narumi steel, co.,ltd
TRANSCRIPT
Company Profile
Narumi Steel Co.,Ltd.
“Steel Supplying &Power Plant Engineering”
Contents of Business:⑴ Steel Trading
【Contents of business: Sales agent of Steel Coil & Plate】
・We purchase the steel coil and manufacture into the plate.
◆Steel Coil
◆Slitting(Slit coil) ◆Shearing (cut plate)
Our Users
【End Users are automobile , furniture ,building , through some processing】
<End Users-Car, Steel furniture, Steel Building etc>
<Processing-Press, Roll Forming , NC ,etc>
Competitive price for law grade materials
【Supplying competitive price needed in law grade materials】
<Steel Pallet・Container Box>
<Shelf Board> <Scaffolding Material> <Concrete Cut Off>
Handling Product : Steel Plate
■Hot rolled/Pickled steel coil/plate
Spec : SPHC, SPHC-P,SAPH440-P,SAPH590-PThickness : 1.6-6mm
■Cold rolled steel coil/plateSpec : SPCC-SDThickness : 0.5~3.2mm
■Galvanized steel coil/plateSpec : SGHC,SGCCThickness : 0.5~3.2mm
■Tin Free Plate, Tin Mill Black Plate
Temper : T1-T5, R8,R9
Thickness: 0.14-0.5mm
Handling Product : Steel Pipe
Contents of Business : ⑵ Power Plant Engineering (with Alliance Partner)
【 Steel Coil Used for Fin tube in the HRSG of power plant 】
Profile Of Alliance Company
• The core activities to do overhauling of power station and supply utilities product for them
• Overhauling activities are re-tubing tube or pipe for boiler or HRSG, Pipe Installation, chemical cleaning of Internal and external tube and some of instrumentation work
• Supply Activities are pipe, seamless tube, fin tube, valve, etc.
• Support by good engineer who have more than 20 years experience at Power Station in Indonesia
• Support by qualify Welder
No Job Description Customer Years
1
2
3
4
5
6
7
Installation of Fire Protection Pipe HRSG or GT Area
Line Desalination Sea Water Pump (DSWP) Plant
AUMA Actuator for FD Fan RehabilitationSteam Power
Re-tubing Aux Boiler @ 14.5 TonPackage 1
Re-tubing LP EVA, LP ECO & HP ECO HRSG @ 50 MW design existing by Sumitomo Corp. and maker by Austrian Energy = 3 Unit
Re-tubing LP EVA HRSG @ 50 MW design existing by Sumitomo Corp. and maker by Austrian Energy = 1 Unit
Re-tubing Aux Boiler @14.5 TonPackage 2
PT. PJB Muara Karang
PT. PJB UPHB
Mitsubishi Corp.
PT. PJB Muara Tawar
PT. PJB Muara Karang
PT. IP Semarang
PT. PJB Muara Tawar
2009
2009
2010
2012
2012
2014
2014
Experience List of Alliance Company
PHOTO FIN TUBE
PHOTO RETUBING HRSG MUARA KARANG
RETUBING HRSG SEMARANG
AUXILIARY BOILER MUARA TAWAR
PE PIPE INSTALLATION
FIRE PIPE SYSTEM
NARUMI STEEL CO.,LTD. : Company Overview
■PresidentNaoshi Horinouchi
■EstablishmentApril. 2013
■CapitalJapanese Yen 5,000,000-
■AdressMeieki First Bld.6F, 4-26-10 Meieki, Nakamura-ku, Nagoya-cityAichi, 450-0002 JapanTel: +81-52-899-3319 Fax:+81-52-899-3320E-mail : [email protected]
■BankAichi Bank Nawa Branch
■CustomerSangyo Sinko, Hanwa Kogyo, Sakai Steel, Taiho Kozai, Toyotsu Tekkou Hanbai、Fuji Kiko、Chubu Kozai、Nagoya Obiko、etc.