and future projections; operational costs and processes; annual and long-range business plans; marketing plans and methods; customers or suppliers; contracts and bids; products or services; and personnel.

33.2 Confidential Information does not include information: that is, or subsequently may become within the knowledge of the public generally through no fault of the CONTRACTOR; that the CONTRACTOR can show was previously known to it as a matter of record at the time of receipt; that the CONTRACTOR may subsequently obtain lawfully from a third party who has lawfully obtained the information free of any confidentiality obligations; or that the CONTRACTOR may subsequently develop as a matter of record, independently of disclosure by MTNL.

33.3 As between MTNL and the CONTRACTOR, MTNL shall own all right title and interest in and to Confidential Information.

34. INDEMNITY

34.1 The CONTRACTOR hereby agrees to fully and effectively indemnify and hold harmless MTNL, its officers, employees and servants from and against all actions, proceedings, claims, damages, liabilities, losses, costs and expenses (including without limitations, legal costs and expenses) whatsoever that may be imposed on, incurred by, or asserted against MTNL in any way relating to, arising out of or in connection with the works / services provided by the CONTRACTOR and/or non-compliance of the code of conduct under or pursuant to this Agreement.

34.2 The CONTRACTOR hereby agrees to indemnify and hold MTNL harmless at all times from any loss, claim, prejudice, damage, costs, taxes, duties, penalties, interest thereon or expenses of any kind, including reasonable attorney’s fees and legal costs to which MTNL may be subjected:

86

Page 88: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(a) by virtue of a breach of the representations and warranties made by the CONTRACTOR,

(b) by virtue of any contravention and/or non-compliance on the part of the CONTRACTOR with any laws, ordinance, rules, regulations and code of conduct as may be applicable from time to time,

(c) on account of any act, commission or omission attributable to the improper handling of the works / services or to the negligence of any person or workman/allocated personnel of the CONTRACTOR, which has resulted whether on account of breach of any of the conditions of this Agreement by the CONTRACTOR and/or its employees, workmen/allocated personnel’s or otherwise,

(d) on account of any improper disclosure of Confidential Information.(e) on account of any act of negligence, misfeasance or fraud.

34.3 Further the CONTRACTOR hereby, agrees to indemnify MTNL in respect of any claims that may be made by the relevant authorities against MTNL in respect of income tax or similar contributions, taxes or levies relating to the CONTRACTOR pursuant to this Agreement.

34.4 The CONTRACTOR shall obtain the necessary permissions and licenses from the concerned authorities for the purposes of this Agreement. Further, it shall keep the said permissions and licenses valid and subsisting at all times during the term of this Agreement. In the event that the CONTRACTOR omits or fails to obtain any requisite permission or license from the concerned authorities, it shall indemnify and keep indemnified MTNL against all losses, costs, or damages that may be suffered by MTNL as a result of such omission or failure.

34.5 The provisions of this Clause shall be without prejudice to any other rights available to MTNL. In this regard, MTNL’s estimation of claim or loss caused would be final and binding on the CONTRACTOR.

34.6 Notwithstanding any other provisions of this Agreement, in no event shall MTNL be liable to the CONTRACTOR for lost profits or revenues, consequential or similar damages arising out of or in connection with the works / services provided under this Agreement, or for any claim made by MTNL on the CONTRACTOR.

35. PAYMENT OF TAXES

The CONTRACTOR shall be responsible for and pay all taxes, levies, duties, assessments and deductions of every nature required by law in connection with the provision of works / services under this Agreement, and hereby indemnifies, defends and holds harmless MTNL and their respective shareholders, directors, officers, employees and agents, from any and all liability that may become due on account of any alleged non-payment of any or all of such taxes, levies, duties, assessments, or deductions, including, among other things, any penalties and interest thereon assessed by any federal, state or local government authority against MTNL and all costs and expenses including attorney's fees incurred in defense of any such assessment. Notwithstanding anything in the foregoing to the contrary, in no event will MTNL be responsible for any taxes based on the CONTRACTOR’S net income or gross receipts, or other such taxes based on the CONTRACTOR doing business in any particular jurisdiction.

36. LIMITATION OF LIABILITY 36.1 Neither MTNL nor any of its respective officers, directors, shareholders, employees,

consultants or agents shall have any liability whatsoever for any losses or expenses of any nature suffered by the CONTRACTOR, its employees, workmen/allocated personnel’s, agents or representatives arising directly or indirectly from any act or omission of the CONTRACTOR or its employees, workmen/allocated personnel’s, agents or representatives hereunder.

36.2 Neither MTNL nor any of its respective officers, directors, shareholders, employees, consultants, subcontractors or agents shall have any liability whatsoever for any injury to the CONTRACTOR, its employees, workmen/allocated personnel’s, agents or representatives suffered while providing works / services under this Agreement.

37. REPRESENTATIONS AND WARRANTY

87

Page 89: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

37.1 The CONTRACTOR represents and warrants to MTNL that- (a) they are duly incorporated and validly existing under the laws of India and have

all necessary corporate power, authority and capacity to enter into this Agreement and to undertake the obligations contemplated herein;

(b) the execution of this Agreement has been duly authorized and constitutes a valid and legally binding obligation on the CONTRACTOR and is enforceable in accordance with its terms and the performance hereof does not:

i. violate any provision of the organization or governance documents of the CONTRACTOR;

ii. conflict with or result in any material breach or violation of any of the terms and conditions of, or constitute or (with notice or lapse of time or both) will constitute default under, any provision of any agreement or other instrument to which the CONTRACTOR may be bound;

iii. violate any order, judgment or decree against, or binding upon the CONTRACTOR or upon its respective, properties or businesses; or

iv. violate any applicable laws.

37.2 The CONTRACTOR represents that there are no legal proceedings, including appeals and applications for review, in progress, pending against or relating to the CONTRACTOR or any of the assets or properties of the CONTRACTOR that could materially adversely affect its ability to perform its obligations under this Agreement.

37.3 The CONTRACTOR shall not represent that it is authorized to bind MTNL in any manner to any agreement or contract or undertake or create any liability on behalf of MTNL, without express prior written consent. The CONTRACTOR shall be solely responsible for its own actions and those of its employees, agents, sub-contractors and representatives.

37.4 The CONTRACTOR shall comply with all requirements of law in connection with the performance of its obligations under this Agreement.

37.5 All governmental authorizations, consents, registrations and notifications required by the CONTRACTOR in connection with the entry into, performance, validity and enforceability of, this Agreement have been obtained or effected (as appropriate) and are and will continue to be in full force and effect.

37.6 The CONTRACTOR has not breached the provisions of the Integrity Pact entered into with MTNL.

37.7 The CONTRACTOR represents and warrants that all technical and commercial requirements set forth in the Tender are met by the CONTRACTOR and that it shall be bound by all its representations and submissions in response to the Tender including those relating to time lines, inclusive nature of costs submitted/quoted, etc.

37.8 The representations and warranties contained in this Clause 37 are given and made on and as of the execution of this Agreement, shall survive the execution and delivery of this Agreement and shall be deemed to have been repeated on each day this Agreement continues in force, as though made on and as of such date and shall be true and accurate until the expiry of the term of this Agreement or prior termination of this Agreement.

38. PENALTIES38.1 For works other than maintenance

a. If the CONTRACTOR desires an extension of time (without penalty) for completion of the work due to reasons beyond its control, it shall apply in writing to the concerned DE within 3 (three) days from the date of occurrence of such hindrance/reason.

(i) The DE can waive off the penalty up to a maximum period of 15

(fifteen) days in case he is fully satisfied with the reasons for delay.(ii) In case DE is of the opinion that waiver of penalty is justified for more

than 15 (fifteen) days, approval of concerned DGM shall have to be taken.

(iii) After the opening of financial bid of the new tender, waiver of penalty should be given only with the approval of the concerned GM. The decision of DE/DGM/GM will be final and binding in this regard.

88

Page 90: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

b. Delay in Start: If the Contractor fails to start the work within the specified period as per Work Order (W.O.), without any valid reason, penalty shall be levied @ Rs.1,000/- (One Thousand) for each day of delay. If the delay exceeds 15 (fifteen) days, W.O. may also be cancelled forth with besides imposition of the penalty.

c. Delay in Execution/Completion: If the Contractor fails to execute the work within the specified time schedule as per W.O. or during the extended period (if any), penalty shall be levied @ Rs.1,500/- (One Thousand Five Hundred) for each day of delay.

d. Penalty shall be levied by DE to a maximum of 12% of respective W.O. (i.e. amount payable to Contractor) and will be recorded on the bill.

e. Concerned DGM may also take action to rescind the W.O. and get the non-executed portion of work done by any other Contractor/Agency or to have the defects removed/repaired by any other Contractor/Agency. In case excess expenditure is incurred beyond the approved rates, the same will be recovered from the defaulting Contractor and such defaulting Contractor shall be liable to pay the same without protest or demur.

In case the Work Order is rescinded / cancelled due to any reason: a) Penalty will be imposed for an amount equal to 12% of the cost of Work

Order.b) The Contractor’s allotment can be curtailed to the extent of the work (LKM /

DELs) for which Work Order has been cancelled/rescinded. Even if the Work Order has been cancelled in part, the full quantities as per the Work Order will be taken into account for this purpose.

c) In case decision is taken to curtail the defaulting Contractor’s allotment, whosoever will execute these works, it may be over and above his/her allotment. The decision of concerned DGM will be final in this regard.

d) In case more than two Work Orders have been cancelled / rescinded in respect of any Contractor, its allotment may be curtailed by 10% against each Work Order (cancelled/rescinded). This will be in addition to (a) & (b) above.

f. If the Contractor fails to redress the trench properly i.e. ramming and consolidation of the trench and removing of surplus earth, road spoils within 48 hours of the completion of the work, then a penalty at the rate of 20% of the excavation of trenching charge on pro-rata basis shall be recovered straightway from the bill.

g. If the Contractor fails to provide adequate provision of barricading G.I. Sheet, Caution Sign Board, Red Light, etc. on site, then a penalty @ of 20% of the excavation charges on pro-rata basis shall be recovered from the bills.

h. The cable laying/pulling has to be done by using jack, failing which a penalty of Rs.1,000/- (One Thousand) will be imposed on each such occasion.

i. Test pits/trench should be restored immediately after completion of work. The Contractor will be wholly responsible for any damage to life & property of any person due to delay in restoration work. If the pits are not restored as per specifications of local bodies in time, penalty of Rs. 2000/- (Two Thousand) per day for first day and Rs. 1000/- (One Thousand) per day for each subsequent day shall be imposed.

j. In cases of damage to the existing cable (PIJF/OF ) penalty (recovery) at following rates shall be imposed :-Rate of Penalty:OF:- (i) 12 Fiber Cable Rs. 5, 000/-(ii) 24 Fiber Cable Rs. 8, 000/-

89

Page 91: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(iii) 48 Fiber Cable Rs.10, 000/-PIJF:- (i) Up to 100 pr. PIJF Cable Rs.2, 000/-(ii) Above 100 to 800 pr. PIJF Cable Rs.3, 500/-(iii) Above 800 pr. PIJF Cable Rs.5, 000/-

k. In case of damage to the PIJF/OF cable, the cost of the cable damaged (i.e. cost of replacement of cable) plus 20% overhead charges shall be recovered as penalty from the Contractor. In this regard, decision of the Purchaser shall be final and binding on the Contractor to pay.

l. In case of damage to ducted PIJF/OF cable, the cost of full cable length plus 20% overhead charges shall be recovered from the Contractor.

m. The penalties shall be recovered from the amount due to the Contractor in the same or other W.O. or from the Security Deposit or from any other amount payable to the Contractor by the Purchaser.

n. If break of conductor is noticed due to careless pulling of PIJF Cable then a penalty of Rs. 2000/- (Two Thousand) per break per conductor and Rs.5000/- (Five Thousand) per break per OF fibre shall be recovered as penalty from the Bills of Contractor. In case faulty pairs exceed 10% of size of cable cost, the Contractor has to pay full cost of cable plus 20% overhead charges.

o. Other Terms, Conditions and penalties for Maintenance Work:5. The Contractor should commence the work at site within 2 hours of

telephonic intimation to him (round the clock) without waiting for written Work Order. The covering written Work Order should follow telephonic intimation.

6. In case of failure to report within the stipulated time, a penalty of Rs.200/- (Two Hundred) per hour shall be levied. The maximum penalty on this default will be Rs.1,000/- (One Thousand) per occasion.

7. In case the Contractor does not commence its assigned work within 4 hours of telephonic intimation, the Purchaser shall be at liberty to re-allot the work to other Contractor but a penalty of Rs.1000/- (One Thousand) shall be charged on the defaulting Contractor.

8. The amount of Work Orders cancelled of any Contractor shall be reduced from the tentative amount of work allotted to him, and on the other hand, this will be over and above the allotment of the Contractor who finally executes these Work Orders.

The penalty rates specified in Clause 38.1 above are acknowledged and accepted by the bidder and will not be questioned or contested by the bidder in case the penalty at the above rates are imposed or recovered by the Purchaser or its authorised person under any of the circumstances mentioned aforesaid or elsewhere in the Tender document.

