National Park Service Recovery Act Projects State/ Insular Area Park Project Description Total $ per Park (in thousands) Multiple States Appalachian National Scenic Trail (Maine to Georgia) Reconstruct and Install Footbridges and Boardwalks on Appalachian Trail (multiple projects) Rehabilitate Appalachian Trail (multiple projects) Appalachian National Scenic Trail Total $613 Big South Fork National River and Recreation Area (Tennessee, Kentucky) Close Eight Hazardous Abandoned Oil and Gas Wells and Restore Natural Landscape Install Gate to Protect Visitors and Preserve Resource Habitat Big South Fork National River and Recreation Area Total $3,074 Bighorn Canyon (Montana, Wyoming) Increase Alternative Energy Capacities at Resource Management Building and Trail Creek Campground (multiple projects) Bighorn Canyon Total $36 Blue Ridge Parkway (North Carolina, Virginia) Reconstruct Historic Stone Guardwalls Rehabilitate Peaks of Otter Dam Remove Hazardous Trees and Encroaching Vegetation Along Parkway Corridor Remove Vegetation on Bridges and Bridge Abutments to Increase Driver Safety Repair Trails Parkwide Replace Mt. Pisgah Wastewater Treatment System (Filter bid option) Blue Ridge Parkway Total $13,265 Chesapeake and Ohio Canal (Maryland, West Virginia, District of Columbia) Repair Historic Canal Towpath (multiple projects) Chesapeake and Ohio Canal Total $661 Death Valley (California, Nevada) Install Gate to Protect Visitors and Preserve Resource Habitat at Greenwater Valley Install Gate to Protect Visitors and Preserve Resource Habitat at Keane Wonder Mine Install Gate to Protect Visitors and Preserve Resource Habitat at Remote Locations (multiple projects) Install Gate to Protect Visitors and Preserve Resource Habitat at Skidoo Mine Death Valley Total $4,889 Dinosaur (Colorado, Utah) Repair Frontcountry and Backcountry Trails Parkwide Replace Waterlines to Prevent Emergency Use of Reservoir (multiple projects) Dinosaur Total $478 George Washington Memorial Parkway (District of Columbia, Maryland, Virginia) Rehabilitate Trails and Remove Exotic Plants Replace Ultraviolet Filters on Windows at Historic Structures George Washington Memorial Parkway Total $430 Glen Canyon (Arizona, Utah) Increase Efficiency and Accuracy of Water Meters by Replacing Meters and Automating Systems (multiple projects) Install Gate to Protect Visitors and Preserve Resource Habitat Glen Canyon Total $653 Lake Mead (Nevada, Arizona) Install Gate to Protect Visitors and Preserve Resource Habitat (multiple projects) Rehabilitate Fish Cleaning Stations at Boat Launch Ramps Repair Flash Flood Warning System Replace HVAC Units Parkwide Seal Hazardous Mine and Restore Natural Landscape (multiple projects) Seal Hazardous Mine, Install Gate, and Restore Natural Landscape (multiple projects) Lake Mead Total $802 1

Upload: others

Post on 13-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Multiple

States

Appalachian National Scenic Trail (Maine to Georgia) Reconstruct and Install Footbridges and Boardwalks on Appalachian

Trail (multiple projects)

Rehabilitate Appalachian Trail (multiple projects)

Appalachian National Scenic Trail Total $613

Big South Fork National River and Recreation Area

(Tennessee, Kentucky)

Close Eight Hazardous Abandoned Oil and Gas Wells and Restore

Natural LandscapeInstall Gate to Protect Visitors and Preserve Resource Habitat

Big South Fork National River and Recreation Area Total $3,074

Bighorn Canyon (Montana, Wyoming) Increase Alternative Energy Capacities at Resource Management

Building and Trail Creek Campground (multiple projects)

Bighorn Canyon Total $36

Blue Ridge Parkway (North Carolina, Virginia) Reconstruct Historic Stone Guardwalls

Rehabilitate Peaks of Otter Dam

Remove Hazardous Trees and Encroaching Vegetation Along Parkway

CorridorRemove Vegetation on Bridges and Bridge Abutments to Increase

Driver SafetyRepair Trails Parkwide

Replace Mt. Pisgah Wastewater Treatment System (Filter bid option)

Blue Ridge Parkway Total $13,265

Chesapeake and Ohio Canal (Maryland, West Virginia,

District of Columbia)

Repair Historic Canal Towpath (multiple projects)

Chesapeake and Ohio Canal Total $661

Death Valley (California, Nevada) Install Gate to Protect Visitors and Preserve Resource Habitat at

Greenwater ValleyInstall Gate to Protect Visitors and Preserve Resource Habitat at

Keane Wonder MineInstall Gate to Protect Visitors and Preserve Resource Habitat at

Remote Locations (multiple projects)Install Gate to Protect Visitors and Preserve Resource Habitat at

Skidoo MineDeath Valley Total $4,889

Dinosaur (Colorado, Utah) Repair Frontcountry and Backcountry Trails Parkwide

Replace Waterlines to Prevent Emergency Use of Reservoir (multiple

projects)Dinosaur Total $478

George Washington Memorial Parkway (District of

Columbia, Maryland, Virginia)

Rehabilitate Trails and Remove Exotic Plants

Replace Ultraviolet Filters on Windows at Historic Structures

George Washington Memorial Parkway Total $430

Glen Canyon (Arizona, Utah) Increase Efficiency and Accuracy of Water Meters by Replacing

Meters and Automating Systems (multiple projects)Install Gate to Protect Visitors and Preserve Resource Habitat

Glen Canyon Total $653

Lake Mead (Nevada, Arizona) Install Gate to Protect Visitors and Preserve Resource Habitat

(multiple projects)Rehabilitate Fish Cleaning Stations at Boat Launch Ramps

Repair Flash Flood Warning System

Replace HVAC Units Parkwide

Seal Hazardous Mine and Restore Natural Landscape (multiple

projects)Seal Hazardous Mine, Install Gate, and Restore Natural Landscape

(multiple projects)Lake Mead Total $802

1

Page 2: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Multiple Parks At Multiple Parks: Use Youth Employment Programs To Repair Trails

And Collect Ecological Data Perform Energy Audit Retrofits on 50 Largest Buildings in the NPS

(multiple projects)Purchase 15 Pieces of Energy Efficient Heavy Equipment in 13 Parks

to Replace Aging, Inefficient UnitsReplace Heating, Cooling, Water and Electrical Equipment with

Energy Efficient Units in 80 Park Units Nationwide - Phase I

Multiple Parks Total $7,233

Statue of Liberty (New York, New Jersey) Stabilize Ellis Island Baggage and Dormitory Building

Stabilize Ellis Island Seawall (completion of Phase 1)

Statue of Liberty Total $26,134

Multiple

State

Total

$58,268

AK Denali Close Hazardous Mine to Improve Visitor Safety

Construct Consolidated Emergency Services and LE Facility and

Remove Unneeded StructuresRehabilitate Comfort Station and Campground (multiple projects)

Rehabilitate Fuel, Power and Water/Wastewater Utility Systems at C-

CampRepair Surfaces of Trails

Repair Wonder Lake Ranger Station Sewer Line

Replace Aging Unit Heaters in Autoshop to Improve Energy Efficiency

Replace Front Country Wastewater Treatment Facility and

Rehabilitate Collection SystemDenali Total $16,025

Gates of the Arctic Install Wind Turbine and Battery System at Anaktuvuk Pass Ranger

StationGates of the Arctic Total $119

Glacier Bay Demolish and Replace Deteriorated Storage Building

Inspect, Repaint and Provide Preventative Maintenance for Four

VesselsPrevent Further Corrosion of Submerged Structures at Bartlett Cove

Marine FacilitiesRestripe Main Park Road

Glacier Bay Total $1,012

Katmai Demolish and Replace King Salmon Maintenance Building

Katmai Total $3,008

Kenai Fjords Enhance Visitor Facilities at Exit Glacier

Install Gate to Protect Visitors and Preserve Resource Habitat at

Remote Locations (multiple projects)Repaint Maintenance Facility

Kenai Fjords Total $302

Klondike Gold Rush Rehabilitate the Kalvick House

Rehabilitate Trails, Campgrounds, and Cultural Sites

Repair Chilkoot Trail

Klondike Gold Rush Total $111

Multiple Parks Perform Invasive Plant Treatment at Nine Parks Using Americorps

VolunteersPerform Invasive Plant Treatment at Nine Parks Using Student

Conservation Association InternsMultiple Parks Total $532

Sitka Rehabilitate Park Trails with Alaska Native Youth Partnership

Sitka Total $22

2

Page 3: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Wrangell-St. Elias Develop Shuttle Stop and Exhibits at the Kennecott Mines National

