o Participate in RF cage & then MRI installation (eight Achieva 1.5 Tesla,one
Achieva 3 T, one Panorama HFO 1 T) in many sites with South African
engineers mainly in (Aom EL Masreien Hosp. , EL Mustafa Radiology Center ,
Nile Scan , Kobry EL Koba Military Hosp. , Port saeid Military Hosp. , kafr EL
Sheikh Military Hosp. , Osama Ganam Radiology Center , Sayed Galal Azher
University Hosp. , International Medical Center).
1. My job was providing the local materials (which necessary for the
installation like distilled water, cable ties …etc), AutoCAD drawing
papers, tools.
2. My role was Connection between RF cage team and MRI installation
team (the South African engineers).
3. Connection between Philips MRI engineers and the installation team to
clear any problems (like name of each account and his password).
4. Provide communication between installation teams and chillers team if
there were any problems about water pressure, flow or temperature.
5. Provide communication between installation team and printer's team
(AE Title, Host name, IP Address, Port No.).
6. This beside my basic role in the MRI installations itself specially in
cables routing ,mechanical installations , electrical
installations(power on, ramp up ,shimming , ...etc.)
7. Arrangement with the installation team to adjust our schedule with
their especially about time of each tool to be provided.
8. The communication Language with project stuff (contractors,
technicians, third party guys, even the hospital employees) is very
important as it can build the trust or break it down.
o I participate also in x-ray projects (installation of Bucky diagnost, upgrade in
urodiagnost and moving of duediagnost from room to other).
o Beside project management assistance, I participate also in providing
preventive and corrective maintenance as well as measurements and
calibrations in following modalities (X-ray, Cath-Lab, Computed tomography,
Magnetic Resonance Imaging) doing the following (early problem diagnosing
and solving it if possible, spare parts ordering and then mount it, schedule
preventive maintenance and assist in long corrective maintenance
processes [like deicing in MRI, X-ray tubes& generators replacements] ).
o Helium liquid refilling in closed systems (Achieva, Intera) modalities and
those open system cooling by Helium (Panorama HFO 1T, Panorama 0.6T)
Biomedical engineer missions in a hospital وتسرٌع (Periodic Preventive Maintenance PPM)تنظٌم عمل الصٌانة الوقائٌة الدورٌة .1
من قواعد البٌانات التى ٌنظمها (Corrective Maintenance)إنجاز الصٌانة الإلصالحٌة
Magnetic)المهندس عن كل جهاز كالجدول األتى عن جهاز كالرنٌن المغناطٌسً كمثال
Resonance Imaging)
إنجازالصٌانة الإلصالحٌة لألجهزة المـتعطلة بمعرفة الشركة الموردة وبناءا على إرشادها الفنً .2
service manual, subsystem manual, unit manual))أو من خالل كتب اإلرشادات الفنٌة
إطالةالعمر اإلفتراضى لألجهزةمن خالل عمل الصٌانة الوقائٌة بإنتظام وإستمرارٌة .3
System Life timeαPPM .
مراقبة أداء األجهزة لتفادي كال من سوء اإلستخدام و عدم اإلستخدام األمثل إلمكانٌات .4
.الجهازالمتوفرة
,Radiology Hazards, biology hazards, )مراقبة أداء األجهزة لتفادي األخطار المتنوعة .5
electrical hazards, infection Hazards)
:-توفٌر قاعدة بٌانات فنٌة عن األجهزة المتوفرة فى كل قسم بحالتها الراهنة فى جدول كاألتى .6
...etc Laboratory ICU Radiology Depart.
Systems Ava.
(3)centrifuges (15)Patient monitors
(3)Mobile X-ray
(1)Blood Cells Counter
(4)ventilators 2) Bucky X-ray )
(4)Autoclaves (15)ECG MRI
...etc ...etc ...etc
و ٌوضح حالة SQL Data Baseوكل خلٌة من الجدول السابق موصلة بجدول خاص بهابواسطة
.الجهاز و بٌاناته كاملة
.هذا باإلضافة الى اإلشراف الهندسى على المشروعات بالمستشفى ألجل تحقٌق الهدف النهائى- 7
…etc
notes en
ginee
r
Ho
urs
ne
ed
ed
Spare parts
replaced Date of
CM
faults Date of PPM
procedure
MRI subsystem
checked 11/4/2010 magnet checked 11/4/2010 Patient Table checked 11/4/2010 Gradient coil MS 1-day Board 4522 990 332 12/9/2010 Z-module 11/4/2010 Gradient Amp PM
Chiller MS 1-day none 12/9/2010 55 11/4/2010 LCC Cap
…etc