It is clarified that in case any work allocated to the Contractor remains incomplete beyond the specified time and any loss or damage is caused to the Purchaser due to such incompletion of work, the Contractor shall be liable to pay damages to the Purchaser on actual basis or differential amount of penalty and actual loss, as the case may be.

Delay Register: For the purpose of imposing penalty, record of delays/ penalty details shall be maintained in a register called “Delay Register”. All the entries should be signed by CO/DE and the Contractor. In case the Contractor does not sign the Delay Register, a show cause notice (by Registered / Speed Post) will be sent to the Contractor in this regard. In the event the Contractor fails to respond the show cause notice or if the response of the Contractor is not satisfactory, then the Delay Register shall be deemed to have been signed by the Contractor notwithstanding its failure to sign the same at the first instance.

90

Page 92: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

38.2 In case the works are not being performed satisfactorily either in quality of work or in terms of rate of progress, due to the negligence / failure of the Contractor, action may be initiated by GM (MM) on recommendation of concerned GM for termination of contract on the following lines:

i. In case penalty has been imposed for 30 (Thirty) days or more in any W.O. and the quantum of work affected (LKM / DELs) i.e. total work of such Work Orders exceeds 30% of allotment issued by MM Cell. The W.O. where penalty limit has gone to a maximum of 12%, in less than 30 (Thirty) days itself will also be accounted for this purpose.

ii. In case Penalty has been imposed for an amount of Rs.45,000/- or more in any W.O., and the quantum of work affected (LKM / DELs) i.e. total work of such Work Orders exceeds 30% of allotment issued by MM Cell.

iii. In case the W.Os have been cancelled / rescinded in full or in part and the quantum of work affected (LKM / DELs) i.e. total work of such Work Orders exceeds 30% of allotment issued by MM Cell. If the partly executed W.O. gets rescinded due to the negligence / failure of Contractor, full quantity as per W.O. shall be taken into account.

iv. For the W.Os falling in above three categories, if at any stage the quantum of work affected (LKM / DELs) i.e. total work of such Work Orders, exceeds 30% of allotment issued by MM Cell.

v. Regarding maintenance work, in case the amount of penalty imposed exceeds 12% or more of the total financial limit (as per MM Cell), in two or more areas individually.

vi. If the Contract gets terminated, the PBG/Security Deposit furnished by the Contractor will stand forfeited and the Contractor shall not be eligible to participate against the Tender in question in MTNL Delhi unit for such period as may be decided by the Purchaser. The termination of Contract under this clause shall be without prejudice to the right to impose penalty under Clause 38.2 above.

38.3 Blacklisting of Contractor:

Without prejudice to its rights under Clauses 38.1 and 38.2 above, the Purchaser shall be entitled to blacklist the Contractor upon occurrence of all or any of the following events:

i. Any breach by the Contractor of any of the terms & conditions or refusal to carry out the work; and/or

ii. If any fraud or fraudulent motive is detected in the Contractor’s actions with the Purchaser and / or;

iii. If the Contractor demands undue changes not stipulated in the Contract, and/or;iv. If any person connected with the Purchaser or any official drawing salary from

the Purchaser becomes in any way interested in the Contract, and/or;v. If the Contractor himself or any of his servants be guilty of fraud or attempt

fraud in connection with the Contract or offer any bribe or gratuity to any person connected with the Purchaser or to any official drawing salary from the Purchaser and / or;

vi. If the Contractor employs any outside agent to perform the Contract or assign, transfer or sub-contract any of its rights or obligations under the Contract without the prior written consent of the concerned DGM of MTNL.

In case the Contractor is blacklisted, the PBG/Security Deposit furnished by the Contractor will stand forfeited and the Contractor shall not be eligible to participate in any of the Tender in MTNL Delhi unit for such period as may be decided by the Purchaser.

39. TERMINATION

39.1 This Agreement may be terminated by MTNL without assigning any reason whatsoever by giving one (1) month prior written notice to the CONTRACTOR.

91

Page 93: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

39.2 MTNL will have the right to terminate this Agreement immediately (without giving any prior notice) if the CONTRACTOR is found guilty of breach of the Agreement or other unethical practices, including violations of any laws.

39.3 MTNL or any Officer authorized by it may, at its option, terminate the Agreement forthwith upon the occurrence of any of the following termination events (each a “Termination Event”):(a) if the CONTRACTOR convenes a meeting of its creditors, takes any action to

authorize, proposes or makes any scheme or arrangement or composition with, or any assignment for the benefit of, its creditors, or convenes a meeting for the purpose of considering a resolution for the liquidation or winding up of its business or a resolution for the making of a petition for liquidation, reorganization or other relief under any bankruptcy, reorganization, compromise, arrangement, insolvency, readjustment of debt, suspension of payments, dissolution, liquidation or similar law, whether now or hereafter in effect; and/or

(b) if the CONTRACTOR suspends or ceases or threatens to suspend or cease to carry on its business; and/or

(c) if the CONTRACTOR threatens to dispose or takes any action to dispose of all or a substantial part of its assets, whether by one or a series of transactions, related or not;

(d) if the security deposit / bank guarantee furnished by the CONTRACTOR ceases to be in full force and effect; and/or

(e) if the CONTRACTOR is or becomes insolvent or is unable to pay its debts as they fall due, shall admit its inability to pay its debts as they fall due or shall be deemed for the purpose of any law to be insolvent or unable to pay its debts; and/or

(f) if there is a direct or indirect change in the control & management of the CONTRACTOR for whatever reason without the prior written consent of MTNL; and/or

(g) if any of the information, representations or warranties made by the CONTRACTOR under this Agreement and/or its bid is found to be false or incorrect, either fully or partially; and/or

(h) if the CONTRACTOR fails to furnish / restore the security deposit / bank guarantee in accordance with the terms of this Agreement / Tender; and/or

(i) if any fraud or fraudulent motive is detected in the CONTRACTOR’s action with the MTNL and / or

(j) if the CONTRACTOR demands undue charges not stipulated in the Contract; and / or

(k) if any person connected with the DEPARTMENT of Telecom / MTNL or any official drawing salary form the MTNL becomes in any way interested in the Agreement; and/or.

(l) if the CONTRACTOR himself or any of his servants be guilty of fraud or attempt fraud in connection with the Agreement or offer any bribe or gratuity to any person connected with the Department of Telecommunication / MTNL or to any official drawing salary from the MTNL; and / or

(m) if the CONTRACTOR employs any outside agent or sub-lets the Agreement or any right to payment thereunder without the consent in writing of the Chief General Manager, MTNL, Delhi Unit and / or

(n) if in the event of any deduction of being made from the CONTRACTOR’s security deposit the CONTRACTOR fails to make good the payment of such deduction within the time therein before specified; and / or.

(o) if the CONTRACTOR becomes insolvent or applies for relief as insolvent debtor and / or in case the CONTRACTOR is a company and it is wound up or in case the CONTRACTOR is a partnership firm when it is dissolved or reconstituted; and / or.

(p) if the CONTRACTOR makes default in or fails to comply with any of the terms and conditions set forth in this Contract; and / or

(q) if the CONTRACTOR’s work is found unsatisfactory in the opinion of the Chief General Manager, MTNL Delhi Unit.

39.4 The termination of this Agreement by MTNL shall be without prejudice to the accrued rights of MTNL.

39.5 Upon termination, the CONTRACTOR shall forthwith (a) pay all monies accrued to MTNL pursuant to this Agreement; and (b) stop providing the work / services. The

92

Page 94: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

CONTRACTOR further agrees that it shall not make any claims nor demand the payment of any dues, costs, damages or other moneys unless it is expressly provided for in this Agreement.

39.6 In the event the Agreement is terminated for whatever reason and MTNL requires the continued provision of works / services from the CONTRACTOR until alternative arrangements are made by MTNL, then the CONTRACTOR acknowledges and undertakes that there shall be complete and continued performance of the works / services under the Agreement until such date that MTNL may stipulate; without any dispute or denial whatsoever by the CONTRACTOR. The CONTRACTOR further agrees that it shall provide such works / services on the same terms as were being provided during the term of the Agreement. Additionally, the CONTRACTOR shall also assist MTNL with the eventual transition of the works / services onto whichever alternative mechanism to be adopted by MTNL thereupon, without any delay, protest or demur.

40. DISPUTE RESOLUTION:

Except where otherwise provided in the Agreement, all questions and disputes relating to the meaning of the specification, design, drawing and instructions hereinbefore mentioned and as to the quality of workmanship or materials used on the work or as to any other question, claim, right, matter or thing whatsoever in any way arising out of or relating to contract, design, drawings, specifications, estimates, instructions orders or the terms & conditions or otherwise concerning the work s or the execution or failure to execute the same whether arising during the progress of the work or after the cancellation , termination ,completion or abandonment thereof shall be dealt with as mentioned hereinafter:-

40.1 If the contractor considers that he is entitled to any extra payment or compensation in respect of the works over and above amounts admitted as payable by the MTNL or in case the contractor intends to dispute the validity of any deductions or recoveries made or proposed to be made from the contract, the contractor shall forthwith give notice in writing of his claim, in this behalf to the Construction Officer/S.D.E within 30 (thirty) days from the date of disallowance thereof for which the contractor claims such additional payment or compensation or dispute the validity of any deduction or recovery. The said notice shall give full particulars of the claim, reasonable grounds on which it is based and detailed & logical calculations of the amount claimed and the contractor shall not be entitled to raise any claim nor shall MTNL be in any way liable in respect of any claim by the contractor unless notice of such claim shall have been given by the contractor to the Construction Officer/S.D.E in the manner and within the time as aforesaid. The contractor shall be deemed to have waived and extinguished all his rights in respect of any claims not notified to the Construction Officer/S.D.E in writing in the manner and within the time aforesaid.

40.2 The Construction Officer/S.D.E shall give the decision in writing on the claims notified by the contractor within 30 (thirty) days of the receipt of the notice thereof. If the contractor is not satisfied with the decision of the Construction Officer/S.D.E, the contractor may within 15 (fifteen) days of the receipt of the decision of Engineer-in-Charge submit his claims to conciliation authority DGM (Concerned) for conciliation along with all details and copies of correspondence exchanged between him and the Construction Officer/S.D.E.

40.3 If the conciliation proceeding are terminated without settlement of the disputes, the contractor shall, within a period of 30 (thirty) days of termination thereof shall give a notice in the form prescribed by the MTNL to the Chief General Manager as in-Charge of the work or if there be no Chief General Manager, to the Executive Director of MTNL,Delhi for appointment of an arbitrator to adjudicate the notified claims failing which the claims of the contractor shall deemed to have been considered absolutely barred and waived.

40.4 Except where the decision has become final, binding and conclusive in terms of the contract, all disputes or difference arising out of the notified claims of the contractor as aforesaid and all claims of the MTNL shall be referred for adjudication through the arbitration by the Sole Arbitrator appointed by the Chief General Manager of MTNL in-charge of the work or if there be no Chief General Manager, the

93

Page 95: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Executive Director of MTNL, Delhi. The CONTRACTOR shall have no objection to any such appointment that the Arbitrator so appointed is a Government Servant and

that he had to deal with the matters to which the contract relates in the course of his duties as Government Servant. If the arbitrator so appointed is unable or unwilling to act or resigns his appointment or vacates his office due to any reason whatsoever another sole arbitrator shall be appointed in the manner aforesaid by the said Chief General Manager/Executive Director, MTNL, Delhi. Such person shall be entitled to proceed with the reference from the stage at which his predecessor left it.

It is a term of this contract that the party invoking arbitration shall give a list of disputes with amounts claimed in respect of each dispute along with the notice for appointment of arbitrator.

It is also a term of this contract that no person other than person appointed by such Chief General Manager, MTNL or the Executive Director, MTNL, Delhi as aforesaid should act as arbitrator and if for any reasons that is not possible, the matter shall not be referred to arbitration at all.

The conciliation clause and arbitration shall be conducted in accordance with the provisions of the Arbitration & Conciliation Act 1986 or any statuary modification or re-enactment thereof and rules made there under and for the time being in force shall apply ton the arbitration proceeding under this clause.

It is also a term of this contract that the arbitrator shall adjudicate on only such disputes as are referred to him by the appointing authority and give separate award against each disputes and claim referred to him. The arbitrator shall give reasons for award.

It is also a term of the contract that if any fees are payable to the arbitrator these shall be paid equally by both the parties.

It is also a term of the contact that the arbitrator shall be deemed to have entered on the reference on the date he issues notice to both the parties calling them to submit their statement of claims and counter statement of claims. The venue of the arbitration shall be such place as may be fixed by the arbitrator in his sole discretion. The fees, if any, of the arbitrator shall, if required to be paid before the award is made and published, be equally shared by each of the parties. The cost or the reference and of the award (including the fees, if any, of the arbitrator) shall be the discretion of the arbitrator who may direct to any, by whom and in what manner, such costs or any part thereof, shall be paid and fix or settle the amount of cost to be paid.

