1 QUARRYING PLAN AND PROGRESSIVE CLOSURE PLAN FOR BUILDING STONE QUARRY LEASE Granted to SRI. B.N. NAVEEN KUMAR Over an area of 1.2140 Ha. in Sy.No.16 of KANTHEVADERAHALLI VILLAGE, KORATAGERE TALUK TUMAKURU DISTRICT (Government Kharab Land) Prepared by: SRI. SUBBAN H.V., and DR. P. VIRUPAKSHI RQP/BNG/284/2011/ A M.Sc., M. Phil., Ph.D., Valid up to 04.12.2021

Upload: lamdat

Post on 15-Mar-2018

219 views

Category:

Documents


3 download

TRANSCRIPT

1

QUARRYING PLAN AND

PROGRESSIVE CLOSURE PLAN FOR

BUILDING STONE QUARRY LEASE

Granted to

SRI. B.N. NAVEEN KUMAR

Over an area of 1.2140 Ha. in Sy.No.16 of

KANTHEVADERAHALLI VILLAGE, KORATAGERE TALUK

TUMAKURU DISTRICT

(Government Kharab Land)

Prepared by:

SRI. SUBBAN H.V., and DR. P. VIRUPAKSHI RQP/BNG/284/2011/ A M.Sc., M. Phil., Ph.D.,

Valid up to 04.12.2021

2

3

4

5

6

7

8

Contents

Sl. No. Particulars Page No.

Introduction 1

1.0 General 3

2.0 Location and Accessibility 4

PART-A

3.0 Geology and Exploration 7

4.0 Quarrying 10

5.0 Blasting 16

6.0 Mine Drainage 16

7.0 Stoking of Mineral rejects and Disposal of Waste 17

8.0 Use of Mineral 18

9.0 Others 18

10.0 Mineral Processing 19

Part –B

11.0 Environment Management Plan 21

9

LIST OF PLATES Plate No. Details Scale

1 KEY PLAN 1: 50,000

2 CADASTRAL PLAN 1: 7920

3 GEOLOGICAL PLAN 1: 1000

4 GEOLOGICAL CROSS SECTIONS 1Cm : 10

5 5 YEARS PRODUCTION AND DEVELOPMENT PLAN

1: 1000

6 5 YEARS DEVELOPMENT CROSS SECTION 1Cm : 10

7 CONCEPTUAL PLAN 1: 1000

8 CONCEPTUAL CROSS SECTION 1Cm : 10

9 ENVIRONMENT MANAGEMENT PLAN 1: 1000

LIST OF TABLES

Sl. No. Particulars Table No

1 Calculations of Geological Reserves 1

Calculation of Minable reserves 2

2 Calculations of Five years production 3

LIST OF ANNEXURES

Sl. No. Particulars Annexure No.

1 Notification of Department of Mines and Geology, Tumkur District No. DMG/DDT/Notification No. 11/ 2017-18 /820 dated 08.05.2017.

1

2 NOC from Thasildar, Koratagere Taluk, Tumkur District No. IND.CR/47 /2015-16 dated 01.08.2015.

2

3 NOC from Forest Department, Deputy Conservator of Forest, Tumkur Division No.A9/ Mining/ Quarry/ Details-141/ 2015-16 dated 26.08.2015.

3

4 RTC of Survey No. 16 and of Kanthevaderahalli Village, Koratagere Taluk, Tumkur District.

4

5 Address Proof 5

6 Minutes of the District Taskforce (single Window) meeting held on 28.02.2017, 07-03-2017, 14-03-2017, 23-03-2017 & 04-04-2017.

6

PHOTOGRAPHS OF THE LEASE AREA

10

PART– I MINING PLAN FOR BUILDING STONE

Granted to

SRI. B.N. NAVEENKUMAR OVER AN EXTENT OF 1.2140 Ha. IN SURVEY NO. 16 OF

KANTHEVADERAHALLI VILLAGE, KORATAGERE TALUK TUMKURU DISTRICT

Government Kharab Land INTRODUCTION:

SRI. B.N. NAVEENKUMAR, S/o. Narayana, No. 15, 6th Cross, 5th Main, K.N.

Extention, Yeshwanthpur, Bengaluru-560 022 was granted Quarry Lease/ license

for quarrying of building stone for a period of 20 years over an extent of 1.2140

Ha. (3.00 Acres) of Government Kharab Land in Survey No. 16 of

Kanthevaderahalli Village, Koratagere Taluk, Tumakuru District vide Notification

No. DMG/DDT/Notification No. 11/2017-18 /820 dated 08.05.2017. The applicant

has obtained NOC from Office of the Thasildar, Koratagere Taluk, NOC from

Forest Department, RTC, Address proof and Minutes of District Task Force are

enclosed in Annexure 1- 6. The applicant is submitting quarrying plan and seeking

approval of the same and submitting Environmental clearance from District

Environmental Impact Assessment Authority to start the extraction of building

stone.

The applicant has approached the RQP for preparation of quarry Plan for first five

years, the quarrying plan is being prepared as per KMMCR 1994 and Chapter II A,

8 (C & D) of amendment rules of 2013 and Rule of 17 of Granite Conservation &

Development Rules 1999. The applicant is intended to supply the building material

to the domestic and construction purposes to the surrounding areas of Koratagere,

Dabespet, Tumkur and Bengaluru City areas.

The area is found to have prominent exposure of Granitic Gneiss exposures suitable

for building stone material covering the lease area. Detailed study of the area has

11

been done by the RQP along with applicant to assess the quality and quantity of the

building material available in the area. The exposure of building material i.e

granitic gneiss in the area indicates the persistence of deposit to the depth. In view

of the proposed development and production of building stone, the applicant intend

to go for production of 120058 Tons per annum by carrying out medium scale of

quarrying by engaging both manual and machineries i.e. semi-mechanized open

cast method. The quarrying plan is prepared for the quarry area through systematic

mining, with an aim to ensure systematic development, production and

conservation of building stone deposit with eco-friendly quarry operations and

providing employment to the local people as per Rule 8 O and protection of

environment in accordance with 8 Q of KMMCR, 1994 and amendment Act of

2013. The applicant is submitting this quarry plan for a period of first five years

and revival of production as pre-requisite to getting approval from the Departments

to proceed with quarrying.

