Sl. No. Financial Year Dept. Name of Principal Investigator Title of the Project Funding Agency 1 2015-2016 Civil Ambarish Ghosh Soil Investigation for the Proposed Construction of Boy's Hostel in the premises of Government College of Engineering & Ceramic Technology, Kolkata College of Engineering & Ceramic Technology, Govt. of West Bengal 2 2015-2016 Civil Saibal Kumar Ghosh Vetting of G+16 Storied building at New Town Kolkata PRAKRITIK Housing Co- operative Society Ltd. 3 2015-2016 Civil Saibal Kumar Ghosh Vetting of 4 Storied Barrack & Type II Residential Building Aakriti, Kolkata 4 2015-2016 IIPC Ashok Kumar Maitra Technical Inspection (Visual) of Non-linear Ropeway site at Bhasa Conveyor & Ropeway Services Pvt. Ltd. 5 2015-2016 Civil Saibal Kumar Ghosh Vetting of Salt Lake KendriyaVidyalaya Abhirup Architects & Engineers 6 2015-2016 Civil Asok Adak Vetting of Hydraulic Design and Drawing of Storm Water Drainage System of Lake Gardens Area under Borough - X of KMC followed by proposal of Drainage Pumping Station Comtel Consultants &InfraprojectsPvt. Ltd. 7 2015-2016 Civil Subrata Chakraborty Vetting of structural design of proposed construction of East Bidhannagar Police Station WBPH & Infrastructure Development Corporation Ltd. 8 2015-2016 HRM Manas Kumar Sanyal Advisory Services for Carrying out Social and Environment Impact Assessment for SH-13 Package - III RITES Ltd. 9 2015-2016 Civil Ambarish Ghosh Independent Assessment of effect of vibration, emanating from installation of Piles for Construction of proposed B+G+XVII office building - Siddha Esplanade Project, Kolkata under M/S SIDDHA REAL ESTATE DEVELOPMENT PRIVATE LIMITED at 6 J.L. Nehru Road, Kolkata - 700007 Siddha Real Estate Development Private Limited 10 2015-2016 Civil Saibal Kumar Ghosh Vetting of Building in B.R. Singh Hospital Panchadeep Constructions Ltd. 11 2015-2016 Civil Saibal Kumar Ghosh Vetting of Structural design - Akademia Tower ShibNiketanPvt. Ltd. 12 2015-2016 Civil Aparna (Dey) Ghosh Vetting of Design & Drawings of Effluent Treatment Plant at Haringhata Dairy under KMDA, E&WEPL Effluent & Water Treatment Engineers (P) Ltd. 13 2015-2016 Civil Saibal Kumar Ghosh Third Party Inspection of paving block Haldia Dock Complex 14 2015-2016 Civil Ambarish Ghosh Independent Assessment of effect of vibration, emanating from installation of Sheet Piles using a vibro-sinker at 2 Judge Court Road, Alipore, Kolkata (for PROPOSED CESC CORPORATE OFFICE BUILDING), on the adjoining structures and providing guidance to the construction team ShapoorjiPallonji and Company Pvt. Ltd. 15 2015-2016 IIPC Ashok Kumar Maitra Technical Inspection of DRV Passenger Ropeway at Darjeeling Conveyor & Ropeway Services Pvt. Ltd., DRV Passenger

Upload: truongphuc

Post on 04-Apr-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Sl. No. Financial Year Dept. Name of Principal

Investigator Title of the Project Funding Agency

1 2015-2016 Civil Ambarish Ghosh

Soil Investigation for the Proposed Construction of Boy's Hostel in

the premises of Government College of Engineering & Ceramic

Technology, Kolkata

College of Engineering & Ceramic

Technology, Govt. of West Bengal

2 2015-2016 Civil Saibal Kumar Ghosh Vetting of G+16 Storied building at New Town Kolkata PRAKRITIK Housing Co-

operative Society Ltd.

3 2015-2016 Civil Saibal Kumar Ghosh Vetting of 4 Storied Barrack & Type II Residential Building Aakriti, Kolkata

4 2015-2016 IIPC Ashok Kumar Maitra Technical Inspection (Visual) of Non-linear Ropeway site at Bhasa Conveyor & Ropeway Services

Pvt. Ltd.

5 2015-2016 Civil Saibal Kumar Ghosh Vetting of Salt Lake KendriyaVidyalaya Abhirup Architects & Engineers

6 2015-2016 Civil Asok Adak

Vetting of Hydraulic Design and Drawing of Storm Water Drainage

System of Lake Gardens Area under Borough - X of KMC followed

by proposal of Drainage Pumping Station

Comtel Consultants

&InfraprojectsPvt. Ltd.

7 2015-2016 Civil Subrata Chakraborty Vetting of structural design of proposed construction of East

Bidhannagar Police Station

WBPH & Infrastructure

Development Corporation Ltd.

8 2015-2016 HRM Manas Kumar Sanyal Advisory Services for Carrying out Social and Environment Impact

Assessment for SH-13 Package - III RITES Ltd.

9 2015-2016 Civil Ambarish Ghosh

Independent Assessment of effect of vibration, emanating from

installation of Piles for Construction of proposed B+G+XVII office

building - Siddha Esplanade Project, Kolkata under M/S SIDDHA

REAL ESTATE DEVELOPMENT PRIVATE LIMITED at 6 J.L. Nehru

Road, Kolkata - 700007

Siddha Real Estate Development

Private Limited

10 2015-2016 Civil Saibal Kumar Ghosh Vetting of Building in B.R. Singh Hospital Panchadeep Constructions Ltd.

11 2015-2016 Civil Saibal Kumar Ghosh Vetting of Structural design - Akademia Tower ShibNiketanPvt. Ltd.

12 2015-2016 Civil Aparna (Dey) Ghosh Vetting of Design & Drawings of Effluent Treatment Plant at

Haringhata Dairy under KMDA, E&WEPL

Effluent & Water Treatment

Engineers (P) Ltd.

13 2015-2016 Civil Saibal Kumar Ghosh Third Party Inspection of paving block Haldia Dock Complex

14 2015-2016 Civil Ambarish Ghosh

Independent Assessment of effect of vibration, emanating from

installation of Sheet Piles using a vibro-sinker at 2 Judge Court Road,

Alipore, Kolkata (for PROPOSED CESC CORPORATE OFFICE

BUILDING), on the adjoining structures and providing guidance to

the construction team

ShapoorjiPallonji and Company

Pvt. Ltd.