41. MISCELLANEOUS

41.1 This Agreement and the arrangement between the parties shall at all times be read along with the terms of the Tender and the response of the CONTRACTOR to the Tender. In the event of any interpretation of the provisions of this arrangement between the parties, the documents shall be read in the following order:-(a) the Clauses of this Agreement followed by;(b) the contents of the annexure(s) to this Agreement followed by;(c) CONTRACTOR’S response to the Tender followed by;(d) the Tender document (including the terms and conditions stipulated therein).For purposes of this clause and also for purposes of interpretation, the Tender and the CONTRACTOR’S response to the Tender and/or any other document pertaining to the works / services to be performed under this Agreement shall also form part of this Agreement. Further, any clause finding reference in the Tender document but not finding reference in this Agreement shall be read along with this Agreement.

41.2 MTNL being the beneficiary under the Agreement shall have audit rights upon the CONTRACTOR during the entire term of this Agreement. The CONTRACTOR will submit for examination in the office of the Executive Director, MTNL, Delhi Unit, its books of account and all concerned papers maintained by it in this connection within fifteen (15) days from the date of its being called upon to do so.

94

Page 96: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

41.3 The parties to this Agreement are entering into this arrangement as independent contractors, and this Agreement does not bestow either party the right against the other, as partner, agent or joint venture or any other form of legal association.

41.4 This Agreement along with the Tender, acceptance thereof by the CONTRACTOR and the response of the CONTRACTOR to the Tender together with other documents referred to herein including the specifications, designs, drawings and instructions issued from time to time by MTNL/its authorised persons and all these documents taken together shall collectively constitute the full and complete arrangement between the Parties with respect to the subject matter hereof. The expiration or termination of this Agreement for any reason will not release the CONTRACTOR from any liabilities or obligations set forth herein this Agreement and such clauses (as applicable to the parties) will survive any termination of this Agreement.

41.5 This Agreement will be governed by and construed in accordance with the laws of the Republic of India and the Courts at New Delhi shall have exclusive jurisdiction in all matters relating to this Agreement.

41.6 Any changes or modifications to this Agreement or its annexure(s) can only be made by a written amendment mutually signed by the parties. Unless otherwise expressly provided in this Agreement, a delay or omission by MTNL to exercise any of its rights under this Agreement will not be construed to be a waiver thereof.

41.7 If at any time, during the continuance of the Agreement, the performance in whole or in part by either party of any obligation under the Contract be prevented or delayed by reason of:(a) Any war or hostility,(b) Acts of the public enemy, civil commotion, sabotage, explosions, fires,(c) Effects of floods, epidemics, quarantine restrictions,(d) General strikes and bandhs,(e) Acts of God,hereinafter referred to as EVENT, neither party shall, by reason of such EVENT, be entitled to terminate this Agreement, nor shall either party have any claim for damages against the other in respect of such non-performance or delay in performance provided notice of happening, of any such EVENT is given by either party to the other within seven (7) days from the date of occurrence of the EVENT.Work and deliveries under the Agreement shall resume as soon as practicable after such EVENT has come to an end or ceased to exist. The decision of MTNL as to whether the situation has become normal or not, shall be final and conclusive.However, if the performance in whole or part of any obligation under the Agreement is prevented or delayed by reason of any such EVENT for a period exceeding sixty (60) days, either party may, at his/their option, terminate the Agreement by giving a written notice to the other party.It is clarified that the CONTRACTOR will not be responsible for delays, which may arise on account of reasons beyond their control. The decision of G.M. (TRANS) shall be the final in this regard. However, strikes by CONTRACTOR’S labour on account of any dispute between the CONTRACTOR and its labour as to wages or otherwise will not be deemed to be a reason beyond the CONTRACTOR’S control and the CONTRACTOR shall be responsible for any loss or damage, which MTNL may suffer on this account.

41.8 In the event any one or more of the provisions of this Agreement shall, for any reason, be held to be invalid, illegal or unenforceable, the remaining provisions of this Agreement shall be unaffected, and the invalid, illegal or unenforceable provision(s) shall be replaced by a mutually acceptable provision(s), which being valid, legal and enforceable, comes closest to the intention of the parties underlying the invalid, illegal or unenforceable provision(s)

The CONTRACTOR will submit for examination in the office of the Executive Director, MTNL, Delhi Unit, its books of account and all concerned papers maintained by it in this connection within fifteen (15) days from the date of its being called upon to do so.

If the CONTRACTOR fails to do so, and / ora) If any fraud or fraudulent motive is detected in the CONTRACTOR’s action with

the MTNL and / orb) If the CONTRACTOR demands undue charges not stipulated in the Contract

and / or

95

Page 97: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

c) If any person connected with the DEPARTMENT of Telecom / MTNL or any official drawing salary form the MTNL becomes in any way interested in the Contract and/or.

d) If the CONTRACTOR himself or any of his servants be guilty of fraud or attempt fraud in connection with the Contract or offer any bribe or gratuity to any person connected with the Department of Telecommunication / MTNL or to any official drawing salary from the MTNL and / or

e) If the CONTRACTOR employees any outside agent or sublets the Contract or any right to payment there under without the consent in writing of the Chief General Manager, MTNL, Delhi Unit and / or

f) If in the event of any deduction of being made from the CONTRACTOR’s security deposit the CONTRACTOR fails to make good the payment of such deduction within the time therein before specified and / or.

g) If the CONTRACTOR becomes insolvent or applies for relief as insolvent debtor and / or in case the CONTRACTOR is a company and it is wound up or in case the CONTRACTOR is a partnership firm when it is dissolved or reconstituted and / or.

h) If the CONTRACTOR makes default in or fails to comply with any of the terms and conditions set forth in this Contract and / or.

i) If the CONTRACTOR’s work is found unsatisfactory in the opinion of the Chief General Manager, MTNL Delhi Unit.

The ED, MTNL, Delhi or an Officer Authorized by him shall be at liberty, by notice in writing to the CONTRACTOR, to terminate the Contract in any of the cases stated above (i.e. Items - ‘25-a’ to 25-i).

Signature of ContractorWith Seal

Witnesses1.

2.

Part-D

96

Page 98: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Rules and regulations for the contractors

97

Page 99: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

ANNEXURE -1

ROAD MAINTENANCE AND INTER UTILITYCODE OF CONDUCT

1.0 This code of conduct for road excavation and trenching etc. is being adopted by the following utilities operation in the area of Union Territory of Delhi.

1) Municipal Corporation of Delhi.2) N.D.M.C.3) D.E.S.U.4) D.D.A.5) P.W.D.6) M.T.N.L.7) Delhi Water and Sewage Disposal Undertaking.8) Traffic Police.9) Delhi Cantonment Board.10) C.P.W.D.

2.0 SCOPE

This code of conduct will regulate the road excavation trenching activities of the above utilities only to the extent of ensuring minimized hazard to life of operating personnel and the road user, minimized inconveniences to the road user, minimized damages to the underground plant/services of other utilities by the excavating utility and a co-coordinated works programme in the interest of public convenience and road safety overall. The provision of the code will apply to the public roads except bye-lanes.

3.0 CO-ORDINATED PLANNING

3.1 There will be tree co-ordination Committees, namely MCD Co-ordination Committee, N.D.M.C. Co-ordination Committee and P.W.D. (Delhi Admn.) Co-ordination Committee, which would accord necessary road cutting permissions in respect of their roads, MCD will co-ordinate in respect of DDA roads also. The information and functions of these Committees are described in Para 3.2.

3.2 ANNUAL SUBMISSION OF PROGRAMME OF WORKS

All the concerned utilities shall submit to the concerned Co-ordination Committees, as detailed in Annexure ‘b’, ‘c’ & ‘d’ by the first week of May every year, their annual program me of major works such as construction of flyovers, subways, main sewerage and water works, programme of resurfacing of roads, programme of tree planting and of the cable works involving at a strech excavation of more than one kilometer in length on all major roads. The programme shall cover works to be executed in the period extending from the 1st September in that year to the end of June of the following year. The utilities, while submitting their programme, should invariably give the following information :

a) The name and type of work to be carried out.

b) The name of the road and locality where it is proposed to cut road or excavate trenches for laying of their services from its starting point to its completion point. This information should be furnished in duplicate.

c) The Co-ordination Committee shall then review all these cases in the first week of July to formulate a co-ordinated plan for these works, and accord necessary sanctions of taking into account the right of way and the section of the individual roads.

98

Page 100: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

3.3 PROVISION OF ROAD CROSSING PIPES

a) The Road Maintenance Agency will ascertain requirements of road crossing pipes from the different utilities when new roads are being constructed or existing roads

are being widened. After a reference from Roan Maintaining agency is received, the utilities shall indicated their requirement of road crossing pipes within a period of 4 weeks.

b) On receipt of this information, the road Maintenance Agency will intimate the estimated cost of providing such cross pipes to the concerned utility/utilities which shall deposit the estimated cost within 4 weeks. such requirements of the crossing pipes should be anticipated at least for the next 2 years, if not longer. Further requirements of road crossing pipes if any, will have to be taken up subsequently.

3.4 PERMISSION BY THE CO-ORDINATION COMMITTEE CONCERNED

In normal circumstances, permissions shall be accorded for the full period required to complete the work in a section. However, in case of any contingency the work in progress could be stopped for a specified period. In such cases, the permission should be suitably extended by the concerned co-ordination committee while stopping the work. Road cutting without permission shall be liable to a fine of Rs.1250/- per day.

4. PRIOR INFORMATION ON TRENCHING ACTIVITIES

4.1 Intimation to Road Maintenance Agency

In case of emergency trenching for attending to faults in existing services, the concerned Divisional Officer of the road Maintenance Agency shall be intimated the exact location of the trench being dug/road being cut, likely duration of the trench being kept open and the particular unit responsible for trenching. On receipt of this intimation, the road Maintenance Agency shall allow the concerned utility to carry out the repair work and then get it through coordination committee ex-post-fact, but the payments for the road restoration charges shall be made by the concerned utility within 4 weeks of receipt of the bill.

4.2 Intimation to Traffic Police

Before actually taking up the work in hand, an intimation regarding trenches on main roads shall be given at least 72 hours in advance to the Traffic Police Authorities by the concerned utility to enable them to divert or regulate the traffic among the location of the trenches. as traffic Police is represented in co-ordination Committee, there is no need to provide for a separate permission from the Traffic Police.

The Traffic Police will be responsible for enforcement of the code. The violations will be reported through a joint report of Assistance Engineer and the Traffic Inspector concerned to the Co-ordination Committee which after giving one opportunity of hearing to the defaulting agency would impose, find as prescribed under various provisions of the code and also direct the Agency to take immediate necessary action to rectify the default. In case of NDMC, the Traffic police would nominate Inspector (Headquarters) for this work in the NDMC area.

4.3 Information to other utilisationPrior information on trenching works etc. Shall be given to all concerned, to enable them to take necessary steps to safeguard their underground plant services. This information shall be given as soon as practicable and each utility seeking such information shall have its own central information to receive it.

99

Page 101: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

5.0 TRENCHING

5.1 Trial holes

Before deciding alignment of trenches, the concerned utility with prior information to road maintaining Agency, shall make trial holes at reasonable intervals, to ascertain the locations of various underground plant services. The depth of the trial hole shall be minimum 1 meter and the final alignment shall be so chosen as to minimize possible exposure of underground plant/services of other utilities.

5.2 Separation between power and Telecommunication Cables

While laying power and telecommunication cables, the following standard shall be adhered to as far as possible. The horizontal and vertical separation between power and telecommunication cables, shall be preferably 0.6m and it shall not be less than 0.4m for single core cables and 0.3m for multicore cables. The power and telecommunication cables shall cross at right angles to each other. It will be the responsibility of the concerned utilities viz. NDMC /DESU and MTNL to enforce these arrangements subject to overall supervision and sanction of the road maintaining

agency.

5.3 Caution - cum - Information Boards

Before commencing excavating etc., ‘Caution-cum-Information Boards shall be installed at site. The contractor will provide the boards (It will be his property). These boards shall remain as long as the trenches remain open. The Boards shall be installed at either ends of the trench at least 100m before the approach to the area, if the trench is less than 600m in length. additional such boards at every 300m shall be installed if the length of the trench exceeds 600m. Where street lighting is inadequate, lettering with fluorescent paint be used for these boards. The boards shall also contain information regarding dates of commencement and completion, names and phone number of Engineers in Charge of the work. Non-installation of such boards is liable to a fine of Rs.500/- per day till their installation.

5.4 Mode of Trenching

5.4.1 Use of crow-bars shall be restricted to removal of the hard upper crust of earth and for levering stones and hard murram. Thereafter, excavation shall be carried out with pick-axes. If during the progress of excavation warning covers of other utilities are exposed carefully with a phowra, metal rod, fencing pins or with the tip of a pickaxe. After loosening the covers they shall be removed and stacked carefully out side the trench for re-use. In case of cables of rating of 11 KV and the above, the warning covers shall be removed only in consultation with the utility concerned, and shall be placed back under their supervision. However, the concerned utility will interact with a week’s time so that necessary shifting can be carried out. In case they do not interact with a week’s time, the concerned utility will be responsible for any mishap or accident at the site. In case of excavation work of depth more than 1.5, depending upon the soil conditions, appropriate shoring of walls of the trenching shall be provided to prevent collapse of the excavated portion. Non-compliance is liable to a fine of Rs.1000/- per day till the shoring is fixed.

