Position: B8_FDB-Ref-BS Spannbettbinder B8 01/2018 (Frilo prerelease)
3.75 3.75
1515 1515
8 15 2985 15 8
3030
95
75
170
19
60
146.8
23.2
170
19
60
71.8
23.2
95
19
60
71.8
23.2
95
15 3000 15
3030
10.84.3
0.61
Eigengewicht Fertigteil nicht dargestellt
System:
Double-pitch roof
Basics:Load combinatorics: NA to BS EN 1990/A1:2009-06 + EN 1990:2002/AC:2010 ULS: Structural safety checks(STR) permanent/variable design situation with equation 6.10 a,b
Design code: NA to BS EN 1992-1-1/A2:2015-07 + EN 1992-1-1:2004 /AC:2010 Prestressing for pretensioning
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 201067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
System Geometry:
Total L = 30.30 m Effective L1 = 30.00 m Outstand left L0 = 0.15 m right L2 = 0.15 m Distance Ridge L3 = 15.15 m Height beam :left H1 = 95.0 cm Ridge H2 = 170.0 cm right H3 = 95.0 cm Relation eff.span to height of beam: L1/H2 = 17.65
Erection attachment, distance from the beginning resp. end of beam:Hook L8 = 3.75 m right L9 = 3.75 m
Cross-section Precast :
Layer of cross-section from top to bottomNr Width Distance Remarks
[cm] [cm]
1 60.0 0.02 60.0 15.03 19.0 23.2 Web begin4 19.0 170.0 Web end
Web height over beam length constant
Material:
Prestressing steel
Y1770S7 Strand 7 wiresdd = 4.1 mm dp = 12.3 mm Ep = 195000 N/mm2 Ap = 0.930 cm2
fp0.1k = 1520 N/mm2 fpk = 1770 N/mm2 εuk = 35.0 ‰ εud = 31.5 ‰
Partial safety factor : γs = 1.15
Coeff. prestress: charact. value rsup = 1.00 rinf = 1.00 Design value γp,max = 1.10 γp,min = 0.90
Proof of crack width Equ. diameter dpV = 7.20 mm ξ = 0.60 (Tab. 6.2)
Relaxation class 2 (strands, wires, low relaxation)σp0/fpk 10 h 200 h 1000 h 500000h
0.60 0.1 0.2 0.4 2.50.70 0.3 0.7 1.0 3.90.80 1.2 1.9 2.4 6.1
- Losses in % by 3.3.2 (6), example process
Permitted stresses: in formwork σp ≤ 1368.0 N/mm2 (0.90* fp0.1k) after anchor. release σp ≤ 1292.0 N/mm2 (0.85* fp0.1k) char. Lc σp ≤ 1327.5 N/mm2 (0.75* fp0.1k)
Transmission length ηp1 = 3.20 η1 = 1.00 α1 = 1.25 α2 = 0.19 σpm0 = 922 N/mm2 PT: fctdt = 0.81 N/mm2 fbpt = 2.58 N/mm2 lpt = 1.05 m
Dispersion_length: d = 0.91 m ldisp = 1.39 m
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 301067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Reinforcing steel:
Longitudinal StirrupB 500B B 500B
Es = 200000 N/mm2 Es = 200000 N/mm2
fyk = 500 N/mm2 fyk = 500 N/mm2
ftk = 540 N/mm2 ftk = 540 N/mm2
εuk = 50.0 ‰ εuk = 50.0 ‰εud = 45.0 ‰ εud = 45.0 ‰
Partial safety factor :γs = 1.15 γs = 1.15
permitted stresses in SLS :σs ≤ 400 N/mm2 σs ≤ 400 N/mm2 (0.80 * fyk)
Requirements durability:
top bottomattack on concrete X0 X0attack on reinforc. XC1 XC1min. concrete class C 20/25 C 20/25stirrup φ,l = 8 mmlong. reinforcement φ,m = 20 mm φ,m = 16 mmprestressed steel dp = 12.3 mm strandallowance in design Δcdev = 5 mm *2 Δcdev = 5 mm *2stirrup cmin,l = 15 mm cmin,l = 15 mmconcrete coverage cnom,l = 20 mm cnom,l = 20 mmlongitudinal bars cmin,m = 20 mm *5 cmin,m = 16 mm *5concrete coverage cnom,m = 28 mm *1 cnom,m = 28 mm *1prestressing steel : cmin,p = 19 mm *5 cmin,p = 19 mm *5concrete coverage cnom,p = 28 mm *1 cnom,p = 28 mm *1laying dist. link c,l = 20 mm c,l = 20 mmall. crack width wmax = 0.20 mm wmax = 0.20 mmdecompression not req. not req. *1:with cmin,l *2: Quality Control*5: bond decisive
Concrete:
PrecastC 50/60
fck = 50.00 N/mm2
αcc = 0.85fctk0.05 = 2.85 N/mm2
αct = 1.00γ = 25.00 kN/m3 Unit
Ecm = 37000 N/mm2
αE = 1.00 Coeff. E-moduleGcm = 14800 N/mm2
Partial safety factor : γc = 1.50
permitted stresses in SLS : char. Lc σc ≥ -30.00 N/mm2 q.perm.Lc σc ≥ -22.50 N/mm2 Removal the anchor t= t0T(sto) fcm(t) = 24.56 N/mm2 fck(t) = 16.56 N/mm2 linear creep σc ≥ -7.45 N/mm2 (k2=0.45) maximum σc ≥ -11.59 N/mm2 (k6=0.70)
Creep modulus & shrinkage strain
no heat treatment, t0T = t0CementStrenght class 42,5R;52,5ρ= 0.5 (Aging coefficient)Reference point for t0 is the start of the concreting of the precast
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 401067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Creep t0 RHDays %
Storage 1 70Utilization precast 21 50
L. Segment Part- t0 t α t0,eff βt0 ßH βc(t,t0) φRH βfcm φ(t,t0)cross-section B.9 B.5 B.8 B.7 B.3 B.4 B.1
1 Storage PcC 1.0 21.0 1 4.0 0.70 475.4 0.38 1.24 2.21 0.742 Utilization precast PcC 21.0 26000.0 1 4.0 0.70 463.7 0.61 1.47 2.21 1.39
L. A U h0 ßds(t0,ts) ßds(t,ts) ßRH εcd,0 ßas εca/10e6 εcs(t,t0)[cm2] [cm] [cm] 3.10 B.12 B.11 3.13 3.12 [‰]
1 4013.10 446.8 179.7 0.000 0.172 1.02 402.5 0.60 100.00 0.1212 4013.10 446.8 179.7 0.172 0.996 1.36 536.0 1.00 100.00 0.430
Loads:
Self weight
Beam beginning g11 = 6.47 kN/mRidge g12 = 10.03 kN/mBeam end g13 = 6.47 kN/m
Total G = 250.1 kNVolume V = 10.00 m3
Surf. A = 95.00 m2
Live loads
Units: Single load[kN] Single moment[kNm] line load[kN/m]span type gle qle Dist. a gri qri Length Fact Act. Sim. Pos.
[m] [m]
1 1 10.80 4.30 1.00 10 0 1 1 0.00 0.61 1.00 9 0
Load types: 1 = uniformly distr., 2 = single load at a, 3 = single moment at a 4 = trapezoidal load from a, 5 = triangle load over L
Actions:
Act. γQ ψ0 ψ1 ψ2 Dep. Cat. Description
9 1.50 0.50 0.20 0.00 0 W Windlasten10 1.50 0.50 0.20 0.00 0 S Schnee bis NN +1000m
Tendons:
Dist(LE) > 3.5 cm axis horizontal > 3.7 cm vertical > 3.7 cm
lay. num- area Dist.LE Prestressing <--- Isolations --->No. ber Ap Yp σp(0) Count to x1 from x2 Type
[cm2] [cm] [N/mm2] [m] [m] ||
1 3 2.79 8.5 1000 0 LE2 3 2.79 12.3 1000 0 LE3 3 2.79 16.1 1000 0 LE4 3 2.79 19.9 1000 0 LE5 3 2.79 23.7 1000 0 LE6 3 2.79 27.5 1000 0 LE7 3 2.79 31.3 1000 0 LE8 1 0.93 35.1 1000 0 LE
x1 and x2 with respect to the left beginning from jointLE= parallel lower edge, UE= parallel upper edgeThe calculation of the losses due to creep, shrinkage and relaxationfollowing the method from Abelein
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 501067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Untensioned reinforcement:
Layer num- diam. area Dist.LE effective rangeNo. ber Φs,l As Ys from xA to xE Type
[mm] [cm2] [cm] [m] [m] ||
1 2 16 4.02 3.5 0.00 30.30 LE2 2 20 6.28 166.5 0.00 30.30 UE3 2 20 6.28 155.0 0.00 30.30 UE
xA and xE with respect to the left beginning from jointLE= parallel lower edge, UE= parallel upper edge
Surface reinforcement acc.to Tab. NA.J.41 (B0 < D0) :
Web (Z1/S3) AsS = 1.24 cm2/m (UwkS <= XC4) (per side)Top flange (Z3/S1) AsO = 0.00 cm2/m (UwkS <= XC4)
Settings for shear resistance check
Bearing width, distance bearing edge, effective height of the bearing lineleft bAl = 0.15 m al = 0.07 m dAl = 0.92 m right bAr = 0.15 m ar = 0.07 m dAR = 0.92 m For shear reinforcement not decisive ranges over support A and B:xaRe=0.99 m direct bearing (width of bearing/2 + eff. depth)xbLi=0.99 m direct bearing (width of bearing/2 + eff. depth)
Check the limit deformation:
Total sagging f ≤ L/ 250 Increase deflection |df| ≤ L/ 500 Cantilever left f ≤ 0.1 cm |df| ≤ 0.1 cm Span f ≤ 12.0 cm |df| ≤ 6.0 cm Cantilever right f ≤ 0.1 cm |df| ≤ 0.1 cm quasi- permanent combination and eff. char. prestressDeflection due to shrinkage consideredTension stiffening: Member rigidity, Characteristic combination
RESULTS ( summary)
Reaction forces (t = infinitely):
Units: all [kN] G:perm., Q:variable. ,V: Sum <------char. value-----> <--ULS(PT)---->
