NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition Part RA Administrative Requirements (Part 3 – Section 1) Part RB Inservice Inspection of Pressure-Retaining Items (Part 2 Inspection) Part RC Repairs and Alterations of Pressure-Retaining Items (Part 3 Repairs and Alterations) Part RD Repair/Alteration Methods (Part 3 Repairs and Alterations) Part RE Repairs of Pressure Relief Valves (Part 3 Repairs and Alterations – Supplement 7) Mandatory Appendices Appendix 1 Preparation of Technical Inquiries to the National Board Inspection Code Committee (Parts 1, 2, & 3 – Section 8) Appendix 2 Stamping and Nameplate Information (Part 2 & 3– Section 5) Appendix 3 Steam Locomotive Firetube Boiler Inspection, Repair, and Storage (Parts 1 & 2 – Supplement 1) Appendix 4 Glossary of Terms (Parts 1, 2, & 3 – Section 9) Appendix 5 National Board Forms Part 1 – 2.10.6, Part 2 – 5.5, Part 3 – 5.13) Appendix 6 Examples of Repairs and Alterations (Part 3 – 3.3.3) Appendix 7 Procedures to Extend the “VR” Certificate of Authorization Stamp to ASME “NV” Stamped Pressure Relief Devices (Part 3 – Supplement 9) Appendix 8 Inspection, Repair, and Alteration of Graphite Pressure Equipment (Part 2 & 3 – Supplement 3) Appendix 9 Repair, Alteration, and Inspection of Fiber-Reinforced Thermosetting Plastic Pressure Equipment (Part 2 & 3 – Supplement 4) Appendix 10 NBIC Policy on “Metrication” (Part 1, 2, & 3 Section 7)

Upload: jprokop-1

Post on 21-Nov-2015

113 views

Category:

Documents


11 download

TRANSCRIPT

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    Part RA Administrative Requirements (Part 3 Section 1) Part RB Inservice Inspection of Pressure-Retaining Items (Part 2 Inspection) Part RC Repairs and Alterations of Pressure-Retaining Items (Part 3 Repairs and Alterations) Part RD Repair/Alteration Methods (Part 3 Repairs and Alterations) Part RE Repairs of Pressure Relief Valves (Part 3 Repairs and Alterations Supplement 7) Mandatory Appendices Appendix 1 Preparation of Technical Inquiries to the National Board Inspection Code Committee (Parts 1, 2, & 3 Section 8) Appendix 2 Stamping and Nameplate Information (Part 2 & 3 Section 5) Appendix 3 Steam Locomotive Firetube Boiler Inspection, Repair, and Storage (Parts 1 & 2 Supplement 1) Appendix 4 Glossary of Terms (Parts 1, 2, & 3 Section 9) Appendix 5 National Board Forms Part 1 2.10.6, Part 2 5.5, Part 3 5.13) Appendix 6 Examples of Repairs and Alterations (Part 3 3.3.3) Appendix 7 Procedures to Extend the VR Certificate of Authorization Stamp to ASME NV Stamped Pressure Relief Devices (Part 3 Supplement 9) Appendix 8 Inspection, Repair, and Alteration of Graphite Pressure Equipment (Part 2 & 3 Supplement 3) Appendix 9 Repair, Alteration, and Inspection of Fiber-Reinforced Thermosetting Plastic Pressure Equipment (Part 2 & 3 Supplement 4) Appendix 10 NBIC Policy on Metrication (Part 1, 2, & 3 Section 7)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    Nonmandatory Appendices Appendix A Standard Welding Procedures (Part 3 2.3) Appendix B Recommended Preheat Temperatures (Part 3 2.5.1) Appendix C Historical Boilers (Part 2 & 3 Supplement 2) Appendix D Recommended Guide for the Design of a Test System for Pressure Relief Devices in Compressible Fluid Service (Part 3 Supplement 8) Appendix E Recommended Procedures for Repairing Pressure Relief Valves (Part 3 S7.14) Appendix F Pressure Differential between Safety or Safety Relief Valve Setting and Boiler or Pressure Vessel Operating Pressure (None) Appendix G Safety Valves on the Low Pressure Side of Steam Pressure-Reducing Valves (Part 1 Supplement 2) Appendix H Recommended Guide for the Inspection of Pressure Vessels in LP Gas Service (Part 2 Supplement 7) Appendix I Installation Requirements (Part 1 Installation) Appendix J Guide to Jurisdictions for Authorization of Owners to Make Adjustments to Pressure Relief Valves (Part 3 S7.10) Appendix K Inspection, Repairs, and Alterations for Yankee Dryers (Part 1 Supplement 1, Part 2 & 3 Supplement 5) Appendix L Continued Service, Inspection, and Repair of DOT Vessels (Part 2 & 3 Supplements 6) Interpretations (Part 1, 2, & 3 Section 10) Index (Part 1, 2, & 3 Section 11)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    Part RA Administrative Requirements RA-1000 General (Part 3 Section 1) RA-1010 Scope (Part - 3 1.1) RA-1020 Accreditation Process (Part 3 - 1.5.1) RA-2000 Accreditation of Repair Organizations (Part 3 - 1.5.1) RA-2010 Scope (Part 3 - 1.6.1) RA-2020 Scope Issuance and Revision to Pressure-Retaining Items

    (Part 3 - 1.3.1) RA-2030 Scope Issuance and Revision to Pressure Relief Valves

    (Part 3 - 1.3.1) RA-2100 R Administrative Rules and Procedures (Part 3 - 1.6) RA-2110 Scope (Part 3 1.6.1) RA-2111 Owner-User Organizations (Part 3 - 1.6.1) RA-2120 Prerequisites for Issuing a National Board Certificate of

    Authorization (Part 3 - 1.6.2) RA-2130 Procedure for Obtaining or Renewing a National Board Certificate

    of Authorization (Part 3 - 1.6.3) RA-2140 National Board R Symbol Stamp (Part 3 - 1.6.4) RA-2150 Quality System (Part 3 - 1.6.5) RA-2151 Outline of Requirements for a Quality System for Qualification for

    the National Board R Certificate of Authorization (Part 3 - 1.6.5.1)

    RA-2200 VR Administrative Rules and Procedures (Part 3 - 1.7) RA-2210 Scope (Part 3 - 1.7.1) RA-2212 Jurisdictional Participation (Part 3 - 1.7.2) RA-2213 General Rules (Part 3 - 1.7.3) RA-2214 Repair of Nuclear Valves (Part 3 1.7.4) RA-2220 Issuance and Renewal of the VR Certificate and Stamp

    (Part 3 - 1.7.5) RA-2221 General (Part 3 1.7.5.1) RA-2222 Issuance of Certificate (Part 3 1.7.5.2) RA-2223 Renewal of Certificate (Part 3 1.7.5.3) RA-2224 Review of Applicants Facility (Part 3 1.7.5.4) RA-2225 Verification Testing (Part 3 1.7.5.5) Ra-2226 Verification Testing Alternatives (Part 3 1.7.5.6) RA-2230 Use of the VR Stamp (Part 3 - 1.7.6) RA-2231 Technical Requirements (Part 3 - 1.7.6.1) RA-2232 Stamp Use (Part 3 - 1.7.6.2) RA-2233 Return of Stamp (Part 3 - 1.7.6.3)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    RA-2234 Multiple Locations (Part 3 - 1.7.6.4) RA-2240 Certificate of Authorization Contents (Part 3 - 1.7.6.5) RA-2241 Changes to Certificates of Authorization (Part 3 - 1.7.6.6) RA-2242 Issuance of more than one VR Symbol Stamp to A Certificate Holder (Part 3 - 1.7.6.7) RA-2250 Quality System (Part 3 - 1.7.7) RA-2251 General (Part 3 - 1.7.7.1) RA-2252 Written Description (Part 3 - 1.7.7.2) RA-2253 Review (Part 3 1.7.7.3) RA-2254 Maintenance of Controlled Copy (Part 3 - 1.7.7.4) RA-2255 Outline of Requirements for a Quality System (Part 3 - 1.7.7.5) RA-2256 ASME U, HV, or UV Certificate Holders (Part 3 - 1.7.8) RA-2300 NR Accreditation Requirements (Part 3 - 1.8) RA-2310 Scope (Part 3 - 1.8.1) RA-2320 Prerequisites for Issuing a National Board NR Certificate

    of Authorization (Part 3 - 1.8.2) RA-2330 Procedures for Obtaining or Renewing a National Board NR

    Certificate of Authorization (Part 3 - 1.8.3) RA-2340 National Board NR Symbol Stamp (Part 3 - 1.8.4) RA-2350 Quality System Program (Part 3 - 1.8.5) RA-2360 Outline of Requirements for a Quality System Program for

    Qualification for the National Board NR Symbol Stamp (Part 3 - 1.8.5.1)

    RA-2370 Interface with the Owners Repair/Replacement Program (Part 3 - 1.8.6)

    PART RB INSERVICE INSPECTION OF PRESSURE-RETAINING ITEMS (Section 2) RB-1000 General Requirements for Inservice Inspection of

    Pressure-Retaining Items (Section 2) RB-1010 Scope (Part 2 - 1.1) RB-1020 Administration (Part 2 - 1.2) RB-1030 Stamping (Part 2 - 5.1) RB-1040 Reference to Other Codes and Standards (Part 2 - 1.3) RB-1050 Conclusions (Part 2 - None) RB-2000 Personnel Safety and Inspection Activities