5.4.2 Any utility, for laying is underground services, will dig up a trench to a maximum stretch of 100m for Telephone Deptt.. and 500mts. for others at a time, and shall fill up the previous stretch before taking up fresh digging in the subsequent stretch. Digging of trench beyond these limits shall invite a fine of Rs.500/- per day till the damage is restored. Further, non stacking of materials during execution of work, causing inconvenience to road users, is liable to fine of Rs.1000/-. when the under ground plant/services of other utilities are exposed during the progress of excavation, the concerned utility shall be informed of the same, who will take

100

Page 102: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

necessary precautions to safeguard its services within the shortest possible time so that the work of other utility is not help up.

5.4.3 Trenches of more than 1.5mm depth and 1m width should be barricaded properly at both the ends & all along the length on the road side. The manhole pits shall be barricaded on all the four sides. The barricading will be done with corrugated sheets painted with red and white strips. This is required for safety of the traffic and the pedestrians. The utility which has dug up the trench shall be responsible for any mishap which may occur on account of its nit taking necessary precautionary measure. Non barricading of trenches more than 1.5m deep shall be liable to a fine of Rs.500/- per day.

5.4.4 Blasting in trenches will not be allowed. In case blasting is considered necessary depending on the side conditions, the road maintaining Agency and other utilities shall be consulted prior to blasting operations.

5.5 Trenches Across Roads

Telephone and power cables shall be taken across the main roads and streets through road crossing pipes. The trench work for laying these pipes shall be carried out during night time if vehicular and pedestrians traffic density is very high during the daytime. Even during the night, the trench shall be excavated in parts so that the traffic is not completely blacked. When trenches taken along or across carriage ways are to be kept open overnight, or when trenching is to be done during night warning red lanterns of flickering lights shall be placed at both the ends of the trenches. The electric connections for flickering light shall be provided by the local electricity authority viz. NDMC/DESU free of cost from their street lighting poles, for the permitted period, beyond which rates of temporary connections will be charged. when trenches are taken across entrenches of premises, care shall be taken to minimize inconvenience to users of the premises. Excavation of trenches across and along roads during day time ( 8 a.m. to 8 p.m.) without permission shall be liable to a fine of Rs.500/- per day.

5.6 Blind driving of piles, poles etc.

Blind driving of piles, poles spikes etc, in footpaths to a depth greater than 0.8m shall be avoided.

6.0 Flooding

During excavation, if telephone cables are exposed, Delhi Telephone shall be informed of such exposure and at the discretion of Delhi Telephone, the trenching utility shall allow Delhi Telephones to flood the trenches with water to enable detection and rectification of possible damage to the telephone cables. For this purpose, the trenching utility shall keep the trench open for 24 hours over and above the time otherwise required, Delhi Telephones shall be given a prior notice of at least 24 hours as to when the trench would be ready for flooding. If flooding is not carried out within the allowed time, the trenches may be filled up by the trenching utility.

7.0 BLACKFILLING

7.1 While backfilling the trenches if plant/services of other utilities are disturbed incidentally, the concerned utility shall be informed for taking suitable measure.

7.2 While backfilling the crown of the earth left, shall be between 50mm and 100mm above road surface and shall be free from sharp edged stones and boulders.

7.3 After trenches are properly backfilled, the excess earth and other stones shall be removed and stacked at one or two spaces, causing minimum inconvenience to road users. These stacks may be subsequently removed by the utility concerned within six days, which the road Maintaining Agency will remove this at the cost of the concerned utility carrying out the trenching work.

101

Page 103: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

7.4 While backfilling, care should be taken to consolidated the earth below the joints and cables to avoid subsequent subsidence. Masonry walls to support joints and cables to the extent necessary shall be provided.

7.5 In case of excavation deeper than 3m, shoring shall be abandoned in that excavation while backfilling to avoid subsidence of other utility services/plant depending upon site conditions.

7.6 After completion of trenching of each drum length backfilling shall be completed within a maximum of 4 weeks of laying of the cables in that stretch. If this work is likely to be considerably delayed, the utility concerned shall fill in the trench & remove the surplus excavated material from the site at its own cost. It will get a fresh permission from the road

7.7 Maintaining Agency for taking up the work fresh. In case the utility delays backfilling and removing the surplus earth/material, it shall pay a fine of Rs.1000/- per day for the delay into revolving fund. Non-consolidation of earth while backfilling to the original level shall be liable to a fine of Rs.500/- per day till completed.

8.0 PERMANENT REINSTATEMENT

8.1 Reinstatement authorization shall be sent by the utility concerned in the prescribed from to the concerned Divisional Office of the Road Maintaining Agency within a week of completion of work for carrying out permanent reinstatement of the excavated roads surface. In case such authorizations are not received from the utility concerned, it shall pay Rs.500/- per day as fine and the Road Maintaining Agency shall carry out permanent reinstatement of the excavated surface without intimation to the utility concerned. In the case of long trenches, notices for re-instatement shall be sent in parts as soon as portion of a trench are progressively backfilled subject to the total time of completion specified in the road cutting permission being observed. The road Maintaining Agency shall carry out the permanent road reinstatement as soon as it is possible and not later than two weeks, after receipt of reinstatement authorization to avoid serious public complaints. In case of delay a fine of Rs.250/- per day shall be paid into the revolving fund by the Road Maintaining Agency.

8.2 Road Maintaining Agency shall maintain a register indicating date of receipt of reinstatement notices date of commencement and completion of reinstatement work.

8.3 The utility concerned will lay its service strictly in accordance with the permission given, adhering to the route distance, depths etc. prescribed in the permission. In case of any violation, the utility concerned shall dismantle the same and relay it according to permission at its own cost. In case of the utility’s failure to do so, the road Maintaining Agency shall dismantle the same at the cost of the utility concerned.

9.0 REVOLVING FUNDS9.1 Each utility shall maintain a “Revolving Fund” with each of the road Maintaining

Agencies. The amount of the fund shall be equal to the amount of road restoration bills for three months, worked out on an average basis. After the “Revolving Funds” are established, permission of road cutting shall be granted within a week of making an application by the utility concerned. The road reinstatement charges shall be debited to the “Revolving Funds” and a monthly statement of all such debits along with the R.R.Bills complete in all respect will be sent to the utility concerned. The utility will replenish the amount when 2/3rd of the “Revolving Fund” is consumed. The fines laid by the utilities shall also be deposited in the funds and shall be used for common purposes. Once a fine is imposed, the appeal against the decision of the Co-ordination Committee would lie to the Chairman of the High Powered Monitoring Committee i.e. Engineer in Chief, M.C.D. The defaulting agency may also prefer a review petition to the secretary

102

Page 104: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(LSG) in case the former is not satisfied with the decision of the Chairman, High Powered Monitoring Committee.

The fines so imposed would be deposited in the revolving fund to be operated jointly by the Chairman. High Powered Monitoring Committee and the Secretary (LSG). The funds would be used as per the Lt. Governor’s orders for the general road maintenance in different parts of Delhi. The revolving fund a/c to be operated in the State Bank of India, Vikas Minar.

10.0 MONITORING

The monitoring will be carried out by the High Power Monitoring Committee headed by Engineer in Chief MCD who will monitor proper enforcement of the “Inter Utility code of conduct”, in their quarterly meetings. The formation of the committee will be as per Annexure ‘a’.

11.0 ARBITRATION

In case of any dispute concerning matters other than the execution of a work, the matter shall be decided under the arbitration of Secretary L.S.C.

12.0 Any person/Agency violating the provisions contained in this code of conduct will be liable to fine of Rs.500/- to Rs.1000/- specially with paras 5.3 & 5.4.4.

103

Page 105: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

ANNEXURE-2SAFETY CODE

1) Suitable scaffolds should be provided for workman for all works that cannot safety be done from the ground, or from solid construction except such short period work as can be done safely from ladders. When a ladder is used an extra mazdoor shall be engaged for holding the ladder and if the ladder is use for carrying materials as well suitable footholds and hand-holds shall be provided on the ladder and the ladder shall be given an inclination not steeper than 1/4 to 1 (1/4 horizontal and 1 vertical).

2) Scaffolding of staging more than 3.6m (12 foot) above the ground of floor, swung or suspended from an overhead support or erected with stationery support shall have a guard rail property attached or bolted, braced and otherwise secured at least 9. cm (3 feet) high above the floor or platform of such scaffolding or staging and extending along the entire length of the out-side and ends there of with only such opening as may be necessary for the delivery of materials. Such scaffolding or staging shall be so fastened as to prevent it from swaying from the building or structure.

3) Working platform gangways and stair ways should be so constructed that they should no

t sag unduly or unequally, and if the height of the platform or the gangway or the stairway is more than 3.6m. (12feet) above ground level or floor level, they should be closely boarded, should have adequate width and should be suitable fastened as described in (2) above.

4) Every opening in the floor of a building or in a working platform be provided with suitable means to prevent the fall or per one or materials by providing suitable fencing or railing whose minimum height shall be 90cm (3 feet)

5) Safe means access shall be provided to all working platforms and other working places. Every ladder shall be securely fixed. No portable single ladder shall be over 9m (30 feet) in length while the width between side rails in rung ladder shall be in no exceed 30 cm (12 inches). Adequate shall be in no case be less than 29 cm (11.5”) for ladder upto and including 3m (10 feet) in length. For longer ladder this with should be increased at least1/4”for each additional 30 cm (1 foor) of length. Uniform step spacing shall be taken to prevent danger from electrical equipment. No materials on any of the sites or work shall be so stacked or placed as to cause danger or inconvenience to any person or the public. The contractor shall provide all necessary fencing and lights to protect the public from accident shall be bound to bear the expenses of defense of every suit, action or other proceedings at law that may brought by any person for injury sustained owing to neglect of the above precautions and to pay any damages and cost which may be awarded in any such suit, action or proceedings to any such person or which may, with the consent of the contractor, be paid to compromise any claim by any such person.

6) Excavation and Trenching - All trenches, 1.2m (4 feet) or more in depth, shall at all times be supplied with at least one ladder for each 30m(100 feet) in length or fraction thereof Ladder shall be extended from bottom of the trench to at least 90 cm (3 feet) above the surface the ground. The side of the trenches which are 1.5m(5 feet) or more in depth shall be steeped back to give suitable slope or securely held by timber bracing, so as to avoid the danger of sides to collapse. The excavated materials shall not be placed within 1.5m (5 feet) of the edges of the trench or half of the depth of the trench which ever is more. Cutting shall be done from top to bottom. Under no circumstances undermining or undercutting shall be done.

104

Page 106: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

7) Demolition - Before any demolition work is commenced and also during the process of the work-

(a) All road and open areas adjacent to the work site shall either be close or suitably protected.

(b) No electric cable or apparatus which is liable to be a source of danger over a cable

or apparatus used by the operator shall remain electrically charged.(c) All practical steps shall be taken to prevent danger to persons employed from

risk of fire explosion or flooding. No floor, roof or other part of the building shall be so overloaded with debris or materials as to render it unsafe.

8) All necessary personal safety equipment as considered adequate by the Engineer in Charge should be kept available for the use of the person employed on the site and maintained in a condition suitable for immediate use, and the contractor should take adequate steps to insure proper use of equipment by those concerned-

(a) Workers employed on mixing aphetic materials, cement and lime mortars shall be provided with protective footwear and protective goggles.

(b) Those engaged in white washing and mixing or stacking or cement bags or any material which is injurious to the eyes shall be provided with protective goggles.

(c) Those engaged in welding works shall be provided with welder’s protective eye shields.

(d) Stone breakers shall be provided with protective goggles and protective and protective clothing and seated at sufficiently safe intervals.

(e) When workers are employed in sewers and manholes, which are in active use, the contractor shall ensure that the following safety measure are adhered to :

(i) Entry for workers into the line shall not be allowed except under supervision of the JE or any other any higher officer.

(ii) At least 5 to 6 manholes upstream and downstream should be kept open for at least 2 to 3 hours before any man is allowed to enter into the manhole for working inside.

(iii) Before entry presence of Toxic gases should be tested by inserting wet lead acetate paper, which changes colour in the presence of such gases and gives indication of their presence.

(iv) Presence of Oxygen should be verified by lowering a detector lamp into the man-hole. In case, no oxygen is found inside the sewer line, workers should be sent only with Oxygen kit.

(v) Safety belt with rope should be provided to the workers, While working inside the manholes such rope should be handled outside to enable him to be pulled out during emergency.

(vi) The area should be barricaded or cordon of by suitable means to avoid mishaps of any kind Proper warning signs should be displayed for the safety of the public whenever cleaning works undertaken during night or day.

(vii) No smoking or open flames be allowed near the blocked manhole being cleaned.

105

Page 107: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(viii) The malba obtained on account of cleaning of blocked manholes and sewer lines should be immediately removed to avoid accidents on account of slippery nature of the malba.

(ix) Workers should not be allowed to work inside the manhole continuously. The Engineer-in-Charge may decide the time up to which a worker may be allowed to work continuously inside the manhole.

(x) Gas masks with oxygen Cylinder should be kept at site for use in emergency.

(xi) Air blowers should be used for few of fresh air through the manholes. Whenever called for Portable air blowers are recommends for ventilating the manholes. The Motors for these shall be vapour proof and of totally enclosed type. Non-sparkling gas engines also could be used but they should be placed at least 2 metres away from the opening and on the lowered side protected from wind so that they will not be source of friction on any inflammable gas that might be present.

