Nepal Electricity Authority List of Projects to be Developed by Independent Power Pr Power Purchase Agreement (PPA) Concluded Projects S.No. Name of Company Name of Project Location Date of P (District) BS Projects In Operation 1 Himal Power Ltd. Khimti Khola Dolkha 60,000 Magh 1, 2052 2 Bhotekoshi Power Company Ltd. Bhotekoshi Khola Sindhupalchok 45,000 Shrawan 6, 2053 3 Chilime Rasuwa 22,000 Ashadh 11, 2054 4 Indrawati - III Sindhupalchowk 7,500 Mangsir 15, 2054 5 Butwal Power Company Ltd. Jhimruk Khola Pyuthan 12,000 Ashadh 29, 2058 6 Butwal Power Company Ltd. Andhi Khola Syangza 9,400 Ashadh 29, 2058 7 Syange Bidyut Company Limited Syange Khola Lamjung 183 Magh 3, 2058 8 Piluwa Khola Sankhuwasava 3,000 Magh 9, 2056 9 Rairang Khola Dhading 500 Mangsir 27, 2059 10 Sanima Hydro Power Company Ltd. Sunkoshi Khola Sindhupalchok 2,500 Kartik 28, 2058 11 Alliance Power Nepal Pvt.Ltd. Chaku Khola Sindhupalchok 3,000 Falgun 3, 2056 12 Khudi Hydro Power Ltd. Khudi Khola Lamjung 3,450 Ashadh 4, 2058 13 Unique Hydel Co. Pvt.Ltd. Baramchi Khola Sindhupalchowk 4,200 14 Thoppal Khola Dhading 1,650 Falgun 23, 2059 15 Sisne Khola Palpa 750 Shrawan 29, 2061 Capacity (kW) Chilime Hydro Power Company Ltd. National Hydro Power Company Ltd. Arun Valley Hydro Power Company Ltd. Rairang Hydro Power Development Co. (P) Ltd. Chaitra 14, 2058 Mangsir 3, 2066 Thoppal Khola Hydro Power Co. Pvt. Ltd. Gautam Buddha Hydropower (Pvt) Ltd

Upload: nirajlamichhane

Post on 29-Dec-2015

132 views

Category:

Documents


3 download

DESCRIPTION

nea different projects in nepal

TRANSCRIPT

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

Power Purchase Agreement (PPA) Concluded Projects

S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD

Projects In Operation1 Himal Power Ltd. Khimti Khola Dolkha 60,000 Magh 1, 2052 15-Jan-96

2 Bhotekoshi Power Company Ltd. Bhotekoshi Khola Sindhupalchok 45,000 Shrawan 6, 2053 21-Jul-96

3 Chilime Rasuwa 22,000 Ashadh 11, 2054 25-Jun-97

4 Indrawati - III Sindhupalchowk 7,500 Mangsir 15, 2054 30-Nov-97

5 Butwal Power Company Ltd. Jhimruk Khola Pyuthan 12,000 Ashadh 29, 2058 13-Jul-01

6 Butwal Power Company Ltd. Andhi Khola Syangza 9,400 Ashadh 29, 2058 13-Jul-01

7 Syange Bidyut Company Limited Syange Khola Lamjung 183 Magh 3, 2058 16-Jan-02

8 Piluwa Khola Sankhuwasava 3,000 Magh 9, 2056 23-Jan-00

9 Rairang Khola Dhading 500 Mangsir 27, 2059 13-Dec-02

10 Sunkoshi Khola Sindhupalchok 2,500 Kartik 28, 2058 13-Nov-01

11 Alliance Power Nepal Pvt.Ltd. Chaku Khola Sindhupalchok 3,000 Falgun 3, 2056 15-Feb-00

12 Khudi Hydro Power Ltd. Khudi Khola Lamjung 3,450 Ashadh 4, 2058 18-Jun-01

13 Unique Hydel Co. Pvt.Ltd. Baramchi Khola Sindhupalchowk 4,200 27-Mar-02

14 Thoppal Khola Dhading 1,650 Falgun 23, 2059 7-Mar-03

15 Sisne Khola Palpa 750 Shrawan 29, 2061 13-Aug-04

Capacity (kW)

Chilime Hydro Power Company Ltd.

National Hydro Power Company Ltd.

