    PROJECT REPORT

    FORSENIOR POLICE OFFICERS MESS

    CUM

    COMMERCIAL/OFFICE SPACE

    FOR

    THE DEPARTMENT OF POLICE

    Z104

  • 8/12/2019 nasa project report cspa

    2/20

    INTRODUCTION

    TO

    LUDHIANA(PUNJAB)

    Being centrally located Ludhiana is the largest city and

    district which falls in the Malwa region of Punjab and has a

    total urban metro environment.

    It is also called the commercial & Industrial hub of Punjab,mainly bicycle parts and hosiery.

    It covers an area of 3767sq.kms.

    The city is situated on the Sutlej rivers bank.

    The population increases substantially.

    It is popularly known as the Manchester of Punjab

  • 8/12/2019 nasa project report cspa

    3/20

    SITE ANALYISISSITE ANALYISIS

    The North part of the site has the busy DMC road and

    existing buildings, control rooms and other structuresthat cannot be demolished.

    The Eastern part of the main wide road abutting tocommercial area.

    The North Eastern part of the site has the petrol pumpwhich caters to the need of the police department.

    The South Eastern part of the site has the grounds,internal road which divides the police area into two

    parts .

    Minimum Land will be used for mess facilities sincethe land is very costly and is in the busy commercialhub.

  • 8/12/2019 nasa project report cspa

    4/20

    As we had to provide two blocks having separate access and

    barricading, we selected our site next to the main road so thatthere is a separate entry for both the blocks.The existing internal road has been used as the approach to the

    mess so that the extra construction cost of the road could bereduced. Placing the officers mess on the inner side, connects theblock to the police areas and the security of the area ismaintained.

    The building is proposed on the opposite side of the existingmess ,for the better usage of the land, petrol pump andGurudwara are the major site constraints.

    SITE SELECTION

  • 8/12/2019 nasa project report cspa

    5/20

    EXISTING BUILDING

    The existing mess was basically a hospital building which wasconverted into officers mess without any structural changes.

    No optimum use of the existing space. Eastern side has petrol pump and Gurudwara which cannot be

    demolished.

    No specific parking space was allotted ,grounds were used asparking. Due to improper orientation corridors has no proper ventilation

    and light. Corridors were provided on all sides of the old hospital building,

    due to which mess has no proper lighting. The existing mess is not designed as per the need of the users

    ,there is no provision for indoor games gymnasium and optimumnumber of accommodation

    The library was provided in the training centre which had no

    internal linkage to the mess and is quite far away from the mess. There is no barricading and demarcation of the entry and exit ofthe police line.

  • 8/12/2019 nasa project report cspa

    6/20

  • 8/12/2019 nasa project report cspa

    7/20

    Due to the overage of buildingthe strength ofcement concretein DPC has beenlost. Due to thisthe water isseeping into thewalls & is notrepairable.

    Drainage pipe arenot properly on the

    ground level beingtoo old.

    Drainage pipes a

    on the front sides the DSP house ,

    indicating towards

    poor sewerage an

    drainage system.

    The sunshade

    provided

    ,properly is not to

    stop rain or

    harmful rays of

    the sun.

    Existing structure

    Undue dampness and

    cracks have developed

    because of poor

    specification .

  • 8/12/2019 nasa project report cspa

    8/20

    PLANNING

    The L-shaped flange is placed on the site such that

    the commercial area is on the junction of two main

    roads.

    Designing of the mess block has been done on the

    rear thinner width of the flange as this part has the

    lesser commercial value .

    There is a Provision of 45 Nos Transit

    accommodation having area of 600 sft .

    Mess Block having the Dinning hall, Kitchen, Party

    hall , Kitty Party hall, Stores, Indore game

    facilities, Billiards room, Badminton court, Gym

    Hall, etc.

    The library is provided as per requirements of the

    users.

    Optimum use of the space ensured.

    For parking and lawn commercial area parking will

    be utilized .

    This project provides proper orientation.

    There is a provision of lift for the 12 story block

    Every room is well ventilated.

    Indoor Badminton court have double height roof

    Maximum Prime land have been saved for

    commercial activities.

  • 8/12/2019 nasa project report cspa

    9/20

  • 8/12/2019 nasa project report cspa

    10/20

  • 8/12/2019 nasa project report cspa

    11/20

  • 8/12/2019 nasa project report cspa

    12/20

  • 8/12/2019 nasa project report cspa

    13/20

  • 8/12/2019 nasa project report cspa

    14/20

    PERSPECTIVE VIEW

    TRANSIT UNIT BLOCK

  • 8/12/2019 nasa project report cspa

    15/20

    DETAIL OF AREA

    S.

