n. dixon ph / dt vladimir elsha jinr straw working group meeting monday 6th february 2011 cern1...

13
N. Dixon PH / DT N. Dixon PH / DT Vladimir Elsha JI Vladimir Elsha JI NR Straw wo NR Straw wo 1 Straw Material and Straw Material and development. development.

Upload: claud-mckenzie

Post on 29-Dec-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

N. Dixon PH / DT VladiN. Dixon PH / DT Vladimir Elsha JINR Straw womir Elsha JINR Straw working group meeting Mondrking group meeting Monday 6th february 2011 CERNay 6th february 2011 CERN

11

Straw Material and Straw Material and development.development.

N. Dixon PH / DT VladiN. Dixon PH / DT Vladimir Elsha JINR Straw womir Elsha JINR Straw working group meeting Mondrking group meeting Monday 6th february 2011 CERNay 6th february 2011 CERN

22

Latest news on Material.Latest news on Material.

Pressure tests.Pressure tests.

Straws for assembly.Straws for assembly.

N. Dixon PH / DT VladiN. Dixon PH / DT Vladimir Elsha JINR Straw womir Elsha JINR Straw working group meeting Mondrking group meeting Monday 6th february 2011 CERNay 6th february 2011 CERN

33

Coated Material at CERNCoated Material at CERNspool reference length in metres Location Date

A1-1 320 CERN 27.11.2010

A1-2 320 CERN 27.11.2010

A1-3 320 CERN 27.11.2010

A1-4 320 CERN 27.11.2010

A1-5 320 CERN 27.11.2010

A1-6 320 CERN 27.11.2010

A1-7 210 Maud 10.12.2010

A1-8 320 CERN 27.11.2010

A1-9 320 JINR 14.12.2010

A1-10 320 CERN 27.11.2010

A1-11 320 JINR 14.12.2010

A1-12 320 CERN 27.11.2010

A1-13 320 Sefar 30.11.2010

A1-14 320 Sefar 24.01.2011

A1-15 320 Sefar 30.11.2010

A1-16 320 Sefar 24.01.2011

A1-17 320 JINR 14.12.2010

A1-18 320 CERN 27.11.2010

Coating of remaining PET material to be planned for 2011

N. Dixon PH / DT VladiN. Dixon PH / DT Vladimir Elsha JINR Straw womir Elsha JINR Straw working group meeting Mondrking group meeting Monday 6th february 2011 CERNay 6th february 2011 CERN

44

Quality ControlQuality Control

Permeation: Permeation: (Effect of the weld; (Effect of the weld; ongoing, 2 ongoing, 2 measurements remain: Latest material measurements remain: Latest material coated by Fraunhofer, and permeation coated by Fraunhofer, and permeation through weld.through weld.))

Creep test. Creep test. (Compare RNK 2600 to GN 4600) (Compare RNK 2600 to GN 4600) ongoingongoing

Ultrasonic welds. Ultrasonic welds. RNK 2600 straws produced by both JINR RNK 2600 straws produced by both JINR and Sefar are giving good results. and Sefar are giving good results. (See Maud’s presentation)(See Maud’s presentation)

N. Dixon PH / DT VladiN. Dixon PH / DT Vladimir Elsha JINR Straw womir Elsha JINR Straw working group meeting Mondrking group meeting Monday 6th february 2011 CERNay 6th february 2011 CERN

55

Current newsCurrent news

Straw ultrasonic welding.Straw ultrasonic welding.

Sefar supplied straws (DEC 2010) that have been tested at CERN. Sefar supplied straws (DEC 2010) that have been tested at CERN.

(Pressure tests)(Pressure tests)

A contract is in place with Sefar for 250 tubes to be delivered 25 February 2011A contract is in place with Sefar for 250 tubes to be delivered 25 February 2011

(start of week 9)(start of week 9)

JINR have produced “130 +” straw tubes.JINR have produced “130 +” straw tubes.

N. Dixon PH / DT VladiN. Dixon PH / DT Vladimir Elsha JINR Straw womir Elsha JINR Straw working group meeting Mondrking group meeting Monday 6th february 2011 CERNay 6th february 2011 CERN

66

Storage valves.Storage valves.

Valves for storage have been tested and approved.Valves for storage have been tested and approved.

Gluing method and straw pressurisation validated.Gluing method and straw pressurisation validated.

1000 Pieces have been ordered (100 to be supplied to JINR this week)1000 Pieces have been ordered (100 to be supplied to JINR this week)Provision for 7000 more valves in placeProvision for 7000 more valves in place

N. Dixon PH / DT VladiN. Dixon PH / DT Vladimir Elsha JINR Straw womir Elsha JINR Straw working group meeting Mondrking group meeting Monday 6th february 2011 CERNay 6th february 2011 CERN

77

Pressure measurements.Pressure measurements.Using the mechanical device developed. It is possible to accurately Using the mechanical device developed. It is possible to accurately measure changes in pressure over long periods.measure changes in pressure over long periods.

