multi-utility infrastructure management
TRANSCRIPT
Multi-Utility Infrastructure Management update
Industryware Multi-Utility Infrastructure Management Solution for Utilities (Electric,
Fiber, Gas, Water and Sewer)
Industry-specific Infrastructure Management Solutions
6/5/2014 Multi Utility Infrastructure Management Solution 2
Best Practices
Facility Data model (oracle spatial objects)
Fully configured Metadata
Compatible Unit
Custom commands
Business rules
Distribution Network Analysis
Fiber Management
Duct Management
Staking (Streamlines sketching)
Symbology library
Analysis tools
Electric Design Tools
Reports and prints
Solution documentation
Multi-industry
Fully functional application
Rapid implementation
Cost reduction
Configurable to your needs
Ready to go
Fib
er
Industryware Product Goals and Direction
To provide Industryware solutions to improve planning, design, construction
and maintenance productivity and improve the efficiency, reliability and
responsiveness of operations
To Provide a solution to improve design and asset management productivity
by powering user with productivity tools.
To provide a single scalable database solutions for utilities (within a single
database instance, for ease of administration and integration) and can grow
as an organization grows and its needs evolve.
To enable utility customers to easily leverage geospatial asset data through
other applications such as financial, work management and customer
information system (CIS) platforms for maximum ROI.
6/5/2014 Multi Utility Infrastructure Management Solution 3
Material Management
Normalized Compatible Unit (CU) data model
Ready to interface with other work management systems.
It includes information about…– Material assignment
– Job cost estimation
– Bill of material
– Static attribute
– Construction print
6/5/2014 Multi Utility Infrastructure Management Solution 4
Compatible Unit database maintenance interface
• User friendly interface• Add/modify material
• Build/modify CU
• Build/modify Macros
• CU to feature mapping
• Static attribute assignment
6/5/2014 Multi Utility Infrastructure Management Solution 5
CU Engine
Industryware CU Service (IWCUService) The Industryware CU Service is a .NET assembly (DLL)
Graphical interface
Ability to add, replace or delete CU component records
Exploding macros
Static attribute setting
Managed optional repeating component
Metadata driven
6/5/2014 Multi Utility Infrastructure Management Solution 6
CU Engine
Industryware Collect Job CU Service (IWCollectJobCU)
– The Industryware Collect Job CU Service is a .NET assembly (DLL)
– Collect CU data by job
– Returns structure set of CU data by job
– Reporting
– For external system
Industryware Job Report Service (IWJRService)
– The Industryware Job Report Service is a .NET assembly (DLL)
– Report job features with or without workpoint association
– Metadata driven
6/5/2014 Multi Utility Infrastructure Management Solution 7
Staking (Streamlines sketching)
CU integration
Configuration placements
Spatial relationships
Business rules/validation
Repetitive placements
Auto generation of work points
Attribute assignments
6/5/2014 Multi Utility Infrastructure Management Solution 8
Job Cost Estimation (JCE)
Job Cost estimates by activity– Install
– Remove
– Abandoned
– Transfer
Job Cost estimate by category– Labor
– Material
– Equipment
– Overhead
Job level fixed Cost estimate– Labor
– Material
– Equipment
– Overhead
Feature level fixed cost estimates– Additional cost item component
Multiple job estimates– Versioning of job cost estimates
Save and print Job Cost estimates
6/5/2014 Multi Utility Infrastructure Management Solution 9
User Command: Job Cost Estimation (JCE)
6/5/2014 Multi Utility Infrastructure Management Solution 10
User Command: Bill of Material Report
6/5/2014 Multi Utility Infrastructure Management Solution 11
Construction print
Metadata driven construction print
No plotting template required
6/5/2014 Multi Utility Infrastructure Management Solution 12
Electric Design Tool
Secondary Calculator
– Auto Sizing secondary
conductor and transformer
6/5/2014 Multi Utility Infrastructure Management Solution 13
User Command: Up/Down Stream Trace
Up/Down stream network tracing
Load transfer
Network update
Metadata driven
Configurable
6/5/2014 Multi Utility Infrastructure Management Solution 14
User Command: Up/Down Stream Trace Results
Trace results in grid
Sort-able by column
Locate and highlight
Feature count
6/5/2014 Multi Utility Infrastructure Management Solution 15
User Command: Up/Down Stream Trace – Network update
Update network
Metadata driven
6/5/2014 Multi Utility Infrastructure Management Solution 16
User Command: Circuit Validation and Loop detection
Loop detection
6/5/2014 Multi Utility Infrastructure Management Solution 17
User Command: Circuit Validation and Loop detection
Phase mismatch
Circuit mismatch
6/5/2014 Multi Utility Infrastructure Management Solution 18
User Command (Job on Job)
The Job on Job custom command looks in the active Map Window for all of the Design
Areas/Work Areas that touch the active Map Window and display the list of jobs associated
with the Design Areas/Work Areas.
