NASA Advisory Council Presentation Status of Exploration Systems Development Dan Dumbacher Deputy Associate Administrator for Exploration Systems Development December 9, 2013
Progress Video
FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
EFT-1 flt h/w EM-1 flt h/wProgress to date
Milestones are "complete"milestones unless noted
ESD Summary ScheduleESD Summary ScheduleElement
HEO / ESD
SLS
Booster
Core Stage
ICPS
Orion
Flight Article
GSDO
Veh. Integ. / LaunchOffline Proc. /CCC & Range
12/5C-SRR C-SDR APMC EFT-1
Design-to Sync Build-to Sync
EM-1Uncrewed
3/11MCR
7/19
ASM
3/30
SRR/SDR
5/17Brd reconvene
PDR CDR DCR
9/14
DM-3 BRR PDR CDR QM-1 QM-2 DCR Production
EM-1 H/W(Aft Skirt, RSRMV Seg/Aft Exit Cone)
EM-1 H/WFwd Assy
10/17
ATP SRR/SDR PDR
STA Mfg/Assy/Instrument
Core Stage 1 Mfg/Assy/Integration @ MAF
CDR
STA Struct. Tests
Struct TestStart STA Mfg Cmplt
ProductionDCR
B-2 Test Stand CmpltGreen Run Tests @ SSC
EM-1 H/W
Trade StudiesStart
IssueJFOC
Start Design@ Prime
Production
StartProd EM-1 HW
6/18
PTR 2
11/17
PTR 3 MPCV Synch
DAC-1 POD B/L ERB 1/25
KDP-B APMC
1/30DAC-1K/O ERB
EFT-1 Flt. Art.Ready
Delta PDR (UR) CDR (UR) SAR (UR)
LAS Comp Qual
Design CM AI&T Vehicle on dock at KSC
SM AI&T
11/30
MCR SRR/SDR PDR CDROPI W/C3R
ORDML-VAB
ORDML-PAD
w/C3R ORD
10/3
Pad InfrastructConst start
BasicC&C
MPPF Fac.Construct
ML Struct Mod Start
RPSF Booster Ops
ready
VAB PlatformConst start
Flame Deflect.Const. st.
ML Arm UmbInstall st.
ML/VABV&V cmplt
OPI w/C3RSAR/ORR
ML-VABSAR/ORR
ML-PADw/C3R SAR/ORR
Orion CSM
LV Fwd, LV Aft
LV Core
Integ Ops (EM-1)Transferto Pad
EFT-1 flt h/w EM-1 flt h/wProgress to date
Milestones are "complete"milestones unless noted
Version: 2013-10-31
For comments [email protected]
Orion EFT-1 Accomplishments Crew Module Propulsion and ECLSS System Assembly
4
Orion Fully Powered at KSC
5
Orion EFT-1 Accomplishments Heat Shield Developmental Flight Instrumentation Installation
6
ORION EFT-1 ACCOMPLISHMENTS Thermal Protection System Tile and Backshell Status
Complete
Complete Complete
11/2/13
11/2/13 12/21/13
11/19/13
1/10/14
11/19/13
E
F
A
B
G I
D
H C
A 100% E 100%
F 64%
B 100% D 100%
G 100% I 100%
H 100%
C 100%
96%
Total Backshell
Paint Applied 8
Paint in Process
Pore Sealer Sanding Primer/Pore Sealer Application
Loading into the Super Guppy
Arrival at Kennedy Space Center
• Image placeholder
EFT-1 Service Module
Nozzle Ablative Insulation Fit Checks on Flight Nozzles at Stennis Space Center
Core Stage Flight Computers Installed and Almost Ready for Testing
SLS Program Highlights
Completed Painting of the Crew Vehicle Stage Adapter
VAC Foundation – Overall View !Self Propelled Modular Transporter to Support Manufacturing and Assembly of the Core Stage
SLS Core Stage Manufacturing Commitments Enabled
12 Drawings for 70% of the mass of Core Stage has been released Updated: 10/17/2013
Weld Tools Operational
Enhanced Robotic Weld Tool (Domes)
Segmented Ring Tool (Rings) Vertical Weld Center (Barrels)
First Dome Welded at MAF
GSDO Accomplishments Vehicle Integration & Launch (VIL)
15
CT-‐1 rolled out of HB 3 and in CT yard for tesFng Removal of items in AB compartments of ML Base
Roller Assembly InstallaFon Work Flame Trench/Flame Deflector DemoliFon
2014
17
Exploration Mission One (EM–1)
Asteroid Redirect Crewed Mission Overview
Partners and Suppliers in America
• NASA continues to make great progress with SLS, Orion and GSDO – SLS preparing for final KDP-C approval Jan 2014 – GSDO preparing for PDR early 2014 – Orion on track for EFT-1 in September, 2014
• SLS, Orion, and GSDO programs remain on track for the first
integrated test flight, Exploration Mission-1.
21
Summary