The quarry area is moderately sloping surface towards north with few surface

boulders on top followed by sheetrock; the area has to be worked by semi-

mechanized open cast method. The quarry plan is prepared with specific aims as

given below:

1. To minimize the environmental degradation due to quarrying.

2. Conserve and maximum utilization of reserves by minimizing the wastage.

3. Planned dumping and storage of waste.

4. Conservation and utilization of the top soil, if any in the area to be worked.

5. The quarrying operations will be conducted by semi-mechanized method

through controlled blasting to extract the rock in the quarry.

12

1.0 GENERAL:

The applicant is supplying building stone, M-sand and other building materials

to the surrounding area is having good business experience.

a. Name and address of the applicant

: SRI. B.N. NAVEENKUMAR S/o. Narayana No. 15, 6th Cross, 5th Main K.N. Extension, Yeshwanthpur Bengaluru-560 022 Ph: 8867630290

b. Status of the applicant : Individual

c. Minerals/ Which are occurring in the area and which intends to mine: Granitic Gneiss - Building stone

d. Period for which the quarry lease is proposed to be applied: The period proposed for quarry Lease of 20 Years

e. Name and address of RQP

Sri. Subban H.V RQP/BNG/284/2011/A # 58, 26th Main Behind BHEL Colony Nandini Layout Bengaluru- 560 096 Phone: +91 916137429 DR. P. VIRUPAKSHI M.sc. Ph.D. Spoorthy Services, No.273, 8th Main B.C.C Layout, Chandra Layout Vijayanagara, Bemgaluru-560040

f. Reference No. and Date of consent letter from the State Govt. :

The Deputy Director, Department of Mines & Geology, Tumakuru

District was accorded grant of Quarry Lease/ license for quarrying of

building stone for a period of 20 years over an extent of 1.2140 Ha.

(3.00 Acres) of Government Kharab Land in Survey No. 16 of

Kanthevaderahalli village, Koratagere Taluk, Tumakuru District vide

Notification No. DMG/DDT/Notification No. 11/2017-18 /820 dated

08.05.2017 (Annexure-1).

13

2.0 LOCATION AND ACCESSIBILITY:

Details of the Area (with Location Map)

Details of the Area (with location map)

a. District and State

: Tumakuru District Karnataka State

Taluk : Koratagere

Village : Kanthevaderahalli

Survey. No : 16

Lease Area (Acres) : 1.2140 Ha. ( 3.00 Acres)

b. Whether the area is recorded to be in the forest

(Please specify whether protected, reserved etc.) : No

c. Ownership occupancy : Government Kharab Land

d. Existence of public road/ railway line, if any nearby & approximate distance:

The proposed quarry area is situated about 0.65 Km. North West of

Kanthevaderahalli Village revenue village, about 0.90 Km. east of

Vajjanahalli Village, about 0.63 Km. South East of Nayakanapalya

Village, about 1.4 Km. North of Seethakallu Village and about 4.00 Km.

South west of Kolalu Village which is a Hobli Headquarter. The area is

connected by MDR road Dabespet-Doddaballapur SH via Nidavanda-

Sitakallu-Kolalu-Koratagere MDR. The area is connected by private road

to Kanthevaderahalli village to MDR road; the quarry area is located 22.00

Km South of Koratagere Town which is a taluk and district headquarter

where all the welfare amenities are available.

The nearest railway station is Nidavanda at a distance of 11.00 Km. The

nearest airport is Bangalore International Airport which is 90.00 Kms. The

quarry/ lease area can be reached through cart road to Kanthevaderahalli-

road intern connecting to –Koratagere-Dabespet- MDR road in all seasons.

The lease area is surrounded by waste lands and agricultural fields. Power

14

connections are available at Kanthevaderahalli Villages to quarry area.

Telecommunication facility is available at above said villages, Dispensary

is located at Yalekyathanahalli Village 5.30 Km. and Koratagere town is

22.00 Km from the lease area.

e. Toposheet No. with Latitude and Longitude: The quarry area falls part of Survey of India Topo Sheet No. 57 G/ 7 of 1:50, 000 Scale (Plate No.1)

GPS Readings (Datum: WGS 84)

Point No. Latitude Longitude

A N 130 20’ 34.60” E 770 17’ 04.80” B N 130 20’ 35.30” E 770 17’ 01.20” C N 130 20’ 40.10” E 770 17’ 01.38” D N 130 20’ 39.80” E 770 17’ 03.20”

15

f. Land use Pattern (Forest, Agricultural, Grazing and Barren etc.):

The quarrying area is Govt. land. It is rocky mound and underlined by sheet rock as

visible in the surface quarry workings and open pits earlier by the local people for

their day to day needs.

The present Land Use pattern of the quarry Area is as follows

Sl. No. Land use Category Present Land Use

(Ha.) 1 Quarry workings - 2 Waste dumps - 3 Roads - 4 Rock boulder storage - 5 Buffer zone/Green belt - 6 Infrastructure - 7 Untouched Area/ Reserved

for future activity 1.2140

Total 1.2140

g. Attach a general location and vicinity map showing area boundaries and

existing and proposed access routes. It is preferred that the area to be marked

on a Survey of India Topographical map or a cadastral map or forest map as

the case may be. However if none of the these area available, the area should

be shown on an accurate map of 1:5000 Scale

Location of Quarry Lease area is marked on 1:50,000 scale Survey India Topo

sheet 57 G / 7 (Plate-1) and 1’: 660” Cadastral map (Plate No. 2)

16

PART-A

3.0 GEOLOGY AND EXPLORATION:

a. Briefly describe the topography and general geology and local / mine

geology of the mineral deposit including drainage pattern:

Topography: Koratagere Taluk of Tumkuru District coming under western

slopes covered by famous Peninsular Gneiss and Granites. The topography of

the area consists of massive gneisses and ground sloping towards North and

South. The altitude of the area is 925 to 965 Meters above sea level. The

general slope of the area is towards west. Topography is both structurally and

lithologically controlled. The quarry area is moderately sloping terrain

towards North with gneissic rock exposures trending North- South direction.

The area drains towards north flows in to nala further flows north and joins

Jayamangali river.

General Geology: Stratigraphycally the Peninsular gneisses belong to older

group belongs to Dharwar Super group. The gneisses are most widespread

lithological unit in Karnataka State is poly phase granite. The gneissic rock

exposed in the form of mounds they are medium grained, banded in nature

with major feldspar and quartz bands. The gneissic exposures are massive

and exhibiting strike and sheet joints. The soil cover exists along the joints

with an average thickness of 3.0 to 4.00 meters at certain places in the lease

area.