Support point G min Q max Q min V max V
A (left) 287.01 0.00 73.65 287.01 462.02B (right) 287.01 0.00 73.65 287.01 462.02
max. bending moment in erection state(char. value):
MF = = 2763.72 kNm at x = = 15.15 m
Checks are not complied with:
Checkvalue Extrem Utilisation x [m]
Resisting tens force bot η = 0.84 1.19 0.15Crack MinAs+AsDuc bottom AsMin = 6.7 cm2 1.67 15.15Incr.-deflection(Util) |df|= 6.9 cm 1.15 13.47Prc.:Compr.stress t0(sto) σc = -28.43 N/mm2 2.45 3.75Buckling installation state (Stiglat) η = 1.69 1.19
Warning
Prc.:lin. creep t0(Sto) σc =-23.91 N/mm2 x= 29.47 m σc <0.45*fck(t)= -7.45 N/mm2 _disproportional creeping by increased creep modulus considered(fk= 2.28)
Required shear reinforcement:
Column A: asw = 5.00 cm2/mColumn B: asw = 5.00 cm2/m
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 601067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Bursting reinforcement
left Laying length = 1.04 m from x = 0.00 m As = 5.6 cm2 right Laying length = 1.04 m from x = 30.30 m As = 5.6 cm2
Check of anchorage
left: Tensile force resistance in anchoring area Util = 1.19 additional reinforcement necessaryright: Tensile force resistance in anchoring area Util = 1.19 additional reinforcement necessary
Overview crit. sections
Selected basic grid: 10 Sections
Checkvalue Extrem Utilisation x [m]
Flexural capacity bottom η = 1.17 0.85 11.11Flexural capacity top η = **** **** ****Resisting tens force bot η = 0.84 1.19 0.15 !Resisting tens force top η = **** **** ****Prc.:Compr.stress t0(sto) σc = -28.43 N/mm2 2.45 3.75 !Prc.:Compr.stress Cc σc = -18.62 N/mm2 0.62 3.75Stress in prestress.steel σp,Cc = 1083.7 N/mm2 0.82 11.11Stress in rebars σs = 116.1 N/mm2 0.29 10.81Crack MinAs+AsDuc bottom AsMin = 6.7 cm2 1.67 15.15 !Crack MinAs+AsDuc top AsMin = ---- cm2 ---- ----Crack width bottom wk = 0.07 mm 0.36 9.76Crack width top wk = 0.15 mm 0.77 3.75Sagging top fo = -3.5 cm 0.29 16.83Sagging bottom fu = 7.2 cm 0.60 13.47Incr.-deflection(Util) |df|= 6.9 cm 1.15 13.47 !Prc.:Shear reinf (web) asw = 5.00 cm2/m 1.00 1.14Concrete strut capacity η = 1.33 0.75 0.83
---- Check not required**** Check not fulfilledPrc.:Precast member Add.: in-situ supplementIS : Installed state SC : State of constructionAsDuk:Ductility reinforcement
Linear creep limit, informative: Extrem Utilisation x [m]
Prc.:lin. creep t0(Sto) σc = -23.91 N/mm2 3.21 29.47Prc.:Compression quasi-permanent Lc σc = -17.37 N/mm2 0.77 29.16
Tensile stress state I, informative: Extrem Utilisation x [m]
Prc.:Tens.stress (IS) σt = 9.10 N/mm2 2.24 10.10Prc.:Tens.stress (SC) σt = 3.11 N/mm2 1.23 29.47
Internal forces ULS [kN,kNm]
Design sit. permanent/transient from prestressing ( formwork state)x Min Max Min Max Sto.tA Sto.tA Use.tE Use.tE PRE
[m] My My Qz Qz Nv Mv Nv Mv Deg
0.00 0.00 0.00 0.0 0.0 0.0 0.00 0.0 0.00 0.000.15 -0.10 -0.07 -1.3 -1.0 -363.4 -137.09 57.2 -29.46 3.020.15 -0.10 0.43 -1.3 460.8 -368.8 -139.14 54.3 -30.50 2.930.83 -3.05 306.66 -7.4 441.3 -2024.0 -801.75 -742.5 -339.86 1.611.14 -5.77 442.10 -10.2 432.4 -2044.3 -827.27 -1007.9 -477.46 2.011.38 -8.48 545.05 -12.4 425.5 -2044.3 -840.78 -1112.6 -541.72 2.051.39 -8.60 549.30 -12.5 425.2 -2044.3 -841.35 -1113.2 -542.62 2.043.37 -51.68 1334.23 -31.3 367.5 -2044.3 -952.08 -1212.9 -711.96 1.083.75 -64.27 1471.73 98.4 356.2 -2044.3 -973.19 -1233.0 -744.63 1.026.73 197.37 2400.70 75.4 266.8 -2044.3 -1137.35 -1374.5 -986.59 0.82
10.10 406.73 3125.02 46.9 162.5 -2044.3 -1320.54 -1437.0 -1198.12 0.7713.47 515.65 3492.30 15.8 54.9 -2044.3 -1501.74 -1453.0 -1364.52 0.7815.15 529.62 3538.52 -0.7 0.7 -2044.3 -1591.46 -1451.0 -1433.08 0.8116.83 515.65 3492.30 -54.9 -15.8 -2044.3 -1501.74 -1453.0 -1364.52 0.7820.20 406.75 3125.02 -162.5 -46.9 -2044.3 -1320.54 -1437.0 -1198.12 0.77
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 701067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Design sit. permanent/transient from prestressing ( formwork state)x Min Max Min Max Sto.tA Sto.tA Use.tE Use.tE PRE
[m] My My Qz Qz Nv Mv Nv Mv Deg
23.57 197.38 2400.70 -266.8 -75.4 -2044.3 -1137.35 -1374.5 -986.59 0.8226.55 -64.23 1471.73 -356.2 35.0 -2044.3 -973.19 -1233.0 -744.63 1.0226.93 -51.65 1334.23 -367.5 31.2 -2044.3 -952.08 -1212.9 -711.96 1.0828.91 -8.59 549.30 -425.2 12.5 -2044.3 -841.35 -1113.2 -542.62 2.0428.92 -8.46 545.05 -425.5 12.4 -2044.3 -840.78 -1112.6 -541.72 2.0529.16 -5.76 442.10 -432.4 10.2 -2044.3 -827.27 -1007.9 -477.46 2.0129.47 -3.04 306.66 -441.3 7.4 -2024.0 -801.75 -742.5 -339.86 1.6130.15 -0.10 0.43 -460.8 1.3 -368.8 -139.14 54.3 -30.50 2.9330.15 -0.10 -0.07 1.0 1.3 -363.4 -137.09 57.2 -29.46 3.0230.30 0.00 0.00 0.0 0.0 0.0 0.00 0.0 0.00 0.00
Internal forces SLS
<- char. Lc-> <- freq. Lc-> <q.- perm. Lc>x Min Max Min Max Min Max
[m] My My My My My My
0.00 0.00 0.00 0.00 0.00 0.00 0.000.15 -0.07 -0.07 -0.07 -0.07 -0.07 -0.070.15 -0.07 0.32 -0.07 0.26 -0.07 0.240.83 -2.26 236.33 -2.26 198.99 -2.26 190.421.14 -4.27 340.71 -4.27 286.93 -4.27 274.591.38 -6.28 420.07 -6.28 353.81 -6.28 338.591.39 -6.37 423.35 -6.37 356.57 -6.37 341.233.37 -38.28 1028.49 -38.28 867.02 -38.28 829.943.75 -47.61 1134.52 -47.61 956.56 -47.61 915.696.73 214.01 1851.08 214.01 1562.52 214.01 1496.25
10.10 423.38 2410.09 423.38 2036.53 423.38 1950.7413.47 532.30 2693.69 532.30 2277.66 532.30 2182.1315.15 546.27 2729.40 546.27 2308.09 546.27 2211.3416.83 532.30 2693.69 532.30 2277.66 532.30 2182.1320.20 423.39 2410.09 423.39 2036.53 423.39 1950.7423.57 214.03 1851.08 214.03 1562.52 214.03 1496.2526.55 -47.58 1134.52 -47.58 956.56 -47.58 915.6926.93 -38.26 1028.49 -38.26 867.02 -38.26 829.9428.91 -6.36 423.35 -6.36 356.57 -6.36 341.2328.92 -6.27 420.07 -6.27 353.81 -6.27 338.5929.16 -4.27 340.71 -4.27 286.93 -4.27 274.5929.47 -2.25 236.33 -2.25 198.99 -2.25 190.4230.15 -0.07 0.32 -0.07 0.26 -0.07 0.2430.15 -0.07 -0.07 -0.07 -0.07 -0.07 -0.0730.30 0.00 0.00 0.00 0.00 0.00 0.00
<Flex. capacity-> <-----resisting tensile force--------->x[m] η bo η to η bo σI/σR al η to σI/σR al
=MRd/MEd =MRd/MEd =TRd/TEd [N/mm2] [cm] =TRd/TEd [N/mm2] [cm]
0.00 --- --- --- 0.00# --- --- 0.00# ---0.08 --- --- --- 0.00# --- 303.56 0.00# 43.10.15 --- --- --- 0.00# --- 209.24 0.00# 43.20.15 --- --- 0.84 0.00# 103.8 207.30 0.00# 43.20.22 62.84 --- 1.04 0.00# 104.2 110.21 0.00# 43.40.31 27.98 --- 1.27 0.00# 104.7 102.06 0.00# 43.60.32 26.37 946.57 1.29 0.00# 104.7 101.47 0.00# 43.70.61 10.11 91.70 1.87 0.00# 106.3 44.33 3.17*! 44.40.92 6.20 *** 2.34 0.00# 108.1 *** 3.01*! 150.41.22 4.64 *** 2.54 1.66# 109.7 *** 1.72# 150.21.38 4.11 *** 2.40 1.56# 110.6 *** 1.43# 146.81.39 4.08 *** 2.39 1.55# 110.7 *** 1.41# 146.61.53 3.73 *** 2.29 1.18# 111.5 *** 1.16# 143.31.84 3.12 *** 2.09 1.06# 113.2 *** 0.64# 137.33.37 1.92 *** 1.60 6.98*! 121.7 *** 0.11# 109.43.75 1.77 *** 1.55 8.40*! 123.8 *** 0.09# 102.86.73 1.29 *** 1.25 15.01*! 88.6 *** 0.02# 59.5
10.10 1.18 *** 1.17 16.76*! 70.8 *** 0.00# 67.911.15 1.17 *** 1.17 16.49*! 73.3 *** 0.00# 70.513.47 1.22 --- 1.21 14.97*! 79.1 --- 0.00# ---16.83 1.22 --- 1.21 14.97*! 79.1 --- 0.00# ---
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 801067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
<Flex. capacity-> <-----resisting tensile force--------->x[m] η bo η to η bo σI/σR al η to σI/σR al
