NAME OF WORK CONSTRUCTION OF 4 NOS BRIDGE AT KHUTRI CANAL OPPOSITE BASTI Amount of Work. Rs: 9,539,000/-
CHANARAN, CHAK NO.113/DNB, BRIDGE AT SHAHI WALA CANAL OPPOSITE Earnest Money.Rs: 191,000/-
MUDRASSA QARI SHAHBAZ BAJWA, BRIDGE AT SALARI CANAL, CHAK NO.84/DB Time Limit: 06 Months.
OPPSITE DERA MALIK AZEEM BOHAR AND BRIDGE AT CHUMMAN WALI CANAL
OPPOSITE GRAVEYARD CHAK NO.134/DRB TEHSIL YAZMAN & DISTRICT BAHAWALPUR.Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
1 -- Bridge at Khutri Canal756
P.Sft (Per
Square feet)
2 -- Bridge at Shahi Wala Canal644
P.Sft (Per
Square feet)
3 -- Bridge at Salari Canal182
P.Sft (Per
Square feet)
4 -- Bridge at Chumman Wali Canal168
P.Sft (Per
Square feet)
1 411-1 to 411-13.
301-1 & 202-3
Earth work in ordinary soil for embankment all lead and lift i/c
ploughing and mixing with blade grade or disc harrow or other suitable
equipment and compaction by mechanical means at OMC and
dressing to designed section complete in all respect, 95% to 100%
maximum modified AASHO dry density.
79.200
%oCft
(Thousand
Cubic feet)
Executive Engineer
Highway Division, Bahawalpr
BID SCHEDULE
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
Executive Engineer,Executive Engineer,
NAME OF WORK 1. REHABILITATION OF METALLED ROAD HEAD RAJKAN NEAR AL-NOOR Amount of Work. Rs: 10,372,000/-
HOSPITAL (LENGTH 0.60 KM) TEHSIL YAZMAN & DISTRICT BAHAWALPUR. Earnest Money.Rs: 207,500/-
Time Limit: 06 Months.
2. CONSTRUCTION OF METALLED ROAD FROM KHUTRIE BANGLOW TO DERA
RA-SHABAN (LENGTH 0.88 KM) TEHSIL YAZMAN & DISTRICT BAHAWALPUR.
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
1. REHABILITATION OF METALLED ROAD HEAD RAJKAN NEAR AL-NOOR
HOSPITAL (LENGTH 0.60 KM) TEHSIL YAZMAN & DISTRICT BAHAWALPUR.
1 18.1/401-5.1 Dismantling of exisitng dry brick soling / road edging.
7.38
%Cft
(Hundred
Cubic feet)
2 411-1 to 411-13.
301-1 & 202-3
Earth work in ordinary soil for embankment all lead and lift i/c
ploughing and mixing with blade grade or disc harrow or other suitable
equipment and compaction by mechanical means at OMC and
dressing to designed section complete in all respect, 95% to 100%
maximum modified AASHO dry density.
19.680
%oCft
(Thousand
Cubic feet)
3 552-1 to 552-5 Providing and laying road edging of 3" (three inches) wide & 9" (nine
inches) deep brick on end complete in all respect. 3936
P.Rft
(Per Running
foot)
4 501-1 to 501-6/551-
6.1
P/L of water bound macadum base course of crushed stone agg: of
approved quality and grade and supply and spreading of Stone
screening I/c placing and mixing and compaction of Base Course
material to required depth camber and grade to achieve 100%
maximum modified dry density I/c carriage of all material to site of
work except gravel and aggregate.
65.60
%Cft
(Hundred
Cubic feet)
5 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. of approved quality,including cleaning or road
surface neating and sparaying bajri and rollin wih road roller (including
its operation,fuel and hire charges,etc) cmplete including carriage of
all materials to site of work except bajri/crushed stone aggrgate,using
67 lbs bitumen & 7.50 Cft Bajri 100 Sft area.
196.80
%Sft
(Hundred
Square feet)
ROAD FURNITURE
6 Manufacturing of Rectangular Sign Board Size 4'x6' With Double Post
of G.I Pipe 3" Dia 12' Height Complete Base & Lettering / Symboling
With Diamond Grade Reflective Sheet / Tape (Single Side)
Informatory Board.
1 Each
BID SCHEDULE
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
2. CONSTRUCTION OF METALLED ROAD FROM KHUTRIE BANGLOW TO DERA
RA-SHABAN (LENGTH 0.88 KM) TEHSIL YAZMAN & DISTRICT BAHAWALPUR.
1 411-1 to 411-13.
301-1 & 202-3
Earth work in ordinary soil for embankment all lead and lift i/c
ploughing and mixing with blade grade or disc harrow or other suitable
equipment and compaction by mechanical means at OMC and
dressing to designed section complete in all respect, 95% to 100%
maximum modified AASHO dry density.
194.052
%oCft
(Thousand
Cubic feet)
2 501-1 to 501-6/501-
6.2
P/L of Sub base course of crushed stone agg: of approved quality and
grade and supply and spreading I/c placing and mixing and
compaction of Sub Base Course material to required depth camber
and grade to achieve 100% maximum modified dry density I/c carriage
of all material to site of work complete in all respect.
147.21
%Cft
(Hundred
Cubic feet)
3 552-1 to 552-5 Providing and laying road edging of 3" (three inches) wide & 9" (nine
inches) deep brick on end complete in all respect. 5773
P.Rft
(Per Running
foot)
4 501-1 to 501-6/551-
6.1
P/L of water bound macadum base course of crushed stone agg: of
approved quality and grade and supply and spreading of Stone
screening I/c placing and mixing and compaction of Base Course
material to required depth camber and grade to achieve 100%
maximum modified dry density I/c carriage of all material to site of
work except gravel and aggregate.
147.21
%Cft
(Hundred
Cubic feet)
5 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. of approved quality,including cleaning or road
surface neating and sparaying bajri and rollin wih road roller (including
its operation,fuel and hire charges,etc) cmplete including carriage of
all materials to site of work except bajri/crushed stone aggrgate,using
67 lbs bitumen & 7.50 Cft Bajri 100 Sft area.
294.41
%Sft
(Hundred
Square feet)
ROAD STRUCTURE
Construction of 2' Span RCC Slab Culvert 24' Formation 02 Nos.
6 17.1 to 17.5.
402-14.1
Excavation in foundation of building, bridges and other structures,
including dag-belling, dressing, refilling around structure with
excavated earth, watering ramming lead up to one chain and lifts up to
5 ft in ordinary soil.