Historic LandmarkInstall Gate to Protect Visitors and Preserve Resource Habitat

(multiple projects)Paint Interior of Copper Center Complex

Perform Preventative Maintenance on Water Treatment System

Rehabilitate and Develop Twin Lakes Campground

Repair Historic Trail

Wrangell-St. Elias Total $585

Yukon-Charley Rivers Replace Obsolete Employee Housing In Eagle, AK

Yukon-Charley Rivers Total $150

AK Total $21,866

AL Horseshoe Bend Eradicate Invasive Exotic Plants

Replace Roof on Visitor Center and Administration Complex

Horseshoe Bend Total $116

Russell Cave Install Energy Efficient Windows and Doors in Visitor Center

Russell Cave Total $49

Tuskegee Airmen Preserve Moton Airfield Site, Phase 3

Tuskegee Airmen Total $7,159

Tuskegee Institute Conduct Conservation and Maintenance Work With Youth

Conservation Corps ParticipantsRehabilitate Historic Drive at The Oaks

Restore Historic Barn on the Selma to Montgomery Trail

Tuskegee Institute Total $69

AL Total $7,393

AR Buffalo National River Rehabilitate Trails Parkwide

Repair Fences to Protect Visitors and Preserve Resource Habitat

Repair Flood-Damaged Park Assets

Repair Ice-Damaged Park Assets

Buffalo National River Total $1,271

Fort Smith Repair Storm-Damaged Historic Assets

Fort Smith Total $442

Hot Springs Rehabilitate 20 Miles of Trails Parkwide

Hot Springs Total $132

Pea Ridge Repair Storm-Damaged Park Assets

Pea Ridge Total $151

AR Total $1,996

AZ Canyon de Chelly Perform Preservation Treatment on Roads Parkwide

Rehabilitate Unsafe and Unsanitary Restroom Facilities

Repair Historic Trails Parkwide

Canyon de Chelly Total $2,894

Casa Grande Ruins Correct Drainage Deficiencies on Trails to Protect Historic

Archeological SitesCasa Grande Ruins Total $55

Chiricahua Perform Preservation Treatment on All Roads Parkwide Including

Historic RoadsPerform Preventative Maintenance on Historic Park Trails

Replace Fencing at Bonita Creek Campground

Replace Roof and Paint at Historic Faraway Ranch Cowboy House and

Stafford Cabin (multiple projects)Chiricahua Total $838

3

Page 4: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Coronado Install Gate to Protect Visitors and Preserve Resource Habitat at

Remote Locations (multiple projects)Rehabilitate Existing Building to Law Enforcement Operations Center

Coronado Total $948

Fort Bowie Install Gate to Protect Visitors and Preserve Resource Habitat

Repair Trails Parkwide

Replace Roof For Two Employee Quarters

Fort Bowie Total $164

Glen Canyon Install Arsenic Control System on Potable Water Supply for Visitor

ProtectionGlen Canyon Total $531

Grand Canyon Install Wastewater Flow Meters To Increase Visitor Health And Safety

Perform Preservation Treatment on 130 Miles of Roads, Phase I

Purchase Five Alternative Fuel Transit Buses

Rehabilitate Four Historic and Two Non-Historic Structures at Supai

CampRehabilitate Historic South Rim Housing Units (multiple projects)

Rehabilitate HVAC Systems in Fee Management Office and Visitor

Interpretation Center (multiple projects)Rehabilitate the Historic Trans-Canyon Trail

Repair and Rehabilitate Housing at Supai Camp

Repair Historic North Rim Forest Trails and Trail Structures Damaged

by WildfireReplace Doors and Paint Exteriors of Historic South Rim Facilities to

Improve Energy Efficiency and Appearance (multiple projects)

Replace Shingles on South Rim Quarters (multiple projects)

Grand Canyon Total $10,887

Grand Canyon Parashant Install Gate to Protect Visitors and Preserve Resource Habitat

(multiple projects)Remove Abandoned Grazing Facilities and Rehabilitate Sites

Repair Nine Miles of Grazing Management Fencing

Grand Canyon Parashant Total $454

Hubbell Trading Post Perform Farmland Preservation with Navajo Youth Corps

Rehabilitate the Historic Hubbell Family Picnic Area

Hubbell Trading Post Total $86

Navajo Rehabilitate Aging Mission 66 Quarters

Navajo Total $65

Organ Pipe Cactus Paint Visitor Center, Campground Comfort Stations, Ranger Station

and Maintenance FacilitiesPerform Preservation Treatment on Seven Miles of Road and Parking

Areas ParkwideOrgan Pipe Cactus Total $1,025

Petrified Forest Repair Blue Mesa Trail

Replace Inadequate HVAC System in the Historic Painted Desert

Visitor Center and Administration BuildingReplace Lighting and Improve Energy Efficiency Parkwide

Petrified Forest Total $441

Pipe Spring Replace Sidewalks and Walkways

Replace Visitor Center Walkways and Curbing

Pipe Spring Total $190

Saguaro Install 100-amp Electric Service to Corral to Improve Energy

Efficiency

4

Page 5: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Install Gate to Protect Visitors and Preserve Resource Habitat

(multiple projects)Install Steel Cupola to Protect Visitors and Preserve Resource Habitat

Remove Contaminated Soil and Restore Natural Landscape

Repair Fences to Protect Visitors and Preserve Resource Habitat

Repair the Rincon Creek, Rincon Peak, and Heartbreak Ridge Trails

Replace HVAC System in Visitor Center and Headquarters Annex

Buildings (multiple projects)Replace Roof on Equipment Storage Structure

Seal Hazardous Mine to Protect Visitor and Restore Natural

Landscape (multiple projects)Seal Mine and Remove Hazardous Structures to Improve Visitor

SafetySaguaro Total $1,491

Sunset Crater Replace Unsafe Sidewalks in Visitor Center Area

Sunset Crater Total $53

Tonto Rehabilitate Park Administration Building to Meet ADA Requirements

Tonto Total $125

Tumacacori Rehabilitate and Replace Original Unsafe Wiring and Plaster Exterior

of Historic 1930's Era Building (multiple projects)Tumacacori Total $44

Walnut Canyon Repair Drainage Features at Historic Ranger Ledge Site

Walnut Canyon Total $51

Wupatki Repair 1950s Drainage System and Backfill Historic Pueblo to Protect

Exposed FeaturesWupatki Total $134

AZ Total $20,476

CA Cabrillo Replace Deteriorated Walkway Around Whale Overlook

Cabrillo Total $206

Channel Islands Install 10 kW Grid-Connected Solar Array at Headquarters

Replace Failing Visitor Center Windows and Retrofit Park

Headquarters Windows for Energy EfficiencyChannel Islands Total $372

Death Valley Convert Water Plant at Stovepipe Wells to Photovoltaic Power

Correct Safety Deficiencies In Coyote Loop Housing

Demolish and Replace 12 Deteriorated Trailers at Grapevine - Phase

IIPerform Preservation Treatment on Roads Parkwide

Replace Roofs on Seven Historic Houses

Sealcoat Parking Areas and Driveways to Prevent Asphalt

DeteriorationDeath Valley Total $7,972

Devils Postpile Replace Unsafe Steps with Graded Trail To Improve Visitor Safety

Use California Conservation Corps to Improve Visitor Safety at

Rainbow Falls Trail and OverlooksDevils Postpile Total $69

Eugene O'Neill Improve Park Headquarters Administrative Building and Restroom

AccessibilityEugene O'Neill Total $39

Fort Point Remove Accessibility Barriers to Meet ADA Requirements

Fort Point Total $330

Golden Gate Correct Accessibility Deficiencies Parkwide

Correct Fire and Safety Deficiencies in Multiple Park Buildings

5

Page 6: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Demolish Two Abandoned Houses in Fort Barry and Revegetate

LandscapeInstall Photovoltaic Panels on Headquarters Building

Protect Endanged Species Habitat by Restoring and Revegetating an

Eroding Trail; Replace With New Dias Ridge Trail

Protect Endangered Species by Realigning Trails

Rehabilitate Historic Fort Mason Chapel to Meet ADA Requirements

Remove Accessibility Barriers at Historic Fort Mason to Meet ADA

RequirementsRepair and Replace Boilers and HVAC Systems Parkwide

Repair Trails and Trail Structures Parkwide

Replace Boiler In Historic Park Headquarters Building, Fort Mason

Replace Deteriorated Waterlines at Fort Barry

Replace Roofing on Multiple Historic Buildings

Replace Water Lines to Increase Fire Protection Capabilities, Marin

HeadlandsSeismic Retrofit and Loopback Antenna Tower for Park Emergency

CommunicationsGolden Gate Total $16,106

Joshua Tree Clean and Paint Water Tank Interiors to Prevent Deterioration

Decommission Well at Lost Horse Ranger Station

Install Gate to Protect Visitors and Preserve Resource Habitat

(multiple projects)Maintain Camp Sites and Picnic Area Sites

Perform Preservation Treatment on Roads Parkwide

Repair and Stabilize Trails Parkwide

Repair Damaged Section of 49 Palms Canyon Trail

Joshua Tree Total $5,306

Lassen Volcanic Improve Visitor Safety with Trail Footbridges at Mill Creek Falls

