Problem Statement
• Turbidity in Onondaga Creek too high to support species historically present• Sediment load to the creek
from mudboils has been identified as major contributor to turbidity
![Page 3: Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood](https://reader035.vdocument.in/reader035/viewer/2022062804/56649d085503460f949d9c4b/html5/thumbnails/3.jpg)
Goals and Objectives
• Improve Onondanga Creek to support fish species present upstream of the mudboils– Intercept 100% of sediment load from mudboils. • This will protect river ecosystem from ever being
affected by mudboil sediments that increase turbidity
![Page 4: Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood](https://reader035.vdocument.in/reader035/viewer/2022062804/56649d085503460f949d9c4b/html5/thumbnails/4.jpg)
Design Constraints
• Landowner– Honeywell
• Hydrogeology– Unclear
• Environmental• Energy• Cost– Dredging may
be required
![Page 5: Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood](https://reader035.vdocument.in/reader035/viewer/2022062804/56649d085503460f949d9c4b/html5/thumbnails/5.jpg)
Potential Solutions (1)
• One Large Relief Well– Attempt to create mudboil in the existing area to
control source of sediment• “One Well to Rule them All”
• Advantages:• Control source• Easier to design sediment
abatement
• Disadvantages:
• Unclear if control is possible• Low flexibility if other
mudboils appear
![Page 6: Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood](https://reader035.vdocument.in/reader035/viewer/2022062804/56649d085503460f949d9c4b/html5/thumbnails/6.jpg)
Potential Solutions (2)
• Divert Creek around mudboils, Contain mudboils– Build impoundment around entire area– Move creek channel into field adjacent
• Advantages:• Creek avoids sediment loading
(never impacted)• Mudboils potentially capped by
hydraulic head
• Disadvantages:• Expensive
• May create mudboils down gradient
• Creek channel may migrate back to mudboil area
![Page 7: Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood](https://reader035.vdocument.in/reader035/viewer/2022062804/56649d085503460f949d9c4b/html5/thumbnails/7.jpg)
Potential Solutions (3)
• Impoundment around rogue mudboil, Wetland for smaller particle removal, relief wells– Build impoundment around rogue mudboil followed by
wetland– Surround impoundment by relief wells– Construct levee to protect creek
• Advantages:• Protects creek from incoming
sediment• Provides ecological and aesthetic
service• Flexible design
• Disadvantages:
• Storm events could decrease sediment capacity
• Annual dredging required• Large land area required
![Page 8: Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood](https://reader035.vdocument.in/reader035/viewer/2022062804/56649d085503460f949d9c4b/html5/thumbnails/8.jpg)
Design Overview
• Relief Wells assumed to control flow from mudboils to not exceed 400 gpm
• Impoundment designed to contain particles > 4 μm
• Wetland designed to remove smaller particles (< 2 μm)
• Levee high enough to protect creek from storm events
![Page 9: Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood](https://reader035.vdocument.in/reader035/viewer/2022062804/56649d085503460f949d9c4b/html5/thumbnails/9.jpg)
Relief Well Design
• Install 4 relief wells surrounding impoundment berm – 5” diameter with screens excluding sand
size particles– Installing 1 well next to mudboil can
potentially reduce hydraulic head by 15 ft.
– Install wells 20 ft. from mudboil vent to prevent intercepting sediment flow in vent
![Page 10: Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood](https://reader035.vdocument.in/reader035/viewer/2022062804/56649d085503460f949d9c4b/html5/thumbnails/10.jpg)
Impoundment Design (1)
• Dredging is unavoidable– Annual dredging– Design to remove 4
μm particles • Settling velocity of 6
x 10-4 cm/s• 38 hr detention• design driven by
solids dredging annually, not settling time requirements
![Page 11: Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood](https://reader035.vdocument.in/reader035/viewer/2022062804/56649d085503460f949d9c4b/html5/thumbnails/11.jpg)
Impoundment Design (2)
• 35 meter diameter• 6 ft high• 3 feet water level design• walls are 3 foot wide top, 3:1 slope, 13 ft
bottom
![Page 12: Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood](https://reader035.vdocument.in/reader035/viewer/2022062804/56649d085503460f949d9c4b/html5/thumbnails/12.jpg)
Profile View: Impoundment
Mudboil cone
Drains to Wetlands
![Page 13: Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood](https://reader035.vdocument.in/reader035/viewer/2022062804/56649d085503460f949d9c4b/html5/thumbnails/13.jpg)
Wetland Design (1)
• Sheet flow over vegetation to remove particles smaller than 2 μm.
• 155 acres• size driven by solids limit to 2 cm/yr depth• <1 acre needed for solids removal retention
time
![Page 14: Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood](https://reader035.vdocument.in/reader035/viewer/2022062804/56649d085503460f949d9c4b/html5/thumbnails/14.jpg)
Profile View: Wetland
4 % slope
![Page 15: Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood](https://reader035.vdocument.in/reader035/viewer/2022062804/56649d085503460f949d9c4b/html5/thumbnails/15.jpg)
Design Overview
![Page 16: Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood](https://reader035.vdocument.in/reader035/viewer/2022062804/56649d085503460f949d9c4b/html5/thumbnails/16.jpg)
Estimated Cost
• $45,000 based on $15/cu. yd.– Includes berms for access to impoundment and
levee• $5 million for bio-swale– Based on estimated cost per acre of $35,000
![Page 17: Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood](https://reader035.vdocument.in/reader035/viewer/2022062804/56649d085503460f949d9c4b/html5/thumbnails/17.jpg)
Other Considerations• Problem of source too large to contain• Salinity diluted in stream to lower levels
– Salinity in relief wells presumed to decrease (drawing from freshwater aquifer)
– Not included in treatment goal• Snowfall my decrease residence time in winter• Do relief wells control flow from mudboils to below historic high flows?
– Studies on effects of relief wells on mudboil flow should be done• Pilot-scale study on effectiveness of wetland
– Vegetation response to sediment over time– Fine particle removal rates
• Construction should occur in phases– Install relief wells first, allow some time for mudboils to react (1-2 years)– Build levees and impoundment around stabilized mudboils (1-2 years)– Construct wetland, route water from impoundment through wetland (20-
year design life)
![Page 18: Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood](https://reader035.vdocument.in/reader035/viewer/2022062804/56649d085503460f949d9c4b/html5/thumbnails/18.jpg)
Summary
• As designed, sediment load from mudboils intercepted before entering Odondanga Creek– Ecological buffer (wetland) between mudboils and
creek should enhance recovery of fish populations – Levee would prevent resuspension and
conveyance of sediment to creek during storm events
– While dredging required, sediment has astringent qualities that could have market value as a cosmetic product