15 2015-2016 IIPC Ashok Kumar Maitra Technical Inspection of DRV Passenger Ropeway at Darjeeling Conveyor & Ropeway Services

Pvt. Ltd., DRV Passenger

Ropeway at Darjeeling

16 2015-2016 Civil Ambarish Ghosh

Strengthening and Widening to 2 lane/2-lane with paved shoulder

configuration of Ghatakpukur - Malancha - Sarberia Section of

Kolkata Basanti Road (Section of SH-3) in West Bengal, Km29 Ch to

Km 60 Ch Length - 31 Km (approx.) District - 24 Pgs. (North and

South) Construction of Embankment with Fly Ash - reg.

AdhunikInsfrastructure (P) Ltd.

17 2015-2016 Civil Ambarish Ghosh Non Destructive Testing and Analysis of Piles at Berth 18 KPD in

Kidderpore Dock - II Kolkata Port Trust

18 2015-2016 Civil Ambarish Ghosh Review of Structural Stability and Adequacy of Berth 4, 5, & 8 NSD

for allowing working of Mobile Harbour Crane (MHC) Kolkata Port Trust

19 2015-2016 Civil Ambarish Ghosh

Stability test of Dyke / Embankment through the proposed

Navigational Channel across Nayachara Island as a Long Term

Measures of KoPT

WAPCOS Ltd.

20 2015-2016 Civil SoumyaBhattacharjya Proof Checking of Warehouse at Agartala RITES Ltd.

21 2015-2016 Civil Ambarish Ghosh Analysis and Design of Mastand it's Support System on the building

roof top at Sagar

Kongsberg Norcontrol

Surveillance Pvt. Ltd., Gujrat

22 2015-2016 Civil Aparna (Dey) Ghosh Earthquake Resistance Certificate Shukla Devi Academy for B.Ed.

23 2015-2016 Civil Saibal Kumar Ghosh Stability Test of 2 Bays at Metal & Steel Factory, Ishapore Metal & Steel Factory, Ishapore

24 2015-2016 Civil Arun Kumar

Chakraborty

Consultancy for compressive strength of 100 mm grout cubes for up-

gradation of Man Entry Brick Sewer & allied works along Rashbehari

Avenue under JNNURM

Gypsum Structural India Pvt. Ltd.

25 2015-2016 Civil Ambarish Ghosh Vetting of Structural Design of PrabhuJagatbandhu College at Andul,

Howrah Unitech Construction

26 2015-2016 Civil Ambarish Ghosh Soil Exploration for Proposed Construction of Road over canal in

between South Sealdah Road and Canal South Road

The Kolkata Municipal

Corporation, Kolkata

27 2015-2016 Civil Ambarish Ghosh and

Sujit Kumar Dalui

Assessment of the stability of the residential building at Premises No.

1665, Nayabad, Ward no. 109, Borough No. 12 under KMC N.B. Constructor, Kolkata

28 2015-2016 Civil Sudip Kumar Roy and

Sandip Chakraborty

Strengthening and Widening/Reconstruction of Koderma -

Domchanch - Khorimahua - Jamua Road (SH 13) to two lane with

paved shoulder under EPC Mode: Safety Consultant

Ram Kripal Singh Construction

Pvt. Ltd.

29 2015-2016 Civil Arun Kumar

Chakraborty

Vetting for Civil Design and Drawings for Abutment of Bailey Bridge

Bridge (Package for Sambalpur &Sudargarh District, Odisha

Sinha & Associates (Engineers &

Design Consultants)

30 2015-2016 Civil Ambarish Ghosh

Vetting of the Design of Foundation and Superstructure system for

the proposed project "Construction of G+2 Educational Building at

Garhbeta college"

Garhbeta College, Garhbeta,

PaschimMedinipur - 721127

31 2015-2016 Civil Ambarish Ghosh Soil Exploration for Construction of Multi Storied Building in the

College Premises

SammilaniMahavidyalaya, E.M.

Bypass, Baghajatin

32 2015-2016 Civil Arun Kumar

Chakraborty

Consultancy for Material Design for piles etc for DebendrabalaGhat

to Newtown 11.5 km Pipe line project Simplex Infrastructures Limited

33 2015-2016 Civil Tapas Kumar Roy Technical vetting of structural design and estimate of a new

classroom building of Moyna College Moyna College, PurbaMedinipur

34 2015-2016 Civil Saibal Kumar Ghosh Inspection of VidyasagarSetu HRBC

35 2015-2016 Civil Saibal Kumar Ghosh Vettling of Beck Bagan Flyover &Mridangabhanga Bridge HRBC

36 2015-2016 Civil Saibal Kumar Ghosh Vetting of Design & Drawing of Tower at Belilius Park, Howrah PanchdeepContructions Ltd.

37 2015-2016 Civil Sudip Kumar Roy Vetting of pavement design of strengthening and widening to

Kolkata - Basanti Road (SH-3) Solo Consulting Services Pvt. Ltd.

38 2015-2016 Minin

g

Netai Chandra Dey&

Pratik Datta Scientific Study for Trench T-3 of ShardaHighwall Mining Project Cuprum Bagrodia Limited

39 2015-2016 Civil Ambarish Ghosh

Soil Investigation for the Proposed Construction of a Building

complex for accommodating the West Bengal State Council of Higher

Education and West Bengal College Service Commission

Kolkata Division, Social sector,

P.W.Dte., Govt. of West Bengal

40 2015-2016 Civil Sujit Kumar Dalui Vetting of Design and Drawing of B+G+10 Residence for Hon'ble

Minister of Govt. of West Bengal at Alipore, Kolkata

National Building Construction

Corporation Ltd.

41 2015-2016 Civil Saibal Kumar Ghosh Vetting of Design and Drawing of Bearings for ROB at Km 520 + 383 Oriental Structural Engineers Pvt.

Ltd.

42 2015-2016 Civil Sujit Kumar Dalui Vetting of Design and Drawing of B+G+2 Kolkata House of Govt. of

West Bengal at Alipore, Kolkata

National Building Construction

Coporation Ltd.