0.664
%oCft
(Thousand
Cubic feet)
7 20.1/701-18-15 Cement concrete brick or stone ballast 1.5” to 2” gauge, in foundation
and plinth ratio 1:4:8 complete in all respect I/c supply of all material. 5.28
%Cft
(Hundred
Cubic feet)
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
8 21.1 to 21.4/801-
35.1
Pacca brick work ratio 1:4 cement sand mortar complete in all respect
including supply of all material. 7.20
%Cft
(Hundred
Cubic feet)
9 851-5/821-14.2 Fabrication mild steel reinforcement for cement concrete, including
cutting bending laying in position, making joints and fastening,
including cost of binding wire and labour charges for binding of steel
reinforcement (also includes the removal of crust from bars) complete
in all respect.b) Deform bars.
3.96
% Kg
(Hundred Kilo
Gram)
10 20.4/701-18.3 Providing and laying reinforced cement concrete (including pre-
stressed concrete) using coarse sand and screened graded and
washed aggregate in required shape and design including forms,
moulds, shuttering lifting, compacting, curing, rendering, and finishing
exposed surface complete including supply of material ( but excluding
the cost of steel reinforcement its fabrication and placing in position
etc.b) Reinforced cement concrete in roof slabs, beams columns,
lintels, girders and other structural member laid in situ or pre-cast laid
in position or pre-stressed members cast in situ, complete in all
respect. Type “C”( Nominal mix 1:2:4)
162.66
P.Cft
(Per Cubic
foot)
ROAD FURNITURE
11 Manufacturing of Rectangular Sign Board Size 4'x6' With Double Post
of G.I Pipe 3" Dia 12' Height Complete Base & Lettering / Symboling
With Diamond Grade Reflective Sheet / Tape (Single Side)
Informatory Board.
1 Each
The amount of Rs.7,694/- of material received after dismentling of
existing road structure shall be recovered from the contractor
of existing culverts in recpect of the quantity of material.
Executive Engineer
Highway Division, Bahawalpr
Executive Engineer,Executive Engineer,
NAME OF WORK CONSTRUCTION OF METALLED ROAD FROM SUKHAIL ROAD BASTI NIAZI KHAN Amount of Work. Rs: 9,414,000/-
TO BASTI ZAFAR KHAN MOUZA SUKHAIL & CONSTRUCTION OF BRIDGE ON Earnest Money.Rs: 188,500/-
BAHAWAL WAH AT RD 126490 (LENGTH:0.97 KM) Time Limit: 06 Months.
TEHSIL AHMEDPUR EAST & DISTRICT BAHAWALPUR.Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
1 411-1 to 411-13.
301-1 & 202-3
Earth work in ordinary soil for embankment all lead and lift i/c
ploughing and mixing with blade grade or disc harrow or other suitable
equipment and compaction by mechanical means at OMC and
dressing to designed section complete in all respect, 95% to 100%
maximum modified AASHO dry density.
197.499
%oCft
(Thousand
Cubic feet)
2 501-1 to 501-6/501-
6.2
P/L of Sub base course of crushed stone agg: of approved quality and
grade and supply and spreading I/c placing and mixing and
compaction of Sub Base Course material to required depth camber
and grade to achieve 100% maximum modified dry density I/c carriage
of all material to site of work complete in all respect.
159.08
%Cft
(Hundred
Cubic feet)
3 552-1 to 552-5 Providing and laying road edging of 3" (three inches) wide & 9" (nine
inches) deep brick on end complete in all respect. 6363
P.Rft
(Per Running
foot)
4 501-1 to 501-6/551-
6.1
P/L of water bound macadum base course of crushed stone agg: of
approved quality and grade and supply and spreading of Stone
screening I/c placing and mixing and compaction of Base Course
material to required depth camber and grade to achieve 100%
maximum modified dry density I/c carriage of all material to site of
work except gravel and aggregate.
106.05
%Cft
(Hundred
Cubic feet)
5 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. of approved quality,including cleaning or road
surface neating and sparaying bajri and rollin wih road roller (including
its operation,fuel and hire charges,etc) cmplete including carriage of
all materials to site of work except bajri/crushed stone aggrgate,using
67 lbs bitumen & 7.50 Cft Bajri 100 Sft area.
318.16
%Sft
(Hundred
Square feet)
ROAD STRUCTURE
Construction of 2' Span RCC Slab Culvert 24' Formation 08 Nos.
6 17.1 to 17.5.
402-14.1
Excavation in foundation of building, bridges and other structures,
including dag-belling, dressing, refilling around structure with
excavated earth, watering ramming lead up to one chain and lifts up to
5 ft in ordinary soil.
2.656
%oCft
(Thousand
Cubic feet)
BID SCHEDULE
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
7 20.1/701-18-15 Cement concrete brick or stone ballast 1.5” to 2” gauge, in foundation
and plinth ratio 1:4:8 complete in all respect I/c supply of all material. 21.12
%Cft
(Hundred
Cubic feet)
8 21.1 to 21.4/801-
35.1
Pacca brick work ratio 1:4 cement sand mortar complete in all respect
including supply of all material. 28.80
%Cft
(Hundred
Cubic feet)
9 851-5/821-14.2 Fabrication mild steel reinforcement for cement concrete, including
cutting bending laying in position, making joints and fastening,
including cost of binding wire and labour charges for binding of steel
reinforcement (also includes the removal of crust from bars) complete
in all respect.b) Deform bars.
15.84
% Kg
(Hundred Kilo
Gram)
10 20.4/701-18.3 Providing and laying reinforced cement concrete (including pre-
stressed concrete) using coarse sand and screened graded and
washed aggregate in required shape and design including forms,
moulds, shuttering lifting, compacting, curing, rendering, and finishing
exposed surface complete including supply of material ( but excluding
the cost of steel reinforcement its fabrication and placing in position
etc.b) Reinforced cement concrete in roof slabs, beams columns,
lintels, girders and other structural member laid in situ or pre-cast laid
in position or pre-stressed members cast in situ, complete in all
respect. Type “C”( Nominal mix 1:2:4)
650.64
P.Cft
(Per Cubic
foot)
11 Construction of Bridge on Bahawal wah Canal 1.00 Each
ROAD FURNITURE
12 Manufacturing of Rectangular Sign Board Size 4'x6' With Double Post
of G.I Pipe 3" Dia 12' Height Complete Base & Lettering / Symboling
With Diamond Grade Reflective Sheet / Tape (Single Side)
Informatory Board.
