ADDENDUM #2 MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA PDS #J1401 A2-1 ISSUE DATE: September 18, 2014 TOTAL PAGES: 1 (plus attachment) CITY OF HAZELWOOD, MO 1186 TESON ROAD HAZELWOOD, MO 63042 PLANNING DESIGN STUDIO In association with WEBB ENGINEERING SERVICES, INC. 727 NORTH FIRST STREET, SUITE 360 SAINT LOUIS, MO 63102 TO: PROSPECTIVE BIDDERS SUBJECT: MUSICK PARK IMPROVEMENTS RESTROOM & FITNESS AREA 8617 LATTY, AVENUE HAZELWOOD, MO 63385 PDS Project No. J1401 This addendum forms a part of the contract documents and modifies the original bidding documents dated September 8, 2014. Contractor shall acknowledge receipt of this addendum in the space provided on the Bid Form. Failure to do so may subject bidder to disqualification. A. GENERAL 1. Response to Additional Contractor Question(s): Not applicable – There were no additional questions submitted within the time period specified. B. SPECIFICATION REVISIONS 1. Not applicable this addendum. C. DRAWING REVISIONS 1. Not applicable this addendum D. ADDITIONAL ATTACHMENTS To assist bidders in the preparation of their bids, the Manufacturer’s Cut Sheets and Installation Instructions are attached for reference. E. ATTACHMENTS Manufacturer’s Submittal for Fitness System Components (53 pages) END OF ADDENDUM #2

Upload: others

Post on 12-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

ADDENDUM #2

MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA PDS #J1401 A2-1

ISSUE DATE: September 18, 2014 TOTAL PAGES: 1 (plus attachment) CITY OF HAZELWOOD, MO 1186 TESON ROAD HAZELWOOD, MO 63042 PLANNING DESIGN STUDIO In association with WEBB ENGINEERING SERVICES, INC. 727 NORTH FIRST STREET, SUITE 360 SAINT LOUIS, MO 63102 TO: PROSPECTIVE BIDDERS SUBJECT: MUSICK PARK IMPROVEMENTS RESTROOM & FITNESS AREA

8617 LATTY, AVENUE HAZELWOOD, MO 63385 PDS Project No. J1401

This addendum forms a part of the contract documents and modifies the original bidding documents dated September 8, 2014. Contractor shall acknowledge receipt of this addendum in the space provided on the Bid Form. Failure to do so may subject bidder to disqualification. A. GENERAL

1. Response to Additional Contractor Question(s): Not applicable – There were no additional questions submitted within the time period specified.

B. SPECIFICATION REVISIONS

1. Not applicable this addendum.

C. DRAWING REVISIONS

1. Not applicable this addendum D. ADDITIONAL ATTACHMENTS

To assist bidders in the preparation of their bids, the Manufacturer’s Cut Sheets and Installation Instructions are attached for reference.

E. ATTACHMENTS

Manufacturer’s Submittal for Fitness System Components (53 pages)

END OF ADDENDUM #2

Page 2: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

Document #18903300

161437 Intro SignHealthBeat®

18903300

DETAILDIRECT BURY(FITNESS POST)

Concrete

CrushedRock

FitnessFooter

(4) 3/8" x 1 1/8"BHCS w/Pin& 3/8" FlatWashers

(4) 3/8" StandardHex Nuts & 3/8" FlatWashers

18"460

20

" M

in.

51

0

34

"8

60

Intro PostAssembly

DETAILSURFACE MOUNT

Intro PostAssembly

ConcreteCrushedRock

Sign

Intro PostAssembly

53

3/ 4

"1

36

5

5" /130Minimum

(4) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)

(4) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers

GaryPerkins
Rectangle
GaryPerkins
Line
Page 3: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Specifications are subject to change without notice.

HealthBeat® 161437 Intro Sign

J:\INSTSPEC\SPECS\189\18903300.P65

Parts List

Part # Description Qty.160895-00 Fitness Footer, (DB), Specify Color ........................ 1161545-00 Intro Post Assembly, Specify Color ......................... 1

155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8

188103-00 4-Hole (SM) Hardware Package ........................... 1100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 4187933-00 3/8" x 2" Double Expansion Anchor ......................... 4100362-00 3/8" Flat Washer, SST ................................................. 4

SM = Surface MountDB = Direct Bury

Specifications

Post Assembly: Weldment comprised of 1/4" HRPO steel plate and 10"O.D. x 12 GA. (.105" wall) steel tube zinc plated. Fin-ish: ProShield®, color specified. (Post Cap) Fabricatedfrom A356 sand casted aluminum. Finish: ProShield®,silver. (Sign) Digital image is transfered to a .032"thick ProShield coated aluminum plate, then infusedinto the ProShield.

Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.

Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).

Installation Time: (DB) 1 HourWeight: (DB) 86 lbs.

(SM) 56 lbs.Concrete: (DB) Approx. 3 cu.ft.

Installation Instructions

1) (Direct Bury) Dig footing as shown. Refer to the Direct Bury De-tail.

2) (Direct Bury) Attach intro post assembly to fitness footer, using 3/8" x1 1/8" BHCS w/pin with 3/8" flat washers & 3/8" standard hex nuts with3/8" flat washers. Refer to the Direct Bury Detail. Place the intro postassembly in footing hole, and prop in plumb position. With intropost assembly in plumb position, pour concrete footing.

(Surface Mount) With intro post assembly in final position, use acenter punch to mark expansion anchor locations on concrete slabthrough holes in intro post assembly plate.

Move intro post assembly aside and drill 3/4" x 2 1/4" deep holes intoconcrete, using a hammer drill and 3/4" masonry bit. NOTE: Drillholes perpendicular to the work surface. To assure full holding power,do not ream holes or allow the drill to wobble. Verify hole depthafter drilling. Clean holes using compressed air.

Tap double expansion anchors (with threaded end down) into drilledholes. Reposition intro post assembly. Fasten intro post assembly toexpansion anchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flat wash-ers.

Eco #54718 Document 18903300 replaces 17645300. Replaced expansion anchors with double expansionanchors.

GaryPerkins
Rectangle
Page 4: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

Document #18904200

161314 Ab Crunch/Leg LiftHealthBeat®

16132400

Sign

(4) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers

Ab CrunchPost Assembly (2) Attachment

Covers

Ab-CrunchPost Assembly

Sit-Up Footrest

DETAIL

(6) 3/8" x 7/8"BHCS w/Pin &3/8" FlatWashers

Bench

Bench Frame

Bench Frame &Sit-Up Footrest

Sheet 1 of 2

(2) AttachmentCovers

NOTE: Make sure Sit-UpFootrest is level beforetightening fasteners.

Page 5: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

HealthBeat® 161314 Ab Crunch/Leg Lift

J:\INSTSPEC\SPECS\189\18904200.P65

Parts List

Part # Description Qty.160616-00 Bench Frame, (SM), Specify Color ......................... 1160716-00 Bench, Black .............................................................. 1161013-00 Bench Frame, (DB), Specify Color .......................... 1161336-00 Sit-Up Footrest, Specify Color ................................. 1161640-00 Attachment Cover, Silver .......................................... 2160895-00 Fitness Footer, (DB), Specify Color ........................ 1161647-00 Ab-Crunch Post Assembly, Specify Color .............. 1

161668-00 Ab-Crunch/Leg Lift Hardware Package ............ 1100196-00 3/8" x 7/8" BHCS w/Pin, SST ...................................... 6100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100362-00 3/8" Flat Washers, SST ............................................... 6100365-00 3/8" SAE Flat Washer, SST ........................................ 4

155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8

188103-00 4-Hole (SM) Hardware Package ........................... 2100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 8187933-00 3/8" x 2" Double Expansion Anchor ......................... 8100362-00 3/8" Flat Washer, SST ................................................. 8

SM = Surface MountDB = Direct Bury

Specifications

Bench Frame: Weldment comprised of 1.900" O.D. RS20 (.090"-.100" wall) galvanized steel tube, and 3/16" HRPO sheetsteel. Finish: ProShield®, color specified.

Sit-Up/Footrest: Weldment comprised of 1.660" O.D. RS20 (.085"-.095" wall) galvanized steel tube, 1.029" O.D. RS20(.070"-.080" wall), and 3/16" HRPO sheet steel. Fin-ish: ProShield, color specified.

Bench: Rotationally molded from U.V. stabilized linear lowdensity polyethylene, black in color.

Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.

Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver.

Post Assembly: Weldment comprised of 1/4" HRPO steel plate, 1/4"stainless steel plate, and 10" O.D. x 12 GA. (.105"wall) steel tube zinc plated. Finish: ProShield, colorspecified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" thick ProShieldcoated aluminum plate, then infused into the ProShield.

Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).

Installation Time: (DB) 2 man hoursArea

Recommended: 120" x 48" (3,05 m x 1,22 m)Weight: (DB) 133 lbs.

(SM) 104 lbs.Concrete: (DB) Approx. 4.75 cu.ft.

Installation Instructions

1) (Direct Bury) Dig footings spaced as shown. Refer to the Plan View/Footing Layout. Place fitness footer in footing hole. With fitnessfooter in plumb position, pour concrete footing. Allow concrete foot-ing to cure a minimum of 72 hours before attaching post assembly tofitness footer.

2) (Direct Bury) Attach ab/crunch post assembly to fitness footer, using3/8" x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standard hexnuts with 3/8" flat washers. Refer to the Direct Bury Detail.

3) Attach attachment cover and bench frame to Ab-Crunch Post Assem-bly, using 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Refer toDetail.

4) Attach attachment cover and sit-up footrest to Ab-Crunch Post As-sembly, using 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Referto Detail. NOTE: Make sure Sit-Up Footrest is level before tighten-ing fasteners.

5) Attach bench to bench frame, using 3/8" x 7/8" BHCS w/pin & 3/8" flatwashers, as shown.

6) (Direct Bury) With bench frame in plumb position, pour concretefooting. Allow concrete footing to cure a minimum of 72 hours be-fore users are allowed to play on the fitness equipment.

(Surface Mount) With fitness post and bench frame in final posi-tion, use a center punch to mark expansion anchor locations on con-crete slab through holes in fitness post and bench frame plates.

Move fitness post and bench frame aside and drill 3/4" x 2 1/4" deepholes into concrete, using a hammer drill and 3/4" masonry bit. NOTE:Drill holes perpendicular to the work surface. To assure full holdingpower, do not ream holes or allow the drill to wobble. Verify holedepth after drilling. Clean holes using compressed air.

Tap double expansion anchors (with threaded end down) into drilledholes. Reposition fitness post and bench frame. Fasten fitness postand bench frame to expansion anchors, using 3/8" x 2 1/4" BHCS w/pinand 3/8" flat washers.

Specifications are subject to change without notice. Eco #54718 Document 18904200 replaces 17644900. Replaced expansion anchors with double expansionanchors.

GaryPerkins
Rectangle
GaryPerkins
Rectangle
Page 6: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

(8) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)

(8) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers

189031a

Document #18904200

Sheet 2 of 2161314 Ab Crunch/Leg LiftHealthBeat®

DETAILDIRECT BURY

AB-CRUNCH POST ASSEMBLY) DETAILDIRECT BURY(BENCH FRAME)

Concrete

CrushedRock

Fitness Footer

(4) 3/8" x 1 1/8"BHCS w/Pin& 3/8" FlatWashers

(4) 3/8" StandardHex Nuts & 3/8" FlatWashers

Finished Grade

18"460

20

" M

in.

51

0

34

"8

60

14"360

20

" M

in.

51

0

34

"8

60

Finished Grade

Concrete

CrushedRock

BenchFrame

Ab-CrunchPost Assembly

DETAILSURFACE MOUNT

Bench Frame & Ab-CrunchPost Assembly

Concrete CrushedRock

5" /130Minimum

GaryPerkins
Rectangle
GaryPerkins
Line
GaryPerkins
Line
Page 7: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185161314 Ab Crunch/Leg LiftHealthBeat®

161326b

53

3/ 4

"1

36

5

20

3/ 8

"5

17

37

1/ 4

"9

50

66"1680

PLAN VIEW

72"1830

16

5/ 8

"4

22

16

"4

10

Page 8: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

Document #18903400

161316 Assisted Row/Push-UpHealthBeat®

16132600

Sign

(6) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers

Assisted RowPost Assembly

DETAILRAIL ATTACHMENT

(3) AttachmentCovers

(3) Rails

PLAN VIEW

High Rail

Mid Rail

Low Rail

(3) AttachmentCovers

75 1/2"1917

59 7/8"1520

47 7

/ 8"

12

16

52 3

/ 4"

13

40

20 3

/ 4"

52

7 38 3

/ 4"

98

4

Sheet 1 of 2

PLAN VIEW/FOOTING LAYOUT

Assisted RowPost Assembly

53

3 /4"

13

65

Page 9: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Specifications are subject to change without notice.

