nahr el-bared update
monthly reconstruction report
december 2015 | issue no.1
process for the preparation of detailed design and tender
documents for the remaining blocks of Package 5, bids were
received in December and the technical and financial evaluation
process will commence in the New Year. In support of the
community participatory process which is underway in the
remaining three packages, technical advice was provided by the
Senior Socio-economist in the HQ Infrastructure and Camp
Improvement Department. The purpose of the week long
mission was to strengthen the mechanisms for community
engagement in relation to the planning process and to meet
with relevant community stakeholders as part of this process.
The evaluation of tenders for the protection of Archeology
soundings in Package 7 & 8 which have been completed took
place in December and the works are expected to start in
January.
The bids received for Lot 10, Lot 11 and Lot 12 were ratified
by the Area Committee for Procurement at headquarters
level in December and donor approval was requested from
the Saudi Fund for Development prior to the finalization of
the contracts with the selected contractors. It is expected
that works on site will commence in February 2016 once all
of the relevant formalities have been completed. The
reconstruction of Blocks N23, N24, N6R1, Water Tower and
Mosque continued to progress slowly during the month.
Notwithstanding this, however, partial handovers of
reconstructed buildings took place and eleven buildings
were handed over to beneficiaries. As part of the tendering
Executive Summary
HSEQualityCostTimeAreaShopsFamilies
Blocks N23 & N24 & N6R1
104.06 NMU/BC/012/13 Package 4 236 71 17146
Blocks N16,N32 (Lot 10 )
105.06 TBA Package 5 108 23 8968
Blocks N100,N101,N102
109.05 TBA A0 162 29 16302
Blocks N31, N33
105.04 TBA Package 5 195 33 16808
This report covers major construction contracts only. Please see map next page.
Coloured indicators reflect an approximate status of the project: Green = Good, Yellow = Acceptable, Red = Unsatisfactory
‘HSE’ stands for ‘Health, Safety, and Environment’. Indicators for time and cost are not necessarily attributed to the performance of the
contractor, but may caused by extensions or variations due to the introduction of design modifications to the contract.
Cover Photo: Dome and Minaret of the Mosque in Block N23
COMPLETED 2099
UNDER CONSTRUCTION 94
UNFUNDED
FAMILIESSTATUS
TOTAL 4934
2264
28 N17
26 N63,N65
27 N64,N66, N67
25 N54, N5522
24 N57, N58
21 N45,N60,N62
N59,N61, N68
2 N15
10 N16, N32
14 N30
12 N31, N33
13 N36
15 N34, N35
16 N37
17 N38
18 N27 9 N28, N29
8 N25, N26
N21, N22
N101, N102
N23, N24
23 N40,N56
151
10386
100
83
168
98
196
94
110
103
63
20 N42,N43,N44
214
197
165
184134
173
175
139
SCHOOLS 4&5
NGOs
SCHOOL 3
SCHOOL 1
SCHOOL 1A
SCHOOL 2
HEALTH CENTER
SCHOOL 4
SCHO
OL 5
Mt. Tabbour
Amqa / N
TC
Ein Karem/Toubas
Manara
Samakh
Mazzar / Majeddo
The total unfunded value is $137 million, including future infrastructure contracts and buildings in the UNRWA compound.
Construction Lot
Number Of Families
Block Numbers
Unfunded cost incl.Overheads in millions USD
7.2 m148
9 N28, N29
FUNDED 477
4
46
N18
5
1 N14
11
7
6 N6, N8
156
211
148
197
109
3
62
19
191
N11
N9
N10
N6
N12
N8
N7
N1
N5
N4
N2
N3
N44
N43
N17
N64
N54
N66
N55
N39
N41
N40
N56
N58
N20
N62
N63
N65
N68
N57
N61
N59
N67
N45
N60
N28
N25
N23
N21
N18
N19
N15
N22
N24
N26
N29
N32
N16
N31
N33
N27
N102
N101
N14
N37
N38
N36
N30
N35
N34
N42
N13
10
12
2
1 3
0
0
0
0
8
9
7
5
13
14
15
16
17
18
26
27
28
22
21
24
2325
19
20
11
6
0
0
4
N A H R E L - B A R E D C A M PPlanned Sequence of Construction and Cost of Unfunded Lots
P L A
Y G
R O
U N
D
N19
N39,N41
December 2015
NBC Monthly Report December 2015
Families People Buildings Apts Shops Area Rate Elapsed Progress
236 839 72 259 71 17146 485 115% 97%
104.06 NMU/BC/012/13 Package 4 Blocks N23 & N24 are being reconstructed thanks to the generous donation of the Kingdom of Saudi Arabia through the Saudi Fund for Development.Blocks N23 & N24 & N6R1
Contractor ABNIAH S.A.R.L
UNRWA Manager Jamal Abu Heit
The Reconstruction of Blocks N23 and N24 continued to progress at a slow pace in December.Notwithstanding
this, however,eleven buildings, six in Block N24 and five in Block N23 were handed over to the beneficiaries at the
end of the month. The completion of the remaining buildings, Mosque and Elevated Water Tower is expected to
be finalized by February.