Local Mine Geology: The area forms part of rocks formed as peninsular

gneisses and other adjoining with Granites. The lease area is moderately

sloping towards west, at the lower part covered by soil to a depth of 3.00 to

4.00 meters. The area is located at an altitude of 925 to 965 Meters MSL.

The hardness of granites is varying from 5 to 6 and is having specific gravity

of 2.6. The Geological sequence is as sown below.

17

Achaean Ramanagaram / Kolar Granites

Granites

Peninsular Gneissic complex

Granites and Gneisses

Dharwar super Group Amphibolites and hornblende Schist

b. The Topographic plan of the lease area prepared on a scale of 1:1000 or

1:2000 with contour interval of 3 to 10 meters. Depending on upon the

topography of the area should taken as the base plan for preparation of

geological plan. The details of exploration already carried out including

evidences of mineral existence should be shown on the geological plan:

The surface geological map is prepared on a scale 1:2000 and enclosed as Plate

No.3

c. Geological Section should be prepared at suitable intervals on scale of

1:1000 / 1: 2000: Based on the Geological plan and the data collected from the

quarry area, open workings the geological cross sections were drawn and

prepared. The cross section are prepared on scale 1:10 meters is enclosed as

Plate No. 4

d. Broadly indicate the year wise future program of exploration, taking into

consideration the future production program planned in next five years as

in the table below:

Years No. of Bore Holes

Total Meterage

No. of Pits Die mention (M2) Cross section x Strike influence

No. of trenches and dimensions

First - - 1 6 x 4 - Second - - 1 8 x 3 - Third - - 1 7 x 4 - Fourth - - 1 4 x 2 - Fifth - - 1 7 x 3 -

18

Present Status of the Area:

The proposed quarry area is new quarry. The quarry will be worked from

southern portion of the area shown in the quarry plan Plate No. 3. The soil

mixed with boulders present at the eastern and western portion of the lease area.

Since the area is moderately sloping surface, the thin little soil cover will be

removed which is present on the surface of the granitic rock. A part of the camp

services also established near the lease area at applicant own land. Local people

has opened the quarry towards southern side at two locations and extracted about

6200 Cubic meters in the proposed lease area.

e. Reserves-Indicate geological and recoverable reserves and grade, duly

supported by standard method of estimation and calculations along with

required sections (give split of various categories i.e proved, probable, and

possible) Indicate cut-off grade. Availability of resource should also be

indicated for the entire leasehold.

Based on the study and survey carried out and the geological plan has been

prepared along with the size and shape of reserves in the quarry location. The

reserves have been calculated for 1.2140 Ha. of the notified area by using the

standard norms.

The reserves have been estimated in three different categories 1). Proved and

2).Probable (See Table-1 and 2).

(i). Proved Reserves: The reserves have been estimated up to an average depth of

40 meters where massive sheet rock exists. The recovery percentage is 95% and the

mineral reject is 5%.

(ii). Probable Reserves: The reserves have been estimated from the sheet rock to a

depth of 10 meters below the proved formation depth and the mineral recovery and

reject is same as above.

The detail of Geological reserves for the lease area is given below.

19

Category of

reserves

Section

Mineral in Cum (ROM)

Recovery

Factor

Building stone in Cum.

Bulk density Salable

Mineral in Tons

Mineral Waste

in Cum. (@5%)

Soil Waste

in Cum.

Proved A – A’ 530880

95%

504336

2.6

1311274 26544 9480

Probable A – A’ 132720 126084 327818 6636

Total 663600 630420 1639092 33180 9480

The detail of Mineable reserves for the lease area is given below.

Category of

reserves

Section

Mineral in Cum (ROM)

Recovery

Factor

Building stone in Cum.

Bulk density Salable

Mineral in Tons

Mineral Waste

in Cum. (@5%)

Soil Waste

in Cum.

Proved A – A’ 521304

95%

495239

2.6

1287621 26065 9309

Probable A – A’ 114660 108927 283210 5733

Total 635964 604166 1570831 31798 9309

f. Indicate Mineable reserves by slice plan / level plan method, as applicable as

per the proposed mining parameters: No slice plan / Level plan is required as

per the proposed mining parameters and quarrying / mining is medium scale

semi mechanized to mechanized open cast method.

4.0 QUARRYING /MINING METHOD:

a. Briefly describe the existing / proposed method for developing / working

the deposit with all design parameters:

The Granitic Gneisses are in the form of massive sheets with sheet joints in nature.

The quarrying in the lease area is semi-mechanized open cast method. The

technical parameters like surface topography, quality variations, and geotechnical

aspects are considered for production and extraction of building material in the

area. It is proposed to work the deposit by adopting benches formation with

20

ultimate pit slope of 600. Wagon drilling is required for mild blasting to break the

hard sheet rock. The bench height and the width will be maintained as specified by

D.G.M.S. The width of the working benches shall not be less than the height. Year

wise production and development plan indicate the areas of workings site, disposal

of waste, site for afforestration are shown in the Plate No. 5. The plan also showing

position of the working pit proposed for extension etc. due care has to be taken to

maintain and advancing the benches for production. The ground water problem

does not arise the existing and proposed levels is much above ground water table.

b. Indicate quantum of development and tonnage and grade of production pit

wise as in table below:

The present the quarrying activity will be confined to 0.8640 Ha. out of the

total area of 1.2140 Ha. The remaining area is used for safety zone and future

mining activity. The development and production program for five years is

shown in the (Plate 6). The proposed year-wise working area is demarcated in

the map. As a result of systematic development program in the area the

anticipated production is 600292 tons of saleable quantity for the five years as

shown in Table 2 and Plate No. 6.

Category Mineral ROM

(in Cum.)

Saleable Mineral in Tons

Mineral Waste (in Cum.)

Soil Waste (in Cum.)

1st Year 48006 118575 2400 686

2nd Year 48127 118874 2406 760

3rd Year 48416 119588 2421 854

4th Year 48720 120338 2436 1044

5th Year 49764 122917 2488 1287

Total 243033 600292 12152 4631

c. Attach – Individual year wise plans and section (in case of A class mines)

A geological cross section of the area(Plate 4) and the section for year wise for

5 years production and development plan is enclosed in Plate No. 5, 6 and

conceptual plan and cross section is enclosed in Plate 7 and 8.