HealthBeat® 161316 Assisted Row/Push-Up

J:\INSTSPEC\SPECS\189\18903400.P65

Parts List

Part # Description Qty.160717-00 High Rail, (SM), Specify Color ............................... 1160718-00 Mid Rail, (SM), Specify Color ................................. 1160719-00 Low Rail, (SM), Specify Color ................................ 1160731-00 Assisted Row Post Assembly, Specify Color .......... 1160895-00 Fitness Footer (DB), Specify Color ......................... 1160941-00 High Rail, (DB), Specify Color ................................ 1160942-00 Mid Rail, (DB), Specify Color ................................. 1160943-00 Low Rail, (DB), Specify Color ................................. 1161640-00 Attachment Cover, Silver .......................................... 3

155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8

188103-00 4-Hole (SM) Hardware Package ........................... 4100199-00 3/8" x 2 1/4" BHCS w/Pin, SST ................................. 16187933-00 3/8" x 2" Double Expansion Anchor ........................ 16100362-00 3/8" Flat Washer, SST ................................................ 16

161672-00 Assisted Row Hardware Package ......................... 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 6100365-00 3/8" SAE Flat Washers, SST ...................................... 6

SM = Surface MountDB = Direct Bury

Specifications

Rail: Weldment comprised of 1.660" O.D. RS20 (.085"-.095" wall) galvanized steel tube, 3/16" HRPO sheetsteel and 1/4" HRPO sheet steel. Finish: ProShield®,color specified.

Post Assembly: Weldment comprised of 1/4" HRPO steel plate, 1/4"stainless steel plate, and 10" O.D. x 12 GA. (.105"wall) steel tube zinc plated. Finish: ProShield, colorspecified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" thick ProShieldcoated aluminum plate, then infused into the ProShield.

Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver.

Fitness Footer.: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.

Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).

Installation Time: (DB) 2 man hoursArea

Recommended: 168" x 96" (4,27 m x 2,44 m)Weight: (DB) 146 lbs.

(SM) 122 lbs.Concrete: (DB) Approx. 8.25 cu.ft.

Installation Instructions

1) (Direct Bury) Dig footings spaced as shown. Refer to the Plan View/Footing Layout. Place fitness footer in footing hole. With fitnessfooter in plumb position, pour concrete footing. Allow concrete foot-ing to cure a minimum of 72 hours before attaching post assembly tofitness footer.

2) (Direct Bury) Attach Assisted Row Post Assembly to fitness footer,using 3/8" x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standardhex nuts with 3/8" flat washers. Refer to the Direct Bury Detail.

3) Attach attachment covers and rails to assisted row post assembly, us-ing 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Refer to the RailAttachment Detail.

4) (Direct Bury) With rails in plumb position, pour concrete footings.Allow concrete footings to cure a minimum of 72 hours before usersare allowed to play on the fitness equipment.

(Surface Mount) With assisted row post assembly and rails in finalposition, use a center punch to mark expansion anchor locations onconcrete slab through holes in assisted row post assembly and railplates.

Move assisted row post assembly and rails aside and drill 3/4" x 2 1/4"deep holes into concrete, using a hammer drill and 3/4" masonry bit.NOTE: Drill holes perpendicular to the work surface. To assure fullholding power, do not ream holes or allow the drill to wobble. Verifyhole depth after drilling. Clean holes using compressed air.

Tap double expansion anchors (with threaded end down) into drilledholes. Reposition assisted row post assembly and rails. Fasten assistedrow post assembly and rails to expansion anchors, using 3/8" x 2 1/4"BHCS w/pin and 3/8" flat washers.

Eco #54718 Document 18903400 replaces 17645100. Replaced expansion anchors with double expansionanchors.

GaryPerkins
Rectangle
GaryPerkins
Rectangle
Page 10: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

Document #18903400

161316 Assisted Row/Push-UpHealthBeat® Sheet 2 of 2

189031a

DETAILDIRECT BURY

(POST ASSEMBLY)

DETAILDIRECT BURY

(RAILS)

Concrete

CrushedRock

Fitness Footer

(4) 3/8" x 1 1/8"BHCS w/Pin& 3/8" FlatWashers

(4) 3/8" StandardHex Nuts & 3/8" FlatWashers

Finished Grade

18"460

20

" M

in.

51

0

34

"8

60

14"360

20

" M

in.

51

0

34

"8

60

Finished Grade

Concrete

CrushedRock

(3) Rails

Assisted RowPost Assembly

Assisted RowPost Assembly& (3) Rails

DETAILSURFACE MOUNT

ConcreteCrushedRock

5" /130Minimum

(16) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)

(16) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers

GaryPerkins
Rectangle
GaryPerkins
Line
GaryPerkins
Line
Page 11: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

Document #18903500

Sheet 1 of 2161315 Balance StepsHealthBeat®

16132500

(2) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers

Balance/Steps PostAssembly Attachment

Cover

DETAILHANDRAIL ATTACHMENT

Handrail

Handrail

(5) Steps

Balance/Steps PostAssembly

Sign

(20) 3/8" x 7/8" BHCS w/Pin &3/8" Flat Washers

(5) Bases

Page 12: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

161315 Balance StepsHealthBeat®

161325a

PLAN VIEW/FOOTING LAYOUT

75 1/4"1910

TypicalConcreteFooting

17

7 /8"

45

0

21 3/4"552

39 3/4"1009

57 3/4"1466

75 3/4"1923

93 3/4"2381

8 1/4"209

12 1/4"311

16 1/4"412

8 1/4"209

12 1/4"311

53

3 /4"

13

65

50

"1

27

0

24

3 /4"

62

8

104 3/4"2660

Page 13: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

Document #18903500

Sheet 2 of 2161315 Balance StepsHealthBeat®

176456a

DETAILDIRECT BURY(FITNESS POST) DETAIL

DIRECT BURY(HANDRAIL & BASES)

Concrete

CrushedRock

Fitness Footer

(4) 3/8" x 1 1/8"BHCS w/Pin& 3/8" FlatWashers

(4) 3/8" StandardHex Nuts & 3/8" FlatWashers

Finished Grade

18"460

20

" M

in.

51

0

34

"8

60

14"360

20

" M

in.

51

0

34

"8

60

Finished Grade

Concrete

CrushedRock

Handrail &(5) Bases

Balance/StepsPost Assembly

DETAILSURFACE MOUNT

Balance/Steps Post Assembly/Handrail & (5) Bases

CrushedRock

5" /130Minimum

189031a

Concrete

(28) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)

(28) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers

GaryPerkins
Rectangle
GaryPerkins
Line
GaryPerkins
Line
Page 14: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Specifications are subject to change without notice.

HealthBeat® 161315 Balance Steps

J:\INSTSPEC\SPECS\189\18903500.P65

Parts List

Part # Description Qty.160368-00 Handrail, (SM), Specify Color ................................. 1160671-00 6" Base, (SM), Specify Color ................................... 2160670-00 10" Base, (SM), Specify Color ................................. 2160370-00 14" Base, (SM), Specify Color ................................. 1160937-00 6" Base, (DB), Specify Color ................................... 2160938-00 10" Base, (DB), Specify Color ................................. 2160939-00 14" Base, (DB), Specify Color ................................. 1160586-00 Step, Black .................................................................. 5160895-00 Fitness Footer (DB), Specify Color ......................... 1160940-00 Handrail, (DB), Specify Color ................................. 1161640-00 Attachment Cover, Silver .......................................... 1161646-00 Balance/Steps Post Assembly, Specify Color ......... 1

155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8

188103-00 4-Hole (SM) Hardware Package ........................... 7100199-00 3/8" x 2 1/4" BHCS w/Pin, SST ................................. 28187933-00 3/8" x 2" Double Expansion Anchor ........................ 28100362-00 3/8" Flat Washer, SST ................................................ 28

161669-00 Balance/Steps Hardware Package ........................ 1100196-00 3/8" x 7/8" BHCS w/Pin, SST .................................... 20100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 2100362-00 3/8" Flat Washers, SST .............................................. 20100365-00 3/8" SAE Flat Washers, SST ...................................... 2

SM = Surface MountDB = Direct Bury

Specifications

Handrail: Weldment comprised of 1.660" O.D. RS20 (.085"-.095wall) galvanized steel tube, and 3/16" HRPO sheet steel.Finish: ProShield®, color specified.

Step: Rotationally molded from U.V. stabilized linear lowdensity polyethylene, black in color.

Base: Weldment comprised of 1.900" O.D. RS20 (.090"-.100" wall) galvanized steel tube, and 1/4" HRPO sheetsteel. Finish: ProShield, color specified.

Post Assembly: Weldment comprised of 1/4" HRPO steel plate, 1/4"stainless steel plate, and 10" O.D. x 12 GA. (.105"wall) steel tube zinc plated. Finish: ProShield, colorspecified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" thick ProShieldcoated aluminum plate, then infused into the ProShield.

Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver.

Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.

Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).

Installation Time: (DB) 3 man hoursArea

Recommended: 144" x 72" (3,66 m x 1,83 m)Weight: (DB) 172 lbs.

(SM) 146 lbs.Concrete: (DB) Approx. 13.5 cu.ft.

Installation Instructions

1) (Direct Bury) Dig footings spaced as shown. Refer to the Plan View/Footing Layout. Place fitness footer in footing hole. With fitnessfooter in plumb position, pour concrete footing. Allow concrete foot-ing to cure a minimum of 72 hours before attaching post assembly tofitness footer.

2) (Direct Bury) Attach balance/steps post assembly to fitness footer,using 3/8" x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standardhex nuts with 3/8" flat washers. Refer to the Direct Bury Detail.

3) Attach attachment covers and handrail to balance/steps post assem-bly, using 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Refer tothe Handrail Attachment Detail.

4) Attach steps to bases, using 3/8" x 7/8" BHCS w/pin & 3/8" flat washers.

5) (Direct Bury) Place bases and handrail in footing holes. With basesand handrail in plumb position, pour concrete footings. Allow con-crete footings to cure a minimum of 72 hours before users are al-lowed to play on the fitness equipment.

(Surface Mount) With balance/steps post assembly, bases and hand-rail in final position, use a center punch to mark expansion anchorlocations on concrete slab through holes in balance/steps post as-sembly, bases and handrail plates.

Move balance/steps post assembly, bases and handrail aside and drill3/4" x 2 1/4" deep holes into concrete, using a hammer drill and 3/4"masonry bit. NOTE: Drill holes perpendicular to the work surface.To assure full holding power, do not ream holes or allow the drill towobble. Verify hole depth after drilling. Clean holes using compressedair.

Tap double expansion anchors (with threaded end down) into drilledholes. Reposition balance/steps post assembly, bases and handrail.Fasten balance/steps post assembly, bases and handrail to expansionanchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flat washers.

Eco #54718 Document 18903500 replaces 17645000. Replaced expansion anchors with double expansionanchors.

GaryPerkins
Rectangle
GaryPerkins
Rectangle
Page 15: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Document #18903800

161312 Cardio StepperHealthBeat®

16681900

Sheet 1 of 3

(2) Foot Pads

Stepper PostAssembly

(5) AttachmentCovers

StepperFrameAssembly

Shroud Cover

(2) ThreadedPivot Shafts

(2) StepperArms

(8) 3/8" x 7/8"BHCS w/Pin& 3/8" SAEFlat Washers

(6) 5/16" x 7/8"BHCS w/Pin &3/8" SAE FlatWashers

Sign DETAILHANDBAR/FRAME

ATTACHMENT

StepperPostAssembly

(5) AttachmentCovers

Handbar &Frame

(10) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

Handbar

53

3/ 4

"1

36

5

(6) Bumpers

Page 16: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

167483d

161312 Cardio StepperHealthBeat®

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

DETAILSTEPPER ARM ASSEMBLY

Stepper Shaft1" Dia.

