(nasa npc-200-2) quality program provisions for space system contractors (nhb-5300.4-1b) (1962)
TRANSCRIPT
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
1/43
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
2/43
PREFACE
Date: A p r il 20,
1962
The
QUALITY
P R O G R A M PROVISIONS
FO R SPACE SYSTEM
CONTRAC
TORS
NPC
200-2)
is e sta b lish e d
to
provide
c o m m o n , g e n e r a l
requirements for contractor quality
program.s
to ensure
the
required
quality
of NASA
s p a c e s y s t e m s
and
e le me n ts
t h e re o f.
This publication
is c o n siste n t with existing D e p a r tme n t
o f
Defense quality aSSurance
p o lic ie s
as of date of
publication) an d specification MIL-Q -9 8 5 8 , and
a m p l i fi e s ,
in
c o ns id e ra bl e d et ai l, th e r e q u i r e m e n t s which m a y be in
voked in a s pa ce s ys te nl
contract.
NASA in sta lla tio n s s h al l in vo ke th e req u i remen t s
o f th is publication
c o n tr a c tu a lly
to the
e xt en t n ee de d
and
c o n siste n t with
p r o g r a m planning
for procurements of complete
space s y s t s ~ launch vehicles space-
c r a f t , and a sso c ia te d gr ound support s y s t ~ m s
NASA
sp a c e
s y s t e m
contractors
will
also
invoke
requirements of this publication in
selected
m a j o r
s u b c o n t r a c t s .
To facil itate t imely execution of NASA
programs
th e cognizant
NASA
in sta lla tio n m a y d el eg at e a ut ho ri ty fo r d e ta ile d
i m p l e m e n t a t i o n
to its field representatives or to the designated inspect ion agency . as
a p p r o p r ia te .
Where d ec is io n s c on ce rn in g
the
c o n t r a c t o r s
quality
p r o
g r a m re not delegated, the m os t d ire c t and expeditious m e a n s of
c o m m u n i c a t i o n
with
th e
NASA
in sta lla tio n
s ho uld b e
u s e d ,
Contro ents and questions
concerning th e
r eq uir em e nt s s et
forth
in
th is pu blic ation
shou ld be referre to the
Of f ice
of
Reliability
and
Quality
A s s u r a n c e ,
NASA
H e a d q u a r t e r s ,
Washington 25, D .C . Q ue st io ns
c on ce rn in g it s
application
to specif ic procurements should be referred
to the
designated
NASA field r e p r e s e n t a t i v e
o r,
if t h e r e is none, to th e
cognizant NASA
installation.
This p ub li ca ti on i s
a u th o r iz e d in a c c o r d a n c e with NASA
G e n e r a l
Ma n a g e m e n t I n str u c tio n 4 - 2 - 2 .
As s o c i a t e
A d mi n i s t rat o r
ational eronautics and Space dministration
For : ale
by the Supermteodent
of
Documentll
US
Government Prmtmg Office
Washmgton 25
DC
Price
4Q
cent..
i)
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
3/43
1
2
.3
.4
.5
6
1
.2
.3
1
.2
1
.2
.3
.4
.1
.2
.3
.4
.5
.6
7
.8
.9
TABLE OF CONTENTS
Quality Publication NPC 200-2
ge
Section 1: Introduction
General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1
Applicability.. . . I
Relation
to
Detail Requirements
I
Relation
to Reliabi li ty Requirements I
Government Qual ity Assurance Actions I
Revisions 0 0 0
0
0 2
Section
2: Basic Requ iremen ts
General 0 0 0
0
3
Quality
Program
Documentation 3
Change
Control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
Section 3: Management
Planning , , .. 5
Organization
0 0
5
Section 4:
Design
and Development
Control
General 7
Drawing
and Specif ica tion
Review.. . . . . . . . . . . . . . . . .
7
Qualification Tests 8
Identification.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9
Section 5: Control of Contractor
Procured
Material
General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Selection
of Procurement Sources
Procurement
Documents 12
Government Source Inspect ion 14
Contractor
Source
Inspection 14
Receiving Inspection 14
Identification
0
0
0
0 0 0 15
Failure and Deficiency Feedback 16
Supplier
Rating and
Preferred Source Lists 16
Coordination of Contractor - Supplier Measuring
and Test
Equipment
and
Standards.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16
Section 6: Control
of
Government
Furnished Property GFPj
1 Inspection
of GFP.. . . . . . . . . . . . . . . . . . . . . .
17
2 Defective GFP.. . 17
Section 7: Control of Contractor
-Fabricated
Articles
I
General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
19
2
Conformance Criter ia
19
3
Inspection
and Test Planning 19
4
Inspection
and
Tes t Per fo rmance
20
5
Fabrication
Controls
0 0 0
o
0
0
0 22
iii
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
4/43
Section 8: Nonconforming
Material
ge
8.1
Material
Review 25
8.2
Approval
of
Contracting
Officer. 25
8.3
Control
of
Nonconforming
Mater ia l 25
8.4 Rework Without MRB 26
Section
Inspection
Measuring and Test Equipment
9.1
General . . .
27
9 2 Calibration 27
9.3
Calibration Facili t ies and
Standards 27
9.4 Evalua tion
27
9.5 Maintenance
and
ont ro l 28
9.6
Written Procedures 28
9.7
Records 29
Section 10: Inspection
Stamps
10.1
Genera l
31
Section 11: Preservation Packaging
Handling
Storage and
Shipping
11.1
11.2
11.3
11.4
11.5
11.6
Genera l 33
Preservation
33
Packaging 33
Handling 33
Storage
33
Shipping
34
Section 12: Statist ical
Planning
Analysis and Qua li ty
Control
12.1 General 35
12.2
Statist ical
Analysis and
Test Planning
35
12.3 Sampling
Plans
35
12.4
Statist ical
Quality
Control Charts 35
Section 13:
Training
and Certification of
Personnel
3 Training 37
13.2 Certification
of
Fabricat ion and Inspection Personne l 37
Section
14:
Data
Reporting
and
Correct ive
Action
4
General
39
14.2 Data Reporting
40
14.3 Corrective
Action 41
Section
15: Audit
of Quality Program
Performance
5
Performance
of Audits 43
15.2 Audit Reports and Corrective Action 43
Appendix A: Glossary
of
Term s A i
Appendix B:
Quality
Program Documentation B i
iv
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
5/43
SE TION
INTRO U TION
GENERAL
The Quality Program Provis ions for Space System
Contractors
NPC 200-2)
sets
forth g eneral requ iremen ts for contractor
quality
programs
necessary
to
ensure
that
complete space sys tems
launch
vehicles spacecraft and
associated ground support equipment meet
the
quality
requirements
of
the
contrac t. These
requirements
i nc lude the
establishment
and
maintenance
of
an
effective
quality
program
from
the design conception
to
the delivery
of
art ic les
of
satisfactory
quality
level
meeting
t he int ended
design.
. 2 APPLICABILITY
This
publ ica tion is
applicable when
invoked
by
reference
to i t
in
the
contract ,
to
NASA space sy stem prim e
contracts.
also
applies to
those
major sub
contracts
to
which its provisions
are
pertinent, as de te rmined by
the cognizant
NASA installation or by the prime
contractor.
3
4
RELATION TO DETAIL REQUIREMENTS
The
quality
program
requirements setforth in this publication shall be sat is fi ed
in addition to
all
detail requirements contained in the statement of work or in
other parts
of the
cont rac t. Regard le ss ofthe
requirements of thi s publica tion ,
the contractor is responsible
for compliance with
all provisions
of
the contract
and for
furni sh ing speci fi ed
art ic les
which
meet all
the
requirements
of
the
contract . To the
extent of
any inconsistency
between
the
contract
Schedule or
its General
Provisions
and this publication, the
contract
Schedule
and the
General P ro visio ns sh all
control.
(The term contract
schedule
is not to be
confused
with
the delivery
schedule.
See
Glossary).
RELATION TO RELIABILITY REQUIREMENTS
The
quality
program
prov ision s h erein a re
intended to aid
in achieving
the
r equ ired rel iab il ity of the
complete
space systems, launch vehicles, space
craft , and
ground
support systems
involved.
Detailed re liabil ity requirements
general ly will
be
contained in
the
contract
work
statement Certain
require-
:ments herein such as te stin g m ay be con sidered common to quality
an d
rel iabil i ty
programs.