(xii) The workers engaged for cleaning the manholes/sewers should be properly trained before allowing to worked in the manhole.

(xiii) The workers shall be provided with Gumboots or non-sparkling shoes bump helmets and gloves non-sparkling tools safety lights and gas masks and portable air blowers (when necessary). They must be supplied with barrier cream for anointing the limbs before working inside the sewer lines.

(xiv) Workmen descending a manhole shall try each ladder stop or rung carefully before putting his full weighty on it to guard against insecure fastening due to corrosion of the rung fixed to manhole well.

(xv) If a man has received physical injury he should be brought out by the sewer immediately and adequate medical aid should be provide to him.

(xvi) The extent to which these precautions are to be taken depend on individual situation but the decision of the Engineer in charge regarding the steps in this regard to be taken in an individual case will be final.

(f) The contractor shall not employ men and women below the age of 18 years on the work of painting with products contained feed in any form. Wherever men above the age of 18 are employed on the work of lead painting, the following precaution should be taken:

(i) No paint containing lead or lead products shall be used except in the form of paste or ready-made paint.

(ii) Suitable face masks should be supplied for use by the workers when paint is applied in the form of spray or a surface having lead paint dry rubbed and scraped.

(iii) Overalls shall be supplied by the contractors to the workmen and adequate facilities shall be provided to enable the working painters to wash during the cessation of work.

(iv) 1. (a)White lead, sulphate of lead or product containing these pigment, shall not be use in painting operations except in the form of pastes of paint ready for use.

(b) Measures shall be taken, wherever required in order to prevent danger arising out of from the application of paint in the form of spray.

106

Page 108: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(c) Measures shall be taken, wherever practicable, to prevent danger arising out of from dust caused by dry rubbing down and scraping.

2. (a) Adequate facilities shall be provided to enable working painters to wash during and on cessation of work.

(b) Over all shall be worn by working painters during the whole of working period.

(c) Suitable arrangement shall be made to prevent clothing put off during working hours being soiled by painting materials.

3. (a) Cases of lead poisoning and suspected lead poisoning shall be notified and shall be subsequently verified by medical man appointed by competent authority of Telecommunication/Postal. (b) Telecommunication/Postal may require, when necessary medical examination

of workers.

4. Instruction with regard to special hygienic precautions to be taken in the painting trade shall be distributed to working painters.

9) When the work is done near any place there is risk of drowning, all necessary equipments should be provided and kept ready for use and all necessary steps taken for prompt rescue of any person in danger and adequate provision, should be made for prompt first aid treatment of all injuries likely to be obtained during the course of the work.

10) Use of hoisting machines and tackle including their attachments, anchorage and supports shall conform the following standards or conditions:

1. (a) These shall be of good mechanical construction, sound materials and adequate strength and free from patent defects and shall be kept repaired and in good working order.

(b) Every rope used in hoisting or lowering materials or as a means of suspension shall be of durable quality and adequate strength, and free from patent defects.

2. Every crane driver or hoisting appliance operator shall be properly qualified and no person under the age of 21years should be in charge of any hoisting, machine including any scaffolding winch or give signals to operator.

3. In case of every hoisting machine and of every chain ring hook, shackle swuvek and pulley block used in hoisting or as means of suspension the safe working load shall be ascertained by adequate means. Every hoisting machine and all gear referred to above shall be plainlu marker with the safe working load. In case of a hoisting machine having variable safe working load each safe working load and the conditions under which it is applicable shall beclearly indicated. No part of any machine or any gear referred to above in this paragraphshall be loaded beyond the safe working load except for the purposed of testing.

4. In case of departmental machines, the safe working load shall be notified by the Electrical Engineer - in - charge. As regards contractor’s machines the contractors shall notify the safe working load of the machine to the Engineer-in-charge whenever he brings any machinery to site of work and get it verified by the Electrical Engineer concerned.

11) Motors, gearing, transmission, electric wiring and other dangerous parts of hoisting appliances should be provided with efficient safeguards Hoisting appliances should be provided with such means as will reduce to the minimum the risk of accidental descent of the load. Adequate precautions should be taken to reduce to the minimum the risk of any part of a suspended load becoming accidentally displaced. When workers employed on electrical installations which are already energised in insulating mats,

107

Page 109: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

wearing apparel, such as gloves, sleeves and boots as may be necessary should be provided. The workers should not wear any rings, watches and carry keys or other materials which are the goods conductors of electricity.

12) All scaffolds, ladders and other devices mentioned or described herein shall be maintained in safe condition and no scaffold, ladder or equipment shall be altered or removed while it is in use Adequate washing facilities should be provided at or near places of work.

13) These safety provisions should be brought to the notice of all concerned by display on a notice board at a prominent place at work spot. The person responsible for compliance or the safety code shall be named therein by the contractor.

14) To ensure effective enforcement of the rules and regulations relating to safety precautions the arrangements made by the Labour Office Engineer-in-charge of the department or their representatives.

15) Notwithstanding the above clauses from (1) to (14) there is nothing in these to exempt the contractor from the operations of any other Act or Rule in force in the Republic of India.

108

Page 110: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

ANNEXURE -3

MODEL RULES

MODEL RULES FOR THE PROTECTION OF HEALTH AND SANITARY ARRANGEMENTS FOR WORKERS EMPLOYED BY TELECOMMUNICATION OR ITS CONTRACTORS.

1. Applications:

These rules shall apply to all building and construction works in charge of Telecommunication/Postal in which twenty or more workers are ordinarily employed or are proposed to be employed in any day during the period which the contract work is in progress.

2. Definition:

Work place means a place where twenty or more workers are ordinarily employed in a connection with construction work on any day during the period during which the contract work is in progress.

3. First-Aid-Facilities:

(1) At every work place there shall be provided and maintained, so as to be easily accessible during working hours, first-aid boxes at the rate if not less than one box for 150 contract labour or part thereof ordinarily employed.

(2) The firs-aid box shall be distinctly marked with a red cross on white ground and shall contain the following equipment, namely :

(a) For work places in which the number of contact labour employed does not exceed 50.

Each first-aid box shall contain the following equipments:

(i) 6 small sterilised dressings.(ii) 3 medium size sterilised dressings.(iii) 3 large size sterilised dressings.(iv) 3 large sterilised burn dressings.(v) 1 (30 ml) bottle containing a two per cent alcoholic solution of iodine.(vi) 1 (30 ml) bottle containing salvoiatile having the dose and mode of

administration indicated on the label.(vii) 1 snakebite lancet.(viii) 1 (30 ml) bottle of potassium permanganate crystals.(ix) 1 pair of scissors.

(x) 1 copy of the first-aid leaf-let issued by the Director General, Factory Advice Service and Labour Institutes, Government of India.(xi) 1 bottle containing 100 tablets (each of 5 grams) of aspirin.(xii) Ointment for burns.(xiii) A bottle of suitable surgical antiseptic solution.

(b) For work places in which the number of contract labour exceed 50 -

Each first-aid box shall contain the following equipments:-

(i) 12 small sterilised dressings.(ii) 6 medium size sterilised dressings.(iii) 6 large size sterilised dressings.(iv) 6 large size sterilised burn dressings.(v) 6 (15 gms) packets sterilised cotton wool.(vi) 1 (60ml) bottle containing a two per cent alcolic solution iodine.

109

Page 111: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(vii) 1 (60ml) bottle containing salvotatile having the dose and mode of administration indicated on the label.(viii) 1 roil of adhesive plaster.(ix) 1 snake-bite lancet.(x) 1 (30gms) bottle of potassium permanganate crystals.(xi) 1 pair scissors.(xii) 1 copy of the first-aid leaf-let issued by the Director General Factory Advice

Service and Labour institutes. Government of India.(xiii) A bottle containing 100 tablets (each of 5 grams of aspirin).(xiv) Ointment for burns.(xv) A bottle of suitable surgical antiseptic solution.

(3) Adequate arrangements shall be made for immediate recoupment of the equipment when necessary.

(4) Nothing except the prescribed contents shall be kept in the First-aid box.(5) The First aid box shall be kept in charge of a responsible person who shall

always be readily available during the working hours of the work place.

(6) A person in charge of the First-aid box shall be a person trained in First-Aid treatment, in work places where the number of contract labour employed is 150 or more.

(7) In work place where the number of contract labour employed is 500 or more and hospital facilities are not available within easy distance the works, First-Aid posts shall be establishes and run by a trained compounder. The compounder shall be on duty and shall be available at all hours when the workers are at work.

(8) Where work places are situated in places, which are not towns or cities, a suitable meter transport shall be kept readily available to carry injured person or person suddenly taken ill to the nearest hospital.

4. Drinking Water.(a) In every work place, there shall be provided and maintained at suitable places,

easily accessible to labour, a sufficient supply of cold water fit for drinking.

(b) Where drinking water is obtained from an intermittent public water supply, each work place shall be provided with storage where such drinking shall be stored.

(c) Every water supply of storage shall be at a distance of not less than 50 feet from any latrine drain or other source of pollution. Where water has to be drawn from an existing well which is within such proximity of latrine, drain or any other source of pollution, the well shall be properly chlorinated before water is drawn from it for drinking. All such wells shall be entirely closed in and be provided with a trap door which shall be dust and water proof.

(d) A reliable pump shall be fitted to each covered well, the trap door shall be kept locked and opened only for cleaning or inspection which shall be done at least once a month.

5. Washing Facilities : (i) In every work place adequate and suitable facilities for washing shall be

provided and maintained for the use of contract labour employed therein.(ii) Separate and adequate screening facilities shall be provided for the use of male and female workers.(iii) Such facilities shall be conveniently accessible and shall be kept in clean and hygienic condition.

6. Latrines and Urinals:

(i) Latrines shall be provided in every work place on the following scale namely :-

110

Page 112: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(a) Where female are employed there shall be at least one latrine, for every 25 females.

(b) Where males are employed, there shall be at least one latrine for every 25 males.

Provided that where the number of males or females exceeds 100, it shall be sufficient if there is one latrine for 25 males or females as the case may be up to the First 100, and one for every 50 thereafter.

(ii) Every latrine shall be under cover and so partitioned off as to secure privacy, and shall have a proper door and fastenings.

(iii) Construction of latrines: The inside walls shall be constructed of masonry or some suitable heat-resisting non-absorbent materials and shall be cement washed inside and outside at least once a year Latrines shall not be of a standard lower than bore-hole system.

(iv) (a) Where workers of both sexes are employed, there shall be displayed outside each block of latrine and urinal, a notice in the Language understood by the majority of the workers “For Men only” or For Women only” as the case may be.(b) The notice shall also bear the figure of a man or of a woman as the case may be.

(v) There shall be at least one urinal for male workers up to 50 and one for female workers up to fifty employed at a time. Provided that where the number of male or female workmen, as the case may be, exceeds 500, it shall be sufficient if there is one urinal for every 50 males or females up to the first 500 and age for every 100 on part thereafter.

(vi) (a) The latrines and urinals shall be adequately lighted and shall be maintained in a clean and sanitary condition at all times.

(b) Latrines and Urinals other than those connected with a flush sewage system shall comply with the requirements of the Public Health Authorities.

(vii) Water shall be provided by means of a tap or otherwise so as to be conveniently accessible in or near the latrines and urinals.

(viii) Disposal or extreta: Unless otherwise arranged for by the local sanitary authority, arrangements for proper disposal excreta by incineration a the work place shall be make by means of a suitable incinerator Alternatively extreta may be disposed of by putting a layer of night soil at the bottom of a pucca tank prepared for the purpose and covering it with a 1 cm layer of waste of refuse and then covering it with a layer of earth for a fortnight (when it will turn into manure).

(ix) The contractor shall at his own expense, carry out all instructions issued to him by the Engineer-in-charge to effect proper disposal of soil and other conservancy work in respect of the contractor’s workmen or employees on the site. The contractor shall be responsible for payment of any charges, which may be levied by Municipal or Cantonment Authority for execution of such on his behalf.

7. Provision of shelter during rest At every place there shall be provided, free of cost, four suitable sheds, two for meals and the other two for rest separately for the use of men and women labour. The height of each shelter shall not be less than 3 meters from the floor level to the lowest part of the roof. These shall be kept clean and the space provided shall be on the basis of 0.6 sq.m per head.

Provided that the Engineer-in-Charge may permit subject to his satisfaction, a portion of the building under construction or other alternative accommodation to be used for the purpose.

111

Page 113: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

8. Crèches: (a) At every work place, at which 20 or more women worker are ordinarily employed,

there shall be provided two rooms of reasonable dimensions for the use of their children under the age of six years. One room shall be used as a play room for the children and the other as their bed-room. The rooms shall be constructed with specifications as per clause 19H (2), a,b & c.

(1) Thatched roof (a) The rooms shall be provided with suitable and sufficient openings for light

and ventilation. There shall be adequate provision of sweepers to keep the places clean.

(b) The contractor shall supply adequate number of toys and games in the play room and sufficient number of cots and beddings in the bed room.

(c) The contractor shall provide one Dal to look after the children in the crèche when the number of women workers does not exceed 60 and two Dals when the number of women workers exceed 60.