43 2014-2015 Electri

cal Ashok Kumar Maitra

Technical Consultancy on Electrical Equipment, Indo Nabin Projects

Limited

Indo Nabin Projects Limited,

Kolkata

44 2014-2015 Civil Sudip Kumar Roy Renovation, Rehabilitation and Strengthening of Old Arched

Masonry Bridge over river Bankra at Birhata on G.T. Road Burdwan Burdwan Development Authority

45 2014-2015 Civil Saibal Kumar Ghosh Relationship as Advisor SarojInfraconPvt. Ltd.

46 2014-2015 Civil Tapas Kumar Roy Structural Vetting for the work "Construction of Maharaja

NandakumarMahavidyalaya at BhabanipurPurbaMedinipur" Haldia Development Authority

47 2014-2015 Civil Ambarish Ghosh Proof Checking of Launching Scheme of Bhatpara ROB & POT PTFE

bearing of KMDA Project

Larsen & Toubro Ltd.,

Construction, Infrastructure IC

48 2014-2015 Civil Arun Kumar

Chakraborty

Vetting for Civil Design and Drawings for Abutment of Bailey Bridge

(Package for Koraput District, Odisha)

Sinha & Associates (Engineers &

Design Consultants)

49 2014-2015 Civil Aparna (Dey) Ghosh Training Programme for PWD Engineers - Module 2 & 3 Road and Building Research

Institute

50 2014-2015 Civil Aparna (Dey) Ghosh Training Programme for PWD Engineers - Module 1 Road and Building Research

Institute

51 2014-2015 Civil Aparna (Dey) Ghosh Vetting of Design & Drawing of Arsenic cum Iron Removal Plant

(AIRP)

Effluent &Watertreatment

Engineers (P) Ltd.

52 2014-2015 AE&A

M

Amit Roy Chowdhury,

SantanuMajumder&Nilo

yKhutia

Vibration Analysis of Cooling Towers Paharpur Cooling Towers Ltd.

53 2014-2015 Civil Ambarish Ghosh

Soil Investigation for the Proposed Construction of G+9 Storied

Building for Mother and Child Hub in the Compound of Canning

Sub-Division Hospital in the District of South 24 Parganas

South 24 Parganas Division,

Social Sector, P.W. Dte., Govt. of

West Bengal

54 2014-2015 Civil Saibal Kumar Ghosh Vetting of RCC Box under B.G. Mainline at Dunlop E.E. PWD Kolkata North Division

55 2014-2015 Civil Ambarish Ghosh

Soil Exploration Work at HIT Scheme No. VI, Holding No.144, 144/3,

145/1, 146, 146/1, 146/2, 147(P), Naskarpara Road, Ghusuri, Salkia,

Howrah for the work:- Construction of Old Age Home

Howrah Improvement Trust

56 2014-2015 Civil Tapas Kumar Roy and

PritamSaha Quality testing of road works under Alipore Division, PWD PWD, Govt. of West Bengal

57 2014-2015 Civil Prabir Kumar Paul

Certification on probable future damage of SovaIspat Plant in

Ardhagram Coal Block due to under ground mining based on of

subsidence prediction study report of CIMFR

SovaIspat Ltd.

58 2014-2015 Civil Saibal Kumar Ghosh Scaffolding Design for T G Deck Petron Engineering Construction

Ltd.

59 2014-2015 Civil Arun Kumar

Chakraborty

Consultancy for compressive strength testing of cylinder concrete

core specimens

Rajarhat IT Park Ltd. (A Bharti

Enterprise)

60 2014-2015 Civil Ambarish Ghosh

Study on the river bank protection adjoining the proposaed

construction of multistoried building at 99/1 Dr.Abani Dutta Road,

Howrah

NilimaVinimayPvt. Ltd.

61 2014-2015 Civil Saibal Kumar Ghosh Vetting of Structural Design for Bldg at Durgapur Genesis Infrastructure

Development Services, Durgapur

62 2014-2015 Civil Ambarish Ghosh

Design, engineering, procurement, construction and completion of

7.4 km, 2(two) lane elevated road between Jinjira bazar and

Batanagar on Budge Budge Trunk Road in Kolkata - Proposal for

vetting of detail design of road, substructure and superstructure

Larsen & Toubro Ltd.,

Construction, Infrastructure IC

63 2014-2015 Civil Ambarish Ghosh Soil Exploration Work at Premises No. 117, G.T. Road, Salkia,

Howrah Howrah Improvement Trust

64 2014-2015 Civil Ambarish Ghosh Soil Exploration Work at Premises No. 128, G.T. Road, Salkia,

Howrah Howrah Improvement Trust

65 2014-2015 Civil Ambarish Ghosh

Soil Exploration Work at the junction Belilious Road and

Narasinghadutta Road in connection with the laying of 1400 mm dia.

Sewer

Howrah Improvement Trust

66 2014-2015 Civil Tapas Kumar Roy Vetting of estimate, design & drawing for the work "Construction of

Muktamancha in front of BDO Office, Mahishadal Haldia Development Authority

67 2014-2015 Civil Tapas Kumar Roy Technical vetting of structural design and estimate of four storied

classroom building of Moyna College Moyna College

68 2014-2015 Civil Saibal Kumar Ghosh Consultancy for Transformer Foundation in Kolkata CESC, Kolkata

69 2014-2015 Civil Saibal Kumar Ghosh Third Party Consultancy of Paving Block at Haldia GangadharBera, Haldia

70 2014-2015 Civil Ambarish Ghosh

Soil Exploration work for Proposed Construction of a new

Government English Medium School in Matikole area under South

Dum Dum Municipality

Executive Engineer, 24 Parganas

North Division, PW(C.B.)DTE,

GOWB

71 2014-2015 Civil Ambarish Ghosh Analysis of Murram samples (four nos.) for road subgrade

construction

Larsen & Toubro Ltd.,

Construction, Infrastructure IC

72 2014-2015 Civil Saibal Kumar Ghosh Vetting of Quantification work for Tripura Food Park Sikaria Mega Food Park (P) Ltd.

