nespak projects in afghanistan pakistan international ... · nespak projects in afghanistan 18...
TRANSCRIPT
NESPAK Projects in Afghanistan 18 Sialkot Goes International 21
December 2012 Wwww.pcq.com.pk
Connecting Pakistan With The Rest Of The World
14
Pakistan International
Container Terminal
14Pakistan, Korea Ink Deal For Tunnel Project,Water Resources
CUTS DOWN ON COSTS
RELATED TO
...crushing, in terms of time and energy
...manpower
...disposal and procurement of gravel
REDUCES TIMES RELATED TO
...installation and instant use of the machine
...operations, allowing the crushed material to be reused right away ...crushing, since it can be used directly at all worksites, even small ones
MODELS
BF60.1 BF70.2
BF90.3 BF120.4
BF150.10MB S.p.A.Via Calcara, 11 Z.A.
36042 Breganze (Vicenza) Italy Fax +39 0445 308179
Email: Web:www.mbcrusher.com
Tel. +39 0445 308148
BUCKET CRUSHER MB
Company in Focus
Events
09 The Volvo PL4808D
Pipelayer
Technology Review
11
News
18 NESPAK Wins 2
Mega Dam
Projects in
Afghanistan
News
19 100 MW To Be Added By TwoWind Power Projects
News
10 Build Tech Pakistan 2013
News
14 Pakistan, Korea Ink DealFor Tunnel Project, Water Resources
Cover04
3Pakistan Construction & QuarryDecember 2012
News
21Pak Punjab
Development Schemes
Worth Rs2bn
Approved
07 M.A.Aleem Khan & Sons(Pvt.) Ltd.
Pakistan International
Container Terminal
www.pcq.com.pk
Pakistan’s ConstructionOrganization Celebrates47 Years ofExecllence
COVER STORY
4 Pakistan Construction & Quarry December 2012 www.pcq.com.pk
Introduction
Capacity of the Terminal and Salient Features
Key Stakeholders Involved with PICT
Background and Evolution of PICT
The only container terminal sponsored
and owned by Pakistanis, Pakistan
International Container Terminal (PICT)
operates at East Wharf at the Karachi Port,
its key sponsor being Premier Mercantile the services of private players to Services (Pvt.) Ltd. (PMS). Another unique increase efficiency and enhance the feature of PICT is that it is the only port quality of its operations. That is where infrastructure project listed on the Karachi the value of top notch companies, such Stock Exchange (KSE), and also the first as the Pakistan International Container port infrastructure project to be financed Terminal (PICT), is acknowledged and by the International Finance Corporation utilized. Realizing the need to maintain (IFC), the private sector arm of the World the mark and standard of Port Qasim as Bank and also the first private sector the primary port of Pakistan, the project that got financing from the OPEC Karachi Port Trust (KPT) invited Fund for International Development. proposals from the private sector for PICT has 200 Reefer points operational
developing a second fully-equipped and are expanding the capacity further. international-standard container New equipment purchased for timely terminal at East Wharf. PMS won the completion of phase 1 in March 2004 competitive bidding process, resulting included:in a Build Operate Transfer (BOT) ?2 Ship to shore Gantry Cranescontract with the Karachi Port trust for
?4 Rubber Tyred GantriesPICT, giving it prerogative for managing
?4 Reach stackers, 1 Top Lifterthe construction, development , ?2 Empty Container Handlersoperations and management of a
?2 Container Stuffing Forkliftsdedicated container terminal at Karachi
Port for a period of 21 years ?10 Tractor unitscommencing mid-2002. ?20 Trailer Units
?5 Service Vehicles
Further adding to the utilitarian features of
this terminal are a 600 meters quay wall In March 2012, a Mauritian company The total area of the PICT is and deep, modern berths with that are 13.5 called ICTSI Mauritius Limited expressed approximately 210,000 square meters. meters deep. What is striking is that there its intention to purchase 35-55% of In addition to this, 50,000 square is not going to be any reduction of the shareholding interest in PICT. In the same meters are also available at adjacent sanctioned depth during the monsoon month, ICTSI entered into an agreement storage yards in KPT area. As for the season. The PICT is also the only terminal with the majority shareholders of PICT to container storage capacity, Pakistan in Pakistan that has an onsite rail link to up sell up to 35% of the shares of PICT to ICTSI International Container Terminal has a country, with round-the-clock arrival and at Rs150 per share. This agreement is container storage capacity of 19,500 departures of containers. believed to generate synergies and TEU (Twenty Foot Equivalent Container operational efficiencies by benefitting Units) per day.from the experience of a globally
recognized terminal operating company.As far as PICT's terminal handling The main sponsor of the Pakistan capacity is concerned, it was completed International Container Terminal is in four phases, bringing it to 750,000 Premier Mercantile Services (Pvt.) Ltd.