(d) The use of the rooms earmarked as crèches shall be restricted to children, their attendants and mothers of the children.

Model rules for the protection of health and sanitary arrangements for workers employed by Telecommunication/Postal or its contractor.Forms And Terms And Conditions of Licence.1) Every licence granted sub-section (i) or Section 12 shall be in form VI.

2) Every licence granted under sub-rule (1) or renewed under rule 29 shall be subject to the following conditions namely :-

a) In every establishment where twenty or more women are ordinarily employed as contract labour there shall be provided two rooms of reasonable dimensions for the use of their children under the age of six years.

b) One of such rooms shall be used as a play room for the children and the other as bedroom for the children.

c) The contractor shall supply adequate number of toys and games in the play rooms and sufficient numbers of cots and be doing the sleeping rooms.

d) The standard of construction and maintenance of crèches shall be as may be specified in this behalf of the Chief Labour Commission [Central].

9. Canteens: [1] In every work place where the work regarding the employment of contract labour is

likely to continue for six months and wherein contract labour numbering one hundred or more are ordinarily employed, an adequate canteen shall be provided by the contractor for the use of such contract labour.

[2] The canteen shall be maintained by the contractor in an efficient manner. [3] The canteen shall consist of at least a dining hall, kitchen, storeroom pantry and

washing places separately for workers and utensils. [4] The canteen shall be sufficiently lighted at all times when any person has access to it. [5] The floor shall be made of smooth and impervious material and inside walls shall be

lime- washed or colour washed at least once in each year.Provided that the inside walls of the kitchen shall be lime-washed every four months.

[6] The precincts of the canteen shall be maintained in a clean and sanitary condition. [7] Waster water shall be carried away in suitable covered drains and shall not be allowed

to accumulate so as to cause a nuisance. [8] Suitable arrangements shall be made for the collection and disposal of garbage. [9] The dining hall shall accommodate at a time 30 percent of the contract labour working

at a time. [10] The floor area of the dining hall, excluding the area occupied by the service counter

and any furniture except tables and chairs shall not be less than one square meter per diner to be accommodated as prescribed in sub-Rule 9.

112

Page 114: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

[11] (i) A portion of the dining hall and service counter shall be partitioned off and reserved for women worker in proportion to their number.

(ii) Washing places for women shall be separate and screened to secure privacy. [12] Sufficient tables stools, chair or benches shall be available for the number of diners to

be accommodated as prescribed in sub-Rule 9. [13] [a] [i] There shall be provided and maintained sufficient utensils crockery, furniture and

any other equipments necessary for the efficient running of the canteen. [ii] The furniture utensils and other equipments shall be maintained in a clean and

hygienic condition. (b) (i) Suitable clean clothiers for the employee serving in the canteen shall be

provided and maintained. (ii) Suitable facilities including an adequate supply of hot water shall be provided

for the cleaning of utensils and equipments. [14] The foodstuffs and other items to served in the canteen shall be conformity with

the normal habits of the contract labour. [15] The charges for foodstuffs, beverages and any other items served in the canteen

shall be based on ‘No profit, No loss’ and shall be conspicuously displayed in the canteen.

[16] In arriving at the price of foodstuffs, and other article served in the canteen, the following items shall not be taken into consideration as expenditure namely: -

(a) The rent of land and building; (b) The depreciation and maintenance charges for the building and equipments

provided for the canteen; (c) The cost of purchase, repairs and replacement of equipments including furniture,

crockery, cutlery and utensils; (d) The water charges and other charges incurred for lighting and ventilation; (e) The interest and amounts spent on the provision and maintenance and

equipments provided for in the canteen. [17] The accounts pertaining to the canteen shall be audited once every 12 months by

registered accountants and auditors.

10. Anti-Malarial Precautions: The contractor shall at his own expense, conform to all anti-malarial instruction given to

him by the Engineer-in-Charge including the filling up of any borrow pits which may have been dug by him.

11. The above rules shall be incorporated in the contracts and in notices inviting tenders and shall form an integral part of the contracts.

12. Amendments:

Government may, from time to time, add to or amend these ruls and issue such directions - it may consider necessary for the purpose of removing any difficulty, which may arise in the administration thereof.

113

Page 115: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

ANNEXURE -4

CONTRACTOR’S LABOUR REGULATIONS

1. Short Title:

These regulations may be called the Telecommunication/Postal Contractors Labour Regulations.

+2 (i) Definitions:

“Workman: means any persons employed by a Telecommunication/Postal or its Contractor directly or indirectly through a sub-contractor with or without the knowledge a sub-contractor, with or without the knowledge of the Central Public Works Department to do any skilled, semi-skilled or unskilled manual, supervisory, technical or clerical work for hire or reward, whether the terms of employment are expressed or implied but does not include any person-

(a) Who is employed mainly in a managerial or administrative capacity; or (b) Who, being employed in a supervisory capacity draws wages exceeding five

hundred rupees per mensem or exercises either by the nature of the duties attached to the office or by reason or powers wasted in him, functions mainly of managerial nature;

(c) Who is an out worker, that is to say, person to whom any article or materials are given out by or on behalf of the principal employers to be make up cleaned, washed, altered, ornamental finished, repaired adopted or otherwise processed for sale for the purpose of the trade or business of the principal employers and the process is to be carried out either in the home of the cut worker or in some other premises. not being premises under the Central and management of the principal employer.

(ii) “Fair Wages” means wages whether for time or piece work fixed and notified under the provisions of the Minimum Wages Act from time to time.

(iii) “Contractors” shall include every person who undertakes to produce a given result other than a mere supply of goods or articles of manufacture through contract labour or who supplies contract labour for any work and includes a sub-contractor.

(iv) “Wages” shall have the same meaning as defined in the Payment of Wages Act.

2(a) Normally working hours of an adult employee should not exceed 9 hours a day and in case of a child 4 1/2 hours a day. The working day shall be so arranged that inclusive of interval for rest, if any, it shall not spread over more than 12 hours on any day.

2(b) When an adult worker in made to work for more than 9 hours on any day or for more than 48 hours in any week he shall be paid over time for the extra hours put in by him at double the ordinary rate of wages. Children shall not be made to work extra hours.

2(c) (i) Every worker shall be given a weekly holiday normally on a Sunday, in accordance with the provisions of the Minimum Wages (Central Rules 1960 as amended from time to time irrespective of whether such worker is governed by the Minimum Wages Act or not.

(ii) Where the minimum Wages prescribed by the Government under the Minimum Wages Act are not inclusive of the wages for the weekly day of rest, the worker shall be entitled to rest day wages at the rate applicable to the next preceding day, provided he has worked under the same contractor for a continuous period of not less than 6 days.

(iii) Where a contractor is permitted by the Engineer-in-Charge to allow a worker to work on a normal weekly holiday, he shall grant a substituted holiday to him for

114

Page 116: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

the whole day on one of the five days immediately before or after the normal weekly holiday and pay wages to such workers for the work performed on the normal weekly holiday at overtime rate.

115

Page 117: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

3. Display of Notice regarding Wages etc.

The contractor shall before he commences his work on contract, display and correctly maintain and continue to display and correctly maintain and continue to display and correctly maintain in a clean and legible condition in conspicuous places on the work,

notices in English and in the local Indian languages spoken by the majority of the workers, giving the minimum rates of wages fixed under the Minimum Wages Act, the actual wages being paid, the hours of work for which such wages are earned, wage periods, dates of payments of wages and other relevant information as per Appendix ‘A’ on page 77.

4. Payment of wages:

(i) The contractor shall fix wage periods in respect of which wages shall be payable.(ii) No wage period shall exceed one month.(iii) The wages of every person employed as contract labour in an establishment or by

a contractor where less than one thousand, such persons are employed shall be paid before the expiry of seventh day and in other cases before the expiry of tenth day after the last day of the wage period in respect of which the wages are payable.

(iv) Where the employment of any worker is terminated by or on behalf of the contractor the wages earned by him shall be paid before the expiry of the second working day from the date on which his employment is terminated.

(v) All payment of wages shall be made on a working day at the work premises and during the working time and on a date notified in advance and in case the work is completed before the expiry of the wages period, final payment shall be made within 48 hours of the last working day.

(vi) Wages due to every worker shall be paid to him direct or to other person authorized by him in this behalf.

(vii) All wages shall be paid in current coin or currency or in both.(viii) Wages shall be paid without any deductions of any kind except those specified by

the Central Government by general or special order in this behalf or permissible under the Payment of Wages Act 1956.

(ix) A notice showing the wages period and the place time of disbursement of wages shall be displayed at the place of work and copy sent by the contractor to the Engineer-in- Charge under acknowledgement.

(x) It shall be the duty of the contractor to ensure the disbursement of wages in the presence of the Junior Engineer or any other authorised representative of the

Engineer-in- Charge who will be required to be present at the place and time of disbursement of wages by the contractor to workmen.

(xi) The contractor shall obtain from the Junior Engineer or any other authorized representative of the Engineer-in-Charge as the case may be, a certificate under his signature at the end of the entries in the “Register of wages” or the “Wage-cum-Master Roll” as the case may be in the following form :

“Certified that the amount shown in column No........... has been paid to the workman concerned in my presence on ....................... at ......................................

5. Fines and deductions, which may be made from wages

(i) The wages of a worker shall be paid to him without any deduction of any kind except the following :-

(a) Fines (b) Deductions for absence from duty i.e. from the place or the places

where by the terms of his employment he is required to work. The amount of deduction shall be in proportion to the period for which he was absent.

(c) Deduction for damage to or loss of goods expressly entrusted to the employed person for custody, or for loss of money or any other

116

Page 118: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

deduction which he is required to account, where such damage or loss is directly attributable to his neglect or default.

(d) Deduction for recovery of advances or for adjustment of over-payment of wages: advances granted shall be entered in a register.

e) Any other deduction, which the Central Government may from time to time allow.

(ii) No fines should be imposed on any worker save in respect of such acts and omissions on his part as have been approved by the Chief Labour Commissioner.

Note:- An approved list of Acts of Omissions for which fines can be imposed is enclosed at

Appendix-1.

(iii) No fines shall be imposed on a worker and no deduction for damage or loss shall be made from his wages until the worker has been given an opportunity of showing cause against such fines or deductions.

(iv) The total amount of fine which may be imposed in any one wage period on a worker

shall not exceed an amount equal to three paise in a rupee of the total wages, payable to him in respect of that wage period.

(v) No fine imposed in any worker shall be recovered from him by installment, or after the expiry of sixty days form the date on which it was imposed.

(vi) Every fine shall be deemed to have been imposed on the day of the act or omission in respect of which it was imposed.

(vii) Wage shall be paid by the contractor to the workers directly without the intervention of any jamadar of Khatada. The contractor shall further ensure that no amount by way of commission of otherwise is deducted or recovered by the jamadar from the wages of the workman.

6. Labour Records:

(i) The contractor shall maintain a “Register of persons employed” on work contract in Form XIII of the CL (R & A) Central Rules 1971 (Appendix b)

(ii) The contractor shall maintain of “Muster Roll” register in respect of all workmen employed by him on the work under Contract in Form XVI of the CL(R&A) Rules 1971(Appendix-C).

(iii) The contactor shall maintain a “Wage Register” in respect of all workmen employed by him on the work under contract in Form XVI of the CL (R&A) Rules 1971 (Appendix-D)

(iv) Register of accident - The contractor shall maintain a register of accident’s in such form as may be convenient at the work place but the same shall include the following particulars:

(a) Full particulars of the labourers who met with accident(b) Rate of wages(c) Sex(d) Age(e) Nature of accident and cause of accident(f) Time and date of accident(g) Date and time of when admitted in Hospital(h) Date of discharge from the Hospital(i) Period of treatment and result of treatment

(j) Percentage of loss of earning capacity and disability as assessed by Medical Officer.

(k) Claim required to be paid under Workmen’s Compensation Act.(l) Date of payment of compensation.

(m) Amount paid with details of the person to whom the same was paid.(n) Authority by whom the compensation was assessed.

117

Page 119: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(o) Remarks

(v) Register of Fines-- The contractor shall maintain a “Register of Fines” in the Form XII of the CL(R&A) Rules 1971 (Appendix-H)

The contactor shall display in a good condition and in a conspicuous place of work the approved list of acts and Omissions for which fines cab be imposed (Appendix-

I)

(vi) Register of Deductions: -- The contractor shall maintain a “Register of deductions” for damage or loss” in Form XX of the CL(R&A) Rules 1971 (Appendix-J)

(vii) Register of Advances: -- The contractor shall maintain a “Register of Advances” in Form XXII of the CL(R&A) Rules 1971 (Appendix-K)

(viii) Register of Overtime: -- The contractor shall maintain a “Register of Overtime” in Form XXIII of the CL(R&A) Rules 1971 (Appendix-L)

7. Attendance Card-cum Wage slip

(i) The contractor shall issued an attendance card-cum-wage slip to each workman employed by him in the specimen form at (Appendix-E)

(ii) The card shall be valid for each wage period. (iii) The contractor shall mark the attendance of each workman on the card twice

each day, once at the commencement of the day and again after the rest interval, before he actually starts work.

(iv) The card shall remain in possession of the worker during the wage period under reference.