    (Part 2 - 1.4) (Part 2 - 1.5) RB-2010 Scope (Part 2 1.1) RB-2100 Personnel Safety (Part 2 1.4)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    RB-2110 Equipment Operation (Part 2 1.4.2) RB-2120 Vessel Entry Requirements (Part 2 1.4.1) RB-2200 Inspection Activities (Part 2 1.5 & 1.5.1) RB-2210 Preparation for Internal Inspection (Part 2 1.5.3) RB-2220 Pre-inspection Activities (Part 2 1.5.2) RB-2230 Post-inspection Activities (Part 2 1.5.4) RB-3000 Inspection and Test Methods (Part 2 Section 4) RB-3010 Scope (Part 2 4.1) RB-3100 Nondestructive Examination Methods (NDE) (Part 2 4.2) RB-3110 Visual (Part 2 4.2.1) RB-3120 Magnetic Particle (Part 2 4.2.2) RB-3130 Liquid Penetrant (Part 2 4.2.3) RB-3140 Ultrasonic (Part 2 4.2.4) RB-3150 Radiography (Part 2 4.2.5) RB-3160 Eddy Current (Part 2 4.2.6) RB-3170 Metallographic (Part 2 4.2.7) RB-3180 Acoustic Emission (Part 2 4.2.8) RB-3200 Testing (Part 2 4.3) RB-3210 Pressure Testing (Part 2 4.3.1) RB-3220 Leak Testing (Part 2 4.3.2) RB-3300 Material Preparation General Guidelines (Part 2 None) RB-4000 Causes of Deterioration and Failure Mechanisms

    (Part 2 Section 3) RB-4010 Scope (Part 2 3.1) RB-4020 General (Part 2 3.2) RB-4100 Corrosion (Part 2 3.3) RB-4110 Macroscopic Corrosion Environments (Part 2 3.3.1) RB-4120 Microscopic Corrosion Environments (Part 2 3.3.2) RB-4200 Control of Corrosion (Part 2 3.3.3) RB-4210 Process Variables (Part 2 3.3.3.1) RB-4220 Engineering Design (Part 2 3.3.3.5) RB-4230 Protection (Part 2 3.3.3.2) RB-4240 Material Selection (Part 2 3.3.3.3) RB-4250 Coatings (Part 2 3.3.3.4) RB-4300 Conclusions (Part 2 3.3.3.6) RB-4400 Failure Mechanisms (Part 2 3.4) RB-4410 Fatigue (Part 2 3.4.1) RB-4420 Creep (Part 2 3.4.2) RB-4430 Temperature (Part 2 3.4.3) RB-4440 Hydrogen Embrittlement (Part 2 3.4.4)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    RB-4450 Hydrogen Attack (Part 2 3.4.5) RB-4451 Hydrogen Damage (Part 2 3.4.6) RB-4460 Bulges and Blisters (Part 2 3.4.7) RB-4470 Overheating (Part 2 3.4.8) RB-4480 Cracks (Part 2 3.4.9) RB-4500 Specific Inspection Requirements (Part 2 Section 2) RB-5000 Inspection of Boilers (Part 2 2.2) RB-5010 Scope (Part 2 2.2.1) RB-5100 General Conditions (Part 2 2.2.2) RB-5200 Pre-Inspection Activities (Part 2 2.2.3) RB-5300 Condition of Installation (Part 2 None) RB-5310 General (Part 2 2.2.4) RB-5400 Inspections (Part 2 None) RB-5410 External Inspection (Part 2 2.2.5) RB-5420 Internal Inspection (Part 2 2.2.6) RB-5430 Evidence of Leakage (Part 2 4.3.3) RB-5500 Inspection Requirements General (Part 2 2.1 (b)) RB-5510 Corrosion (Part 2 2.2.8) RB-5520 Inspection of Piping, Parts, and Appurtenances (Part 2 2.2.10) RB-5521 Boiler Piping (Part 2 2.2.10.1) RB-5522 Waterside Deposits (Part 2 2.2.9) RB-5523 Stays and Staybolts (Part 2 2.2.10.2) RB-5524 Flanged or Other Connections (Part 2 2.2.10.3) RB-5525 Miscellaneous (Part 2 2.2.10.4) RB-5526 Gages (Part 2 2.2.10.5) RB-5527 Pressure Relief devices (Part 2 2.2.10.6) RB-5528 Controls (Part 2 2.2.10.7) RB-5529 Records Review (Part 2 2.2.11) RB-5600 Specific Inspection Requirements for Boiler Types

    (Part 2 2.2.12) RB-5601 Watertube Boilers (Part 2 2.2.12.1) RB-5602 Kraft or Sulfate Black Liquor Recovery Boilers (Part 2 2.2.12.2) RB-5603 Thermal Fluid Heaters (Part 2 2.2.12.3) RB-5604 Waste Heat Boilers (Part 2 2.2.12.4) RB-5605 Cast-Iron Boilers (Part 2 2.2.12.5) RB-5606 Electric Boilers (Part 2 2.2.12.6) RB-5607 Fired Coil Water Heaters (Part 2 2.2.12.7) RB-5608 Fired Storage Water Heaters (Part 2 2.2.12.8) RB-5609 Firetube Boilers (Part 2 2.2.12.9) RB-5700 Inservice Inspection Activities (Part 2 None)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    RB-6000 Inspection of Pressure Vessels (Part 2 2.3) RB-6010 Scope (Part 2 2.3.1) RB-6100 General Conditions (Part 2 2.3.2) RB-6200 Inspections General Requirements (Part 2 None) RB-6210 Condition of Installation (Part 2 2.3.2) RB-6220 External Inspection (Part 2 2.3.3) RB-6230 Internal Inspection (Part 2 2.2.4) RB-6240 Inspection of Parts and Appurtenances (Part 2 2.3.5) RB-6250 Gages, Safety Devices, and Controls (Part 2 None) RB-6251 Gages (Part 2 2.3.5.1) RB-6252 Safety Devices (Part 2 2.3.5.2) RB-6253 Controls/Devices (Part 2 2.3.5.3) RB-6300 Records Review (Part 2 2.3.5.4) RB-6400 Inspections for Specific Types of Pressure Vessels

    (Part 2 None) RB-6410 General (Part 2 2.3.6) RB-6420 Deaerators (Part 2 2.3.6.1) RB-6430 Compressed Air Vessels (Part 2 2.3.6.2) RB-6440 Expansion Tanks (Part 2 2.3.6.3) RB-6450 Liquid Ammonia Vessels (Part 2 2.3.6.4) RB-6460 Inspection of Pressure Vessels with Quick-Actuating Closures

    (Part 2 2.3.6.5) RB-6470 Graphite Pressure Equipment (Part 2 Supplement 3) RB-6480 Fiber-Reinforced Vessels (Part 2 Supplement 4) RB-6490 Propane LP Gas Vessels (Part 2 Supplement 7) RB-6500 Nondestructive Examination (NDE) (Part 2 None) RB-6600 Remaining Life and Inspection Intervals (Part 2 None) RB-6700 Inservice Inspection Activities (Part 2 None) RB-7000 Inspection of Piping Systems (Part 2 2.4) RB-7010 Scope (Part 2 2.4.1) RB-7100 General Conditions (Part 2 2.4.2) RB-7200 Assessment of Piping Design (Part 2 2.4.3) RB-7300 Inspection (Part 2 None) RB-7310 External Inspection of Piping (Part 2 2.4.4) RB-7320 Internal Inspection of Piping (Part 2 2.4.5) RB-7330 Evidence of Leakage (Part 2 2.5.6) RB-7340 Provisions for Expansion and Support (Part 2 2.4.7) RB-7350 Gages, Safety Devices, and Controls (Part 2 2.4.8) RB-7351 Gages (Part 2 2.4.8.1) RB-7352 Safety Devices (Part 2 2.4.8.2)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    RB-7353 Quick-Disconnect Coupling (Part 2 2.4.8.3) RB-7400 Inservice Inspection Activities (Part 2 None) RB-8000 Inspection of Pressure Relief Devices (Part 2 2.5) RB-8010 Scope (Part 2 2.5.1) RB-8100 Safety Considerations (Part 2 None) RB-8200 Device Data (Part 2 2.5.2) RB-8210 Device Condition (Part 2 2.5.3) RB-8300 Installation Condition (Part 2 2.5.4) RB-8400 Testing and Operational Inspection (Part 2 2.5.4 & 2.5.7) RB-8410 Recommended Inspection and Test Frequencies (Part 2 2.5.8) RB-8500 Additional Inspection Information (Part 2 2.5.5) RB-8510 Boilers (Part 2 2.5.5.1) RB-8520 Pressure Vessels and Piping (Part 2 2.5.5.2) RB-8530 Rupture Disks (Part 2 2.5.5.3) RB-8600 Requirements for Shipping and Transporting (Part 2 2.5.6) RB-8700 Inservice Inspection Activities (Part 2 1.5.1) RB-9000 Methods to Assess Damage Mechanisms and Inspection

    Frequency for Pressure-Retaining Items (Part 2 5.3) RB-9010 Scope (Part 2 5.3.1) RB-9020 General Requirements (Part 2 5.3.2) RB-9021 Responsibilities (Part 2 5.3.3) RB-9030 Remaining Service Life Assessment Methodology (Part 2 5.3.4) RB-9040 Data Requirements for Remaining Service Life Assessments (Part 2 5.3.5) RB-9041 Identification of Damage Mechanisms (Part 2 5.3.6) RB-9050 Determining Inspection Intervals (Part 2 5.3.7) RB-9100 Method for Estimating Inspection Intervals for Pressure-Retaining