=MRd/MEd =MRd/MEd =TRd/TEd [N/mm2] [cm] =TRd/TEd [N/mm2] [cm]
20.20 1.18 *** 1.18 16.76*! 70.8 *** 0.00# 67.923.57 1.29 *** 1.25 15.01*! 88.6 *** 0.02# 59.526.55 1.77 *** 1.55 8.40*! 123.8 *** 0.09# 102.826.93 1.92 *** 1.60 6.98*! 121.7 *** 0.11# 109.428.46 3.12 *** 2.09 1.06# 113.2 *** 0.64# 137.328.77 3.73 *** 2.29 1.18# 111.5 *** 1.16# 143.328.91 4.08 *** 2.39 1.55# 110.7 *** 1.41# 146.628.92 4.11 *** 2.40 1.56# 110.6 *** 1.43# 146.829.08 4.64 *** 2.54 1.66# 109.7 *** 1.72# 150.229.38 6.20 *** 2.34 0.00# 108.1 *** 3.01*! 150.429.69 10.11 91.97 1.87 0.00# 106.3 55.14 3.17*! 44.429.98 26.37 950.37 1.29 0.00# 104.7 76.08 0.00# 43.729.99 27.98 --- 1.27 0.00# 104.7 75.32 0.00# 43.630.08 62.84 --- 1.04 0.00# 104.2 101.48 0.00# 43.430.15 --- --- 0.84 0.00# 103.8 207.92 0.00# 43.230.15 --- --- --- 0.00# --- 209.87 0.00# 43.230.22 --- --- --- 0.00# --- 304.54 0.00# 43.130.30 --- --- --- 0.00# --- --- 0.00# ---
---- Check not required**** Check not fulfilled#:Main tens.stress σI #!: σI > fctk0.05*:Edge tens. str. σR *!: σR > fctk0.05
Concrete stresses precast
x σc,1 σc,2 σc,Cc σc,Qc σt,Cc σt,SC[m] [N/mm2] [N/mm2] [N/mm2] [N/mm2] [N/mm2] [N/mm2]
0.08 -2.45 -2.45 -1.61 -1.61 0.86 0.460.15 -4.56 -4.56 -3.55 -3.55 0.98 0.780.15 -4.62 -4.62 -3.61 -3.60 0.98 0.790.69 -22.87 -19.30 -15.40 -15.40 0.77 2.610.83 -27.46 -23.91 -12.90 -12.90 0.83 3.110.92 -27.73 -23.76 -14.54 -12.52 0.52 3.011.00 -27.72 -23.41 -13.83 -12.04 0.22 2.891.14 -27.71 -22.34 -17.37 -17.37 --- 2.691.38 -27.71 -21.64 -17.09 -16.60 --- 2.351.39 -27.71 -21.62 -17.09 -16.58 --- 2.343.37 -28.23 -17.00 -18.23 -13.07 1.60 4.873.75 -28.43 -16.30 -18.62 -12.61 2.66 4.966.73 -18.50 -12.43 -16.35 -10.28 7.60 2.47
10.10 -15.14 -10.32 -14.93 -10.36 9.10 1.2213.47 -13.56 -9.63 -13.73 -9.45 7.99 1.0015.15 -13.21 -9.63 -12.34 -8.59 6.84 1.1516.83 -13.56 -9.63 -13.73 -9.45 7.99 1.0020.20 -15.14 -10.32 -14.93 -10.36 9.10 1.2223.57 -18.50 -12.43 -16.35 -10.28 7.60 2.4726.55 -28.42 -16.30 -18.62 -12.61 2.66 4.9626.93 -28.23 -17.00 -18.23 -13.07 1.60 4.8628.91 -27.71 -21.62 -17.09 -16.58 --- 2.3428.92 -27.71 -21.64 -17.09 -16.60 --- 2.3529.16 -27.71 -22.34 -17.37 -17.37 --- 2.6929.30 -27.72 -23.41 -13.83 -12.04 0.22 2.8929.38 -27.73 -23.76 -14.54 -12.52 0.52 3.0129.47 -27.46 -23.91 -12.90 -12.90 0.83 3.1129.61 -22.87 -19.30 -15.40 -15.40 0.77 2.6130.15 -4.62 -4.62 -3.61 -3.60 0.98 0.7930.15 -4.56 -4.56 -3.55 -3.55 0.98 0.7830.22 -2.45 -2.45 -1.61 -1.61 0.86 0.46
---- Check not required**** Check not fulfilledσc,1 : Disproportional creeping check with early strength (sto.)σc,2 : Compressive stress check with early strength (sto./erect.)σc,Cc : Compression check Characteristic load combinationσc,Qc : Disproportional creep check quasi-perm. load combinationσt,Cc : Tensile stresses ,Installed state, Characteristic load combination (informative)σt,SC : Tensile stresses,State of construction (informative)
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 901067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Check the limit deformation:
Total sagging f ≤ L/ 250 Increase deflection |df| ≤ L/ 500 Cantilever left f ≤ 0.1 cm |df| ≤ 0.1 cm Span f ≤ 12.0 cm |df| ≤ 6.0 cm Cantilever right f ≤ 0.1 cm |df| ≤ 0.1 cm quasi- permanent combination and eff. char. prestressDeflection due to shrinkage consideredTension stiffening: Member rigidity, Characteristic combination
Storage Utilizationx ftA ftE ftA ftE |df|
[m] [cm] [cm] [cm] [cm] [cm]
0.00 0.0 0.1 0.0 -0.1 -0.13.37 -1.0 -1.8 -0.3 2.2 2.56.73 -1.6 -2.8 -0.1 4.7 4.8
10.10 -1.9 -3.3 0.2 6.4 6.213.47 -2.0 -3.5 0.3 7.2 6.916.83 -2.0 -3.5 0.3 7.2 6.920.20 -1.9 -3.3 0.2 6.4 6.223.57 -1.6 -2.8 -0.1 4.7 4.826.93 -1.0 -1.8 -0.3 2.2 2.530.30 0.0 0.1 0.0 -0.1 -0.1
|df|= ftE(service)- ftA(service)
Shear resistance
x VEd VEd,red cot Θ z asw,Web η[m] [kN] [kN] [cm] [cm] =VRd,max/VEd
0.08 0.7 ---- 1.00 68.5 2.15 610.030.22 456.5 ---- 2.50* 69.1 5.00 1.440.23 455.9 ---- 2.50* 69.1 5.00 1.450.83 420.4 ---- 2.50* 72.4 5.00 1.331.14 402.9 402.9 2.50 74.1 5.00 1.421.38 389.7 389.7 2.50 75.4 4.75 1.571.39 389.2 389.2 2.50 75.5 4.74 1.583.37 289.9 289.9 2.50 85.1 3.13 2.633.75 272.6 272.6 2.50 87.2 2.88 2.926.73 150.1 150.1 1.58 101.8 2.15 7.22
10.10 41.0 41.0 1.00 118.6 2.15 21.2313.47 73.3 73.3 1.00 134.9 2.15 30.8115.15 122.5 122.5 1.00 143.0 2.15 19.4816.83 73.3 73.3 1.00 134.9 2.15 30.8120.20 41.0 41.0 1.00 118.6 2.15 21.2423.57 150.1 150.1 1.58 101.8 2.15 7.2226.55 272.6 272.6 2.50 87.2 2.88 3.0826.93 289.9 289.9 2.50 85.1 3.13 2.6328.91 389.2 389.2 2.50 75.5 4.74 1.5828.92 389.7 389.7 2.50 75.4 4.75 1.5729.16 402.9 402.9 2.50 74.1 5.00 1.4229.47 420.4 ---- 2.50* 72.4 5.00 1.3330.08 456.5 ---- 2.50* 69.1 5.00 1.4430.22 0.7 ---- 1.00 68.5 2.15 610.03
---- Check not required**** Check not fulfilled*: Take over from last construction phase
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 1001067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Internal forces
-0.07
3538.5
max MEd from external loads (PT)
0 5 10 15 20 25 30x [m]
-64.3
529.6
min MEd from external loads (PT)
-1591.5
Moment from prestressing, t= tA storage
-1433.1
1.98
Moment from prestressing, t= tE use
460.8
-75.4
max VEd from external loads (PT)
98.4
-460.8
min VEd from external loads (PT)
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 1101067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Bending resitance (failure safety)
Flexural capacity bottom η = 1,17 x=11,11 m
0 5 10 15 20 25 30x [m]
Ausn
100%
Flexural capacity top η = ***** x= 0,83 m
Resisting tens force bot η = 0,84 x= 0,15 m
Resisting tens force top η = ***** x= 0,83 m
Ultimate stress precast component
Prc.:Compr.stress Cc σc =-18,62 N/mm2 x= 3,75 m
0 5 10 15 20 25 30x [m]
Ausn
100%
Prc.:Compr.stress t0(sto) σc =-28,43 N/mm2 x= 3,75 mPrc.:Tens.stress (IS) > 100% condition II, informative only
Prc.:Tens.stress (SC) > 100% condition II, informative only
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 1201067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Deformation
Sagging t=tA storage -2,05 cm
0 5 10 15 20 25 30x [m]
Sagging t=tE storage -3,50 cm
Sagging t=tA utilisatio -0,34 cm
Sagging t=tE utilisa 7,19 cm
Shear force resistance (shear covering)
Prc.:Shear reinf (web) asw = 5,00 cm2/m x= 1,14 m
0 5 10 15 20 25 30x [m]
Ausn As (cm2/m)
5.0100%
Concrete strut capacity η = 1,33 x= 0,83 m
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 1301067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Selected section x = 11.00 m from left support
Internal force combinations from external loadingLAc: dominant variable action (leading action)ULS-PT : permanent + transient design situation (fundam. combination)SLS-Cc : characteristic combinationSLS-Fc : frequent combinationSLS-Qc : quasi-permanent combination
maximum moment : [kNm]
ULS-PT SLS-Cc SLS-Fc SLS-Qc
Storage 1240.12 918.59 918.59 918.59Storage/Erection 649.14 468.51 468.51 468.51Utilization 3278.28 2528.41 2137.06 2047.19LAc 10 10 10 -
Minimum moment : [kNm]
ULS-PT SLS-Cc SLS-Fc SLS-Qc
Storage 918.56 918.59 918.59 918.59Storage/Erection 451.86 468.51 468.51 468.51Utilization 2047.16 2047.19 2047.19 2047.19LAc - - - -
maximum shear force:[kN]
ULS-PT