The
contractor s quality
program shall
be planned and
used
in
a
manner to effectively
support the
contractor s
re liabil i ty program.
GOVERNMENT QUALITY ASSURANCE ACTIONS
The quality programs of the
contractor
and of
his
subcontractors are subject
to
continuous evaluation,
review,
and inspection by the cognizant NASA installation
or
its
designated representat ives. Actions by or on behalf of the Government
will determine not only
whether
the requirements ofthis publ ica tion have been
met,
but
als o th at the
contract
articles
r
of
sat isfactory
quality
and meet the
intended design. The contractor
s existing
quality
program
will be
considered
adequate
upon
demonstration satisfactory to the cognizant NASA
installation
that it continuously provides an equ ival en t to the provisions herein.
1
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
6/43
.6
R VISIONS
Quality
Publication
200 2
When this publication
is
revised
the
contractor
is
encouraged
to follow
and
to authorize his subcontractors
to
follow the applicable portions of the revised
publication.
However
the
contractor is not required
to
comply with revisions
made after
th e e ff ec tiv e
date of
the contract
ex cep t as
contract change.
the
contractor elects
to follow the revised
publication without
contract
change
he
shal l
not ify the
contracting officer
the
cognizant
NASA
installation
and its
designated representat ive in
writing.
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
7/43
SECTION
BASIC
REQUIREMENTS
1 GENER L
The
contractor
shall maintain
an effective
and
t imely
quality program
planned
and developed
in
conjunction
with all
other contractor s
functions necessary
to
satisfy the contract requirements. The program shall demonstrate recognition
of
the quality aspects
of
the
contract
and an organized approach to achieve
them. The program
shall e ns ure that
quality
requirements
are
determined
and satisfied throughout all phases of c on tr ac t p er fo rm a nc e
including
preliminary and engineering
design
development fabrication processing
assembly
inspection
test checkout packaging shipping storage
mainte
nance field use
flight
preparations flight operations and
flight
analysis.
The
program
shall
ensure that quality aspects are
fully
included in all designs
and
are
continuously
maintained in
the
fabricated
ar t icles.
Any
changes
required to improve
component
subsystem or
system
performance without
c om p ro m is in g q ua lity or re lia bi li ty s ha ll be inc orpo ra ted at
the ear l iest
practical point
in
development and
fabrication.
The program
shall
provide
for
the
ear ly
and prompt detection of actual
or
potential
deficiencies
system
incompatibi l i ty
marginal quality and trends or
condi tions which
could resul t
in
unsatisfactory
quality.
t
shall also
provide
t imely
and e ff ec ti ve
corrective
action of all
such
conditions.
Objective
evidence of
quality
conformance
including records
of inspection and t e st r esu l ts shall be made readily available
to t he cogni zant NASA
installation
and its designated representative.
.2
QU LITY PROGR M DO UMENT TION
The
contractor
shall
develop
and
provide
simultaneously
to
the
cognizant
NASA
installation and
its
designated representative
all
documentat ion specified herein
and tabulated
in
A ppe ndix B . Depending
upon
requirements
specified
by the
NASA installations contracts m ay p ro vid e for departures
from
the documenta-
tion
specified
herein.
W here th is
is
done
the
contract requi rements shall
be
followed. All quality program
documents such as
process and qua li ty control
procedures.
which
are peculiar
to
or
developed
for
a part icular space
system
shall
include
identification with that
system.
For ready
use
such documents
shall
be
maintained
separate
from
common documents. All documenta tion wi ll
be subject to actions of
the
cognizant
NASA
installation or its designated
representative
as
follows:
2.2.1 Avvroval .
The cogni zant
NASA
installation
approval
will be
granted
in
wnting within the
tim e spec ified in the contract. The cont rac to r sha ll
not implement documents in this category unti l
NASA
installation
approval
is
granted . Ne ithe r approva l
nor
waiver
of
such approval
shall
relieve
the contractor of his obligation
to
meet
requirements
of the
contract.
2.2.2 Review. Documents in this
category
shall be
received
by the NASA
installation or
its designated
representative a
minimum of
two weeks
prior
to
the
intended or requi red use by the contractor.
the contractor
has not been notified
of disapproval
within the two week period he
may
proceed.
However subsequent changes in
such
docum en ts m ay be
required
by the NASA installation.
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
8/43
2.2.3
Quali ty
Publication 200
2.2.3
Information.
All
documents
in this cat egory sha ll be submitted
for
the
purpose of determining current
quality prograITl
status
progr ss
and
future planning. The
submit ta l
schedules
shal l
be
as
speci fi ed in
Appendix
B.
2.3 CHANGE CONTROL
2.3.1
General.
A
system
shall be provided
by
the
contractor
to
ensure
control
of
all documen ts a ff ec ting the quality
program
and for the
incorporation of changes thereto.
These
documents
include quality
control
procedures
engineering
drawings
inspection and
test
proce-
dures
specif ications
procurement docuITlerits
engineering
orders
process manufacturing
and operating instructions and s imilar docu-
ments .
These
documents shal l
be
distributed
to
the proper points
at
the p rope r t ime s,
in
o r d e r
t ha t con tr ac t
work and all quality program
functions
a r e accomplished in a cc ordance with
the
la test
applicable
documents. The system
shal l
also
provide for
the
p rompt r emova l
of all
obsolete documentation f rom operating areas and
that
quality program
personnel
shal l
review all
changes
to
determine
their
effect
upon
the
quality of the
fabricated
a r t i c l e s
and upon
the
operation
of
the con-
t r a c t o r s
quality
program.
Specia l a tten t ion
shal l
be given
to
changes
involving
i nt er fa ce r el at ionsh ips ,
including those changes a ffec ting
art ic les not
under
the
design
control
of
the contractor .
2.3.2 Effectivity.
The contractor s ha ll c le ar ly
define t he e ff ec ti vit y point
of
all
changes,
except
those
which
affect
only
presentat ion
of
informa-
tion on
a
document
e.g., spelling
o r
completeness and
do not
affect
:materia ls fabrication or perforrnance
The contractor
shall ensure
that changes a r e accomplished
On
the affected art ic les at an
appropria te
point, the
changed
art ic les
a r e
appropriately
marked or
identified,
and
applicable documents a r e revised accordingly.
Provi sions sha ll
be
made
for adequate and t imely inspection and
t e s t
of all changed
a r t i c l e s .
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
9/43
SECTION
MANAGEMENT
.1
PL NNING
The contractor shal l demonstrate
an organized approach
to
his
quality program
which includes:
a. Clearly speci fied pol ic ies and objectives,
b.
writ ten
operating plan
for
t he qua li ty program, and
c.
Documented
meanS f or measu ring r ea liz at io n aga in st the plan.
These
shall encompass the
total
range of
actions of
the
contractor s quality
program from
the i ni ti al pha se throughout
the
development, fabrication, and
delivery
of
art icles of required
qua li ty , and constitute the contractor s quality
program plan. All
contractor
quality a ctiv itie s s ha ll be coo rd in ate d so
that
specific
quality program functions can
be
effectively directed,
and
their
accomplishments and
effectiveness
measured.
3.1.1
Quality Program
Plan Submission. The
contractor s
quality program
plan
shal l
be avai lable in
prel iminary fo rm within 45
days
after award
of
the contract for review and
discussion with
the NASA installation
and/or i ts
designated
representat ive. The prel iminary plan
shall
include:
a.
flow chart or tabulation showing the
contractor s
proposed
quality program opera ti ons
in g en er al terms
of what
where
and
how
b.
Proposed
reV1Slons
or
additions to
present
quality
operations
to
satisfy
the
contract.
c.
Time schedule for quality program docume ts
to
be prepared by or
on behalf
of
the contractor.
d.
Contractor s organizational structure, showing all elements which
will perform functions
required by th is pub lic ation.
The
contractor s quality program p lan sha ll be subsequently de ta i led
and submit ted for review
to
the cogn izant NASA installation and i ts
designated representative within 45 days after the review of the
prel iminary plan.
Fur ther
details ,
including changes and additions.
shall
be submitted
as
prepared
and two weeks
prior
to their
implemen
tation.
.2 ORG NIZ TION
No s ing le organiza tiona l pattern
is
mandatory
to satisfy
the
requirements
of
this
publication.
Personnel
performing quality program functions shall have
sufficient,
well-defined
responsibility and the
organizational
freedom to
recognize and ssess quality problems and
to
initiate, recommend, and/or
p rovid e solu tions.