1 Each
Executive Engineer
Highway Division, Bahawalpr
NAME OF WORK REHABILITATION OF METALLED ROAD FROM HAJI MUKHTAR BHUTTA MULLAN Amount of Work. Rs: 9,413,000/-
WALI MOUZA LALLU NAICH (LENGTH 1.17 KM) TEHSIL AHMEDPUR EAST Earnest Money.Rs: 188,500/-
& DISTRICT BAHAWALPUR. Time Limit: 06 Months.
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
1 18.1/401-5.1 Dismantling of exisitng dry brick soling / road edging.
142.64
%Cft
(Hundred
Cubic feet)
2 18.1/401-5.1 Dismantling and removing road pavement, etc., including screening
and stacking of byproducts upto one chain lead (30 metre). 116.47
%Cft
(Hundred
Cubic feet)
3 411-1 to 411-13.
301-1 & 202-3
Earth work in ordinary soil for embankment all lead and lift i/c
ploughing and mixing with blade grade or disc harrow or other suitable
equipment and compaction by mechanical means at OMC and
dressing to designed section complete in all respect, 95% to 100%
maximum modified AASHO dry density.
240.513
%oCft
(Thousand
Cubic feet)
4 501-1 to 501-6/501-
6.3
Re-Lying sub base course of dismentalled material of Stone
aggregate (received after dismentalling of existing road as sub base
course of specied thickness complete in all respect including breaking
charges to specified size (Stone aggregate) compacted to all respect.
116.47
%Cft
(Hundred
Cubic feet)
5 501-1 to 501-6/501-
6.3
Re-Lying sub base course of dismentalled material of Brick aggregate
(received after dismentalling of existing road as sub base course of
specied thickness complete in all respect including breaking charges
to specified size (Stone aggregate) compacted to all respect.
142.64
%Cft
(Hundred
Cubic feet)
6 552-1 to 552-5 Providing and laying road edging of 3" (three inches) wide & 9" (nine
inches) deep brick on end complete in all respect. 7852
P.Rft
(Per Running
foot)
7 501-1 to 501-6/551-
6.1
P/L of water bound macadum base course of crushed stone agg: of
approved quality and grade and supply and spreading of Stone
screening I/c placing and mixing and compaction of Base Course
material to required depth camber and grade to achieve 100%
maximum modified dry density I/c carriage of all material to site of
work except gravel and aggregate.
209.17
%Cft
(Hundred
Cubic feet)
BID SCHEDULE
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
8 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. of approved quality,including cleaning or road
surface neating and sparaying bajri and rollin wih road roller (including
its operation,fuel and hire charges,etc) cmplete including carriage of
all materials to site of work except bajri/crushed stone aggrgate,using
67 lbs bitumen & 7.50 Cft Bajri 100 Sft area.
435.61
%Sft
(Hundred
Square feet)
ROAD STRUCTURE
Re-Construction of 2' Span RCC Slab Culvert 24' Formation 01 No.
9 18.1 Dismantling cement concrete plain 1:4:8 complete in all respect.
2.98
%Cft
(Hundred
Cubic feet)
10 18.1 Dismantling cement concrete 1:2:4 complete in all respect. 4.78 %Cft
(Hundred
Cubic feet)
11 17.1 to 17.5.
402-14.1
Excavation in foundation of building, bridges and other structures,
including dag-belling, dressing, refilling around structure with
excavated earth, watering ramming lead up to one chain and lifts up to
5 ft in ordinary soil.
0.332
%oCft
(Thousand
Cubic feet)
12 20.1/701-18-15 Cement concrete brick or stone ballast 1.5” to 2” gauge, in foundation
and plinth ratio 1:4:8 complete in all respect I/c supply of all material. 2.64
%Cft
(Hundred
Cubic feet)
13 21.1 to 21.4/801-
35.1
Pacca brick work ratio 1:4 cement sand mortar complete in all respect
including supply of all material. 3.60
%Cft
(Hundred
Cubic feet)
14 851-5/821-14.2 Fabrication mild steel reinforcement for cement concrete, including
cutting bending laying in position, making joints and fastening,
including cost of binding wire and labour charges for binding of steel
reinforcement (also includes the removal of crust from bars) complete
in all respect.b) Deform bars.
1.98
% Kg
(Hundred Kilo
Gram)
15 20.4/701-18.3 Providing and laying reinforced cement concrete (including pre-
stressed concrete) using coarse sand and screened graded and
washed aggregate in required shape and design including forms,
moulds, shuttering lifting, compacting, curing, rendering, and finishing
exposed surface complete including supply of material ( but excluding
the cost of steel reinforcement its fabrication and placing in position
etc.b) Reinforced cement concrete in roof slabs, beams columns,
lintels, girders and other structural member laid in situ or pre-cast laid
in position or pre-stressed members cast in situ, complete in all
respect. Type “C”( Nominal mix 1:2:4)
81.33
P.Cft
(Per Cubic
foot)
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
ROAD FURNITURE
16 Manufacturing of Rectangular Sign Board Size 4'x6' With Double Post
of G.I Pipe 3" Dia 12' Height Complete Base & Lettering / Symboling
With Diamond Grade Reflective Sheet / Tape (Single Side)
Informatory Board.
1 Each
The amount of Rs.14,521/- of material received after dismentling of
existing road structure shall be recovered from the contractor
of existing culverts in recpect of the quantity of material.
Executive Engineer
Highway Division, Bahawalpr
Executive Engineer,Executive Engineer,
NAME OF WORK 1. CONSTRUCTION OF METALLED ROAD FROM DERA JAM SHABBIR CHAK NO.73/DB Amount of Work. Rs: 16,908,000/-
TO CHAK NO.85/DB COLONY (LENGTH 0.38 KM) TEHSIL YAZMAN Earnest Money.Rs: 338,500/-
& DISTRICT BAHAWALPUR. Time Limit: 06 Months.
2. REPAIR OF METALLED ROAD FROM ADDA 42000 TO CHAK NO.110/DNB
(LENGTH 2.00 KM) TEHSIL YAZMAN & DISTRICT BAHAWALPUR.
3. CONSTRUCTION OF METALLED ROAD FROM CHAK NO.117/DB DERA ABDUL GHAFOOR
TO GOVT. PRIMARY SCHOOL CHAK NO.117/DB (LENGTH 1.00 KM) TEHSIL YAZMAN & DISTRICT BAHAWALPUR.
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
1. CONSTRUCTION OF METALLED ROAD FROM DERA JAM SHABBIR CHAK NO.73/DB
TO CHAK NO.85/DB COLONY (LENGTH 0.38 KM) TEHSIL YAZMAN
& DISTRICT BAHAWALPUR.
1 411-1 to 411-13.