21

d. Attach supporting composite plan and section showing pit layouts, dumps,

stacks of subgrade mineral, if any etc. : Year wise production and

development plan / land use and afforestration plan is prepared on 1:1000 scale

and pit layout, position of dumps stacking of mineral, site services, ultimate pit

limit etc. are shown in Environmental Management plan Plate No. 9.

e. Indicate proposed rate of production when the mine is fully developed, and

the expected life of the mine and the year from which effected:

(i). Proposed rate of production when the mine is fully developed: It is proposed

to produce an average 120058 tons / annum when the quarry is fully developed

(ii). Mineable reserves: Though the reserves are quite attractive, the mineable

reserves will be reduced due to formation of benches towards boundary line, this

can be solved by having suitable arrangements with adjacent land owner for full

exploitation of the reserves, meanwhile the reserves have been blocked in 7.5

meters safety barrier below the ground level.

Total Mineable reserves:

Total Geological Reserves - Mineable reserves= Non Mineable Reserves

(in Cum).

663600 – 635964 = 27636 Cum.

(iii) Anticipated life of the Mine: the quantities of mineable reserves estimated are

total reserves minus non mineable reserves and already extracted, considered as

(economical) marketable reserves. The mineable reserves of 1570831 Tons are

available in the lease area. The average annual production is 120058 Tons and thus

the life of the mine is 13 years.

f. Attach a note furnishing a conceptual mining plan for the entire lease

period (for “B” category mines) and up to the life of the (for “A”

category mines) based on the geological, mining and environmental

considerations: The Granitic gneiss as building stone deposit in the quarry

area is envisaged to be worked by forming mining benches of 6 meters height

22

from the ground level and the width shall me more than the height of the

benches with a general pit slope of 60o. The ultimate pit limit is marked as

shown on the quarry Closure Plan (Plate- 9). However, when the granitic

gneiss deposit is proved to full depth, the closure plan will be modified. The

quarrying is proposed to be taken with the full capacity of development and

production of on an average of about 120058 Tons per annum, during the

proposed closure plan period. Any modifications in the in the quantity of

production will be intimated to Department of Mines and Geology. The

mined out pits after extraction of the building material, will be reclaimed by

suitable reclamation and afforestration techniques and also by back filling the

pits by the overburden. The design and layout of the quarry benches is shown

on the above referred plan. During the closure plan period, the anticipated

production for the next 5 years period shall be 600292 Tons.

g. Open Cast Mines:

(i). Describe briefly giving salient features of the mode of working

(mechanized, semi-mechanized, manual): The extraction of building

material proposed to be worked by semi-mechanized method of working. In

view of the prepared quarry plan production of building stone material, it is

planned to operate by deploying machineries for development and

production, the separation of building stone material based on physical

parameters manually with conventional tools like crowbars, hammers,

pickaxe etc. and mechanically using drilling equipment’s, tippers will be

used for quarrying work. The parameters will thus the bench height of about

3 m and width is more than height of bench and jackhammer drilling carried

with dust proof drilling machineries. As proposed above, the development of

latest mechanization plays a very important role in the development quarry

and production program. The quarrying operation in notified area planned to

be of open cast and semi-mechanized. The recovery of building stone is

23

generally high i.e. more than 95%. It requires machinery for increased

production.

(ii) Describe briefly the layout of the mine workings, the layout of the

faces and sites for disposal of overburden/ waste: A reference to the plan

enclosed under 4 (b) and 4 (d) will suffice: During the plan period the

development and production will be carried out as shown in the 5 years

production and development plan Plate 5. The quarrying is done manually

and semi-mechanized (open cast method). During the development and

production program for the plan period it is proposed to produce 2306189

tons of saleable quantity.

Years Pit Nos.

Overburden

ROM in Cum

Saleable quantity in Tons (ROM x (bulk density 2.6) RF 95%

Mineral Reject(@5%)++Soil in Tons

Over burden/ waste ratio

1st - - 48006 118575 7338 1: 0.06188

2nd - - 48127 118874 7472 1: 0.06286 3rd - - 48416 119588 7661 1: 0.06406 4th - - 48720 120338 8004 1: 0.06651 5th - - 49764 122917 8529 1: 0.06938

Total 243033 600292 39004 1 : 0.06494

h. Underground mines: Not Applicable

(i) Extent of Mechanization

Describe briefly including the calculations for adequacy and type

of machinery and equipment proposed to be used in different

mining operations:

1. The quarrying will be worked with semi-mechanized method by

deploying following machinery and manpower.

Sl. No. Name of the Machinery Nos.

1 Excavator 210 Capacity 1 No.

2 Air Compressor (Atlas Cop) 1 No.

3 Tractor mounted compressor 1No.

24

4 Jack Hammer 2 Nos.

5 Tippers 2 No.

The transportation will be made by own / hired trucks to the dispatching points.

2. Drilling Machine: Drilling will be done by compressor operated jack-

hammer drills.

3. Loading Equipment: Loading of the building stone material will be

done mechanically by tippers of 10 ton capacity and transported from

the quarry to the required site. The rejected material will be dumped

separately. All other safety measures were observed as per D.G.M.S.

specifications.

4. Haluage and Transport: Hauling and transportation will be done by

using excavators, cranes, tippers etc. The waste and the other

overburden will be transported to the waste dumping yard by using

trucks / tippers.

i. Transport from the mine head to the destination:

Describe briefly the transport system (Please specify). The material

extracted will be transported by trucks to the crushing point and also needs of

the local people. The mode of transport will be road. The transportation is by

tippers/ trucks depending on the requirement.

5.0 BLASTING: A mild blasting will be done for the purpose of removing

weathered rock and over burden for this purpose whenever it is required the

services of the licensed blasting agencies will be engaged.

a. Broadly blasting parameters like charge per hole, blasting pattern

charge per delay, maximum number of holes blasted in a round manner

and sequence of firing, etc: Since the quarrying is going to be operate

manually, jackhammer drilling will be used for the holes will be fired with

ordinary detonators and safety fuse.

25

The parameters for blasting:

Diameter of the hole : 32 mm

Depth : 1.5 m

Spacing : 0.9 m

Burden : 0.6 m

Charge per hole : 3 cartridge of 104 gm each

= 0.42 Kg.

Yield of the explosive : Spacing x Burden x depth Explosive in Kg Charge : 0.9 x 0.6 x 1.5 x 2.6

0.42

: 5 Tons of ROM

Storage of explosives: Authorized explosive dealers as per the requirement

will supply the explosive material as and when required.

6.0 MINE DRAINAGE:

The area receives an average rainfall of 715 mm. There are no water canals in the

area. The quarry area receives only less rainfall with moderate slope towards south.