Perform Preventative Inspections and Cleaning of Park Sewage Lines

Rehabilitate 10 Miles of Route 10 to Improve Visitor Safety

Rehabilitate Lassen Peak Trail

Lassen Volcanic Total $15,705

Lava Beds Apply Aggregate to Frequently Travelled Unpaved Park Roads

Maintain Historic Visitor Use Trails within Four Miles of Caves

Modify Valve Handles to Correct Confined Space Hazard for Park

Employees in Water Valve VaultReplace Inefficient Lighting Fixtures in Administration Area Buildings

Lava Beds Total $511

Manzanar Install Grid-Tied Photovoltaic System On Visitor Center Auditorium

RoofRepair Inadequately Insulated Attic in Historic Manzanar Visitor's

CenterManzanar Total $351

Mojave Install Gate to Protect Visitors and Preserve Resource Habitat

(multiple projects)Install Gate to Protect Visitors and Preserve Resource Habitat at

Abandoned Paymaster MineInstall Grid-Tied Solar Panels on Baker Office Roof

Perform Initial Temporary Mine Closure (multiple projects)

Provide Preventative Maintenance on Park Roads

6

Page 7: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Replace and Expand Yard Lights With Solar Electric Powered Lights

Restore Natural Landscape and Resource Habitat

Spray Dust Palliative on the Kelso Dunes Road

Mojave Total $7,272

Muir Woods Demolish Four Abandoned Structures in Camino del Canyon

Rehabilitate Facilities to Meet ADA Requirements

Muir Woods Total $631

Pinnacles Construct Accessible Overlook Trail and Connector Trail to West

Pinnacles Visitor Contact StationInstall Six Miles of Fencing to Protect Sensitive Park Lands

Replace Retaining Walls Protecting Utility Lines

Pinnacles Total $1,056

Point Reyes Construct Staff and Visitor Lodging Facility for the American Youth

HostelDemolish Hazardous Facilities at Cheda Ranch

Demolish Non-essential Structures on the Drakes Bay Fish Dock Pier

Demolish Six Unsafe Facilities at Sacramento Landing

Develop Perimeter Access Trails, Overlooks and Interpretive Exhibits

for the Scenic Giacomini WetlandsInstall Photovoltaic System at Historic RCA-Marconi Site in Bolinas

Install Photovoltaic Systems at Youth Hostel and Visitor Center

Rehabilitate Campground and Replace Restrooms at Tomales Beach

Point Reyes Total $3,136

Redwood Construct Three Miles of Trail

Install a Grid-Intertied Photovoltaic System on the Parks'

Headquarters and Visitor Center BuildingPaint Interior Surfaces and Replace Carpeting at Headquarters

BuildingRepair Gravel Road and Horse Trail

Repair Storm Damage at Mill Creek Area

Restore Ancient Redwood Forest and Watershed

Restore Lost Man Creek

Redwood Total $5,627

San Francisco Maritime Install Two Vertical Lifts in National Historic Landmark Building for

Accessibility & SafetyPaint Overheads and Bulkheads to Eliminate Hazardous Lead-Based

Materials at Historic Ferry EurekaStabilize National Historic Landmark Steam Schooner Wapama and

Install Additional Shoring and Safety PlatformUpgrade and Repair Exterior Surfaces, Windows and Doors of

National Historic Landmark Building E, Lower Fort MasonSan Francisco Maritime Total $785

Santa Monica Mountains Establish Gateway Interagency Visitor Center at Historic Gillette

Ranch PropertyInstall Photovoltaic Systems at Historic Diamond X Ranch and Historic

Paramount RanchInstall Photovoltaic Systems at Three Park Buildings

Install Rodent Proof Barriers in Multiple Park Buildings

Install Two Photovoltaic Systems at Circle X Ranch

Refurbish HVAC System

Rehabilitate The Latigo Canyon Section of The Backbone Trail System

Remove and Replace Student Intern Housing Center Destroyed by

Fire

7

Page 8: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Santa Monica Mountains Total $10,545

Sequoia and Kings Canyon Repair Fire Damage to Tehipite Switchbacks

Repair Storm Damage to the Kennedy Pass Trail

Replace Potable Water Tanks and Provide Fire Suppression at Park

HeadquartersReplace Propane Electrical Generation System with Hybrid

Photovoltaic SystemReplace Wastewater Monitoring Components

Sequoia and Kings Canyon Total $13,678

Whiskeytown Repair Trails Parkwide

Whiskeytown Total $170

Whiskeytown Unit Repaint Exterior of Potable Water Tank

Replace Deteriorated Carpet

Whiskeytown Unit Total $81

Yosemite Install Renewable Energy Solar Equipment at El Portal Complex

Paint Exterior of Historic Public Use Buildings Park-Wide

Purchase Two Hybrid Electric Shuttle Buses

Replace Roofs on Multiple Historic Buildings

Yosemite Total $7,456

CA Total $97,404

CO Bent's Old Fort Upgrade Maintenance Shop Electrical System to Meet Code

Bent's Old Fort Total $63

Black Canyon of the Gunnison Apply Preservative Oil to the Exterior of 10 Historic Log Structures

Repair Perimeter Fencing to Protect Park Resources from Livestock

(multiple projects)Black Canyon of the Gunnison Total $63

Colorado Perform Preventative Maintenance on Historic Park Trails

Colorado Total $58

Curecanti Repair Trails and Footbridges Parkwide

Curecanti Total $44

Dinosaur Rehabilitate Access Gates of Lodore Boat Ramp

Replace Carpeting and Windows in Headquarters Building (multiple

projects)Dinosaur Total $150

Florissant Fossil Beds Rehabilitate Interior and Exterior of Visitor Center to Increase Energy

Efficiency and Prevent Hanta Virus (multiple projects)Repair Electrical Hazards at Historic Maytag Barn

Florissant Fossil Beds Total $77

Great Sand Dunes National Preserve Improve Energy Efficiency of Maintenance Shop

Rehabilitate Wood Elements at Visitor Center, Picnic Area and

Campground Replace and Relocate Aging and Unsafe Gas Storage System

Restore Natural Landscape and Resource Habitat

Great Sand Dunes National Preserve Total $2,579

Hovenweep Perform Preventative Maintenance on Historic Structures

Hovenweep Total $55

Mesa Verde Install Eight Photovoltaic Systems on Historic Headquarters Buildings

Modify Trail to Spruce Tree Site to Meet ADA Requirements

Purchase Three Alternative Fuel Transit Buses

Replace Failing Waterline at Morefield Village and Campground

(multiple projects)Replace Inadequate Electrical Service in Navajo Loop

Replace Waterline: Chapin Mesa to North Park Boundary

8

Page 9: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Mesa Verde Total $14,642

Rocky Mountain Eliminate Hazardous Trees in High Use Visitor Areas

Realign Segments of Continental Divide Trail and Construct

FootbridgeRehabilitate Alpine Visitor Center Trail

Rehabilitate Historic Barn, Shed and Stable

Repair or Replace Footbridges Parkwide

Replace Deteriorated Boardwalk at Many Park Curve

Replace Failing Sewer Lines at Campground and Headquarters

(multiple projects)Replace Heating Systems in Five Employee Residences to Correct

Mold ProblemResurface Roads in Glacier Basin Campground and Timber Creek

CampgroundRocky Mountain Total $2,726

CO Total $20,457

CT Weir Farm Convert Caretaker's Garage into Artist in Residence Studio

Rehabilitate the Exteriors of the Historic Weir and Young Studios

(multiple projects)Weir Farm Total $457

CT Total $457

DC Chesapeake and Ohio Canal Reconstruct and Stabilize Big Slackwater Historic Stone Wall and

TowpathChesapeake and Ohio Canal Total $12,086

George Washington Memorial Parkway Rehabilitate Arlington House, Outbuildings & Grounds, Phase II -

complete Climate Management SystemGeorge Washington Memorial Parkway Total $3,676

National Capital Parks Repair Lincoln Memorial Reflecting Pool Including Providing Visitor

ImprovementsRestore Jefferson Memorial Plaza and Seawall Phases I & II

Restore the District of Columbia War Memorial

National Capital Parks Total $55,825

National Capital Parks - East Repair and Stabilize Kenilworth Park Trail System

National Capital Parks - East Total $70

National Mall Maintain Landscape Features on the National Mall

National Mall Total $200

Rock Creek Park Rehabilitate Deteriorated Historic Lodge House and Rostrum

Rehabilitate Hazardous Historic Park Bridle Trails

Repair Washed-out Abutment at Historic Rolling Meadows Trail

BridgeStabilize Historic High Wall on 16th Street at Meridian Hill Park

Rock Creek Park Total $5,024

DC Total $76,881

FL Big Cypress Demolish and Replace Air Strip Perimeter Fence

Rehabilitate Little Deer Trail

Rehabilitate Lost Dog Trail and Pace's Dike Trail

Rehabilitate Raccoon Point Trail

Repair Termite Damage to the Ochopee Water Treatment Building

and Treat the Oasis Wood HouseReplace Plumbing System Components at Headquarters

Replace Roofs on 36 Structures

Big Cypress Total $934

Biscayne Maintain Navigational Aids

Paint Marine Fleet (multiple projects)