301-1 & 202-3
Earth work in ordinary soil for embankment all lead and lift i/c
ploughing and mixing with blade grade or disc harrow or other suitable
equipment and compaction by mechanical means at OMC and
dressing to designed section complete in all respect, 95% to 100%
maximum modified AASHO dry density.
86.044
%oCft
(Thousand
Cubic feet)
2 501-1 to 501-6/501-
6.2
P/L of Sub base course of crushed stone agg: of approved quality and
grade and supply and spreading I/c placing and mixing and
compaction of Sub Base Course material to required depth camber
and grade to achieve 100% maximum modified dry density I/c carriage
of all material to site of work complete in all respect.
63.57
%Cft
(Hundred
Cubic feet)
3 552-1 to 552-5 Providing and laying road edging of 3" (three inches) wide & 9" (nine
inches) deep brick on end complete in all respect. 2493
P.Rft
(Per Running
foot)
4 501-1 to 501-6/551-
6.1
P/L of water bound macadum base course of crushed stone agg: of
approved quality and grade and supply and spreading of Stone
screening I/c placing and mixing and compaction of Base Course
material to required depth camber and grade to achieve 100%
maximum modified dry density I/c carriage of all material to site of
work except gravel and aggregate.
63.57
%Cft
(Hundred
Cubic feet)
5 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. of approved quality,including cleaning or road
surface neating and sparaying bajri and rollin wih road roller (including
its operation,fuel and hire charges,etc) cmplete including carriage of
all materials to site of work except bajri/crushed stone aggrgate,using
67 lbs bitumen & 7.50 Cft Bajri 100 Sft area.
127.13
%Sft
(Hundred
Square feet)
BID SCHEDULE
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
ROAD STRUCTURE
Construction of 2' Span RCC Slab Culvert 24' Formation 02 Nos.
6 17.1 to 17.5.
402-14.1
Excavation in foundation of building, bridges and other structures,
including dag-belling, dressing, refilling around structure with
excavated earth, watering ramming lead up to one chain and lifts up to
5 ft in ordinary soil.
0.664
%oCft
(Thousand
Cubic feet)
7 20.1/701-18-15 Cement concrete brick or stone ballast 1.5” to 2” gauge, in foundation
and plinth ratio 1:4:8 complete in all respect I/c supply of all material. 5.28
%Cft
(Hundred
Cubic feet)
8 21.1 to 21.4/801-
35.1
Pacca brick work ratio 1:4 cement sand mortar complete in all respect
including supply of all material. 7.20
%Cft
(Hundred
Cubic feet)
9 851-5/821-14.2 Fabrication mild steel reinforcement for cement concrete, including
cutting bending laying in position, making joints and fastening,
including cost of binding wire and labour charges for binding of steel
reinforcement (also includes the removal of crust from bars) complete
in all respect.b) Deform bars.
3.96
% Kg
(Hundred Kilo
Gram)
10 20.4/701-18.3 Providing and laying reinforced cement concrete (including pre-
stressed concrete) using coarse sand and screened graded and
washed aggregate in required shape and design including forms,
moulds, shuttering lifting, compacting, curing, rendering, and finishing
exposed surface complete including supply of material ( but excluding
the cost of steel reinforcement its fabrication and placing in position
etc.b) Reinforced cement concrete in roof slabs, beams columns,
lintels, girders and other structural member laid in situ or pre-cast laid
in position or pre-stressed members cast in situ, complete in all
respect. Type “C”( Nominal mix 1:2:4)
162.66
P.Cft
(Per Cubic
foot)
ROAD FURNITURE
11 Manufacturing of Rectangular Sign Board Size 4'x6' With Double Post
of G.I Pipe 3" Dia 12' Height Complete Base & Lettering / Symboling
With Diamond Grade Reflective Sheet / Tape (Single Side)
Informatory Board.
1 Each
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
2. REPAIR OF METALLED ROAD FROM ADDA 42000 TO CHAK NO.110/DNB
(LENGTH 2.00 KM) TEHSIL YAZMAN & DISTRICT BAHAWALPUR.
1 18.1/401-5.1 Dismantling of exisitng dry brick soling / road edging.
5.66
%Cft
(Hundred
Cubic feet)
2 411-1 to 411-13.
301-1 & 202-3
Earth work in ordinary soil for embankment all lead and lift i/c
ploughing and mixing with blade grade or disc harrow or other suitable
equipment and compaction by mechanical means at OMC and
dressing to designed section complete in all respect, 95% to 100%
maximum modified AASHO dry density.
39.360
%oCft
(Thousand
Cubic feet)
3 552-1 to 552-5 Providing and laying road edging of 3" (three inches) wide & 9" (nine
inches) deep brick on end complete in all respect. 3018
P.Rft
(Per Running
foot)
4 501-1 to 501-6/551-
6.1
P/L of water bound macadum base course of crushed stone agg: of
approved quality and grade and supply and spreading of Stone
screening I/c placing and mixing and compaction of Base Course
material to required depth camber and grade to achieve 100%
maximum modified dry density I/c carriage of all material to site of
work except gravel and aggregate.
75.55
%Cft
(Hundred
Cubic feet)
5 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. Of approved quality,including cleaning or
road surface neating and sparaying bajri and rollin wih road roller
(including its operation,fuel and hire charges,etc) cmplete including
carriage of all materials to site of work except bajri/crushed stone
aggrgate,using 67 lbs bitumen & 7.50 Cft Bajri 100 Sft area.
150.88
%Sft
(Hundred
Square feet)
6 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. Of approved quality,including cleaning or
road surface neating and sparaying bajri and rollin wih road roller
(including its operation,fuel and hire charges,etc) cmplete including
carriage of all materials to site of work except bajri/crushed stone
aggrgate,using 35 lbs bitumen & 4.00 Cft Bajri 100 Sft area.
151.54
%Sft
(Hundred
Square feet)
7 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. Of approved quality,including cleaning or
road surface neating and sparaying bajri and rollin wih road roller
(including its operation,fuel and hire charges,etc) cmplete including
carriage of all materials to site of work except bajri/crushed stone
aggrgate,using 32 lbs bitumen & 3.5 Cft Bajri 100 Sft area.
505.12
%Sft
(Hundred
Square feet)
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
ROAD FURNITURE
8 Manufacturing of Rectangular Sign Board Size 4'x6' With Double Post
of G.I Pipe 3" Dia 12' Height Complete Base & Lettering / Symboling
With Diamond Grade Reflective Sheet / Tape (Single Side)
Informatory Board.
1 Each
3. CONSTRUCTION OF METALLED ROAD FROM CHAK NO.117/DB DERA ABDUL GHAFOOR
TO GOVT. PRIMARY SCHOOL CHAK NO.117/DB (LENGTH 1.00 KM) TEHSIL YAZMAN
& DISTRICT BAHAWALPUR.