The collection of water even during the rainy season is negligible and remains dry

in the rest of the year. The hydrogeological investigation of the bore well drilled in

the nearby vicinity indicated that the ground water strikes at depth of 50 meters

which is 875 meters MSL. The ultimate pit level is 940 meters including soil cover

and the ground level expected to be above 940 M MSL which is above water table.

No water is likely to be encountered during the course of quarrying.

7.0 STACKING OF MINERAL REJECTS AND DISPOSAL OF WASTE:

a). Indicate briefly the nature & quantity of top soil, overburden / waste and

mineral rejects likely to be generated during the next five years: The

26

average generation is during the proposed quarrying will be shown in the

below.

Year Top Soil

(in Cum)

Over Burden /

Waste

Mineral Reject

(In Cum.)

1st 686 - 2400

2nd 760 - 2406

3rd 854 - 2421

4th 1044 - 2436

5th 1287 - 2488

Total 4631 - 12152

b).Land chosen for disposal of waste with proposed Justification: The place

selected for dumping of top soil, overburden and waste material will be dumped

away from the working area. The site selected for disposal by following the rules

18 (3) of GC & DR 1999. The area selected is as shown in 5 years production

and development plan Plate 5.

c). Attach Note indicating the manner of disposal and configuration sequence

of buildup of dumps along with the proposals for the stacking of sub grade

ore, to be indicated item wise: The area selected for dump is a near/ along the

buffer area, when the step wise dumping will be carried out for a maximum

height of 12 m with 280 dump slope. Proper terracing will be done along dump

slopes to provide better slope stability. The mineral reject likely to be generated

is about 12152 Cum. is being used as replacement of sand. The location of waste

dump yard, mineral stock yard, afforestration etc. are shown in the Environment

Management plan Plate 9.

8.0 USE OF MINERAL:

a).Describe briefly the end use of mineral (Sale to intermediatery parties,

captive consumption, export, industrial use: The granite produced from the

27

quarry will be used for building stone, road metal, different grades of jelly for road

and construction purposes. Major produce will be utilized for ready mix concrete

industry.

b). Indicate physical and chemical specifications stipulated by buyers: The raw

material as well as finished granite different sizes demanded by the buyers as per

their requirement.

c). Give details incase blending of different grades of ores is being practiced or

is to be practiced at the mine to meet specifications stipulated by users: Not

Applicable.

9.0 OTHERS

Describe briefly the following:

a. Site Services: The following services are located in a separate area

demarcated.

1. Quarry Office room/First Aid room

2. Canteen

3. Drinking water

4. Rest Shelter

5. Toilets

All other required site services are proposed and fulfilled during the first five Year

plan period.

Employment potential: Manpower chart of the building stone Quarry:

Sl. No. Description No. of Posts

1 Manager/Supervisor 1

2 Operator 2

28

3 Tipper Drivers 2

4 Drillers 2

5 Skilled Labors 2

6 Clerk-cum Typist 1

7 Security 1

Total 11

10.0 MINERAL PROCESSING:

a. If the processing / beneficiation of the ore or minerals mined is planned to

be conducted on site or adjacent to the extraction area, briefly describe the

nature of the processing / beneficiation. This should indicate size and grade

of feed material and concentrate (finished marketable predicted), recovery

rate.

b. Explain the disposal method for tailings or waste from the processing plant

(quantity and quality of tailings proposed to be discharged, size and

capacity of tailing pond, toxic effects of such tailings, if any with proves

adopted to neutralize any such effect before their disposal and dealing of

excess water from the tailing dam)

c. A flow sheet or schematic diagram of the processing procedure should be

attached.

d. Specify quantity and type of chemicals to be used in the processing plant.

e. Specify quantity and type of chemicals to be stored on site / plant.

f. Indicate quantity (Cum./ per day ) of water required for mining and

processing and sources of supply of water. Disposal of water and extent of

recycling.

29

As there is no beneficiation or processing plant is required for this

quarrying, hence the above said item in the Sl. No. 10 are not

applicable.

30

PART-B

11.0 ENVIRONMENTAL MANAGEMENT PLAN

a. Base line Information:

i. Existing land use pattern indicating the area already degraded due to

quarrying, pitting/ mining, dumping, road, processing plant, workshops,

township etc, in tabular form.

The details of area utilization proposed for the next five years as follows:

Sl. No. Purpose Extent In Ha.

(in Guntas) 1 Area under mining 0.8640 (86.00) 2 For Waste Dump Yard

(WDY) 0.0300 (3.00)

3 Mineral Stock yard 0.0200 (2.00) 4 Infrastructure 0.0100 (1.00) 5 Roads 0.0200 (2.00) 6 Green Belt 0.2700 (27.00) 7 Tailing ponds - 8 Railways - 9 Mineral Separation plant - 10 Untouched Area - Total 1.2140(120.00)

ii. Water regime: There are no perennial water sources in around the applied

area within 500 meters radius. Since the lease area is moderate to steeply

sloping, the rain water drains through the surface area and joins to seasonal

water course outside the lease area.

iii. Flora and fauna: There are bushy thorny plants in the surrounding area. This

area is surrounded by villages and quarries hence there are no chances of wild

animals in the area. Only few species of thorny bushes, shrubs and few trees

are grown in the area. Pigeons, sparrows, Crows and Minas found in the area,

31

rarely deer’s, rabbits fox etc. are seen which are highly mobile. Apart from

this no other faunal habitat is observed in the area.

iv. Quality of Ambient Air, Noise level and Water: The quality of air and

water has not been studied in the area or around the area. Presently there are

no quarries surrounding this area under quarrying operations and there are no

other industries. As there are no other activities, generation of dust /noise at

present is within the limits prescribed by CPCB.

v. Climatic conditions: The area has a tropical climate. The peak summer will

be in the month of April and May, highest temperature will be about 390 C

will be during this season and the lowest temperature was recorded of about

140 C during the months of November and December. During previous years

the rainfall in this area was recorded about 715 mm.

iv. Human Settlements: The proposed quarry area is situated about 0.65 Km.

North West of Kanthevaderahalli Village revenue village, about 0.90 Km.

east of Vajjanahalli Village, about 0.63 Km. South East of Nayakanapalya

Village, about 1.4 Km. North of Seethakallu Village and about 4.00 Km.