Time
13 Nov 2013
20 Jan 2014
22 Mar 2015
Contract Date
Commencement
Duration
Original Completion
Extension
Scheduled End
Expected Delay
Forecast Completion
21 Sep 2015
29 Feb 2016
149 days
427 days ( 14 months )
Cost
Contract Value
Variations
Revised Value
Deviations
Forecast Value
% of Contract Value
Value of Works in Period
Value of Works to Date
Expenditure
0.00
8,237,015.50
241,183.00
8,478,198.00
0.00
8,478,198.00
103%
6,959,809.00
6,959,809.00
161 days
Elevated Water Tank in Block N6 Finished Staircase in a Building in Block N23
Fitted Kitchen in Block N23 Front Elevation of Mosque in Block N23
NBC Monthly Report December 2015
Families People Buildings Apts Shops Area Rate Elapsed Progress
108 470 35 181 23 8968
105.06 TBA Package 5 Blocks N16 & N32 are being reconstructed thanks to the generous donation of the Kingdom of Saudi Arabia through the Saudi Fund for Development.Blocks N16,N32 (Lot 10 )
Contractor N/A
UNRWA Manager TBA
The process for internal ratification of the recommended bidders was concluded in December following approval
by the Area Committee for Procurement at HQ level. Donor non-objection was requested in relation to the
selected bidder in order for the formalities of awarding the contract to be completed. It is anticipated that works
on site will commence at the beginning of February2016.
Time
Contract Date
Commencement
Duration
Original Completion
Extension
Scheduled End
Expected Delay
Forecast Completion
days
days ( months )
Cost
Contract Value
Variations
Revised Value
Deviations
Forecast Value
% of Contract Value
Value of Works in Period
Value of Works to Date
Expenditure
4,320,000.00
days
Archaeolgy View of Lot 10 From North-West
View of Lot 10 From South-West View of Lot 12 From East
NBC Monthly Report December 2015
Families People Buildings Apts Shops Area Rate Elapsed Progress
162 690 45 223 29 16302
109.05 TBA A0 Blocks N101 & N102 are being reconstructedthanks to the generous donations of theEuropean Union, the Government of Germanyand the Government of the United States of Blocks N100,N101,N102
Contractor N/A
UNRWA Manager TBA
The approval of the selected bidder was granted by the Area Committee for Procurement in December following
the completion of the technical and financial evaluation process. It is anticipated that contracts will be signed
with the successful bidder in the New Year, with works on site to commence at the beginning of February 2016.
Time
Contract Date
Commencement
Duration
Original Completion
Extension
Scheduled End
Expected Delay
Forecast Completion
days
days ( months )
Cost
Contract Value
Variations
Revised Value
Deviations
Forecast Value
% of Contract Value
Value of Works in Period
Value of Works to Date
Expenditure
8,291,911.45
days
Block N100 Blocks N100, N101 & N102 View From East
Blocks N100, N101 & N102 View From North Blocks N100, N101 & N102 View
NBC Monthly Report December 2015
Families People Buildings Apts Shops Area Rate Elapsed Progress
195 885 65 194 33 16808
105.04 TBA Package 5 Blocks N31 & N33 are being reconstructed thanks to the generous donation of the Kingdom of Saudi Arabia through the Saudi Fund for Development.Blocks N31, N33
Contractor N/A
UNRWA Manager TBA
The process for internal ratification of the recommended bidders was concluded in December following approval
by the Area Committee for Procurement at HQ level. The results of the bidding process were forwarded to the
donor for review and approval prior to the finalization of the contracting process with the selected bidder. It is
anticipated that works on site will commence at the beginning of February 2016.
Time
Contract Date
Commencement
Duration
Original Completion
Extension
Scheduled End
Expected Delay
Forecast Completion
days
days ( months )
Cost
Contract Value
Variations
Revised Value
Deviations
Forecast Value
% of Contract Value
Value of Works in Period
Value of Works to Date
Expenditure
8,142,500.00
days
Archaeology in Package 5 View of Lot 12 From North-West
View of Lot 12 From South View of Lot 12 From South-West
Timeline February 2016
Status Update TODAY
Year
`
In-house Design Tendering Design Services Production of TD Tendering for Construction Re-construction
Planned Planned Planned Planned PlannedActual Actual
P3
Pac
kag
es 6
, 7 &
8
Tender Documents were completed at the end of May 2015. Tendering process is pending the availibility of Funding.
25 N54 & N55
26 N63 & N65
27 N64, N66 & N67
22 N59, N61 & N68
23 N40 & N56
24
10 N16 & N32
N38
18
P5
12
13
14
15
16
17
N31 & N33
N36
N30
N34 & N35
N37
N27
A0
9 10LOT TITLE MONTH 6 7 8
11N100 extension,
N101 & N102
11 12
2015 2016
3 4 5 6 7 89 10 11 12 1 2
N57 & N58
19 N39 & N41
20 N42, N43 & N44
21 N45, N60 & N62
28
UNRWA is a United Nations agency established by the General Assembly in 1949 and is mandated to provide assistance and protection to a population of some registered Palestine refugees.
Its mission is to help Palestine refugees in Jordan, Lebanon, Syria, West Bank and the Gaza Strip to achieve their full potential in human development, pending a just solution to their plight.
UNRWA services encompass education, health care,relief and social services, camp infrastructure and improvement, microfinance and emergency assistance. UNRWA is funded almost
entirely by voluntary contributions.
Actual
N17
ActualActual