Shaft Plate,1" Shaft

3/8" x 3/4"FHCS w/Pin

(2) StepperArms

1 1/2" O.D. x 5 5/16" Lg.Lower Inner PlasticSpacer

NOTE: Align flat on shaftwith flat on shaft plate.

Page 17: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

161312 Cardio StepperHealthBeat®

166819b

(2) StepperArms

DETAILPIVOT SHAFT ATTACHMENT

StepperPivotAssembly

(2) SphericalRod Ends

StepperStop

StepperFrameAssembly

(2) 3/8" x 7/8"BHCS w/Pin &3/8" SAE FlatWashers

Cylinder w/RodEnd

(2) ThreadedPivot Shafts

(2) 5/16" x 7/8"BHCS w/Pin &D Washers

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

Label

Document #18903800

Sheet 2 of 3

StepperPivotAssembly

(4) 1/2" x 20 Jam NUts

DETAILBUMPER ATTACHMENT

(6) Bumpers

StepperFrameAssembly

(4) 3/8" StandardHex Nuts w/ 3/8"SAE FlatWashers

(4) 3/8" x 2"BHCS w/Pin(4) 3/8" SAE FlatWashers

Page 18: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

161312 Cardio StepperHealthBeat®

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

189038a

DETAILSURFACE MOUNT

StepperPost Assembly

Concrete CrushedRock

DETAILDIRECT BURY

Concrete

CrushedRock

Fitness Footer

(4) 3/8" x 1 1/8"BHCS w/Pin3/8" FlatWashers

(4) 3/8" StandardHex Nuts & 3/8" FlatWashers

18"460

20

" M

in.

51

0

34

"8

60

StepperPost Assembly

Finished Grade

PLAN VIEW

43

3/ 4

"11

1118 3/4"476

5" /130Minimum

(4) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)

(4) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers

GaryPerkins
Rectangle
GaryPerkins
Line
GaryPerkins
Line
Page 19: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Parts List

Part # Description Qty.160817-00 Stepper Post Assembly, Specify Color .................... 1182001-00 Stepper Frame Assembly, Specify Color ................. 1162771-00 Stepper Shaft 1" Dia., SST ....................................... 1166652-00 Stepper Arm, Specify Color ...................................... 2166586-00 Threaded Pivot Shaft, Alum. .................................... 2160829-00 Foot Pad, Black .......................................................... 2160834-00 1" O.D. x 14 1/8" Lg. Stepper Stop, Brown ............. 1160835-00 Handbar, Specify Color ............................................. 1160837-00 Shroud Cover, Specify Color .................................... 1160895-00 Fitness Footer, (DB), Specify Color ........................ 1166511-00 Spherical Rod End ..................................................... 2161640-00 Attachment Cover, Silver .......................................... 5162878-00 Shaft Plate, 1" Shaft, Specify Color ........................ 1166463-00 1 1/2" O.D. x 5 5/16" UHMW Spacer ......................... 1

155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8

188103-00 4-Hole (SM) Hardware Package ........................... 1100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 4187933-00 3/8" x 2" Double Expansion Anchor ......................... 4100362-00 3/8" Flat Washer, SST ................................................. 4

173222-00 Cardio Stepper Hardware Package ...................... 1100196-00 3/8" x 7/8" BHCS w/Pin, SST .................................... 10100198-00 3/8" x 1 1/8" BHCS w/Pin, SST ................................. 14100327-00 3/8" Standard Hex Nut, SST ...................................... 8100365-00 3/8" SAE Flat Washers, SST ..................................... 42124911-00 1/2"-20 Hex Jam Nut, SST ......................................... 4132626-00 5/16" x 7/8" BHCS w/Pin, SST .................................... 8166836-00 Bumper ........................................................................ 6148686-00 3/8" x 3/4" FHCS w/Pin, SST ...................................... 1166456-00 D Washer H/B, SST ................................................... 2100173-00 3/8" x 2" BHCS w/Pin, SST ....................................... 4

SM = Surface MountDB = Direct Bury

Specifications

Stepper Arm: Weldment comprised of 1.660" O.D. RS40 (.111" -.121" wall) galvanized steel tube, 7 GA. (.179") HRPOsheet steel, 2.000" O.D. x 1.256" I.D. steel tube and 1/4"HRPO steel sheet. Finish: ProShield®, color specified.

Stepper Pivot: Weldment comprised of 1.500" O.D.x .75" I.D. steeltube, 3/8" HR flat steel and stainless steel threaded stub.Finish: ProShield, color specified.

Cylinder: The cylinder features a 7/8" diameter stainless steelshaft, and a 2 3/4" diameter stainless steel housing. Oil-impregnated bronze bushings are featured on all wear-surfaces.

Handbar: Weldment comprised of 1.660" O.D. RS20 (.085" -.095" wall) galvanized steel tube and 7 GA. (.179")HRPO sheet steel. Finish: ProShield, color specified.

Foot Pad: Rotationally molded from U.V. stabilized linear lowdensity polyethylene, black in color.

Stepper Frame: Weldment comprised of 1.660" O.D. RS20 (.085" -.095" wall) galvanized steel tube and 7 GA. (.179")HRPO sheet steel. Finish: ProShield, color specified.

Shroud Cover: Fabricated from 11 GA. (.120") HRPO sheet steel.Finish: ProShield, color specified.

Stepper Stop: Fabricated from 1" O.D. cold rolled steel. Finish:TenderTuff, brown in color.

Fitness Post: Weldment comprised of 1/4" HRPO steel plate, 1/4"stainless steel plate, and 10" O.D. x 12 GA. (.105"wall) steel tube zinc plated. Finish: ProShield, colorspecified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" thick ProShieldcoated aluminum plate, then infused into the ProShield.

Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver.

Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.

ThreadedPivot Shaft: Fabricated from 1" diameter 2024 aluminum bar,

threaded each end.

StepperBottom Shaft: Fabricated from 3/8" stainless steel plate and 1" stain-

less steel round bar.

Cylinder Shaft: Fabricated from 1/2" stainless steel round bar.

Shaft Plate: Fabricated from 3/8" stainless steel plate.

Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).

Installation Time: (DB) 4 man hoursArea

Recommended: 96" x 60" (2,44 m x 1,52 m)Weight: (DB) 208 lbs.

(SM) 178 lbs.Concrete: (DB) Approx. 3 cu.ft.

Specifications are subject to change without notice.

HealthBeat® 161312 Cardio Stepper

J:\INSTSPEC\SPECS\189\18903800.P65

Document #18903800Sheet 3 of 3

Eco #54718 Document 18903800 replaces 18194300. Replaced expansion anchors with double expansionanchors.

Page 20: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Installation Instructions

1) (Direct Bury) Dig footing as shown. Place fitness footer in footinghole. With fitness footer in plumb position, pour concrete footing.Allow concrete footing to cure a minimum of 72 hours before attach-ing post assembly to fitness footer. Refer to the Direct Bury Detail.

2) (Direct Bury) Attach stepper post assembly to fitness footer, using 3/8" x1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standard hex nutswith 3/8" flat washers. Refer to the Direct Bury Detail.

3) Attach bumpers to frame, using 3/8" x 2" BHCS w/pin with 3/8" SAEflat washers and 3/8"standard hex nuts with 3/8" SAE flat washers, asshown. Refer to the Bumper Attachment Detail.

4) Turn jam nuts onto threaded pivot shafts. Turn (2) spherical rod endsonto threaded pivot shafts. Turn threaded pivot shafts into sphericalrod ends that are attached to stepper arms. NOTE: Do not tightenjam nuts to spherical rod ends at this time.

5) Attach foot pads to stepper arms, using 3/8" x 7/8" BHCS w/pin & 3/8"SAE flat washers.

6) Attach attachment covers and stepper frame to stepper post assem-bly, using 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Refer tothe Handbar/Shroud Attachment Detail.

7) Insert stepper shaft through stepper arms and 1 1/2" O.D. x 5 5/16"long lower inner plastic spacer, as shown. Fasten stepper shaft toshaft plate, using 3/8" x 3/4" FHCS w/pin, as shown. Refer to the Step-per Arm Assembly Detail.

8) Attach stepper arm assembly to stepper frame, using 3/8" x 1 1/8" BHCSw/pin with 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8"SAE flat washers.

9) Attach spherical rod ends to stepper pivot, using 5/16" x 7/8" BHCS w/pin & D washers. Refer to the Pivot Shaft Attachment Detail.

10) Tighten jam nuts to spherical rod ends.

11) Attach stepper stop to frame, using 3/8" x 7/8" BHCS w/pin & 3/8" SAEflat washers, as shown.

12) Attach attachment cover and handbar to stepper post assembly, us-ing 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Refer to theHandbar/Frame Attachment Detail.

13) Attach shroud cover to frame, using 5/16" x 7/8" BHCS w/pin & 3/8"SAE flat washers, as shown.

14) (Surface Mount) With stepper post assembly in final position, use acenter punch to mark expansion anchor locations on concrete slabthrough holes in stepper post assembly plate.

Move stepper post assembly aside and drill 3/4" x 2 1/4" deep holesinto concrete, using a hammer drill and 3/4" masonry bit. NOTE:Drill holes perpendicular to the work surface. To assure full holdingpower, do not ream holes or allow the drill to wobble. Verify holedepth after drilling. Clean holes using compressed air.

Tap double expansion anchors (with threaded end down) into drilledholes. Reposition stepper post assembly. Fasten stepper post assem-bly to expansion anchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flatwashers.

HealthBeat® 161312 Cardio Stepper

Specifications are subject to change without notice.

GaryPerkins
Rectangle
Page 21: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Document #18904100

Sheet 1 of 4161309 Chest/Back PressHealthBeat®

16663200

Chest/BackPostAssembly

Sign

Chest/BackFrame

Hand Bar

Seat

Back Support

Chest/BackFooter

DETAILCHEST/BACK FOOTER

ATTACHMENT

Chest/BackFooter

Chest/BackFrame

(2) 3/8" x 7/8"BHCS w/Pin& 3/8" SAE FlatWashers

(2) 3/8" StandardHex Nuts & 3/8"SAE FlatWashers

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

PLAN VIEW

53

3 /4"

13

65

21

"5

30

40

3/ 8

"1

02

5

30 5/8"777

23 5/8"600

49"1240

38 1/2"977

40 5/8"

1030

Page 22: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

161309 Chest/Back PressHealthBeat®

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

181944c

DETAILHAND BAR ASSEMBLY

DETAILCYLINDER ASSEMBLY

Hand Bar

Shaft PlateCylinder Shaft

Bushing

Bushing

Shaft Plate

Cylinder Shaft

Cylinder w/Rod End

1 1/8" Dia. x 15/16"Spacer

1 1/8" Dia. x 15/16"Spacer

Shaft Plate

(2) .510" I.D.Thrust Washers

Shaft Plate

Page 23: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

161309 Chest/Back PressHealthBeat®

Document #18904100

Sheet 2 of 4

166910a

Chest/BackPost Assembly

Sign

DETAILCHEST/BACK PRESS ASSEMBLY

Chest/BackFrame

Cylinder w/Rod End

Pipebolt

(2) 3/8" x 7/8"BHCS w/Pin &3/8" SAE FlatWashers

(4) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers

CylinderAssembly

(2) 1 1/8" Dia. x 15/16"Spacers

DETAIL

Chest/BackFrameBumper

(2) 3/8" x 7/8"BHCS w/Pinw/ 3/8" SAEFlat Washers

Hand Bar

Label

DETAILBUMPER ATTACHMENT

(SIDE VIEW)

SpacerNut

NOTE: ChestBack frame sidehas been re-moved pictori-ally for clarity.