Storage 51.6Storage/Erection 52.4Utilization 129.3LAc 10
Effective Tendons ( prestressed formwork state for t = t0 (sto))
No. Area Distance Prestress tens.force ShorttimeLayer Ap f.bottom max min max min RelaxationNo. [cm2] [cm] [N/mm2] [N/mm2] [kN] [kN] [N/mm2]
1 3 2.8 8.5 999.16 999.16 278.8 278.8 -0.842 3 2.8 12.3 999.16 999.16 278.8 278.8 -0.843 3 2.8 16.1 999.16 999.16 278.8 278.8 -0.844 3 2.8 19.9 999.16 999.16 278.8 278.8 -0.845 3 2.8 23.7 999.16 999.16 278.8 278.8 -0.846 3 2.8 27.5 999.16 999.16 278.8 278.8 -0.847 3 2.8 31.3 999.16 999.16 278.8 278.8 -0.848 1 0.9 35.1 999.16 999.16 92.9 92.9 -0.84
Untensioned reinforcement
Layer Number Diameter Area LE[mm] [cm2] [cm]
1 2 16 4.0 3.52 2 20 6.3 135.23 2 20 6.3 146.7
Cross-section Precast :
Layer of cross-section from top to bottomNr Width Distance Remarks
[cm] [cm]
1 60.0 0.02 60.0 15.03 19.0 23.2 Web begin4 19.0 150.2 Web end
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 1401067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Cross-section Values
brutto idealAc zu Ic Ai zi Ii
[cm2] [cm] [cm4] [cm2] [cm] [cm4]
Precast cross-section 3636.9 89.2 8019344 3797.3 88.0 8770273
Internal forces from prestress (mean values, prestressed formwork state)
Npm(0) Mpm(0) φFakCreep tB tE tB tE Prcperiod [kN] [kN] [kNm] [kNm]
Storage -2044.3 -1836.6 -1377.19 -1288.39 1.26Utilization -1836.6 -1445.6 -1288.39 -1254.32 1.00
tA=Begin, tE=End creep periodφFak: Increase factor creep modulus (non-linear creep:> 1.0)
Prestress steel relaxationStorage Utilization
Lay. Δσp,r1 Δσp,r2
No. [N/mm2] [N/mm2]
1 -1.06 -15.912 -1.07 -15.863 -1.07 -15.824 -1.08 -15.775 -1.09 -15.736 -1.09 -15.697 -1.10 -15.648 -1.11 -15.60
Prestr. steel, losses due to creeping, shrinking and relaxation:Storage Utilization
Lay. Δσp,csr1(0) Δσp,csr2(0)
No. [N/mm2] [N/mm2]
1 -67.71 -76.722 -66.83 -79.153 -65.96 -81.584 -65.09 -84.015 -64.22 -86.446 -63.35 -88.867 -62.48 -91.298 -61.61 -93.72
Stress in rebars due to creeping,shringing and relaxation:Storage Utilization
Lay. Δσs,csr1(0) Δσs,csr2(0)
No. [N/mm2] [N/mm2]
1 -69.76 -62.312 -38.61 -149.893 -35.89 -157.54
Bending with Normal Force ULS
L. Creep period Cross- Tens- z MEd MRd ηsection zone [cm] [kNm] [kNm] (>1.0)
1 tB Storage P top ---- Arm of lev. Hz < 0 -918.56 ---- #12 tE Storage P bottom 123.8 3834.60 1240.12 3.093 tB Storage/Erection P top ---- Arm of lev. Hz < 0 -451.86 ---- #14 tE Storage/Erection P bottom 123.8 3834.60 649.14 5.915 tE Utilization P top 124.9 775.54 MEd < 0 n/a6 tE Utilization P bottom 123.5 3851.97 3278.28 1.17
#1: fck(t)= 0.33 * fck
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 1501067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Interim results : Ultimate elongation and internal forcesL. εc εs x Ap As Zp Zs Dc Dp Ds
[‰] [‰] [cm] [cm2] [cm2] [kN] [kN] [kN] [kN] [kN]
2 3.500 21.900 20.2 20.5 4.0 2963.9 180.5 2731.8 0.0 383.54 3.500 21.900 20.2 20.5 4.0 2963.9 180.5 2731.8 0.0 383.55 3.500 9.300 40.1 0.0 12.6 0.0 551.6 1748.1 -1353.6 164.06 3.500 22.700 19.6 20.5 4.0 2968.9 180.7 2661.7 0.0 478.0
Shear Resistance
Design value shear forceL. Creep period Combination VEd,0 MEd dV due to
[kN] [kNm] [kN]
1 tB Storage QMax 51.6 1240.10 -49.6 Vccd2 tE Storage QMax 51.6 1240.10 -49.6 Vccd3 tB Storage/Erection QMax 52.4 637.90 -25.5 Vccd4 tE Storage/Erection QMax 52.4 637.90 -25.5 Vccd5 tB Utilization MMax 129.3 3278.28 -131.4 Vccd6 tE Utilization MMax 129.3 3278.28 -131.4 Vccd
Effective cross-sectionL. Cross- Tens- bw d z Ac Asl σcp VRdc
section zone [cm] [cm] [cm] [cm2] [cm2] [N/mm2] [kN]
1 P bottom 19.0 146.7 123.8 3636.9 24.5 2.21 204.12 P bottom 19.0 146.7 123.8 3636.9 24.5 4.54 351.63 P bottom 19.0 146.7 123.8 3636.9 24.5 2.21 204.14 P bottom 19.0 146.7 123.8 3636.9 24.5 4.54 351.65 P bottom 19.0 146.7 123.5 3636.9 24.5 4.54 351.66 P bottom 19.0 146.7 123.5 3636.9 24.5 3.58 311.1
Shear design ν1= 0.480L. VEd VEd,red acw cot Θ asw Note al VRd,max
[kN] [kN] [cm2/m] [cm] [kN]
1 2.0 2.0 1.250 1.000 1.24 Min 73.3 909.3 #12 2.0 2.0 1.136 1.000 2.15 Min 73.3 2138.13 26.9 26.9 1.250 1.000 1.24 Min 73.3 909.3 #14 26.9 26.9 1.136 1.000 2.15 Min 73.3 2138.15 2.1 2.1 1.136 1.000 2.15 Min 73.3 2132.96 2.1 2.1 1.107 1.000 2.15 Min 73.3 2078.4
#1: fck(t)= 0.33 * fck
Check of crack width limit in SLS
perm. crack width: wk < 0.20 mm, Frequent load combination
L. Creep period Cross- Tens- rsup max.σs sr,max εsm-εcm wk
section zone rinf [N/mm2] [mm] [‰] [mm]
1 tB Storage P top 1.00 CS completely compressed2 tE Storage P bottom 1.00 CS completely compressed3 tB Storage/Erection P top 1.00 no cracks4 tE Storage/Erection P bottom 1.00 CS completely compressed5 tE Utilization P top 1.00 CS completely compressed6 tE Utilization P bottom 1.00 119.42 191.65 0.358 0.07
Internal forces and elongationState I State II
L. Nges Mges max. σ X0I φeff εc X0II[kN] [kNm] [N/mm2] [cm] [‰] [cm]
1 -2044.3 -458.60 -2.13 190.92 -1836.6 -369.81 -8.55 202.73 -2044.3 -908.68 1.07 139.94 -1836.6 -819.88 -13.06 139.75 -1445.6 792.87 -9.43 104.36 -1445.6 882.74 5.05 100.1 2.32 -0.866 86.8
X0I: Pressure zone height in state I X0II: Pressure zone height in state II
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 1601067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
L. hc,ef Aceff ξ1 Ap As ρp,ef ρtot k1 k2 k3 c k4[cm] [cm2] [cm2] [cm2] [%] [%] [cm]
6 21.1 401.2 1.15 11.2 4.0 4.712 3.784 1.38 0.50 3.40 2.7 0.425
Internal forces cracking and strains (state II)State I State II
L. Nges Mges max. σ X0I φeff εc X0II[kN] [kNm] [N/mm2] [cm] [‰] [cm]
6 -1445.6 785.56 4.07 104.7
X0I: Pressure zone height in state I X0II: Pressure zone height in state II
Minimum reinforcement for crack control:
L. Creep period Cross- Tens- rsup σt req. As exist. Assection zone rinf [N/mm2] [cm2] [cm2]
1 tB Storage P top 1.00 -1.58 < 4.07 not req.2 tE Storage P bottom 1.00 -8.55 < 4.07 not req.3 tB Storage/Erection P top 1.00 1.61 < 4.07 not req.4 tE Storage/Erection P bottom 1.00 -13.06 < 4.07 not req.5 tE Utilization P top 1.00 -9.19 < 4.07 not req.6 tE Utilization P bottom 1.00 8.97 <= 0 cm2
Web FlangeL. D x0IZ Ap ξ1 k kc Act As k kc Act As
[mm] [cm] [cm2] [cm2] [cm2] [cm2] [cm2]
6 16 45.5 5.6 1.15 0.65 0.28 863.7 4.3 --no flange--
x0IZ: tensile zone in state I due to cracking forces
Ductility reinforcement in precompressed tensile zone:
b fctm Zs req. As exist. As[cm3] [N/mm2] [cm] [cm2] [cm2]
19 4.07 146.7 5.9 4.0
Stress checks SLS
Concrete edge stresses in state I due to prestress, creep, shrinkage and relaxationσR Precast
L. due to top bottom[N/mm2] [N/mm2]
1 Prestr. release anchorage 4.39 -19.202 csr storage -0.08 1.443 csr utilisation 0.79 1.37
Tab. Compr stresses of concreteMEd σc Precast
L. Creep period Cross- + = Max Cc,Pk Qc,Pksection - = Min [N/mm2] [N/mm2]
1 tB Storage P -- -9.98 -9.98 #12 tE Storage P -- -8.55 -8.553 tB Storage/Erection P -- -14.50*4 tE Storage/Erection P -- -13.065 tB Utilization P +- -14.83 -10.226 tE Utilization P +- -13.31 -8.95
#1: due to σc > 0.45* fck(t) increased ceep modulus
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 1701067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Tab. Steel- and Concrete tension stressMEd σp σs σt
L. Creep period Cross- + = Max Cc,Pm Cc,Pk Cc,Pksection - = Min [N/mm2] [N/mm2] [N/mm2]