Arun Valley Hydro Power Company Ltd.

Rairang Hydro Power Development Co. (P) Ltd.

Sanima Hydro Power Company Ltd.

Chaitra 14, 2058 Mangsir 3, 2066

Thoppal Khola Hydro Power Co. Pvt. Ltd.

Gautam Buddha Hydropower (Pvt) Ltd

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

Power Purchase Agreement (PPA) Concluded Projects

S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD

Capacity (kW)

16 Sali Nadi Kathmandu 232 Shrawan 24, 2062 8-Aug-05

17 Pheme Khola Panchtar 995 Chaitra 31, 2057 13-Apr-01

18 Unified Hydropower (P) Ltd. Pati Khola Parbat 996 Magh 28, 2062 10-Feb-06

19 Seti-II Kaski 979 Ashwin 08, 2063 24-Sep-06

20 Ridi Khola Gulmi 2,400 Bhadra 08, 2063 24-Aug-06

21 Upper Hadi Khola Sindhupalchowk 991 Shrawan 7, 2064 23-Jul-07

22 Gandaki Hydro Power Co. Pvt. Ltd. Mardi Khola Kaski 4,800 Kartik 7, 2060 24-Oct-03

23 Mai Khola Ilam 4,500 Chaitra 19, 2063 2-Apr-07

24 Baneshor Hydropower Pvt. Ltd. Lower Piluwa Sankhuwasabha 990 Kartik 21,2064

25 Hewa Khola Sankhuwasabha 4,455 Ashwin 2, 2064

26 Nyadi Group (P.) Ltd. Siuri Khola Lamjung 4,950 Shrawan 17, 2064 2-Aug-07

27 United Modi Hydropwer Pvt. Ltd. Lower Modi I Parbat 9,900 Magh 20, 2065 2-Feb-09

28 Bijayapur-1 Kaski 4,410 Ashadh 30, 2066 14-Jul-09

29 Sipring Khola Dolkha 9,658 Magh 20, 2065 2-Feb-09

30 Solar Kathmandu, Lalitpur 680 Aswin 12, 2069

Kathmandu Small Hydropower Systems Pvt. Ltd.

Khoranga Khola Hydro Power Co. Ltd.

Task Hydropower Company (P.) Ltd.

Ridi Hydropower Development Co. (P.) Ltd.Centre for Power Dev. And Services (P.) Ltd.

Himal Dolkha Hydropower Company Ltd.

Barun Hydropower Development Co. (P.) Ltd.

Bhagawati Hydropower Development Co. (P.) Ltd.

Synergy Power Development (P.) Ltd.

Kathmandu Upatyaka Khanepani Board

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

Power Purchase Agreement (PPA) Concluded Projects

S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD

Capacity (kW)

31 Tadi Khola (Thaprek) Nuwakot 5,000 28-Mar-05

32 Middle Chaku Sindhupalchowk 1,800 Falgun 03, 2066 15 Feb. 10

33 Nepal Hydro Developer Pvt..Ltd Charanawati Khola Dolakha 3,520

34 Lower Chaku Khola Sindhupalchowk 1,765 Kartik 02, 2063

35 Ankhu Khola - 1 Sindhupalchok 8,400 Jestha 22, 2066 5-Jun-09

Sub Total 240,554

Projects Under Construction

36 Lower Indrawati Khola Sindhupalchok 4,500 Mangsir 23, 2059 9-Nov-02

37 Bhairab Kunda Sindhupalchowk 3,000 17-Nov-08

38 Bojini Company Private Limited Jiri Khola Dolkha 2,200 Magh 23, 2065 5-Feb-09

39 Eastern Hydropower (P.) Ltd. Pikhuwa Khola Bhojpur 2,475 Kartik 24, 2066 10 Nov. 09

40 Sanima Hydro Power P.Ltd. Mai Khola Ilam 22,000 Baishakh 8, 2067 21-Apr-10

41 Upper Tamakoshi HPP Dolkha 456,000 Poush 14, 2067 29-Dec-10

42 Prime Hydropower Co. Pvt. Ltd. Belkhu Dhading 518 Shrawan 4, 2064 20-Jul-07

Aadishakti Power Dev. Company (P.) Ltd.

Chaitra 15, 2061, 2068/4/15 amd from 970

Laughing Buddha Power Nepal (P.) Ltd.