StopperPlate

(4) 3/8" StandardHex Nuts & 3/8"SAE Flat Washers

Chest/BackFrame

(4) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers

(4) 3/8" StandardHex Nuts & 3/8"SAE Flat Washers

Hand BarAssembly

Chest/BackFrame

5/16" x 1/2"BHCS w/Pin

CylinderSpacer

CylinderPin

Important!Bevel Side

BumperPlate

3/8" x 1" FlatHead CapScrew

Page 24: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

161309 Chest/Back PressHealthBeat®

162976b

DETAILFRAME TO POST

ATTACHMENT DETAILCAP ATTACHMENT

DETAILBACK SUPPORT/SEAT

ATTACHMENT

Chest/BackPost Assembly

Frame

(2) AttachmentCovers

(4) 3/8" x 1 3/8"BHCS w/Pin &3/8" SAE FlatWashers

Frame

Cap

(4) 5/16" x 7/8"BHCS w/Pin

Frame

Back Support

Seat

(4) 3/8" x 7/8"BHCS w/Pin &3/8" SAE FlatWashers

(4) 3/8" x 7/8"BHCS w/Pin &3/8" SAE FlatWashers

(2) AttachmentPlates Chest/Back

Post Assembly

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

Page 25: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

161309 Chest/Back PressHealthBeat®

189041d

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

DETAILDIRECT BURY(FITNESS POST)

DETAILDIRECT BURY

(CHEST/BACK FOOTER)

Concrete

CrushedRock

Fitness Footer

(4) 3/8" x 1 1/8"BHCS w/Pin& 3/8" FlatWashers

(4) 3/8" StandardHex Nuts & 3/8" FlatWashers

Finished Grade

18"460

20

" M

in.

51

0

34

"8

60

14"360

20

" M

in.

51

0

34

"8

60

Finished Grade

Concrete

CrushedRock

Chest/BackFooter

Chest/BackPost Assembly

DETAILSURFACE MOUNT

Chest/BackPost Assembly &Chest/Back Footer

Concrete

CrushedRock

Document #18904100

Sheet 3 of 4

5" /130Minimum

(6) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)

(6) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers

GaryPerkins
Rectangle
GaryPerkins
Line
GaryPerkins
Line
Page 26: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Specifications are subject to change without notice.

Parts List

Part # Description Qty.185819-00 Cylinder w/Rod End .................................................. 1161844-00 Chest/Back Footer, (SM), Specify Color ................ 1161909-00 Chest/Back Footer, (DB), Specify Color ................. 1160586-00 Seat, Black .................................................................. 1160591-00 Back Support, Black .................................................. 1160655-00 Pipebolt, Brown ......................................................... 1166386-00 Hand Bar, Specify Color ........................................... 1178448-00 Shaft Plate, SST ......................................................... 4178447-00 1/2" Dia. Cylinder Shaft, SST .................................... 2162801-00 1 1/8" Dia. x 15/16" Spacer, Alum., Specify Color ..... 2160812-00 Chest/Back Post Assembly, Specify Color .............. 1160895-00 Fitness Footer, (DB), Specify Color ........................ 1161373-00 Chest/Back Cap, Specify Color ................................ 1162908-00 Chest/Back Frame, Specify Color ............................ 1161642-00 Attachment Plate, Specify Color .............................. 2161640-00 Attachment Cover, Silver .......................................... 2

155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8

188103-00 4-Hole (SM) Hardware Package ........................... 1100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 4187933-00 3/8" x 2" Double Expansion Anchor ......................... 4100362-00 3/8" Flat Washer, SST ................................................. 4

188105-00 2-Hole (SM) Hardware Package ........................... 1100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 2187933-00 3/8" x 2" Double Expansion Anchor ......................... 2100362-00 3/8" Flat Washer, SST ................................................. 2

181935-00 Chest/Back Press Hardware Package .................. 1100196-00 3/8" x 7/8" BHCS w/Pin, SST .................................... 14131849-00 5/16" x 1/2" BHCS w/Pin, SST .................................... 1100327-00 3/8" Standard Hex Nut, SST ..................................... 10100365-00 3/8" SAE Flat Washers, SST ..................................... 36113027-00 3/8" x 1 3/8" BHCS w/Pin, SST .................................. 4166616-00 Cylinder Spacer, SST ................................................ 1166630-00 Cylinder Pin, SST ...................................................... 1132626-00 5/16" x 7/8" BHCS w/Pin, SST .................................... 4181870-00 .510 I.D. Thrust Washer, SST ................................... 2100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 8166836-00 Bumper ........................................................................ 1160654-00 Oilite Bushing ............................................................ 2162177-00 Spacer, Aluminum ...................................................... 1166835-00 Bumper Plate, Aluminum .......................................... 1137091-00 3/8" x 1" Flat Head Cap Screw, SST ......................... 1

SM = Surface MountDB = Direct Bury

Specifications

Cylinder: The cylinder features a 7/8" diameter stainless steelshaft, and a 2 3/4" diameter stainless steel housing. Oil-impregnated bronze bushings are featured on all wear-surfaces.

Back Support/Seat: Rotationally molded from U.V. stabilized linear lowdensity polyethylene, black in color.

Frame: Weldment comprised of 7 GA. (.179") HRPO sheetsteel. Finish: ProShield®, color specified.

Cap: Fabricated from 11 GA. (.120") HRPO sheet steel.Finish: ProShield, color specified.

Attachment Plate: Fabricated from 3/16" HRPO steel plate. Finish:ProShield, color specified.

Post Assembly: Weldment comprised of 1/4" HRPO steel plate, 1/4"stainless steel plate, and 10" O.D. x 12 GA. (.105"wall) steel tube zinc plated. Finish: ProShield, colorspecified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" thick ProShieldcoated aluminum plate, then infused into the ProShield.

Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver.

Chest/Back Footer: Weldment comprised of 1.660" O.D. RS20 (.085"-.095" wall) galvanized steel tube, and 1/4" HRPO steelplate. Finish: ProShield, color specified.

Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.

Pipebolt: Fabricated from 1.125" O.D. 6061-T6 Aluminum. Fin-ish: TenderTuff, brown in color.

Spacer: Fabricated from 1.125" O.D. 6061-T6 Aluminum. Fin-ish: ProShield, color specified.

Cylinder Shaft: Fabricated from 1/2" stainless steel round bar.

Shaft Plate: Fabricated from 3/8" stainless steel plate.

Hand Bar: Weldment comprised of 1.660" O.D. RS40 (.111"-.121" wall) galvanized steel tube, 1.500" O.D. x .750I.D. steel tube, 1.315" O.D. RS20 (.080"-.090" wall)galvanized steel tube, 2.375" O.D. RS40 (.130"-.140"wall) galvanized steel tube and 3/16" HRPO sheet steel.Finish: ProShield, color specified.

Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).

Installation Time: (DB) 3 man hoursArea

Recommended: 96" x 72" (2,44 m x 1,83 m)Weight: (DB) 187 lbs.

(SM) 158 lbs.Concrete: (DB) Approx. 4.75 cu.ft.

HealthBeat® 161309 Chest/Back Press

J:\INSTSPEC\SPECS\189\18904100.P65

Eco #54718 Document 18904100 replaces 18582100. Replaced expansion anchors with double expansionanchors.

Page 27: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Specifications are subject to change without notice.

Installation Instructions

1) (Direct Bury) Dig footings as shown. Place fitness footer in footinghole. With fitness footer in plumb position, pour concrete footing.Allow concrete footing to cure a minimum of 72 hours before attach-ing post assembly to fitness footer. Refer to the Direct Bury Detail.

2) (Direct Bury) Attach chest/back post assembly to fitness footer, us-ing 3/8" x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standardhex nuts with 3/8" flat washers. Refer to the Direct Bury Detail.

3) Attach attachment covers, attachment plates and frame to chest/backpost assembly, using 3/8" x 1 3/8" BHCS w/pin & 3/8" SAE flat washers.Refer to the Frame To Post Attachment Detail.

4) Attach chest/back footer to chest/back frame, using 3/8" x 7/8" BHCSw/pin with 3/8" SAE flat washers & 3/8" standard hex nuts with 3/8"SAE flat washers. Refer to the Chest/Back Footer Attachment De-tail.

5) Place pipebolt on the inside of frame and fasten, using 3/8" x 7/8" BHCSw/pin and 3/8" SAE flat washers, as shown. Refer to the Chest/BackPress Assembly Detail.

6) Place spacer behind stopper plate, as shown. Attach bumper plate tostopper plate and spacer using 3/8" x 1" flat head cap screw. Attachbumper to bumper plate, using 3/8" x 7/8" BHCS w/pin and 3/8" SAEflat washers. Refer to the Bumper Attachment Detail.

7) Insert (2) bushings into hand bar attachment tube. Insert cylindershaft through bushings and hand bar attachment tube. Insert cylindershaft into shaft plate slots. Refer to Hand Bar Assembly Detail.

8) Attach hand bar assembly to chest/back frame, using 3/8" x 1 1/8" BHCSw/pin with 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8"SAE flat washers. Refer to Detail.

9) Insert cylinder shaft through spacers, thrust washers and cylinder, asshown. Insert cylinder shaft into shaft plate slots. Refer to CylinderAssembly Detail.

10) Attach cylinder assembly to chest/back frame, using 3/8" x 1 1/8" BHCSw/pin with 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8"SAE flat washers. Refer to Detail.

11) Attach cylinder assembly to hand bar, using cylinder pin, cylinderspacer and 5/16" x 1/2" BHCS w/pin, as shown. Refer to the Chest/Back Press Assembly Detail.

12) Attach cap to the frame, using 5/16" x 7/8" BHCS w/pin, as shown.Refer to the Cap Attachment Detail.

13) Attach back support and seat to frame, using 3/8" x 7/8" BHCS w/pinand 3/8" SAE flat washers, as shown. Refer to the Back Support/SeatAttachment Detail.

HealthBeat® 161309 Chest/Back Press

Document #18904100

Sheet 4 of 4

14) (Direct Bury) With chest/back footer in plumb position, pour con-crete footing. Allow concrete footing to cure a minimum of 72 hoursbefore users are allowed to play on the fitness equipment.

(Surface Mount) With chest/back post assembly and chest/backfooter in final position, use a center punch to mark expansion anchorlocations on concrete slab through holes in chest/back post assem-bly and chest/back plates.

Move chest/back post assembly and chest/back footer aside and drill3/4" x 2 1/4" deep holes into concrete, using a hammer drill and 3/4"masonry bit. NOTE: Drill holes perpendicular to the work surface.To assure full holding power, do not ream holes or allow the drill towobble. Verify hole depth after drilling. Clean holes using compressedair.

Tap double expansion anchors (with threaded end down) into drilledholes. Reposition chest/back post assembly and chest/back footer.Fasten chest/back post assembly and chest/back footer to expansionanchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flat washers.

GaryPerkins
Rectangle
GaryPerkins
Rectangle
Page 28: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Document #18903100

177722 Mobility StationHealthBeat®

18106200

Sheet 1 of 3

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

DETAILRAMP TO PLATFORM

ATTACHMENT

Ramp

(2) 3/8" x 1 1/8"BHCS w/Pinw/ 3/8" SAEFlat Washers

(2) 3/8" StandardHex Nuts 3/8" SAEFlat Washers

Platform

DETAILHANDRAIL TO SUPPORT

ATTACHMENT

(6) Supports

(2) Handrails

(12) 1/4" x 3/16"Drive Rivets

(2) Handrails

PlatformStepLadder

(2) Handrail/Deck Supports

(2) RailSupports #1

Mobility PostAssembly

(2) RailSupports #2

Ramp

DETAILSUPPORT TO RAMP

ATTACHMENT

Ramp

(2) 3/8" x 2 1/2"BHCS w/Pinw/ 3/8" SAEFlat Washers

(2) 3/8" StandardHex Nuts 3/8" SAEFlat Washers

(2) RailSupports #2

DETAILSUPPORT ATTACHMENT

(2) Handrail/Deck Supports

(4) 3/8" x 1 1/8"BHCS w/Pinw/ 3/8" SAEFlat Washers

(4) 3/8" StandardHex Nuts 3/8" SAEFlat Washers

Platform

(12) 3/8" x 1 3/8"BHCS w/Pinw/ 3/8" SAEFlat Washers

(12) 3/8" StandardHex Nuts 3/8" SAEFlat Washers

(2) Ramp FootGuards

Page 29: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

177722 Mobility StationHealthBeat®

181062a

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

PLAN VIEW /FOOTING LAYOUT

ConcreteFooting

Mobility PostAssembly

Ramp

PlatformStep Ladder

114 1/4"290230 1/8"

