National Grid and community energy

Nicky Conway, Sustainable Development

Manager

Page 2: National Grid and community energywestmillsolar.coop/wp-content/uploads/2017/01/National-Grid-and... · substation voltage (132 / 275 / 400kV) • Up to 60MVA Capacity • Non-Firm

2National Grid

Environmental Management

Our environmental sustainability strategy,

Our Contribution, focuses on 3 areas, which we believe are most significant for our customers and our business

Our climate commitment

Naturalenvironment

OUR CONTRIBUTION

Responsibleresource use

Excellent environmental management

Page 3: National Grid and community energywestmillsolar.coop/wp-content/uploads/2017/01/National-Grid-and... · substation voltage (132 / 275 / 400kV) • Up to 60MVA Capacity • Non-Firm

3National Grid

National Grid Group

US Regulated – Elec & GasUK Regulated – Elec & Gas

UK & US Businesses

£26 or 3% Annual domestic

electricity bill in UK

UK network (gas & elec)

reliability is

>99.99%

We are one of the

world’s largest

investor-owned utilities

Page 4: National Grid and community energywestmillsolar.coop/wp-content/uploads/2017/01/National-Grid-and... · substation voltage (132 / 275 / 400kV) • Up to 60MVA Capacity • Non-Firm

4National Grid

We own and maintain the electricity

transmission network across England

and Wales

Our Network

Page 5: National Grid and community energywestmillsolar.coop/wp-content/uploads/2017/01/National-Grid-and... · substation voltage (132 / 275 / 400kV) • Up to 60MVA Capacity • Non-Firm

5National Grid

Legal Separation

The ESO role includes balancing the

electricity grid second by second. As

the electricity system becomes more

flexible this role will need to evolve.

The ESO will need to work more

closely with local electricity distribution

network operators (DNOs) to manage

electricity flows across the grids.

Electricity Transmission’s role is

adapting to keep pace with an ever-

changing system. The business

separation is an opportunity for us to

keep consumers' household bills down

by working to ensure and enable more

competition, coordination, and

innovation across the transmission

network in England and Wales.

In April 2019, Electricity Transmission will legally separate

from the Electricity System Operator (ESO) within the National Grid Group.

Page 6: National Grid and community energywestmillsolar.coop/wp-content/uploads/2017/01/National-Grid-and... · substation voltage (132 / 275 / 400kV) • Up to 60MVA Capacity • Non-Firm

6National Grid

Were creating a business plan built on Consumers

and Stakeholders priorities

Page 7: National Grid and community energywestmillsolar.coop/wp-content/uploads/2017/01/National-Grid-and... · substation voltage (132 / 275 / 400kV) • Up to 60MVA Capacity • Non-Firm

The connections process

Page 8: National Grid and community energywestmillsolar.coop/wp-content/uploads/2017/01/National-Grid-and... · substation voltage (132 / 275 / 400kV) • Up to 60MVA Capacity • Non-Firm

8National Grid

Page 9: National Grid and community energywestmillsolar.coop/wp-content/uploads/2017/01/National-Grid-and... · substation voltage (132 / 275 / 400kV) • Up to 60MVA Capacity • Non-Firm

9National Grid

We offer two main ways to connect to the HV network

Provision of a bay Tertiary Connection

• Large capacity

• Firm connection

• Bay provided at

substation voltage

(132 / 275 / 400kV)

• Up to 60MVA Capacity

• Non-Firm connection*

• 33kV connection

* If the SGT is on outage then there is no alternative

route for energy so the generating unit must be off

and will not be compensated by NGESO or NGET.

Maintenance is typically 3 weeks every 3 years.

Page 10: National Grid and community energywestmillsolar.coop/wp-content/uploads/2017/01/National-Grid-and... · substation voltage (132 / 275 / 400kV) • Up to 60MVA Capacity • Non-Firm

10National Grid | [Insert document title] | [Insert date]

https://www.nationalgridet.com/ge

t-connected/network-capacity-

map

https://www.nationalgridet.com/ge

t-connected/cost-estimator

Page 11: National Grid and community energywestmillsolar.coop/wp-content/uploads/2017/01/National-Grid-and... · substation voltage (132 / 275 / 400kV) • Up to 60MVA Capacity • Non-Firm

11National Grid

Page 12: National Grid and community energywestmillsolar.coop/wp-content/uploads/2017/01/National-Grid-and... · substation voltage (132 / 275 / 400kV) • Up to 60MVA Capacity • Non-Firm

12National Grid

Tertiary Connections

Up to

60MVA(50MW approx)

£3m+Total connection

cost

We recognise that our

connections have traditionally

been for large customers -

that’s why we’ve designed a

smaller connection type

for developers of smaller

projects.

24months♣ delivery

timescales

LandAvailability

Page 13: National Grid and community energywestmillsolar.coop/wp-content/uploads/2017/01/National-Grid-and... · substation voltage (132 / 275 / 400kV) • Up to 60MVA Capacity • Non-Firm

13National Grid

Mark Beasley

Onshore Connections Sector Head

[email protected]

07767 656 526

David Adkins

Business Development

[email protected]

07896 590 902

Key Contacts:

Page 14: National Grid and community energywestmillsolar.coop/wp-content/uploads/2017/01/National-Grid-and... · substation voltage (132 / 275 / 400kV) • Up to 60MVA Capacity • Non-Firm

14National Grid

Our Environmental performance and priorities

Natural environment

We own a huge amount of land (over 7,000 hectares), including over 300 substations and the non-operational land around them.

We are committed to making our contribution to achieving the UK’s 25 year environment plan by managing our land in ways that deliver the greatest value to us, our communities and the wider environment.

Net gain

We are pioneering a new approach (aligned to UK government strategic direction) that measures biodiversity and Natural Capital impacts, and opportunities associated with our major projects, so that we leave the environment in a better condition that it was before.

sites where we have enhanced the value of our natural assets; target of 50 sites by 2020

37

Page 15: National Grid and community energywestmillsolar.coop/wp-content/uploads/2017/01/National-Grid-and... · substation voltage (132 / 275 / 400kV) • Up to 60MVA Capacity • Non-Firm

15National Grid https://powerpaired-pilot.herokuapp.com/welcome

Page 16: National Grid and community energywestmillsolar.coop/wp-content/uploads/2017/01/National-Grid-and... · substation voltage (132 / 275 / 400kV) • Up to 60MVA Capacity • Non-Firm

16National Grid

Our Environmental performance and priorities

Our climate commitment

Reduction in Scope 1 and 2 greenhouse gases (GHG), including the GHG emissions associated with electricity line losses

Carbon PricingWe are putting a price on carbon to help inform our major investment decisions

We are committed to reducing greenhouse gas (GHG) emissions from our processes and operations.

By 2050, we have a target to reduce GHG emissions by 80% (from a 1990 baseline) with an interim target of 70% reduction by 2030.