1 18.1/401-5.1 Dismantling of exisitng dry brick soling / road edging.
43.30
%Cft
(Hundred
Cubic feet)
1 411-1 to 411-13.
301-1 & 202-3
Earth work in ordinary soil for embankment all lead and lift i/c
ploughing and mixing with blade grade or disc harrow or other suitable
equipment and compaction by mechanical means at OMC and
dressing to designed section complete in all respect, 95% to 100%
maximum modified AASHO dry density.
229.086
%oCft
(Thousand
Cubic feet)
2 501-1 to 501-6/501-
6.2
P/L of Sub base course of crushed stone agg: of approved quality and
grade and supply and spreading I/c placing and mixing and
compaction of Sub Base Course material to required depth camber
and grade to achieve 100% maximum modified dry density I/c carriage
of all material to site of work complete in all respect.
167.28
%Cft
(Hundred
Cubic feet)
3 552-1 to 552-5 Providing and laying road edging of 3" (three inches) wide & 9" (nine
inches) deep brick on end complete in all respect. 6691
P.Rft
(Per Running
foot)
4 501-1 to 501-6/551-
6.1
P/L of water bound macadum base course of crushed stone agg: of
approved quality and grade and supply and spreading of Stone
screening I/c placing and mixing and compaction of Base Course
material to required depth camber and grade to achieve 100%
maximum modified dry density I/c carriage of all material to site of
work except gravel and aggregate.
167.28
%Cft
(Hundred
Cubic feet)
5 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. of approved quality,including cleaning or road
surface neating and sparaying bajri and rollin wih road roller (including
its operation,fuel and hire charges,etc) cmplete including carriage of
all materials to site of work except bajri/crushed stone aggrgate,using
67 lbs bitumen & 7.50 Cft Bajri 100 Sft area.
334.56
%Sft
(Hundred
Square feet)
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
ROAD STRUCTURE
Construction of 2' Span RCC Slab Culvert 24' Formation 03 Nos.
6 17.1 to 17.5.
402-14.1
Excavation in foundation of building, bridges and other structures,
including dag-belling, dressing, refilling around structure with
excavated earth, watering ramming lead up to one chain and lifts up to
5 ft in ordinary soil.
0.996
%oCft
(Thousand
Cubic feet)
7 20.1/701-18-15 Cement concrete brick or stone ballast 1.5” to 2” gauge, in foundation
and plinth ratio 1:4:8 complete in all respect I/c supply of all material. 7.92
%Cft
(Hundred
Cubic feet)
8 21.1 to 21.4/801-
35.1
Pacca brick work ratio 1:4 cement sand mortar complete in all respect
including supply of all material. 10.80
%Cft
(Hundred
Cubic feet)
9 851-5/821-14.2 Fabrication mild steel reinforcement for cement concrete, including
cutting bending laying in position, making joints and fastening,
including cost of binding wire and labour charges for binding of steel
reinforcement (also includes the removal of crust from bars) complete
in all respect.b) Deform bars.
5.94
% Kg
(Hundred Kilo
Gram)
10 20.4/701-18.3 Providing and laying reinforced cement concrete (including pre-
stressed concrete) using coarse sand and screened graded and
washed aggregate in required shape and design including forms,
moulds, shuttering lifting, compacting, curing, rendering, and finishing
exposed surface complete including supply of material ( but excluding
the cost of steel reinforcement its fabrication and placing in position
etc.b) Reinforced cement concrete in roof slabs, beams columns,
lintels, girders and other structural member laid in situ or pre-cast laid
in position or pre-stressed members cast in situ, complete in all
respect. Type “C”( Nominal mix 1:2:4)
243.99
P.Cft
(Per Cubic
foot)
ROAD FURNITURE
11 Manufacturing of Rectangular Sign Board Size 4'x6' With Double Post
of G.I Pipe 3" Dia 12' Height Complete Base & Lettering / Symboling
With Diamond Grade Reflective Sheet / Tape (Single Side)
Informatory Board.
1 Each
The amount of Rs.51,055/- of material received after dismentling of
existing road structure shall be recovered from the contractor
of existing culverts in recpect of the quantity of material.
Executive Engineer
Highway Division, Bahawalpr
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
Executive Engineer,Executive Engineer,
NAME OF WORK 1. REHABILITATION OF METALLED ROAD FROM ADDA QAZI WALA PULL TO DERA Amount of Work. Rs: 9,843,000/-
QAZI BASHIR (LENGTH 0.81 KM) TEHSIL YAZMAN & DISTRICT BAHAWALPUR. Earnest Money.Rs: 197,000/-
Time Limit: 06 Months.
2. REPAIR OF METALLED ROAD FROM CHAK NO.119/DNB TO CHAK NO.120/DNB VIA
GOVT. MIDDLE SCHOOL CHAK NO.120/DNB (LENGTH 1.56 KM) TEHSIL YAZMAN & DISTRICT BAHAWALPUR.
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
1. REHABILITATION OF METALLED ROAD FROM ADDA QAZI WALA PULL TO DERA
QAZI BASHIR (LENGTH 0.81 KM) TEHSIL YAZMAN & DISTRICT BAHAWALPUR.
1 18.1/401-5.1 Dismantling of exisitng dry brick soling / road edging.
9.96
%Cft
(Hundred
Cubic feet)
2 411-1 to 411-13.
301-1 & 202-3
Earth work in ordinary soil for embankment all lead and lift i/c
ploughing and mixing with blade grade or disc harrow or other suitable
equipment and compaction by mechanical means at OMC and
dressing to designed section complete in all respect, 95% to 100%
maximum modified AASHO dry density.
15.941
%oCft
(Thousand
Cubic feet)
3 552-1 to 552-5 Providing and laying road edging of 3" (three inches) wide & 9" (nine
inches) deep brick on end complete in all respect. 5314
P.Rft
(Per Running
foot)
4 501-1 to 501-6/551-
6.1
P/L of water bound macadum base course of crushed stone agg: of
approved quality and grade and supply and spreading of Stone
screening I/c placing and mixing and compaction of Base Course
material to required depth camber and grade to achieve 100%
maximum modified dry density I/c carriage of all material to site of work
except gravel and aggregate.
140.49
%Cft
(Hundred
Cubic feet)
5 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. Of approved quality,including cleaning or road
surface neating and sparaying bajri and rollin wih road roller (including
its operation,fuel and hire charges,etc) cmplete including carriage of all
materials to site of work except bajri/crushed stone aggrgate,using 79
lbs bitumen & 9.75 Cft Bajri 100 Sft area.
