NASA EVM CENTRAL REPOSITORY POSTING INSTRUCTIONS Use these instructions as a guide for the EVM Central Repository monthly posting process. *All repository submittals due by end of the following month (ex. 31 Mar for Feb month end (ME) data) PROJECT EVM POC Follow the guidelines below as month end EVM data becomes available: Empower: Import cost & schedule data via xml files for required in-house work Import cost & schedule data via xml/Empower Optimized files for required contractor formats per the contract Data Requirements Description (DRD) Windchill: Upload cost and schedule human readable and machine readable files (i.e. UNCEFACT, JSON) for required in-house work and contractor formats per contract DRD o IPMR Formats 1-4 human readable o IPMR format 5 (or equivalent variance analysis) if required for all in-house & contractor work o IPMR format 6 if required * o Any native files for other required contractor formats not in Empower Notify the EVM Tools Admin Team ([email protected]) upon submission and include “Central Repository Submission” in the subject line. Verify that machine and human readable files in Windchill align with Empower data * IMS used for analysis purposes; does not meet Schedule Repository requirement unless coordinated with Schedule Repository POC Communicate monthly updates to your Center EVM Focal Point or Designee CENTER EVM FOCAL POINT OR DESIGNEE Assess what EVM data is uploaded into Windchill & Empower for each EVM project at your center Review posting requirements above Contact Project EVM POC if any ME EVM data is missing from Windchill & Empower Communicate status on Center EVM submittals to HQ-OCFO EVM Support by the end of the following month – Current POC information can be found on the OMB Max EVM website Inform HQ of any new projects with EVM requirements HQ-OCFO EVM SUPPORT Update NASA EVM Central Repository Tracker based on feedback from each Center EVM Focal Point or Designee Post monthly tracker to OMB Max EVM Website https://community.max.gov/display/NASA/NASA+EVM+Central+Repository+Data LINKS Empower: https://nasa-ice.nasa.gov/empower/ Windchill: https://nasa-ice.nasa.gov/Windchill/app/ OMB Max EVM Page: https://community.max.gov/display/NASA/NASA+EVM+Central+Repository+Data Rev (A) July 2021

Upload: others

Post on 20-Mar-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

NASA EVM CENTRAL REPOSITORY POSTING INSTRUCTIONS

Use these instructions as a guide for the EVM Central Repository monthly posting process. *All repository submittals due by end of the following month (ex. 31 Mar for Feb month end (ME) data)

PROJECT EVM POC Follow the guidelines below as month end EVM data becomes available:

☐ Empower:

• Import cost & schedule data via xml files for required in-house work

• Import cost & schedule data via xml/Empower Optimized files for required contractor formats per the contract Data Requirements Description (DRD)

☐ Windchill:

• Upload cost and schedule human readable and machine readable files (i.e. UNCEFACT, JSON) for required in-house work and contractor formats per contract DRD o IPMR Formats 1-4 human readable o IPMR format 5 (or equivalent variance analysis) if required

for all in-house & contractor work o IPMR format 6 if required* o Any native files for other required contractor formats not in Empower

• Notify the EVM Tools Admin Team ([email protected]) upon submission and include “Central Repository Submission” in the subject line.

• Verify that machine and human readable files in Windchill align with Empower data * IMS used for analysis purposes; does not meet Schedule Repository requirement unless coordinated with Schedule Repository POC

☐ Communicate monthly updates to your Center EVM Focal Point or Designee

CENTER EVM FOCAL POINT OR DESIGNEE

☐ Assess what EVM data is uploaded into Windchill & Empower for each EVM project at your center • Review posting requirements above

☐ Contact Project EVM POC if any ME EVM data is missing from Windchill & Empower

☐ Communicate status on Center EVM submittals to HQ-OCFO EVM Support by the end of the following month – Current POC information can be found on the OMB Max EVM website

☐ Inform HQ of any new projects with EVM requirements

HQ-OCFO EVM SUPPORT

☐ Update NASA EVM Central Repository Tracker based on feedback from each Center EVM Focal Point or Designee

☐ Post monthly tracker to OMB Max EVM Website • https://community.max.gov/display/NASA/NASA+EVM+Central+Repository+Data

LINKS Empower: https://nasa-ice.nasa.gov/empower/ Windchill: https://nasa-ice.nasa.gov/Windchill/app/ OMB Max EVM Page: https://community.max.gov/display/NASA/NASA+EVM+Central+Repository+Data

Rev (A) July 2021

NASA EVM Central Repository Process Flow chartC

ente

r EV

M F

oca

l Po

int

or

Des

ign

ee

Pro

ject

PO

CH

Q-O

CFO

EV

M S

up

po

rt*

Revised July 2021

Month End

Repeat Process Monthly

Verify EVMData is uploadedinto Windchill &

EmpowerNO

YES

Contact ProjectEVM POC

EVMDataAvailable

Verify EVMData is uploadedinto Windchill &

EmpowerContact Center

EVM Focal Point

NO

YES

Inform HQof any new

projects with EVM requirements

UpdateNASA EVM Central

Repository Tracking list

Upload cost/schedule human readable & machine

readable files for required in-house work & contractor

formats per contract DRD

Upload EVM Data

for in-house work +

Contractors

Distribute updated Central Repository

Tracker to Center EVM Focal Points

All repository submittals posted

by end of the following month

(ex. Mar 31 for Feb ME data)

**Empower: Import cost & schedule machine readable files for required in-house work and contractor formats per contract DRD.

*Windchill: Upload cost & schedule human readable and machine readable files (i.e. UNCEFACT, JSON) for required in-house work and contractor formats per contract DRD. - IPMR Formats 1-4 human readable - IPMR Format 5 (or equivalent variance analysis) if required for all in-house & contractor work - IPMR Format 6 (IMS used for analysis purposes; does not meet Schedule Repository requirement unless coordinated with Schedule Repository POC)Notify EVM Tools Admin Team ([email protected]) upon submission and include “Central Repository Submission” in the subject line.

Do the Windchill human

readable files align with Empower

data?

NO

YES

Notify originator

Notify EVM Tools AdminTeam upon submission