Often, a public sector organization needs TEU per annum.
Pakistan International Container Terminal
During 2008-09, PICT handled 41 percent of TEUs
(Twenty Foot Equivalent
Container Units), which are 512,599
containers. Shipments from all around the world arrive at ports in
Karachi, including the PICT
“
“The first phase of a handling
capacity of 150,000 TEU per
annum was completed in 2004,
the second phase increased it to
300,000 TEU per annum in
2006, the third phase brought it
up to 550,000 TEU per annum
in 2009, and finally, in 2010, the
total handling capacity was
raised to 750,000 per annum in
the final phase, i.e. phase IV.
5Pakistan Construction & QuarryDecember 2012
MS). The technical services for PICT were
provided by Hamburg Port Consulting
(HPC), a subsidiary of German port
o p e r a t o r H a m b u r g e r H a f e n - u n d
Lagerhaus-AG (HHLA). PICT purchased
HPC's Container Terminal Information
System (CTIS). This is a software package
that caters to the need of managing rapidly
growing container traffic, and making the
operational and documentation process
m o re e f f i c i e n t a t t h e p o r t . T h e
implementation of CTIS was also carried
out in phases at the PICT.
It also has refrigerated containers and a PACCS is carried out for access into and
10MW power generation plant that caters exit from the terminal. Centralized and to the domestic and commercial power real-time reporting of vessel activities is Key financers for PICT were The generation needs of the terminal.
also carried out for Lines and their agents International Finance Corporation (IFC),
the private sector arm of the World Bank through lists such as special container Its ship-to-shore gantry cranes can lift two G r o u p , a n d t h e O P E C F u n d f o r lists, import/export lists, and reports such empty containers at a time, doubling International Development.
as terminal departure reports (TDR) empty container moves. A terminal reports for load /discharge activities, operating system by the name of Navis
which are created every 1-4.Sparcs N4 has automated yard and vessel
planning, while it also has an advanced
container scanner system that uses high-
energy X-ray imaging technology for
? There are three key projects lined up
for the Pakistan International Container
Terminal. The first one is an off-dock
terminal which the PICT is developing at
the northern bypass. It will have a total
area of 16.5 acres and will be used for the
storage of empty containers. It will also
have separate covered sheds for import
and export, and a separate area for scrap An investment of approximately $150 cargo. million is involved with this project. Out of
this, a senior loan of $7.75 million was ? At the same time, PICT has also
provided by IFC initially. The OPEC Fund submitted a proposal to Port Qasim
for International Development also Authority (PQA) for setting up the
detecting smuggled weapons and drugs.provided a parallel senior loan of the same country's first dirty bulk cargo terminal. It
amount. A bridge worth Rs230 million was will be able to handle about 8 million tons
also later added to the $150 million per annum of material such as coal, clinker
infrastructure of the PICT.The PICT has a 24/7 dedicated customer and cement.
services and facilitation center, as well as PICT has various quality equipment
an integrated billing and documentation ? Besides these, the third important installed in its infrastructure.
project has been developed by PICT's software. Its gate operations include a data sponsor company PMS. It is an off-dock processing centre (DPC), an outer gate, terminal at Prem Nagar , Raiwind road in
and a CFS gate exclusively for CFS/DG Lahore, covering a total area of 30 acres. It
shifting. Examples of activities carried out will direct train connectivity from PICT at the gates include inspection, release of terminal in Karachi port to the Lahore ICD.
tickets, and seal checks. Full identification
of the trucker, confirmation by the Line,
and confirmation from Customs through
PICT Growth Potential/ Upcoming Projects
Costs Involved and Equipment used in the PICT Project.
Process Control System of PICT
COVER STORY
www.pcq.com.pk
In 2009, a new bridge was constructed for PICT,
the design consultancy for which was provided by NESPAK. The unique feature of this bridge is its ability to handle the
heaviest traffic that comes from the port
““
It has 6 ship-to-shore quayside cranes and 2 mobile harbor cranes. Yard equipments of PICT include rubber-tyred gantry cranes, reach stackers, top loaders, empty container handlers, forklifts, prime movers and service vehicles.
COVER STORY
6 Pakistan Construction & Quarry December 2012
CSR’s Initiatives by PICT
PICT, The Future
serves cargo handling needs of the
country extensively. In addition, it also has PICT is not just a commercially-driven a strong priority towards serving the enterprise. It realizes its duty to the community and is indulged in various country and society, and has therefore corporate social responsibility programs
and welfare initiatives. It also contributed
Rs761 million to the national exchequer
through taxes paid for the year ended June
30 2012, making it a very strong player in
the corporate sector of Pakistan.