The
effectiveness
of quality program
functions and the
ability
of
assigned personnel
to
objectively
ssess
document , and
repor t
t rue
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
10/43
3.2
Quality Publication 200 2
quality findings shall be
maintained
during all phases of the
contract
work and
shall
not
be
reduced by
other considerations
such a s
the influence
of engineer
ing
changes rework or rescheduling. The one
responsible
fo r d ir ec tin g the
quali ty
program
shall
have direct unimpeded access
to
h igher management
and shall
repor t regular ly on the status and adequacy
of
the program.
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
11/43
SECTION DESIGN
AND
DEVELOPMENT CONTROL
G N R L
Product quali ty shal l be a major considerat l0n in
the cont rac tor
des ign and
development effor ts . The
cont rac tor
shal l ini t iate a prograITl to es tabl ish
document , and
ensure
compliance with desig n co ntro l re quire IT le nts and
quali ty cr i te r ia during the pre l imina ry design
and
development stages and
mainta in i t t hroughou t the
life
of
the
con t rac t ar t i c les
2 DR WING
AND
SPECIFIC TION REVIEW
4 2 1
General. The
contractor shal l pe r fo rm
d esig n re view
of
drawings ,
speci f icat ions,
and technical docurnents to establ ish the
character is t ics
which
dete rmine
the
quali ty and re l iabi l i ty of
the
sys tem and to
p r o -
vide cr i te r ia to ju dge con fo rmance
to
these charac te r i s t i c s The con
t rac tor
shal l
docu1TIent
design
reviews and make
such documentat ion
avallable to the NASA ins ta l la t ion and
it s d es ig na te d
representa t ive
The contractor
shal l
ensure that
drawings , specif icat ions, and tech
nical documents contain
adequate
requi rements for
determining
and
con tr oll in g th e q ua lity of
a ll
i t ems purchased o r
produced
by
the
con
t rac to r
Such
r eq ui re m e nt s s ha ll
be
re la ted
to
a ll
phases
of
the
system
development including design, fabrication,
testing, and
end-use . Inde
t ai li ng qual it y
requi rements
documents shal l mclude:
a. Identif ication of the
ar t ic le
b. Character is t ics
deter ITIined to
inf luence quali ty ,
c .
Inspect ion and tes t methods including
specif ic t e s t
equipment ,
envi ronmenta l cond it ions , and
sample
size, as applicable , and
d.
Conformance
l imits .
4 2 2
Qualified and
Preferred
Parts.
The
d es ig n r ev iew shal l
include spe-
cific
act ions to
maximize
the use of
par ts and componen ts
which
have been qualified as
meet ing
the per fo rmance re l i ab i l i ty and
quali ty
requi rements
of
the
c on tr ac t. F ee dback of informat ion f rom
previous experience with s imi la r or
related
designs
is
a necessa ry
input at
this
s tage of the sys tem
development .
The des ign
review
shal l include
appl icat ion
of any
pre fe r red
p a r ts l is ts
ci ted
in the
contrac t
Or req\ l i red
to
be
es tab l i shed by the cont rac tor to:
a.
Eliminate
f rom
the
design
par ts
known
to
be inadequate, and
b. Aid
in
planning par t and
component
test ing
and
screen ing
4 2 3
Government Document Review
The
cont rac tor
shal l review applicable
Gove rnmen t d rawi ng s, specifications,
and
t ec hn Ic al documen ts as
above, fo r adequacy and provide necessary addenda and supplements
to
adequately define th e q ua lity
requi rements
of
the fabr icated
ar t ic les
4 2 4
Planning. The contractor sha l l use th es e re views for
t imely
planning
for fabr icat ion to olin g, m .e as urin g a nd
t e s t equipment ,
and
inspect ion
and tes t procedure s
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
12/43
4.3 QUALIFICATION TESTS
4.3 Quali ty Publica t ion 200 2
4.3.1 General.
Qualification
tes t of par ts
components
subassembl ies
and higher
levels of
assembly
shal l be performed to demonstrate
that the design is
inherent ly
capable of
meet ing
the
establ ished
r e -
q u ir em e n ts T es ts s h al l be
designed
to:
a.
L o ca te s ig ni fi ca nt
f ai lu re m o d es
b.
t rmin
the
effects
of var ied
s t ress levels
c.
Determ.ine
the effects of combinations of
tolerances and
dr if t of
design
paramete r s and
d.
Determine
the
effects
of
combinat ions
and s eq ue nc es o f
envi ron-
me n t s
and
of
s t ress levels
Destruct ive tes ts and a n i ns p ec ti on of disas
sembled
ar t ic les shal l be
included
as
appropria te The con t rac to r shal l document and
submlt
qualification
t e s t
procedures
in
accordance
with
paragraph
7.3.1
and
the
contract
These procedures
sha l l be sta t is t ica l ly
d e si gn ed w h e re
advantageous
to obtain
the
maxiITlum
of
useful
information.
Data
shal l
be
submit ted
as
specified
in
Sect ion
14.
4.3.2
Parts
Components and
Subassemblies. Qualification t e s t s
of
par ts
components
and
subassembl ies shal l be appropria te
for
the
sys tem
per fo rmance environments
and associa ted
t ime
requireTIlents.
4.3.3
SystemS and
Major Subsystems. Th ese q u al if ic a ti on t e s t s shal l include
demonst ra t ion ana1ysls
and
evaluat ion
of
sys tem and subsystem
effec t iveness interac t ion integra t ion
and
c ompat ib i li ty under
condi
t ions
which
s imulate
a ct ua l e nd u se to the highest prac t ica l degree
4.3.4
Requalification
Tests.
Qualification
tes ts
performed
on
identical
ar t ic les
pr io r
to
O r
outside the scope
of
the
contract
laybe accepted
at the
discre t ion of the NASA
insta l la t ion
to reduce
qualification
t e s t -
ing. Actual t e s t data
envi ronments
and procedures for such t e s t s
shal l
be
m ad e a va ilab le
to
the
NASA
insta l la t ion
when
the
qual if lca-
tion tes t procedures a re submit ted. Qualification t e s t s shal l be r e -
peated
at in tervals s pe ci fi ed b y the NASA installation.
Requal i f icat ion
m ay be
requi red
when inspection tes ts or ope ra t iona l data indica tes the
inadequacy
of
a
qualified
a rt ic le o r
w hen th e
des
ign
has
been
changed.
Requalification
shal l be
accomplished
only
af te r
n e c e s sa ry c o rr e ct iv e
achon
has been
implemented .
4.3.5
Qualification
Status List.
The cont rac tor
shal l
prepa re and
maintain
a qualification sta tus l is t
showing
the
p la nn ed a nd
completed qualif i-
cat ion
s ta tus of
each part
component
subassembly
and
higher
level
of
assembly .
The
basis
for any omiSSIon of
qualification
tes ts shal l
be shown. Where qual if ica t ion is
based on
tes ts conducted
under the
applicable contract
re fe rence
shal l be
made
to the pert inent
t e s t
repo rts o r
data . The qualification
s ta tus l is t and changes
thereto
shal l
be
submit ted
for
a pp ro va l in
accordance
with paragraph
2.2 and
Appendix B
at
in tervals mutua l ly
agreed
u po n w ith
the
NASA msta l la -
t ion.
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
13/43
and Development
Control
4 IDENTIFI TION
4 4
MaterIals processes
and
design
parameters
shall be so i de nt if ie d i n
the
design d oc um en ta tio n th at the engineering features
to
be evaluated m ay
be
associated
with
the particular art ic les Each article including parts an d
components
shall
be
identified
by
a
unique part num ber and serial
or
lot
number Certain art icles such as rivets
wil l not
be serial ized or identified
by lot
numbers
af ter
fabricat ion provided that
select ion
of
such
r
approved
by
the NASA installat ion or i ts
designated
representat ive
These i den ti fi ca ti on
numbers shal l be consistent WIth the engIneering drawing and change control
system used
throughout
the contract When
the
contract
r quir s
mechanized
or e le ct ro n ic p r oc es si ng
of data for distribution the identi f icat ion numbers
shal l b e su ita ble for such process ing
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
14/43
SECTION
CONTROL O
CONTRACTOR
PROCURED
MATERIAL
.1
GENER L
T he c on tr ac to r s ha ll a s su:me th e res pons i bi l i t y
fo r th e a de qu ac y
and
quality
of all purchased
materials art icles and serv ices unless
otherwise
directed
by the
contracting agency
in
writing.
