mzwandile manana transnet tit review 0 - 6 months 2016

15
Review Presentation Prepared by: Mzwandile Manana Sap Number: 0146615 ID: 9304126131082 ECSA Registration number: Date: 04 November 2016

Upload: mzwandile-manana

Post on 15-Apr-2017

67 views

Category:

Documents


11 download

TRANSCRIPT

Page 1: Mzwandile Manana Transnet TIT Review 0 - 6 months 2016

Review Presentation

Prepared by: Mzwandile MananaSap Number: 0146615ID: 9304126131082ECSA Registration number:Date: 04 November 2016

Page 2: Mzwandile Manana Transnet TIT Review 0 - 6 months 2016

Results Announcement 2016

CONTENT

• Signals TIT progress cycle• Transnet Structure• Organogram• Safety• Market Demand Strategy• Budget• Other Discipline• ITCMS• Phoenix hotbox detector• Vehicle identification system• Measurement systems• Course attended

Page 3: Mzwandile Manana Transnet TIT Review 0 - 6 months 2016

Results Announcement 2016

Signals - TIT Progress Cycle (Overview)

• Wpms & Skew Bogie• Market Demand Strategy• Project involvement• Explore Other Disciplines• Issued with a section• Fill maintenance

documents• Attend CPD courses• Signalling at Esselen Park.

• General Business Understanding• Market Demand Strategy• Budgets• Explore the section• Understand the work structure• Attend IMDCRE• ECSA candidate registration

0 – 6 M 6-12 M

12 – 18 M

18 – 24 M

Page 4: Mzwandile Manana Transnet TIT Review 0 - 6 months 2016

Results Announcement 2016

Transnet Structure

Transnet Group

National Port AuthorityPipelinesPort Terminal EngineeringFreight Rail

Rail Network

Richards Bay Depot

Central Region

Eastern Region

Western Region

Page 5: Mzwandile Manana Transnet TIT Review 0 - 6 months 2016

Results Announcement 2016

Organogram

TFR• CHIEF EXECUTIVE• RAVI NAIR

TFR• GENERAL MANAGER• CEASAR MTHETHWA

TFR• CHIEF ENGINEER• TSHILIDZI MUNYAI

TFR• INFRA MANAGER• BONGUMUSA THUSI

TFR• DEPOT ENGINEER• THULANI FAKUDE

TFR• M.MANAGER PROD. MANAGER CAS - MANAGER• F.STOLTZ X. KHUMALO B. BIYELA

TFR• TECHNICIAN - TECHNICIAN IN TRAINING

TFR• TECHNICAL WORKER• INFRA WORKER

Page 6: Mzwandile Manana Transnet TIT Review 0 - 6 months 2016

Results Announcement 2016

Safety

Transnet 5’s Supervision Substance Abuse Speed ( Train Driver & Drivers) Signals Sleepiness

Why the 5’s High level of serious injuries High level of serious incidents Image of Transnet Freight Rail Negative impact on employees

Depot level Housekeeping Safety talks Green area meetings

Page 7: Mzwandile Manana Transnet TIT Review 0 - 6 months 2016

Results Announcement 2016

Market Demand Strategy

Core Strategies

Market Demand Strategy

Market Development

Operational Efficiency

Capital Investment

Regional Integration Safety People

Page 8: Mzwandile Manana Transnet TIT Review 0 - 6 months 2016

Results Announcement 2016

Budget

Budget

Opex Copex Capex

Budget Year Depot Amount

OPEX 2016/17 R160 204 378

COPEX 2016/17 R89 426 103

What is EBITDA

Page 9: Mzwandile Manana Transnet TIT Review 0 - 6 months 2016

Results Announcement 2016

Other Disciplines

• Perway• Technical Support• OHTE and substations• Train authorisation & Condition Assessment• Telecommunication• War-room• Rail Network Planning

Page 10: Mzwandile Manana Transnet TIT Review 0 - 6 months 2016

Results Announcement 2016

Integrated Train Conditions Monitoring Systems

• This is a system that integrate information from different types of measurement systems in one system.

• The primary purpose of the system is to collect important data on the condition of trains passing along the rail line and to generate alarms when train condition is out of tolerance.

• This information can also be used for maintenance planning.

FCS FCSFCS

MEASUREMENT SYSTEMS

MEASUREMENT SYSTEMS

MEASUREMENT SYSTEMS

OPS

INTRANET

(OAT) PROVIDES ALARMS RAISED TO THE TCO

(MAT) PROVIDE ROLLING STOCK MAINTENANCE ALARMS TO MAINTENANCE PERSONNEL

(MTT) THIS IS WHERE THE MANAGER CAN VIEW & CONFIGURE SYSTEM SETTING & WHERE THE TECHNICIAN CAN VIEW SETTINGS

MAILERQuery PC

Page 11: Mzwandile Manana Transnet TIT Review 0 - 6 months 2016

Results Announcement 2016

Phoenix Hotbox Detector

Page 12: Mzwandile Manana Transnet TIT Review 0 - 6 months 2016

Results Announcement 2016

Vehicle Identification System

WSWS

JBOX

Antenna Cabinet

Page 13: Mzwandile Manana Transnet TIT Review 0 - 6 months 2016

Results Announcement 2016

Measurement Systems.

Skew Bogie Wheel Profile Monitoring System Wim-Wim Weighbridge Cwrm Wilma

Page 14: Mzwandile Manana Transnet TIT Review 0 - 6 months 2016

Results Announcement 2016

Courses Attended

Formal Courses COMPLETED

CWRM 30-August-2016

IMDCRE 19th - 23th September 2016

Formal Courses DUE

RIMM 7th – 11th November 2016

Page 15: Mzwandile Manana Transnet TIT Review 0 - 6 months 2016

Thank You