765

12

1 /1

6"3

06

23

15/ 1

6"6

08

51 /

4"1

33

51 /

4"1

33

60

9 /1

6"1

53

8

122 5/16"3107

22 1/4"565

24

"6

10

Top OfPlatform

Page 30: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

177722 Mobility StationHealthBeat®

189031c

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

Document #18903100

Sheet 2 of 3

Step Ladder

ConcreteFootings

13 1/2"343

10"254

Step Ladder

ConcreteSlab

2" 51

(2) 3/8" StandardHex Nuts w/ 3/8"SAE Flat Washers

Support

34

"8

64

DETAILSURFACE MOUNT

DETAILDIRECT BURY

UnitaryProtectiveTile

Loose FillProtectiveSurfacing

20

"/5

08

Min

imu

m

CrushedRock

CrushedRock

Subgrade

STEP LADDER DETAILS

DETAILSUPPORT TO STEP LADDER

ATTACHMENT

StepLadder

(2) RailSupports #1

(4) 3/8" x 2 1/2"BHCS w/Pinw/ 3/8" SAEFlat Washers

(4) 3/8" StandardHex Nuts 3/8" SAEFlat Washers

DETAILSTEP LADDER TO PLATFORM

ATTACHMENT

StepLadder

Platform

(2) 3/8" x 1 1/8"BHCS w/Pinw/ 3/8" SAEFlat Washers

(2) 3/8" StandardHex Nuts 3/8" SAEFlat Washers

(2) 3/8" x 1 1/8"BHCS w/Pinw/ 3/8" SAEFlat Washers

14"356

(2) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)

(2) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers

GaryPerkins
Rectangle
GaryPerkins
Line
Page 31: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

176456a

DETAILDIRECT BURY

MOBILITY POST ASSEMBLY DETAILDIRECT BURY

(SUPPORTS)

Concrete

CrushedRock

Fitness Footer

(4) 3/8" x 1 1/8"BHCS w/Pin& 3/8" FlatWashers

(4) 3/8" StandardHex Nuts & 3/8" FlatWashers

Finished Grade

18"457

20

" M

in.

51

0

34

"8

60

14"356

20

" M

in.

50

8

34

"8

64

Finished Grade

Concrete

CrushedRock

(4) Supports

Mobility PostAssembly

DETAILSURFACE MOUNT

Supports & MobilityPost Assembly

Concrete CrushedRock

5" /130Minimum

177722 Mobility StationHealthBeat®

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

(12) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)

(12) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers

189031a

GaryPerkins
Rectangle
GaryPerkins
Line
GaryPerkins
Line
Page 32: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

HealthBeat® 177722 Mobility Station

J:\INSTSPEC\SPECS\189\18903100.P65

Parts List

Part # Description Qty.160895-00 Fitness Footer, (DB), Specify Color ........................ 1177027-00 Handrail/Deck Support, SM ..................................... 2177034-00 Mobility Post Assembly, Specify Color .................. 1178247-00 Ramp Foot Guard, Gray ............................................ 2178548-00 Handrail, Specify Color ............................................ 2178809-00 Rail Support #1, Specify Color ................................ 2178814-00 Rail Support #2, SM, Specify Color ........................ 2180038-00 Rail Support #2, DB, Specify Color ........................ 2180688-00 Step Ladder Support, DB, Specify Color ................ 1180840-00 Platform, Gray ............................................................ 1180841-00 Ramp, Gray ................................................................. 1180842-00 Step Ladder, Gray ...................................................... 1180946-00 Handrail/Deck Support, DB, Specify Color ........... 2

155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8

188103-00 4-Hole (SM) Hardware Package ........................... 1100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 4187933-00 3/8" x 2" Double Expansion Anchor ......................... 4100362-00 3/8" Flat Washer, SST ................................................. 4

188105-00 2-Hole (SM) Hardware Package ........................... 5100199-00 3/8" x 2 1/4" BHCS w/Pin, SST ................................. 10187933-00 3/8" x 2" Double Expansion Anchor ........................ 10100362-00 3/8" Flat Washer, SST ................................................ 10

181068-00 Mobility Station Hardware Package .................... 1100174-00 3/8" x 2 1/2" BHCS w/Pin, SST .................................. 6100198-00 3/8" x 1 1/8" BHCS w/Pin, SST ................................. 10100327-00 3/8" Standard Hex Nut, SST ..................................... 28100365-00 3/8" SAE Flat Washer, SST ....................................... 56100609-00 1/4" x 3/16" Drive Rivet, AL/SST .............................. 12113027-00 3/8" x 1 3/8" BHCS w/Pin, SST ................................. 12

SM = Surface MountDB = Direct Bury

Specifications

Handrail/DeckSupport: Weldment comprised of 1.660" (42,16 mm) O.D. RS20

(.085"-.095") (2,16 mm-2,41 mm) wall galvanizedsteel tube, and 1/4" (6,35 mm) HRPO sheet steel. Fin-ish: ProShield®, color specified.

Step Ladder: Weldment comprised of 12 GA (.105") (2,67 mm)HRPO sheet steel conforming to ASTM A1011. Stand-ing surface is 22" (559 mm) wide x 11 5/8" (295,28mm) deep and is perforated with 5/16" (7,94 mm) di-ameter holes. Finish: TenderTuff, gray in color.

Ramp: Weldment comprised of 11 GA (.120") (3,05 mm)HRPO sheet steel and is perforated with 5/16" (7,94mm) diameter holes. Finish: TenderTuff, gray in color.

Platform: Weldment comprised of 11 GA (.120") (3,05 mm)HRPO sheet steel. Standing surface is 22" (559 mm)x 18" (457 mm) and is perforated with 5/16" (7,94 mm)diameter holes. Finish: TenderTuff, gray in color.

Step Ladder Supt.: Weldment comprised of 1.660" (42,16 mm) O.D. RS-20 (.085" - .095") (2,16 mm-2,41 mm) galvanized steeltubing and 1 1/2" (38,1 mm) diameter pipe cap. Finish:ProShield, color specified.

Rail Support #1: Weldment comprised of 1.660" (42,16 mm) O.D. RS20(.085"-.095") (2,16 mm-2,41 mm) wall galvanizedsteel tube, and 1/4" (6,35 mm) HRPO sheet steel. Fin-ish: ProShield, color specified.

Rail Support #2: Fabricated from 1.660" (42,16 mm) O.D. RS20 (.085"-.095") (2,16 mm-2,41 mm) wall galvanized steel tube.Finish: ProShield, color specified.

Handrail: Weldment comprised of 1.660" (42,16 mm) O.D. RS20(.085"-.095") (2,16 mm-2,41 mm) wall galvanizedsteel tube. Finish: ProShield, color specified.

Ramp Foot Guard: Solid color Permalene, gray in color.

Fitness Footer: Weldment comprised of 5.000" (127 mm) O.D. x 11GA. (.120") (3,05 mm) galvanized steel tube and 1/4"(6,35 mm) HRPO steel plate. Finish: ProShield, colorspecified.

Post Assembly: Weldment comprised of 1/4" (6,35 mm) HRPO steelsheet, and 10" (254 mm) O.D. x 12 GA. (.105") (2,67mm) wall steel tube zinc plated. Finish: ProShield,color specified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" (0,81 mm) thickProShield coated aluminum plate, then infused intothe ProShield.

Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).

Installation Time: (DB) 6 man hours(SM) 5 man hours

AreaRecommended: 8' x 15' (2,44 m x 4,57 m)

Weight: (DB) 389 lbs.(SM) 346 lbs.

Concrete: (DB) Approx. 13.63 cu.ft.

Specifications are subject to change without notice.

Document #18903100Sheet 3 of 3

Eco #54718 Document 18903100 replaces 18106200. Replaced expansion anchors with double expansionanchors.

Page 33: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Installation Instructions

1) (Direct Bury) Dig footings spaced as shown. Refer to the Plan View/Footing Layout.

2) Attach step ladder support to step ladder, using 3/8" x 1 1/8" BHCS w/pin with 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8"SAE flat washers. Refer to the Step Ladder Direct Bury Detail.

3) Attach step ladder to platform, using 3/8" x 1 1/8" BHCS w/pin with 3/8"SAE flat washers and 3/8" standard hex nuts with 3/8" SAE flat wash-ers. Refer to the Step Ladder To Platform Attachment Detail.

4) Attach handrail/deck supports to platform, using 3/8" x 1 1/8" BHCS w/pin with 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8"SAE flat washers. Refer to the Support Attachment Detail.

5) Stand assembly in upright position, and place step ladder support andhandrail/deck supports in footing holes. Attach ramp to platform, us-ing 3/8" x 1 1/8" BHCS w/pin with 3/8" SAE flat washers and 3/8" stan-dard hex nuts with 3/8" SAE flat washers. Refer to the Ramp To Plat-form Attachment Detail.

6) Attach rail supports #1 to step ladder, using 3/8" x 2 1/2" BHCS w/pinwith 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8" SAEflat washers. Refer to the Support To Step Ladder Attachment Detail.

7) Attach rail supports #2 to ramp, using 3/8" x 2 1/2" BHCS w/pin with 3/8"SAE flat washers and 3/8" standard hex nuts with 3/8" SAE flat wash-ers. Refer to the Support To Ramp Attachment Detail.

8) Place handrails onto supports. Drill 1/4" holes through supports us-ing the predrilled 1/4" holes in handrails as a guide. Insert 1/4" x 3/16"drive rivets into drilled holes and tap pin in until it is flush with rivethead. Refer to the Handrail To Support Attachment Detail.

9) Attach ramp foot guards to ramp, using 3/8" x 1 3/8" BHCS w/pin with3/8" SAE flat washers and 3/8" standard hex nuts with 3/8" SAE flatwashers, as shown.

10) Attach fitness footer to mobility post assembly, using 3/8" x 1 1/8" BHCSw/pin with 3/8" flat washers and 3/8" standard hex nuts with 3/8" flatwashers. Place mobility post assembly in footing hole, and turn inproper direction. Refer to the Direct Bury Detail.

11) With post assembly and supports in plumb position, pour concretefootings. Allow concrete footing to cure a minimum of 72 hours be-fore users are allowed to play on the fitness equipment.

HealthBeat® 177722 Mobility Station

1) (Surface Mount) Attach step ladder to platform, using 3/8" x 1 1/8"BHCS w/pin with 3/8" SAE flat washers and 3/8" standard hex nutswith 3/8" SAE flat washers. Refer to the Step Ladder To PlatformAttachment Detail.

2) Attach handrail/deck supports to platform, using 3/8" x 1 1/8" BHCS w/pin with 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8"SAE flat washers. Refer to the Support Attachment Detail.

3) Stand assembly in upright position. Attach ramp to platform, using 3/8" x1 1/8" BHCS w/pin with 3/8" SAE flat washers and 3/8" standard hexnuts with 3/8" SAE flat washers. Refer to the Ramp To Platform At-tachment Detail.

4) Attach rail supports #1 to step ladder, using 3/8" x 2 1/2" BHCS w/pinwith 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8" SAEflat washers. Refer to the Support To Step Ladder Attachment Detail.

5) Attach rail supports #2 to ramp, using 3/8" x 2 1/2" BHCS w/pin with 3/8"SAE flat washers and 3/8" standard hex nuts with 3/8" SAE flat wash-ers. Refer to the Support To Ramp Attachment Detail.

6) Place handrails onto supports. Drill 1/4" holes through supports us-ing the predrilled 1/4" holes in handrails as a guide. Insert 1/4" x 3/16"drive rivets into drilled holes and tap pin in until it is flush with rivethead. Refer to the Handrail To Support Attachment Detail.

7) Attach ramp foot guards to ramp, using 3/8" x 1 3/8" BHCS w/pin with3/8" SAE flat washers and 3/8" standard hex nuts with 3/8" SAE flatwashers, as shown.

8) (Post/Supports/Step Ladder) With Mobility Station in proper posi-tion, use a center punch to mark expansion anchor locations on con-crete slab through holes in post assembly plate, support plates andstep ladder.

Move Mobility Station aside and drill 3/4" x 2 1/4" deep holes intoconcrete, using a hammer drill and 3/4" masonry bit. NOTE: Drillholes perpendicular to the work surface. To assure full holding power,do not ream holes or allow the drill to wobble. Verify hole depthafter drilling. Clean holes using compressed air.