Laughing Buddha Power Nepal (P.) Ltd.

Ankhu Khola Jal Bidhyut Co. (P.) Ltd.

Sunkoshi Hydro Power Co. Pvt. Ltd.

Bhairabkunda Hydropower Pvt. Ltd.

Mangsir 2, 2065, 17 chait 2065

Upper Tamakoshi Hydropower Co. Ltd.

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

Power Purchase Agreement (PPA) Concluded Projects

S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD

Capacity (kW)

43 Mailung Khola Rasuwa 5,000 Shrawan 9, 2058 24-Jul-01

44 Jhyadi Khola Sindhupalchowk 2,000 13-May-10

45 Phawa Khola Taplejung 4,950 Falgun 1, 2063 13-Feb-07

46 Upper Mai Khola Ilam 9,980 1-Apr-05

47 Chake Khola Ramechhap 2,830 Falgun 6, 2065 17-Feb-09

48 Madi Power Pvt. Ltd. Upper Madi Kaski 19,008 Bhadra 21, 2066 6 Sep. 09

49 Radhi Bidyut Company Ltd. Radhi Khola Lamjung 4,400 Magh 18, 2066 01 Feb. 10

50 Greenlife Energy Pvt.Ltd Khani khola-1 Dolakha 25,000 Ashoj 24, 2067 10-Oct-10

51 Sanjen Hydropower Co.Limited Upper Sanjen Rasuwa 14,800 Aswin 23, 2068

52 Middle Bhotekoshi Sindhupalchowk 102,000 Kartik 28, 2068

53 RasuwaGadi Rasuwa 111,000 Kartik 28, 2068

54 Water and Energy Co.Pvt.Ltd Badi Gad Baglung 6,600 Mansir 13, 2068

55 Sanjen Hydropower Co.Limited Sanjen Rasuwa 42,500 Mansir 19, 2068

Mailung Khola Hydro Power Company (P.) Ltd.

Electro-com and Research Centre Pvt.Ltd

Baishakh 30, 2067, 2068/4/15 amd by 1MW

Shivani Hydropower Company (P.) Ltd.

East Nepal Development Endeavour (P) Ltd

Chaitra 19, 2061, 2068/4/13 amd from 3100

Garjang Upatyaka Hydropower (P.) Ltd.

Middle Bhotekoshi Jalbidhyut Company

Chilime Hydro Power Company Ltd.

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

Power Purchase Agreement (PPA) Concluded Projects

S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD

Capacity (kW)

56 Gelun Hydropower Co.Pvt.Ltd Gelun Sindhupalchowk 3,200 Poush 25, 2068

57 Hewa Khola A Pachathar 14,900

58 Upper Marsyangdi A Lamjung 50,000

59 Upper Puwa Khola-1 Ilam 3,000

60 Hira Ratna Hydropower P.ltd Tadi Khola Nuwakot 5,000 Baishakh 9, 2067 22-Apr-10

61 Robust Energy Pvt. Ltd. Mistri Khola Myagdi 42,000 Magh 20, 2067

62 Dronanchal Hydropower Co.Pvt.Ltd Dhunge-Jiri Dolakha 600 Poush 28, 2068

63 Chhandi Lamjung 1,700 Chaitra 23, 2068

64 Tungun-Thosne Lalitpur 4,360 Srawan 5, 2069

65 Khani Khola Lalitpur 2,000 Srawan 5, 2069

66 Manang Trade Link Pvt. Ltd. Lower Modi Parbat 20,000 Bhadra 20, 2068

67 Chhote Khola Gorkha 993 Phalgun 9, 2067

68 Ruru Hydropower Project (P) Ltd. Upper Hugdi Khola Gulmi 5,000 20 Sep. 09

Pachathar Power Company Pvt. Ltd.

Sinohydro-Sagarmatha Power Company (P.) Ltd

Joshi Hydropower Development Co. (P.) Ltd.

Chyangdi Hydropower Privated Limited

Pashupati Energy Development Co. Pvt. Ltd.

Pashupati Energy Development Co. Pvt. Ltd.

Pashupati Environmental Eng. Power Co. Pvt. Ltd.