9

Page 10: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Paint Maintenance Building at Convoy Point

Biscayne Total $76

Canaveral Replace Apollo Visitor Contact Station

Canaveral Total $646

Castillo de San Marcos Upgrade Water Distribution and Phone Systems at Fort Matanzas

Castillo de San Marcos Total $60

De Soto Conserve Historic 16th Century Armor

Resurface Trails

De Soto Total $37

Dry Tortugas Replace Museum Exhibit Cases

Stabilize Fort Jefferson Phase 2

Dry Tortugas Total $2,228

Everglades Demolish Mobile Home in Florida Bay District

Install Solar Water Heaters in Campgrounds

Repair and Resurface Historic Guy Bradley Trail

Replace Two Failed Plugs (Dams) To Prevent Salt Water Intrusion Into

Cape Sable and Provide Visitor SafetyEverglades Total $13,218

Gulf Islands Complete Boardwalk at Naval Live Oaks Visitor Center to Improve

AccessibilityInstall Solar-Powered Security Lighting

Remove Hazardous Trees Caused by Hurricane Gustav

Gulf Islands Total $131

Timucuan Ecological and Historic Replace Trash Receptacles at Kingsley Plantation and Fort Caroline

Timucuan Ecological and Historic Total $9

FL Total $17,339

GA Andersonville Align Historic Headstones

Repair the Historic Rostrum Wall and Refurbish Historic Iron

ComponentsReplace Floor Covering in Three Historic Buildings

Andersonville Total $181

Chattahoochee River Conduct Boundary Retracement

Construct Comfort Station at Cochran Shoals to Meet ADA

Requirements and Repair Columns Drive Comfort Station (multiple

projects)Improve Access to Hewlett Field to Meet ADA Requirements

Upgrade Comfort Stations With Low Flow Technology to Improve

Energy EfficiencyChattahoochee River Total $736

Chickamauga and Chattanooga Conduct Conservation and Maintenance Work With Youth

Conservation Corps ParticipantsMaintain Vistas in Historic Cultural Landscape

Repaint Historic Cast Iron Plaques

Repair Trails and Remove Hazardous Trees

Chickamauga and Chattanooga Total $380

Cumberland Island Install Six Solar Panels and Lighting Systems on Coastal Docks

Rehabilitate Historic Dormitories

Replace Failing HVAC System

Cumberland Island Total $162

Fort Pulaski Replace HVAC System in Historic Cottage With Energy Efficient Water

Source Heat Pump Resurface Nature Trail to Meet Safety and ADA Requirements

Fort Pulaski Total $70

10

Page 11: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Jimmy Carter Rehabilitate Walking Trail at Boyhood Farm

Jimmy Carter Total $55

Kennesaw Mountain Install Photovoltaic System on Visitor Center

Kennesaw Mountain Total $700

Martin Luther King, Jr. Stabilize the exterior of Historic 491 Auburn Avenue

Martin Luther King, Jr. Total $146

Ocmulgee Replace Theatre Doors to Meet ADA Requirements

Ocmulgee Total $15

GA Total $2,445

HI Haleakalā Repair and Replace Fences Parkwide (multiple projects)

Repair Flashflood Damage to the Pipiwai Trail and Remove Debris

Haleakalā Total $1,338

Hawai‘i Volcanoes Demolish and Replace Existing Dilapidated Visitor Contact Station to

Support Visitor ServicesRehabilitate Halemaumau Trail From Iliahi Trail to Crater Rim Trail

Replace Boundary and Pig Fencing (multiple projects)

Resurface Rainshed Roads

Hawai‘i Volcanoes Total $7,802

Kalaupapa Rehabilitate Historic Paschoal Hall Phase 4

Kalaupapa Total $536

Kaloko-Honokohau Grade and Re-gravel 2 Miles of Unpaved Roads

Kaloko-Honokohau Total $20

Pu'uhonua o Hōnaunau Repair Flood Damage to Historic Kiilae Archaeological Village, 1871

Trail and Fence LinePu'uhonua o Hōnaunau Total $61

USS Arizona Memorial Construct Intermodal Transfer Station

USS Arizona Memorial Total $5,983

HI Total $15,740

IA Effigy Mounds Construct Trail to Marching Bear Mound Group to Avoid Unsafe

Highway Crossing and Increase AccessibilityEffigy Mounds Total $480

Herbert Hoover Rehabilitate the Historic Wright House Including Abatement of Lead

Herbert Hoover Total $250

IA Total $730

ID Craters of the Moon Install Photovoltaic System at Headquarters

Replace Path to Campground, Currently on Road Shoulder, with Safe

Trail to Meet ADA RequirementsCraters of the Moon Total $469

Hagerman Fossil Beds Repair and Replace 12 Miles of Boundary Fencing

Hagerman Fossil Beds Total $201

Minidoka Internment, S. Central Maintain Trails

Remove Safety Hazards from Landscape

Repair Boundary Fence Along Canal

Minidoka Internment, S. Central Total $105

ID Total $775

IL Lincoln Home Replace Wheelchair Lifts

Lincoln Home Total $103

IL Total $103

IN Indiana Dunes Control Invasive Plants to Protect Natural Resources

Install Exterior Solar Lighting for Park Facilities

11

Page 12: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Remove Invasive Plants Near Trails and Overlook at Inland Marsh

Remove Invasive Plants to Preserve Communities around Ly-co-ki-we

TrailReplace Roofs on Two Buildings with Sustainable Practices

Indiana Dunes Total $501

IN Total $501

KS Fort Scott Replace Outdated Electric Heaters, Furnaces and Heat Pumps

Fort Scott Total $105

KS Total $105

KY Abraham Lincoln Birthplace Remove Hazardous Trees (multiple projects)

Repair Damaged Boardwalk to Increase Safety and Accessibility

Repair Roof Damage from Ice Storm

Repair Wall-Mounted Exhibit Case

Restore Trails and Fields

Abraham Lincoln Birthplace Total $458

Big South Fork National River and Recreation Area Replace Roof of Stearns Ranger Building

Big South Fork National River and Recreation Area Total $15

Cumberland Gap Install Electrical Service and Repair Comfort Station

Rehabilitate Harlan Road Trail

Repair Ridge Trail

Replace Exterior of Comfort Station and Improve Accessibility

Overlook (multiple projects)Cumberland Gap Total $369

Mammoth Cave Rehabilitate and Restore Unsafe Section of Cedar Sink Trail

Rehabilitate Visitor Center (PH 2 - West Building) and Exhibits

Repair Storm-Damaged Park Assets

Mammoth Cave Total $9,120

KY Total $9,962

LA Cane River Creole NHP and Heritage Area Apply Limewash Surface to Interior of Historic Cook's Cabin

Install HVAC System in Two Historic Structures

Paint Historic Plantation House at Oakland Plantation

Cane River Creole NHP and Heritage Area Total $136

Jean Lafitte NHP and Preserve Remove Debris From Marine Waterways and Canals

Repair and Replace Storm-Damaged Park Assets (multiple projects)

Replace Obsolete Light Fixtures For Energy Efficiency and Improve

Access at Prairie Acadian Cultural CenterJean Lafitte NHP and Preserve Total $945

LA Total $1,081

MA Adams Install Photovoltaic System for Headquarters and Maintenance

BuildingRepair Historic Beale House (multiple projects) $240

Adams Total $311

Boston Install Green Roofs on Historic Bunker Hill Buildings

Repair Historic Brick Walls at Charlestown Navy Yard

Repair Steps and Complete Repairs/Repointing of the Historic Bunker

Hill Monument (multiple projects)Upgrade Utility Systems In Multiple Historic Buildings to Increase

Energy EfficiencyBoston Total $2,230

Boston Harbor Islands Rehabilitate Trails

Rehabilitate Trails Through the Native American Youth Summer

Employment Program

12

Page 13: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Boston Harbor Islands Total $177

Cape Cod Complete Installation of HVAC and Wastewater Systems In Salt Pond

Visitor Center and Atlantic Research CenterExpand Existing Storage Facility to Fully House Existing Fire

EquipmentInstall Backup Generator for the Fire Suppression System at the

Historic Race Point Ranger StationInstall Fire Suppression Systems in Three Historic Highland Structures