This
responsibil i ty includes:
a. Selection of
qualified procurement sources;
b.
TranslTIission of
all
design reliability
and
quality requirements
to
procurement subcontrac ts and purchase orders;
c . Evaluation
of the adequacy of
procured
arhcles;
d.
E ff ec ti ve p ro v is io n s fo r e a r l y
infor:mation
feedback an d orre -
tion of deficiencies; and
e .
P ro vi di ng te ch nic al
a s s i s t a n c e and
t r a i ni ng
to s u p p l i e r s w h e n
ne ess ry
to a ch ie ve
d e s ir e d r el ia b il it y
an d
qua l i t y
l e v e l s .
.2 SELECTION OF PROCUREMENT SOUR S
5.2.1 General
T he c on tr ac to r s ha ll e va l ua t e an d a pp ro ve h is procure:ment
s o u r c e s .
Appr ova l s hal l b e b a s e d upon th e s u p p l i e r s qua l i t y h i s t o r y
r e c o r d s o r s u r v e y r e p o r t c ov er in g t he r e q u i r e m e n t s
stated
below.
The c o n t r a c t o r s
quality
organi zat i on s h a l l revi ew and pr ovi de c o m
:ments on
th e ad eq u acy
of a ll p ro cu re me nt s ou rc es . E a ch s el ec te d
s up p li er s ha ll
s a t i s f y one
of the following conditions:
a.
Th e s uppl i er s h a l l
have pr e vi ous
a nd c on ti nu ou s
qua l i t y
r e c o r d
of supplying h ig h q ua li ty a rt i c l e s oft he t y pe b e in g p r o c u r e d . T h e s e
qua l i t y r e c o r d s s hal l
be
suppor t e d
b y
docu:mented qualitative and
quantitative
information.
b.
If
no previous quality
records
are aval lab le
a survey
of the sup
plier s
facilities
and quality control inspection systeno. s ha ll indi-
c ate t ha t he
is
capable
o f s u pp ly in g
a rt i c l e s
which :meet a ll qua l i t y
requ irements . Resu lt s
of th ese r ev ie ws
shall be
documented and
m ad e a va ila ble
to
th e co gn iza nt NASA i ns t al l at i on o r i ts d e s i g
nated
representative upon request.
When c o: m m e r c i a l o r o ff- th e- sh el f i t e m s re
to
be
p r o c u r e d
an d the
c o n t r a c t o r h a s
no
p r ev io u s q u al it y r e c o r d o f th e s uppl i er, s u r v e y of
the s u p p l i e r s faci l i t i es
and
quality
c o n tr o l i n sp e c ti o n s y s t e m will not
necessari ly be
required. In these c ses the contractor sha ll ensure
t ha t
t h o ro u g h i nspe c t i on
is p e r f o r m e d t o d et er :m in e qualification and
conform.ance.
5.2.2
Records
R e c o r d s n e c e s s a r y fo r
es t abl i s hi ng and m a i nt a i ni ng
quality
h i s t o r y fo r e a c h s u b c o n t r a c t o r an d
s uppl i er
s hal l b e
:maintained
b y th e
contractor.
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
15/43
5.3
PRO UREMENT DO UMENTS
5.3 Quali ty
Publ icat ion
200-2
5.3.1 ontents Subcontracts
and
purchase orde rs i ssued at a ll t ie rs
of
procurement shal l
include
provis ions for the following, a s app li cabl e:
a. Basic Technical Requirem.ents:
All
drawings,
engineering orders,
specifications,
quantitative
reliabil i ty requirements
test
and
inspection procedures, special inspection and
test equipment,
and the la tes t applicable revis ion symbol shal l be re fe renced
and made ava ilab le
as
necessary.
b. Government Sourc e Inspe ct ion Requi rement s: When Government
SOurce inspection
is
required, include
the
following
statement;
All
work on
this order is subject to inspection and
test
by
the Government at a ll t im e s including the per iod
of
pe r fo rm
ance) and
places;
and,
in any event,
prior
to shipm.ent. The
Government representative
who
normally services
your
plant
should be notif ied for ty-eight 48 hours in advance
of
the
tilne
articles
or
processes
are ready
for
inspection
test.
All other
orde rs shal l mclude the
following s ta temen t :
liThe Government
reserves
the
right
to inspect
any
or all
of
the work
included in
this
order at
the
supplier s
plant.
c. COntractor Source
Inspection.
When
the
need for
contractor
source
inspection has been determined,
the
requirements shall be de-
tailed in
subcontracts
and purchase orders .
d.
Subcontrac tor
Quali ty
Prog rams .
The
s ubcon tr ac to r s h al l
provide
and maintain quali ty program which conforms to one of the
following:
1 Subcontrac tors
for major subsys tems
as des ig n at ed by the
contractor
o r the NASA instal lat ion,
shal l be
requ i red
to
fol
low
this
publication.
2
Suppl iers
of mater ia l s
par t s
and
components including off
t h e- s he l f i tems s h a ll be requ i red as
minimum
to follow
NASA Quali ty
Publ icat ion NPC
200 -3 .
3
All other subcon t rac to rs having
design
responsibi l i ty o rp ro
ducing
complex a ssem blies o r
subassembl ies
sha l l be re
quired
to follow
the
con t rac to r
s document c on ta in ing,
as
min imum,
applicable pOrtions
of
this publication and
a ll
the
provis ions
of
NASA
Quali ty Publ icat ion NPC 200-3.
In all c ses the cognizant
NASA
installation, its authorized
representat ive , or the contractor, may survey the subcontractor s
quality program
or inspection system to verify
com.pliance.
e. Purchased Raw
Mater ia l s .
Purchased
raW
mate r i a l s which
a re
required
to
sat i s fy
documented specifications
shal l
be accompanied
with
chemica l
and
phys ica l t e s t
resul t s
as
appl icable .
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
16/43
o f C o n t r a c t o r P r o c u r e d M a t e r i a l
5.3.2
f.
Raw
Materials Used
in
Purchased
Articles . Tests
performed on
spe cim en s or detailed a nalyses of suppl ier s acceptance
test
-
sults
on all raw materials
that are r equir ed
to satisfy speci f ica-
tion requirements and which are
employed
in the f abrica tion o f
a r t i c l e s p u r c h a s e d on this subc ontr a c t Or p u r c h a s e
o r d e r
s h a l l
b e
made
available
to the
procuring
contractor
upon request.
g.
Evidence
of
Supplier Inspect ions
Performed.
Evidence
of specif ic
tests
and
inspections
of
procured a rticles sh all
be
submitted
to
the contractor
and
made
available
on
request
for review by the
NASA
insta lla tio n o r
its d esign ate d representative. Particular
e m ph a s is sh a ll
be given t h o s e c h a r a c t e r i s t i c s w hich c an n o t be
n o r m a l l y i n s p ect ed b y th e c on tr ac to r a ft er r e c e i p t . I n sp e c tio n
r e c o r d s m a i n t a i n e d b y th e
s u p p l i e r
m u s t be a de qu at e t o a s c e r t a i n
th e q ua li ty le ve l o f r e q u i r e d
a r t i c l e s
and
o f t h e s u p p l i e r s p r o d u c -
tion
processes .
h.
Identification Preservation and
Packaging. Requirements for
adequate identification special preservation and transportation
p a c k a g in g
r e q u i r e d
to
p r e s e r v e th e q ua li ty
o f
th e
a r t i c l e s h a l l b e
referenced.
Age Co n t ro l . M a t e r i a l s
a nd
a r t i c l e s
having
definite c h a r a c t e r i s t i c s
of quality
d e g r a d a t i o n Or
d r i f t
with a g e
a n d o r u s e s h a l l b e
m a r k e d
to i n d i cat e
th e
date and t e s t t i m e Or
c yc le th e
c r i t i c a l
life
w as
init ia te d o r
the
d at e
a nd
t e s t t i m e
o r c y c le
at
which
u s e f u l
life
w ill b e ex p en d ed . V a r i a b l e s d at a s h a l l b e
r e c o r d e d
and m a i n -
tained. The supplier Or
contractor
s ha ll ens ure
renloval
of such
materials on scheduled basis .
j. R e s u b m i s s i o n of R e j e c t e d M a t e r i a l . A ll a r t i c l e s r e j e c t e d b y the
c o n t r a c t o r
and
s u b s eq u en t l y
r e s u b m i t t e d
b y
th e
s u p p l i e r
to the
contractor
shall
bear
adequate id en tific ation o f su ch r esu bm .is-
s i o n e i t h e r on th e a r t i c l e s o r
o n t h e
s u p p l i e r s s hi pp in g d o cu m e n t.