236.16
%Sft
(Hundred
Square feet)
6 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. Of approved quality,including cleaning or road
surface neating and sparaying bajri and rollin wih road roller (including
its operation,fuel and hire charges,etc) cmplete including carriage of all
materials to site of work except bajri/crushed stone aggrgate,using 67
lbs bitumen & 7.50 Cft Bajri 100 Sft area.
67.24
%Sft
(Hundred
Square feet)
ROAD FURNITURE
7 Manufacturing of Rectangular Sign Board Size 4'x6' With Double Post
of G.I Pipe 3" Dia 12' Height Complete Base & Lettering / Symboling
With Diamond Grade Reflective Sheet / Tape (Single Side) Informatory
Board.
1 Each
BID SCHEDULE
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
2. REPAIR OF METALLED ROAD FROM CHAK NO.119/DNB TO CHAK NO.120/DNB VIA
GOVT. MIDDLE SCHOOL CHAK NO.120/DNB (LENGTH 1.56 KM) TEHSIL YAZMAN & DISTRICT BAHAWALPUR.
1 18.1/401-5.1 Dismantling of exisitng dry brick soling / road edging.
19.19
%Cft
(Hundred
Cubic feet)
2 411-1 to 411-13.
301-1 & 202-3
Earth work in ordinary soil for embankment all lead and lift i/c
ploughing and mixing with blade grade or disc harrow or other suitable
equipment and compaction by mechanical means at OMC and
dressing to designed section complete in all respect, 95% to 100%
maximum modified AASHO dry density.
30.701
%oCft
(Thousand
Cubic feet)
3 552-1 to 552-5 Providing and laying road edging of 3" (three inches) wide & 9" (nine
inches) deep brick on end complete in all respect. 10234
P.Rft
(Per Running
foot)
4 501-1 to 501-6/551-
6.1
P/L of water bound macadum base course of crushed stone agg: of
approved quality and grade and supply and spreading of Stone
screening I/c placing and mixing and compaction of Base Course
material to required depth camber and grade to achieve 100%
maximum modified dry density I/c carriage of all material to site of work
except gravel and aggregate.
170.56
%Cft
(Hundred
Cubic feet)
6 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. Of approved quality,including cleaning or road
surface neating and sparaying bajri and rollin wih road roller (including
its operation,fuel and hire charges,etc) cmplete including carriage of all
materials to site of work except bajri/crushed stone aggrgate,using 67
lbs bitumen & 7.50 Cft Bajri 100 Sft area.
511.68
%Sft
(Hundred
Square feet)
ROAD FURNITURE
7 Manufacturing of Rectangular Sign Board Size 4'x6' With Double Post
of G.I Pipe 3" Dia 12' Height Complete Base & Lettering / Symboling
With Diamond Grade Reflective Sheet / Tape (Single Side) Informatory
Board.
1 Each
The amount of Rs.30,403/- of material received after dismentling of
existing road structure shall be recovered from the contractor
of existing culverts in recpect of the quantity of material.
Executive Engineer
Highway Division, Bahawalpr
NAME OF WORK CONSTRUCTION OF METALLED ROAD FROM BHINDA ROAD TO BASTI CHAKIR Amount of Work. Rs: 9,414,000/-
KHAN (LENGTH 1.24 KM) TEHSIL AHMEDPUR EAST & DISTRICT BAHAWALPUR. Earnest Money.Rs: 188,500/-
Time Limit: 06 Months.
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
1 411-1 to 411-13.
301-1 & 202-3
Earth work in ordinary soil for embankment all lead and lift i/c
ploughing and mixing with blade grade or disc harrow or other suitable
equipment and compaction by mechanical means at OMC and
dressing to designed section complete in all respect, 95% to 100%
maximum modified AASHO dry density.
214.753
%oCft
(Thousand
Cubic feet)
2 501-1 to 501-6/501-
6.2
P/L of Sub base course of crushed stone agg: of approved quality and
grade and supply and spreading I/c placing and mixing and
compaction of Sub Base Course material to required depth camber
and grade to achieve 100% maximum modified dry density I/c carriage
of all material to site of work complete in all respect.
207.98
%Cft
(Hundred
Cubic feet)
3 552-1 to 552-5 Providing and laying road edging of 3" (three inches) wide & 9" (nine
inches) deep brick on end complete in all respect. 8156
P.Rft
(Per Running
foot)
4 501-1 to 501-6/551-
6.1
P/L of water bound macadum base course of crushed stone agg: of
approved quality and grade and supply and spreading of Stone
screening I/c placing and mixing and compaction of Base Course
material to required depth camber and grade to achieve 100%
maximum modified dry density I/c carriage of all material to site of
work except gravel and aggregate.
138.65
%Cft
(Hundred
Cubic feet)
5 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. of approved quality,including cleaning or road
surface neating and sparaying bajri and rollin wih road roller (including
its operation,fuel and hire charges,etc) cmplete including carriage of
all materials to site of work except bajri/crushed stone aggrgate,using
67 lbs bitumen & 7.50 Cft Bajri 100 Sft area.
415.96
%Sft
(Hundred
Square feet)
ROAD STRUCTURE
Construction of 2' Span RCC Slab Culvert 24' Formation 03 Nos.
6 17.1 to 17.5.
402-14.1
Excavation in foundation of building, bridges and other structures,
including dag-belling, dressing, refilling around structure with
excavated earth, watering ramming lead up to one chain and lifts up to
5 ft in ordinary soil.
0.996
%oCft
(Thousand
Cubic feet)
7 20.1/701-18-15 Cement concrete brick or stone ballast 1.5” to 2” gauge, in foundation
and plinth ratio 1:4:8 complete in all respect I/c supply of all material. 7.92
%Cft
(Hundred
Cubic feet)
BID SCHEDULE
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
8 21.1 to 21.4/801-
35.1
Pacca brick work ratio 1:4 cement sand mortar complete in all respect
including supply of all material. 10.80
%Cft
(Hundred
Cubic feet)
9 851-5/821-14.2 Fabrication mild steel reinforcement for cement concrete, including
cutting bending laying in position, making joints and fastening,
including cost of binding wire and labour charges for binding of steel
reinforcement (also includes the removal of crust from bars) complete
in all respect.b) Deform bars.
