multipurpose wood frame week5
DESCRIPTION
Project process selectionTRANSCRIPT
MULTIPURPOSE WOOD FRAME
[ Project process selection ]
-What is your primary process? Why did you choose this process?
MANUFACTURING PROCESS SEQUENCE
-What is your secondary process? Why did you choose this process?
MANUFACTURING PROCESS SEQUENCE
- What is your tertiary process? Why did you choose this process?
MANUFACTURING PROCESS SEQUENCE
Glaze
PRODUCT FUNCTION
-With your selected material, how is your material compatible with product geometry and manufacturing processes?
-What is the normal applied load to the material? Can your material take such load?
-What is the normal ambient conditions to your material?
- With your selected manufacturing process, how is your process compatible with the product geometry?
MANUFACTURING COSTThe material costs per part, cM is
cm=cw*wp(1+a)cw=35 bath/kgwp=0.02kg/parta=ww/wp=0.01/0.02=0.5
cm =(45 bath/kg)x(0.02 kg/part)x(1+0.5)=1.35 bath/part
The processing cost per part, cP is
cp=ct x t
ct=(50 bath/hr)t=(0.5hr/part)
cp=(50 bath/hr)x(0.5hr/part)=2.5 bath/part
total cost per part
C=cm+cp+ct=(1.35 bath/part)+(2.5 bath/part)+(50 bath/hr)=53.85 bath/part
END PRESENTATION