A calibration curve is required, for specific range measurements A calibration curve is required, for specific range measurements

Straws with an unknown “start” pressure can be measured. Straws with an unknown “start” pressure can be measured.

(input valves are precise to +/- 100 mbar.)(input valves are precise to +/- 100 mbar.)

N. Dixon PH / DT VladiN. Dixon PH / DT Vladimir Elsha JINR Straw womir Elsha JINR Straw working group meeting Mondrking group meeting Monday 6th february 2011 CERNay 6th february 2011 CERN

88

Pressure measurements.Pressure measurements.Measure straw deformation with 2 calibrated loadsMeasure straw deformation with 2 calibrated loads..

Measuring deviceMeasuring device Straw testStraw test

The measurement of a single straw is simple and fast. The results precise.The measurement of a single straw is simple and fast. The results precise.

N. Dixon PH / DT VladiN. Dixon PH / DT Vladimir Elsha JINR Straw womir Elsha JINR Straw working group meeting Mondrking group meeting Monday 6th february 2011 CERNay 6th february 2011 CERN

99

Straw long term pressure testStraw long term pressure test

Sefar straw long term leak test

1800

1850

1900

1950

2000

2050

2100

2150

2200

2250

2300

02-01-11 0:00 07-01-11 0:00 12-01-11 0:00 17-01-11 0:00 22-01-11 0:00 27-01-11 0:00 01-02-11 0:00 06-02-11 0:00 11-02-11 0:00

Time in days

P In

mb

ar

specification

Leak Rate Specification (7.67 mbar/day )

N. Dixon PH / DT VladiN. Dixon PH / DT Vladimir Elsha JINR Straw womir Elsha JINR Straw working group meeting Mondrking group meeting Monday 6th february 2011 CERNay 6th february 2011 CERN

1010

Straw long term pressure testStraw long term pressure testLeak Rate of a tested batch (22 days displayed)

Sefar straw long term leak test

1800

1850

1900

1950

2000

2050

2100

2150

2200

2250

2300

02-01-11 0:00 07-01-11 0:00 12-01-11 0:00 17-01-11 0:00 22-01-11 0:00 27-01-11 0:00 01-02-11 0:00 06-02-11 0:00 11-02-11 0:00

Time in days

P In

mb

ar

700

750

800

850

900

950

1000

1050

1100

1150

1200

23

50

55

56

79

85

87

93

2

3

4

5

6

97

specification

atm P

N. Dixon PH / DT VladiN. Dixon PH / DT Vladimir Elsha JINR Straw womir Elsha JINR Straw working group meeting Mondrking group meeting Monday 6th february 2011 CERNay 6th february 2011 CERN

1111

JINR strawsJINR straws

We urgently need straw tubes to test We urgently need straw tubes to test

the mechanical and permeation properties of:the mechanical and permeation properties of:

1) Standard tubes from RNK 2600.1) Standard tubes from RNK 2600.

2) Valves installed and pressurised in JINR.2) Valves installed and pressurised in JINR.

3) Boxes to ship to CERN.3) Boxes to ship to CERN.

N. Dixon PH / DT VladiN. Dixon PH / DT Vladimir Elsha JINR Straw womir Elsha JINR Straw working group meeting Mondrking group meeting Monday 6th february 2011 CERNay 6th february 2011 CERN

1212

Conclusions:Conclusions:

1212

Straws expected fromStraws expected from

JINR and Sefar in February 2011JINR and Sefar in February 2011

to be installed in module ZERO.to be installed in module ZERO.

N. Dixon PH / DT VladiN. Dixon PH / DT Vladimir Elsha JINR Straw womir Elsha JINR Straw working group meeting Mondrking group meeting Monday 6th february 2011 CERNay 6th february 2011 CERN

1313

Straw long term pressure testStraw long term pressure testLeak Rate of a tested batch (43 days displayed)

Sefar straw long term leak test

1800

1850

1900

1950

2000

2050

2100

2150

2200

2250

2300

18-12-100:00

23-12-100:00

28-12-100:00

02-01-110:00

07-01-110:00

12-01-110:00

17-01-110:00

22-01-110:00

27-01-110:00

01-02-110:00

06-02-110:00

11-02-110:00

Time

P In

mb

ar

900

950

1000

1050

1100

1150

1200

1250

1300

1350

1400

23

79

93

specification

atm P

2