Tap double expansion anchors (with threaded end down) into drilledholes. Reposition Mobility Station. Fasten Mobility Station to expan-sion anchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flat washers.

GaryPerkins
Rectangle
Page 34: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

Document #18903700

161317 PlyometricsHealthBeat®

16132700

PlyometricsPost Assembly

(18) 3/8" x 7/8"BHCS w/Pin & 3/8"Flat Washers

(3) Benches

PLAN VIEW/FOOTING LAYOUT

24"610

38 1/2"977

57 1/2"1461

24

"6

10

24

"6

10

48

"1

22

091 /

2"2

41

12

"3

00

16

"4

10

8"

20

0

Sheet 1 of 2

Typical ConcreteFooting

(3) Frames

Sign

53

3 /4"

13

65

64

"1

63

0

69"1750

91 /

2"2

41

Page 35: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Specifications are subject to change without notice.

HealthBeat® 161317 Plyometrics

J:\INSTSPEC\SPECS\189\18903700.P65

Parts List

Part # Description Qty.160716-00 Bench, Black .............................................................. 3160895-00 Fitness Footer, (DB), Specify Color ........................ 1161273-00 14" Plyometrics Frame, (SM), Specify Color ......... 1161274-00 10" Plyometrics Frame, (SM), Specify Color ......... 1161275-00 6" Plyometrics Frame, (SM), Specify Color ........... 1161445-00 14" Plyometrics Frame, (DB), Specify Color ......... 1161446-00 10" Plyometrics Frame, (DB), Specify Color ......... 1161447-00 6" Plyometrics Frame, (DB), Specify Color ........... 1161645-00 Plyometrics Post Assembly, Specify Color ............. 1

155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8

188103-00 4-Hole (SM) Hardware Package ........................... 7100199-00 3/8" x 2 1/4" BHCS w/Pin, SST ................................. 28187933-00 3/8" x 2" Double Expansion Anchor ........................ 28100362-00 3/8" Flat Washer, SST ................................................ 28

161674-00 Plyometrics Hardware Package ............................ 1100196-00 3/8" x 7/8" BHCS w/Pin, SST .................................... 18100362-00 3/8" Flat Washers, SST .............................................. 18

SM = Surface MountDB = Direct Bury

Specifications

Frame: Weldment comprised of 2.375" O.D. RS20 (.095"-.105" wall) galvanized steel tube and 1/4" HRPO sheetsteel. Finish: ProShield®, color specified.

Bench: Rotationally molded from U.V. stabilized linear lowdensity polyethylene, black in color.

Post Assembly: Weldment comprised of 1/4" HRPO steel plate and 10"O.D. x 12 GA. (.105" wall) steel tube zinc plated. Fin-ish: ProShield, color specified. (Post Cap) Fabricatedfrom A356 sand casted aluminum. Finish: ProShield,silver. (Sign) Digital image is transfered to a .032"thick ProShield coated aluminum plate, then infusedinto the ProShield.

Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.

Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).

Installation Time: (DB) 3 man hoursArea

Recommended: 96" x 96" (2,44 m x 2,44 m)Weight: (DB) 246 lbs.

(SM) 208 lbs.Concrete: (DB) Approx. 13.5 cu.ft.

Installation Instructions

1) (Direct Bury) Dig footings spaced as shown. Refer to the Plan View/Footing Layout. Place fitness footer in footing hole. With fitnessfooter in plumb position, pour concrete footing. Allow concrete foot-ing to cure a minimum of 72 hours before attaching post assembly tofitness footer.

2) (Direct Bury) Attach plyometrics post assembly to fitness footer, us-ing 3/8" x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standardhex nuts with 3/8" flat washers. Refer to the Direct Bury Detail.

3) Attach plyometrics frames to benches, using 3/8" x 7/8" BHCS w/pin &3/8" flat washers, as shown.

4) (Direct Bury) Place plyometrics frames in footing holes, and prop inplumb position. With plyometrics frames in plumb position, pourconcrete footings. Allow concrete footings to cure a minimum of 72hours before users are allowed to play on the fitness equipment.

(Surface Mount) With plyometrics post assembly and plyometricsframes in final position, use a center punch to mark expansion an-chor locations on concrete slab through holes in plyometrics postassembly and plyometrics frame plates.

Move plyometrics post assembly and plyometrics frames aside anddrill 3/4" x 2 1/4" deep holes into concrete, using a hammer drill and 3/4"masonry bit. NOTE: Drill holes perpendicular to the work surface.To assure full holding power, do not ream holes or allow the drill towobble. Verify hole depth after drilling. Clean holes using compressedair.

Tap double expansion anchors (with threaded end down) into drilledholes. Reposition plyometrics post assembly and plyometrics frames.Fasten plyometrics post assembly and plyometrics frames to expan-sion anchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flat washers.

Eco #54718 Document 18903700 replaces 17645200. Replaced expansion anchors with double expansionanchors.

GaryPerkins
Rectangle
GaryPerkins
Rectangle
Page 36: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

Document #18903700

161317 PlyometricsHealthBeat® Sheet 2 of 2

DETAILDIRECT BURY(FITNESS POST) DETAIL

DIRECT BURY(BENCH FRAMES)

Concrete

CrushedRock

FitnessFooter

(4) 3/8" x 1 1/8"BHCS w/Pin& 3/8" FlatWashers

(4) 3/8" StandardHex Nuts & 3/8" FlatWashers

Finished Grade

18"460

20

" M

in.

51

0

34

"8

60

14"360

20

" M

in.

51

0

34

"8

60

Finished Grade

Concrete

CrushedRock

(3) BenchFrames

Plyometrics PostAssembly

DETAILSURFACE MOUNT

Plyometrics Post Assembly& (3) Bench Frames

Concrete CrushedRock

5" /130Minimum

(28) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)

(28) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers

189031a

GaryPerkins
Rectangle
GaryPerkins
Line
GaryPerkins
Line
Page 37: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

Document #18903900

161313 Pull-Up/DipHealthBeat®

16132300

Sign

(8) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers

Pull-Up/DipPost Assembly

DETAILPULL-UP/DIP BAR

ATTACHMENT

Pull-Up/Dip Bar

Pull-Up/DipBar

80

3 /8"

20

41

(4) AttachmentCovers

Sheet 1 of 2

Pull-Up/DipPost Assembly

53

3 /4"

13

65

(4) AttachmentCovers

DETAILTOP VIEW

42

1 /4"

10

73

35"890

Page 38: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Specifications are subject to change without notice.

HealthBeat® 161313 Pull-Up/Dip

J:\INSTSPEC\SPECS\189\18903900.P65

Parts List

Part # Description Qty.160621-00 Pull-Up/Dip Bar, Specify Color ............................... 1160771-00 Pull-Up/Dip Post Assembly, Specify Color ............ 1160895-00 Fitness Footer, (DB), Specify Color ........................ 1161640-00 Attachment Covers, Silver ........................................ 4

155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8

188103-00 4-Hole (SM) Hardware Package ........................... 1100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 4187933-00 3/8" x 2" Double Expansion Anchor ......................... 4100362-00 3/8" Flat Washer, SST ................................................. 4

161667-00 Pull-Up/Dip Hardware Package ........................... 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 8100365-00 3/8" SAE Flat Washers, SST ...................................... 8

SM = Surface MountDB = Direct Bury

Specifications

Pull-Up/Dip Bar: Weldment comprised of 1.660" O.D. RS40 (.111"-.121" wall) galvanized steel tube, and 3/16" HRPO sheetsteel. Finish: ProShield®, color specified.

Post Assembly: Weldment comprised of 1/4" HRPO steel plate, 1/4"stainless steel plate, and 10" O.D. x 12 GA. (.105"wall) steel tube zinc plated. Finish: ProShield, colorspecified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" thick ProShieldcoated aluminum plate, then infused into the ProShield.

Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver.

Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.

Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).

Installation Time: (DB) 2 man hoursArea

Recommended: 84" x 60" (2,13 m x 1,52 m)Weight: (DB) 136 lbs.

(SM) 106 lbs.Concrete: (DB) Approx. 3 cu.ft.

Installation Instructions

1) (Direct Bury) Dig footing as shown. Place fitness footer in footinghole. With fitness footer in plumb position, pour concrete footing.Allow concrete footing to cure a minimum of 72 hours before attach-ing post assembly to fitness footer. Refer to the Direct Bury Detail.

2) (Direct Bury) Attach pull-up/dip post assembly to fitness footer, us-ing 3/8" x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standardhex nuts with 3/8" flat washers. Refer to the Direct Bury Detail.

3) Attach attachment covers and pull-up/dip bar to pull-up/dip post as-sembly, using 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Referto the Pull-Up/Dip Bar Attachment Detail.

4) (Surface Mount) With pull-up/dip post assembly in final position,use a center punch to mark expansion anchor locations on concreteslab through holes in pull-up/dip post assembly plate.

Move pull-up/dip post assembly aside and drill 3/4" x 2 1/4" deep holesinto concrete, using a hammer drill and 3/4" masonry bit. NOTE:Drill holes perpendicular to the work surface. To assure full holdingpower, do not ream holes or allow the drill to wobble. Verify holedepth after drilling. Clean holes using compressed air.

Tap double expansion anchors (with threaded end down) into drilledholes. Reposition pull-up/dip post assembly. Fasten pull-up/dip postassembly to expansion anchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8"flat washers.

Eco #54718 Document 18903900 replaces 17644800. Replaced expansion anchors with double expansionanchors.

GaryPerkins
Rectangle
Page 39: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

Document #18903900

161313 Pull-Up/DipHealthBeat® Sheet 2 of 2

189039d

DETAILSURFACE MOUNT

Pull-Up/DipPost Assembly

Concrete CrushedRock

DETAILDIRECT BURY

Concrete

CrushedRock

Fitness Footer

(4) 3/8" x 1 1/8"BHCS w/Pin3/8" FlatWashers

(4) 3/8" StandardHex Nuts & 3/8" FlatWashers

18"460

20

" M

in.

51

0

34

"8

60

Pull-Up/DipPost Assembly

Finished Grade

5" /130Minimum

(4) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)

(4) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers

GaryPerkins
Rectangle
GaryPerkins
Line
Page 40: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Document #18903600

Sheet 1 of 4161310 Squat PressHealthBeat®

16297700

Sign

Squat PostAssembly

ShroudCover

Squat Frame

(3) AttachmentCovers

Frame Plate

(2) Shoulder PadsShoulder Bar

Cylinder

PLAN VIEW

43

7/ 1

6"11

03

66

1/ 1

6"1

67

7

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-31855

53

3/ 4

"1

36

5

61 1/4"1555

20

1/ 4

"5

14

Page 41: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

161310 Squat PressHealthBeat®

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-31855

DETAILSHOULDER BAR ASSEMBLY

DETAILCYLINDER ASSEMBLY

Shoulder Bar

Shaft PlateBushing(New)

Bushing

Cylinder w/Rod

1 1/8" Dia. x 15/16"Spacer1 1/8" Dia. x 15/16"

Spacer

Cylinder Shaft

Shaft Plate

Shaft Plate

Shaft Plate

Cylinder Shaft

(2) .510" I.D.Thrust Washers

Page 42: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

161310 Squat PressHealthBeat®

166633a

DETAILSQUAT PRESS ASSEMBLY

Sign

Shoulder Bar

Squat PostAssembly

Squat Frame

(3) AttachmentCovers

Cylinder

(2) 1 1/8" O.D. x 15/16"Spacers

FramePlate

(2) 3/8" x 7/8"BHCS w/Pin &3/8" SAE FlatWashers

Pipebolt

Shoulder BarAttachment Tube

Label

Document #18903600

Sheet 2 of 4

(4) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers

(4) 3/8" StandardHex Nuts & 3/8"SAE Flat Washers

(4) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers

(4) 3/8" StandardHex Nuts & 3/8"SAE Flat Washers

5/16" x 1/2"BHCS w/Pin

CylinderSpacer

CylinderPin

Page 43: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

161310 Squat PressHealthBeat®

162977b

(2) ShoulderPads

Shoulder Bar

Shroud Cover

DETAILSHOULDER PAD/SHROUD COVER

ATTACHMENT

(4) 5/16" x 7/8" BHCS w/Pin &3/8" SAE Flat Washers

(2) 3/8" x 1 1/8"BHCS w/Pin

Squat Frame

(2) 5/8" FlatWashers

(2) 3/8" FlatWashers

DETAILSQUAT FRAME TO POST

ATTACHMENT

Squat PostAssembly

(6) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers

(3) AttachmentCovers

Squat Frame

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

(3) AttachmentCovers

(2) 5/8" O.D. x 3/8"Bushings

Page 44: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

189036d

DETAILSURFACE MOUNT

Squat PostAssembly

ConcreteCrushedRock

DETAILDIRECT BURY

Concrete

CrushedRock

Fitness Footer

(4) 3/8" x 1 1/8"BHCS w/Pin3/8" FlatWashers

(4) 3/8" StandardHex Nuts & 3/8" FlatWashers

18"460

20

" M

in.