Purchase Two Alternative Fuel Trams and Trailers

Rehabilitate Province Lands Bike Trail - Phase 2

Rehabilitate the Historic Province Lands Visitor Center

Cape Cod Total $4,216

Frederick Law Olmsted Complete Retrofit of Historic Barn for Adaptive Reuse

Frederick Law Olmsted Total $322

Longfellow Repaint the Historic Longfellow House and Carriage House and

Rehabilitate the Porches (multiple projects)Longfellow Total $312

Lowell Install Combined Power and Heat Generation System at Historic

Boott MillInstall Photovoltaic Panels and Wind Power Units at Maintenance

ShopRepair Historic Gate House

Replace Cooling System at Historic Mogan Cultural Center

Replace Fire Alarm System at Historic Boott Cotton Mills Museum

Lowell Total $877

Minute Man Rehabilitate Garden Features and Historic Fields at Buttrick House

(multiple projects)Repair and Restore John Nelson House and Barn (multiple projects)

Minute Man Total $1,683

Multiple Parks Stabilize and Maintain Historic Vegetation Throughout the Northeast

RegionMultiple Parks Total $236

Saugus Iron Works Modify Pedestrian Paths to Meet ADA Requirements

Rebuild Stone Retaining Walls to Prevent Damage to Historic

StructuresReplace Sluiceways at Historic Blast Furnace and Mill (multiple

projects)Saugus Iron Works Total $1,550

MA Total $11,914

MD Antietam Pave Parking Areas & Driveways

Preserve Historic Headstones

Rehabilitate Snavely Ford Trail

Replace Administrative Building Roof

Antietam Total $731

Assateague Island Install Fire Suppression Systems In Three Park Quarters

Rehabilitate Sinepuxent District Boardwalks

Assateague Island Total $908

Catoctin Mountain Park Relocate Fueling Station to Camp Round Meadow Area (multiple

projects)Repair and Replace Fire Hydrants

Replace Failing Sections of Underground Electrical Distribution

System (multiple projects)Catoctin Mountain Park Total $1,180

Chesapeake and Ohio Canal Control Exotic Plants to Protect Natural Resources

13

Page 14: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Expand Existing Boat Ramp and Improve Service Road, Brunswick,

MDRepair Historic Lift Lock 22

Replace Boat Ramp and Parking Area, Point of Rocks, MD

Repoint Masonry of Historic Canal Locks in Watered Sections of the

CanalChesapeake and Ohio Canal Total $1,235

Fort McHenry NM and Historic Shrine Improve Energy Efficiency and Environmental Quality in Two Historic

Star Fort BuildingsInstall Fire Suppression System at Four Historic Star Fort Buildings

Install Storm Windows and Shutters In Historic Star Fort Buildings

(multiple projects)Repair Solar Lights on Entrance Road and In Parking Lot

Fort McHenry NM and Historic Shrine Total $736

Hampton Construct a Collections Storage Building to Replace Two Functionally

Obsolete FacilitiesHampton Total $872

Monocacy Control Invasive Species to Protect Natural Resources (multiple

projects)Repair and Repoint Foundation at Historic Baker Barn

Repair Structure of Historic Baker Barn

Replace Non-compliant Above-Ground Diesel Storage Tank

Monocacy Total $247

National Capital Parks - East Repair and Repaint Shutters on Historic Officer's Quarters

Repair Interior Finishes and Utilities at Historic Enlisted Men's

BarracksRepair United States Park Police Substation, Greenbelt

Replace Long Azalea Bridge at Greenbelt Park

National Capital Parks - East Total $699

MD Total $6,608

ME Acadia Demolish Abandoned Buildings and Roads to Restore Landscapes

Perform Preservation Treatment on Roads Parkwide

Rehabilitate Roads and Parking Areas at Schoodic Education and

Research CenterRepair 93 Damaged Culverts and Headwalls On Historic Park Roads

Replace Deteriorated Safety and Information Signs

Acadia Total $8,297

ME Total $8,297

MI Isle Royale Repair and Rehabilitate Backcountry Trails

Isle Royale Total $158

Sleeping Bear Dunes Eradicate Invasive Plants in Critical Piping Plover Habitat

Repair Deteriorating Hiking Trails

Stabilize and Rehabilitate Buildings in Glen Haven Village Historic

DistrictSleeping Bear Dunes Total $2,249

MI Total $2,407

MN Grand Portage Replace Rotting and Hazardous Boardwalk Planks on Grand Portage

TrailReplace Trailers for Seasonal Housing to Correct Safety Deficiencies

and Improve Energy EfficiencyGrand Portage Total $890

Pipestone Replace 1.2 Mile Nature and Quarry Trail

14

Page 15: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Pipestone Total $148

MN Total $1,038

MO Jefferson National Expansion Memorial Replace and Upgrade PLC for Arch Tram

Replace Roof of Historic Old Courthouse

Jefferson National Expansion Memorial Total $5,904

Ozark National Scenic Riverways Perform Preventative Maintenance on Alley Spring Area Paved Roads

and ParkingRepair Chubb Hollow Trail

Repair Park Infrastructure and Stabilize Streambanks Damaged by

StormsReplace Two Failing Underground Electrical Systems (multiple

projects)Ozark National Scenic Riverways Total $2,606

MO

Total

$8,510

MP American Memorial Park Install Grid Connected Solar Array at Visitor Center

American Memorial Park Total $747

MP Total $747

MS Gulf Islands Remove Debris and Overgrowth From Boundary Fence

Gulf Islands Total $54

Natchez Paint the Historic McCallum House

Rehabilitate Historic Melrose Chandeliers

Natchez Total $42

Natchez Trace Parkway Rehabilitate Historic Meriwether Lewis Site

Repair Facilities Damaged by Storm

Replace Water Lines at Tupelo Visitor Center to Meet Public Health

StandardsRestripe 70 Miles of Parkway Centerline and Edgeline

Natchez Trace Parkway Total $4,467

Vicksburg Rehabilitate Historic Shirley House

Rehabilitate South Cemetery Road Route 200

Vicksburg Total $1,946

MS Total $6,509

MT Big Hole Replace Roof, Install Fire Suppression, and Build Climate Controlled

Entrance in Visitor Center to Improve Energy Efficiency

Big Hole Total $620

Bighorn Canyon Perform Preventative Maintenance on Dumpsters Parkwide to

Improve SanitationBighorn Canyon Total $181

Glacier Correct Critical Health and Life Safety Hazards at Many Glacier Hotel,

North PhaseRehabilitate Comfort Stations to Meet ADA Requirements

Rehabilitate Historic West Lakes District Emergency Visitor Services

and Public Safety BuildingRehabilitate Multiple Historic Quarters (multiple projects)

Repair Backcountry Trails and Backcountry Campgrounds (multiple

projects)Repair Disintegrating and Hazardous Segments on Trails with High

Visitor UseGlacier Total $17,567

Grant-Kohrs Ranch Preserve Historic Windows and Doors of Ranch House

Repair Beams of Historic Red Barn

15

Page 16: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Repair Frames of Seven Historic Structures

Grant-Kohrs Ranch Total $126

Yellowstone Construct Micro-Hydro Facility at Mammoth Hot Springs

Yellowstone Total $1,650

MT Total $20,144

NC Blue Ridge Parkway Control Invasive Plants with Student Conservation Corps Team

Design and Install a Fire Suppression System in Pisgah Lodge

Grade and Resurface Historic Carriage Trails on Moses Cone Estate

Rehabilitate White Rock Falls Trail Head and Visitor Parking Area

Repair Historic Buck Spring Tunnel

Repair Historic Stone Walls on Moses Cone Estate

Repave Linville Falls Picnic Area, Balsam Gap and Linville Falls

Maintenance AreasResurface Deteriorated Maintenance Parking Area - Oteen

Blue Ridge Parkway Total $1,321

Cape Hatteras Paint Historic Civilian Conservation Corps Cabins

Repair the Historic Hatteras Island Fire Cache Facility

Replace Deteriorating and Unsafe Campground Picnic Tables and

Grills at Four CampgroundsReplace Roof at Historic Bodie Island Lighthouse Station

Cape Hatteras Total $696

Carl Sandburg Home Maintain and Protect Historic Cultural Landscape

Perform Preventive Maintenance on Fire Suppression Systems

Remove Hazardous Trees and Limbs Throughout Park

Repaint Historic Structures

Carl Sandburg Home Total $99

Great Smoky Mountains Maintain 61 Historic Cemeteries

Provide Accessibility To Park Comfort Stations and Picnic Camp Sites

Rehabilitate 10.4 Miles of Trails in South District

Repair Historic Rock Retaining Walls and Resurface Clingmans Dome

Road and Parking AreasGreat Smoky Mountains Total $20,360

Guilford Courthouse Repair Tour Road Surface

Guilford Courthouse Total $435

Moores Creek Paint Exterior and Reroof Park Facilities (multiple projects)

