NERETVA AND TREBISNJICA MANAGEMENT PROJECT
The project will be implemented during FY 2009-2014
Component GEF GoBiH GoC Beneficiaries
Total Project Costs
Other donors
Total Project Costs and Parallel
Financing
I. Improved Transboundary Water Resource Management*
2.01 0.50 0.14 0.00 2.65 3.50 6.15
II. Improved Management and Use of Wetlands Ecosystems and Biodiversity
2.25 0.21 0.43 0.20 3.09 0.10 3.19
III. High Priority Investments for Water Pollution Control
2.46 2.95 3.25 0.30 8.96 0.33 9.29
IV. Public Participation and Management of Project Implementation**
1.28 0.74 0.50 0.00 2.52 0.00 2. 52
Total including physical and price contingencies
8.00 4.40 4.32 0.50 17.22 3.93 21.15
In percent 38% 21% 20% 2% 81% 19% 100%
Table 1: Project Costs (in US$ millions)
CroatiaInter-State Water
ComiteeBosnia and Herzegovina
Coordination Committee
TA
TA
Ministry of Regional
Development, Forestry and
Water Management HV
PITRep.of MRDFWM
Rep.of MOERep.of MOC
Financial Management
Procurement
-MAFWM-MRDFWM-MOE-PMT /PIU Director-PIT
MOFTER
PMT(Financial Management
& Procurement)
MAFWMFBiH
MAFWMRepubika
Srpska sSSSsssss
sssSSSSrpskaS
Srpska
Agency for Water Shed of Adriatic
SeaMostar
PIT
RS Water Directorate
Bijeljina/Trebinje
PIT
MAFWM MOET Municipalities
MAFWM MEPP Municipalities
Reporting Relation
Working Relation
Component 1 Components 2&3
Component 4
Council of Ministers of Bosnia and Herzegovina District
Brčko
Ministry of Security
Ministry of Foreign Affairs
BH GOVERNMENT STRUCTURE
Ministry of Foreign
Trade and Economic Relations
Ministry of Civil Affairs
Ministry of Finance and
Treasury
Ministry of Defence
Ministry of Transport and Comunication
Ministry of Foreign Trade and Economical Relation is responsible for Environmental Activities at the State Level with competencies for:
International relationsInternational relations Definition of policy, Definition of policy, Base principles Base principles Coordination of activities and harmonisation of plans of entities andCoordination of activities and harmonisation of plans of entities and
Ministry for Justice
Ministry for Human
Rights and Refugee
B & H
City / Municipality
F BH RS
1,2... 10
City / Municipality
I – State level
II – Entities
III – Cantons
IV – Local level `
BiH Government Structure
ISWC and CC• On the transboundary level, the existing ISWC and a Coordination Committee (CC) to be established
by effectiveness– will be responsible for coordinating and monitoring the joint work under the project including preparation of water
management plan, and for giving guidance on solving common problems.
• The CC will consist of 8 members from BiH (2 representatives of MAFWRM, MOE and Project Implementation Team (PIT) from each entity and the Project Coordinator and Deputy from MOFTER)
• and 5 members from Croatia (1representatives of MRDAFWM, MOC, MEPPC MFRD and the Director of the Project Implementation Team (PIT)).
• The CC will report to the ISWC regularly on the progress of implementation of the project joint activities and seek the ISWC guidance on any issue that may arise during implentation of the joint project activities.
• The CC will be chaired alternatively by a representative from each country every six months.
• CC will be supported with Technical Advisory Group which will consist of experts from the two countries in water, environment, agriculture, and energy sectors; HPP authorities; municipal representatives; and NGOs. The Technical Advisory Group (TAG) shall be established upon request of CC on a temporary basis to deal with thematic questions, when the need arise.
PMTFor implementation of Component 1 - “Improved Transboundary Water
Management” –
Responsibility of the BiH State level Ministry of Foreign Trade and Economic Relations (MoFTER) and PMT will:
• coordinate the activities of the implementing agencies across sectors and entities • serve as the liaison with Croatia and the World Bank for the activities financed under
this component. • be responsible for all fiduciary arrangements related to Component 1, part of sub-
component 2.3 and part of sub-components 4.3 (management of project implementation for component 1)
A Project Management Team (PMT) established within the MOFTER includes four specialists: Project Coordinator, Project Coordinator Assistant, Financial Manager, and Procurement Manager.
The main task of the PMT is to prepare and carry out financial management, supervision, reporting, and evaluation during the project implementation period related to the above component/sub-components.
PIT’s• In order to ensure that proper attention is given to project implementation,
• Project Implementation Teams (PIT’s) will be established within two existing water management institutions:
– the Agency for Watershed of Adriatic Sea (Agencija za Vodno područje slivova Jadranskog mora) in Mostar, FBiH,
– RS Water Directorate in Bijeljina (Direkcija za vode Bijeljina, RS). and
– The PITs in each of these institutions will include representatives of relevant Entity Ministries responsible for water, environment and representatives of municipalities.
– The PITs will be responsible for implementation of project components 2, 3 and 4,
They will also be responsible for all fiduciary arrangements related to components 2 and 3, and their share of component 4, including: the preparation of the technical part of tender documents, technical specifications for goods and services, ToRs for consultants, etc