South west of Kolalu Village which is a Hobli Headquarter. The area is

connected by MDR road Dabespet-Doddaballapur SH via Nidavanda-

Sitakallu-Kolalu-Koratagere MDR. The area is connected by private road to

Kanthevaderahalli village to MDR road; the quarry area is located 22.00 Km

South of Koratagere Town which is a taluk and district headquarter where all

the welfare amenities are available.

vii. Public Buildings, places of Worship and Monument: There are no public

Buildings, places of Monuments within or nearby the area.

32

viii. Does area (partly or fully) fall under notified area under water

(prevention and control of pollution) Act. 1974: Yes the applied area falls

under Water Act 1974. The applicant will take up necessary precautions for

control of pollution of water sources.

(b). ATTACH AN ENVIRONMENTAL IMPACT ASSESSMENT

STATEMENT DESCRIBING THE IMPACT OF MINING AND

BENEFICATION ON ENVIRONMENT ON THE FOLLOWING OVEER

THE NEXT 5 YEARS.

i. Land area indicating the area likely to be degraded due to quarrying /

pitting, dumping, roads, workshops, townships etc.,

Sl. No Purpose Extent in Ha.

1 1st 5 years surface area 0.8640

2 For waste dump yard 0.0300

3 Mineral Stock Yard 0.0200

4 Infrastructure 0.0100

5 Roads 0.0200

6 Green belt 0.2700

7 Untouched Area -

Total 1.2140

ii. Air Quality: The mining operations will be by the manual method. The

workforce will expose to the air is due to dust which gets air borne due to

vehicular movements and dumping only.

iii. Water Quality: During rainy season silt is likely to get mixed with rain

water and flow to the seasonal nala flowing through the area. There are no

toxic elements discharges into the drains from the mining operations.

33

iv. Noise level: The area is more than 150 M. from the village roads where the

traffic is very low. The mining digging and traffic are the causes of

increasing noise level.

v. Water regime: As the area is a raising ground, there is no danger envisaged

to water regime by this quarry area.

vi. Socio Economics: The main occupation of the surrounding people is

agriculture and allied activities, the mining activity in this belt will benefit

to the local people both directly and indirectly. The direct beneficiaries will

be those who get employed in the quarry as skilled and un-skilled workers.

The indirect beneficiaries will be those who open small business to sell

goods required by the residents whose “per capita” income will be enhance

by the mining activity, and thereby their purchasing power. In the long run a

lot of social goods is expected in the comparatively backward area when the

inhabitant will be sent their children to school.

vii. Historical Monuments: There are no historical monuments in or around

the area and hence there will be no impact due to mining. Because of small

scale mining there will be no effect.

C. ATTACH AN ENVIRONMENT MANAGEMENT PLAN (SUPPORTED

BY APPROPRIATE PLANS AND SECTIONS) DEFINING THE TIME

BOUND ACTION PROPOSED TO BE TAKEN WITH SEQUENCE AND

TIMING IN THE FOLLOWING AREAS (OR DIAGRAMS SHOULD BE

USED)

i. Temporary storage and utilization of top soil: The soil generated is mixed

with pebbles etc. can be used for road maintenance. The soil useful for

agriculture, afforestration, trenches, whenever excavated will be stored

separately in the yard identified within the lease hold to height of maximum

of 0.06 M to keep their microbial activities safe.

34

ii. Year wise proposal for reclamation of land affected by mining activities

during the 1st to 5 years: No reclamation is proposed in this plan period

because the mining will be continued further depths from present pit bottom.

iii. Program of afforestration. Year wise for the initial five years: It is

proposed to develop a green belt in proportion of the non-mineralized area

and 7.5 m. buffer zone of the lease boundary. In addition, the place around

the haul road and backfilling area shall have plantation at the conceptual

period. Every year it is proposed to carry out afforestration over 0.054Ha.

by planting 500 saplings per annum around the quarry area. The species

chosen for green belt are fast growing good canopy and dense leaf density,

eco-friendly commercial/ species and some ornamental plants to give good

aesthetic.

The Total area of survey No. 16 is Government Kharab Land over an extent of 79

Acres part of which has been sanctioned to quarrying and poor households by the

Revenue Department. The remaining area is having thin soil cover with rock out

crops. The Plantation will be taken up in the vacant waste land followed by

trenching and earthen bunding.

For the plantation the saplings were procured from Karnataka Forest Department

Nursery, Koratagere and plantation will be carried out every year.

The Activities to be carried out under CSR Activities are as follows.

· Plantation in the School and Gram Panchayath Premises at nearby villages.

· Road side plantation along the approach road to the quarry and maintenance.

· Group insurance to workers and staff.

· Health insurance long term employers working in quarry and crusher.

· Medical check of work force once in 3 months and keeping the records.

The Budget for next five i.e. for plan period is shown in the Table below.

iv. Stabilization and Vegetation of dumps: There is no generation of

overburden / waste in the proposal plan period. Hence, there is no need of

stabilization of the dumps.

35

v. Measures to control erosion/ sedimentation of water courses: There is no

surface erosion in the subject area because the surface area is exposed by the

granite.

vi. Treatment and disposal of water from mine: Since there are no mine

waters or ground waters, the proposal of pumping out or any sort of treatment

and disposal of water from the quarry does not arise.

vii. Measures for minimizing adverse effects on water regime: No adverse

effects are anticipated on water regime.

viii. Protective measures from ground vibrations / air blast caused by

blasting: There will be drilling and blasting is proposed in this area.

ix. Measures for protecting historical monuments and rehabilitation of

human settlements: There are no historical monuments are located close by

and hence need for protection does not arise.

x. Socioeconomic benefits arising out of mining: Few labors will get

employment and the state Government and Village Panchayath will get

royalty due to mining activity.

FISCAL ESTIMATE:

The details of investment for procuring the equipment for successful environmental

parameters and implementation of control measures are presented in the below

table.

Environmental protection Investment Cost

Environmental recurring

Sl. No.

Activity Recurring cost in Rs.

Non Recurring cost

in Rs. 1 Afforestation works 3,00,000.00 2 Environmental Monitoring

i. Air quality : 20,000.00 ii. Water Quality : 20,000.00 iii. Noise quality : 10,000.00

50,000.00

3 Dust control and suppression 50,000.00 4 Fencing etc. 2,00,000.00

36

5 CSR Activities 2,00,000.00 6 Donation for Public causes 50,000.00 5 Others 50,000.00 Sub Total Estimate 4,00,000.00 5,00,000.00 Grand Total 9,00,000.00

37

PROGRESSIVE MINE CLOSURE PLAN

1.0 INTRODUCTION:

a. Name of the Applicant : SRI. B.N. NAVEENKUMAR

b. Extent of the lease : 1.2140 Ha. (3.00 Acres )

c. Type of Lease area : Government Kharab Land

d. Present Land use pattern : Details are presented below

Type of Land Used Area put on use at the start of the plan

At the end of plan period of 5th Year in Ha.