Moores Creek Total $38

NC Total $22,949

ND Knife River Indian Villages Relocate Sewage Grinder and Lift Station to Exterior of Visitor Center

Knife River Indian Villages Total $107

ND Total $107

NE Agate Fossil Beds Replace Roof of Visitor Center

Agate Fossil Beds Total $68

Scotts Bluff Rehabilitate Boundary Fence and Markings

Scotts Bluff Total $111

NE Total $179

NH Appalachian National Scenic Trail Rehabilitate "The Perch" Shelter, Randolf Mountain Club, NH

16

Page 17: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Appalachian National Scenic Trail Total $16

Saint-Gaudens Rehabilitate Historic Caretaker's Garage

Saint-Gaudens Total $38

NH Total $54

NJ Delaware Water Gap Repair Failed Structural Trusses at YMCA-Operated Main Lodge

Delaware Water Gap Total $60

Edison Paint Exterior and Replace Gutters, Screen and Downspouts on

Historic Glenmont Mansion (multiple projects)Replace Failing Brick Retaining Wall in Visitor Center Parking Lot

Edison Total $507

Gateway Install Sustainable, ADA Compliant Boardwalks to Replace

Deteriorating StructuresRepair Walls, Plazas and Restroom Facilities at Six Sandy Hook Beach

CentersGateway Total $335

Morristown Install New Boiler to Increase Energy Efficiency

Replace Roof and Fire Suppression System at the Historic Ford

Mansion (multiple projects)Morristown Total $366

NJ Total $1,268

NM Aztec Ruins Rehabilitate Windows and Doors at Historic Visitor Center

Aztec Ruins Total $83

Bandelier Correct Safety Problems on Backcountry Trail Segments

Rehabilitate Juniper Campground

Replace HVAC System in Historic Administration Building to Improve

Energy EfficiencyBandelier Total $580

Capulin Volcano Upgrade Restrooms to Meet ADA Requirements at Visitor Center and

Picnic AreaCapulin Volcano Total $56

Carlsbad Caverns Repaint Exterior of 6 Buildings

Repair Structural Steel and Lead Paint Abatement on Primary

Elevator ShaftCarlsbad Caverns Total $6,610

Chaco Culture Perform Preventative Maintenance on Historic Sandstone Masonry

Retaining Walls Rehabilitate Maintenance Shop Building and Lumber Storage Facility

to Improve Energy Efficiency and Prevent Hanta Virus (multiple

projects)Chaco Culture Total $151

El Malpais Improve Safety and Appearance of Multi Agency Center (multiple

projects)El Malpais Total $84

Fort Union Rehabilitate Quarters 3A to Meet ADA Requirements

Stabilize Historic Flagstone Courtyard

Fort Union Total $61

Gila Cliff Dwellings Replace Security Fence Around At Gila Center Maintenance Shop

Update Fluorescent Light Fixtures to Improve Energy Efficiency

(multiple projects)Gila Cliff Dwellings Total $82

Long Distance Trails Repair Interior Courtyard Columns and Drainage System of Historic

StructuresLong Distance Trails Total $39

Pecos Rehabilitate Historic Well Covering at Forked Lightning Ranch

17

Page 18: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Replace Inadequate HVAC System at Visitor Center

Pecos Total $88

Petroglyph Repair Trails Parkwide

Petroglyph Total $44

White Sands Rehabilitate Headquarters Building to Protect Structural Integrity and

Increase Energy EfficiencyReplace Six Skylights and Resurface Parapet Walls at Warehouse to

Prevent LeaksWhite Sands Total $143

NM Total $8,021

NV Great Basin Repair Damage to Timber Creek Trail

Repair Wheeler Peak Trail to Increase Accessibility

Great Basin Total $85

Lake Mead Install Photovoltaic System at Warehouse Complex

Perform Preservation Treatment on Roads Parkwide

Rehabilitate 9 Miles of Northshore Road

Replace Roofs on Three Quarters Units

Lake Mead Total $18,268

NV Total $18,353

NY Appalachian National Scenic Trail Rehabilitate Appalachian Trail in Bear Mountain, NY

Appalachian National Scenic Trail Total $90

Fire Island Repair 153 Feet of Failed Bulkhead at Sailors Haven Marina

Replace Patchogue Bulkheads and Complete Ferry Terminal Building

Stabilize and Repair Historic Fresnel Lens

Fire Island Total $6,354

Gateway Install Photovoltaic Equipment at Five Sandy Hook Beach Centers

Gateway Total $362

General Grant Complete Rehabilitation General Grant's Tomb and Overlook

General Grant Total $250

Governors Island Hazmat Abatement and Stabilize Castle Williams

Governors Island Total $5,588

Hamilton Grange Complete Rehabilitation of Hamilton Grange

Hamilton Grange Total $2,352

Home of Franklin D. Roosevelt Rehabilitate Historic Stone Walls and the Ice Pond Dam (multiple

projects)Rehabilitate the Greenhouse and Expand Existing Horticulture

Recycling (multiple projects)Home of Franklin D. Roosevelt Total $1,691

Martin Van Buren Restore Basement Floor of Historic Structure

Martin Van Buren Total $95

Sagamore Hill Repair Unsafe Windmill

Sagamore Hill Total $219

Saratoga Rehabilitate Ranger Station

Saratoga Total $64

Statue of Liberty Install Power and Communications Lines for Perimeter Security on

Liberty and Ellis IslandsStatue of Liberty Total $2,526

Thomas Cole Rehabilitate Historic Thomas Cole House to Preserve Structure and

Prevent InjuryThomas Cole Total $343

18

Page 19: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Vanderbilt Mansion Rehabilitate Historic Upper and Middle Dams (multiple projects)

Rehabilitate Historic Vanderbilt Elevator $292

Vanderbilt Mansion Total $723

Women's Rights Install Energy Efficient Lights in Historic Visitor's Center

Women's Rights Total $105

NY Total $20,762

OH Cuyahoga Valley Close Four Hazardous Abandoned Oil and Gas Wells and Restore

Natural LandscapeEliminate Failing Septic Systems in the Village of Everett

Perform Preventative Maintenance to Replace Railroad Ties (multiple

projects)Repair Historic Tinker's Creek Aqueduct Including Removing

Temporary Conveyance System Upgrade Nine Miles of Railroad Line for Sustainability

Cuyahoga Valley Total $7,768

Hopewell Culture Construct Museum Collection Facility

Hopewell Culture Total $2,045

Perry's Victory and International Peace Memorial Preserve Perry's Victory and International Peace Memorial, Phase 1

Repair 90 Year Old Elevator for Improved Health and Safety

Perry's Victory and International Peace Memorial Total $7,636

OH Total $17,449

OK Chickasaw Rehabilitate Comfort Stations to Improve Health and Safety (multiple

projects)Rehabilitate Travertine Nature Center

Repair Historic Rock Creek Multi-Use Trail

Repair trails at Buckhorn Campground to Improve Accessibility

Chickasaw Total $551

Washita Battlefield Replace Fence Along Park Boundary

Washita Battlefield Total $41

OK Total $592

OR Crater Lake Install Central Energy Management Systems to Balance Heating and

Reduce Energy ConsumptionInstall Fire Protection System in Historic Building

Crater Lake Total $367

John Day Fossil Beds Demolish and Replace Employee Quarters at Painted Hills

Repair Historic Structures at James Cant Ranch

John Day Fossil Beds Total $420

Lewis & Clark Rehabilitate South Slough Loop Trail

Repair Walkways and Boardwalks

Resurface Trails

Lewis & Clark Total $207

Oregon Caves Rehabilitate Compacted Trail and Construct New Viewing Platform $21

Oregon Caves Total $21

OR Total $1,015

PA Delaware Water Gap Repaint Building and Replace Inefficient Windows

Replace Roof and Exterior Siding at Headquarters (multiple projects)

19

Page 20: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Delaware Water Gap Total $235

Fort Necessity Replace Maintenance Building Oil Heating System with Geothermal

SystemFort Necessity Total $708

Gettysburg Rehabilitate Historic Daniel Klingle House For Use As Employee

QuartersReplace 5,000 ft. Deteriorated Waterline at McMillan Woods Scout

CampGettysburg Total $717

Hopewell Furnace Install Interior and Exterior Solar Lighting at Storage Building

Prune and Remove Trees at Upper Village

Remove and Replace Roof at Historic Charcoal House

Repair and Regrade Lenape Trail Surface

Repair and Replace Deteriorated Historic Windows at the

Ironmasters HouseRepair Electrical Wiring at Historic Iron Master's House

Repair, Rehabilitate and Paint Historic Structures (multiple projects)