1 tB Storage P -+- 956.23 < 0 ZII2 tE Storage P -+- 900.32 < 0 ZII3 tB Storage/Erection P --- 941.93 3.80 1.074 tE Storage/Erection P -+- 886.02 < 0 0.985 tB Utilization P ++- 1083.72 97.37 2.776 tE Utilization P ++- 1081.53 115.84 ZII
Pk= Prestres char. value, Pm= prestress mean value, StII: State II
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 1801067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Selected section x = 1.00 m from left support
Internal force combinations from external loadingLAc: dominant variable action (leading action)ULS-PT : permanent + transient design situation (fundam. combination)SLS-Cc : characteristic combinationSLS-Fc : frequent combinationSLS-Qc : quasi-permanent combination
maximum moment : [kNm]
ULS-PT SLS-Cc SLS-Fc SLS-Qc
Storage 162.93 120.67 120.67 120.67Storage/Erection -4.35 -4.35 -4.35 -4.35Utilization 446.42 344.04 289.74 277.27LAc 10 10 10 -
Minimum moment : [kNm]
ULS-PT SLS-Cc SLS-Fc SLS-Qc
Storage 120.65 120.67 120.67 120.67Storage/Erection -5.87 -4.35 -4.35 -4.35Utilization 277.25 277.27 277.27 277.27LAc - - - -
maximum shear force:[kN]
ULS-PT
Storage 158.5Storage/Erection -10.3Utilization 432.1LAc 10
Effective Tendons ( prestressed formwork state for t = t0 (sto))
No. Area Distance Prestress tens.force ShorttimeLayer Ap f.bottom max min max min RelaxationNo. [cm2] [cm] [N/mm2] [N/mm2] [kN] [kN] [N/mm2]
1 3 2.8 8.5 999.16 913.66 278.8 254.9 -0.842 3 2.8 12.3 999.16 913.66 278.8 254.9 -0.843 3 2.8 16.1 999.16 913.66 278.8 254.9 -0.844 3 2.8 19.9 999.16 913.66 278.8 254.9 -0.845 3 2.8 23.7 999.16 913.66 278.8 254.9 -0.846 3 2.8 27.5 999.16 913.66 278.8 254.9 -0.847 3 2.8 31.3 999.16 913.66 278.8 254.9 -0.848 1 0.9 35.1 999.16 913.66 92.9 85.0 -0.84
Untensioned reinforcement
Layer Number Diameter Area LE[mm] [cm2] [cm]
1 2 16 4.0 3.52 2 20 6.3 85.73 2 20 6.3 97.2
Cross-section Precast :
Layer of cross-section from top to bottomNr Width Distance Remarks
[cm] [cm]
1 60.0 0.02 60.0 15.03 19.0 23.2 Web begin4 19.0 100.7 Web end
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 1901067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Cross-section Values
brutto idealAc zu Ic Ai zi Ii
[cm2] [cm] [cm4] [cm2] [cm] [cm4]
Precast cross-section 2696.3 62.2 2560641 2856.7 61.1 2849773
Internal forces from prestress (mean values, prestressed formwork state)
Npm(0) Mpm(0) φFakCreep tB tE tB tE Prcperiod [kN] [kN] [kNm] [kNm]
Storage -2044.3 -1488.4 -827.83 -606.47 2.28Utilization -1627.7 -1016.2 -663.23 -481.96 1.00
tA=Begin, tE=End creep periodφFak: Increase factor creep modulus (non-linear creep:> 1.0)
Prestress steel relaxationStorage Utilization
Lay. Δσp,r1 Δσp,r2
No. [N/mm2] [N/mm2]
1 -0.78 -8.352 -0.81 -8.663 -0.83 -8.964 -0.85 -9.285 -0.88 -9.616 -0.90 -9.957 -0.93 -10.308 -0.95 -10.65
Prestr. steel, losses due to creeping, shrinking and relaxation:Storage Utilization
Lay. Δσp,csr1(0) Δσp,csr2(0)
No. [N/mm2] [N/mm2]
1 -174.80 -168.662 -167.86 -165.793 -160.91 -162.934 -153.97 -160.085 -147.02 -157.236 -140.08 -154.407 -133.13 -151.578 -126.19 -148.75
Stress in rebars due to creeping,shringing and relaxation:Storage Utilization
Lay. Δσs,csr1(0) Δσs,csr2(0)
No. [N/mm2] [N/mm2]
1 -188.04 -170.322 -33.56 -101.393 -11.94 -91.75
Bending with Normal Force ULS
L. Creep period Cross- Tens- z MEd MRd ηsection zone [cm] [kNm] [kNm] (>1.0)
1 tB Storage P top ---- Arm of lev. Hz < 0 -120.65 ---- #12 tE Storage P bottom 74.4 2208.47 162.93 13.553 tB Storage/Erection P top ---- Arm of lev. Hz < 0 5.87 ---- #14 tE Storage/Erection P bottom 74.4 2208.47 MEd < 0 n/a5 tB Utilization P top 75.6 504.87 MEd < 0 n/a6 tE Utilization P bottom 74.2 2195.10 446.42 4.92
#1: fck(t)= 0.33 * fck
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 2001067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Interim results : Ultimate elongation and internal forcesL. εc εs x Ap As Zp Zs Dc Dp Ds
[‰] [‰] [cm] [cm2] [cm2] [kN] [kN] [kN] [kN] [kN]
2 3.500 13.900 19.6 20.5 4.0 2823.6 178.0 2656.3 0.0 369.74 3.500 13.900 19.6 20.5 4.0 2823.6 178.0 2656.3 0.0 369.75 3.500 5.100 39.6 0.0 12.6 0.0 548.5 1723.8 -1353.3 164.06 3.500 14.700 18.7 20.5 4.0 2822.4 178.0 2553.9 0.0 425.9
Shear Resistance
Design value shear forceL. Creep period Combination VEd,0 MEd dV due to
[kN] [kNm] [kN]
1 tB Storage QMax 158.5 162.91 -10.8 Vccd2 tE Storage QMax 158.5 162.91 -10.8 Vccd3 tB Storage/Erection QMax -10.3 -5.87 0.0 -------4 tE Storage/Erection QMax -10.3 -5.87 0.0 -------5 tB Utilization QMax 432.1 446.40 -29.8 Vccd6 tE Utilization QMax 432.1 446.40 -29.8 Vccd
Effective cross-sectionL. Cross- Tens- bw d z Ac Asl σcp VRdc
section zone [cm] [cm] [cm] [cm2] [cm2] [N/mm2] [kN]
1 P bottom 19.0 97.2 74.4 2696.3 24.5 2.21 151.42 P bottom 19.0 97.2 74.4 2696.3 24.5 4.97 268.03 P top 19.0 91.4 82.3 2696.3 12.6 2.21 127.64 P top 19.0 91.4 82.3 2696.3 12.6 4.97 230.75 P bottom 19.0 97.2 74.2 2696.3 24.5 5.43 280.96 P bottom 19.0 97.2 74.2 2696.3 24.5 3.39 224.3
Shear design ν1= 0.480L. VEd VEd,red acw cot Θ asw Note al VRd,max
[kN] [kN] [cm2/m] [cm] [kN]
1 147.7 147.7 0.955 3.692 1.24 Min 137.3 210.5 #12 147.7 147.7 1.149 2.125 2.15 Min 79.0 1000.63 10.3 10.3 0.955 1.000 1.24 Min 45.7 461.8 #14 10.3 10.3 1.149 1.000 2.15 Min 45.7 1437.45 402.4 402.4 1.163 2.500 4.99 Var 92.8 904.66 402.4 402.4 1.102 2.500 4.99 Var 92.8 857.0
#1: fck(t)= 0.33 * fck
Check of crack width limit in SLS
perm. crack width: wk < 0.20 mm, Frequent load combination
L. Creep period Cross- Tens- rsup max.σs sr,max εsm-εcm wk
section zone rinf [N/mm2] [mm] [‰] [mm]
1 tB Storage P top 1.00 no cracks2 tE Storage P bottom 1.00 CS completely compressed3 tB Storage/Erection P top 1.00 59.04 420.27 0.177 0.074 tE Storage/Erection P bottom 1.00 CS completely compressed5 tB Utilization P top 1.00 CS completely compressed6 tE Utilization P bottom 1.00 CS completely compressed
Internal forces and elongationState I State II
L. Nges Mges max. σ X0I φeff εc X0II[kN] [kNm] [N/mm2] [cm] [‰] [cm]
1 -2044.3 -707.16 2.67 89.92 -1488.4 -485.80 -15.62 91.63 -2044.3 -832.18 4.41 85.6 0.00 -0.749 69.74 -1488.4 -610.82 -18.30 85.45 -1627.7 -385.96 -0.33 103.26 -1016.2 -192.22 -7.68 113.8
X0I: Pressure zone height in state I X0II: Pressure zone height in state II
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 2101067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
L. hc,ef Aceff ξ1 Ap As ρp,ef ρtot k1 k2 k3 c k4[cm] [cm2] [cm2] [cm2] [%] [%] [cm]
3 10.3 619.6 1.29 0.0 6.3 1.014 1.014 0.80 0.50 3.40 2.5 0.425
Internal forces cracking and strains (state II)State I State II
L. Nges Mges max. σ X0I φeff εc X0II[kN] [kNm] [N/mm2] [cm] [‰] [cm]
1 -2044.3 -807.84 4.07 86.33 -2044.3 -807.84 4.07 86.3
X0I: Pressure zone height in state I X0II: Pressure zone height in state II
Minimum reinforcement for crack control:
L. Creep period Cross- Tens- rsup σt req. As exist. Assection zone rinf [N/mm2] [cm2] [cm2]
1 tB Storage P top 1.00 4.62 <= 0 cm22 tE Storage P bottom 1.00 -15.62 < 4.07 not req.3 tB Storage/Erection P top 1.00 6.36 <= 0 cm24 tE Storage/Erection P bottom 1.00 -18.30 < 4.07 not req.5 tB Utilization P top 1.00 1.81 < 4.07 not req.6 tE Utilization P bottom 1.00 -6.51 < 4.07 not req.