Ashwin 4, 2066 (Capacity Upgraded on 2067/12/18 of 2400 KW)

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

Power Purchase Agreement (PPA) Concluded Projects

S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD

Capacity (kW)

69 Universal Power Company (P) Ltd. Lower Khare Dolakha 8,260 Magh 22, 2069

70 Jumdi Hydropower Pvt. Ltd. Jumdi Khola Gulmi 1,750 Magh 21, 2066 04 Feb. 10

71 Daram Khola A Baglung 2,500 Chaitra 19, 2068

72 Dariyal Small Hydropower Pvt.Ltd Upper Belkhu Dhading 750 Falgun 28, 2068

73 Mount Kailash Energy Pvt. Ltd. Thapa Khola Myagdi 11,200 Magh 11, 2067

Sub-Total = 1,023,774

PPA Concluded Projects (In Different Stage of Development)

74 Annapurna Group Pvt. Ltd. Madi-1 Khola Kaski 10,000 Mangsir 18, 2060 4-Dec-03

75 TMB Energietechnik Rupandehi 600 Magh 25, 2063 8-Feb-07

76 Nama Buddha Hydropower (P) Ltd Tinau Khola Palpa 990 Asadh 31, 2065 15-Jul-08

77 Gayatri Hydro Power (P.) Ltd. Charanawati Dolakha 980 Kartik 6, 2065 22-Oct-08

78 Mansarowar Powers (P.) Ltd. Golmagad Doti 580 Kartik 10, 2065 26-Oct-08

79 L. K. Power (P.) Ltd. Dapcha-Roshi Kavrepalanchowk 5,000 Chaitra 24, 2066 6-Apr-09

80 Universal Power Company (P) Ltd. Ladku Khola Kavrepalanchowk 700 Ashadh 9, 2066 23-Jun-09

Sayapatri Hydropower Privated Limited

Narayani Shankar Biomass

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

Power Purchase Agreement (PPA) Concluded Projects

S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD

Capacity (kW)

81 Himalayan Hydropower Pvt. Ltd. Namarjun Madi Kaski 11,880 Bhadra 30, 2066 15-Sep-09

82 Lower Balephi Sindhupalchowk 18,514 Ashwin 7, 2066 23 Sep. 09

83 Shreeup Hydropower Co. (P.) Ltd. Seti Khola Chitwan 465 Kartik 25, 2066 11 Nov. 09

84 Sikles Hydropower (P) Ltd. Madkyu Khola Kaski 9,968 Mangsir 3, 2066 18 Nov. 09

85 Lower Sunkoshi -III Sindhupalchowk 9,900 Mangsir 19, 2066 04 Dec. 09

86 Middle Gaddigad Doti 2,970 Magh 20, 2066 03 Feb. 10

87 Barahi Hydropower Pvt.ltd Theule Khola Baglung 1,500 Chaitra 16, 2066 29-Mar-10

88 Api Power Company Pvt.Ltd NauGad Gad Khola Baitadi 8,500 Baishakh 19, 2067 2-May-10

89 Eklekunda Hydropower Co.Pvt.Ltd Dorkhu Khola Nuwakot 990 Baishakh 26, 2067 9-May-10

90 Energy Engineering Pvt.ltd Upper Mailun A Rasuwa 5,000 Ashar 25, 2067 9-Jul-10

91 Teleye Samyak Company Pvt.Ltd Dhansi Khola Rolpa 955 Shrawan 12,2067 28-Jul-10

92 Shiva Shree Hydropower Pvt.Ltd Upper Chaku A Sindhupalchowk 22,200 Bhadra 22, 2067 7-Sep-10

93 Swoyembhu Hydropower Pvt. Ltd Upper charnawati Dolakha 2,020 Mangsir 15, 2067 1-Dec-10

Welcome Energy Development Company (P.) Ltd.

Baishno Devi Hydro Power (P.) Ltd.

Triyog Energy & Development Pvt. Ltd.