Hopewell Furnace Total $827

Independence Install Equipment to Coordinate and Reduce Peak Use Loading at 92

Utility Meters ParkwideRehabilitate Independence Tower

Stabilize and Repair Historic Cobblestones At Rose Garden

Independence Total $5,642

Johnstown Flood Reconstruct North and South Abutment Observation Platforms

Replace HVAC System at Historic Unger House and Visitor Center

Johnstown Flood Total $396

Steamtown Demolish Replace Two Condensing Towers to Protect Museum

ArtifactsRehabilitate Historic Railway Coach

Repair and Maintain 4 Historic Operational Locomotives and

Passenger CarsReplace Overhead Cranes Used to Move Railroad Materials

Steamtown Total $1,192

Steamtown NHS Stabilize Railroad Equipment and Remove Asbestos

Steamtown NHS Total $2,150

Upper Delaware Scenic and Recreation River Repair and Weatherize Five Buildings (multiple projects)

Upper Delaware Scenic and Recreation River Total $145

Valley Forge Complete the Rehabilitation of the Historic Valley Forge Train Station

Rehabilitate Exterior at Two Historic Quarters (multiple projects)

Repair and Replace Damaged Plaster and Stucco Surfaces at Multiple

Historic BuildingsValley Forge Total $2,182

PA Total $14,194

PR San Juan Build Five Carriages for Historic Iron Cannons

San Juan Total $50

PR Total $50

SC Congaree Maintain Cedar Creek Canoe Trail

Congaree Total $60

Cowpens Demolish and Replace Nature Trail Bridges

Remove Debris from Landscape to Protect Land and Waterways

Repair Floor in Administration Building

20

Page 21: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Cowpens Total $114

Fort Sumter Install Security Gate at Visitor Center

Replace Scissor Lifts at Fort Sumter and Liberty Square Docks to

Meet ADA RequirementsFort Sumter Total $47

Kings Mountain Replace Garage Bay Doors

Replace Tile Flooring in Historic Park Facility

Kings Mountain Total $26

Ninety Six Remove Invasive Plants to Protect Natural Resources

Replace Faulty Wiring in Maintenance Shop

Ninety Six Total $14

SC Total $261

SD Badlands Rehabilitate Loop Road

Replace Deteriorated Boardwalk on Cliff Shelf Trail

Badlands Total $8,990

SD Total $8,990

TN Andrew Johnson Repair Fire-Damaged Historic Landscape

Upgrade Water Heaters with Tankless Technology to Improve Energy

EfficiencyAndrew Johnson Total $49

Big South Fork National River and Recreation Area Repair Drainage Structures on 387 miles of Trails

Replace Inefficient Restroom Facilities

Big South Fork National River and Recreation Area Total $86

Fort Donelson Conduct Conservation and Maintenance Work With Youth

Conservation Corps ParticipantsMaintain Historic Bronze Monument

Remove Harmful Vegetation and Prevent Erosion Around Historic

EarthworksRemove or Reset Historic Headstones

Fort Donelson Total $145

Great Smoky Mountains Rehabilitate 9 Miles of Historic Roaring Fork Motor Nature Trail and

Cherokee Orchard Road Rehabilitate Roads at Cosby Campground

Repair 22 Miles of Eroded and Hazardous Horse Trails in North

District Repair Parking Area at the Sinks to Protect Resources, Improve

Visitor Safety, and Increase AccessibilityReroof and Paint Park Buildings (multiple projects)

Great Smoky Mountains Total $9,813

Shiloh Replace Display for Historic Cannon Carriages

Shiloh Total $108

Stones River Control Invasive Plants to Protect Historic Cultural Resources

Raise, Straighten and Align Historic Headstones

Stones River Total $79

TN Total $10,280

TX Alibates Flint Quarries Demolish and Replace Comfort Station to Meet ADA Requirements

Alibates Flint Quarries Total $69

Amistad Remove Trash and Debris Along the Shoreline

Amistad Total $228

Big Bend Improve Visitor Safety by Rehabilitating Trails Parkwide

Rehabilitate Historic Law Enforcement Quarters

Repair Park Infrastructure Damaged by Flood

21

Page 22: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Big Bend Total $1,236

Big Thicket Remove Two Oil and Gas Wells and Restore Natural Landscape

Repair Hurricane Damage at Kirby Nature Trail Area

Restore Facilities Damaged by Hurricane Ike (multiple projects)

Big Thicket Total $675

Fort Davis Stabilize Historic Brick Oven

Fort Davis Total $46

Guadalupe Mountains Rehabilitate Pine Springs Quarters (multiple projects)

Repair Trails Parkwide

Replace Heating System Boiler at Park Headquarters/Visitor Center

Guadalupe Mountains Total $315

Lake Meredith Replace Fixtures at Three Comfort Stations With Water-Saving

Models (multiple projects)Replace HVAC System in Ranger Station

Replace Roof on Visitor Contact Station and Maintenance Facility

(multiple projects)Lake Meredith Total $107

Lyndon B. Johnson Rebuild 6.1 Miles of Ranch Fencing Along Tour Route to Maintain

Historic AppearanceReplace HVAC System at Historic Texas Whitehouse

Lyndon B. Johnson Total $175

Padre Island Remove Hurricane Ike Debris

Padre Island Total $123

Palo Alto Battlefield Remove and Replace Unserviceable Air Handling Units to Improve

Energy EfficiencyPalo Alto Battlefield Total $83

San Antonio Missions Rehabilitate Sewer, Septic and Potable Water System at Historic

Mission EspadaSan Antonio Missions Total $103

TX Total $3,160

UT Arches Construct Flood Diversion Wall

Arches Total $78

Bryce Canyon Demolish and Replace Comfort Station to Meet ADA Requirements

Repair Historic Bristlecone Trail

Bryce Canyon Total $579

Canyonlands Rehabilitate Hans Flat Maintenance Building for Energy Efficiency

Replace Failing Propane Tanks at Island in the Sky

Canyonlands Total $159

Capitol Reef Repair and Increase Energy Efficiency of Exterior Components at

Nature Center, Visitor Shelters, and Storage Facilities (multiple

projects)Replace Exterior Siding and Windows in Employee Residences

(multiple projects)Capitol Reef Total $180

Cedar Breaks Perform Preventative Maintenance at North View and Chessman

OverlooksRepair Trails and Boundary Fences

Cedar Breaks Total $150

Dinosaur Demolish and Replace Condemned Portions of Quarry Visitor Center

Dinosaur Total $13,136

Glen Canyon Perform Preservation Treatment on 68 Miles of Roads

22

Page 23: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Glen Canyon Total $8,000

Golden Spike Repair Trails Parkwide

Replace Boundary and Auto Tour Gates

Golden Spike Total $66

Hovenweep Conduct Stabilization Maintenance on Historic Cajon Pueblo

Hovenweep Total $55

Natural Bridges Stabilize Eroded Structures at Historic Bare Ladder Ruin

Natural Bridges Total $15

Timpanogos Cave Construct Roof Extension on Cave Exit Shelter to Protect Visitors

from RockfallTimpanogos Cave Total $192

Zion Install Additional Photovoltaic Panels at Emergency Operations

Center and Administration BuildingInstall Photovoltaic Panels at Headquarters, Museum Building and

Visitor Center (multiple projects)Perform Critical Trail Repairs in Zion Canyon

Zion Total $945

UT Total $23,555

VA Appalachian National Scenic Trail Relocate Two Miles of Appalachian Trail, VA

Appalachian National Scenic Trail Total $25

Appomattox Court House Repair External Features of the Historic McLean Complex

Replace Siding and Insulate Quarters to Improve Energy Efficiency

Appomattox Court House Total $172

Colonial Reconstruct Glasshouse Parking/NOL Area For Safety, ADA And

Visitor SatisfactionColonial Total $1,634

Fredericksburg and Spotsylvania County Battlefields

Memorial

Install Fire Suppression and Detection System to Protect Museum

Collections at Historic Jackson ShrinePaint Interiors and Exteriors of Historic Structures, Office Buildings

and Quarters (multiple projects)Replace and Upgrade HVAC Systems in Multiple Historic Facilities

(multiple projects)Replace HVAC Components In Two Historic Structures

Replace the HVAC System at Fredericksburg Visitor Center

Fredericksburg and Spotsylvania County Battlefields

Memorial Total

$1,101

George Washington Memorial Parkway Repair and Replace Six Sewage Lift Stations

Replace Parkway Wayside Exhibits and Bulletin Boards

Restore Road Shoulders

George Washington Memorial Parkway Total $200

Maggie L. Walker Perform Structural and Cosmetic Repairs on Historic Building

Replace HVAC System Components

Maggie L. Walker Total $94

Manassas Paint Exterior of Historic Sutton House

Paint Historic Thornberry House

Reline Chimneys in Historic Park Structures

Remove Damaging Vegetation From Historic Landscape

Repoint Historic Masonry Structures at Hooe Cemetery and Chinn

HouseManassas Total $211

Petersburg Rehabilitate Historic Pennsylvania Monument

Petersburg Total $563

Prince William Forest Park Rehabilitate 13 Historic Structures In Camp Pleasant

Replace Windows and Doors at Cabin Camp to Improve Energy

Efficiency

23

Page 24: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Resurface 11 Miles of Road and Parking Areas and Repair