With expansion projects in the pipeline, taken part in numerous CSR (Corporate the storage and handling capacity of PICT Social Responsibility) initiatives. It has will increase significantly. This expansion t a ke n e nv i ro n m e n t a l p ro te c t i o n will result in job creation, installation of
Under OSDI's community development measures such as reducing emissions, latest infrastructure, technology and program, PICT has also funded various sewerage treatment, oil spill control and machinery at PICT. Furthermore, it will health-related projects such as a primary power generation. Besides this, PICT is open doors t more shipments entering healthcare center in Shikarpur, Hepatitis also very caring and concerned for its and exiting the port that will result in B & C prevention and control program, e m p l o y e e s , e n s u r i n g m a x i m u m increased trade between Pakistan and the and a Hygiene and nutrition campaign. It occupational safety for workers. Workers rest of the world.has also initiated community welfare of PICT are trained at safety awareness
schemes such as adopting five schools in sessions, while a 24-hour dispensary and
Keamari and a Karigar Tarining Institute.ambulance are also present at the
terminal. Leisure activities are also
encouraged through sports events for the
staff, and the company also provides All in all, the PICT is a multi-purpose,
medical and educational assistance for its state-of-the art container terminal that
low-income staff.
www.pcq.com.pk
PICT is also involved in the
establishment of a social organization called Organization
for Social Development
Initiatives (OSDI) which works
towards poverty alleviation in rural
areas
“
“
COMPANY IN FOCUSM.A.ALEEM KHAN & SONS
(Pvt) Ltd
MAAKSONS Projects
7Pakistan Construction & QuarryDecember 2012www.pcq.com.pk
Roads & Highways
?Lahore Metro Bus Project(In Progress)
?Islamabad Lehtrar Highway
?Islamabad Expressway (10 lane)
?Agha Shahi-9th Avenue (6 lane)
?Islamabad Rawat Highway
Bridges and Structures
?Soan River Bridge
?Bhander Nullah Bridge
?Kurang River Bridge
?Agha Shahi Avenue H-8/H-9 Underpass
Buildings & Residential Constructions
?Diplomatic Enclave Access Control System
?11 Storey Parking Plaza
?Telecom Tower Foundation
?Shabbir Town Complex
Canals & Drains
?Khanpur Canal
?Chashma Right Bank Canal
?P.I Link Canal
Company Profile
.A.Aleem Khan, Chairman and Managing Director established a construction
company in year 1951 by the name of M.A.Aleem Khan & Sons (MAAKSONS). The Mcompany commenced its business with Public Works Department and gradually got
itself enlisted with Water and Power Development Authority and Irrigation Department thus
successfully completing various project of water management and irrigation systems.
The company was later incorporated as 'Private Limited' and registered with Registrar Joint Stock
Companies Lahore in year 1984. MAAKSONS carried out their hard work and during this journey
let lots of landmarks in the field of construction business by executing Road and Highways,
Bridges and Structures, Residential and Commercial Buildings, Canal and Tunnels etc. With slogan
and dream to 'BUILD A BETTER WORLD' the company strived always for ultimate progress and
quality resulting in Ahead of Schedule completions, winning bonuses and letters of
appreciations. Presently the company is licensed to execute works to the tune of 'NO LIMIT' by
Pakistan Engineering Council (a constitutional body) by Government of Pakistan.
MAAKSONS followed the policy of expansion and diversification. To achieve this, it has entered
into different fields of businesses thus establishing into a group. MAAKSONS group presently is
operating in Construction, Ready mix Concrete, Asphalting, Dairies products, Gas, Advanced
Agro Farming, Facilitation Management.
GGGGMMMMMAAKMAAK
(Facility Management Services)
NEWS
8 Pakistan Construction & Quarry December 2012 www.pcq.com.pk
According to a recent Congressional Research Service Report, world demand for rare earth metals will continue to grow with the growth of the middle class, especially in China, India and Africa. Demand will continue to grow because high tech products and renewable energy technology cannot function without rare earth metals.
