my resume

6
CURRICULAR VITAE PERSONAL DETAILS Nam : Nagaraj a/l Ratnasamy POB : Selangor IC No : 861106-43-5067 DOB : November 06 1986 E-Mail : [email protected] Nationality : Malaysian Address : Blok B-15-10, Pangsapuri Sex : Male Bukit Baru,Off Jalan Race : Indian Keramat Hujung, Marital Status : Single 54000 Kuala Lumpur. Phone No : 016 2198 240 Languages (Proficiency : 0=Poor - 10=Excellent) Language Spoken Written -------------------------------------------------------------------------- ----------- Bahasa Malaysia 10 10 English 8 8 Bahasa Tamil 10 0 Availability Date : Immediately after notice period of 1 month(s) CAREER OBJECTIVE

Upload: naga-raj

Post on 09-Jan-2017

46 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: My Resume

CURRICULAR VITAE

PERSONAL DETAILS

Nam : Nagaraj a/l Ratnasamy POB : Selangor

IC No : 861106-43-5067 DOB : November 06 1986

E-Mail : [email protected] Nationality : Malaysian

Address : Blok B-15-10, Pangsapuri Sex : Male Bukit Baru,Off Jalan Race : Indian Keramat Hujung, Marital Status : Single 54000 Kuala Lumpur.

Phone No : 016 2198 240 Languages(Proficiency: 0=Poor - 10=Excellent)

Language Spoken Written ------------------------------------------------------------------------------------- Bahasa Malaysia 10 10 English 8 8 Bahasa Tamil 10 0

Availability Date : Immediately after notice period of 1 month(s)

CAREER OBJECTIVE

To get the challenging position within an organization where I could use my skills more professionally and efficiently and seek as the challenging position and also to contribute organization effectiveness through emphasis on efficient utilization of Technical knowledge experience skill to enhance my job performance.To pursue a highly rewarding career, seeking for a job in challenging and healthy work environment where I can utilize my skills and knowledge efficiently for organizational growth.

EDUCATIONAL BACKGROUND

Page 2: My Resume

2009 – Present : University Technology Malaysia Degree in Mechanical Engineering

2005 - 2008 : Polytechnic Johor Bahru Diploma in Mechanical ( Manufacturing ) Engineering

1999 - 2003 : Sekolah Menengah Kebangsaan Seri Tanjong Penilaian Menengah Rendah (PMR) Sijil Pelajaran Malaysia (SPM)

RESUME SUMMARY

Current Position : SAP B.O.M TECHNICAL ASSISTANT (May 2009 - Present) Current Specialization : Bill of Materials / Spare PartsYears of Experiences : 6 years 11 months

EMPLOYMENT HISTORY

1. MMC Oil & Gas Engineering Sdn. Bhd (SECONDED TO SARAWAK SHELL BERHAD)

March 2012 – August 2012 (Gumusut Kakap Project)

2. CEKAP TECHNICAL SERVICES (SECONDED TO SARAWAK SHELL BERHAD)September 2012 – May 2014 (Gumusut Kakap Project)

3. PETRO HORIZON SDN BHD (SECONDED TO SARAWAK SHELL BERHAD)June 2014 – Present (Malikai Project)

Position Title (Level) : SAP B.O.M TECHNICAL ASSISTANT

Specialization : Bill of Materials / Spare PartsRole : Technical SupportIndustry : Oil & GasSalary : MYR 5500

Work Description

To ensure accurate and timely Bill of Material (BOM) are upload in Systems Applications Products - Material Master and Systems Applications Products – Plant Maintenance for used in Inventory and Maintenance during operation.

Assist Spare Part Engineer to review of Suppliers’ spare parts data is the first step in the Supply Chain Management process of ordering an optimum quantity of spare parts for equipment purchased.

To import Spare Parts Interchangeability Records in the Advisor Program for Gumusut Kakap & Malikai project.

To ensure the quality and completeness of the Spare Parts Interchangeability Records, equipment technical and spare parts data.

Page 3: My Resume

To review the quality and consistency of descriptions and part numbers.

To assign Functional Location to Tag numbers and the equipment criticality.

To assign System’s Application’s Product’s Manufacturer codes, Material groups, Object types, Spare part indicators into Electronic Spare Parts Interchangeability Records (E-SPIR).