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

Power Purchase Agreement (PPA) Concluded Projects

S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD

Capacity (kW)

94 Balefi Jalbidhyut Com. Pvt. Ltd Balefi Sindhupalchowk 24,000 Poush 8, 2067 23-Dec-10

95 Himalayan Urja Bikas Co. Pvt. Ltd. Upper Khimti Dolkha 12,000 Magh 9, 2067

96 Green Venture Pvt.Ltd. Likhu-IV 52,400 Magh 19, 2067

97 Upper Ingua Khola Ilam 9,700 Ashar 10, 2068

98 Daraudi Kalika Hydro Pvt. Ltd. Daraudi Khola A Gorkha 6,000 Bhadra 19, 2068

99 Molnia Power Ltd. Upper Mailung Rasuwa 14,300 Bhadra 23, 2068

100 Tame Khola Dailekha 1,250 Ashwin 8, 2068

101 Sardi Khola Kaski 3,500 Falgun 11, 2068

102 Saba Khola Sankhubasha 3,300 Falgun 17, 2068

103 Suryakunda Hydroelectric Pvt. Ltd. Upper Tadi Nuwakot 11,000 Chaitra 3, 2068

104 Upper Mai C Ilam 5,100 Chaitra 23, 2068

105 Himalayan Power Partner Pvt. Ltd. Dordi Khola Lamjung 27,000 Asadh 1, 2069

106 Khani Khola(Dolakha) Dolakha 30,000 Ashadh 25, 2069

Okhaldhunga, Ramechhap

Ingua Hydropower Company Pvt.Ltd

Jywala Sajhedari Hydropower Company Pvt. Ltd.

Mandakani Hydropower Privated Limited

Dibeshwori Hydropower Company Limited

Mai Valley Hydropower Privated Limited

Sasa Engingeering Hydropower (P). Ltd

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

Power Purchase Agreement (PPA) Concluded Projects

S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD

Capacity (kW)

107 Arun Kabeli Power Ltd. Kabeli B-1 Taplejung, Panchthar 25,000 Ashadh 29, 2069

108 Rising Hydropower Compnay Ltd. Selang Khola Sindhupalchowk 990 Asadh 31, 2069

109 Upper Piluwa Khola Sankhuwa Sabha 9,622 Srawan 1, 2069

110 Suspa Bukhari Dolakha 350 Srawan 32, 2069

111 Middle Tadi Nuwakot 5,325 Bhadra 10, 2069

112 Rshikesh Hydropower Pvt. Ltd. Upper Jumdi Gulmi 995 Bhadra 26, 2069

113 Liberty Hydropower Pvt. Ltd. Upper Dordi A Lamjung 22,000 Ashwin 2, 2069

114 Hydro Innovation Pvt. Ltd. Tinekhu Khola Dolakha 990 Aswin 8, 2069

115 Salankhu Khola Nuwakot 2,500 Aswin 14, 2069

116 Moonlight Hydropower Pvt. Ltd. Balefi A Sindhupalchowk 10,600 Kartik 14, 2069

117 Sanvi Energy pvt. Ltd. Jogmai Ilam 7,600 Mangsir 7, 2069

118 Miya Khola Khotang 996 Mangsir 10, 2069

119 Middle Modi Hydropower Ltd. Madhya Modi Parbat 15,100 Magsir 21, 2069

Upper Piluwa Khola Hydropower Co. Pvt. Ltd.

Kutheli Bukhari Small Hydropower (P).Ltd

Dupcheshowr Mahadev Hydro Co. (P) Ltd.

Salankhu Khola Hydropower Pvt. Ltd.

Sapsu Kalika Hydropower Co. Pvt. Ltd.

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

Power Purchase Agreement (PPA) Concluded Projects

S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD

Capacity (kW)

120 Reliable Hydropower Co. Pvt. Ltd. Khorunga Khola Terhathum 4,800 Magsir 26, 2069

121 Rara Hydropower Co. Pvt. Ltd. Upper Parajuli Khola Dailekha 2,150 Magsir, 28, 2069

122 Lohore Hydropower Co. Pvt. Ltd. Lohore Khola Dailekha 4,200 Mangsir 8, 2069

123 Beni Hydropower Project Pvt. Ltd. Upper Solu Solukhumbu 18,000 Magsir 16, 2069

124 Rawa Khola Khotang 6,500 Paush 26, 2069

125 Bagmati Khola Makabanpur 20,000 Magh 7, 2069

126 Sanima Mai Hydropower Ltd. Mai Cascade Ilam 7,000 Magh 12, 2069

127 Middle Midim Lamjung 3,100 Magh 23, 2069

128 Volcano Hydropower Pvt. Ltd. Teliya Khola Dhankuta 996 Magh 25, 2069

129 Union Hydropower Pvt Ltd. Midim Karapu Lamjung 3,000 Magh 28 2069

130 Rudi A Lamjung, Kaski 6,800 Magh 28, 2069

131 Mai sana Cascade Ilam 8,000 Phalgun 14, 2069

132 Molung Hydropower Co. Pvt. Ltd. Molung Khola Okhaldhunga 7,000 Phalgun 21, 2069

Dudhkoshi Power Company Pvt. Ltd.