    Items Subject to Erosion or Corrosion (Part 2 5.3.7.1) RB-9110 Method for Estimating Inspection Intervals for Exposure to

    Corrosion (Part 2 5.3.7.2) RB-9120 Method for Inspection Intervals for Pressure-Retaining Items

    Where Corrosion Is Not a Factor (Part 2 5.3.7.3) RB-9200 Evaluating Inspection Intervals of Pressure-Retaining Items

    Exposed to Inservice Damage Mechanisms (Part 2 5.3.8) RB-9210 Exposure to Elevated Temperature (Creep) (Part 2 5.3.8.1) RB-9220 Exposure to Brittle Fracture (Part 2 5.3.8.2) RB-9230 Evaluating Conditions That Cause Bulges/Blisters/Laminations

    (Part 2 5.3.8.3) RB-2040 Evaluating Crack-Like Indications in Pressure-Retaining Item (Part 2 5.3.8.4)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    RB-9250 Evaluating Exposure of a Pressure-Retaining Item to Fire Damage (Part 2 5.3.8.5) RB-9260 Evaluating Exposure of Pressure-Retaining Items to Cyclic Fatigue

    (Part 2 5.3.8.6) RB-9270 Evaluating Pressure-Retaining Items Containing Local Thin Areas (Part 2 5.3.8.7) PART RC REPAIRS AND ALTERATIONS OF PRESSURE-RETAINING ITEMS (Part 3 Repairs and Alterations) RC-1000 General Requirements (Part 3 Section 1) RC-1010 Scope (Part 3 1.1) RC-1020 Construction Standards (Part 3 1.2) RC-1030 Accreditation (Part 3 1.5.1) RC-1040 Materials (Part 3 3.2.1) RC-1050 Replacement Parts (Part 3 3.2.2) RC-1060 Authorization (Part 3 1.3.2) RC-1070 Inspector (Part 3 1.31) RC-1090 Welding (Part 3 Section 2) RC-1100 Heat Treatment (Part 3 Section 2) RC-1110 Nondestructive Examination (Part 3 4.2) RC-1120 Pressure Gages, Measurement, Examination, and Test Equipment

    (Part 3 4.3) RC-1130 Acceptance Inspection (Part 3 1.3.2) RC-1140 Stamping (Part 3 Section 5) RC-1150 Registration of R Forms (Part 3 5.5) RC-2000 Additional Requirements for Repairs (Part 3 3.3) RC-2010 Scope (Part 3 None) RC-2020 Defect Repairs (Part 3 3.3.1) RC-2030 Authorization (Part 3 1.3.2) RC-2031 Routine Repairs (Part 3 3.3.2) RC-2050 Examination and Test (Part 3 4.4.1) RC-2060 Stamping (Part 3 5.7.2) RC-2070 Documentation (Part 3 5.2) RC-2071 Preparation of Form R-1 (Part 3 5.2.1) RC-2072 Distribution of Form R-1 (Part 3 5.3) RC-2073 Registration for Repairs (Part 3 5.5.1) RC-2080 Repair of ASME Code Section VIII, Division 2 or 3, Pressure Vessels (Part 3 3.3.5) RC-2081 Scope (Part 3 3.3.5.1) RC-2082 Repair Plan (Part 3 3.3.5.2) RC-3000 Additional Requirements for Alterations (Part 3 3.4)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    RC-3010 Scope (Part 3 3.1) RC-3020 Design (Part 3 3.2.4) RC-3021 Calculations (Part 3 3.2.5) RC-3022 Re-Rating (Part 3 3.4.1) RC-3023 Drawings (Part 3 3.2.3) RC-3024 Allowable Stresses (Part 3 3.4.2) RC-3025 Alteration of ASME Code Section VIII, Division 2 or 3 Pressure Vessels (Part 3 3.4.4) RC-3026 Scope (Part 3 None) RC-3027 Alteration Plan (Part 3 3.4.4.1) RC-3030 Examination and Test (Part 3 4.4.2) RC-3040 Stamping (Part 3 5.7.3) RC-3050 Documentation (Part 3 5.2) RC-3051 Preparation (Part 3 5.2.2) RC-3052 Distribution (Part 3 5.4) RC-3053 Registration (Part 3 5.5) PART RD REPAIR/Alteration Methods (Part 3 Section 2) RD-1000 Alternatives to Postweld Heat Treatment (Part 3 2.5.3) RD-1010 Scope (Part 3 None) RD-1020 Nondestructive Examination of Welds (Part 3 4.2) RD-1030 Welding Method 1 (Part 3 2.5.3.1) RD-1040 Welding Method 2 (Part 3 2.5.3.2) RD-1050 Welding Method 3 (Part 3 2.3.5.3) RD-1060 Welding Method 4 (Part 3 2.5.3.4) RD-1070 Welding Method 5 (Part 3 2.5.3.5) RD-1100 Alternative Local Postweld Heat Treatment Method

    (Part 3 2.5.2 b)) RD-2000 Repair Methods (Part 3 3.3.4) RD-2010 Scope (Part 3 3.3.4.1) RD-2020 Defect Repairs (Part 3 3.3.4.2) RD-2030 Wasted Areas (Part 3 3.3.4.3) RD-2040 Seal Welding (Part 3 3.3.4.4) RD-2050 Re-Ending or Piecing Pipes or Tubes (Part 3 3.3.4.5) RD-2060 Patches (Part 3 3.3.4.6_ RD-2070 Stays (Part 3 3.4.4.7) RD-3000 Alterations Based on Allowable Stress Values (Part 3 3.4.2) RD-3010 Re-rating (Part 3 3.4.1) RD-3020 Minimum Wall Thickness (Part 3 3.4.2)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    Part RE Repairs of Pressure Relief Valves (Part 3 Supplement 7) RE-1000 General Requirements (Part 3 None) RE-1010 Scope (Part 3 S7.1) RE-1020 Definition of Repair (Part 3 Section 9) RE-1030 Accreditation (Part 3 None) RE-1040 Materials (Part 3 S7.4) RE-1050 Replacement Parts (Part 3 S7.5) RE-1060 Nameplates (Part 3 5.9.1) RE-1061 Repair Nameplate (Part 3 5.9.2) RE-1062 Changes to Original Pressure Relief Valve Nameplate Information (Part 3 5.9.3) RE-1063 Test Only Nameplate (Part 3 5.9.4) RE-1064 Replacement of Illegible or Missing Nameplate (Part 3 5.9.5) RE-1070 Field Repair (Part 3 S7.7) RE-1071 Audit Requirements (Part 3 S7.8) RE-1072 Use of Owner-User Personnel (Part 3 S7.9) RE-1100 Welding for Pressure Relief Valves (Part 3 S7.3 & S7.12) RE-1110 Welding Procedure Specifications (Part 3 S12.1) RE-1120 Standard Welding Procedure Specifications (Part 3 S7.12.2) RE-1130 Performance Qualification (Part 3 S7.12.3) RE-1140 Welding Records (Part 3 S7.12.4) RE-1150 Welders Identification (Part 3 S7.12.5) RE-1160 Welders Continuity (Part 3 S7.12.6) RE-1200 Heat Treatment (Part 3 S7.13) RE-1210 Preheating (Part 3 S7.13.1) RE-1220 Postweld Heat Treatment (Part 3 S7.13.2) RE-2000 Performance Testing and Testing Equipment (Part 3 4.5) RE-2010 Test Medium and Testing Equipment (Part 3 4.5.1) RE-2020 Owner-User Section VIII Steam Testing (Part 3 4.5.2) RE-2030 Lift Assist Testing (Part 3 4.5.3) RE-2040 Pressure Test of Parts (Part 3 4.5.4) RE-3000 Training and Qualification of Personnel (Part 3 S7.11) RE-3010 General (Part 3 S7.11.1) RE-3020 Contents of Training Program (Part 3 S7.11.2) RE-3030 Qualification of Personnel (Part 3 S7.11.3) RE-3040 Annual Review of Qualification (Part 3 S7.11.4)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    APPENDIX 1 PREPARATION OF TECHNICAL INQUIRIES TO THE NATIONAL BOARD INSPECTION CODE COMMITTEE (Section 8) 1-1000 Introduction (Parts 1, 2, & 3 8.1) 1-2000 Inquiry Format (Parts 1, 2, & 3 8.2) 1-3000 Code Revisions or Additions (Parts 1, 2, & 3 8.3) 1-4000 Code Interpretations (Parts 1, 2, & 3 8.4) 1-5000 Submittals (Parts 1, 2, & 3 8.5) APPENDIX 2 STAMPING AND NAMEPLATE INFORMATION (Parts 3 5.9.6) 2-1000 Scope (Parts 3 5.9.6.1) 2-2000 General Requirements for Stamping and Nameplates

    (Parts 3 5.9.6.2) 2-2100 Additional Stamping Requirements for Repairs (Parts 3 5.9.6.3) 2-2200 Additional Stamping Requirements for Alterations and Re-Ratings (Parts 3 5.9.6.4) 2-2300 Additional Requirements for Parts (Parts 3 5.9.6.5) 2-2400 Additional Stamping Requirements for Pressure Relief Valves

    (Parts 3 None) APPENDIX 3 STEAM LOCOMOTIVE FIRETUBE BOILER INSPECTION, REPAIR AND STORAGE (Parts 2 & 3 Supplement 1) 3-1000 General Requirements (Parts 3 S1.1) 3-1010 Scope (Parts 2 & 3 S1.1) 3-1100 Special Jurisdictional Requirements (Parts 2 S1.2) 3-1200 Federal Railroad Administration (FRA) (Part 2 S1.3) &