73 2014-2015 Civil Sujit Kumar Dalui Rebound Hammer Teston 6 nos. location of RCC Elevated Reservoir

at Mukundapur Supreme Infrastructure India Ltd.

74 2014-2015 Civil Ambarish Ghosh Vetting of design and drawing for the civil structural works for "RCC

Intake Structure under Bhadreswar Municipality Traders & Engineers Pvt. Ltd.

75 2014-2015 Civil Ambarish Ghosh Analysis of field CBR Kolkata Port Trust, Govt. of India

76 2014-2015 Civil Ambarish Ghosh

Reviewing Vetting of design and drawing for the civil structural

works for "Design and Installation of 6th heavy duty 6 KV HT Pump-

Motor Set with suction and delivery pipeline and allied works at raw

water Pumping station PH-II, GRWW

Traders & Engineers Pvt. Ltd.

77 2014-2015 Civil

Sudip Kumar Roy, Tapas

Kumar Roy &Sandip

Chakraborty

Vetting of Estimates of Road Work under RajarhatGopalpur

Municipality RajarhatGopalpur Municipality

78 2014-2015 Civil Saibal Kumar Ghosh Design of Compressor Foundation at Haldia for IOCL IOCL, Haldia

79 2014-2015 Civil

Sudip Kumar Roy,

Sandip Chakraborty,

Tapas Kumar Roy

&PritamSaha

Safety Consultancy Services during Development and Construction

Phase of NH-34: for Project (i) Barasat - Krishnagar Section from km

31.000 to 115.000 (84 km) and (ii) Krisnnagar - Baharampore Section

from km 115.000 to 193.000 (78 km)

National Highways Authority of

India

80 2014-2015 Civil Saibal Kumar Ghosh Vetting of Gems and Jwellery Park at Domjur, Howrah Skyscraper Projects Pvt. Ltd.

81 2014-2015 Minin

g

Netai Chandra Dey&

Pratik Datta

Analysis and Interpretation of Stress Cell and Extensometer Data

Collected at ShardaHighwall Project of South Eastern Coalfields Ltd. Cuprum Bagrodia Ltd. (CBL)

82 2014-2015 Civil Sudip Kumar Roy

Chandrapura - Bhandaridah - Phusro Railway Crossing - Kathara -

Gomia Road in Jharkhand: Consultancy Services for Safety

Engineering

Ram Kripal Singh Construction

Pvt. Ltd.

83 2014-2015 Civil Sudip Kumar Roy Roughness Survey from Jinzira Bazar to Batanagar on Budge Budge

Truck Road C.E. Testing Company Pvt. Ltd.

84 2014-2015 Civil Saibal Kumar Ghosh Vetting of OHR under Bhadreswar Municipality D.C. Rakshit& Co., Kolkata

85 2014-2015 Civil Ambarish Ghosh

Review on the Structural Safety of River Crossing Transmission

Tower across River Hooghly pertaining to 400KV Double Circuit

Haldia-Subhasgram Transmission Line

Haldia Energy Limited

86 2014-2015 IIPC Ashok Kumar Maitra Technical Inspection of DRV Passenger Ropeway at Darjeeling Conveyor & Ropeway Services

Pvt. Ltd.

87 2014-2015 Civil Sudip Kumar Roy &

Tapas Kumar Roy Evaluation of Granular Mix with RBI 81

Jalnidhi Bitumen Specialties Pvt.

Ltd.

88 2014-2015 Civil Saibal Kumar Ghosh Health Monitoring of Chimney at Raigarh Visa Power Limited, Kolkata

89 2014-2015 Minin

g Pratik Dutta Geotechnical Consultancy for Panchayat Jhora Landslide Zone Mahananda Construction Co.

90 2014-2015 Civil Saibal Kumar Ghosh Health Monitoring of Four RCC Column in Sagar BIL Infratech Limited, Kolkata

91 2014-2015 Civil Ambarish Ghosh Checking of design of VTMS Tower at Dadanpatra Kolkata Port Trust, Govt. of India

92 2014-2015 Civil Ambarish Ghosh

Reviewing Soil Report and Vetting of Design & Drawing for the Civil

Structural works for Design and Construction of 3.0 MG Semi-

Underground Reservoir-cum-Booster Pumping Station at Senpally,

Behala, Ward No. 129

Traders & Engineers Pvt. Ltd.

93 2014-2015 Electri

cal Ashok Kumar Maitra

Technical Vetting of Estimates of Electrical Schemes, Talgachhari-I

Gram Panchayat

Talgachhari-I Gram Panchayat,

PurbaMedinipur

94 2014-2015 Civil Gautam Bhattacharya

Carrying out Slope Stability Analysis for Dyke of Tailing Pond of

Odisha Mining Corporation (OMC) at South Kaliapani, Jajpur,

Odisha for MECON LIMITED - Ranchi

MECON LIMITED - Ranchi, (A

Govt. of India Enterprise)

95 2014-2015 Civil Sudip Kumar Roy

Pavement Soil Investigation, Pavement Material Investigation, Speed

& Delay Survey for Improvement and Widening of NH-44 in the

State of Tripura

Sumit Consultancy Services

96 2014-2015 Metall

urgy SukumarKundu Identification of Non-metallic inclusions in Hadfield Manganese Steel Shilpa Alloys Pvt. Ltd.

97 2014-2015 Civil Saibal Kumar Ghosh Vetting of G+8 Building at Salt Lake Hollyhock Co-operative Housing

Society Ltd.

98 2014-2015 Civil Saibal Kumar Ghosh Investigation for failure of roofing system …… BalmerLawrie& Co. Ltd., Kolkata

99 2014-2015 Civil Sujit Kumar Dalui Analysis of materials and Design Mix of Multi-Storeyed Class Room

Building of Mahishadal Raj College Mahishadal Raj College

100 2014-2015 Civil Saibal Kumar Ghosh Vetting of Design for 4 Storied Buildings for Kolkata Police Partha Das & Associates, Kolkata

101 2014-2015 Civil Sudip Kumar Roy Design of Pavement of Habra-Kumra Road and NaihatiJirat Road

Executive Engineer, Barasat

Highway Division - II.P.W.