(in Guntas) Area under mining - 0.8640 (86.00) Waste Dump Yard - 0.0300 (3.00) Mineral Stock Yard - 0.0200 (2.00) Infrastructure - 0.0100 (1.00) Roads - 0.0200 (2.00) Railways - - Green Belt - 0.2700 (27.00) Tailing Pond - - Effluent Treatment Plant - - Mineral Separation Plant - - Untouched area 1.2140 (400.00) - Total 1.2140 (400.00) 1.2140 (120.00)

e. Details of the area with location map :

Survey No : 16

Village : Kanthevaderahalli

Taluk : Koratagere

District : Tumakuru

State : Karnataka

f. Method of Mining : Open cast manual method

g. Mineral processing : The area which is applied for building stone

38

and the granite material will be extracted in the shape of regular /irregular small boulders for the required size.

1.1 Reasons for closure: The area is under progress of quarrying and hence

regarding closure of mine is not applicable in the present context. However

the mine may be closed due to exhaust of mineral, decretive from the

statutory organization or court.

1.2 Statutory Obligations: The Progressive quarry plan is prepared as per the

directives of draft guidelines of Minor Mineral Conservation and

Development Rules 2010 as a component of the quarrying plan. The lease

will abide by the terms and conditions imposed in the lease deed, comply

with the statutory directions of the State Department of Mines and Geology,

DGMS, MOEF and Forest Department and other State / Central Govt.

agencies from time to time for small scale mining operations.

1.3 Closure plan preparation:

a. Name and Address of Applicant : Sri. B.N. NAVEENKUMAR

S/o. Narayana, No. 15, 6th cross, 5th Main K.N. Extention Bengaluru-560 022 Ph: 8867630290

b. Name of the recognized : Sri. Subban H.V. &

Dr. P. Virupakshi

Qualified Person

a. Name of the executing Agency : Sri. B.N. Naveenkumar

39

2.0 MINE DESCRIPTION

Please refer Para 4 a Page no. 10

3.0 RESERVES: Please refer para No. 3 e (i) (ii) (iii) page No. 9 to 10

3.1 Mining Method: Please refer para No. 4 (b) page No. 12 to 14.

3.2 Mineral beneficiation: There is no mineral beneficiation. Man power will be

used for producing material. The question of tailing from the tailing ponds

does not arise. Only the material removed from the quarry will be transported

from the quarry to the respective stock yard, destination.

3.3 Review of Implementation of Mining Plan/ Scheme including five years

progressive closure Plan up to the final closure of the mine: The various

proposals made in the approved mining plan for the 5 years period has been

carried out to avoid environmental problems in the area.

3.4 Abstract of the proposals for Protecting of Environment:

Temporary storage and Utilization of Top soil: The soil generated is mixed

with pebbles etc., can be used for road maintenance. The soil useful for

agriculture, afforestration and trenches, whenever excavated will be stored

separately in the yard identified within the leasehold to a height of Maximum

0.5 M to keep their microbial activities safe.

3.5 Quarrying and allied activities: As per the proposed production and

development plan for plan period area for quarrying 0.8640 Ha, Mineral

storage area is 0.02 Ha. The Green belt around the lease area is about 0.2700

Ha.

3.6 Year wise proposal for Reclamation: Since Granite deposits are likely to

continue, concurrent reclamation is not feasible and after working pits are

40

exhausted, than concurrent backfilling will be proposed. The mined out areas

as shown in the relevant year wise production and development plans will be

not matured enough for reclamation. Hence, the backfilling on worked out pits

for reclamation program is not envisaged presently. Suitable afforestration

technique will be adopted for reclamation after winning of the mineral. Proper

fencing will be provided all round in order to prevent accidental falling of

animals and human trespassing in to the working areas.

3.7 Afforestration program: It is proposed to develop a green belt in portion of

the non-mineralized area and 7.5 M buffer zone of the lease boundary. In

addition, the place around haul road and backfilling area shall have plantation

at the conceptual period. Every year it is proposed to carryout afforestration

over 0.054 Ha. For planting 500 saplings per annum. The species chosen from

green belt are fast growing with good canopy and dense leaf density, eco-

friendly commercial species and some ornamental plants to give good

aesthetic look are shown on Environment Management Plan Plate No.9.

3.8 Stabilization of dumps: There is no generation of overburden / waste in the

proposal plan period. Hence, no need of stabilization of the dumps.

Measures to control erosion / sedimentation of water courses: There is no

surface erosion in the lease area because; the surface area is exposed by the

granite.

Treatment and disposal of water from mine: Since there is no mine water or

ground water, the proposal of pumping out or any sort of treatment and

disposal of water from the quarry does not arise.

Measures for minimizing adverse effects on water regime: No adverse effects

are anticipated on water regime.

41

Measures for protecting historical monuments and for rehabilitation of the

habitat: There are no historical monuments are located close by and hence

need of protection does not arise.

4.0 CLOSURE PLAN:

4.1 Mined – Out Land:

Reclamation of the area will not be considered during the planned period of 5

years program. In view of the above, reclamation proposed concurrent to

mining and at the end of 5 years without complete extraction of ore available

in the area becomes violation of MCDR. As such the program of reclamation

of mine is not envisaged at this stage.

After complete extraction of estimated reserves the reclamation of area of land

affected by mining activities will be taken up in order to restore to its original

use to the possible extent. The reclamation measures proposed will be back

filling in phased program wherever it is necessary. The deep pits after

completion of mining which could be serving as water ponds will not be

considered for backfilling and will be left as it is after taking necessary

landscaping and providing protective measures in the aspects of safety by

consuming retention wall all along the lease boundary.

The details of the proposed land use are given below:

Type of Land used Extent in Ha. Existing Quarry area 0.8640 Waste dump yard 0.0300 Mineral Stock yard 0.0200 Infrastructure 0.0100 Road 0.0200 Green belt 0.2700 Untouched area - Total 1.2140

42

4.2 Water Quality Management: Water quality is good because there is no

source of pollution due to extraction of building stone material.