    (Part 3 S1.1.1) 3-1300 Requirements for Welding Activities (Part 3 S1.1.2) 3-1400 Formula and Calculations for Steam Locomotive Boilers

    (Part 3 S1.1.4) 3-2000 Locomotive Firetube Boiler Inspection (Part 2 S1.4) 3-1010 Inspection Methods (Part 2 S1.4.1) 3-2020 Inspection Zones (Part 2 S1.4.2) 3-2030 Steam Testing (Part 2 None) 3-3000 Locomotive Firetube Repairs (Part 3 S1.2) 3-3010 Repair of Stay Bolts (Part 3 S1.2.1) 3-3020 Threaded Staybolts (Part 3 S1.2.2) 3-3030 Ball Socket-Type Flexible Staybolts, Sleeves, and Caps

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    (Part 3 S1.2.3) 3-3040 Seal Welded Staybolts (Part 3 S1.2.4) 3-3050 Welded Installation of Staybolts (Part 3 S1.2.5) 3-3060 Diagonal Braces, Gusset Braces and Throat Sheet/Tubesheet Braces

    (Part 3 S1.2.6) 3-3070 Threaded Studs (Part 3 S1.2.7) 3-3080 Patch Bolts (Part 3 S1.2.8) 3-3100 Flues, Arch Tubes, Circulators, Thermic Syphons (Part 3 S1.2.9) 3-3110 Flue and Tube Re-Ending (Part 3 - S1.2.9.1) 3-3120 Arch Tubes (Part 3 S1.2.9.2) 3-3121 Tube Wall Thickness for Arch Tubes (Part 3 S1.2.9.3) 3-3130 Thermic Syphons (Part 3 S1.2.9.4) 3-3140 Circulators (Part 3 S1.2.9.5) 3-3200 Repairs and Alterations to Boiler Barrel Unstayed Areas

    (Part 3 S1.2.10) 3-3300 Repairs and Alterations to Boiler Barrel Stayed Areas

    (Part 3 S1.2.11) 3-3310 Firebox Sheet Repair (Part 3 S1.2.11.1) 3-3320 Firebox Patches (Part 3 S1.2.11.2) 3-3330 Repair of Firebox Sheets Grooved or Wasted at the Mudring

    (Part 3 S1.2.11.3) 3-3340 Mudring Repairs (Part 3 S1.2.11.4) 3-3350 Repair of Firebox Knuckles (Part 3 S1.2.11.5) 3-3360 Tubesheet Repairs (Part 3 S1.2.11.6) 3-3400 Seams and Joints (Part 3 S1.2.12) 3-3410 Caulking Riveted Seams and Rivet Heads (Part 3 S1.2.12.1) 3-3500 Threaded Openings in Vessel Walls, Bushings, and Welded Nozzles

    (Washout Plug Holes and Other Connections) (Part 3 S1.2.12.2) 3-3600 Fittings and Gages (Part 3 S1.2.13) 3-3610 Water Gage Connection (Part 3 S1.2.13.1) 3-3700 Material List for Steam Locomotive Boilers (Part 3 S1.1.3.1) 3-4000 Guidelines for Steam Locomotive Storage (Part 2 S1.5) 3-4010 Storage Methods (Part 2 S1.5.1) 3-4020 Wet Storage Method (Part 2 S1.5.2) 3-4030 Dry Storage Method (Part 2 S1.5.3) 3-4040 Recommended General Preservation Procedures (Part 2 S1.5.4) 3-4050 Use of Compressed Air to Drain Locomotive Components

    (Part 2 S1.5.5) 3-4060 Return to Service (Part 2 S1.5.6) APPENDIX 4 GLOSSARY OF TERMS (Parts 1, 2, & 3 Section 9)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    APPENDIX 5 National Board Forms (Parts 2 & 3 Section 5) Form R-1 Report of Repair (Part 3 5.13.1) Form R-2 Report of Alteration (Part 3 5.13.2) Form R-3 Report of Parts Fabricated By Welding (Part 3 5.13.3) Form R-4 Report Supplementary Sheet (Part 3 5.13.4) Guide for Completing National Board R Reports (Part 3 5.13.4.1) Form NR-1 Nuclear Components and Systems in Nuclear Power Plants (Part 3 5.13.5) Guide for Completing National Board Form NR-1 and NVR-1 Reports (Part 3 5.13.6.1) Form NVR-1 Nuclear Pressure Relief Devices (Part 3 5.15.6) Replacement of Stamped Data Form (Part 2 5.5.2) Form NB-4 New Business or Discontinuance Used by Authorized Inspection Agencies (Parts 2 5.5.3) Form NB-5 Boiler or Pressure Vessel Data Report (First Internal Inspection) (Part 2 5.5.4) Form NB-6 Boiler-Fired Pressure Vessel Report of Inspection (Part 2 5.5.5) Form NB-7 Pressure Vessels report of Inspection (Part 2 - 5.5.6) Boiler Installation Report I-1 (Part 1 1.4.5.1) Guide for Completing National Board Installation Report (Part 1 1.4.5.1.1) APPENDIX 6 EXAMPLES OF REPAIRS AND ALTERATIONS (Part 3 Section 3) 6-1000 Introduction (Part 3 None) 6-2000 Examples of Repairs (Part 3 3.3.3) 6-3000 Examples of Alterations (Part 3 3.4.3) APPENDIX 7 PROCEDURES TO EXTEND THE VR CERTIFICATE OF OPERATION TO ASME NV STAMPED PRESSURE RELIEF DEVICES (Part 3 Supplement 9) 7-1000 Introduction (Part 3 S9.1) 7-2000 Administrative Procedures (Part 3 S9-2) 7-3000 General Rules (Part 3 - S9.3)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    APPENDIX 8 INSPECTION, REPAIR AND ALTERATION of GRAPHITE PRESSURE EQUIPMENT (Parts 2 & 3 Supplement 3) 8-1000 Scope (Part 2 S3.1 & Part 3 S3.1) 8-1010 Application (Part 2 S3.2) 8-1020 Operations (Part 2 S3.4) 8-3000 Repairs (Part 3 S3.2) 8-3010 Repairs of a Routine Nature (Part 3 S3.3) 8-4000 Alterations (Part 3 S3.4) 8-5000 Repair Guide for Impervious Graphite (Part 3 S3.5) 8-5010 Introduction (Part 3 S3.5.1) 8-5020 Typical Graphite Fractures (Part 3 S3.5.2) 8-5021 Major Fracture (Part 3 S3.5.2.1) 8-5022 Intermediate Fracture (Part 3 S3.5.2.2) 8-5023 Minor Fracture (Part 3 S3.5.2.3) 8-5030 Graphite Repair by Plug Stitching (Part 3 S3.5.3) 8-5031 Plug Stitching Procedure (Part 3 S3.5.3.1) 8-5040 Figures Typical Plug Stitching Procedure (Part 3 S3.5.3.2) 8-5050 Reimpregnation of Graphite Parts (Tubesheets, heads and Blocks)

    (Part 3 S3.5.4) 8-5060 Control of Impregnation Material (Part 3 S3.5.4.1) 8-5070 Finishing the Repair (Part 3 S3.5.4.2) 8-6000 Alternative Marking and Stamping (Part 3 5.10) APPENDIX 9 REPAIR, ALTERATION, AND INSPECTION of FIBER-REINFORCED THERMOSETTING PLASTIC PRESSURE EQUIPMENT (Parts 2 & 3 Supplement 4) 9-1000 General Requirements (Parts 2 & 3 None) 9-1010 Scope (Parts 2 & 3 S4.1) 9-1020 Limitations (Part 3 S4.4) 9-1030 Repair Limitations for Filament Wound Vessels (Part 3 S4.5) 9-1031 Vessels Fabricate Using Elevated Temperature Cured Resin Systems

    (Part 3 S4.6) 9-1040 Code of Construction (Part 3 S4.7) 9-1050 Materials (Part 3 S4.8) 9-1060 Replacement Parts (Part 3 S4.9) 9-1070 Secondary Bonding (Part 3 S4.10) 9-1071 Secondary Bonding Procedure Specification (Part 3 S4.10.1) 9-1072 Performance Qualification (Part 3 S4.10.2) 9-1073 Records (Part 3 S4.10.3) 9-1074 Secondary Bonders Identification (Part 3 S4.10.4)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    9-1075 Secondary Bonders Continuity (Part 3 S4.10.5) 9-1080 Curing (Part 3 S4.11) 9-1090 Nondestructive Examination (Part 3 S4.12) 9-1100 Pressure and Acoustic Tests (Part 3 S4.13) 9-1110 Pressure Gages, Measurement, and Examination and Test Equipment