R efe re n ce sh all
b e
m a d e
to th e c o n t r a c t o r s r e j e c t i o n d o c u m e n t
and
evidence
given that the causes
for
rejection
have been
cor-
r e c t e d .
k. A r t I c l e s of S up plie r D es ig n. T he s u p plIe r s h all
notlfy
th e COn-
tractor of any proposed changes in
design
fabrication method or
process and obtain ap proval of the change
from
the contractor
before
making
th e change.
Appropriate
identification
of those
articles
on w hich
the
change
i s incorpora ted
shall
be requir ed .
5.3.2
Review
E ac h p ro cu re m en t d o c u m e n t s h a l l b e r e v i e w e d b y th e
co n -
tractors
quality
organization
prior to
release of
the
docum.ent
for
p r o c u r e m e n t a nd a ll p ro cu re m en t d o c u m e n t s
s h a l l
b e a va ila ble f or
rev i ew b y th e NASA
p l an t
r e p r e s e n t a t i v e
a n d o r
th e d es i g n at ed in -
spect ion agency. This
rev iew wi ll
require
as
minimum
the
following:
a . A s s u r a n c e
t h a t
the
ap p l i cab l e pr ovisions of
p a r a g r a p h
5.3.1
a r e
in c lu d e d in a d e q u a te
d e g r e e .
b .
D e t e r m i n a t i o n
t h at
the
s u p p l i e r
h a s
b e e n
ap p ro v ed
in a c c o r d a n c e
with the
procurement
source selection
requirements
of para-
g r a p h
5.2.
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
17/43
5.4
Quality Publication 200-2
c.
When articles are
being purchased for delivery d i r e c t to the Gov
ernment
that
a
requirement
exists
that these articles
be
qualified
for their spec if ied app li ca tion in acco rdance with
the quali f icat ion
requirements
of the contract .
5.4
GOVERNMENT SOUR E INSPE TION
Sou rc e inspe cti on
performed
by and
for
the convenience of the Government
on
any procured
articles shall
not in any way replace contrac tor
source
in
spection or rel ieve the contractor of his responsibil i t ies for ensuring
the
quality
of these art icles . The
need for Governmen t
source inspection
will
be
determined by the NASA installation or its
designated
representative.
5.5
ONTR TOR SOUR E INSPE TION
The contractor shal l either provide for
non-Govermnent inspection at
source
or
require
objec ti ve evidence that the subcontractor complies in detail
with
applicable requirements
when the procuring contractor s receiVing inspec
tion
cannot verify the
quality
of the ar t ic les
because
of the following:
a.
Artic les
being
procured
are
at a
level
of assembly which prevents
verificat ion of quality at the procuring contractor s plant,
or
b.
In-process
controls have such an effect on the
quality
of the
art icles , that
the
qua li ty canno t be
determined
solely by inspec
t ion
or tes ts
of
the
completed
a rti cle s,
c .
Verification tests are destrucbve in
nature
or the environments
or
special tes t equipment
required
cannot be feasibly and eco-
nomic ally reproduced or made available at
the
procuring COn-
t r a c t o r s
plant.
5.6 RE EIVING INSPE TION
The
contractor s rece iv ing inspect ion shall provide for the following:
a.
That
ar t ic les shal l not be
accep ted un le ss :
1 They have
been
qualified in a cc ord an ce
with
paragraph
4.3,
Or are
designated
for
Buch
quali fi cation or om.i ss ion
of
qua li fi ca tion has been ju st if ied on the approved qualif ica tion
status
l ist ;
and
2
They
have been in sp ec te d by th e supplier in accordance with
the
purchase orders and
satisfactory
evidence of
such in
spection
is
submitted.
b. Planning
and performance of inspections and tests on all procured
art icles to verify quality requirements of specif ications and draw
ings
and changes thereto,
ei ther at
the source,
or
at the con
tractor s
plant
or both.
Inspections
performed
at
receiving in
spectio n sha ll as
a minimum include verification
of all
drawing
and specification characteristics which
have
not been sou rce
inspected
by
the
contractor
and
which can
be
verif ied
without
disassembly
of the art icle.
e r
i 0
d i e disas
sembly
shall
be
14
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
18/43
of C o n t r a c t o r
p r o c u r e d l M a t e r i a l
5.7
accomplisl\ed
s
appropr iate for
m.ore
detailed
verification
of
the
specified ~ q u i r m n t s
Particular em phasis shall be placed on
those
charactJristics
for which
deficiencies
m.ay not
be
detected
during subsequent
inspections
and
tests . The
quantity
and degree
of in sp e c tio n perform.ed
s h al l be co n s i s t en t w i t h
the c r i t i c a l
n at u re
of the
article,
the informat ion avai lab le frornprev ious inspec tions
o r tests
and
the
q u a lity h i s t o r y of
the
a r t i c l e .
Sta tistic a l
sa mp lin g
techniques
m a y
be
u sed , w here ap plicab le,
if
i n a cc o rd a nc e
with
the s t a t i s t i c a l quality
co n t ro l
r e q u i r e m e n t s of Section
12.
c. Th a t in sp e c tio n and t es t
e q u i p m e n t ,
d r aw i n gs , s p e ci f ic a ti o n s and
instructions wil l
be
available
to
perform
necessary
tests and
spection upon receipt of the articles being purchased.
Where
the
cost
of
certain m spection
or
test equipm.ent is considered
prohibitive,
verif ication
at
the
supplier s
plant
will be
necessary.
d.
That
p r o c u r e d
a r t i c l e s which are su b je c t to
age de te r ior a tion
in -
clude
a n
indication of the d ate that the c r i t i c a l life of the a r t i c l e
w as
in it ia te d
Or
the
d a te
at w hich th e useful life w ill be expended.
A ll
such a r t i c l e s s h a l l be adequately p ro tec te d in su b se q u e n t
s t o r e s
a nd
handling o p erat i o n s .
e .
Th a t
c h em i c al a n al ys es and
p h y sic a l
te sts as
n e c e s s a r y to
v eri fy
mater ia l quality s h a l l be
c on du ct ed o n
t e s t
specim.ens su b mitte d
with p u r c h a s e d art icles
Where u se d , s a m p l i n g
plans
s h a l l be
in
a c c o r d a n c e
with p a r a g r a p h
12.3.
C h e m i c a l
an al y s es
and
p h y s i cal
te sts n e c e s s a r y
to ve r if y
that
raw m.ateria ls conform. to specifications
shall
be
periodically
conducted
on s a m p l e s r a n d o m l y s e l e c t e d
f r o m
the ra w m a t e r i a l s
received.
g.
That p h y s i cal s e p a r a t i o n
of
ra w m a t e r i a l s
and of
p u r c h a s e d
fab ri cat ed a r t i c l e s s h a l l be ma in ta in e d .
This
s hall p ro vi de , a s a
minimum, separation
of:
I) M a t e r i a l s
or a r t i c l e s awaiting in sp e c tio n
o r
t e s t r e s u l t s ,
2) Conforrrling m.ate rials
or articles ,
and
3 R e je c te d m a t e r i a l s or a r t i c l e s .
The i n t eg ri t y of lots awaiting in sp e c tio n and
t e s t
r e s u l t s s h al l
be
maintained.
.7
IDENTIFI TION
A ll
r e c e ipts
a t th e c o n t r a c t o r s p l a n t
s h a l l
b e c l e a r l y identified and
this
i de nt it y m a in ta in ed In
s t o r e
r o o m s and during p r o c e s s i n g in o r d e r that i te ms
p r o c u r e d u n d e r
NASA
c o n t r a c t
m.ay
be read i l y r e c o g n iz e d . This r e q u i r e m e n t
does not include commercial off-the -shelf material
cornman
to
other
p ro je ct s, u nle ss
otherwise specified
in the
contract.
Raw
materials
shall
be
i de nt if ie d a t
recei v i n g and
this
identification s h al l
b e ma in ta in e d
e ithe r on the
fab ri cat ed
a r t i c l e
Or On
r e c o r d s t r a c e a b l e
to th e
fab ri cat ed
a r t i c l e .