4.3 Air Quality Management: Dust generated by this quarry activity is quite

less. The major source of air pollution is due to Wagon Drill drilling activity

and loading of overburden / waste. The management of air quality shall be

by suppression of dust by water sprinkling on haulage roads and wet drilling

methods. Also in the vicinity of the area no major industries are seen and

the deposit is worked on very small scale.

4.4 Noise Level and vibration: No deep drilling and blasting activity involved in

quarrying operations. Only small diameter Wagon drilling is proposed for

wire saw cutting. Protective ear muffs, nose masks and hand glows, safety

shoes etc. are provided to reduce the effect of sound / noise and vibrations

for the drill operations.

4.5 Waste Management: The generation of waste material is very less from the

quarry and the same is utilized for afforestration / backfilling.

4.6 Top Soil Management: The soil likely to be generated will be pebbly soil.

This will be heaped in a maximum height of 0.6 M and used in

afforestration trenches. Grass will be planted to arrest erosion due to wind

action.

4.7 Infrastructure: The applicant will construct temporary structure required to

be maintained under statutory obligations which can be removed once the

work is completed. The approach road to the mine will be made and will be

maintained to meet the requirements of transportation. These are required

for utilization till the end of lease period.

4.8 Disposal of quarrying machinery: There is no proposal of disposal of

mining machineries during the present plan period.

43

5.0 SAFETY AND SECURITY:

The applicant will follow prevailing Mines Act., Karnataka Mines Minerals

Concession Rules & Regulations etc., as well as other directions given to him

time to time by the Directorate General of Mines safety. The applicant will

securely fence the excavated area by barbed wire of 1.5 M height to prevent the

free access and unauthorized people to the quarrying area. The applicant will

appoint security persons to ensure to prevent unauthorized entry on weekly off

days and during the time of discontinuation of quarrying operation.

6.0 DISASTER MANAGEMENT AND RISK ASSESSMENT:

All the safety measures during the quarrying will be taken as per the norms of

DGM’s. Safety of the men and machine are most important during this

quarrying activity. No danger to public life and property arises as only trucks

ply from quarry site through public road. There are no water impoundments at

higher levels or at lower contours.

7.0 CARE AND MAINTENANCE DUE TO TEMPORARY

DISCONTINUANCE:

The requisite care and maintenance procedures shall be followed during

temporary discontinuance of the quarry. The notice of temporary

discontinuance in prescribe forms shall be submitted to the appropriate

authorities concerned in this regard with details of protection measures being

taken up. Security of the working areas fencing and suitable display boards

shall be put up during the temporary period of discontinuance.

8.0 ECONOMIC REPERCUSSIONS OF CLOSURE OF MINE

AND MAN POWER RETRECHMENTS:

8.1 Number of local residents employed in the mine, status of the

continuation family occupation and scope of joining the occupation

back: The locals employed are about 50%. Those who are directly

44

employed, they are basically from agriculture back ground, they will be put

back to their original occupation. Necessary counseling will be taken care.

8.2 Compensation given to be given to the employee connecting with

sustenance of him and their family members: Compensation as provided

in the statue will be given, at the time of final mine / quarry closure to the

eligible persons.

8.3 Satellite occupations connected to the quarrying industry-number of

persons engaged therein-continuation of such business after quarry

closes: Most of the satellite occupations are not fully depending up on the

quarrying activity or closure of mines and the quarrying operations is small

scale. So the occupations like workshops hotel and tea shops will not affect

continuance their business.

8.4 Continued engagement of employees in the rehabilitated status of

mining lease area and any other remnant activities: Security and

essential service to the people will continue to be employed for purely

shorter term / temporary basis, where operations are discontinued for longer

period, it is not continue with employment and so there will be reduced to

minimum, counseling will be extended for their rehabilitation.

8.5 Envisaged repercussions on the expectation of the society around due to

closure of the mine / quarry: There will be effect on their economy,

communication, transportation to some extent, but still these difficulties will

be manageable to large extent. The details will be given in the final mine /

quarry closure plan.

9.0 ABANDONMENT / REHABILITATION COST AND COST

ESTIMATION:

The cost based estimation on the activities required for implementing the

protective and rehabilitation measures including their maintenance and

monitoring program.

45

10.0 TIME SCHEDULE FOR ABANDONMENT:

The present plan prepared is a progressive quarry / Mine Closure Plan

indicating the reclamation and rehabilitation measures being taken up

simultaneously with the quarrying operations. No abandonment of quarrying

activities is envisaged. The man power and other resources for implementing

the protective and rehabilitation measures will be dealt in detail in the quarry

closure plan to be prepared for approval before abandonment of the quarry.

The details of afforestration inside and outside the quarrying lease area,

reclamation and rehabilitation, environmental monitoring details, machinery

performance and socioeconomic impact of quarrying shall be regularly

monitored and furnished to DMG records of the same shall also be maintained.

46

47

48

49

50

51

52

53

54

55

56

57

58

1

2

3

4

5

6

7

Budget Estimate for Afforestation and CSR Activities Plan Period – Sri. B.N. Naveenkumar. Activity Total

Budget Year – 1 Year-2 Year-3 Year-4 Year-5

1. Afforestation - in Survey No. 16

3,00,000

10,000

10,000

10,000

10,000

10,000

- Road side plantation 30,000 30,000 30,000 30,000 30,000 - Greenery

Development at Public places

20,000 20,000 20,000 20,000 20,000

2. CSR Activities - Group Insurance

(for employees) 75,000 15,000 15,000 15,000 15,00 15, 000

- Health Insurance (for employees including Families)

75,000 15,000 15,000 15,000 15,00 15, 000

- Medical Check-up for employees

50,000 10,000 10,000 10,000 10,000 10,000

- Donation for Public causes

50,000 10,000 10,000 10,000 10,000 10,000

3. Environmental Monitoring (Air, water and Noise Quality)

50,000 10,000 10,000 10,000 10,000 10,000

4. Dust Control & Suppression

50,000 10,000 10,000 10,000 10,000 10,000

5. Fencing 2,00,000 40,000 40,000 40,000 40,000 40,000

6. Miscellaneous 50,000 10,000 10,000 10,000 10,000 10,000 Grand Total 9,00,000 1,80,000 1,80,000 1,80,000 1,80,000 1,80,000

0

1

Photographs of the Lease Area

Surface Area and Granitic Gneiss exposed at Survey No. 16 (View 1)

Surface Area and Granitic Gneiss exposed at Survey No. 16 (View 2)

Gneissic Rock Exposure in Survey No. 16