    (Part 3 S$.13.1) 9-1120 Acceptance Inspection (Part 3 S4.14) 9-1130 Stamping (Part 3 S4.14.1) 9-1140 Removal of Original Stamping or Nameplate (Part 3 5.11.1) 9-1150 Registration of Documentation (Part 3 5.5.3) 9-2000 Additional Requirements for Repairs (Part 3 S4.16) 9-2010 Scope (Part 3 S4.16.1) 9-2020 Drawings (Part 3 S4.16.2) 9-2030 Repair Plan (Part 3 S4.16.3) 9-2040 Routine Repair (Part S16.4) 9-2050 Repair Methods (Part S16.5) 9-2060 Pressure Testing for Repairs (Part 3 S4.15) 9-2070 Stamping (Part 3 5.11.2) 9-2080 Documentation (Part 3 5.2 b)) 9-2081 Preparation of Form R-1 (Part 3 5.2.1) 9-2082 Distribution (Part 3 5.3) 9-3000 Additional Requirements for Alterations (Part 3 S4.17) 9-3010 Scope (Part 3 - S4.17.1) 9-3020 Design (Part 3 - S4.17.2) 9-3022 Calculations (Part 3 - S4.17.4) 9-3023 Re-Rating (Part 3 - S4.17.5) 9-3024 Drawings (Part 3 3.2.3) 9-3030 Pressure Testing (Part 3 - S4.17.6) 9-3040 Stamping (Part 3 5.11.3) 9-3050 Documentation (Part 3 5.2 b)) 9-3051 Preparation (Part 3 5.2.2) 9-3051 Distribution (Part 3 5.4) 9-4000 Repair/Alteration Methods (Part 3 S4.18) 9-4010 General Requirements (Part 3 S4.18.1) 9-4020 Classification of Repairs (Part 3 S4.18.2) 9-4021 Type 1 Repair of the Corrosion Barrier (Part 3 S4.18.2.1) 9-4022 Type 1B Repair of the Corrosion Barrier for Vessels With

    Precision Bores (Part 3 S4.18.2.2) 9-4023 Type 2 Corrosion Barrier and Internal Structural Layer Repairs (Part 3 S4.18.2.3)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    9-4024 Type 3 External Structural Layer Repairs (Part 3 S4.18.2.4) 9-4025 Type 4 Alterations (Part 3 S4.18.2.5) 9-4026 Type 5 Miscellaneous General External Repairs or Alterations

    (Part 3 S4.18.2.6) 9-4027 Type 6 Thermoplastic Repairs (Part 3 S4.18.2.7) 9-4028 Type 7 Gel Coat repairs (Part 3 S4.18.2.8) 9-5000 Inservice Inspection (Part 2 S4.2) 9-5100 General (Part 2 S4.3) 9-5200 Visual Examination (Part 2 S4.4) 9-5300 Inspector Qualifications (Part 3 S4.2) 9-5400 Assessment of Installation (Part 2 S4.6) 9-5410 Preparation (Part 2 S4.6.1 9-5420 Leakage (Part 2 S4.6.2) 9-5430 Tools (Part 2 S4.6.3) (Part 3 S4.3) 9-5440 Safety (Part 2 None) 9-5500 External Inspection (Part 2 S4.7) 9-5510 Insulation or Other Coverings (Part 2 S4.7.1) 9-5520 Exposed Surfaces (Part 2 S4.7.2) 9-5540 Structural Attachments (Part 2 S4.7.3) 9-5600 Internal Inspection (Part 2 S4.8) 9-5620 General (Part 2 S4.8.1) 9-5630 Examination (Part 2 None) 9-5700 Records Keeping (Part 2 None) 9-5800 Inspection Frequency (Part 2 S4.9) 9-5810 Newly Installed Equipment (Part 2 S4.9.1) 9-5820 Previously Repaired or Installed Equipment (Part 2 S4.9.2) 9-5900 Photographs of Typical Conditions (Part 2 S4.10) APPENDIX 10 NBIC POLICY FOR METRICATION (Parts 1, 2, & 3 Section 7) General (Parts 1, 2, & 3 7.1) Equivalent Rationale (Parts 1, 2, & 3 7.2) Procedure for Conversion (Parts 1, 2, & 3 7.3) Referencing Tables (Parts 1, 2, & 3 7.4) APPENDIX A STANDARD WELDING PROCEDURE (Part 3 - 2.3) APPENDIX B RECOMMENDED PREHEAT TEMPERATURES (Parts 3 Table 2.5.1

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    APPENDIX C HISTORICAL BOILERS (Parts 2 & 3 Supplement 2) C-1000 Purpose (Parts 2 & 3 None) C-1010 Scope (Parts 2 & 3 None) C-2000 Pre-Inspection Requirement (Part 2 S2.4.1) C-2010 Initial Inspection (Part 2 S2.7.3.1) C-2020 Recurring Inspection Requirements (Part 2 S2.7.3.2) C-2030 Safety Devices and Controls (Part 2 S2.8) C-2031 Pressure Relief Valves (Part 2 S2.8.1) C-2032 Gage Glass (Part 2 S2.8.2) C-2033 Try Cocks (Part 2 S2.8.3) C-2034 Fusible Plug (Part 2 S2.8.4) C-2035 Pressure Gage (Part 2 S2.8.5) C-2040 Appurtenances (Part 2 - S2.9) C-2041 Piping and Fittings (Part 2 S2.9) C-3000 Replacements (Part 2 S2.9.1) C-4000 Maximum Allowable Working Pressure (Part 2 S2.10) C-4010 Strength (Part 2 S2.10.1) C-4020 Rivets (Part 2 S2.10.2) C-4030 Cylindrical Components (Part 2 S2.10.3) C-4040 Stayed Surfaces (Part 2 S2.10.4) C-4050 Braced and Stayed Surfaces (Required Brace or Staybolt Diameter) (Part 2 S2.10.4) C-4060 Construction Code (Part 2 S2.10.5) C-4070 Nomenclature (Part 2 S2.10.6) C-5000 Limitations (Part 2 S2.10.7) C-6000 Repairs (Part 3 S2.4) C-6010 Construction Standards (Part 3 S2.5) C-6020 Accreditation (Part 3 S2.6) C-6030 Materials (Part 3 S2.7) C-6040 Replacement Parts (Part 3 S2.7.1) C-6050 Welded Repair Inspection (Part 3 S2.8) C-6060 Welding (Part 3 S2.9) C-6070 Heat Treatment (Part 3 S2.10) C-6080 Nondestructive Examination (Part 3 S2.11) C-6090 Documentation (Part 3 S2.12) C-6090 Boiler Inspection Guideline (Part 2 S2.11)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    PART PR REQUIREMENTS FOR BOILERS FABRICATED BY RIVETING PR-1 Scope (Parts 2 & 3 None) PR-5 Materials (Parts 2 & 3 None) PR-9 Design (Parts 2 & 3 None) PR-10 Strength of Plates (Parts 2 & 3 None) PR-11 Strength of Rivets (Parts 2 & 3 None) PR-12 Crushing Strength of Plates (Parts 2 & 3 None) PR-14 Thickness of Buttstraps (Parts 2 & 3 None) PR-15 Joint Efficiency (Parts 2 & 3 None) PR-16 Longitudinal Joints (Parts 2 & 3 None) PR-17 Circumferential Joints (Parts 2 & 3 None) PR-20 Transverse Pitch (Back Pitch) of Rows of Rivets

    (Parts 2 & 3 None) PR-21 Preparation of Plate Edges (Parts 2 & 3 None) PR-22 Edge Distance (Parts 2 & 3 None) PR-23 Riveted Connections (Parts 2 & 3 None) PR-25 Reinforcement of Openings (Parts 2 & 3 None) PR-30 Fabrication (Parts 2 & 3 None) PR-31 Buttstraps (Parts 2 & 3 None) PR-32 Rivet Holes (Parts 2 & 3 None) PR-37 Assembly of Joints (Parts 2 & 3 None) PR-39 Riveting (Parts 2 & 3 None) PR-40 Joint Tightness (Parts 2 & 3 None) PR-50 Inspection and Tests (Parts 2 & 3 None) PART PFT REQUIREMENTS FOR FIRETUBE BOILERS PFT-1 General (Parts 2 & 3 None) PFT-5 Materials (Parts 2 & 3 None) PFT-8 Design (Parts 2 & 3 None) PFT-9 Minimum Thickness (Parts 2 & 3 None) PFT-10 Shell Joints (Parts 2 & 3 None) PFT-11 Attachment of Heads and Tubesheets (Parts 2 & 3 None) PFT-12 Tubes (Parts 2 & 3 None) PFT-13 Combustion Chamber Tubesheet (Parts 2 & 3 None) PFT-14 Plain Circular Furnaces (Parts 2 & 3 None) PFT-15 Circular Flues (Parts 2 & 3 None) PFT-16 Adamson Type (Parts 2 & 3 None) PFT-17 Ring Reinforced Type (Parts 2 & 3 None) PFT-18 Combined Plain Circular and Corrugated Type

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    (Parts 2 & 3 None) PFT-20 Attachment of Furnaces (Parts 2 & 3 None) PFT-21 Firebox and Water Legs (Parts 2 & 3 None) PFT-22 Stayed Surfaces (Parts 2 & 3 None) PFT-23 Working Pressure for Curved Surfaces (Parts 2 & 3 None) PFT-24 Flexible Staybolts (Parts 2 & 3 None) PFT-25 Attachment of Stays and Staybolts by Welding

    (Parts 2 & 3 None) PFT-26 Maximum Spacing (Parts 2 & 3 None) PFT-27 Area Supported by Stay (Parts 2 & 3 None) PFT-28 Staybolts and Stays (Parts 2 & 3 None) PFT-29 Structural Reinforcements (Parts 2 & 3 None) PFT-30 Staying Segments of Heads (Parts 2 & 3 None) PFT-31 Areas of Heads to be Stayed (Parts 2 & 3 None)

    (Parts 2 & 3 None) PFT-32 Stresses in Diagonal and Gusset Stays (Parts 2 & 3 None) PFT-33 Design of Stays and Stay Connections (Parts 2 & 3 None) PFT-34 Gusset Stays (Parts 2 & 3 None) PFT-35 Staying of Upper Segments of Tube Heads by Steel Structural