Deteriorating CulvertsPrince William Forest Park Total $5,527

Richmond Correct Mechanical Deficiencies

Demolish Structures and Remove Debris from Historic Malvern Hill

Eliminate Hazardous Trees for Visitor Protection (multiple projects)

Repair Exterior of Historic Chimborazo Medical Museum and Improve

Energy EfficiencyRepair Historic Trails Parkwide

Replace HVAC Systems and Components (multiple projects)

Richmond Total $579

Shenandoah Install Waterline and Demolish Parking Area at Thornton Gap

Paint Historic Administrative Buildings Parkwide (multiple projects)

Rehabilitate 11.1 Miles of Historic Skyline Drive

Rehabilitate Sixteen Historic Overlooks along Skyline Drive

Remove Hazardous Trees and Cut Low Limbs on Historic Skyline Drive

(multiple projects)Replace Boilers at Big Meadows Wastewater Treatment Plant and

Fire CacheReplace or Line Culverts Along Historic Skyline Drive

Shenandoah Total $17,025

Wolf Trap National Park for the Performing Arts Repair Water Damage at Filene Center

Wolf Trap National Park for the Performing Arts Total $98

VA Total $27,229

VI Buck Island Reef Repair Storm-Damaged Trail System, Picnic Area, Shoreline and Pier

(multiple projects)Replace, Recover and Relocate Boundary and Regulatory Buoys

Buck Island Reef Total $997

Christiansted Conduct Conservation and Maintenance Work With Youth

Conservation Corps ParticipantsRepair and Rehabilitate Historic House

Repair and Rehabilitate Historic Landscaping from Storm Damage

Repair Historic Danish Customs House (multiple projects)

Repair Historic Danish West India Warehouse

Repair Historic Flagpole

Repair Storm Damage to Historic Steeple Building

Replace Skylights in Comfort Stations Due to Damage From Hurricane

OmarReshingle Historic Bandstand Roof

Christiansted Total $414

Salt River Bay NHP & Ecological Preserve Conduct Conservation and Maintenance Work With Youth

Conservation Corps ParticipantsSalt River Bay NHP & Ecological Preserve Total $32

Virgin Islands Remove Storm Debris and Repair Storm-Damaged Park Assets

(multiple projects)Repair and Stabilize Shoreline Erosion at Cinnamon Bay $60

Virgin Islands Total $245

VI Total $1,688

VT Appalachian National Scenic Trail Rehabilitate Historic Appalachian Trail Little Rock Pond Shelter, VT

Appalachian National Scenic Trail Total $45

24

Page 25: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Marsh-Billings-Rockefeller Replace 30Kw Park-Wide Back-Up Generator, Provide Micro-Power

to Historic Core and Perform Energy Improvements to Multiple

Structures (multiple projects)Upgrade Historic Structures for Energy Efficiency

Work with Student Conservation Association to Repair and

Rehabilitate Historic Carriage RoadsMarsh-Billings-Rockefeller Total $473

VT Total $518

WA Fort Vancouver Replace System Components for Fire and Intrusion Alarms

Resurface Visitor Use Trails

Fort Vancouver Total $99

Lake Roosevelt Install Micro Hydro System and Grid Tied Power Production at Fort

Spokane Water SystemInstall Photovoltaic System at Fort Spokane Shop and Office Building

Install Photovoltaic System at Headquarters Building

Perform Energy Retrofit of Fort Spokane and Kettle Falls Buildings

Lake Roosevelt Total $353

Mount Rainier Construct Accessible Trail at New Visitor Center

Correct Structural Deficiencies In Historic Buildings

Install Grid-Tied Photovoltaic Systems on Park Buildings

Repair Historic Carbon River Area Access Road, Ipsut Campground

and Ipsut Ranger StationRepair Storm-Damaged Trails (multiple projects)

Replace Electric Lines at Narada Falls Overlook

Replace Exhibits in Historic Sunrise Visitor Center to Improve

Accuracy and Meet ADA RequirementsStabilize River Bank and Repair Damaged Pavement on Historic

Longmire Back Road Mount Rainier Total $3,312

North Cascades Implement Energy Efficient Improvements to Stehekin Landing

FacilityPaint Interior and Exterior of Historic Buildings in Stehekin and Skagit

Districts Rehabilitate Stehekin Landing Fuel System

Repair Storm Damage at Stehekin

North Cascades Total $518

Olympic Convert Two Miles of Abandoned Road to a Trail, Remove Failing

Culverts, and Restore CampgroundDemolish and Replace Operationally Obsolete Hoh Sewer System

Rehabilitate Four Park Road Bridges

Replace Electrical Cable Conduit on Hurricane Ridge Road to Preserve

Visitor ServicesReplace Historic Roofing Parkwide

Restore Elwha River Ecosystem and Fisheries Program - Build

Wastewater Collection and Transport SystemRestore Elwha River Ecosystem and Fisheries Program - Maintain Off-

Reservation Flood ProtectionRestore Elwha River Ecosystem and Fisheries Program - Maintain On-

Reservation Flood ProtectionRestore Elwha River Ecosystem and Fisheries Program - Maintain

Water Quality at Nippon Paper MillRestore Elwha River Ecosystem and Fisheries Program - Protect

Elwha Heights Water Association Water QualityRestore Elwha River Ecosystem and Fisheries Program - Protect

Private PropertiesRestore Elwha River Ecosystem and Fisheries Program - Replace Griff

Creek Culvert with Bridge

25

Page 26: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Restore Elwha River Ecosystem and Fisheries Program - Replace

Tribal Fish HatcheryRestore Elwha River Ecosystem and Fisheries Program - Widen

Stratton RoadOlympic Total $57,865

Whitman Mission Protect Entrance Road from Mill Creek Flood Erosion

Whitman Mission Total $51

WA Total $62,198

WI Ice Age Trail Repair Ice Age Trail

Ice Age Trail Total $20

Saint Croix National Scenic Riverway Rehabilitate Deteriorated Hiking Trails

Saint Croix National Scenic Riverway Total $40

WI Total $60

WV Harpers Ferry Repair and Upgrade Park Intrusion and Fire Alarm Systems

Repair Roofs on Seven Historic Buildings

Repair Slate Roofs on Four Historic Buildings

Weatherproof the Exterior of the Historic Lockwood House

Harpers Ferry Total $1,083

Harpers Ferry Center Rehabilitate Attic of Historic Byrd Brady House

Renovate Interior of Historic Anthony Library at Historic Storer

CollegeRestore Exterior of Historic Anthony Library

Upgrade Fire and Security Alarm Systems of the Harpers Ferry Center

Harpers Ferry Center Total $1,594

New River Gorge National River Install Gate to Protect Visitors and Preserve Resource Habitat

(multiple projects)Repair Old Railroad Bridges Used as Trails

New River Gorge National River Total $324

WV Total $3,001

WY Devils Tower Paint Exterior of Historic Buildings

Devils Tower Total $69

Fort Laramie Paint, Plaster, and Repair Floor Coverings in Historic Structures and

Ruins (multiple projects)Fort Laramie Total $121

Fossil Butte Repair Walks and Patios at Visitor Center

Fossil Butte Total $73

Grand Teton Demolish and Replace Unsafe Colter Bay Maintenance Shop Phase II

Rehabilitate Historic Lower Granite Canyon Trail

Rehabilitate Moose Maintenance Building, Including Removal of

Unneeded Structures, Phases 1 & 2Grand Teton Total $18,829

John D. Rockefeller, Jr. Memorial Parkway Demolish Structure and Stabilize Eroding Slope at Flagg Ranch

John D. Rockefeller, Jr. Memorial Parkway Total $83

Yellowstone Demolish and Replace Madison Wastewater Facility

Demolish and Replace Roof of Wastewater Management Lift Station

Improve Restroom Facilities to Eliminate Contamination Issues

Realign Segments of the Historic Shelf Lake Trail

Rehabilitate and Repave Historic South Rim Drive

Rehabilitate the Historic Observation Peak Trail

26

Page 27: National Park Service Recovery Act Projects State/ …i2.cdn.turner.com/cnn/2009/images/08/17/nps_state...National Park Service Recovery Act Projects State/ Insular Area Park Project

National Park Service Recovery Act Projects

State/

Insular

Area

Park Project Description Total $ per Park

(in thousands)

Repair Boardwalks near Thermal Features

Repair Deteriorating Trails and Footbridges

Repair Hazardous Propane Service Line at Fort Yellowstone

Replace Deteriorating Spring and Reservoir to Ensure Clean Drinking

WaterReplace Failing Steam Heat for Historic Buildings Used By Public

Replace Leaking Underground Fuel Storage Tanks and Remediate Soil

ContaminationResurface South Entrance Roadway

Yellowstone Total $13,085

WY Total $32,260

27