(v) The contractor shall complete the wage slip portion on the reverse of the card at least a day prior to the disbursement of wages in respect of the wage period under reference.

(vi) The contractor shall obtain the signature or thumb impression of the worker on the wage slip at the time of disbursement of wages and retain the card with himself.

8. Employment Card:The contract shall issued an Employment Card in Form XIV of the CL(R&A) Central Rules 1971 to each worker within three days of the employment of the worker (Appendix-F)

9. Service CertificateOn termination of employment for any reason whatsoever the contractor shall issue to the workman whose services have been terminated, a service certificate in Form XV of the CL(R&A) of the Central Rules 1971 (Appendix-G)

10. Preservation of Labour Records:All records required to be maintained under Regulations No.s 6 and 7 shall be preserved in original for a period of three years from the date of last entries made in them and shall be made available for inspection by the Engineer-in-charge Labour Office of any other officers authorised by the Department of Telecommunication/Postal in this behalf.

11. Power of Labour Officer to make investigations or enquiry:The labour Officer or any other person authorised by Central Government on their behalf shall have power to make enquires with a view to ascertaining and enforcing due and proper observance of the Fair Wage Clauses and the Provisions of Regulations. He shall investigate into any complaint regarding the default made by the contractor or sub-contractor in regard to such provision.

12. Report of Labour Officer:

118

Page 120: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

The Labour Officer or other persons authourised as aforesaid shall submit a report of result of his investigation or enquiry to the Executive Engineer concerned indicating the extent, if any, to twhich the default has been committed with a note that necessary deductions form the contractor’s bill be made and the wages and other dues be paid to the labourers concerned. In case an appeal is made by the contractor under Clause 12 of these regulations, actual payment to laboureres will be made by the Executives Engineer after the Superintending. Engineer has given his decision on such appeal.

(a) The Executive Engineer shall arrange payments to the labour concerned within 45days from the receipt of the report from the Labour Officer or the Superintending Engineer as the case may be.

13. Appeal against the decision of Labour Officer:

Any person aggrieved by the decision and recommendations of the Labour Officer or other person so authorised may appeal against such decision to the Superintending Engineer concerned within 30 days from the date of decision forwarding simultaneously a copy of his appeal to the Executive Engineer concerned by subject to such appeal, the decision of the officer shall be final and binding upon the contractor.

14. Prohibition regarding representation through lawyer :(i) A Workman shall be entitled to be represented in any investigation or enquiry

under these regulations by :(a) An officer of registered trade union, which he is a member.(b) An officer of a federation of trade unions referred to in clause (a) is

affiliated.(c) Where the employer is not a member of any registered trade union,

by an officer of a registered trade union, connected with, or by any other workman employed in the industry in which the worker is employed.

(ii) An employer shall be entitled to be represented in any investigation or enquiry under these regulations by:(a) An officer of an association of employers of which he is a member.

(b) An officer of a federation of association of employers to which association referred to in Clause (a) is affiliated.

(c) Where the employers is not a member of any association of employers, by an officer of association of employers, connected with or by any other employer, engaged in the industry in which the employer is engaged.

(iii) No party shall be entitled to be represented by a legal practitioner in any investigation or enquiry under these regulations.

15. Inspection of Books and slips :

The contractor shall allow inspection of all the prescribed labour records to any of his workers or to his agent at a convenient time and place after due notice is

received or to the Labour Office or any other person, authourised by the Central Government on his behalf.

16. Submissions of Return :

The contractor shall submit periodical returns as may be specified from time to time.

17. Amendments :

The central Government may from time to time add to it amend the regulations and on any question as to the application interpretation or effect of those regulations the decision of the Superintending Engineer concerned in that behalf shall be final.

119

Page 121: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Part E

Monitoring and Co-ordination Committees

120

Page 122: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

ANNEXURE ‘a’

High Power Monitoring Committee

1. Engineer - in Chief, MCD Chairman2. General Manager(Development) Member

MTNL/representative

3. Additional General Manager, D.E.S.U. Member

4. Chief Engineer, N.D.M.C. Member5. Engineer Member, D.D.A. Member6. Chief Engineer, PWD (Delhi Administration) Member7. Chief Engineer, CPWD Member8. Dy. Commissioner of Police, Traffic Member9. Engineer-in Chief Member

Delhi Water & Sewerage Disposal Undertaking

10. Administration, Delhi Cantt. Board Member

121

Page 123: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

ANNEXURE “b”M.C.D. Co-ordination Committee

1. Engineer-in-Chief, MCD Chairman

2. General Manager(Development) MemberMTNL/representative

3. Additional General Manager MemberDESU/representative

4. Engineer Member MemberDDA/representative

5. Engineer-in-chief, MemberDelhi Water & Sewerage DisposalUndertaking/representative

6. Administration Delhi Cantt. MemberBoard/representative

7. Dy. Commissioner of Police MemberTraffic/ representative

122

Page 124: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

ANNEXURE ‘c’

N.D.M.C. Co-ordination Committee

1. Chief Engineer, N.D.M.C. Chairman

2. General Manager(Development) Member MTNL/representative

3. Dy. Commissioner of Police MemberTraffic/representative

123

Page 125: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

ANNEXURE ‘d’

PWD (Delhi Administration) Co-ordination Committee

1. Chief Engineer, P.W.D. Chairman

2 General Manager(Development) MemberMTNL/representative

3. Additional General Manager MemberDESU/ representative

4. Chief Engineer MemberCPWD/ representative

5. Dy. Commissioner of Police MemberTraffic/representative

124

Page 126: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Section XIII

INTEGRITY PACT

Between

Mahanagar Telephone Nigam Ltd. (MTNL) hereinafter referred to as “The Principal”And

……………………………………………….hereinafter referred to as “The Bidder/Contractor”

Preamble

The Principal intends to award, under laid down organizational procedures, contract/s for ………………….. The Principal values full compliance with all relevant laws of the land, rules, regulations, economic use of resources and of fairness/transparency in its relations with its Bidder(s) and/or Contractor (s).

In order to achieve these goals, the Principal has appointed an Independent External Monitor (IEM), who will monitor the tender process and the execution of the contract for compliance with the principles mentioned above.

Section 1 - Commitments of the Principal

(1) The Principal commits itself to take all measures necessary to prevent corruption and to observe the following principles:

a. PRINCIPAL is committed to have most ethical and corruption free business dealings with Bidder(s)/contractor(s).

b. No employee of the Principal, personally or through family members, will in connection with the tender for, or the execution of a contract, demand, take a promise for or accept, for self or third person, any material or immaterial benefit which the person is not legally entitled to.

c. The Principal will, during the tender process treat all Bidder(s) with equity and reason and will deal with them in a fair and transparent manner. The Principal will in particular, before and during the tender

125

Page 127: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

process, provide to all Bidder(s) the same information and will not provide to any Bidder(s) confidential/additional information through which the Bidder(s) could obtain an advantage in relation to the tender process or the contract execution.

d. The Principal will exclude from the process all known prejudiced persons.

e. PRINCIPAL will honour its commitments and make due payments to The Bidder(s)/Contractor(s) in a timely manner.

f. PRINCIPAL will initiate action and pursue it vigorously whenever unethical behavior occurs or is suspected to have occurred.

(2) If the Principal obtains information on the conduct of any of its employees which is a criminal offence under the IPC/PC Act, or if there be a substantive suspicion in this regard, the Principal will inform the Corporate Vigilance Office and in addition can initiate disciplinary actions.

Section 2 - Commitments of the Bidder(s)/Contractor(s)

(1) The Bidder(s)/Contractor(s) commit himself to take all measures necessary to prevent corruption. He commits himself to observe the following principles during his participation in the tender process and during the contract execution.

a. The Bidder(s)/Contractor(s) will not, directly or through any other person or firm, offer, promise or give to any of the Principal’s employees involved in the tender process or the execution of the contract or to any third person any material or other benefit which he/she is not legally entitled to, in order to obtain in exchange any advantage of any kind whatsoever during the tender process or during the execution of the contract.

b. The Bidder(s)/Contractor(s) will not enter with other Bidders into any undisclosed agreement or understanding, whether formal or informal. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or any other actions to restrict competitiveness or to introduce cartelization in the bidding process.

c. The Bidder(s)/Contractor(s) will not commit any offence under the relevant IPC/PC Act; further the Bidder(s)/Contractor(s) will not use impropriety, for purposes of competition or personal gain, or pass on to others, any information or document provided by the Principal as part of the business relationship, regarding plans, technical proposals and

126

Page 128: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

business details, including information contained or transmitted electronically.

d. The Bidder(s)/Contractor(s) will, when presenting his bid, disclose any and all payments he has made, is committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract.

e. The Bidder(s)/Contractor(s) will not make any false or misleading allegations against the principal or its associates.

f. The Bidder/Contractor will not bring any Political, Governmental or Diplomatic influence to gain undue advantage in its dealing with PRINCIPAL

g. The Bidder(s)/Contractor(s) will promote and observe best ethical practices within its organization.

h. The Bidder(s)/Contractor(s) will promptly inform the Independent Monitor(of PRINCIPAL) If he receives demand for a bribe or illegal payment/benefit and(i) If comes to know of any unethical or illegal practice in PRINCIPAL.(ii) If he makes any payment to any PRINCIPAL Associate.

(2) The Bidder(s)/Contractor(s) will not instigate third persons to commit offences outlined above or be an accessory to such offences.

Section 3 - Disqualification from tender process and exclusion from future contracts.

If the Bidder)s/Contractor(s) before award or during execution has committed a transgression through a violation of Section 2, above or in any other form such as to put his reliability or credibility in question, the Principal is entitled to disqualify the Bidder(s)/Contractor (s) from the tender process or take action as per the procedure mentioned in the “Guidelines on Banning of business dealings”. Copy of the “Guidelines on Banning of Business Dealings” is annexed and marked as Annex-“A”.

Section 4 - Compensation for Damages

(i) If the Principal has disqualified the Bidder(s) from the tender process prior to the award according to Section 3, the Principal is entitled to demand and recover the damages equivalent to Earnest Money Deposit/Bid Security.

127

Page 129: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

(ii) If the Principal has terminated the contract according to Section 3, or if the Principal is entitled to terminate the contract according to Section 3, the Principal shall be entitled to demand and recover from the Contractor the amount equivalent to Security Deposit/Performance Bank Guarantee in addition to any other penalties/recoveries as per terms and conditions of the tender.

Section 5 - Previous transgression

(i) The Bidder declares that no previous transgressions occurred in the last 3 years with any other Company in any country conforming to the anti corruption approach or with any other Public Sector Enterprise in India that could justify his exclusion from the tender process.

(ii) If the Bidder makes incorrect statement on this subject, he can be disqualified from the tender process or action can be taken as per the procedure mentioned in “Guidelines on Banning of business dealings”.

Section 6 – Equal treatment of all Bidders/ Contractors/ Subcontractors

(i) The Principal will enter into agreements with identical conditions as this one with all Bidders/Contractors.

(ii) The Bidder(s)/Contractor(s) undertake(s) to demand from all subcontractors a commitment in conformity with this Integrity Pact.

(iii) The Principal will disqualify from the tender process all bidders who do not sign this Pact or violate its provisions.

Section 7 - Criminal charges against violating Bidder(s) / Contractor(s) / Subcontractor(s)

If the Principal obtains knowledge of conduct of a Bidder, Contractor or Subcontractors, or of an employee or a representative or an associate of a Bidder, Contractor or Subcontractor which constitutes corruption, or if the Principal has substantive suspicion in this regard, the Principal will inform the same to the Corporate Vigilance Office and may initiate criminal proceedings against the violating Bidder(s)/Contractor(s).

Section 8 – Independent External Monitor/Monitors

(1) The Principal has appointed competent and credible Independent External Monitor for this Pact. The task of the Monitor is to review independently and

128

Page 130: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

objectively, whether and to what extent the parties comply with the obligations under this agreement.

(2) The Monitor is not subject to instructions by the representatives of the parties and performs his functions neutrally and independently. He reports to the CMD, MTNL.

(3) The Bidder(s)/Contractor(s) accepts that the Monitor has the right to access without restriction to all Project documentation of the Principal including that provided by the Contractor. The Contractor will also grant the Monitor, upon his request and demonstration of a valid interest, unrestricted and unconditional access to his project documentation. The same is applicable to Subcontractors. The Monitor is under contractual obligation to treat the information and documents of the Bidder(s)/Contractor(s)/Subcontractor(s) with confidentiality.

(4) The Principal will provide to the Monitor sufficient information about all meetings among the parties related to the Project provided such meetings could have an impact on the contractual relations between the Principal and the Contractor. The parties offer to the Monitor the option to participate in such meetings.

(5) As soon as the Monitor notices, or believes to notice, a violation of this agreement, he will so inform the Management of the Principal and request the Management to discontinue or take corrective action, or to take other relevant action. The monitor can in this regard submit nonbinding recommendations. Beyond this the Monitor has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action.

(6) The Monitor will submit a written report to the CMD, MTNL within 8 to 10 weeks from the date of reference or intimation to him by the principal and, should the occasion arise, submit proposals for correcting problematic situations.