To code Bill of Material (BOM) Title for equipment in E-SPIRs.

To enter order quantity and minimum stock level and identifying equipment spare parts to be held in stock.

To review Material Requirements Planning parameters and other plant specific data.

To code Material Master Description and classifications according to the Blueprint big rules.

To manage workflow and monitoring of Spare Parts Interchangeability Record status and Bill of Material (BOM) preparation.

To work with project engineer, vendor, and IT for project team member.

To exports Advisor file ready for loading to Systems Applications Products (SAP).

To import back Systems Applications Products - Material Master into Electronic Spare Parts Interchangeability Records (E-SPIR).

Responsible for ensuring input of data into the completions management system is completed in a consistent and accurate manner and that the compilation of associated completions documentation and handover packages are in line with project requirements/procedures.

3. SUBSEA 7 MALAYSIA SDN BHD ( SECONDED TO SARAWAK SHELL BERHAD )

Mei 2009 – Jan 2012Position Title (Level) : SAP-PM TECHNICAL ASSISTANTSpecialization : Asset Register / SAPRole : Technical Support

Page 4: My Resume

Industry : Oil & Gas

Work Description To ensure accurate and timely updates of data/action items/information are contained in the proper systems and ability to retrieve data to trend and report. To retrieve data from technical drawing, technical data, Process and Instrumentation

Diagrams, design documents and equipment dossiers for Gumusut Kakap project.

To define, prepare, review and deliver into maintenance management system (SAP-PM) the equipment data, maintenance and inspection strategy/Routine, maintenance schedule and equipment bill of materials.

To populate master data into Systems Applications Products (SAP) upload template.

To manage Computerized Maintenance Management Systems (CMMS) data input/uploading.

To ensure the following data are carried and populated in SAP system.a)   Asset register – asset register is a hierarchical structure of all assets, with

equipment installed at the lowest appropriate level. To ensure all detail design parameters and assurance measure values are populated in the respective PD Template accordingly. Asset Register data includes:

Functional Location Standard Minimum Data in a functional process Hierarchy format

Equipment Standard Minimum Data Measurement points Safety Critical Element (SCE) Data

b)   Performance Standard (PS) – The tasks are required to verify that all SCE barriers are in place and are effective. Performance Standards are prepared using the SCE Global Performance Standard Template. Performance Standards include:

Assurance Task Acceptance Criteria Assurance Measure Assurance Value

Assist technical staff (engineers) in preparing various kinds of technical data/ document e.g., drawings (Utility Engineering Flow Scheme & Process Engineering Flow Scheme), presentation, etc.

Responsible for ensuring input of data into the completions management system is completed in a consistent and accurate manner and that the compilation of associated completions documentation and handover packages are in line with project requirements/procedures.

Familiar with MS ACCESS, SAP (P16), E-SPIR, RCM applications.

SKILLS AND STRENGH

Excellent grasping capability and understanding the concepts clearly Ability to adjust to the situation Ability to get work done through influence rather than reporting relationship Sense of Responsibility and a very hard worker A Self motivated team player, with excellent confidence & commitment

Page 5: My Resume

Able to adopt with new environments Ability to work independently with minimum supervision. Self drive and energy. Excellent communication skill in English (both spoken and written) Willingness to learn new skills. Good knowledge and experience on SAP Plant Maintenance and Material

Management modules.

I am a very hardworking and full of energy person, who can make the surroundings very vibrant. I’m a very determined person, who much focused to achieve what I am intending to. I’m a very friendly, open-minded and levelheaded person. I like to work in a team. I can easily get along with new working Environment. I am a pretty much helpful of person. I love my family, they are my motivators. I want to be recognized on my achievements with my hard work and I have a strong believe that I will be someone one day with the hard work that I have applied in my career.

REFERENCES

MR. ANUAR ROSLY

Position : Managing Director Place of Work : Petro Horizon Sdn Bhd Tel : +603 – 5192 8577Fax : +603 – 5192 8511Email : [email protected]

MR. SERIT JANWONG

Position : Senior Control and Automation EngineerPlace of Work : Sarawak Shell Berhad,Tel : 012 - 8079 303Email  : [email protected]