Web FlangeL. D x0IZ Ap ξ1 k kc Act As k kc Act As
[mm] [cm] [cm2] [cm2] [cm2] [cm2] [cm2]
1 20 14.4 0.0 0.00 0.65 0.00 272.9 -nan(ind) 0.97 0.52 484.8 4.53 20 14.4 0.0 0.00 0.65 0.00 272.9 -nan(ind) 0.97 0.52 484.8 4.5
x0IZ: tensile zone in state I due to cracking forces
Ductility reinforcement in precompressed tensile zone:
b fctm Zs req. As exist. As[cm3] [N/mm2] [cm] [cm2] [cm2]
19 4.07 97.2 3.9 4.0
Stress checks SLS
Concrete edge stresses in state I due to prestress, creep, shrinkage and relaxationσR Precast
L. due to top bottom[N/mm2] [N/mm2]
1 Prestr. release anchorage 4.35 -24.902 csr storage -0.83 4.993 csr utilisation -0.08 4.73
Tab. Compr stresses of concreteMEd σc Precast
L. Creep period Cross- + = Max Cc,Pk Qc,Pksection - = Min [N/mm2] [N/mm2]
1 tB Storage P -- -22.31* -22.31 #12 tE Storage P -- -17.33 -17.333 tB Storage/Erection P -- -27.71*4 tE Storage/Erection P -- -15.705 tB Utilization P -- -13.97 -13.976 tE Utilization P -- -9.24 -9.24
#1: due to σc > 0.45* fck(t) increased ceep modulus
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 2201067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Tab. Steel- and Concrete tension stressMEd σp σs σt
L. Creep period Cross- + = Max Cc,Pm Cc,Pk Cc,Pksection - = Min [N/mm2] [N/mm2] [N/mm2]
1 tB Storage P --- 927.47 9.75 2.67*2 tE Storage P -+- 731.36 < 0 1.843 tB Storage/Erection P --- 940.41 59.04 ZII4 tE Storage/Erection P --- 690.99 52.54 ZII5 tB Utilization P ++- 827.61 < 0 ZII6 tE Utilization P ++- 609.42 < 0 ZII
Pk= Prestres char. value, Pm= prestress mean value, StII: State II
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 2301067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Selected section x = 3.60 m from left support
Internal force combinations from external loadingLAc: dominant variable action (leading action)ULS-PT : permanent + transient design situation (fundam. combination)SLS-Cc : characteristic combinationSLS-Fc : frequent combinationSLS-Qc : quasi-permanent combination
maximum moment : [kNm]
ULS-PT SLS-Cc SLS-Fc SLS-Qc
Storage 543.37 402.48 402.48 402.48Storage/Erection -47.61 -47.61 -47.61 -47.61Utilization 1471.73 1134.52 956.56 915.69LAc 10 10 10 -
Minimum moment : [kNm]
ULS-PT SLS-Cc SLS-Fc SLS-Qc
Storage 402.45 402.48 402.48 402.48Storage/Erection -64.27 -47.61 -47.61 -47.61Utilization 915.67 915.69 915.69 915.69LAc - - - -
maximum shear force:[kN]
ULS-PT
Storage 133.8Storage/Erection 134.5Utilization 356.2LAc 10
Effective Tendons ( prestressed formwork state for t = t0 (sto))
No. Area Distance Prestress tens.force ShorttimeLayer Ap f.bottom max min max min RelaxationNo. [cm2] [cm] [N/mm2] [N/mm2] [kN] [kN] [N/mm2]
1 3 2.8 8.5 999.16 999.16 278.8 278.8 -0.842 3 2.8 12.3 999.16 999.16 278.8 278.8 -0.843 3 2.8 16.1 999.16 999.16 278.8 278.8 -0.844 3 2.8 19.9 999.16 999.16 278.8 278.8 -0.845 3 2.8 23.7 999.16 999.16 278.8 278.8 -0.846 3 2.8 27.5 999.16 999.16 278.8 278.8 -0.847 3 2.8 31.3 999.16 999.16 278.8 278.8 -0.848 1 0.9 35.1 999.16 999.16 92.9 92.9 -0.84
Untensioned reinforcement
Layer Number Diameter Area LE[mm] [cm2] [cm]
1 2 16 4.0 3.52 2 20 6.3 98.63 2 20 6.3 110.1
Cross-section Precast :
Layer of cross-section from top to bottomNr Width Distance Remarks
[cm] [cm]
1 60.0 0.02 60.0 15.03 19.0 23.2 Web begin4 19.0 113.6 Web end
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 2401067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Cross-section Values
brutto idealAc zu Ic Ai zi Ii
[cm2] [cm] [cm4] [cm2] [cm] [cm4]
Precast cross-section 2940.8 69.3 3618822 3101.3 68.2 4007375
Internal forces from prestress (mean values, prestressed formwork state)
Npm(0) Mpm(0) φFakCreep tB tE tB tE Prcperiod [kN] [kN] [kNm] [kNm]
Storage -2044.3 -1676.6 -973.19 -825.68 2.23Utilization -1676.6 -1233.0 -825.68 -744.63 1.00
tA=Begin, tE=End creep periodφFak: Increase factor creep modulus (non-linear creep:> 1.0)
Prestress steel relaxationStorage Utilization
Lay. Δσp,r1 Δσp,r2
No. [N/mm2] [N/mm2]
1 -0.89 -11.152 -0.91 -11.293 -0.92 -11.444 -0.94 -11.585 -0.95 -11.736 -0.97 -11.887 -0.99 -12.038 -1.00 -12.18
Prestr. steel, losses due to creeping, shrinking and relaxation:Storage Utilization
Lay. Δσp,csr1(0) Δσp,csr2(0)
No. [N/mm2] [N/mm2]
1 -140.31 -112.892 -136.24 -113.913 -132.17 -114.944 -128.11 -115.965 -124.04 -116.986 -119.97 -118.017 -115.91 -119.048 -111.84 -120.06
Stress in rebars due to creeping,shringing and relaxation:Storage Utilization
Lay. Δσs,csr1(0) Δσs,csr2(0)
No. [N/mm2] [N/mm2]
1 -148.68 -105.412 -44.01 -128.693 -31.35 -131.51
Bending with Normal Force ULS
L. Creep period Cross- Tens- z MEd MRd ηsection zone [cm] [kNm] [kNm] (>1.0)
1 tB Storage P top ---- Arm of lev. Hz < 0 -402.45 ---- #12 tE Storage P bottom 87.4 2614.28 543.37 4.813 tB Storage/Erection P top ---- Arm of lev. Hz < 0 64.27 ---- #14 tE Storage/Erection P bottom 87.4 2614.28 MEd < 0 n/a5 tE Utilization P top 89.6 594.41 MEd < 0 n/a6 tE Utilization P bottom 87.2 2611.08 1471.73 1.77
#1: fck(t)= 0.33 * fck
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 2501067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Interim results : Ultimate elongation and internal forcesL. εc εs x Ap As Zp Zs Dc Dp Ds
[‰] [‰] [cm] [cm2] [cm2] [kN] [kN] [kN] [kN] [kN]
2 3.500 16.300 19.5 20.5 4.0 2869.3 178.8 2645.3 0.0 375.54 3.500 16.300 19.5 20.5 4.0 2869.3 178.8 2645.3 0.0 375.55 3.500 7.100 36.3 0.0 12.6 0.0 549.7 1583.8 -1196.6 164.16 3.500 17.100 18.7 20.5 4.0 2871.5 178.9 2555.0 0.0 452.3
Shear Resistance
Design value shear forceL. Creep period Combination VEd,0 MEd dV due to
[kN] [kNm] [kN]
1 tB Storage QMax 133.8 543.35 -30.8 Vccd2 tE Storage QMax 133.8 543.35 -30.8 Vccd3 tB Storage/Erection QMax 134.5 -64.27 0.0 -------4 tE Storage/Erection QMax 134.5 -64.27 0.0 -------5 tB Utilization QMax 356.2 1471.72 -83.6 Vccd6 tE Utilization QMax 356.2 1471.72 -83.6 Vccd
Effective cross-sectionL. Cross- Tens- bw d z Ac Asl σcp VRdc
section zone [cm] [cm] [cm] [cm2] [cm2] [N/mm2] [kN]
1 P bottom 19.0 110.1 87.4 2940.8 24.5 2.21 165.42 P bottom 19.0 110.1 87.4 2940.8 24.5 5.13 299.93 P top 19.0 104.3 93.9 2940.8 12.6 2.21 140.54 P top 19.0 104.3 93.9 2940.8 12.6 5.13 260.85 P bottom 19.0 110.1 87.2 2940.8 24.5 5.13 299.96 P bottom 19.0 110.1 87.2 2940.8 24.5 3.77 257.3
Shear design ν1= 0.480L. VEd VEd,red acw cot Θ asw Note al VRd,max
[kN] [kN] [cm2/m] [cm] [kN]
1 103.0 103.0 1.083 2.191 1.24 Min 95.8 420.5 #12 103.0 103.0 1.154 1.261 2.15 Min 55.1 1493.13 134.5 134.5 1.083 2.664 1.24 Min 125.0 393.3 #14 134.5 134.5 1.154 1.533 2.15 Min 72.0 1507.15 272.6 272.6 1.154 3.347 2.15 Min 145.9 838.66 272.6 272.6 1.113 2.500 2.88 Var 108.9 1017.1
#1: fck(t)= 0.33 * fck
Check of crack width limit in SLS
perm. crack width: wk < 0.20 mm, Frequent load combination
L. Creep period Cross- Tens- rsup max.σs sr,max εsm-εcm wk
section zone rinf [N/mm2] [mm] [‰] [mm]
1 tB Storage P top 1.00 CS completely compressed2 tE Storage P bottom 1.00 CS completely compressed3 tB Storage/Erection P top 1.00 90.77 565.24 0.272 0.154 tE Storage/Erection P bottom 1.00 CS completely compressed5 tE Utilization P top 1.00 CS completely compressed6 tE Utilization P bottom 1.00 CS completely compressed
Internal forces and elongationState I State II
L. Nges Mges max. σ X0I φeff εc X0II[kN] [kNm] [N/mm2] [cm] [‰] [cm]
1 -2044.3 -570.72 -0.13 114.52 -1676.6 -423.20 -12.61 119.43 -2044.3 -1020.80 4.96 94.1 0.00 -0.768 69.24 -1676.6 -873.28 -20.27 93.05 -1233.0 171.06 -5.91 138.56 -1233.0 211.93 -0.37 120.6
X0I: Pressure zone height in state I X0II: Pressure zone height in state II
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 2601067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
L. hc,ef Aceff ξ1 Ap As ρp,ef ρtot k1 k2 k3 c k4[cm] [cm2] [cm2] [cm2] [%] [%] [cm]
3 14.8 887.5 1.29 0.0 6.3 0.708 0.708 0.80 0.50 3.40 2.5 0.425
Internal forces cracking and strains (state II)State I State II
L. Nges Mges max. σ X0I φeff εc X0II[kN] [kNm] [N/mm2] [cm] [‰] [cm]
3 -1676.6 -837.17 4.07 94.1
X0I: Pressure zone height in state I X0II: Pressure zone height in state II
Minimum reinforcement for crack control:
L. Creep period Cross- Tens- rsup σt req. As exist. Assection zone rinf [N/mm2] [cm2] [cm2]
1 tB Storage P top 1.00 1.06 < 4.07 not req.2 tE Storage P bottom 1.00 -12.61 < 4.07 not req.3 tB Storage/Erection P top 1.00 4.48 <= 0 cm24 tE Storage/Erection P bottom 1.00 -20.27 < 4.07 not req.5 tE Utilization P top 1.00 -5.00 < 4.07 not req.6 tE Utilization P bottom 1.00 2.66 < 4.07 not req.