    Shapes (Parts 2 & 3 None) PFT-36 Crown Bars and Girder Stays (Parts 2 & 3 None) PFT-37 Truncated Cone Shaped Combustion Chambers of Vertical Tubular Boilers (Parts 2 & 3 None) PFT-38 Stay Tubes (Parts 2 & 3 None) PFT-39 Riveted Door Openings (Parts 2 & 3 None) PFT-40 Welded Door Openings (Parts 2 & 3 None) PFT-41 Openings in Wrapper Sheets (Parts 2 & 3 None) PFT-42 Access and Firing Doors (Parts 2 & 3 None) PFT-43 Location of Manholes and Handholes (Parts 2 & 3 None) PFT-44 Opening Between Boiler and Safety Valve (Parts 2 & 3 None) PFT-45 Domes Requirements for Domes (Parts 2 & 3 None) PFT-46 Setting Method of Support (Parts 2 & 3 None) PFT-47 Water Glasses (Parts 2 & 3 None) PFT-48 Feed Piping (Parts 2 & 3 None) PFT-49 Blowoff Piping (Parts 2 & 3 None)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    APPENDIX EXPLANATORY OF THE CODE AND CONTAINING MATTER WHICH IS NOT MANDATORY UNLESS SPECIFICALLY REFFERED TO IN THE RULES OF CODE EFFICIENCY OF JOINTS A-1 Efficiency of Riveted Joints (Parts 2 & 3 None) A-2 Example Lap joint, longitudinal or circumferential, single riveted (Parts 2 & 3 None) A-3 Example - Lap joint, longitudinal or circumferential, double riveted (Parts 2 & 3 None) A-4 Example Butt and double-strap joint, double riveted (Parts 2 & 3 None) A-5 Example - Butt and double-strap joint, triple riveted (Parts 2 & 3 None) A-6 Example - Butt and double-strap joint, quadruple riveted (Parts 2 & 3 None) BRACED AND STAYED SURFACES A-8 Formula for allowable loads based on the net cross-sectional area of Staybolts with V-threads (Parts 2 & 3 None) A-9 Allowable loads on net cross-sectional areas of round stays or braces A-10 Net area of segments of heads for use in computing stays (Parts 2 & 3 None) APPENDIX D RECOMMENDED for the DESIGN of a TEST SYSTEM for PRESSURE RELIEF DEVICES in COMPRESSIBLE FLUID SERVICE (Part 3 - Supplement 8) D-1000 Introduction (Parts 3 S8.1) D-1010 (Parts 3 S8.2) D-1020 (Parts 1, 2, & 3 Section 9) D-2000 (Part 3 S8.3) D-3000 (Part 3 S8.4) Figures (Part 3 S8.5)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    APPENDIX E RECOMMENDED PROCEDURES FOR REPAIRING PRESSURE RELIEF VALVES (Part 3 S7.14) E-1000 Introduction (Part 3 S7.14.1) E-2000 Spring Loaded Relief Valves (Part 3 S7.14.2) E-3000 Piloted Operated Safety Relief Valves (Part 3 S7.14.3) APPENDIX F PRESSURE DIFFERENTIAL BETWEEN SAFETY or SAFETY RELIEF VALVE SETTING and BOILER or PRESSURE VESSEL OPERATING PRESSURE (Parts 1, 2 & 3 None) APPENDIX G SAFETY VALVES ON THE LOW-PRESSURE SIDE OF STEAM PRESSURE-REDUCING VALVES (Part 1 Supplement 2) G-1000 Scope (Part 1 S2.1) G-2000 Installation of Safety Valves (Part 1 None) G-3000 Safety Valve Capacity (Part 1 S2.2) G-4000 Calculating of Safety Valve Relieving Capacity (Part 1 S2.3) G-5000 Steam Flow When Flow Coefficients Are Not Known

    (Part 1 S2.4) G-6000 Two-Stage Pressure-Reducing Valve Stations (Part 1 S2.5) APPENDIX H RECOMMENDED GUIDE FOR THE INSPECTION OF PRESSURE VESSELS IN LP GAS SERVICE (Part 2 Supplement 7) H-1000 General Conditions (Part 2 S7.1) H-2000 Pre-Inspection Activities (Part 2 S7.2) H-3000 Assessment of Installation (Part 2 S7.3) H-3100 Definitions (Parts 1, 2, & 3 Section 9) H-3200 External Inspection (Part 2 S7.4) H-3300 Internal Inspection (Part 2 S7.5) H-3400 Nondestructive Examination (NDE) (Part 2 S7.3.1) H-3500 Acceptance Criteria (Part 2 S7.8) H-3510 Cracks (Part 2 S7.8.1) H-3520 Dents (Part 2 S7.8.2) H-3530 Bulges (Part 2 S7.8.3) H-3540 Cut or Gouges (Part 2 S7.8.4) H-3550 Corrosion (Part 2 S7.8.5) H-3560 Leaks (Part 2 S7.6) H-3570 Fire Damage (Part 2 S7.7) H-4000 Records (Part 2 2.3.5.4 b)) H-5000 Conclusions (Part 2 None)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    APPENDIX I INSTALLATION REQUIREMENTS (Part 1 Installation) I-1000 Installation Requirements (Part 1 None) I-1100 Introduction (Part 1 1.1) I-1200 Purpose (Part 1 1.2) I-1300 Application of These Rules (Part 1 1.3) I-2000 Power Boilers (Part 1 Section 2) I-2110 Scope (Part 1 2.1) I-2120 Power Boilers (Part 1 2.2) I-2200 Certification, Inspection, and Jurisdictional Requirements

    (Part 1 1.4) I-2210 Responsibility (Part 1 1.4.1) I-2200 Equipment Certification (Part 1 1.4.2) I-2230 Jurisdictional Review (Part 1 1.4.3) I-2240 Inspection (Part 1 1.4.4) I-2300 General Requirements (Part 1 2.3) I-2310 Supports, Foundations, and Settings (Part 1 2.3.1) I-2330 Clearances (Part 1 2.3.2) I-2340 Boiler Room Requirements (Part 1 2.4) I-2341 Exit and Egress (Part 1 2.4.1) I-2342 Ladders and Runways (Part 1 2.4.2) I-2343 Drains (Part 1 2.4.3) I-2344 Water (Part 1 2.4.4) I-2400 Source Requirements (Part 1 2.5) I-2410 Feedwater (Part 1 2.5.1) I-2411 Volume (Part 1 2.5.1.1) I-2412 Connection (Part 1 2.5.1.2) I-2413 Pumps (Part 1 2.5.1.3) I-2414 Valves (Part 1 2.5.1.4) I-2420 Fuel (Part 1 2.5.2) I-2430 Electrical (Part 1 2.5.3) I-2440 Ventilation and Combustion Air (Part 1 2.5.4) I-2450 Lighting (Part 1 2.5.5) I-2460 Emergency Valves and Controls (Part 1 2.5.6) I-2500 Discharge Requirements (Part 1 2.6) I-2510 Chimney or Stack (Part 1 2.6.1) I-2520 Ash Removal (Part 1 2.6.2) I-2530 Drains (Part 1 2.6.3) I-2531 Connection (Part 1 2.6.3.1) I-2532 Pressure Rating (Part 1 2.6.3.2) I-2533 Parts (Part 1 2.6.3.3)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    I-2600 Operating Systems (Part 1 2.7) I-2610 Breeching and Dampers (Part 1 2.7.1) I-2620 Burners and Stokers (Part 1 2.7.2) I-2630 Steam Supply (Part 1 2.7.3) I-2640 Condensate and Return (Part 1 2.7.4) I-2650 Blowoff (Part 1 2.7.5) I-2700 Control and Gages (Part 1 2.8) I-2710 Water (Part 1 2.8.1) I-2720 Pressure (Part 1 2.8.2) I-2721 Gage Requirements (Part 1 2.8.2) I-2722 Connection (Part 1 2.8.2.1) I-2730 Temperature (Part 1 2.3) I-2800 Pressure Relief Valves (Part 1 2.9) I-2810 Valve Requirements (Part 1 2.9.1) I-2820 Number (Part 1 2.9.1.1) I-2830 Location (Part 1 2.9.1.2) I-2840 Capacity (Part 1 2.9.1.3) I-2850 Set Pressure (Part 1 2.9.1.4) I-2860 Forced-Flow Steam Generator (Part 1 2.9.2) I-2870 Superheaters (Part 1 2.9.3) I-2871 Economizers (Part 1 2.9.4) I-2880 Pressure-Reducing Valves (Part 1 2.9.5) I-2890 Mounting and Discharge Requirements (Part 1 2.9.5.1) I-2900 Testing and Acceptance (Part 1 2.10) I-2910 General (Part 1 2.10.1) I-2920 Pressure Test (Part 1 2.10.2) I-2930 Nondestructive Examination (Part 1 2.10.3) I-2940 System Testing (Part 1 2.10.4) I-2950 Final Acceptance (Part 1 2.10.5) I-2960 Boiler Installation Report (Part 1 1.4.5) (Part 1 2.10.6) I-3000 Heating Boilers and Potable Water Heaters (Part 1 Section 3) I-3100 Introduction (Part 1 None) I-3110 Scope (Part 1 3.1) I-3120 Definitions (Part 1 3.2) I-3121 Steam Heating Boilers (Part 1 3.2.1) I-3122 Hot-Water Heating and Hot-Water Supply Boilers (Part 1 3.2.2) I-3123 Potable Water Heaters (Part 1 3.2.3) I-3200 Certification, Inspection and Jurisdictional Requirements

