nathalie franck fulmar field coiled tubing campaign · pdf filefulmar field coiled tubing...
TRANSCRIPT
Fulm
ar Field
Coiled Tubing Cam
paign Boosts Production
Fulm
ar Field
Coiled Tubing Cam
paign Boosts Production
DEVEX 15t
hMay
201
3
Nathalie Franck
2Talisman Sinopec Energy UK Limited
Fulm
ar -Field Bac
kground
Reservoir
U. Jurassic Fulmar Sandstone
Gross Thickness
700 ft TVD (1,500ft TVD m
ax)
API
40o
Initial Pressure
5700 psia
STOIIP
822 MMstb
Cum Oil at end 2012
560 MMstb
History
1975: Discovery
1982: 1st Oil Shell Operated
2006: Talisman Operated
2008: Halley Reinstatement
2010: Auk North Online
6 Active Producers: FA01, FA06,FA14, FA15, FA26, FA33
5 Active Injectors:FA03, FA07, FA12, FA21, FA28
SW
NE
3Talisman Sinopec Energy UK Limited
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
Feb-82
Feb-84
Feb-86
Feb-88
Feb-90
Feb-92
Feb-94
Feb-96
Feb-98
Feb-00
Feb-02
Feb-04
Feb-06
Feb-08
Feb-10
Feb-12
Oil export bopd
Water production bwpd
Fulm
ar Historica
l Production 198
2-20
12
Gas Injection
Water Injection
4Talisman Sinopec Energy UK Limited
Fulm
ar Platform
Upgrades
200
6 -2012
HVAC upgrade in TR and
process modules
Deluge piping internal
cleaning
Controls
upgrade
Increased
PFP/painting
Upgrade
PA
system
REPLACE
CAISSONS
F&G system
upgrade
Small bore tubing
Upgrade programme
Water
Injection plant
maintenance
Inst air supply
upgrade
Lifeboats
upgrade
Process
Control
valves
Biocide AFA
Jacket repairs
5Talisman Sinopec Energy UK Limited
Objectives
of the Well C
T cam
paign
•Re-instate high potential wells that are shut due to integrity & scale
•FA15, FA14, and FA33
•Conduct operations safely and with no environmental impact
•Gather data to assess further remaining opportunities
•Boost oil production rates
7Talisman Sinopec Energy UK Limited
•Completed in Sep. 1987
•Cumulative Oil Production: 30MMstb
•Well S/I since Nov 2006
–Suspended with Halliburton HX-4 RBP set
at 9,556 ft BRT.
–Equalising Prong Recovered in 2007 but
unable to recover plug with slicklinedue to
restricted access / scale (no access to the
fish neck of the RBP)
‘Main’Fulmar Sands (Shoreface)
Ribble
sand
Avon
shale
FA15
Log and History
Dec 91
Jan 91
Jul 93
Apr 94
8Talisman Sinopec Energy UK Limited
FA15
Operations & Perform
ance
Summary
•Perform
tubing drift run & scale clean out to HX-4 RBP at 9,556 ft
•Perform
tubing and annulus pressure test for integrity purposes
•Recover HX-4 RBP from the well
•Identify tubing-annulus leak path with M
FCT & PLT (tbgleak point ~ 9050 ft BRT)
•Set modular straddle and repair tubing-annulus leak
•Set SSSV
•Perform
SISQ
•Hand well back to production
•Last well test:
12/03/2013 1,500bopd (93%BSW)
1,900
320 –480 –640
FA15
Actuals
Predicted
Oil Rates
9Talisman Sinopec Energy UK Limited
FA15
success ex
plained
WE
Swincreasing
(%)
Gravity Segregation
R A
Main sands
Swin Nov. 2006
Swin M
ar. 2011
0 100
10
Talisman Sinopec Energy UK Limited
FA14
Log and History
Feb 90
SCAB liner
Oct 94
‘Main’Fulmar Sands (Shoreface)
Clyde Fm.
Apr 90
•Completed in Jul. 1987
•Cumulative Oil Production: 12MMstb
•Well S/I since July 2006 & 99% W
ater Cut
–Known scaling issues in tubing above
SSSV
–PLT data from 1997
•No contribution from Clyde Fm
•All flow from Lydell
Lydell
Avon
11
Talisman Sinopec Energy UK Limited
•Oct. 2011 -ReperfLydell
–CT Turbo M
ill
–Perforate Lydell
–200 bopd(99% BSW)
•Jan. 2012 -ReperfClyde
–Perforate Clyde
–Set Baker Bridge Plug at 10,805ft to
isolate Lydell
–Perform
SISQ
–Hand well back to production
•Last well test:
12/03/2013 350bopd (75%BSW)
FA14
Operations an
d Perform
ance
Summary
Feb 90
SCAB liner
Oct 94
‘Main’Fulmar Sands (Shoreface)
Clyde Fm.
Apr 90
Jan 12
580
60 –325 –590
FA14
Actuals
Predicted
Oil Rates
Lydell
Avon
12
Talisman Sinopec Energy UK Limited
FA14
success ex
plained
Swin Jan. 2012
Perm
increasing
(mD)
5000
0.01
NS
Swincreasing
(%)
0 100
Clyde Fm. –future well infill target
Perm
eability
13
Talisman Sinopec Energy UK Limited
•Completed in Nov. 1994
•Cumulative Oil Production: 1.5MMstb
•Well S/I since Jan 2001
–Workoverattempted in 2002 but suspended
due to LSA scale
–Well suspended with 2 shallow plugs
FA33
Log and History
‘Main’Fulmar Sands (Shoreface)
Ribble
Sand &
Avon
shale
14
Talisman Sinopec Energy UK Limited
•Confirm
access to well and recover two shallow set tubing plugs
•Clean out scale in tubing to SSSV and recover BB packer c/w
storm
choke
•Clean out scale in tubing/ liner to ensure access for perforating guns
•Pressure test ‘A’annulus to confirm
integrity
•Re-perforate reservoir and flow to clean-up
•Perform
SISQ (on coiled tubing)
•Re-set storm
choke on BB packer at 1,020 ft BRT
•Trip and inflow test storm
choke
•Hand well back to production
•Last well test:
12/03/2013 750bopd (91%BSW)
FA 33 Operations an
d Perform
ance Summary
2,500
199 –354 –508
FA33
Actuals
Predicted
Oil Rates
15
Talisman Sinopec Energy UK Limited
FA33
Succ
ess Exp
lained
WE
Swincreasing
(%)
Gravity Segregation
R A
Swin Jan. 2001
Swin Jan. 2012
0 100
16
Talisman Sinopec Energy UK Limited
Fulmar 2011-2012 Green Plot
Export Barrels
0
1000
2000
3000
4000
5000
6000
7000
8000
Jan
11
Feb
11
Mar
11
Apr
11
May
11
Jun
11
Jul
11
Aug
11
Sep
11
Oct
11
Nov
11
Dec
11
Jan
12
Feb
12
Mar
12
Apr
12
May
12
Jun
12
Jul
12
Aug
12
Sep
12
Oct
12
Nov
12
Dec
12
Date (mmm yy)
Oil Rate (boepd)Fulm
ar 2011 an
d 201
2 Production
FA14 online
FA15 online
FA33 online