neesr-vtc rpi centrifuge calibration da ha sept. 26, 2005
TRANSCRIPT
![Page 1: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/1.jpg)
NEESR-VTCRPI Centrifuge Calibration
Da Ha
Sept. 26, 2005
![Page 2: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/2.jpg)
Dummy Pipe Setup (Not to scale)
1A 2A 3A
1B 2B 3B
Strain Gages
1B 2B 3B
1A 2A 3A
Ideal Shape:
Real Shape( Exaggerated):
![Page 3: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/3.jpg)
Step Loading Tension Test
Loading: 1kg, 2kg, 4kg and 6kg
![Page 4: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/4.jpg)
0 500 1000 1500 2000 2500 3000 3500 40000
100
200
300
400
500
600
700Filtered Strain Gage Readings
Time (sec)
Str
ain
Gag
e R
eadi
ngs
(mic
ro s
trai
n)
A1A2A3B1B2B3
![Page 5: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/5.jpg)
Tension Test:
• Pre-existing curvature effects recorded strain
• Gages with pre-existing tension creep
• Will use load- strain data to calculate E
![Page 6: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/6.jpg)
Cantilever Test #1
Loading Sequence: 224g, 424 g, 224g and 0g
3B 2B 1B
3A 2A 1A
Load
32.75”4” 28.75”
![Page 7: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/7.jpg)
![Page 8: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/8.jpg)
![Page 9: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/9.jpg)
![Page 10: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/10.jpg)
![Page 11: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/11.jpg)
Cantilever Test #1:
• Inelastic behavior at moderate strain of 0.4%- non-zero strain after loads removed
• Axial strain, although small, not consistent with geometry of load. Modulus in tension different than modulus in compression?
![Page 12: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/12.jpg)
Cantilever Test #2
Loading: 124g, 224g and 324g
1A 2A 3A
1B 2B 3B
Load
32.75”4” 28.75”
![Page 13: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/13.jpg)
![Page 14: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/14.jpg)
![Page 15: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/15.jpg)
![Page 16: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/16.jpg)
![Page 17: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/17.jpg)
![Page 18: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/18.jpg)
![Page 19: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/19.jpg)
Tension Test w/ Splitbox
No Soil 1G Test
Peak Displacement= 1.1cm
![Page 20: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/20.jpg)
![Page 21: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/21.jpg)
![Page 22: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/22.jpg)
Expected Strain
![Page 23: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/23.jpg)
![Page 24: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/24.jpg)
No Soil Splitbox Test:
• Difference between measured and expected strain may be due to compliance of end connecters at box wall.
• Small bending strain likely due to pre-existing curvature
![Page 25: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/25.jpg)
Centrifuge Dummy [email protected]
6 Strain Gages, 1 malfunctioned at beginning and another malfunctioned @
3.2% strain
![Page 26: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/26.jpg)
![Page 27: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/27.jpg)
![Page 28: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/28.jpg)
![Page 29: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/29.jpg)
Dummy Pipe Setup (Not to scale)
1A 2A 3A
1B 2B 3B
Strain Gages
Malfunctioned
Malfunctioned
![Page 30: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/30.jpg)
![Page 31: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/31.jpg)
Centrifuge Dummy Test:
• End connection acting like pin
• Due to strain gage malfunction cannot calculate axial and bending strains
![Page 32: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/32.jpg)
After Test Check:
• Soil Unit Weight = 13.0 kN/m3=> = 33o
Expected Unit Weight = 14.4 kN/m3=> = 37o
• Water Content = 3.0%
Expected Water Content= 4.0%
![Page 33: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/33.jpg)
Photos from Dummy Test
![Page 34: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/34.jpg)
![Page 35: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/35.jpg)
![Page 36: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/36.jpg)
![Page 37: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/37.jpg)
![Page 38: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005](https://reader035.vdocument.in/reader035/viewer/2022062322/56649f3b5503460f94c5a36e/html5/thumbnails/38.jpg)