Mandu Hydropower Company Pvt.Ltd

Madhya Midim Jalbidhyut Company P. Ltd.

Bidhyabasini Hydropower Development Co. Pvt.Ltd.

Himal Dolkha Hydropower Company Ltd.

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

Power Purchase Agreement (PPA) Concluded Projects

S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD

Capacity (kW)

133 Phalankhu Khola Rasuwa 13,700 Chaitra 6, 2069

134 Upper Khimti II Ramechhap 7,000 Chaitra 9, 2069

135 Salmendevi Hydropower (P).Ltd Kapadigad Doti 3,300 Chaitra 11, 2069

136 Junbesi Khola Solukhumbu 5,200 Chaitra 29, 2069

137 Ghalendi Khola Myagdi 4,000 Chaitra 30, 2069

138 Dwari Khola Dailekha 3,750 Chaitra 30, 2069

139 Lower Midim Lamjung 996 Baishakh 19, 2070

140 Iwa Khola Taplejung 9,900 Baishakh 29, 2070

141 Apolo Hydropower Pvt. Ltd. Buku Khola Solukhumbu 6,000 Jestha 2, 2070

142 Midim Khola Lamjung 100 Jestha 20, 2070

143 Tangchhara Hydro Pvt. Ltd. Tangchhahara Mustang 2,200 Jestha 20, 2070

144 Abiral Hydropower Co. Pvt. Ltd. Upper Khadam Morang 990 Jestha 21, 2070

145 Midim Hydropower Pvt. Ltd. Midim Khola Lamjung 3,400 Asadh 30, 2070

Betrawoti Hydropower Company (P).Ltd

Himalaya Urja Bikash Company (P).Ltd

Dovan Hydropower Company (P).Ltd

Cemat Power Dev Company (P).Ltd

Bhugol Energy Dev Compay (P). Ltd

Tallo Midim Jalbidhut Company (P) Ltd.

Rairang Hydro Power Development Co. (P) Ltd.

Deurali Bahuudesiya Sahakari Sanstha Ltd.

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

Power Purchase Agreement (PPA) Concluded Projects

S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD

Capacity (kW)

146 Ghatte Khola Dolakha 5,000 Srawan 28, 2070

147 Lower Solu Solukhumbu 82,000 Kartik 15, 2070

148 Khare Khola Dolakha 24,100 Kartik 15, 2070

149 Solu Khola Solukhumbu 23,500 Kartik 24, 2070

150 Singati Hydro Energy (P) Ltd Singati Khola Dolakha 16,000 Kartik 27, 2070

151 Maya Khola HP Co. P. Ltd. Maya Khola Sankhuwa Sabha 14,900 Mangsir 30, 2070

152 Idi Hydropower Co. P.ltd. Idi Khola Kaski 975 Poush 1, 2070

153 Todi Khola Nuwakot 4,993 Chaitra 10, 2070

Sub Total = 733,887

Grand Total = 1,998,215

Manakamana Engineering Hydropower Co. Pvt. L.

Essel Clean Solu Hydropower (P).Ltd

Conrorium Power Developer (P) Ltd

Upper Solu Hydroelectric Company (P).Ltd

Buohabhumi Nepal Hydropower Co. P.ltd.