Web FlangeL. D x0IZ Ap ξ1 k kc Act As k kc Act As
[mm] [cm] [cm2] [cm2] [cm2] [cm2] [cm2]
3 20 19.5 0.0 0.00 0.65 0.00 370.3 -nan(ind) 0.97 0.64 657.9 9.2
x0IZ: tensile zone in state I due to cracking forces
Ductility reinforcement in precompressed tensile zone:
b fctm Zs req. As exist. As[cm3] [N/mm2] [cm] [cm2] [cm2]
19 4.07 110.1 4.4 4.0
Stress checks SLS
Concrete edge stresses in state I due to prestress, creep, shrinkage and relaxationσR Precast
L. due to top bottom[N/mm2] [N/mm2]
1 Prestr. release anchorage 4.43 -23.152 csr storage -0.48 3.703 csr utilisation 0.51 2.81
Tab. Compr stresses of concreteMEd σc Precast
L. Creep period Cross- + = Max Cc,Pk Qc,Pksection - = Min [N/mm2] [N/mm2]
1 tB Storage P -- -16.30* -16.30 #12 tE Storage P -- -12.61 -12.613 tB Storage/Erection P -- -28.43*4 tE Storage/Erection P -- -18.625 tB Utilization P +- -8.90 -6.436 tE Utilization P +- -8.39 -5.91
#1: due to σc > 0.45* fck(t) increased ceep modulus
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 2701067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Tab. Steel- and Concrete tension stressMEd σp σs σt
L. Creep period Cross- + = Max Cc,Pm Cc,Pk Cc,Pksection - = Min [N/mm2] [N/mm2] [N/mm2]
1 tB Storage P -+- 939.58 < 0 ZII2 tE Storage P -+- 840.41 < 0 ZII3 tB Storage/Erection P --- 939.36 90.77 ZII4 tE Storage/Erection P --- 775.87 94.17 ZII5 tB Utilization P ++- 872.28 < 0 ZII6 tE Utilization P +++ 763.28 < 0 2.66
Pk= Prestres char. value, Pm= prestress mean value, StII: State II
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 2801067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Selected section x = 0.08 m from left support
Internal force combinations from external loadingLAc: dominant variable action (leading action)ULS-PT : permanent + transient design situation (fundam. combination)SLS-Cc : characteristic combinationSLS-Fc : frequent combinationSLS-Qc : quasi-permanent combination
maximum moment : [kNm]
ULS-PT SLS-Cc SLS-Fc SLS-Qc
Storage 13.29 9.83 9.83 9.83Storage/Erection -0.17 -0.17 -0.17 -0.17Utilization 36.70 28.27 23.78 22.75LAc 10 10 10 -
Minimum moment : [kNm]
ULS-PT SLS-Cc SLS-Fc SLS-Qc
Storage 9.80 9.83 9.83 9.83Storage/Erection -0.23 -0.17 -0.17 -0.17Utilization 22.73 22.75 22.75 22.75LAc - - - -
maximum shear force:[kN]
ULS-PT
Storage 166.7Storage/Erection -2.0Utilization 458.5LAc 10
Effective Tendons ( prestressed formwork state for t = t0 (sto))
No. Area Distance Prestress tens.force ShorttimeLayer Ap f.bottom max min max min RelaxationNo. [cm2] [cm] [N/mm2] [N/mm2] [kN] [kN] [N/mm2]
1 3 2.8 8.5 274.35 182.90 76.5 51.0 -0.002 3 2.8 12.3 274.35 182.90 76.5 51.0 -0.003 3 2.8 16.1 274.35 182.90 76.5 51.0 -0.004 3 2.8 19.9 274.35 182.90 76.5 51.0 -0.005 3 2.8 23.7 274.35 182.90 76.5 51.0 -0.006 3 2.8 27.5 274.35 182.90 76.5 51.0 -0.007 3 2.8 31.3 274.35 182.90 76.5 51.0 -0.008 1 0.9 35.1 274.35 182.90 25.5 17.0 -0.00
Untensioned reinforcement
Layer Number Diameter Area LE[mm] [cm2] [cm]
1 2 16 4.0 3.52 2 20 6.3 81.13 2 20 6.3 92.6
Cross-section Precast :
Layer of cross-section from top to bottomNr Width Distance Remarks
[cm] [cm]
1 60.0 0.02 60.0 15.03 19.0 23.2 Web begin4 19.0 96.1 Web end
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 2901067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Cross-section Values
brutto idealAc zu Ic Ai zi Ii
[cm2] [cm] [cm4] [cm2] [cm] [cm4]
Precast cross-section 2609.7 59.6 2239971 2770.2 58.5 2497429
Internal forces from prestress (mean values, prestressed formwork state)
Npm(0) Mpm(0)
Creep tB tE tB tEperiod [kN] [kN] [kNm] [kNm]
Storage -561.3 -291.0 -213.02 -121.04Utilization -436.6 -49.0 -181.56 -69.53
tA=Begin, tE=End creep period
Prestress steel relaxationStorage Utilization
Lay. Δσp,r1 Δσp,r2
No. [N/mm2] [N/mm2]
1 -0.01 -0.612 -0.01 -0.623 -0.01 -0.634 -0.01 -0.635 -0.01 -0.646 -0.01 -0.657 -0.01 -0.668 -0.01 -0.67
Prestr. steel, losses due to creeping, shrinking and relaxation:Storage Utilization
Lay. Δσp,csr1(0) Δσp,csr2(0)
No. [N/mm2] [N/mm2]
1 -41.09 -108.722 -40.20 -107.393 -39.30 -106.064 -38.40 -104.735 -37.50 -103.396 -36.61 -102.067 -35.71 -100.738 -34.81 -99.40
Stress in rebars due to creeping,shringing and relaxation:Storage Utilization
Lay. Δσs,csr1(0) Δσs,csr2(0)
No. [N/mm2] [N/mm2]
1 -43.35 -112.822 -24.54 -84.743 -21.75 -80.58
Bending with Normal Force ULS
L. Creep period Cross- Tens- z MEd MRd ηsection zone [cm] [kNm] [kNm] (>1.0)
1 tB Storage P top 73.1 446.23 MEd < 0 n/a #12 tE Storage P bottom 69.0 2035.23 13.29 153.083 tB Storage/Erection P top 73.1 446.23 0.23 1916.60 #14 tE Storage/Erection P bottom 69.0 2035.23 MEd < 0 n/a5 tB Utilization P top 61.4 541.22 MEd < 0 n/a6 tE Utilization P bottom 69.1 2020.00 36.70 55.04
#1: fck(t)= 0.33 * fck
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 3001067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Interim results : Ultimate elongation and internal forcesL. εc εs x Ap As Zp Zs Dc Dp Ds
[‰] [‰] [cm] [cm2] [cm2] [kN] [kN] [kN] [kN] [kN]
1 3.500 5.900 34.5 0.9 12.6 24.1 549.2 497.9 -88.5 171.32 3.500 13.500 19.1 20.5 4.0 2771.3 178.1 2600.0 0.0 355.83 3.500 5.900 34.5 0.9 12.6 24.1 549.2 497.9 -88.5 171.34 3.500 13.500 19.1 20.5 4.0 2771.3 178.1 2600.0 0.0 355.85 3.500 12.300 20.5 9.3 12.6 438.5 554.6 894.3 -76.9 163.76 3.500 14.300 18.2 20.5 4.0 2774.0 178.2 2495.0 0.0 399.8
Shear Resistance
Design value shear forceL. Creep period Combination VEd,0 MEd dV due to
[kN] [kNm] [kN]
1 tB Storage QMax 166.7 13.27 -1.0 Vccd2 tE Storage QMax 166.7 13.27 -1.0 Vccd3 tB Storage/Erection QMax -2.0 -0.23 0.0 -------4 tE Storage/Erection QMax -2.0 -0.23 0.0 -------5 tB Utilization QMax 458.5 36.68 -2.6 Vccd6 tE Utilization QMax 458.5 36.68 -2.6 Vccd
Effective cross-sectionL. Cross- Tens- bw d z Ac Asl σcp VRdc
section zone [cm] [cm] [cm] [cm2] [cm2] [N/mm2] [kN]
1 P bottom 19.0 92.6 69.0 2609.7 24.5 1.94 139.12 P bottom 19.0 92.6 69.0 2609.7 24.5 1.00 153.73 P top 19.0 86.9 73.1 2609.7 12.6 1.94 116.24 P top 19.0 86.9 73.1 2609.7 12.6 1.00 123.55 P bottom 19.0 92.6 69.1 2609.7 24.5 1.51 167.06 P bottom 19.0 92.6 69.1 2609.7 24.5 0.17 131.7
Shear design ν1= 0.480Check VRd,s not requ.,asw und CotΘ from the last contruction phaseL. VEd VEd,red acw cot Θ asw Note al VRd,max
[kN] [kN] [cm2/m] [cm] [kN]
1 165.8 165.8 1.175 3.700 1.24 Var 86.3 240.2 #12 165.8 165.8 1.030 2.129 2.15 Var 86.3 832.03 2.0 2.0 1.175 1.000 1.24 Min 43.4 504.9 #14 2.0 2.0 1.030 1.000 2.15 Min 43.4 1144.75 455.9 455.9 1.045 2.500 5.00 Var 86.4 757.66 455.9 455.9 1.005 2.500 5.00 Var 86.4 728.5
#1: fck(t)= 0.33 * fck
Check of crack width limit in SLS
perm. crack width: wk < 0.20 mm, Frequent load combination
L. Creep period Cross- Tens- rsup max.σs sr,max εsm-εcm wk
section zone rinf [N/mm2] [mm] [‰] [mm]
1 tB Storage P top 1.00 no cracks2 tE Storage P bottom 1.00 CS completely compressed3 tB Storage/Erection P top 1.00 no cracks4 tE Storage/Erection P bottom 1.00 CS completely compressed5 tB Utilization P top 1.00 no cracks6 tE Utilization P bottom 1.00 CS completely compressed
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 3101067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Internal forces and elongationState I State II
L. Nges Mges max. σ X0I φeff εc X0II[kN] [kNm] [N/mm2] [cm] [‰] [cm]
1 -561.3 -203.19 1.03 83.42 -291.0 -111.21 -3.66 82.13 -561.3 -213.19 1.18 82.34 -291.0 -121.21 -3.89 80.25 -436.6 -158.81 0.81 83.36 -49.0 -45.74 -1.25 68.2
X0I: Pressure zone height in state I X0II: Pressure zone height in state II
L. hc,ef Aceff ξ1 Ap As ρp,ef ρtot k1 k2 k3 c k4[cm] [cm2] [cm2] [cm2] [%] [%] [cm]
Internal forces cracking and strains (state II)State I State II
L. Nges Mges max. σ X0I φeff εc X0II[kN] [kNm] [N/mm2] [cm] [‰] [cm]
X0I: Pressure zone height in state I X0II: Pressure zone height in state II
Minimum reinforcement for crack control:
L. Creep period Cross- Tens- rsup σt req. As exist. Assection zone rinf [N/mm2] [cm2] [cm2]
1 tB Storage P top 1.00 2.01 < 4.07 not req.2 tE Storage P bottom 1.00 -3.66 < 4.07 not req.3 tB Storage/Erection P top 1.00 2.16 < 4.07 not req.4 tE Storage/Erection P bottom 1.00 -3.89 < 4.07 not req.5 tB Utilization P top 1.00 2.21 < 4.07 not req.6 tE Utilization P bottom 1.00 -1.14 < 4.07 not req.