(Roads) Directorate

102 2014-2015 Civil Ambarish Ghosh

Independent Assessment of effect of vibration, emanating from

installation of Sheet Piles using a vibro-sinker at Premises No. 576,

Anandapur Plot 1-18 Sector 9-J under EKADPPS, Anandapur,

Kolkata - 700107, on the adjoining structures and providing guidance

Ruby General Hospital Ltd.

to the construction team

103 2014-2015 Civil Ambarish Ghosh Soil Exploration Work at three Plots of HIT, Howrah Howrah Improvement Trust

104 2014-2015 Civil Ambarish Ghosh

Feasibility of acceptance of test result of Dynamic load test instead of

static load test for routine load test of 1000/800 mm diameter cast in

situ bored piles at Sabang, PaschimMedinipur

Bridge and Roof Co. (India) Ltd.

105 2014-2015 Civil Arun Kumar

Chakraborty

Consultancy assignment for conducting Non Destructive Test

towards Stability analysis for various R.C.C. structural components

for DPC's of Jute Corporation of India Ltd.

Webcon Consulting (India) Ltd.

106 2014-2015 Civil Saibal Kumar Ghosh Health Monitoring & Vetting of 3 MSC Buildings Ninjas Consultancy & Services,

Kolkata

107 2014-2015 Civil Sujit Kumar Dalui Analysis of Concrete Mix Design for Strengthening and Widening of

SH-6 KCC BuildconPvt. Ltd.

108 2014-2015 Civil Ambarish Ghosh Soil Exploration Work for Proposed Construction of G+5 storied

building at PrabhuJagabandhu College, Jhorehat, Andul-Muuri

PrabhuJagabandhu College,

Educational Institute

109 2014-2015 Minin

g

Suranjan Sinha & Gopal

Chandra Roy

Scientific evaluation of Mine Closure Plan with reference to

sustainable development framework of Government of India for

DongriBuzurg Mine of MOIL

MOIL Limited

110 2014-2015 Civil Ashis Kumar

Bera&Ambarish Ghosh Analysis of Glass Fibre Sardip Consulting Engineers

111 2014-2015 Civil

Ambarish Ghosh, Sudip

Kumar Roy

&SantanuBhanja

Vetting of Drawing of 4 lane Elevated Corridor along KaziNazrul

Avenue (VIP Road) from Kestopur to JoraMandir

IL & FS Infrastructure

Development Corporation

Limited

112 2014-2015 Civil

Ambarish Ghosh, Sudip

Kumar Roy , Sujit Kumar

Dalui&Prabir Kumar

Paul

Pre tender design advisory consultancy for "Design and construction

of 578 m long Theng tunnel including geological investigation and

studies, design of tunnel and construction of tunnel proper including

Civil as well as Electrical/Mechanical works along with approaches at

KM 86.9 on Gangtok-Chungthang road under project Swastik in

Sikkim state

ITD Cementation India Limited

113 2014-2015 Civil Tapas Kumar Roy Vetting of Plan and Estimate of the proposed PG Building

Vivekananda Mission

Mahavidyalaya, Chaitanyapur,

PurbaMedinipur

114 2014-2015 Civil Ashis Kumar Bera Analysis of Bottom Ash and Steel Plant Slag Material in Ash Dyke as

substitute of Sand

NTPC-SAIL Power Company

Private Limited

115 2014-2015 Civil Saibal Kumar Ghosh Structural Stability of Administrative Building of NITA Nabadiganta Industrial Township

Authority

116 2014-2015 Civil Aparna (Dey) Ghosh Vetting of Design & Drawing of Arsenic cum Iron Removal Plant

(AIRP)

Effluent &Watertreatment

Engineers (P) Ltd.

117 2014-2015 Civil Ambarish Ghosh Soil Exploration and Surveying Work at five Sites of Burdwan

The Executive Engineer, Burdwan

Division, P.W. (CB) Directt.

Jagatberth, Surya Nagar

118 2014-2015 Civil Ambarish Ghosh

Soil Exploration Work in connection with the breach of closure work

on the left bank of river New Cossye at GarhPurosottampur within

Panskura Municipal area, District PurbaMedinipur

The Chief Engineer (West),

Irrigation & Waterways

Directorate, Govt. of W.B.

119 2014-2015 Civil Ambarish Ghosh

Geotechnical Investigation for the Contraction of Proposed RCC

Bridge over River Bidya connecting Godkhali and Gosaba Bazar in

the District of South 24 Parganas, against vide Memo No. 742, dated

17.12.2013

Highway Survey Division - I.P.W.

(Roads) Directorate,

BhabaniBhawan, Kolkata -

700027, Govt. of W.B.

120 2014-2015 Civil Sudip Kumar Roy Traffic Study for proposed elevated connector between Belghoria

Expressway and Kalyani Expressway …… NH-34.

Executive Engineer, Highway

Survey Division - I.P.W. (Roads)

Directorate

121 2014-2015 Civil Ambarish Ghosh

Geotechnical Investigation for the Construction of Proposed Elevated

connector between Belgharia Expressway and Kalyani Expressway to

bypass Barasat Town for North Bengal bound Traffic of NH34

Highway Survey Division - I.P.W.

(Roads) Directorate,

BhabaniBhawan, Kolkata - 700027

122 2013-2014 Civil Ambarish Ghosh Soil Exploration Work at four Sites of Burdwan

Burdwan University Division,

P.W. (CB) Directt., Govt. of West

Bengal

123 2013-2014 Civil Sudip Kumar Roy Consultancy Service Preparation DPR of Salkia Flyover Project Howrah Improvement Trust

124 2013-2014 IIPC Ashok Kumar Maitra Technical Vetting of Technical Feasibility Report for Ropeway at

Kurseong

Conveyor & Ropeway Services

Pvt. Ltd.

125 2013-2014 Civil Ambarish Ghosh

Independent Assessment of effect of vibration, emanating from

installation of Sheet Piles using a vibro-sinker at 52/1, Shakespeare

Sarani, Kolkata - 700017, on the adjoining structures and providing

guidance to the construction team

M/S Express DevconPvt. Ltd.

126 2013-2014 Civil Saibal Kumar Ghosh Vetting of Pipe Conveyor Over Bridge in Orissa Bhushan Power & Steel Ltd.,

Kolkata

127 2013-2014 Civil Sudip Kumar Roy Vetting of pavement design of strengthening and widening to 2 lane /

2 lane with paved shoulder of a Section of SH-6

M/S CE Testing Company Pvt.