In Pakistan, several occurrences of a peculiar rock type, namely carbonatite, globally recognized to contain these metals have already been reported from Khyber Pakhtunkhwa and adjoining Khyber Agency (Fata) in over a 150km long and discontinuous belt, extending from Pak-Afghan border in the west up to Tarbela area in the east. So far, seven of such occurrences have already been reported at the localities
While China and its client countries for Rare The development of this important minerals of Loe-Shilman, (Khyber Agency) and Sillai Earth Metals are facing a stand-off over group which is an important input for Patti, Khungi, Jambil, Koga, Tarbela and Jawar supply and rationing of these materials to electronics,superconductors and high tech areas, all lying in Malakand Division, Swat industrial rivals Japan and Taiwan, analytical gadgets, can bring high tech business to Division and Swabi districts.work on surface outcrops in Northern Pakistan.Pakistan has indicated presence of 2-10
Pakistan Government as well as the kg/ton of four rare earth metals in Malakand Provincial Government of KPK must begin to and FATA. Japan, alone, has an annual consumption of
27,000 tons of RE has recently discovered a see the potential in these minerals. The Chief huge resource of this vital group of minerals Minister of KPK should go looking for the
It will now depend on the sagacious handling in the sea mud of the Pacific Ocean up to right investors who must be ready to mine as of this rare resource by the Pakistan Board of 6,000 meters below the ocean surface at 78 well process the ores in Pakistan. They must Investment on how it negotiates with locations and is planning to extract the learn a lesson from the government of prospective investors into mining and final deposits by pumping up the material from Baluchistan which has allowed copper blister reduction of these materials into value- the ocean floor. This difficult investments has to be exported from its territory without added, saleable , final inputs so that Pakistan been prompted by the Chinese stance on being processed into copper metal and its gets maximum revenue for this natural gift. rationing of RE materials by China, creating a secondary and tertiary products.
stranglehold over Japanese high tech industries.
The analytical work on surface outcrops Pakistani Planners also need to learn lessons pertaining to Malakand Agency and Fata was from China itself, which does not allow raw conducted at PINSTEC Laboratories (Nelore, materials to leave its territory without value Islamabad). addition into finished products. Together
with the Revenue Boards of the Federal and Provincial Governments, taxation must be
While elsewhere in the world deposits aligned to add maximum value to local raw containing a maximum of 10 kilogram/ton of material before they leave Pakistan.total rare earth metals are being worked out. The Government of Japan, in November 2010 through the Ministry of Foreign Affairs Pakistan Mineral Development Corporation showed their interest in this particular (PMDC), a federally owned commercial mineral commodity in Pakistan by requesting entrepreneur, mandated for the whole p re l i m i n a r y i n fo r m at i o n fo r t h e i r spectrum of mineral sector activities right
This group of 17 metals which habitually consideration and subsequently offering from exploration to ultimate utilization can occur in the nature together is strategically t h e i r r e c o m m e n d a t i o n s f o r t h e play a pivotal role according to its so important that a former Chinese President development/mining of these minerals to Memorandum of Association by initiating a Deng Xiaoping recognized its importance the Government of Pakistan. project for exploration and evaluation of the almost two decades ago. “The Middle East rare earth metals in Pakistan.has oil and China has rare earths”.
Test Confirms Rare Earth Metals in KPK and FATA
Pakistan May Emerge As a Choice Destination for Rare Earth Metals
TECHNOLOGY REVIEW
9Pakistan Construction & QuarryDecember 2012
he latest addition to Volvo Construction Equipment’s operator to see what weight can be safely lifted at any position revolutionary family of pipelayers is the excavator-based relative to the slope. Using inputs from the hook, boom and base PL4808D. Offering excellent stability with a 90-ton machine-mounted sensors enables the system to monitor boom T
lifting capacity, the PL4808D is highly productive while also angle, machine orientation and inclination. The computer uses being one of the safest and most stable machines in the industry. this information to constantly calculate and display actual loads
and related working loads, all in real time. The operator receives relevant information, together with graphic displays, on an in-
With its 360 degree swing capability, the PL4808D can handle cab monitor. There are also visible and audible warning signals large, heavy pipes with ease and place them anywhere around that notify when the safe load limit is reached, including the machine – an ability that isn’t possible with traditional side green/yellow/red light bars on both sides of the boom.boom pipelayers. The patented design of the PL4808D marks other significant technical advances over traditional side boom pipelayers — not just its superior stability but, if needed, also its ability to swap booms and convert into a standard excavator configuration. A digging kit is available and the hydraulics are optimized for both pipelayer and excavator operations. With up to 80% common parts with its sibling Volvo excavator, the servicing, wear parts replacement and maintenance requirements of having a PL4808D in the fleet is considerably eased. And the PL4808D comes equipped with a Volvo D13H engine, for even greater power.