Web FlangeL. D x0IZ Ap ξ1 k kc Act As k kc Act As
[mm] [cm] [cm2] [cm2] [cm2] [cm2] [cm2]
x0IZ: tensile zone in state I due to cracking forces
Ductility reinforcement in precompressed tensile zone:
b fctm Zs req. As exist. As[cm3] [N/mm2] [cm] [cm2] [cm2]
19 4.07 92.6 3.7 4.0
Stress checks SLS
Concrete edge stresses in state I due to prestress, creep, shrinkage and relaxationσR Precast
L. due to top bottom[N/mm2] [N/mm2]
1 Prestr. release anchorage 1.18 -7.022 csr storage -0.02 1.193 csr utilisation 0.15 3.12
Tab. Compr stresses of concreteMEd σc Precast
L. Creep period Cross- + = Max Cc,Pk Qc,Pksection - = Min [N/mm2] [N/mm2]
1 tB Storage P -- -6.79 -6.792 tE Storage P -- -5.60 -5.603 tB Storage/Erection P -- -7.024 tE Storage/Erection P -- -5.845 tB Utilization P -- -5.30 -5.306 tE Utilization P -- -2.18 -2.18
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 3201067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
Tab. Steel- and Concrete tension stressMEd σp σs σt
L. Creep period Cross- + = Max Cc,Pm Cc,Pk Cc,Pksection - = Min [N/mm2] [N/mm2] [N/mm2]
1 tB Storage P --- 253.62 4.04 1.032 tE Storage P -+- 131.29 < 0 1.013 tB Storage/Erection P --- 253.12 4.78 1.184 tE Storage/Erection P -+- 130.79 < 0 1.165 tB Utilization P ++- 223.65 < 0 0.816 tE Utilization P ++- 43.53 < 0 0.96
Pk= Prestres char. value, Pm= prestress mean value, StII: State II
Lateral buckling (Stiglat)
Safety in installed state η = 1.69 < 2.00Design buckling moment: Mkipp = 4657.51 kNmexisting moment : MEd = 2763.72 kNm without prestressCombination of characteristic values
Interim values acc. to 'Beton- und Stahlbetonbau' 1985, H. 9,10,11 Ecm = 37000 N/mm2 Gcm = 14800 N/mm2 It, Iy averaged It = 208188 cm4 Iy = 394505 cm4 acc.to Rafla Ix = 11379011 cm4 Ak = 4664.5 MN2cm4 (It 60% as C.II) hc = 1.58 m β1 = 0.000 β2 = 0.003 k1 = 3.540 k2 = 1.000 k3 = 0.920 Mk = 7415.48 kNm Wxo = 123859 cm3 x = 10.10 m σB = 52.87 N/mm2 σT = 33.21 N/mm2 λV = 83.1 (σT acc. eq.62calculated !)
a potentially nessecary reinforcement for torsion is not determined in the program
Erection with spreader
Lateral buckling safety η = 4.29 > 2.50Design buckling moment: Mkipp = 2343.70 kNmexisting moment : MEd = 546.27 kNm without prestress
Interim values acc. to 'Beton- und Stahlbetonbau' 1985, H. 9,10,11 β4 = 0.000 δ = 0.000 γ = 1.000 f = 0.331 m Ak = 4664.5 MN2cm4 p = 0.752 j(α) = 0.095 α = 1.478 qkl = 47.76 kN/m Wxo = 148769 cm3 Mk = 2700.05 kNm x = 16.83 m σB = 18.15 N/mm2 σT = 15.75 N/mm2 λV = 141.8
Anchorage by bond ( over the left bearing)
lpt2 = 1.26 m Distance first bending crack lr = 3.37 m fctd(t) = 0.81 N/mm2 t= release anchorage fbpt = 2.58 N/mm2 ηP2 = 1.20 fbpd = 2.28 N/mm2
x Zp Zs TEd η= Util[m] [kN] [kN] [kN] (Zp+Zs)/TEd
0.15 378.4 178.1 664.0 0.84 1.190.31 776.3 178.0 752.1 1.27 0.790.61 1527.5 177.9 910.0 1.87 0.530.92 2303.8 178.0 1058.5 2.34 0.431.22 2826.6 178.0 1185.0 2.54 0.391.53 2830.2 178.0 1315.7 2.29 0.441.84 2842.1 178.3 1446.4 2.09 0.48
Zp: resisting tensile force by the prestressed steelZs: resisting tensile force by the rebarsTEd: tensile force to be anchored
No. Dist.LE XA σp Eq. lbpd xk ΣZp ΣZs TEd add. AsLay. [cm] [m] [N/mm2] [m] [cm2] [kN] [kN] [kN] [cm2]
1 8.5 0.00 583.29 8.21 2.24 Anchorage range uncracked (PT)2 12.3 0.00 596.66 8.21 2.23 Anchorage range uncracked (PT)3 16.1 0.00 610.01 8.21 2.21 Anchorage range uncracked (PT)4 19.9 0.00 623.36 8.21 2.20 Anchorage range uncracked (PT)5 23.7 0.00 636.71 8.21 2.19 Anchorage range uncracked (PT)
Nemetschek Frilo GmbH
Schweriner Str. 25 Position: B8_FDB-Ref-BS
Projekt: R2017-2
09.11.2017 Seite: 3301067
Tel.: 03518761411
Fax: 0351/87614-10Dresden
No. Dist.LE XA σp Eq. lbpd xk ΣZp ΣZs TEd add. AsLay. [cm] [m] [N/mm2] [m] [cm2] [kN] [kN] [kN] [cm2]
6 27.5 0.00 650.04 8.21 2.17 Anchorage range uncracked (PT)7 31.3 0.00 663.37 8.21 2.43 Anchorage range uncracked (PT)8 35.1 0.00 676.68 8.21 2.42 Anchorage range uncracked (PT)
XA: Beginning of the anchoring area of the steel layer (dist. from the corresp. binder side)Eq. 8.21.1: Anchorage area uncracked, σp acc.to fig. 8.17DE (b)Eq. 8.21.1: Anchorage area cracked, σp acc.to fig. 8.17DE (b)xk: decisive section in the anchoring area of the layer (distance from the beginning of the binder)add. As: Additional sagging reinforcement required for anchorage
Anchorage by bond ( over the right bearing)
lpt2 = 1.26 m Distance first bending crack lr = 3.37 m fctd(t) = 0.81 N/mm2 t= release anchorage fbpt = 2.58 N/mm2 ηP2 = 1.20 fbpd = 2.28 N/mm2
x Zp Zs TEd η= Util[m] [kN] [kN] [kN] (Zp+Zs)/TEd
28.46 2842.1 178.3 1446.4 2.09 0.4828.77 2830.2 178.0 1315.7 2.29 0.4429.08 2826.6 178.0 1185.0 2.54 0.3929.38 2303.8 178.0 1058.5 2.34 0.4329.69 1527.5 177.9 910.0 1.87 0.5329.99 776.3 178.0 752.1 1.27 0.7930.15 378.4 178.1 664.0 0.84 1.19
Zp: resisting tensile force by the prestressed steelZs: resisting tensile force by the rebarsTEd: tensile force to be anchored
No. Dist.LE XA σp Eq. lbpd xk ΣZp ΣZs TEd add. AsLay. [cm] [m] [N/mm2] [m] [cm2] [kN] [kN] [kN] [cm2]
1 8.5 0.00 583.29 8.21 2.24 Anchorage range uncracked (PT)2 12.3 0.00 596.66 8.21 2.23 Anchorage range uncracked (PT)3 16.1 0.00 610.01 8.21 2.21 Anchorage range uncracked (PT)4 19.9 0.00 623.36 8.21 2.20 Anchorage range uncracked (PT)5 23.7 0.00 636.71 8.21 2.19 Anchorage range uncracked (PT)6 27.5 0.00 650.04 8.21 2.17 Anchorage range uncracked (PT)7 31.3 0.00 663.37 8.21 2.43 Anchorage range uncracked (PT)8 35.1 0.00 676.68 8.21 2.42 Anchorage range uncracked (PT)
XA: Beginning of the anchoring area of the steel layer (dist. from the corresp. binder side)Eq. 8.21.1: Anchorage area uncracked, σp acc.to fig. 8.17DE (b)Eq. 8.21.1: Anchorage area cracked, σp acc.to fig. 8.17DE (b)xk: decisive section in the anchoring area of the layer (distance from the beginning of the binder)add. As: Additional sagging reinforcement required for anchorage
Bursting Reinforcement at beginning of beam
γp,unfav = 1.20 ldisp = 1.39 m
Initiation zone Section over the last effective position of tension. member No. from to Dist.LE Nc Np Tp Factor req. As
[m] [m] [cm] [kN] [kN] [kN] Interpolation [cm2]
1 0.00 1.39 36.1 -1342.9 1841.0 498.2 0.406 5.6
The bursting reinforcement must be arranged in zone of reduced dispersion length.red. dispersion length indented wire w.o. strand 3/4*l disp=1.04 m
Burstring Reinforcement at end of beam
γp,unfav = 1.20 ldisp = 1.39 m
Initiation zone Section over the last effective position of tension. member No. from to Dist.LE Nc Np Tp Factor req. As
[m] [m] [cm] [kN] [kN] [kN] Interpolation [cm2]
1 30.30 28.91 36.1 -1342.9 1841.0 498.2 0.406 5.6