Ltd.

128 2013-2014 Civil Sudip Kumar Roy Vetting of pavement design of strengthening and widening to Barjora

to Mejhia (Durlavpur More) Road

M/S Caritas Infra Consulting Pvt.

Ltd.

129 2013-2014 Civil Saibal Kumar Ghosh Design of Animal House in Shyamnagar Bose Institute, Kolkata

130 2013-2014 Civil Ambarish Ghosh Analysis of Soil Samples for Construction of Ash Pond, 2 × 600 MW

Raghunathpur Thermal Power Project

DasconSourav Commercial Pvt.

Ltd.

131 2013-2014 Civil Ambarish Ghosh

Vetting of detail design of substructures and superstructure of

Chandan Nagar ROB of KMDA Flyovers and ROBs excluding span

between P19 and P20 along with the proposed road including the

M/S Larsen & Toubro Limited,

Construction Infrastructure IC

minor bridge over river Saraswati

132 2013-2014 Electri

cal

Ashok Kumar Maitra

and Jagadish Pal Consultancy at Government Hospitals in West Bengal PWD, Govt. of West Bengal

133 2013-2014 AE&A

M KoustuvDebnath Calibration of Rotameter

Kolkata Metropolitan Water and

Sanitation Authority

134 2013-2014 Civil Saibal Kumar Ghosh Design of pipe bridge & motor lifting arrangement at Haldia IOCL

135 2013-2014 Civil Ambarish Ghosh Vetting of Warehouse at Maheshtala, Kolkata Amiya Commerce & Construction

Co. Pvt. Ltd., Kolkata

136 2013-2014 Civil Ambarish Ghosh Pile Integrity Test (PIT) with PIT Collector Model, Foundation

System of RCC Bridge Over River Saniajan

Dilip Kumar Saha (Govt.

Contractor and Engineer)

137 2013-2014 Civil Ambarish Ghosh Pile Integrity Test (PIT) with PIT Collector Model, Foundation

System of RCC Bridge Over River Saniajan

Dooars Construction Company

(Rly and Govt. Contractor)

138 2013-2014 Civil Ambarish Ghosh

Soil Investigation Report for the Design of Gangway and Pump

house Structures based on Field and Laboratory testing / observations

for R.C.C. Intake Jetty at Titagarh under JNNURM

Traders & Engineers Private Ltd.

139 2013-2014 SEIHS

M Souvanic Roy

Heritage Survey and Zone Plan Proposal in Serampore's Historic

Centre

National Museum of Denmark

Research & Exhibitions

140 2013-2014 Civil Ambarish Ghosh

Geotechnical Investigation connection with (1) Proposed Connecting

Road from Kamardanga to Howrah Amta Road Including ROB at

Kamardanga., Howrah, and (2) Proposed MultilayeredParkomat

Including Allied Facilities at Domrajola, for DPR preparation under

JNNURM

Road Infrastructure Consultant

Pvt. Ltd.

141 2013-2014 Civil Saibal Kumar Ghosh Vetting of Superstructure of G+13 Building Partha Das & Associates

142 2013-2014 Civil Saibal Kumar Ghosh Health Monitoring of Namkum Bridge, Ranchi C.E. Testing Company Pvt. Ltd.,

Kolkata

143 2013-2014 Civil Ambarish Ghosh

Engineering drawings supported by back up calculations on

structural strength for constructing a temporary shoring by Steel

Sheet Piles of Arcellormittal profile OT-22

Himadri Memorial Cancer

Welfare Trust

144 2013-2014 Civil Ambarish Ghosh Vibration Measurement at site during test pile Driving Ambuja Cements Ltd., Vill. & P.O.

- Dhulagori, Howrah

145 2013-2014 Minin

g

Netai Chandra Dey&

Gopal Chandra Roy

Strata monitoring at CM District (Sub-Panel P6, P7A and P8) of Sarpi

project, SS Pur Colliery, Bankla area, ECL ECL - Bankola Area

146 2013-2014 Civil Tapas Kumar Roy

Structural vetting for Construction of Clear Water Reservoir, Pump

House and Chorine House for dedicated water supply system for

IOCL, Haldia Refinery

Haldia Development Authority,

Haldia

147 2013-2014 Metall

urgy

Manojit Ghosh and

SanjoySadhukhan Welding & Fabrication of Steel Work INSDAG

148 2013-2014 Civil Saibal Kumar Ghosh Vetting of G+8 Storied Building in Kolkata Indian City Properties Ltd.

149 2013-2014 Civil Saibal Kumar Ghosh Vetting of DPR for Bairabi Dam Project, Mizoram Sikaria Power Ltd., Kolkata

150 2013-2014 Civil Saibal Kumar Ghosh Telescope Tower House at Falta Bose Institute, Kolkata

151 2013-2014 Civil Ambarish Ghosh

Validation of the designs and drawings for the work and Approval of

"Design, Drawing, Construction of R.C.C. Intake Jetty and Jetty

Mounted Pump House of capacity 210 MLD including substation

building along with ancillary works at Glass KothiGhat, Titagarh

under Trans-Municipal Water Supply Schemes of Titagarh and

Khardah Municipality under JNNURM"

Traders & Engineers Private Ltd.

152 2013-2014 Civil Saibal Kumar Ghosh Third Party Consultancy for 11.5 Km Water Pipe Line Simplex Infrastructure Limited,

Kolkata

153 2013-2014 Civil Sudip Kumar Roy STA, PMGSY, West Bengal National Rural Roads

Development Agency (NRRDA)

154 2013-2014 Civil Sudip Kumar Roy,

Sandip Chakraborty Preparation of DPR under JNNURM Howrah Improvement Trust

155 2013-2014 Civil Tapas Kumar Roy Vetting of Plan and Estimate of the Proposed Library Building & PG

Building Prabhat Kumar College, Contai

156 2013-2014 Civil

Ambarish Ghosh, Sandip

Chakraborty, Asok

Adak, Sujit Kumar Dalui

Inspection of Sewer Line Work at Doomrajala Scheme - II, Phase - II

Work Howrah Improvement Trust

157 2013-2014 IIPC Ashok Kumar Maitra Technical Audit of DRV Ropeways at Darjeeling Conveyor & Ropeway Services

Pvt. Ltd.