A ll
purchased
art ic le s r ele as ed
from. the
con trac tor s receiving inspection sha ll
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
19/43
5.8
Quality Publication ZOO Z
be clear ly identif ied
to indica te
conforman e or r ej ec ti on . R e je ct ed i terns
shal l
be
handled
i n a cc o rd a nc e with the requ i rements
of
Section 8.
5.8
FAILURE
ND
DEFICIENCY FEEDBACK
The c on tr ac to r s ha ll m ain ta in a system to feed
back
rapidly to
suppl iers
the
information
necessary for correct ion of
d ef ic ie nc ie s d ete cte d during
any
phase of inspection
test
assembly
operation
f in al c he ck ou t
or
use
of
the
purchased ar t ic les The sys tem
shal l
mee t the correct ive action requi re -
ments
of
paragraph 14.3.
5.9 SUPPLIER
RATING ND
PREFERRED
SOURCE LISTS
The quality
capabil i t ies
of
each supplier sha ll
be
objectively evaluated and
docum.ented by
the con t rac to r re fe r red source
l is ts
based
on
these
eva lua -
t ions
and
any p r ef e rr e d p a rt s
l i s ts
ci ted in the
c on tr ac t s ha ll
be made avai l -
able to and used by those responsible
for
procurement and selection of
procurement
sources as required in paragraph 5.2.
5.10
COORDINATION
OF CONTRACTOR SUPPLIER
MEASURING
ND TEST
EQUIPMENT
ND
STANDARDS
The contrac tor shal l ensure
ear ly and continuous coordlnat ion
of
all
inspec-
t ion
measur ing
and tes t
equip:ment and
correla t ion of
inspection
and tes t
procedures between
the contractor
and
his
suppliers .
6
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
20/43
SECTION
6:
CONTROL
GOVERNMENT FURNISHED
PROPERTY GFP
1
INSPE TION
OF
GOVERNMENT FURNISHE PROPERTY
Upon
receipt ,
the contractor shal l inspect Govermnent furnished property
to
the extent
pract ical to
detect damage in
t ransi t ,
and
to
determine that the
property is comp lete, qualified
for
the intended end-use, and of proper
type,
size
or
grade
The
contractor shall provide protect ion periodic inspections
and
controls to
ensure that
quality
is
maintained
that storage
conditions
are
adequate, and
that
damage r
deterioration
does not occur i n handl ing or
storage.
Unless o therwise speci fi ed , the
contractor
shall perform
functional
testing pr ior
to further
processing
or
installation
to
determine sat isfactory
operation.
2 EFE TIVE GOVERNMENT FURNISHE PROPERTY
The contractor
shall advise the cogni zant NASA installation and its designated
representative of any
Government
furnished property
found damaged,
mal
functioning,
or
unsuitable
for its
intended
use.
The
cont rac tor shal l prevent
fur ther damage or additional repair costs.
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
21/43
SECTION CONTROL OF CONTR CTOR F BRIC TED
RTICLES
7.1 GENERAL
The c o n t r a c t o r s ha ll ma in ta in a p r o g r a m for quality control
and
n e c e s s a r y
suppo rt ing documenta tion for a ll
c o n t r a c t o r
- f a b r i c a t e d a r t i c l e s to
e n s u r e
that
all applicable
c o n t r a c t
drawing,
and
speci f ica t ion r e q u i r e m e n t s a r e
obtained
and
main ta in ed in
the
completed a r t i c l e s .
The
p r o g r a m
and its
applicat ion
to
a ll phases
of
fabricat ion s h a l l provide maximum a s s u r a n c e that the quality
inherent
in the
design
m.aintained.
7.2
CONFORMANCE CRITERIA
The c o n t r a c t o r
shal l p rovi de document ed c r i t e r i a for de te rm ini ng conform
ance of all
a r t i c l e s
produced by
the
c o n t r a c t o r
in
accordance with
c o n t r a c t
r e q u i r e m e n t s .
These
documents shal l
be available
in
advance
of the t i m e and
at the place
a r t i c l e s
a r e i nspec te d f or c on fo rmance .
These
c r i t e r i a s ha ll i n
clude s tandards for judging whether Or not the a rt ic le s m e e t th e d rawi ng
and
specificat ion
r e q u i r e m e n t s .
7.3 INSPECTION
N TEST
PLANNING
The
c o nt ra c to r s p ro g ra m shal l provide the n e c e s s a r y planning
function
for
t e s t s
and
inspections conducted
during
the
e n t i r e
p hase o f fabricatio n,
p r o c e s s i n g
and
assembly . The planning shal l
be
based on a comprehens ive
study of:
a.
The
a r t i c l e s
b. The f a b r i c a t i o n and process ing o p e r a t i o n s
c.
The
methods
of m a t e r i a l integrat ion, assembly , a nd c he ck ou t, an d
d.
The End-I tem Test P la n r eq u ir ed in
p a r a g r a p h
7.4.2.
An outl ine of the g e n e r a l plan shal l be documented and submit ted as p a r t of
the qual i ty p r o g r a m
plan, p a r a g r a p h
3.
L The outl ine
s h a l l inc lude
flow
c h a r t s
indicating
inspect ion
sta t ions and control points .
7.3.1
Inspection and
Test Procedures. Specif ic writ ten
inspect ion
and
t e s t
p r o c e d u r e s exc ep t t ho se
which
a r e an
i n t e g r a l
p a r t
of detai l f a b r i c a
t ion
documents ,
shal l be p r e p a r e d and submit ted
for
each inspect ion
and
t e s t
operat ion
to
be
p e r f o r m e d
by
the
c o n t r a c t o r
o r
h is s ub co n
t r a c t o r s . These
p ro c ed ur es s ha ll
include
at
l e a s t the
following:
a.
Identif ication
of
the a r t i c l e to be inspected Or t e s t e d
e.g
.. p a r t
number J s y s t e m involved,
and
nomen cla ture .
b. The
object ives
of the
inspection o r t e s t .
C. Measur ing and
t e s t
equipment to be used, specifying range ,
a c c u r a c y
and
type. Specify the
p a r t i c u l a r
s c a l e dial , o r device
to be
observed.
recording type, i nd ic a te de ta i ls of ta pe, film ,
s e n s i t i z e d
paper
o r
punchcards
involved.
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
22/43
7.3.2
Quality Publication 200-2
d. Detai led operat ions to be
performed
by
the test opera tor including
operationa l checks or preliminary cal ib ra tion o f test setup
e Exact method of inspecting or measuring including necessary
manipulation of controls
on
the ar t icle
involved
and
on
the
measuring and test
equipment
Conditions
that
must
be
maintained
during
inspection
and
test ,
including
ambient Or environmental
conditions
and precaut ions to
be
observed
to prevent
damage
to the
art ic les
or instruments
involved.
g. ri ter i for
passing
or failing the
test ,
or f or de te rm ini ng con
formance or
rejection of the article including
reference
to work-
manship
inspection standards
h. Detai ls
of
sampling
plans
to
be
used,
if
applicable.
T he se in sp ec tio n
and
t es t
p ro ce du re s sh all
be
readily
available to
inspection
and test
personnel
and
shal l
be phys ica ll y l ocat ed
at
the
applicable
station
at the t ime of inspection or
test .
7.3.2 Establishment
of Values to be Observed Each
ch r cterist ic
to be
obse rved sha ll
be
defined
in t e rms of:
a The conditions w i should exist at each examinat ion
point
b.
The to lerance conditions under
which
the
ch r cterist ic
being
examined may
be
considered
acceptable,
and
c The levels or
l imits
o f inputs
or
str ss s
In the
case
of visual inspection the optim um acceptable condition
shall
be well defined.
7.3.3
Workmanship nspectl on
Standards. Where
samples of acceptable
workmanship a re n ec essa ry , the samples will be jointly selected by
the contractor and the cog nizan t NASA
installation
Or i ts
designated
representat ive in the e rly phase of fabrication and util ized for the
duration of the contract
When
design changes are
initiated
the
sam ples shall
be
reviewed and
replaced
as necessary These samples
if
properly protected
throughout
their
use as
s ta nd ar ds , m ay
be
used
as spares or end item co mpo nents at the end
of
the
fabrication
period,
provided
acceptabil i ty has b een d et erm in ed by adequate reinspect ion
and
re test .
7.4
INSPE TION
N
TEST
PERFORM N E
The
contractor
shall
perform inspections and
tests
covering
a ll f ab r ica tion
operations.