51

0

34

"8

60

Squat PostAssembly

Finished Grade

161310 Squat PressHealthBeat®

Document #18903600

Sheet 3 of 4

5" /130Minimum

(4) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)

(4) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers

GaryPerkins
Rectangle
GaryPerkins
Line
Page 45: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Specifications are subject to change without notice.

HealthBeat® 161310 Squat Press

Parts List

Part # Description Qty.185819-00 Cylinder ....................................................................... 1178448-00 Shaft Plate, SST. ........................................................ 4160614-00 Shoulder Pad, Black .................................................. 2162912-00 Squat Frame, Specify Color ...................................... 1166389-00 Shoulder Bar, Specify Color ..................................... 1160655-00 Pipebolt, Brown ......................................................... 1160657-00 Shroud Cover, Specify Color .................................... 1160659-00 Squat Post Assembly, Specify Color ........................ 1178447-00 1/2" Dia. Cylinder Shaft, SST .................................. 2162801-00 1 1/8" Dia. x 15/16" Spacer, Aluminum ....................... 2160895-00 Fitness Footer, (DB), Specify Color ........................ 1161640-00 Attachment Cover, Silver .......................................... 3

155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8

188103-00 4-Hole (SM) Hardware Package ........................... 1100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 4187933-00 3/8" x 2" Double Expansion Anchor ......................... 4100362-00 3/8" Flat Washer, SST ................................................. 4

181939-00 Squat Press Hardware Package ............................ 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST ................................. 16131849-00 5/16" x 1/2" BHCS w/Pin, SST .................................... 1100365-00 3/8" SAE Flat Washers, SST ..................................... 28166616-00 Cylinder Spacer, SST ................................................ 1166630-00 Cylinder Pin, SST ...................................................... 1100366-00 5/8" Flat Washer, SST ................................................. 2127179-00 5/8" O.D. x 3/8" Bushing, SST .................................... 2100196-00 3/8" x 7/8" BHCS w/Pin, SST ..................................... 2160654-00 Oilite Bushing ............................................................ 2100362-00 3/8" Flat Washers, SST ............................................... 2132626-00 5/16" x 7/8" BHCS w/Pin, SST .................................... 4181870-00 .510 I.D. Thrust Washer, SST ................................... 2100327-00 3/8" Standard Hex Nut, SST ...................................... 8

SM = Surface MountDB = Direct Bury

Specifications

Squat Frame: Weldment comprised of 1.660" O.D. SCH 40 (.140"wall) steel pipe and 3/16" HRPO sheet steel. Finish:ProShield®, color specified.

Cylinder: The cylinder features a 7/8" diameter stainless steelshaft, and a 2 3/4" diameter stainless steel housing. Oil-impregnated bronze bushings are featured on all wear-surfaces.

Shoulder Pad: Rotationally molded from U.V. stabilized EVA (ethylvinyl acetate) and high density polyethylene, black incolor.

Shroud Cover: Fabricated from 11 GA. (.120") HRPO sheet steel.Finish: ProShield, color specified.

Post Assembly: Weldment comprised of 1/4" HRPO steel plate, 1/4"stainless steel plate, and 10" O.D. x 12 GA. (.105"wall) steel tube zinc plated. Finish: ProShield, colorspecified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" thick ProShieldcoated aluminum plate, then infused into the ProShield.

Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver.

Shoulder Bar: Weldment comprised of 1.660" O.D. RS40 (.111"-.121" wall) galvanized steel tube, 1.900" O.D. RS40(.120"-.130" wall) galvanized steel tube, 3/16" sheetHRPO steel, .750" I.D. x 1.500 " O.D. steel tube and203 or 303 stainless steel welded inserts with 3/8" in-ternal threads. Finish: ProShield, color specified.

Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.

Pipebolt: Fabricated from 1.125" O.D. 6061-T6 Aluminum. Fin-ish: TenderTuff, Brown in color.

Cylinder Shaft: Fabricated from 1/2" stainless steel round bar.

Shaft Plate: Fabricated from 3/8" stainless steel plate.

Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).

Installation Time: (DB) 3 man hoursArea

Recommended: 108" x 48" (2,74 m x 1,22 m)Weight: (DB) 173 lbs.

(SM) 143 lbs.Concrete: (DB) Approx. 3 cu.ft.

Eco #54718 Document 18903600 replaces 18582200. Replaced expansion anchors with double expansionanchors.

Page 46: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Specifications are subject to change without notice.

HealthBeat® 161310 Squat Press

Installation Instructions

1) (Direct Bury) Dig footing spaced as shown. Refer to the Plan View/Footing Layout. Place fitness footer in footing hole. With fitnessfooter in plumb position, pour concrete footing. Allow concrete foot-ing to cure a minimum of 72 hours before attaching post assembly tofitness footer. Refer to the Direct Bury Detail.

2) (Direct Bury) Attach squat post assembly to fitness footer, using 3/8"x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standard hex nutswith 3/8" flat washers. Refer to the Direct Bury Detail.

3) Attach squat frame and attachment covers to squat post assembly, us-ing 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Refer to theSquat Frame To Post Attachment Detail.

4) Place pipebolt on the inside of frame and fasten using 3/8" x 7/8" BHCSw/pin and 3/8" SAE flat washers, as shown.

5) Insert (2) bushings into shoulder bar attachment tube. Insert cylindershaft through bushings and shoulder bar attachment tube. Insert cyl-inder shaft into shaft plate slots. Refer to Shoulder Bar AssemblyDetail.

6) Attach shoulder bar assembly to squat frame, using 3/8" x 1 1/8" BHCSw/pin with 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8"SAE flat washers. Refer to Detail.

7) Insert cylinder shaft through spacers, thrust washers and cylinder, asshown. Insert cylinder shaft into shaft plate slots. Refer to CylinderAssembly Detail.

8) Attach cylinder assembly to squat frame, using 3/8" x 1 1/8" BHCS w/pinwith 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8" SAEflat washers. Refer to Detail.

9) Attach cylinder assembly to shoulder bar, using cylinder pin, cylin-der spacer and 5/16" x 1/2" BHCS w/pin, as shown. Refer to Detail.

10) Attach shroud cover to frame, using 5/16" x 7/8" BHCS w/pin and 3/8"SAE flat washers, as shown. Refer to the Shoulder Pad/Shroud CoverAttachment Detail.

11) Slide shoulder pads onto shoulder bar, and fasten using 5/8" O.D. x 3/8"bushings, 3/8" x 1 1/8" BHCS w/pin, 5/8" flat washers and 3/8" flat wash-ers, as shown. Refer to the Shoulder Pad/Shroud Cover AttachmentDetail.

12) (Surface Mount) With squat post assembly in final position, use acenter punch to mark expansion anchor locations on concrete slabthrough holes in squat post assembly plate.

Move squat post assembly aside and drill 3/4" x 2 1/4" deep holes intoconcrete, using a hammer drill and 3/4" masonry bit. NOTE: Drillholes perpendicular to the work surface. To assure full holding power,do not ream holes or allow the drill to wobble. Verify hole depthafter drilling. Clean holes using compressed air.

Tap double expansion anchors (with threaded end down) into drilledholes. Reposition squat post assembly. Fasten squat post assembly toexpansion anchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flat wash-ers.

Document #18903600

Sheet 4 of 4

J:\INSTSPEC\SPECS\189\18903600.P65

GaryPerkins
Rectangle
Page 47: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Document #18903200

177723 Stretch StationHealthBeat®

18106300

Sheet 1 of 3

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

Stretch StationPost Assembly

DETAILFOOT PAD ATTACHMENT

(2) Foot Pads

SwivelAssembly

SwivelAssembly

(2) Foot Pads

HandleAssembly

Upright PostAssembly

Top Rail

Upright StraightPost(Direct Bury Only)

DETAILTOP RAIL ATTACHMENT

Upright Post Assembly& Upright Straight Post

Top Rail(4) 1/4" x 3/8"Drive Rivets

DETAIL

(8) 3/8" x 1 1/8"BHCS w/Pinw/ 3/8" SAEFlat Washers

Stretch StationPost Assembly

(4) AttachmentCovers

HandleAssembly &UprightPostAssembly

(8) 3/8" x 7/8"BHCS w/Pinw/ 3/8" SAEFlat Washers

(4) 1/4" x 3/16"Drive RivetsGround Pipe

Assembly

Page 48: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

177723 Stretch StationHealthBeat®

181063a

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

PLAN VIEW /FOOTING LAYOUT

ConcreteFooting

29"737

27

1/ 8

"6

89

82 3/8"2092

10 11/16"271

69

3 /1

6"1

75

7

95

15/ 1

6"2

43

7

7 11/16"195

121 1/8"3077

71

"1

80

3

SwivelAssembly

Foot Pads

HandleAssembly

Upright PostAssembly

Top Rail

UprightStraightPost

Stretch StationPost Assembly

Page 49: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

176456a

DETAILDIRECT BURY

STRETCH STATION POST ASSEMBLY DETAILDIRECT BURY

(GROUND PIPE & POST)

Concrete

CrushedRock

Fitness Footer

(4) 3/8" x 1 1/8"BHCS w/Pin& 3/8" FlatWashers

(4) 3/8" StandardHex Nuts & 3/8" FlatWashers

Finished Grade

18"457

20

" M

in.

50

8

34

"8

60

14"356

20

" M

in.

50

8

34

"8

64

Finished Grade

Concrete

CrushedRock

Stretch Station PostAssembly

DETAILSURFACE MOUNT

Swivel Assembly & Mobility PostAssembly

Concrete CrushedRock

5" /127Minimum

177723 Stretch StationHealthBeat®

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185

Document #18903200

Sheet 2 of 3

189032c

Ground PipeAssembly(Shown) &Upright StraightPost

(8) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)

(8) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers

GaryPerkins
Rectangle
GaryPerkins
Line
GaryPerkins
Line
Page 50: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

HealthBeat® 177723 Stretch Station

J:\INSTSPEC\SPECS\189\18903200.P65

Parts List

Part # Description Qty.107440-00 Ground Pipe Assembly (DB) .................................... 1160829-00 Foot Pad, Black .......................................................... 2160895-00 Fitness Footer, (DB), Specify Color ........................ 1161640-00 Attachment Cover, Silver .......................................... 4176827-00 Stretch Station Post Assembly, Specify Color ........ 1176828-00 Top Rail, Specify Color ............................................. 1176829-00 Upright Post Assembly, Specify Color .................... 1176935-00 Upright Straight Post, DB, Specify Color ............... 1178047-00 Handle Assembly, Specify Color .............................. 1178049-00 Swivel Assembly, SM, Specify Color ...................... 1178053-00 Swivel Plate Assembly, DB, Specify Color ............ 1

181446-00 Stretch Station Hardware Package ...................... 1100196-00 3/8" x 7/8" BHCS w/Pin, SST ..................................... 8100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 8100365-00 3/8" SAE Flat Washer, SST ....................................... 16100609-00 1/4" x 3/16" Drive Rivet, AL/SST ............................... 4100611-00 1/4" x 3/8" Drive Rivet, AL/SST ................................ 4

155083-00 Post Extension DB Hardware Package ............... 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washer, SST ................................................. 8

188103-00 4-Hole (SM) Hardware Package ........................... 2100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 8187933-00 3/8" x 2" Double Expansion Anchor ......................... 8100362-00 3/8" Flat Washer, SST ................................................. 8

SM = Surface MountDB = Direct Bury

Specifications

Top Rail: Weldment comprised of 1.315" (33,4 mm) O.D. RS20(.080" - .090") (2,03 mm-2,29 mm) galvanized steeltubing and 1.900" (48,26 mm) O.D. RS40 (.120" -.130") (3,05 mm-3,30 mm) galvanized steel tubing.Finish: ProShield®, color specified.