158 2013-2014 Civil Saibal Kumar Ghosh Design of DG Room & Building in Meghalaya Sterling and Wilson Ltd.

159 2013-2014 Chemi

stry Sabyasachi Sarkar Desalination of Water by Graphene Desnoz Inc. (USA), Pvt.

160 2013-2014 Civil Ambarish Ghosh Analysis of Soil Samples to be used for Ash Dyke at DVC, 2 x 600

MW Raghunathpur Thermal Power Project

DasconSourav Commercial Pvt.

Ltd.

161 2013-2014 Archit

ecture Arup Sarkar

Developing Concept Plan for Interior Restructuring and Remodelling

of Writers' Building

Govt. of West Bengal, Principal

Secretary PWD

162 2013-2014 Civil Ambarish Ghosh

Validation of the soil test report along with your vetting reports for

the design and drawing by our consultant on "Design & Construction

of One (1) No. UGR-cum-Pump House of 2.0 (Two) M.G. capacity

over pile foundation at Panihati Municipality on Turnkey Basis under

JNNURM

Traders & Engineers Private Ltd.

163 2013-2014 HRM Manas Kumar Sanyal Advisory service for preparation of Social and Environmental

Screening Report

RITES Limited (A. Govt. of India

Enterprise)

164 2013-2014 Civil Saibal Kumar Ghosh Stability Checking of Lift Structure Kalyani University

165 2013-2014 Metall

urgy SanjoySadhukhan Compilation Work on Stainless Steel for Construction Segment

Institute for Steel Development

and Growth (INSDAG)

166 2013-2014 Minin

g Pratik Dutta

Consultancy on Geotechnical Properties of Rock at Bomi Iron Ore

Project Western Cluster Limited

167 2013-2014 Civil Saibal Kumar Ghosh Design of Ganga Sagar Gate Dhar& Associates Pvt. Ltd.

168 2013-2014 Civil Sudip Kumar Roy

Consultancy Service in the form of Advice and Guidance for

Pavement Design of Runway, Taxiway and Apron of Kannur

International Airport, Kannur

ITD Cementation India Limited

169 2013-2014 Civil Saibal Kumar Ghosh Vetting of Slip Form Shuttering in Barauni Basu& Associates, Kolkata

170 2013-2014 Civil Sudip Kumar Roy and

Ambarish Ghosh

Pavement Construction Quality Investigation for road at IQ Citty,

Durgapur SPS Mani Infrastructure Pvt. Ltd.

171 2013-2014 Civil Saibal Kumar Ghosh Vetting of Shed in Sealdah Railway Station M/S Ratan Kumar Das, Kolkata

172 2013-2014 Civil Tapas Kumar Roy Analysis on the WMM materials to be used for Development of

Integrated check-post at Petrapole, along Indo-Bangladesh

RITES Limited (A. Govt. of India

Enterprise), I.C.P. Petrapole

173 2013-2014 Electri

cal

Konika Das

(Bhattacharya) Automatic Power Factor Controller Industrial Repose

174 2013-2014 Civil Ambarish Ghosh Pile Integrity Test (PIT) with PIT Collector Model for TCS IT SEZ

Project, Kolkata L&T Construction SPCL UJV

175 2013-2014 Civil Ambarish Ghosh Liquefaction analysis for Industrial Activity at Nayachar Universal Crescent Power Pvt.

Ltd.

176 2013-2014 Civil Ambarish Ghosh Vetting of detail design of substructures and superstructure of

Kalyani ROB of KMDA Flyovers and ROBs

M/S Larsen & Toubro Limited,

Construction Infrastructure IC

177 2013-2014 Civil Saibal Kumar Ghosh Vetting of Design of Ancillary Unit of CLW at Dankuni Consulting Engineering Services

(India) Pvt. Ltd.

178 2013-2014 Civil Saibal Kumar Ghosh Vetting of Pre-Engineered Building Amiya Commerce & Construction

Co. Pvt. Ltd., Kolkata

179 2013-2014 Civil Sudip Kumar Roy and

Tapas Kumar Roy

Investigation Regarding Pavement Deterioration in the Kholapopota

- Baduria - Maslandapur - Habra Road

MAXDWELL Enterprise, 5/1, S.S.

Banerjee Road, Kolkata - 700060

180 2012-2013 Electri

cal Ashok Kumar Maitra Technical Vetting of Estimates of Electrical Schemes, DSDA

DighaSankarpur Development

Authority, PurbaMedinipur

181 2012-2013 Civil Ambarish Ghosh Measurement of vibration due to sheet pile driving at "THE 42" at

42B, Chowringhee Road, Kolkata 700071 Chowringhee Residency Pvt. Ltd.

182 2012-2013 Civil Arun Kumar

Chakraborty

Consultancy & Contingency Charges for determination of Flexural

Properties of GRP Liners Michel BAU GmbH & Co. KG

183 2012-2013 Minin

g Pratik Dutta Consultancy for Geotechnical analysis of Mahuagarhi Coal block

Mahuagarhi Coal Company Pvt.

Ltd.

184 2012-2013 Civil Ambarish Ghosh Dynamic load test Larsen & Toubro Limited,

Construction Infrastructure IC

185 2012-2013 Civil Ambarish Ghosh

Proof Checking of Detailed Design and Drawing of the Foundation of

Railway Bridges: in connection with gauge conversion work of

SakriNirmali&Jhanjharpur - Laukaha Bazar Section, East Central

Railway

Basic & Progressive Concept

INDIA

186 2012-2013 Civil Anirban Gupta Study on the feasibility of providing separate sewer system in un-

sewered areas of Kolkata under proposed KEIP-II Project Kolkata Municipal Corporation

187 2012-2013 Civil Saibal Kumar Ghosh Vetting of 1100 Cum Water Reservoir at Madhyamgram Amal Dutta Roy, Kolkata

188 2012-2013 Civil Saibal Kumar Ghosh Investigation of a building at Kolkata Kolkata Municipal Corporation

189 2012-2013 Civil Ambarish Ghosh Soil report & Vetting of design - G.J. Khan Pumping Station Traders & Engineers Private Ltd.