5.94
% Kg
(Hundred Kilo
Gram)
10 20.4/701-18.3 Providing and laying reinforced cement concrete (including pre-
stressed concrete) using coarse sand and screened graded and
washed aggregate in required shape and design including forms,
moulds, shuttering lifting, compacting, curing, rendering, and finishing
exposed surface complete including supply of material ( but excluding
the cost of steel reinforcement its fabrication and placing in position
etc.b) Reinforced cement concrete in roof slabs, beams columns,
lintels, girders and other structural member laid in situ or pre-cast laid
in position or pre-stressed members cast in situ, complete in all
respect. Type “C”( Nominal mix 1:2:4)
243.99
P.Cft
(Per Cubic
foot)
ROAD FURNITURE
11 Manufacturing of Rectangular Sign Board Size 4'x6' With Double Post
of G.I Pipe 3" Dia 12' Height Complete Base & Lettering / Symboling
With Diamond Grade Reflective Sheet / Tape (Single Side)
Informatory Board.
1 Each
Executive Engineer
Highway Division, Bahawalpr
Executive Engineer,Executive Engineer,
NAME OF WORK CONSTRUCTION OF METALLED ROAD FROM GHOARI CHOWK TO MAIN GAZAIN Amount of Work. Rs: 16,446,000/-
ABBASI CHWOK VIA BASTI NAZIK GHORI MOUZA SULTAN PUR (LENGTH 1.96 KM) Earnest Money.Rs: 329,000/-
TEHSIL AHMEDPUR EAST & DISTRICT BAHAWALPUR. Time Limit: 06 Months.
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
1 411-1 to 411-13.
301-1 & 202-3
Earth work in ordinary soil for embankment all lead and lift i/c
ploughing and mixing with blade grade or disc harrow or other suitable
equipment and compaction by mechanical means at OMC and
dressing to designed section complete in all respect, 95% to 100%
maximum modified AASHO dry density.
402.580
%oCft
(Thousand
Cubic feet)
2 501-1 to 501-6/501-
6.2
P/L of Sub base course of crushed stone agg: of approved quality and
grade and supply and spreading I/c placing and mixing and
compaction of Sub Base Course material to required depth camber
and grade to achieve 100% maximum modified dry density I/c carriage
of all material to site of work complete in all respect.
327.87
%Cft
(Hundred
Cubic feet)
3 552-1 to 552-5 Providing and laying road edging of 3" (three inches) wide & 9" (nine
inches) deep brick on end complete in all respect. 12858
P.Rft
(Per Running
foot)
4 501-1 to 501-6/551-
6.1
P/L of water bound macadum base course of crushed stone agg: of
approved quality and grade and supply and spreading of Stone
screening I/c placing and mixing and compaction of Base Course
material to required depth camber and grade to achieve 100%
maximum modified dry density I/c carriage of all material to site of
work except gravel and aggregate.
218.58
%Cft
(Hundred
Cubic feet)
5 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. of approved quality,including cleaning or road
surface neating and sparaying bajri and rollin wih road roller (including
its operation,fuel and hire charges,etc) cmplete including carriage of
all materials to site of work except bajri/crushed stone aggrgate,using
67 lbs bitumen & 7.50 Cft Bajri 100 Sft area.
655.74
%Sft
(Hundred
Square feet)
ROAD STRUCTURE
Construction of 2' Span RCC Slab Culvert 24' Formation 09 Nos.
6 17.1 to 17.5.
402-14.1
Excavation in foundation of building, bridges and other structures,
including dag-belling, dressing, refilling around structure with
excavated earth, watering ramming lead up to one chain and lifts up to
5 ft in ordinary soil.
2.988
%oCft
(Thousand
Cubic feet)
7 20.1/701-18-15 Cement concrete brick or stone ballast 1.5” to 2” gauge, in foundation
and plinth ratio 1:4:8 complete in all respect I/c supply of all material. 23.76
%Cft
(Hundred
Cubic feet)
BID SCHEDULE
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
8 21.1 to 21.4/801-
35.1
Pacca brick work ratio 1:4 cement sand mortar complete in all respect
including supply of all material. 32.40
%Cft
(Hundred
Cubic feet)
9 851-5/821-14.2 Fabrication mild steel reinforcement for cement concrete, including
cutting bending laying in position, making joints and fastening,
including cost of binding wire and labour charges for binding of steel
reinforcement (also includes the removal of crust from bars) complete
in all respect.b) Deform bars.
17.82
% Kg
(Hundred Kilo
Gram)
10 20.4/701-18.3 Providing and laying reinforced cement concrete (including pre-
stressed concrete) using coarse sand and screened graded and
washed aggregate in required shape and design including forms,
moulds, shuttering lifting, compacting, curing, rendering, and finishing
exposed surface complete including supply of material ( but excluding
the cost of steel reinforcement its fabrication and placing in position
etc.b) Reinforced cement concrete in roof slabs, beams columns,
lintels, girders and other structural member laid in situ or pre-cast laid
in position or pre-stressed members cast in situ, complete in all
respect. Type “C”( Nominal mix 1:2:4)
731.97
P.Cft
(Per Cubic
foot)
ROAD FURNITURE
11 Manufacturing of Rectangular Sign Board Size 4'x6' With Double Post
of G.I Pipe 3" Dia 12' Height Complete Base & Lettering / Symboling
With Diamond Grade Reflective Sheet / Tape (Single Side)
Informatory Board.
1 Each
Executive Engineer
Highway Division, Bahawalpr
Executive Engineer,Executive Engineer,
NAME OF WORK 1. REPAIR OF METALLED ROAD FROM CHAK NO.141/DRB TO CHAK NO.142/DRB Amount of Work. Rs: 16,305,000/-
(LENGTH 0.50 KM) TEHSIL YAZMAN & DISTRICT BAHAWALPUR. Earnest Money.Rs: 326,500/-
Time Limit: 06 Months.
2. REPAIR OF METALLED ROAD FROM CHAK NO.22/DRB TO CHAK NO.19/DRB
DERA JAMAL DIN NAICH(LENGTH 3.50 KM) TEHSIL YAZMAN & DISTRICT BAHAWALPUR.
3. REPAIR OF METALLED ROAD FROM CHAK NO.39/DNB BIG TO CHAK NO.39/DNB
SMALL (LENGTH 2.00 KM) TEHSIL YAZMAN & DISTRICT BAHAWALPUR.
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
1. REPAIR OF METALLED ROAD FROM CHAK NO.141/DRB TO CHAK NO.142/DRB
(LENGTH 0.50 KM) TEHSIL YAZMAN & DISTRICT BAHAWALPUR.
1 18.1/401-5.1 Dismantling of exisitng dry brick soling / road edging.
6.15%Cft (Hundred
Cubic feet)
2 411-1 to 411-13.