On selecting a one or many jobs in that area user can see features of other job in active job in
read-only mode with attribute available as tooltips.
Temporary geometries representing features from other jobs are listed on the Display Control
by job and can be turn on or off.
6/5/2014 Multi Utility Infrastructure Management Solution 19
Plotting Application
Plot Boundary Placement
– Plot Boundary placement is
used to automate the
placement of boundary
geometries at a predefined
Paper Size, Orientation and
Map Scale
– Multiple Title Block support.
– Displays coverage size in
ground units.
– Predefined or custom scales.
– Place rotated Plot Boundary
by using the Ctrl and/or Shift
keys during placement.
6/5/2014 Multi Utility Infrastructure Management Solution 20
Plotting Application
New Plot Window – Plot Boundary Tab
– The Plot Boundary tab is used to
creating one or more plots from plot
boundaries placed in a given job
– Default or selectable Legend
– Style substitution
– Legend Overrides
– Auto Insertion of the following base on
metadata configuration:
– Grouped Redlines (Title Block, Notes,
etc.)
– Border
– MapFrame with given polygon's content
at the specified scale and map rotation.
– North Arrow
6/5/2014 Multi Utility Infrastructure Management Solution 21
Plotting Application
New Plot Window – User Defined Plot Tab
– The User Defined Plot tab is used in creating a single plot from a number of user inputs. Because
the source data is not being derived from a plot boundary the user is presented with a list of
automatic fields inputs, Default or selectable Legend
6/5/2014 Multi Utility Infrastructure Management Solution 22
Plotting Application
Workspace Plots
– Functionality from the out of the box New Plot Window command was moved to the new
Workspace Plots custom command to support batch operations on workspace plots through the
use of a multi selectable list
6/5/2014 Multi Utility Infrastructure Management Solution 23
Reporting
Select-Set Report
– The Report interface for select set.
– User selected attributes
– Default attribute – metadata driven
6/5/2014 Multi Utility Infrastructure Management Solution 24
Reporting
Graphic Reports– This Report Interface is used to generate Graphic report out of Adhoc Queries.
– It supports Pie chart and 3-D bar charts
– Various features can be configured.
6/5/2014 Multi Utility Infrastructure Management Solution 25
Smart/Green features
Communication tower
6/5/2014 Multi Utility Infrastructure Management Solution 26
Smart/Green features
Interface device
6/5/2014 Multi Utility Infrastructure Management Solution 27
Smart/Green features
Demand response system
6/5/2014 Multi Utility Infrastructure Management Solution 28
Smart/Green features
Power generation unit
6/5/2014 Multi Utility Infrastructure Management Solution 29
Smart/Green features
Energy storage
6/5/2014 Multi Utility Infrastructure Management Solution 30
Smart/Green features
Fiber equipment
6/5/2014 Multi Utility Infrastructure Management Solution 31
Multi-Utility Infrastructure Management Solutions
6/5/2014 Multi Utility Infrastructure Management Solution 32
Fully configured Electric, gas, water, sewer and
fiber data model
Relationship (Connectivity and Ownership)
Life Cycle management
Long-Term Transaction (Optimistic)
CU database Engine
CU database maintenance interface
Staking (Streamlines sketching)
Job Cost Estimation (JCE)
Bill of material report
Construction print
Distribution Network Analysis
Electric Design tools
Pre-configured Analysis tools
Ad Hoc Trace Wizard
Schematics
Pre-configured placement Configurations
Feature Detail Drawings
Pre-configured Assemblies
Pre-configured display controls
User Commands and Automation for
Productivity
Job on Job
Select by fence
Update by fence
Locate feature
Circuit validation and loop detection
Point in area
Modify Vertex
Upstream/Downstream traces
Load transfer and network update
Plotting application
Graphic report
Select set report
Valve isolation report
Customer report
Smart/Green features
Business and validation rules
G/Netviewer ready
G/Mobileviewer ready
Data Model and Functional Specification
document
Test plan template
End User training manual
Install and Remove application (in progress)
Re-Conducting application (planned)
Standard design by job (planned)
G/Technology Database Tuner
Testing results using Tuner Tool on Industryware Multi Utility Solution.
6/5/2014 Multi Utility Infrastructure Management Solution 33
G/Technology Database Tuner
Percent improvement in performance based on testing.
6/5/2014 Multi Utility Infrastructure Management Solution 34
Multi-Utility Infrastructure Management Solutions
6/5/2014 Multi Utility Infrastructure Management Solution 35