    N

    o

    Description

    N

    o

    s

    Length BreadthArea in

    Sqm

    Remar

    ks

    1 Total Site/land Area

    1 58.264

    (105.389+

    112.22)/2 6339.00

    1 57.555 31.611 1819.00

    8158.00

    2 Site Area for Mess Facility Block A 1 58.602 31.611 1852.00

    3 Site Area for commercial Block B 6306.00

    4 Ground Coverage of Mess Block

    Mess Block 464.00

    Transit unit 286.00

    Total 750.00 40%

    5 Total Area of all the floors

    A Mess Block

    Ground Floor 464.00

    First Floor 344.00

    Second Floor 464.00

    Total A :- 1272.00 A

    B Transit unit

    Ground Floor 286.00

    First Floor 286.00

    Second Floor 286.00

    Third Floor 286.00

    Fourth Floor 286.00

    Fifth Floor 286.00

    Sixth Floor 286.00

    Seventh Floor 286.00

    Eighth Floor 286.00

    Nineth Floor 286.00

    Tenth Floor 286.00

    Eleventh Floor 135.00

    Total B :- 3281.00 B

    Total A+B :- 4553.00

    6 FSI against Mess Facilities Block A 2.46

  • 8/12/2019 nasa project report cspa

    16/20

    FIRE SAFETY

    As per NBC

    Fire exist norms in planning central staircase have been

    provided.

    All around the building proper set back has been kept

    for moving of fire fighting vehicle.

    Every unit has Balcony outside the building .

    Fire detection system will be provided.

    Fire exit rout will be placed on every door

  • 8/12/2019 nasa project report cspa

    17/20

    ECO FRIENDLY

    Every efforts have been made to provide the cross

    ventilation of each room .

    Fly ash bricks will be used in the construction

    PPC (Pezolona Portland Cement) will be used in the

    construction

    Rain water harvesting system will be provided

    Solar energy will be used for street light and heating of

    water

    Plantation will be provided along the boundary of the

    site.

  • 8/12/2019 nasa project report cspa

    18/20

    BRIEF SPECIFICATIONS

    Structure:-Due to bigger span and more than 3 story building RCC frame structure have been adopted

    Flooring:-

    Mess Block

    Party hall = vitrified Floor tiles

    Entrance area = Green marble

    Toilet = Anti skid Floor tile

    Rest are = kota stone

    Transit units

    Drawing room = vitrified Floor tiles

    Bed room, Kit = Mosaic Flooring

    Toilet = Anti skid Floor tile

    Corridor, Balcony

    and stair = kota stone

    Joinery:-

    Chokhat = Pressed steel

    Doors Shutter = Factory made Flush door

    Toilet Door =Factory made PVC doors

    Windows Shutters = MS Tubular

    Finishing:-

    Outside = cement pointing and exterior grade paint

    Inside = cement plaster and dry distemper

    Joinery work = enamel paint

    Water supply, sewerage and sanitation :-

    Plumbing pipe = PPR/PVC will be used havinglonger life and cheaper then G.I pipe

    sewerage pipe = SWR/HDPE pipes will be used which are` longer life and cheaper then HCI pipe and

    SW pipe

    Disposal will be made in the M.C sewerage exist .

    Water supply will be taken from M.C supply

    Electrical service sand Electrical installation :- All conduit will be underground PVC pipe, best Quality wire and switches will be provided

    Fire fighting :-

    Fire fighting arrangement will be made as per NBC Norms

  • 8/12/2019 nasa project report cspa

    19/20

    ESTIMATESr.

    No

    .DESCRIPTION Qty.

    Uni

    tRate Amount (In Rs.)

    1

    2 3 5 6

    1 Cost of construction of RCC framed structure

    building as per specification attached and

    detail worked out as per Punjab PWD

    prevailing rates.

    Mess block all floors 1272.0

    0

    sq

    m 6800.00 Rs.8,649,600.00

    Transit unit all floors 3281.0

    0

    sq

    m 6800.00 Rs.22,310,800.002 Construction of boundary wall 131/2" thick 6'

    high finished with one side plastering,

    otherside pointing.

    for block A mess facilities

    58.602+57.555+31.611+31.611 179.38 mtr 3300.00 Rs.591,950.70

    3 Concrete pavement 100mm thick c.conc

    1:2:4 with base course of 100mm thick 1:4:8

    lean conc 803.00

    sq

    m 750.00 Rs.602,250.00

    4 Internal water supply sewerage and sanitary

    instalation @15% of building cost. Rs.4,644,060.005 Internal electrical services and instalation

    @15% of building cost. Rs.4,644,060.00

    6 External water supply, sewerage services

    including rainwater harvesting system @ 5%

    of building cost. Rs.1,548,020.00

    7 External electrical services including fire

    fighting system @ 5% of building cost. Rs.1,548,020.00

    Total:- Rs.44,538,760.70

    Architect and consultancy fees @ 3% Rs.1,336,162.82

    Contigencies charges 1.50% Rs.668,081.41

    Grand Total:-Rs.46,543,004.93

    Say 465.43

    Lacs

    4

  • 8/12/2019 nasa project report cspa

    20/20

    COST CONTROL

    Common corridors reduces the cost and increases utilization o

    space.

    A common toilet has been given for the lobby and bedroom.

    115mm thick internal walls have been provided which reduce

    the cost and utilization of space.

    Party hall and mess has the same kitchen which reduces its

    running cost.

    To reduce the cost of construction PPR/PVC, SWR/HDPE

    pipes will be used in plumbing and sewerage system.

    To reduce the cost parking will be utilized from commercial

    Block-B

    Maintenance

    As per PWD Norms funds @ 2% of capital cost of the buildin

    are required for the annual maintenance

    works out to 465.43x 2% = Rs. 9.30 lacs

    The funds will be made available from the nominal earning of

    gym and party hall.