    (Part 1 1.4) I-3210 Responsibility (Part 1 1.4.1)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    I-3220 Equipment Certification (Part 1 1.4.2) I-3230 Jurisdictional Review (Part 1 1.4.3) I-3240 Inspection (Part 1 1.4.4) I-3300 General Requirements (Part 1 3.3) I-3310 Supports (Part 1 3.3.1) I-3311 Method of Support for Steam Heating, Hot-Water Heating, and

    Hot-Water Supply Boilers (Part 1 3.3.1.1) I-3320 Settings (Part 1 3.3.2) I-3330 Structural Steel (Part 1 3.3.3) I-3340 Clearances (Part 1 3.3.4) I-3350 Boiler Room Requirements (Part 1 3.4) I-3351 Exit and Egress (Part 1 3.4.1) I-3352 Ladders and Runways (Part 1 3.4.2) I-3353 Ventilation and Combustion Air (Part 1 3.5.4) I-3354 Lighting (Part 1 3.5.5) I-3355 Emergency Valves and Controls (Part 1 3.5.6) I-3400 Source Requirements (Part 1 3.5) I-3410 Water (Part 1 3.5.1) I-3420 Fuel (Part 1 3.5.2) I-3430 Electrical (Part 1 3.5.3) I-3500 Discharge Requirement (Part 1 3.6) I-3510 Chimney or Stack (Part 1 3.6.1) I-3520 Ash Removal (Part 1 3.6.2) I-3530 Drains (Part 1 3.6.3) I-3600 Operating Systems (Part 1 3.7) I-3610 Oil Heaters (Part 1 3.7.1) I-3620 Breeching and Dampers (Part 1 3.7.2) I-3630 Burners and Stokers (Part 1 3.7.3) I-3640 Feedwater, Makeup Water and Water Supply (Part 1 3.7.4) I-3650 Stop Valves (Part 1 3.7.5) I-3651 Steam Heating, Hot-Water Heating, and Hot-Water Supply Boilers (Part 1 3.7.5.1) I-3652 Potable Water Heaters (Part 1 3.7.5.2) I-3660 Return Pipe Connections (Part 1 3.7.6) I-3670 Bottom Blowoff and Drain Valves (Part 1 3.7.7) I-3671 Steam Heating, Hot-Water Heating, and Hot-Water Supply Boilers (Part 1 3.7.7.1) I-3672 Potable Water Heaters (Part 1 3.7.7.2) I-3680 Modular Steam Heating and Hot Water Heating Boilers

    (Part 1 3.7.8)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    I-3681 Individual Modules (Part 1 3.7.8.1) I-3682 Assembled Modular Boilers (Part 1 3.7.8.2) I-3690 Provisions for Thermal Expansion in Heating Boilers (Part 1 3.7.9) I-3691 Expansion Tanks and Piping for Steam Heating, Hot-Water Heating,

    and Hot-Water Supply Boilers (Part 1 3.7.9.1) I-3692 Expansion Tanks and Piping for Potable Water Heaters

    (Part 1 3.7.9.2) I-3700 Instruments, Fittings, and Controls (Part 1 3.8) I-3710 Steam Heating Boilers (Part 1 3.8.1.1) I-3711 Steam Gages (Part 1 3.8.1.2) I-3712 Water Gage Glass (Part 1 3.8.1.2) I-3713 Water Column and Water Level Control Pipes (Part 1 3.8.1.3) I-3714 Pressure Control (Part 1 3.8.1.4) I-3715 Automatic Low-Water Fuel Cut-off and/or Water Feeding Device (Part 1 3.8.1.5) I-3716 Modular Steam Heating Boilers (Part 1 3.8.1.6) I-3717 Instruments, Fittings, and Controls Mounted Inside Boiler Jackets (Part 1 3.8.1.7) I-3720 Hot-Water heating or Hot-Water Supply Boilers (Part 1 3.8.2) I-3721 Pressure or Altitude Gages (Part 1 3.8.2.1) I-3722 Thermometers (Part 1 3.8.2.2) I-3723 Temperature Control (Part 1 3.8.2.3) I-3724 Low Water Fuel Cut-Off (Part 1 3.8.2.4) I-3725 Modular Hot Water Heating Boilers (Part 1 3.8.2.5) I-3726 Instruments, Fittings, and Controls Mounted Inside Boiler Jackets (Part 1 3.8.2.6) I-3730 Potable Water Heaters (Part 1 3.8.3) I-3731 Temperature Controls (Part 1 3.8.3.1) I-3732 Thermometer (Part 1 3.8.3.2) I-3800 Pressure Relieving Valves (Part 1 3.9) I-3810 Safety Valve Requirements for Steam Boilers (Part 1 3.9.2) I-3820 Safety Relief Valve Requirements for Heating or Hot-Water Supply

    Boilers (Part 1 3.9.3) I-3830 Mounting Safety and Safety Relief Valves for Steam Heating,

    Hot-water Heating, and Hot-Water Supply Boilers (Part 1 3.9.1.1) I-3831 Permissible Mountings (Part 1 3.9.4.2) I-3832 Requirements for Common Connection for Two or More Valves (Part 1 3.9.4.3) I-3833 Threaded Connections (Part 1 3.9.1.2) I-3834 Prohibited Mountings (Part 1 3.9.1.3)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    I-3835 Use of Shutoff Valves Prohibited (Part 1 3.9.1.4) I-3836 Safety and Safety Relief Valve Discharge Piping (Part 1 3.9.1.5) I-3837 Temperature and Pressure Safety Relief Valves (Part 1 3.9.1.6) I-3840 Safety and Safety Relief Valves for Tanks and Heat Exchangers (Part 1 3.9.5) I-3841 Steam to Hot-Water Supply (Part 1 3.9.5.1) I-3842 High Temperature Water to Water Heat Exchanger (Part 1 3.9.5.2) I-3843 High Temperature Water to Steam Heat Exchanger (Part 1 3.9.5.3) I-3850 Safety Relief Valve Requirements for Potable Water Heaters (Part 1 3.9.4) I-3851 Installation (Part 1 3.9.4.1) I-3852 Permissible Mountings (Part 1 3.9.4.2) I-3853 Requirements for Common Connection for Two or More Valves (Part 1 3.9.4.3) I-3854 Thread Connections (Part 1 3.9.4.4) I-3855 Prohibited Mountings (Part 1 3.9.4.5) I-3856 Use of Shutoff Valves Prohibited (Part 1 3.9.4.6) I-3857 Safety Relief Valve Discharge Piping (Part 1 3.9.4.7) I-3900 Testing and Acceptance (Part 1 3.10) I-3910 Pressure Test (Part 1 3.10.1) I-3920 Final Acceptance (Part 1 3.10.2) I-3930 Boiler Installation Report (Part 1 3.10.3) I-3940 Tables and Figures (Part 1 3.10.4) I-4000 Pressure Vessels (Part 1 Section 4) I-4100 Introduction (Part 1 None) I-4110 Scope (Part 1 4.1) I-4120 Pressure Vessels (Part 1 4.2) I-4200 Certification, Inspection and Jurisdictional Requirements

    (Part 1 1.4) I-4210 Responsibility (Part 1 1.4.1) I-4220 Equipment Certification (Part 1 1.4.2) I-4230 Jurisdictional Review (Part 1 1.4.3) I-4240 Inspection (Part 1 1.4.4) I-4300 General Requirements (Part 1 4.3) I-4310 Supports (Part 1 4.3.1) I-4320 Clearances (Part 1 4.3.2) I-4330 Piping (Part 1 4.3.3) I-4700 Instruments and Controls (Part 1 4.4) I-4710 Level Indicating Devices (Part 1 4.4.1) I-4720 Pressure Indicating Devices (Part 1 4.4.2

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    I-4800 Pressure Relief Devices (Part 1 4.5) I-4810 Device Requirements (Part 1 4.5.1) I-4820 Number of Devices (Part 1 4.5.2) I-4830 Location (Part 1 4.5.3) I-4840 Capacity (Part 1 4.5.4) I-4850 Set Pressure (Part 1 4.5.5) I-4860 Installation and Discharge Piping Requirements (Part 1 4.5.6) I-4900 Testing and Acceptance (Part 1 4.6) I-5000 Piping (Part 1 Section 5) I-5100 Scope (Part 1 5.1) I-5120 Additions to Existing Piping (Part 1 5.2.1) I-5200 Certification, Inspection, and Jurisdictional Requirements

