ةo Participate in RF cage & then MRI installation (eight Achieva 1.5 Tesla,one Achieva 3 T, one Panorama HFO 1 T) in many sites with South African engineers mainly in (Aom EL Masreien Hosp. , EL Mustafa Radiology Center , Nile Scan , Kobry EL Koba Military Hosp. , Port saeid Military Hosp. , kafr EL Sheikh Military Hosp. , Osama Ganam Radiology Center , Sayed Galal Azher University Hosp. , International Medical Center). 1. My job was providing the local materials (which necessary for the installation like distilled water, cable ties …etc), AutoCAD drawing papers, tools. 2. My role was Connection between RF cage team and MRI installation team (the South African engineers). 3. Connection between Philips MRI engineers and the installation team to clear any problems (like name of each account and his password). 4. Provide communication between installation teams and chillers team if there were any problems about water pressure, flow or temperature. 5. Provide communication between installation team and printer's team (AE Title, Host name, IP Address, Port No.). 6. This beside my basic role in the MRI installations itself specially in cables routing ,mechanical installations , electrical installations(power on, ramp up ,shimming , ...etc.) 7. Arrangement with the installation team to adjust our schedule with their especially about time of each tool to be provided. 8. The communication Language with project stuff (contractors, technicians, third party guys, even the hospital employees) is very important as it can build the trust or break it down. o I participate also in x-ray projects (installation of Bucky diagnost, upgrade in urodiagnost and moving of duediagnost from room to other). o Beside project management assistance, I participate also in providing preventive and corrective maintenance as well as measurements and calibrations in following modalities (X-ray, Cath-Lab, Computed tomography, Magnetic Resonance Imaging) doing the following (early problem diagnosing and solving it if possible, spare parts ordering and then mount it, schedule preventive maintenance and assist in long corrective maintenance processes [like deicing in MRI, X-ray tubes& generators replacements] ). o Helium liquid refilling in closed systems (Achieva, Intera) modalities and those open system cooling by Helium (Panorama HFO 1T, Panorama 0.6T)

Upload: mahmoud-saber

Post on 08-Apr-2017

109 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: my job description

ة

o Participate in RF cage & then MRI installation (eight Achieva 1.5 Tesla,one

Achieva 3 T, one Panorama HFO 1 T) in many sites with South African

engineers mainly in (Aom EL Masreien Hosp. , EL Mustafa Radiology Center ,

Nile Scan , Kobry EL Koba Military Hosp. , Port saeid Military Hosp. , kafr EL

Sheikh Military Hosp. , Osama Ganam Radiology Center , Sayed Galal Azher

University Hosp. , International Medical Center).

1. My job was providing the local materials (which necessary for the

installation like distilled water, cable ties …etc), AutoCAD drawing

papers, tools.

2. My role was Connection between RF cage team and MRI installation

team (the South African engineers).

3. Connection between Philips MRI engineers and the installation team to

clear any problems (like name of each account and his password).

4. Provide communication between installation teams and chillers team if

there were any problems about water pressure, flow or temperature.

5. Provide communication between installation team and printer's team

(AE Title, Host name, IP Address, Port No.).

6. This beside my basic role in the MRI installations itself specially in

cables routing ,mechanical installations , electrical

installations(power on, ramp up ,shimming , ...etc.)

7. Arrangement with the installation team to adjust our schedule with

their especially about time of each tool to be provided.

8. The communication Language with project stuff (contractors,

technicians, third party guys, even the hospital employees) is very

important as it can build the trust or break it down.

o I participate also in x-ray projects (installation of Bucky diagnost, upgrade in

urodiagnost and moving of duediagnost from room to other).

o Beside project management assistance, I participate also in providing

preventive and corrective maintenance as well as measurements and

calibrations in following modalities (X-ray, Cath-Lab, Computed tomography,

Magnetic Resonance Imaging) doing the following (early problem diagnosing

and solving it if possible, spare parts ordering and then mount it, schedule

preventive maintenance and assist in long corrective maintenance

processes [like deicing in MRI, X-ray tubes& generators replacements] ).

o Helium liquid refilling in closed systems (Achieva, Intera) modalities and

those open system cooling by Helium (Panorama HFO 1T, Panorama 0.6T)

Page 2: my job description

Biomedical engineer missions in a hospital وتسرٌع (Periodic Preventive Maintenance PPM)تنظٌم عمل الصٌانة الوقائٌة الدورٌة .1

من قواعد البٌانات التى ٌنظمها (Corrective Maintenance)إنجاز الصٌانة الإلصالحٌة

Magnetic)المهندس عن كل جهاز كالجدول األتى عن جهاز كالرنٌن المغناطٌسً كمثال

Resonance Imaging)

إنجازالصٌانة الإلصالحٌة لألجهزة المـتعطلة بمعرفة الشركة الموردة وبناءا على إرشادها الفنً .2

service manual, subsystem manual, unit manual))أو من خالل كتب اإلرشادات الفنٌة

إطالةالعمر اإلفتراضى لألجهزةمن خالل عمل الصٌانة الوقائٌة بإنتظام وإستمرارٌة .3

System Life timeαPPM .

مراقبة أداء األجهزة لتفادي كال من سوء اإلستخدام و عدم اإلستخدام األمثل إلمكانٌات .4

.الجهازالمتوفرة

,Radiology Hazards, biology hazards, )مراقبة أداء األجهزة لتفادي األخطار المتنوعة .5

electrical hazards, infection Hazards)

:-توفٌر قاعدة بٌانات فنٌة عن األجهزة المتوفرة فى كل قسم بحالتها الراهنة فى جدول كاألتى .6

...etc Laboratory ICU Radiology Depart.

Systems Ava.

(3)centrifuges (15)Patient monitors

(3)Mobile X-ray

(1)Blood Cells Counter

(4)ventilators 2) Bucky X-ray )

(4)Autoclaves (15)ECG MRI

...etc ...etc ...etc

و ٌوضح حالة SQL Data Baseوكل خلٌة من الجدول السابق موصلة بجدول خاص بهابواسطة

.الجهاز و بٌاناته كاملة

.هذا باإلضافة الى اإلشراف الهندسى على المشروعات بالمستشفى ألجل تحقٌق الهدف النهائى- 7

…etc

notes en

ginee

r

Ho

urs

ne

ed

ed

Spare parts

replaced Date of

CM

faults Date of PPM

procedure

MRI subsystem

checked 11/4/2010 magnet checked 11/4/2010 Patient Table checked 11/4/2010 Gradient coil MS 1-day Board 4522 990 332 12/9/2010 Z-module 11/4/2010 Gradient Amp PM

Chiller MS 1-day none 12/9/2010 55 11/4/2010 LCC Cap