native title assessment pathway - department of energy and ... · ss61 and 24fa, nta module ic...

1
Module IB Identifcation of proposed dealing and dealing area Module AA e.g. Grant of a lease on Lot 1 on SP6574 Registered ILUA covering proposed dealing area Module AC Hint: The ILUA must authorise the proposed dealing Determination of native title over proposed dealing area Module AD Hint: Check NNTT/ QNTIME Previous grant and vesting the PEPA Module BA Hint: applies to s23B(2), (3) & (9)-(9C) NTA s20, NT(Q)A Reliance on the extinguishing efect of the PEPA Module BB Hint: s 47, 47A or 47B (NTA) Extinguishment of native title by public works Module CA Hint: s 23B(7), NTA s21,NT(Q)A ILUA Module Q. Proposed dealing does not ft with the future act provisions - proceed to an ILUA s24BA-24EC, NTA Non-claimant applications Module R. Only use this option if there is no registered native title claim over the proposed dealing area Ss61 and 24FA, NTA Module IC S24IC & 24IDRenewal, regrants, extensions of the term lease, licenence, permit or authorityS24JAA Public housing & certain government infrastructure on Indigenous land. Module JAA S24JAA Public housing & certain government infrastructure on Indigenous land. Module J S24JA Reservations and leases. Module K S24KA Facilities for services to the public. Module L S2LA Low impact future acts. Module M S24MD Freehold test, acquisitions, mining. Module N S24NA Of-shore places. Module O s.24OAValidity Module P S25 -44 Right to negotiate process Extinguishment of native title through road dedication Module CB Hint: s 23B(7), NTA s21,NT(Q)A Dealing that may proceed without further reference to native title Module AB Dealing can proceed where: It’s an emergency action a determination has been made that native title does not exist it’s covered by a QNTIME conclusion it does not afect native title Native Title assessment pathway Future act provisions Hint: s24FA to 24NA may apply to the proposed dealing. If yes, please provide the relevant procedural rights (if any) to the native title parties. Hint: Start assessment at the base. Module F S24FA protection – non-claimant application Module GB S24GB Primary production on non-exclusive agro pastoral leases Module GD S24GD Of-farm activities directly connected to primary production Module GE S24GE Third party rights on non-exclusive agro pastoral leases Module H S24HA Water, living aquatic resources, airspace S24IA Pre-existing right-based acts and renewals etc Conclude assessment/s by providing supporting evidence and relevant annexures Abbreviations ILUA Indigenous Land Use Agreement PEPA Previous exclusive possession act NNTT National Native Title Tribunal QNTIME Queensland Native Title Information Environment CS8037_06/2018

Upload: others

Post on 30-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Native Title assessment pathway - Department of Energy and ... · Ss61 and 24FA, NTA Module IC S24IC & 24IDRenewal, regrants, extensions of the term lease, licenence, permit or authorityS24JAA

Module IB

Identification of proposed dealing and dealing area Module AA e.g. Grant of a lease on Lot 1 on SP6574

Registered ILUA covering proposed dealing area Module AC Hint: The ILUA must authorise the proposed dealing

Determination of native title over proposed dealing area Module AD Hint: Check NNTT/ QNTIME

Previous grant and vesting the PEPA Module BA Hint: applies to s23B(2), (3) & (9)-(9C) NTA s20, NT(Q)A

Reliance on the extinguishing effect of the PEPA Module BB Hint: s 47, 47A or 47B (NTA)

Extinguishment of native title by public works Module CA Hint: s 23B(7), NTA s21,NT(Q)A

ILUA Module Q. Proposed dealing does not fit with the future act provisions - proceed to an ILUA s24BA-24EC, NTA

Non-claimant applications Module R. Only use this option if there is no registered native title claim over the proposed dealing area Ss61 and 24FA, NTA

Module IC S24IC & 24IDRenewal, regrants, extensions of the term lease, licenence, permit or authorityS24JAA Public housing & certain government infrastructure on Indigenous land.

Module JAA S24JAA Public housing & certain government infrastructure on Indigenous land.

Module J S24JA Reservations and leases.

Module K S24KA Facilities for services to the public.

Module L S2LA Low impact future acts.

Module M S24MD Freehold test, acquisitions, mining.

Module N S24NA Off-shore places.

Module O s.24OAValidity

Module P S25 -44 Right to negotiate process

Extinguishment of native title through road dedication Module CB Hint: s 23B(7), NTA s21,NT(Q)A

Dealing that may proceed without further reference to native title Module AB Dealing can proceed where: • It’s an emergency action • a determination has been made that

native title does not exist • it’s covered by a QNTIME conclusion • it does not affect native title

Native Title assessment pathway

Future act provisions Hint: s24FA to 24NA may apply to the proposed dealing. If yes, please provide the relevant procedural rights (if any) to the native title parties. Hint: Start assessment at the base.

Module F S24FA protection – non-claimant application

Module GB S24GB Primary production on non-exclusive agro pastoral leases

Module GD S24GD Off-farm activities directly connected to primary production

Module GE S24GE Third party rights on non-exclusive agro pastoral leases

Module H S24HA Water, living aquatic resources, airspace

S24IA Pre-existing right-based acts and renewals etc

Conclude assessment/s by providing supporting evidence and relevant annexures

Abbreviations

ILUA Indigenous Land Use Agreement

PEPA Previous exclusive possession act

NNTT National Native Title Tribunal

QNTIME Queensland Native Title Information Environment

CS80

37_0

6/20

18