(7) If the Monitor has reported to the CMD, MTNL, a substantiated suspicion of an offence under relevant IPC/PC Act, and the MTNL has not, within the reasonable time taken visible action to proceed against such offence or reported it to the Corporate Vigilance Office, the Monitor may also transmit this information directly to the Central Vigilance Commissioner.

(8) The word ‘Monitor’ would include both singular and plural.

Section 9 – Pact Duration

129

Page 131: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

This pact begins when both parties have legally signed it. It expires for the Contractor 12 months after the last payment under the contract, and for all other Bidders 6 months after the contract has been awarded.

If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by CMD, MTNL.

Section 10 – Other provisions

(1) This agreement is subject to Indian Law, place of performance and jurisdiction is the Registered Office of the Principal, i.e. New Delhi. The arbitration clause provided in the tender document/contract shall not be applicable for any issue/dispute arising under Integrity Pact.

(2) Changes and supplements as well as termination notice need to be made in writing.

(3) If the Contractor is a partnership or a consortium, this agreement must be signed by all partners or consortium members.

(4) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.

_________________________ ____________________________

(For & On behalf of the Principal) (For & On behalf of Bidder/Contractor)

(Office Seal) (Office Seal) Place -------------------Date -------------------

Witness 1:(Name & Address)__________________________

__________________________ __________________________ __________________________

Witness 2: (Name & Address)__________________________

__________________________ __________________________

130

Page 132: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Part-F

Section-XIV

Special instructions to Bidders for e-Tendering

General

The Special Instructions (for e-Tendering) supplement ‘Instruction to Bidders’, as given in these Tender Documents. Submission of Online Bids is mandatory for this Tender.

E-Tendering is a new methodology for conducting Public Procurement in a transparent and secured manner. Now, the Government of India has made e-tendering mandatory. Suppliers/ Vendors will be the biggest beneficiaries of this new system of procurement. For conducting electronic tendering, . MTNL has decided to use the portal https://www.tcil-india-electronictender.com through TCIL, a Government of India Undertaking. This portal is based on the world’s most ‘secure’ and ‘user friendly’ software from ElectronicTender®. A portal built using ElectronicTender’s software is also referred to as ElectronicTender System® (ETS).

Benefits to Suppliers are outlined on the Home-page of the portal.

Instructions

Tender Bidding Methodology:

- Single Stage Two EnvelopeBroad Outline of Activities from Bidder’s Perspective:

1. Procure a Digital Signing Certificate (DSC)2. Register on ElectronicTendering System® (ETS) 3. Create Marketing Authorities (MAs), Users and assign roles on ETS. It is

mandatory to create at least one MA. 4. View Notice Inviting Tender (NIT) on ETS5. For this tender -- Assign Tender Search Code (TSC) to an MA 6. Download Official Copy of Tender Documents from ETS. Note: Official copy of

Tender Documents is distinct from downloading ‘Free Copy of Tender Documents’. To participate in a tender, it is mandatory to procure official copy of Tender Documents for that tender.

7. Clarification to Tender Documents on ETS– Query to MTNL (Optional)

8. View response to queries posted by MTNL 9. Bid-Submission on ETS10. Attend Public Online Tender Opening Event (TOE) on ETS

– Opening of relevant Bid-Part11. Post-TOE Clarification on ETS (Optional)

– Respond to MTNL

131

Page 133: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

For participating in this tender online, the following instructions are to be read carefully. These instructions are supplemented with more detailed guidelines on the relevant screens of the ETS.

Digital Certificates

For integrity of data and authenticity/ non-repudiation of electronic records, and to be compliant with IT Act 2000, it is necessary for each user to have a Digital Certificate (DC). also referred to as Digital Signature Certificate (DSC), of Class 2 or above, issued by a Certifying Authority (CA) licensed by Controller of Certifying Authorities (CCA) [refer http://www.cca.gov.in].

Registration

To use the ElectronicTender® portal https://www.tcil-india-electronictender.com, vendors need to register on the portal. Registration of each organization is to be done by one of its senior persons who will be the main person coordinating for the e-tendering activities. In ETS terminology, this person will be referred to as the Super User (SU) of that organization. For further details, please visit the website/portal, and click on the ‘Supplier Organization’ link under ‘Registration’ (on the Home Page), and follow further instructions as given on the site. Pay Annual Registration Fee as applicable.

Any Instructions for Online/ Offline Payment of Registration Fee (??)

After successful submission of Registration details and Annual Registration Fee, please contact TCIL/ ETS Helpdesk (as given below), to get your registration accepted/activated

Important Note: To minimize teething problems during the use of ETS (including the Registration process), it is recommended that the user should peruse the instructions given under ‘ETS User-Guidance Center’ located on ETS Home Page, including instructions for timely registration on ETS. The instructions relating to ‘Essential Computer Security Settings for Use of ETS’ and ‘Important Functionality Checks’ should be especially taken into cognizance.

Please note that even after acceptance of your registration by the Service Provider, to respond to a tender you will also require time to complete activities related to your organization, such as creation of users, assigning roles to them, etc.

TCIL/ ETS HelpdeskTelephone/ Mobile Customer Support: +91-11-26241790 (Multiple Lines)

Emergency Mobile Numbers: +91-9868393775, 9868393717, 9868393792

E-mail ID [email protected][Please mark CC: [email protected]]

132

Page 134: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Special Note on Security and Transparency of Bids

Security related functionality has been rigorously implemented in ETS in a multi-dimensional manner. Starting with 'Acceptance of Registration by the Service Provider', provision for security has been made at various stages in ElectronicTender's software. Specifically for Bid Submission, some security related aspects are outlined below:

As part of the ElectronicEncrypter® functionality, the contents of both the ‘ElectronicForms®’ and the ‘Main-Bid’ are securely encrypted using a Pass-Phrase created by the Bidder himself. Unlike a ‘password’, a Pass-Phrase can be a multi-word sentence with spaces between words (eg I love this World). A Pass-Phrase is easier to remember, and more difficult to break. It is mandatory that a separate Pass-Phrase be created for each Bid-Part. This method of bid-encryption does not have the security and data-integrity related vulnerabilities which are inherent in e-tendering systems which use Public-Key of the specified officer of a Buyer organization for bid-encryption. Bid-encryption in ETS is such that the Bids cannot be decrypted before the Public Online Tender Opening Event (TOE), even if there is connivance between the concerned tender-opening officers of the Buyer organization and the personnel of e-tendering service provider.

CAUTION: All bidders must fill ElectronicForms® for each bid-part sincerely and carefully, and avoid any discrepancy between information given in the ElectronicForms®

and the corresponding Main-Bid. For transparency, the information submitted by a bidder in the ElectronicForms® is made available to other bidders during the Online Public TOE. If it is found during the Online Public TOE that a bidder has not filled in the complete information in the ElectronicForms®, the TOE officer may make available for downloading the corresponding Main-Bid of that bidder at the risk of the bidder. If variation is noted between the information contained in the ElectronicForms® and the ‘Main-Bid’, the contents of the ElectronicForms® shall prevail. Alternatively, the Buyer organization reserves the right to consider the higher of the two pieces of information (eg the higher price) for the purpose of short-listing, and the lower of the two pieces of information (eg the lower price) for the purpose of payment in case that bidder is an awardee in that tender.

Typically, ‘Pass-Phrase’ of the Bid-Part to be opened during a particular Public Online Tender Opening Event (TOE) is furnished online by each bidder during the TOE itself, when demanded by the concerned Tender Opening Officer.

(Optional Text depending upon the decision of the MTNLAdditionally, the bidder shall make sure that the Pass-Phrase to decrypt the relevant Bid-Part is submitted to MTNL Name in a sealed envelope before the start date and time of the Tender Opening Event (TOE).

OR

Additionally, the bidder shall make sure that the Pass-Phrase to decrypt the relevant Bid-Part is submitted into the ‘Time Locked Electronic Key Box (EKB)’ after the corresponding deadline of Bid Submission, and before the commencement of the Online TOE. The process of submission of this Pass-Phrase in the ‘Time Locked Electronic Key Box’ is done in a secure manner by first encrypting this Pass-Phrase with the designated keys provided by the MTNL

133

Page 135: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

There is an additional protection with SSL Encryption during transit from the client-end computer of a Supplier organization to the e-tendering server/ portal.

Public Online Tender Opening Event (TOE) ETS offers a unique facility for ‘Public Online Tender Opening Event (TOE)’. Tender Opening Officers, as well as, authorized representatives of bidders can simultaneously attend the Public Online Tender Opening Event (TOE) from the comfort of their offices. Alternatively, one/ two duly authorized representative(s) of bidders (i.e. Supplier organization) are requested to carry a Laptop with Wireless Internet Connectivity, if they wish to come to MTNL office for the Public Online TOE.

Every legal requirement for a transparent and secure ‘Public Online Tender Opening Event (TOE)’, including digital counter-signing of each opened bid by the authorized TOE-officer(s) in the simultaneous online presence of the participating bidders’ representatives, has been implemented on ETS.

As soon as a Bid is decrypted with the corresponding ‘Pass-Phrase’ as submitted by the bidder himself during the TOE itself or as per alternative methods prescribed in the Tender Documents, salient points of the Bids (as identified by the Buyer organization) are simultaneously made available for downloading by all participating bidders. The tedium of taking notes during a manual ‘Tender Opening Event’ is therefore replaced with this superior and convenient form of ‘Public Online Tender Opening Event (TOE)’.

ETS has a unique facility of ‘Online Comparison Chart’ which is dynamically updated as each online bid is opened. The format of the chart is based on inputs provided by the Buyer for each Bid-Part of a tender. The information in the Comparison Chart is based on the data submitted by the Bidders. A detailed Technical and/ or Financial Comparison Chart enhances Transparency. Detailed instructions are given on relevant screens.

ETS has a unique facility of a detailed report titled ‘Minutes of Online Tender Opening Event (TOE)’ covering all important activities of ‘Online Tender Opening Event (TOE)’. This is available to all participating bidders for ‘Viewing/ Downloading’.

There are many more facilities and features on ETS. For a particular tender, the screens viewed by a Supplier will depend upon the options selected by the concerned Buyer.

134

Page 136: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

SEVEN CRITICAL DO’S AND DON’TS FOR BIDDERS

Specifically for Supplier organizations, the following 'SEVEN KEY INSTRUCTIONS for BIDDERS' must be assiduously adhered to:

1. Obtain individual Digital Signing Certificate (DSC or DC) well in advance of your first tender submission deadline on ETS

2. Register your organization on ETS well in advance of the important deadlines for your first tender on ETS viz ‘Date and Time of Closure of Procurement of Tender Documents’ and ‘Last Date and Time of Receipt of Bids’. Please note that even after acceptance of your registration by the Service Provider, to respond to a tender you will also require time to complete activities related to your organization, such as creation of -- Marketing Authority (MA) [ie a department within the Supplier/ Bidder Organization responsible for responding to tenders], users for one or more such MAs, assigning roles to them, etc. It is mandatory to create at least one MA. This unique feature of creating an MA enhances security and accountability within the Supplier/ Bidder Organization.

3. Get your organization's concerned executives trained on ETS well in advance of your first tender submission deadline on ETS

4. For responding to any particular tender, the tender (ie its Tender Search Code or TSC) has to be assigned to an MA. Further, an ‘Official Copy of Tender Documents’ should be procured/ downloaded before the expiry of Date and Time of Closure of Procurement of Tender Documents. Note: Official copy of Tender Documents is distinct from downloading ‘Free Copy of Tender Documents’. Official copy of Tender Documents is the equivalent of procuring physical copy of Tender Documents with official receipt in the paper-based manual tendering system.

5. Submit your bids well in advance of tender submission deadline on ETS (There could be last minute problems due to internet timeout, breakdown, et al)

6. It is the responsibility of each bidder to remember and securely store the Pass-Phrase for each Bid-Part submitted by that bidder. In the event of a bidder forgetting the Pass-Phrase before the expiry of deadline for Bid-Submission, facility is provided to the bidder to ‘Annul Previous Submission’ from the Bid-Submission Overview page and start afresh with new Pass-Phrase(s)

7. ETS will make your bid available for opening during the Online Public Tender Opening Event (TOE) ‘ONLY IF’ your ‘Status pertaining Overall Bid-Submission’ is ‘Complete’. For your record, you can generate and save a copy of ‘Final Submission Receipt’. This receipt can be generated from 'Bid-Submission Overview Page' only if the ‘Status pertaining overall Bid-Submission’ is ‘Complete’.

NOTE: While the first three instructions mentioned above are especially relevant to first-time users of ETS, the fourth, fifth, sixth and seventh instructions are relevant at all times.

135

Page 137: mtnl.in  · Web viewProviding of Nylon rope and END Cap, Rubber Cock, Coupler along with sealing of pipes. Lifting of cable from the cable store. Transportation of cables, empty

Minimum Requirements at Bidder’s End

Computer System having configuration with minimum Windows 7 or above, and Broadband connectivity Microsoft Internet Explorer 7.0 or aboveDigital Certificate(s)

Vendors Training Program

One day training (10:00 to 17:00) would be provided by TCIL. Training is optional. Vendors are requested to carry a Laptop and Wireless Connectivity to Internet.

Scheduled Date To be filledVenue To be filledVendors Training Charges(Per Participant)

Rs. 3,000/- (plus GST)

************************************************************************