Handle Assembly: Weldment comprised of 1.315" (33,4 mm) O.D. RS20(.080" - .090") (2,03 mm-2,29 mm) galvanized steeltubing, 1.900" (48,26 mm) O.D. RS20 (.090" - .100")(2,29 mm-2,54 mm) galvanized steel tubing, and 7 GA.(.179") (4,55 mm) HRPO sheet steel. Finish:ProShield, color specified.

Upright Post Assy.: Weldment comprised 1.900" (48,26 mm) O.D. RS40(.120" - .130") (3,05 mm-3,30 mm) galvanized steeltubing and 7 GA.(.179") (4,55 mm) HRPO sheet steel.Finish: ProShield, color specified.

StraightUpright Post: Weldment comprised 1.900" (48,26 mm) O.D. RS40

(.120" - .130") (3,05 mm-3,30 mm) galvanized steeltubing. Finish: ProShield, color specified.

Post Assembly: Weldment comprised of 1/4" (6,35 mm) HRPO steelplate, 1/4" (6,35 mm) stainless steel plate, and 10" (254mm) O.D. x 12 GA. (.105") (2,67 mm) wall steel tubezinc plated. Finish: ProShield, color specified. (PostCap) Fabricated from A356 sand casted aluminum.Finish: ProShield, silver. (Sign) Digital image istransfered to a .032" (0,81 mm) thick ProShield coatedaluminum plate, then infused into the ProShield.

Fitness Footer: Weldment comprised of 5.000" (127 mm) O.D. x 11GA. (.120") (3,05 mm) galvanized steel tube and 1/4"(6,35 mm) HRPO steel plate. Finish: ProShield, colorspecified.

Foot Pad: Rotationally molded from U.V. stabilized linear lowdensity polyethylene, black in color.

Swivel Assembly: Weldment comprised of 2.375" (60,33 mm) O.D. x.188" (4,78 mm) wall steel tubing, and 1/4" (6,35 mm)HRPO steel sheet. Finish: ProShield, color specified.

Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver.

Ground Pipe Assy.: Comprised of 1.660" O.D. schedule 80 black pipe,and oil impregnated bronze bearings.

Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).

Installation Time: (DB) 5 man hours(SM) 4 man hours

AreaRecommended: 6' x 14' (1,83 m x 4,27 m)

Weight: (DB) 212 lbs.(SM) 182 lbs.

Concrete: (DB) Approx. 6.51 cu.ft.

Specifications are subject to change without notice.

Eco #54718 Document 18903200 replaces 18106300. Replaced expansion anchors with double expansionanchors.

Page 51: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

HealthBeat® 177723 Stretch Station

Document #18903200Sheet 3 of 3

Installation Instructions

1) (Direct Bury) Dig footings as shown. Place fitness footer in footinghole. With fitness footer in plumb position, pour concrete footing.Allow concrete footing to cure a minimum of 72 hours before at-taching stretch station post assembly to fitness footer. Refer to theDirect Bury Detail. Attach stretch station post assembly to fitness footer,using 3/8" x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standardhex nuts with 3/8" flat washers. Refer to the Direct Bury Detail.

(Surface Mount) With stretch station post assembly in final posi-tion, use a center punch to mark expansion anchor locations on con-crete slab through holes in assembly plate.

Move stretch station assembly post aside and drill 3/4" x 2 1/4" deepholes into concrete, using a hammer drill and 3/4" masonry bit. NOTE:Drill holes perpendicular to the work surface. To assure full hold-ing power, do not ream holes or allow the drill to wobble. Verifyhole depth after drilling. Clean holes using compressed air.

Tap double expansion anchors (with threaded end down) into drilledholes. Reposition stretch station post assembly. Fasten stretch stationpost assembly to expansion anchors, using 3/8" x 2 1/4" BHCS w/pinand 3/8" flat washers.

2) Attach upright post assembly and handle assembly to stretch stationpost assembly, using attachment covers, 3/8" x 1 1/8" BHCS w/pin and3/8" SAE flat washers. Refer to Detail.

3) Insert upright straight post into top rail. Place top rail onto uprightpost assembly. Drill 1/4" holes through upright straight post and up-right post assembly, using the predrilled 1/4" holes in top rail as aguide. Insert 1/4" x 3/8" drive rivets into drilled holes and tap pin inuntil it is flush with rivet head. Refer to the Top Rail AttachmentDetail.

4) (Direct Bury) Place swivel plate assembly over bearings on groundpipe assembly. Tap 1/4" x 3/16" drive rivets into holes.

(Surface Mount) With swivel assembly in final position, use a cen-ter punch to mark expansion anchor locations on concrete slabthrough holes in assembly plate.

Move swivel assembly aside and drill 3/4" x 2 1/4" deep holes intoconcrete, using a hammer drill and 3/4" masonry bit. NOTE: Drillholes perpendicular to the work surface. To assure full holding power,do not ream holes or allow the drill to wobble. Verify hole depthafter drilling. Clean holes using compressed air.

Tap double expansion anchors (with threaded end down) into drilledholes. Reposition swivel assembly. Fasten swivel assembly to expan-sion anchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flat washers.

(Surface Mount) Place swivel plate assembly over bearings onswivel assembly. Tap 1/4" x 3/16" drive rivets into holes.

5) Attach foot pads to swivel plate assembly, using 3/8" x 7/8" BHCS w/pin and 3/8" SAE flat washers. Refer to Foot Pad Attachment Detail.

6) (Direct Bury) With upright straight post and ground pipe assemblyin plumb position, pour concrete footings. Allow concrete footingsto cure a minimum of 72 hours before users are allowed to play onthe fitness equipment.

GaryPerkins
Rectangle
GaryPerkins
Rectangle
Page 52: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 888-574-4678 LSI Install Help 888-438-6574 LSI Direct 763-972-5200 Int. FAX (763) 972-3185

Document #19308000

161311 Tai Chi WheelsHealthBeat®

DETAILSPEED BALL ATTACHMENT

(2) SpeedBalls

(2) 3/16" x 1 1/4"Spring Pins

(2) Tai ChiWheels

16380000

(2) 1.25" O.D. x 1.25"Bushings

Sign

(2) Tai ChiWheels

(2) Speed Balls

Right Tai Chi Arm

(4) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers

Tai Chi Post Assembly

DETAILWHEEL ATTACHMENT

(2) Tai ChiWheels

(2) 1.25" O.D. x 2"Bushings

(2) Tai Chi Arms

(2) 5/16" x 1/2"BHCS w/Pin

Left Tai Chi Arm

DETAILARM ATTACHMENT

(2) Tai ChiArms

Tai Chi Post Assembly

(2) AttachmentCovers

Sheet 1 of 2

ArmShaft

WheelShaft

(2) AttachmentCovers

PLAN VIEW

53

3 /4"

13

65

46

7 /8"

119

04

0"

10

20

23"580

Page 53: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

Specifications are subject to change without notice.

HealthBeat® 161311 Tai Chi Wheels

J:\INSTSPEC\SPECS\193\19308000.P65

Parts List

Part # Description Qty.192247-00 Tai Chi Wheel, Specify Color ................................... 2160677-00 Tai Chi Arm, (RT.), Specify Color ........................... 1160682-00 Tai Chi Arm, (LT.), Specify Color ........................... 1160797-00 Tai Chi Post Assembly, Specify Color ..................... 1160895-00 Fitness Footer, (DB), Specify Color ........................ 1161640-00 Attachment Cover, Silver .......................................... 2

155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8

188103-00 4-Hole (SM) Hardware Package ........................... 1100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 4187933-00 3/8" x 2" Double Expansion Anchor ......................... 4100362-00 3/8" Flat Washer, SST ................................................. 4

161662-00 Tai Chi Wheels Hardware Package ...................... 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100365-00 3/8" SAE Flat Washers, SST ...................................... 4116788-00 3/16" x 1 1/4" Spring Pin, SST .................................... 2131849-00 5/16" x 1/2" BHCS w/Pin, SST .................................... 2160680-00 1.25" O.D. x 2" Bushing ........................................... 2160683-00 1.25" O.D. x 1.25" Bushing ..................................... 2163655-00 Speed Ball, Aluminum .............................................. 2

SM = Surface MountDB = Direct BuryRT. = RightLT. = Left

Specifications

Tai Chi Wheel: Weldment comprised of .125" thick aluminum alloy6061, aluminum round hub and aluminum shaft. Fin-ish: ProShield®, color specified.

Tai Chi Arm: Weldment comprised of 1.660" O.D. RS20 (.085"-.095" wall) galvanized steel tube, 3/16" HRPO sheetsteel and stainless steel shaft. Finish: ProShield, colorspecified.

Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver in color.

Post Assembly: Weldment comprised of 1/4" HRPO steel plate, 1/4"stainless steel plate, and 10" O.D. x 12 GA. (.105"wall) steel tube zinc plated. Finish: ProShield, colorspecified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" thick ProShieldcoated aluminum plate, then infused into the ProShield.

Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.

Speed Ball: Fabricated from 6061-T6 aluminum. Finish: Clearanodize.

Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).

Installation Time: (DB) 2 man hoursArea

Recommended: 60" x 72" (1,52 m x 1,83 m)Weight: (DB) 125 lbs.

(SM) 95 lbs.Concrete: (DB) Approx. 3 cu.ft.

Installation Instructions

1) (Direct Bury) Dig footing as shown. Place fitness footer in footinghole. With fitness footer in plumb position, pour concrete footing.Allow concrete footing to cure a minimum of 72 hours before attach-ing post assembly to fitness footer.

2) (Direct Bury) Attach Tai Chi Post Assembly to fitness footer, using 3/8"x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standard hex nutswith 3/8" flat washers. Refer to the Direct Bury Detail.

3) Attach attachment covers and arms and to Tai Chi Post Assembly, us-ing 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Refer to the ArmAttachment Detail.

4) Place 1.25" O.D. x 2" bushings and wheels onto arm shafts and fas-ten using 5/16" x 1/2" BHCS w/pin. Refer to the Wheel AttachmentDetail.

5) Place 1.25" O.D. x 1.25" bushings and speed balls onto wheel shafts.Tap 3/16" x 1 1/4" spring pins into holes in speed balls. Refer to theSpeed Ball Attachment Detail.

6) (Surface Mount) With Tai Chi Post Assembly in final position, use acenter punch to mark expansion anchor locations on concrete slabthrough holes in Tai Chi Post Assembly plate.

Move Tai Chi Post Assembly aside and drill 3/4" x 2 1/4" deep holes intoconcrete, using a hammer drill and 3/4" masonry bit. NOTE: Drillholes perpendicular to the work surface. To assure full holding power,do not ream holes or allow the drill to wobble. Verify hole depthafter drilling. Clean holes using compressed air.

Tap double expansion anchors (with threaded end down) into drilledholes. Reposition Tai Chi Post Assembly. Fasten Tai Chi Post Assemblyto expansion anchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flat wash-ers.

Eco #54834 Document 19308000 replaces 18904000. Replaced Tai Chi Wheel.

GaryPerkins
Rectangle
Page 54: MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA … musick park improvements – restroom & fitness area pds #j1401 a2-1 issue date: september 18, 2014 total pages: 1 (plus attachment)

© 2013 by Landscape Structures. All rights reserved.

601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 888-574-4678 LSI Install Help 888-438-6574 LSI Direct 763-972-5200 Int. FAX (763) 972-3185

Document #19308000

161311 Tai Chi WheelsHealthBeat® Sheet 2 of 2

DETAILSURFACE MOUNT

Tai ChiPost Assembly

ConcreteCrushedRock

DETAILDIRECT BURY

Concrete

CrushedRock

Fitness Footer

(4) 3/8" x 1 1/8"BHCS w/Pin3/8" FlatWashers

(4) 3/8" StandardHex Nuts & 3/8" FlatWashers

18"460

20

" M

in.

51

0

34

"8

60

Tai ChiPost Assembly

Finished Grade

5" /130Minimum

189039d

(4) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)

(4) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers

GaryPerkins
Rectangle
GaryPerkins
Line