190 2012-2013 Civil Ambarish Ghosh Preparation of Validation report of Soil data - Intake Jetty with Pump

House under Panihati Municipality Traders & Engineers Private Ltd.

191 2012-2013 Civil Saibal Kumar Ghosh Vetting of Garment Park HRBC, Govt. of WB

192 2012-2013 Civil Saibal Kumar Ghosh Vetting of G+3 Storied Building at Uttarpara, Hooghly ChandiProsadKhanra, Howrah

193 2012-2013 Civil Subrata Chakraborty Vetting of Bridges MBB Consultancy Services Pvt.

Ltd., Kolkata

194 2012-2013 Civil Ambarish Ghosh Pile Integrity Test (PIT) with PIT Collector Model for E K Tower ShrachiBurdwan Developers Pvt.

Ltd.

195 2012-2013 HRM Manas Kumar Sanyal

Consultancy Services on Environmental Study for the "Preparation of

Pre-Feasibility Study Report for Selected State Highway Corridors in

West Bengal for Taking up in DBFOT Pattern or EPC Mode"

RITES Ltd. (A Govt. of India

Enterprise)

196 2012-2013 Civil Saibal Kumar Ghosh Vetting of G+13 SGO Complex at Salt Lake for the Dept. of Urban

Development, Govt. of West Bengal Partha Das & Associates

197 2012-2013 Civil Arun Kumar

Chakraborty

Vetting/checking of design calculations and drawings of RCC-

structures for construction of "G+8" stroried residential building of

Setu Co-operative Housing Society Ltd. at New Town, Kolkata

Setu Co-operative Housing

Society Ltd., Kolkata

198 2012-2013 Minin

g Pratik Dutta

Consultancy service for Geotechnical study of NimbriChandawatan

project Binani Cement Limited

199 2012-2013 Civil Ambarish Ghosh Consultancy Services for Fortune Multispeciality Hospital Pvt. Ltd. Fortune Multispeciality Hospital

Pvt. Ltd.

200 2012-2013 Mecha

nical

Sujoy Kumar Saha and

six other Professors JhargramGuptamani Project BIAIPPL

201 2012-2013 Civil Saibal Kumar Ghosh Design of steel shoring for construction of basement for proposed

Commercial Building at Nagerbazar, Dumdum Shelter Kolkata

202 2012-2013 Civil Ambarish Ghosh Vetting of Design & Drawing - Intake Jetty with Pump House under

Panihati Municipality Traders & Engineers Private Ltd.

203 2012-2013 Civil Saibal Kumar Ghosh Vetting of Design & Drawing of Bridges in Bihar Chaitanya Projects Consultancy

Pvt. Ltd.

204 2012-2013 Civil Saibal Kumar Ghosh Vetting of Slip Form Shuttering Prasad & Co. Limited

205 2012-2013 Civil Ambarish Ghosh

Independent Assessment of effect of vibration, emanating from

installation of Sheet Piles using a vibro-sinker at 52/1, Shakespeare

Sarani, Kolkata - 700017, on the adjoining structures and providing

guidance to the construction team

M/S Express DevconPvt. Ltd.

206 2012-2013 Civil Ambarish Ghosh Soil Exploration Work at five Sites of Burdwan Medical College

Campus

Burdwan University Division,

P.W. (CB) Directt., Govt. of West

Bengal

207 2012-2013 Civil Tapas Kumar Roy Vetting of Estimates Burdwan Development Authority

208 2012-2013 Civil Saibal Kumar Ghosh Vetting of Design & Drawing of Railway Bridges Chaitanya Projects Consultancy

Pvt. Ltd.

209 2012-2013 Civil Saibal Kumar Ghosh Vetting of "Unified Campus of Bose Institute" Bose Institute, Govt. of India

210 2012-2013 Civil Ambarish Ghosh Soil Exploration Work at six Plots of HIT, Howrah Howrah Improvement Trust,

Government

211 2012-2013 Civil Ambarish Ghosh Assessment of vibration emanating from installation of Sheet Piles

using a vibro-sinker at 52/1, Shakespeare Sarani, Kolkata - 700017 M/S Express DevconPvt. Ltd.

212 2012-2013 Civil Saibal Kumar Ghosh Vetting of Structural Design & Drawing of Launching Girder 02 Simplex Infrastructures Limited,

Kolkata

213 2012-2013 Civil Saibal Kumar Ghosh Redesign of Boundary Wall for Project Site at Kulpi Bengal Shipyard Limited, Kolkata

214 2012-2013 Civil Kalyan Kumar

Chattopadhyay

Soil Investigation Work for Construction of Multipurpose Cyclone

Shelters at Amtalia Village, Deshapran Block, PurbaMidnapur, West

Bengal

Engineering Projects (India)

Limited

215 2012-2013 Civil Ambarish Ghosh Pile Integrity testing of in-situ-bored piles IVRCL Limited Kalyani

216 2012-2013 Civil Sudip Kumar Roy and

Ambarish Ghosh

Distress signs at various locations of the buildings of the Primary

Health Centre at Lakhuria, Burdwan BurdwanZillaParishad

217 2012-2013 Civil Saibal Kumar Ghosh Vetting of Design and Drawing for Slip Form Shuttering for Chimney

Structure at Vizag Basu& Associates, Kolkata

218 2012-2013 Civil Ambarish Ghosh Vetting of Design and Drawing for G+11 Storied Building under

Howrah Municipal Corporation Vijai Shree Ltd., Kolkata

219 2012-2013 Civil Ambarish Ghosh Vetting/Approval of the Designs of Diaphragm wall system at IB 167,

Sector - III, Salt Lake City, Kolkata Traders & Engineers Private Ltd.

220 2012-2013 Civil Saibal Kumar Ghosh Proof checking of Design and Drawing for Pile Foundation of 5 nos

Bridges from Bankura to Mukutmanipur of South Eastern Railway

MBB Consultancy Services Pvt.

Ltd., Kolkata

221 2012-2013 AE&A

M Amit Roychowdhury

Consultancy job for Stress analysis of RCC chimney and Fan

Foundation Descon United Technical Service

Total Amount Sanctioned (Rs. in lakh) 1410.28