    (Part 1 1.4) I-5210 Responsibility (Part 1 1.4.1) I-5220 Equipment Certification (Part 1 1.4.2) I-5230 Jurisdictional Review (Part 1 1.4.3) I-4240 Inspection (Part 1 1.4.4) I-5250 Operating Permit (Part 1 1.4.3) I-5300 Layout and Configuration (Part 1 None) I-5310 Proximity to Other Equipment and Structures (Part 1 5.2.2) I-5320 Flanges and Other Non-Welded Joints (Part 1 5.2.3) I-5330 Valves (Part 1 5.2.4) I-5400 Materials (Part 1 5.2.5) I-5500 Hangers and Supports (Part 1 5.2.6) I-5600 Protection and Cleaning (Part 1 5.2.7) I-5700 Welding and Brazing (Part 1 5.2.8) I-5800 Pressure Relief Devices (Part 1 5.3) I-5810 Device Requirements (Part 1 5.3.1) I-5820 Number of Devices (Part 1 5.3.2) I-5830 Location (Part 1 5.3.3) I-5840 Capacity (Part 1 5.3.4) I-5850 Set Pressure (Part 1 5.3.5) I-5860 Installation and Discharge Piping Requirements (Part 1 5.3.6) I-5900 Examination, Inspection, and Testing (Part 1 5.4)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    APPENDIX J GUIDE to JURISDICTIONS for AUTHORIZATION of OWNERS-USERS to MAKE ADJUSTMENTS to PRESSURE RELIEF VALVES (Part 3 S7.10) J-1000 General (Part 3 S7.10.1) J-1010 Training (Part 3 S7.10.2) J-1020 Documentation (Part 3 S7.10.3) J-1030 Quality System (Part 3 S7.10.4) J-1040 External Adjustment (Part 3 S7.10.5) J-1050 Repairs (Part 3 S7.10.6) APPENDIX K INSPECTION, REPAIR, AND ALTERATION OF YANKEE DRYERS (Part 1 Supplement 2, Parts 2 & 3 Supplement 5) K-1000 Inspection of Yankee Dryers (Rotating Cast-Iron Pressure Vessels)

    With Finished Shell Outer Surfaces (Part 2 Supplement 5) K-1010 Scope (Part 1 S1.1) (Part 2 S5.1) K-1020 Assessment of Installation (Part 1 S1.2) (Part 2 S5.2) K-1030 Causes of Deterioration and Damage (Part 2 S5.3) K-1031 Local Thinning (Part 2 S5.3.1) K-1032 Cracking (Part 2 S5.3.2) K-1033 Corrosion (Part 2 S5.3.3) K-1040 Inspections (Part 2 S5.4) K-1050 Nondestructive Examination (Part 1 S1.6) (Part 2 S5.5) K-1060 Pressure Testing (Part 1 S1.5) (Part 2 S5.6) K-2000 General Requirements for Repairs and Alterations to Yankee Dryers

    (Part 3 Supplement 5)

    K-2010 Scope (Part 3 S5.1) K-2020 Replacement Parts (Part 3 S5.3.1) K-2030 Examinations and Test Methods (Part 3 S5.2) K-2040 Determination of Allowable Operating Parameters (Part 1 S1.3)

    (Part 2 S5.2.1) K-2041 ASME Code Primary Membrane Stress Criterion (Part 1 S1.4) K-2042 Adjusting the Maximum Allowable Operating Parameters of the

    Yankee Dryer Due to a Reduction in Shell Thickness from Grinding for Machining (Part 2 S5.2.2)

    K-2043 Documentation of Shell Thickness and Adjusted Allowable Operating Parameters (Part 2 S5.2.3)

    K-2050 Stamping

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    K-3000 Yankee Dryer Repair Methods (Part 3 S5.3) K-3010 Scope (Part 3 S5.1) K-3020 Repair Guide for Yankee Dryers (Part 3 S5.4) K-3030 Procedures Which do not Require Stamping or Nameplate

    Attachment (Part 3 S5.5) K-3050 Damage Repair (Part 3 S5.6) K-3051 Repair of Local Thinning (Part 3 S5.6.1) K-3052 Treatment of Crack-Like Flaws (Part 3 S5.6.2) K-3053 Driven Plug Repair (Part 3 S5.6.3) K-4000 Alterations to Yankee Dryers (Part 3 S5.7) K-4010 Scope (Part 3 S5.7.1) K-4020 Alteration Types (Part 3 S5.7.2) APPENDIX L CONTINUED SERVICE, INSPECTION, and REPAIR for DOT VESSELS (Parts 2 & 3 Supplement 6) L-1000 General Requirements (Part 3 S.0) L-1010 Scope (Part 2 S6.4.1) L-1015 Terminology (Part 2 S6.2) L-1020 Administration (Part 2 S6.3) L-1030 Stamping (Part 2 S6.5.2) L-1040 Potential Deterioration and Failure Mechanisms (Part 2 S6.6) L-1050 Classification Boundaries (Part 2 S6.7) L-1060 Pressure, Temperature, and Capacity Requirements for Transport

    Tanks (Part 2 S6.8) L-1070 Reference to Other Codes and Standards (Part 2 S6.9) L-1080 Conclusion (Part 2 S6.10) L-2000 Personnel Safety and Inspection Activities (Part 2 S6.11) L-2010 Scope (Part 2 S6.11) L-2100 Personnel Safety (Part 2 S6.11 c)) L-2110 Transport Tank Entry Requirements (Part 2 S6.12) L-2200 Inspection Activities (Part 2 S6.12.1) L-2210 Preparation for Internal Inspection (Part 2 S6.12.2) L-2220 Pre-Inspection Activities (Part 2 S6.12.1) L-2230 Post-Inspection Activities (Part 2 S6.12.3) L-3000 Scope (Part 2 None) L-3100 Inspection and Tests of Cargo Tanks (Part 2 S6.13) L-3110 Visual External Inspections (Part 2 S6.13.1) L-3120 Inspection of Piping, Valves and Manholes (Part 2 S6.13.2) L-3130 Inspection of Appurtenances and Attachments (Part 2 S6.13.3)

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    L-3140 Visual Internal Inspection (Part 2 S6.13.4) L-3150 Lining Inspections (Part 2 S6.13.5) L-3160 Pressure Tests (Part 2 S6.13.6) L-3161 Hydrostatic or Pneumatic Test Method (Part 2 S6.13.6.1) L-3162 Pressure Testing Insulated Cargo Tanks (Part 2 S6.13.6.2) L-3163 Pressure testing Cargo Tanks Constructed of Quenched and

    Tempered Steels (Part 2 S6.13.6.3) L-3164 Pressure Testing Cargo Tanks Equipped With a Heating System (Part 2 S6.13.6.4) L-3165 Exceptions to Pressure Testing (Part 2 S6.13.6.5) L-3166 Acceptance Criteria (Part 2 S6.13.6.6) L-3167 Inspection Report (Part 2 S6.13.6.7) L-3168 Additional Requirements for MC 330 and MC 331 Cargo Tanks (Part 2 S6.13.7) L-3169 Certificates and Reports (Part 2 S6.13.8) L-3170 Leakage Test (Part 2 S6.13.9) L-3180 New or Replaced Delivery Hose Assemblies (Part 2 S6.13.10) L-3181 Thickness Testing (Part 2 S6.13.10.1) L-3182 Testing Criteria (Part 2 S6.13.10.2) L-3183 Thickness Requirements (Part 2 S6.13.10.3) L-3190 Cargo Tanks That No Longer Conform to Minimum Thickness Requirements in Tables L-3183-1 and L-3883-2 (Part 2 S6.13.11) L-3191 Minimum Thickness Requirements for 400 Series Cargo Tanks (Part 2 S6.13.11.1) L-3192 DOT 406 Cargo Tanks (Part 2 S6.13.11.2) L-3193 DOT 407 Cargo Tanks (Part 2 S6.13.11.3) L-3194 DOT 412 Cargo Tanks (Part 2 S6.13.11.4) L-3200 Inspection and Test of Portable Tanks (Part 2 S6.14) L-3210 Periodic Inspection and Test (Part 2 S6.14.1) L-3220 Intermediate Periodic Inspection and Test (Part 2 S6.14.2) L-3230 Internal and External Inspections (Part 2 S6.14.3) L-3240 Exceptional Inspection and Test (Part 2 S6.14.4) L-3250 Internal and External Inspection Procedure (Part 2 S6.14.5) L-3260 Pressure Tests Procedures for Specification 51, 57, 60, IM, or UN Portable Tanks (Part 2 S6.14.6) L-3261 Specification 57 Portable Tanks (Part 2 S6.14.6.1) L-3262 Specification 51 or 56 Portable Tanks (Part 2 S6.14.6.2) L-3263 Specification 60 Portable Tanks (Part 2 S6.14.6.3) L-3264 Specification IM or Unportable Tanks (Part 2 S6.14.6.4) L-3270 Inspection and Test markings for IM or UN Portable Tanks

  • NBIC Cross Reference 2004 Edition 2006 Addenda to 2007 Edition

    (Part 2 S6.14.7) L-3280 Inspection and Test Markings for Specification DOT 51, 56, 57, or

    60 (Part 2 S6.14.8) L-3290 Record Retention (Part 2 S6.14.9) L-3300 General Requirements for DOT Specifications 106A and 110a Tank

    Cars (Ton Tanks) (Part 2 S6.15) L-3310 Special Provisions for Ton Tanks (Part 2 S6.15.1) L-3320 Visual Inspection of Ton Tanks (Part 2 S6.15.2) L-3330 Inspection and Tests of DOT Specification 106A and DOT

    Specification 110A Ton Tanks (Part 2 S6.15.3) L-3331 Air Tests (Part 2 S6.15.13.1) L-3332 Pressure Relief Testing (Part 2 S6.15.3.2) L-3333 Rupture Discs and Fusible Plugs (Part 2 S6.15.3.3) L-3334 Successful Completion of the Periodic Retesting

    (Part 2 S6.15.3.4) L-3335 Exceptions to Periodic Hydrostatic Retesting (Part 2 S6.15.3.5) L-3336 Record of Retest Inspection (Part 2 S6.15.3.6) L-3340 Stamping Requirements of DOT 106a and DOT 110A Ton Tanks (Part 2 S6.15.4) Definitions (Parts 2 & 3 Definitions) INTERPRETATIONS (Parts 1, 2, & 3 Section 10 NBIC Approved Interpretations) Index (Parts 1, 2, & 3 Section 11 - Index