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

RCOD (as per PPA) CODBS BS

Ashadh 27, 2057

Magh 11, 2057

Bhadra 8, 2060

Magh 10, 2058

Ashwin 1, 2060

Mangsir 1, 2061

Chaitra 11,2061

Ashadh 1,2062

Poush 15, 2063

Kartik 13, 2064

Ashwin 1, 2064

Ashwin 21, 2059

Poush 27, 2063 Kartik

28, 2067

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

RCOD (as per PPA) CODBS BS

Mangsir 1, 2064

Mangsir 5, 2064

Magh 27, 2065

Falgun 14, 2065

Kartik 10, 2066

Kartik 22, 2066

Magh 08, 2066

Shrawan 1, 2068

Shrawan 17, 2068

Kartik 30, 2069

Mansir 10, 2069

Bhadra 4,2069

Magh 3, 2069

Kartik 15, 2069

Magh 14, 2067(upgrade

2400 Kw)

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

RCOD (as per PPA) CODBS BS

Chaitra 14,2069

Falgun 15, 2069

Jestha 24, 2070

Falgun 1, 2068

Ashadh 15, 2063

Ashadh 31 , 2069

Falgun 30, 2069

Ashad 30, 2070

Chaitra 30, 2067

Jestha 1, 2068, 14 chaitra 2068

Poush 10, 2072 - 4 Units, Asadh 30, 2073 - 2 Units

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

RCOD (as per PPA) CODBS BS

Chaitra 18, 2060

61776

Poush 16, 2067

Ashad 16, 2068

Shrawan 1, 2071

Chaitra 31, 2069

Ashad 1, 2072

Shrawan 15, 2072

Ashadh 1 , 2074

Ashadh 1 , 2074

Jestha 14, 2072

Poush 15, 2072

Falgun 20, 2065, 2071/3/31

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

RCOD (as per PPA) CODBS BS

Falgun 7, 2070

Shrawan 1, 2070

Jestha 3, 2073

Baishakh 17, 2072

Bhadra 14, 2072

Chaitra 30, 2071

Chaitra 30, 2071

Asjoj 15, 2072

Chaita 25, 2069

Jestha 18, 2069

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

RCOD (as per PPA) CODBS BS

Poush 17, 2073

Magh 11, 2069

Magh 1, 2071

Kartik 16, 2071

Jestha 5, 2071

Mangsir 30,2065

Chaitra 18, 2065

Falgun 1, 2066

Aswin 1, 2068

Poush 30, 2066

Falgun 1, 2068

Kartik 30, 2068

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

RCOD (as per PPA) CODBS BS

Shrawan 1, 2071

Chaitra 17, 2070

Falgun 1, 2068

Shrawan 4, 2071

Mangsir 15, 2071

Baishakh 02, 2069

Shrawan 16, 2069

Poush 15, 2070

Falgun 1, 2069

Shrawan 1, 2071

Falgun 28, 2069

Baishakh 1, 2071

Jestha 7, 2070

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

RCOD (as per PPA) CODBS BS

Poush 16, 2071

Kartik 30, 2072

Poush 16, 2071

Shrawan 1, 2073

Shrawan 15, 2072

Shawan 1, 2072

Phalgun 15, 2070

Kartik 11, 2072

Chaitra 1, 2071

Asoj 23, 2074

Chaitra 12, 2071

Asadh 1, 2074

Baishakh 31, 2073

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

RCOD (as per PPA) CODBS BS

Aswin 1, 2073

Aswin 15, 2071

Aswin 1, 2076

Baishakh 10, 2070

Asadh 1, 2071

Ashwin 15. 2071

Ashwin 28, 2073

Paoush 31, 2071

Phalgun 30, 2071

Asadh 1, 2075

Kartik 7, 2073

Phalgun 16, 2071

Aswin 1, 2074

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

RCOD (as per PPA) CODBS BS

Shrawan 1, 2074

Chaita 17, 2071

Magh 16, 2071

Magh 1, 2074

Mangsir 25, 2072

Ashadh 31,2075

Srawan 1, 2072

Bhadra 1, 2072

Kartik 24, 2071

Asadh 1, 2071

Srawan 1, 2073

Srawan 15, 2074

Baishakh 7, 2074

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

RCOD (as per PPA) CODBS BS

Shrawan 16, 2073

Shrawan 1, 2074

Ashadh 31, 2073

Shrawan 1, 2074

Ashadh 17, 2074

Ashadh 16, 2074

Mangsir 1, 2071

Srawan 1, 2075

Srawn 1, 2074

Bhadra 1, 2070

Kartik 1, 2073

Magsir 1, 2071

Ashadh 17, 2074

Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers

RCOD (as per PPA) CODBS BS

Ashadh 17, 2074

Srawn 1, 2075

Magsir 15, 2074

Srawn 1, 2075

Ashoj 1, 2074

Poush 1, 2076

Asadh 1, 2074

Poush 30, 2074