The c on tr ac to r s ha ll maintain a system of defec t p revent ion by
observing
analyzing
and recording nonconformances
during
all phases of
fabrication
and shal l init iate correct ive action in accordance with the
require-
ments
of
paragraph
14.3. The
contractor shal l ensure that
each
operat ion
of
inspection
and to
the extent
pract icable ,
fabricat ion
is
t raceable to the
individual responsible for
i ts accompli shment .
All inspection per sonne l shal l
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
23/43
ontrol of COntractor Fabr ica ted Art ic les
7.4.2.4
be q ua lified in accordance
with
the training and certification
requirements of
Section 13.
7.4.1 In Process Inspection. The contractor shall provide
for the
verif ica-
t ion
of n plant
processing
and fabrication
o pe ra ti on s i n
accordance
with established
test
and
inspect ion
planning. Inspections shall
be
established at points
w hich w ill
minimize
potential
delays result ing
from
deficiencies and
in
all cases
shal l
be at Or
before the last point
at
which the
acceptability
of the
operation
or
quality
of the
charac-
ter ist ic
m ay
be
verified.
7.4. 2 End Item Tests n Final Inspection
7 4 2 End item Test lan Contractor conducted tests shal l b e d ocumen ted
in
an
E nd Item T est Plan which has
been
submitted
fo r a pp ro va l
prior
to beginning
tests
on
completed
end i tems
i nt en ded for de-
l ivery
under
the contract . The E nd Ite m T es t Plan
shal l
provide:
a.
A technical
description of
the
system
assemblies and
sub-
assem.bl ies;
b. Parameters
to
be
inspected
and
tested
on
each
installed sys-
tem
assem.bly
and
subassembly;
c. The nominal and tolerance values
of
these
parameters ;
and
d.
Sequence
of tests.
7 4 2 2
Tests
and Inlf{Jeotion
The
final tests and inspect ions
shall
be
p r-
formed
in such a manner
and under
such
conditions
as
will
sim.u-
late end use to the highest degree
practicable
without
damage
to
the end i tem and which w ill p ro vid e
a
valid measure
of overall
quality.
The
degree duration
and
number of such final tests
performed
on each
end
ite m s ha ll be suf fi ci en t to provide as sur-
ance that the
required quality
is
present. Detailed end item
test
and inspection procedures
documented per
paragraph 7.3.1 shall
be submitted
for
approval
prior to beginning these
tests
and
in-
spections.
In addition to
deterro ining
contrac tua l conformance
the contractor
shal l
report immediately any
unusual phenomena
occurrence
difficulty Or questionable condition whose detection
and
correction
is
not specifically
contained
in the applicable
requirements
to
the cognizant
NASA
installation O r its
desiJ-
nated representative in
order
that the necessary action
and/or
p ro vi sion o f
contractual
c ov er ag e m a y be
initiated.
7 4 2 3
Documents and Records. Data on the final tests
of
the
end
i tems
shal l
be
submitted
to
the cognizant NASA installation and in accordance
with
the
d ata r ep o rt in g requirements
of
paragraph
14.2.
7 4 2 4 Modifioations after Final Tests and {
speomo.... A fter c om pletio n of
final
tests
and inspection
any
modifications repairs replacements
either
authorized
or unauthorized
shal l
necessi ta te a reinspec-
t ion and retest to the extent determined
necessary by
the
cogni-
zant NASA installat ion
Or
i ts
authorized representat ive
to
com-
pletely verify acceptability
and compatibi l i ty
with
associated
components
subassem.blies assemblies
and
systems.
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
24/43
7.4.2.5
Quality
Publication
200-2
7 4 5
ersonnel The contractor personnel
responsible
for perfor:ming
f inal tests
and inspect ions shal l be technical ly competent in
each
area of a ign:ment.
They
shall be able to
perfor:m
analyses
and
com.patibility evaluations of methods and
equipm.ent
used, resul ts
obtained,
and
adequacy of t es t procedures
7 5
FABRICATION CONTROLS
.5 .1 Production
Toolin and
Fabrication
E
ui
ment.
Production
tooling,
jigs, ixtures and other
fabrication
equip:ment
which control
di:men
sians contours , o r location
of
f ab ri cat ion opera ti ons shal l be con
t rol led to ensure initial accuracy and
repeatability
during u e
7.5.2 Material Control . Materials
and
art icle
undergoing
fabrication or
as
sembly
shall be
identified
and shal l :maintain this identification
ei ther
on
the
fabricated
art ic les
o r on
r ec o rd s t ra ce ab le to the fabr i
cated ar t ic les
Controls shal l
ensure that only conforming mater ia l s
and art icles
are used.
Materials and art icles not
conforming or
not
required
for
the
operation
involved
shall
be
removed
from
work op
era t ions
Posi t ive action shal l
be
taken to
protec t
controlled proces s
or
operat ions
from
contamination by residue from
nonconforming
mater ia ls
from previous o pe ra tio ns. Materia16 and
articles
having
definite character is t ics of quality degradation or drift with
age
and/or
use shall be
marked
to
indicate
the
date and tes t t ime or cycle
the
cri t ical
life wa.
initiated or the date
and test
time or cycle the useful
life
will be expended. Variable. data .ha l l be recorded and maintained
for
such articles.
The
contractor
.hal l
plan his
operations
so that
mater ia l and
art icles
with
l imited
u sefu l life w ill not be
used unles s
an adequate hfe will remain for subsequent periods
of
fabrication,
storage,
and
operation.
The
remaining useful life
of
l imited life
articles
.hal l be recorded
and supplied as part of
the
shipping docu
mentation.
7 .5.3 Control of Cleanliness of
Fabricat ion
and Tes t Space s. P rope ll an ts ,
lubricants,
chemicals ,
and prec is ion a rt ic le s shall be
handled, as-
sembled,
and
processed
u nd er c on tro lle d c le an lin es s conditions
as
specified or as necessary to maintain
the
required quality. Special
procedures to maintain
such
cleanliness shall be inc luded o r r ef er en ced
on app lic ab le contractor -prepared dr awings, s p e c i f ie
a t io n
s, and
process documents . Spec ia l atten tion shall
be directed by the con
t ractor to the review and enforcement of cleanlines s procedures
clean o r
white
room
r equi re :m .ents , and to the clothing
of
personnel
working
in
such areas
7.5.4 Process Control .
The
contractor shall maintain a defect prevention
program
for
the
control
of
all metallurgical, chemical,
mater ia l
cleaning
and
bonding,
welding,
coa ti ng , p la ti ng ,
and
other processes
where uniform,
h igh qua lit y cannot
be assured by inspection of ar t ic le
alone. In addition, special inspection processes , s uch a s ra diogra phy,
ultrasonic tes t ,
liquid penetrant,
and magnetic part icle, shall be con
trolled to ensure that the
results
uniformly
and
accurately
indicate
t rue
quality.
Contractor
fabrication
and inspection personnel, including
personnel
responsible
for the
control
of
processes
or
cri t ical
mate
rials , shall
be
t rained and properly
certified in accordance
with
the
requirements of .ect ion 13.
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
25/43
of Contractor Fabricated Artic les
7.5.4.1
7.5.4.3
ProceS8
Control P1 }cedures.
Process
control
procedures
shall
be
r -
pared
and
submitted when necess ry to s u p p m ~ n t applicable
process
specifications to provide detailed
performance and
control
methods. The
p ro ce du re s s ha ll ful fi ll t he
applicable
test
and
in-
spection
planning
reqUlrements of
paragraph
7.3
for both the
processing and its inspection. T hese p ro c ed u re s s ha ll document
the
preparation fabrication details conditions
to be
maintained
during
each
phase
of
the
process
the methods
of
verifying
the
adequacy of proces sing materia ls
solutions
equipment their
associated control param.eters including
statist ical
quality control
plans
w h er e a pp lic ab le
and the r eq u ir ed r ec o rd s to
indicate
the
results of such in sp ec tio n and process verification. The con-
tractor s
quality
organization
shal l r ev ie w th e w ri t ten p ro ced ures
for these
process controls and cond uct
audits
to determine
that
the
a ctua l operat ions
conform
with approved
methods
and proce-
dures.
7 5 4 Process
Environments.
Where
processes
must be
conducted
in special
enviromnents
such as under
vacuum. or
inert gases the process
controls shall
include
means
of maintaining the
re qu ire d e n-
vironments and means of indicating o r m ea surin g the
environ-
ments
maintained.