301-1 & 202-3
Earth work in ordinary soil for embankment all lead and lift i/c
ploughing and mixing with blade grade or disc harrow or other suitable
equipment and compaction by mechanical means at OMC and
dressing to designed section complete in all respect, 95% to 100%
maximum modified AASHO dry density.
9.840
%oCft
(Thousand
Cubic feet)
3 552-1 to 552-5 Providing and laying road edging of 3" (three inches) wide & 9" (nine
inches) deep brick on end complete in all respect. 3280P.Rft (Per
Running foot)
4 501-1 to 501-6/551-
6.1
P/L of water bound macadum base course of crushed stone agg: of
approved quality and grade and supply and spreading of Stone
screening I/c placing and mixing and compaction of Base Course
material to required depth camber and grade to achieve 100%
maximum modified dry density I/c carriage of all material to site of
work except gravel and aggregate.
54.67%Cft (Hundred
Cubic feet)
5 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. Of approved quality,including cleaning or
road surface neating and sparaying bajri and rollin wih road roller
(including its operation,fuel and hire charges,etc) cmplete including
carriage of all materials to site of work except bajri/crushed stone
aggrgate,using 67 lbs bitumen & 7.50 Cft Bajri 100 Sft area.
164.00%Sft (Hundred
Square feet)
BID SCHEDULE
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
2. REPAIR OF METALLED ROAD FROM CHAK NO.22/DRB TO CHAK NO.19/DRB
DERA JAMAL DIN NAICH(LENGTH 3.50 KM) TEHSIL YAZMAN & DISTRICT BAHAWALPUR.
1 18.1/401-5.1 Dismantling of exisitng dry brick soling / road edging.
6.15%Cft (Hundred
Cubic feet)
2 411-1 to 411-13.
301-1 & 202-3
Earth work in ordinary soil for embankment all lead and lift i/c
ploughing and mixing with blade grade or disc harrow or other suitable
equipment and compaction by mechanical means at OMC and
dressing to designed section complete in all respect, 95% to 100%
maximum modified AASHO dry density.
68.880
%oCft
(Thousand
Cubic feet)
3 552-1 to 552-5 Providing and laying road edging of 3" (three inches) wide & 9" (nine
inches) deep brick on end complete in all respect. 6560P.Rft (Per
Running foot)
4 501-1 to 501-6/551-
6.1
P/L of water bound macadum base course of crushed stone agg: of
approved quality and grade and supply and spreading of Stone
screening I/c placing and mixing and compaction of Base Course
material to required depth camber and grade to achieve 100%
maximum modified dry density I/c carriage of all material to site of
work except gravel and aggregate.
150.33%Cft (Hundred
Cubic feet)
5 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. Of approved quality,including cleaning or road
surface neating and sparaying bajri and rollin wih road roller (including its
operation,fuel and hire charges,etc) cmplete including carriage of all materials
to site of work except bajri/crushed stone aggrgate,using 67 lbs bitumen &
7.50 Cft Bajri 100 Sft area.
328.00%Sft (Hundred
Square feet)
6 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. Of approved quality,including cleaning or road
surface neating and sparaying bajri and rollin wih road roller (including its
operation,fuel and hire charges,etc) cmplete including carriage of all materials
to site of work except bajri/crushed stone aggrgate,using 35 lbs bitumen &
4.00 Cft Bajri 100 Sft area.
246.00%Sft (Hundred
Square feet)
7 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. of approved quality,including cleaning or road
surface neating and sparaying bajri and rollin wih road roller (including its
operation,fuel and hire charges,etc) cmplete including carriage of all materials
to site of work except bajri/crushed stone aggrgate,using 32 lbs bitumen & 3.5
Cft Bajri 100 Sft area.
820.00%Sft (Hundred
Square feet)
ROAD FURNITURE
8 Manufacturing of Rectangular Sign Board Size 4'x6' With Double Post
of G.I Pipe 3" Dia 12' Height Complete Base & Lettering / Symboling
With Diamond Grade Reflective Sheet / Tape (Single Side)
Informatory Board.
1 Each
Pay item No. or
reference to special
specification
Description of item Quantity in
Units
Unit of
Measurement
In figures In Words
1 2 3 4 5 6 7 8
Sr.
No.
Unit Rate ( To be filled in by
the contractor)
Amount (to be
filled in by the
contractor)
3. REPAIR OF METALLED ROAD FROM CHAK NO.39/DNB BIG TO CHAK NO.39/DNB
SMALL (LENGTH 2.00 KM) TEHSIL YAZMAN & DISTRICT BAHAWALPUR.
1 18.1/401-5.1 Dismantling of exisitng dry brick soling / road edging.
24.60%Cft (Hundred
Cubic feet)
2 411-1 to 411-13.
301-1 & 202-3
Earth work in ordinary soil for embankment all lead and lift i/c
ploughing and mixing with blade grade or disc harrow or other suitable
equipment and compaction by mechanical means at OMC and
dressing to designed section complete in all respect, 95% to 100%
maximum modified AASHO dry density.
39.360
%oCft
(Thousand
Cubic feet)
3 552-1 to 552-5 Providing and laying road edging of 3" (three inches) wide & 9" (nine
inches) deep brick on end complete in all respect. 13120P.Rft (Per
Running foot)
4 501-1 to 501-6/551-
6.1
P/L of water bound macadum base course of crushed stone agg: of
approved quality and grade and supply and spreading of Stone
screening I/c placing and mixing and compaction of Base Course
material to required depth camber and grade to achieve 100%
maximum modified dry density I/c carriage of all material to site of
work except gravel and aggregate.
218.67%Cft (Hundred
Cubic feet)
5 612-1 to 612-6/612-
7.1
Providing surface treatment to road,including supply of bitumen and
bajri/crushed stone agg. Of approved quality,including cleaning or
road surface neating and sparaying bajri and rollin wih road roller
(including its operation,fuel and hire charges,etc) cmplete including
carriage of all materials to site of work except bajri/crushed stone
aggrgate,using 67 lbs bitumen & 7.50 Cft Bajri 100 Sft area.
656.00%Sft (Hundred
Square feet)
ROAD FURNITURE
6 Manufacturing of Rectangular Sign Board Size 4'x6' With Double Post
of G.I Pipe 3" Dia 12' Height Complete Base & Lettering / Symboling
With Diamond Grade Reflective Sheet / Tape (Single Side)
Informatory Board.
1 Each
The amount of Rs.38,487/- of material received after dismentling of
existing road structure shall be recovered from the contractor
of existing culverts in recpect of the quantity of material.
Executive Engineer
Highway Division, Bahawalpr
Executive Engineer,Executive Engineer,