7 5 4 3
ro ess
ertification
The
contractor shall provide for the cert if ic -
tion
of m achines
equipment
and proce dure s u se d
in selected
process o pe ra ti on s. R e co rd s shall be m a in ta in ed o f the qualify-
in g
tests
performed and the
resul ts
of such tes ts Machines
equipment
and procedures
shall
be recertif ied
as indicated
necessary by the results of quality
audits.
t rends in
inspections
and tests performed or
when
major changes re made such
as
m ter i l
type
or
thickness
sequence
of
operation design
re -
location
power
source capacity sensitivity voltage and current
densit ies. The
proficiency
capabllity and adequacy of the
per -
sonnel
responsible for performing certif ications including
the
inspection
and testing operations
for
continuous
control shall
be
subject to
verif ication
and
disapproval by the cognizant NASA
installation.
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
26/43
SECTION NONCONFORMING MATERIAL
.1 MATERIAL REVIEW
The contractor shall provide for the review control and
disposition
o f non-
conforming
m.aterial.
Each nonconformance shall be
reviewed
disposition
made by per sonnel v es ted
with this
responsibility and posi ti ve correct iv e
action
taken
to
prevent
recurrence
of
s imi lar d iscrepanc ies .
Except
as
pro-
vided in p a r a g r a p h
8.4, the co n tr acto r
m a y offer m a t e r i a l having m i n o r non
c o n f o r m a n c e for
revi ew of a deci s i on-m aki ng
m a t e r i a l
revi ew
b o a r d
MRB).
E a c h MRB s hal l
be
c o m p o s e d of
one co n tr acto r
r ep r esen tativ e w h o se primary
respons ib ilit y is design one contractor representative
whose primary -
sponsibility is product quali ty
and
one Government
representative
acting on
be ha l f of
t he c og niz an t
NASA
i nst a l l a t i on.
Ac c e pt a nc e of nonconforming
m a t e
r i a l s hal l be deterrrdned b y un an im ous a g r e e m e n t of th e
MRB.
P e r t i n e n t
t e c h n i c a l
c om pe t e nc e and
t h o ro u g h
knowledge
of p r o d u c t quality
and
functional
r eq u ir emen ts
s hal l
b e
p r e r e q u i s i t e
q ua lif ic atio ns f or a l l
MRB m e m b e r s .
Material review board
members may
consult with other organizations and
personnel
as required
to arrive
at optimum
decisions. The dec is ions o f
the
b oa rd s ha ll
be
s u p p o r t e d
b y
r e c o r d s
of
a ll
c a s e s
s u b m i t t e d
fo r a ction , including
m a t e r i a l that
c a n b e r e wor ke d
to
spe c i f i c a t i on, and c o r r e c t i v e a ct io n t ak e n.
P e r t i n e n t
dr a wi ngs
and doc um e nt a t i on s hal l be chan ged o r
i ni t i a t e d as n e c e s
5ary.
8.1.1 Subcontractor
MRB.
The se
r e q u i r e m e n t s a ls o sh a ll
a pp ly t o s u b c o n
t ractors
to
whom MRB res pons i bi l i t y
is
de l e ga t e d
b y
th e c o n t r a c t o r .
The c o n t r a c t o r s ha ll lim it the aut hori t y of th e s u b c o n t r a c t o r s MRB
dispositions to those of minor inc identa l nature
not
affecting
safety, function,
o r i nt e r c ha nge a bi l i t y.
.2
APPROVAL OF CONTRACTING OFFICER
W r it te n r eq u es ts
fo r
a ppr ova l
of th e c ont r a c t i ng
o ff ic er s ha ll
b e
m a d e if
th e
n o n co n fo rm an ce
m ay a d v e r se ly
affect sa f e t y, rel i abi l i t y, dur a bi l i t y, per -
f o r m a n c e ,
i nt erchangeabi l i t y
of p a r t s
o r a ss em b lie s, weight, Or the
b a s i c
obj e c t i ve s of
th e co n tr act.
the c ont r a c t i ng
o ff ic er is o th er t ha n the cognizant
NASA i ns ta ll at io n, t he
l a t t e r
sha l l be
s u pp l ie d c o pi e s
of a ll suc h r e q u e s t s
fo r
a ppr ova l .
.3
CONTROL OF NONCONFORMING MATERIAL
The co n tr acto r s hal l
p ro v i d e f a c i l i t i e s fo r th e s e g r e g a t i o n and p o si ti ve i de n ti
fication
of
defective a r t i c l e s . The m e t hod
of identification s h a l l
d escr ib e th e
n a t u r e an d prob able ca u se
of th e
de f e c t
and
indicate
w h e t h e r
th e defective
a r tic le s a r e
to be r etu r n ed
fo r r e p a i r in a c c o r d a n c e
with
a ppr ove d p r o c e
d u r e s ,
a r e
to
b e r e wor ke d
to
drawing, o r a r e
to be
s u b m i t t e d
to
m a t e r i a l
review for disposition.
In
cases where depar ture s f rom drawings or specif ica-
tions a r e
aut hori zed
by th e
MRB
for p a r ti cu l a r c h a r ac t er i st ic s , th e a r t i c l e s
sha l l b e i de nt if ie d a s n on co nfo rm in g and a c c e pt e d b y M R B
s o
t hat a n ev al u at i o n
m a y
b e m a d e
at
la ter
a s s e m b l y ,
i n s p ect i o n ,
and
t e s t points
as to th e effect on
h i g h e r l evel s of a s s e m b l y .
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
27/43
8 4 R WORK WITHOUT MR
8
Quality
Publ ic at ion 200 2
Disposi tion o f
nonconforming material in the
categories
of return
for
o ~
pletion of operat ions
or lr turn for
rework
to
drawing
may be authorized
w t out
formal m ter i l review
only
if writ ten
procedures
le rly
define
the
types of rework included in these
categories,
and l 'einspections
are per-
formed to
ensure
that
the
reworked
m ter i l meets
drawing
and specification
requirements .
-
7/24/2019 (NASA NPC-200-2) Quality Program Provisions for Space System Contractors (NHB-5300.4-1B) (1962)
28/43
.1
SECTION
INSPECTION
ME SURING
ND
TEST
EQUIPMENT
GENERAL
The contractor shal l provide for the select ion, evaluation, approval , mainte
nance, and control
of a ll inspect ion s tandards ,
gages , m .easur ing,
and
t es t
equipInent neces sa ry
to
determine conformance
with
specificat ion, drawing,
and contract requirements. The
requi rements
of
this publicat ion include
product ion
tools and
automated
equipment
incorporating
an
inspect ion,
measur ing , Or
t es t
function.
All
qu pm nt shal l
be used
in
an enVlrOnrrlent
and
in
a manner to
ensure continued measurements of the required accuracy .
All
inspect ion,
measur ing , and tes t equipment shal l be cal ibrated at
scheduled
in te rv als aga in st
certif ied
s tandards which have known, valid relat ionships to
nat ional s tandards . Records shal l be maintained indicating the date of las t
cal ibrat ion and due date.
The
due date o r
other
identif icat ion
attesting the
due
date of the next
calibration
shal l be displayed on each i tem of inspect ion,
measuring,
and
t es t
equipment
or
tools.
The
c on tra cto r sh all
provide
the
procedures and
means for pet-iadic
operat ional
checks
to
be
per formed
prior
to use of each inspect ion, measuring, and test
equipment
(e.g., warmup and
set t ing of electronic
instruments, and
check of micrometers
against
shop
s tandards)
9.2.1
Tooling Used
for
Measuring Tools, gages,
j igs, O r fixtures which
measure d imens ions , c on tours ,
Or
locat ions a ffec ting qual it y char-
acter is t ics shal l
be
init ial ly checked for
accuracy pr ior
to use.
Periodic check
and r ec al ib ra ti on sha ll be made at predetermined
intervals to
ensure
their continued accuracy.
.3
CALIBRATION
FACILITIES N
STANDARDS
The cont ra c to r shal l have his
ownor
use
the
serv ices
of
an app roved
s tandards
laboratory for the cal ibrat ion of a ll i nspec ti on , m.easuring,
and
t es t equipm.ent
compat ible
with
the design and qua li ty
requirements
ofthe
art icles and
of this
publication.
a . Standards Laboratory .
The
s tandards
l ab or at or y sha ll
ma