Volvo pipelayers are built for safety and flexibility. Not only can the PL4808D lay pipes all around the machine, it can also operate on slopes of up to 30 degrees and rugged terrain A solid footing is secured, thanks to 30 in. (750 mm) tracks – which can be upgraded to wider 42 in. (1,050 mm) tracks for added stability and lower ground pressure. The extra wide undercarriage is hydraulically retractable, decreasing the pipelayer's width to make road transportation easier.
Volvo pipelayers feature long booms that offer higher hook heights and longer reach, allowing the machine to lift and lower pipes at a safe distance from the trench. If needed, a boom extension is also available, offering additional reach and hook height. The PL4808D's newly designed counterweight is situated to the side for a lower center of gravity and greater stability — as well as easy cleaning. A mechanical anti two-block with wireless sensor prevents the winch blocks from coming in contact during lifting. Inside the cab, the high pull winch can be operated using the operator's preferred joystick. A mode switch boosts performance, using split pump flow for better load controllability during simultaneous travel/lift operations – or combined flow for maximum performance speed when travelling or in stationary pipe laying operations. A fine work mode gives high pressure and low flow for maximum lifting power but minimal fuel use.
The PL4808D's exclusive load management system (LMS) makes operation even safer and easier. The LMS enables the
SAFE AND SECURE
NICE AND EASY
www.pcq.com.pk
SPECIFICATIONS
Model PL4808D
Engine Volvo D13H Certified Tier 4i
Max. Operating Weight 126,250lb (57,265 kg)
Max. Tipping Capacity 176,000 lb (90,000 kg)
Max. Rated Capacity 110,000 lb (50,000 kg)
With a powerful Volvo D13H engine, unrivaled lifting capacity and an extra wide undercarriage for greater stability, the heavy-duty Volvo PL4808D is one of the top performing pipelayers in the industry
The Volvo PL4808D Pipelayer
10 Pakistan Construction & Quarry December 2012
Subsequent to the massive success of Build Pakistan 2012, FAKT constructing a formal structure of a building. The event is exposed Group is geared to another sequential of the sensational to widespread media coverage of print and electronic medium, as achievement in the upcoming year; Build Tech Pakistan 2013- well as local and international media associations.International Building & Construction Technology, Materials, Pakistan is en route international quality construction projects Property, Stone, Interiors & Architecture Exhibition & Conference. and moving at a considerable pace to lead the market in the The event is destined to engage more diverse country industry. We believe in working unanimously to incorporate a representation, worldwide networks and countless number of better living standard and hence, upholding the rate of economic opportunities to prolong the era of development, quality and growth. Build Tech Pakistan 2013 is one such significant event that precision. integrates positive lifestyle for a healthy living. FAKT Group is passionate to continue the success story of Build Tech Pakistan in the coming years as well. Undeniably, construction industry is the backbone to the economic growth of any region throughout the world as it engages the socio economic development factors improving infrastructure and creating employment opportunities.
World Bank research quotes, a single activity carried out in the construction industry deems to have a multiplier effect and a capability of generating as much as five times of that single action. An increased construction movement plays a snowball effect in supporting the associated sectors as it is strongly linked up with other relevant industries like stone, cement, iron, steel & interiors etc.
The construction industry in Pakistan is an ever growing sector which propels the economy towards designing a better infrastructure and even better investment possibilities. The growing number of population embarks innumerous gateways for local and foreign business leads to carve their niche in designing the future prospect of generations to come. Build Tech Pakistan 2013 is just that event which can employ all leading yet relevant resources at once to achieve each aspect of prosperity. The exhibit of modern equipments and machines in the event will generate new concepts and techniques of construction & building.
The government is positive about the growth of construction industry and hence, introducing such laws which could process the foreign direct investments accordingly. The analysts see the construction segment to be one sector which can revive the economic growth and catch up with the sustainable rate of development as before the recession knocked the international trade. Events like Build Tech Pakistan enjoin the trade connections to foresee upcoming prospects of advancement, expansion and progression to support trade worldwide.
Build Tech Pakistan 2013 is an unrivalled platform for the stone refiners, architects, interior designers, machinery and equipment manufacturers, landscapers, contractors, cement producers, developers, builders, suppliers of Public and Private intermediaries and all other industries that are relevant in
www.pcq.com.pk
Diesel / LPG Forklift Trucks
Flagship House, Reading Road North, Fleet, Hampshire, GU51 4WD, United KingdomTel: +44 1252 810261, Web: www.hyster.com
Hyster Europe
Powerful and Versatile
Dependable
Low Cost of Operation
May 24-26, at the Expo Centre, Lahore.Build Tech Pakistan 2013
BUILD TECH PAKISTAN2013
NEWS
11Pakistan Construction & QuarryDecember 2012www.pcq.com.pk
The setting up of mega project will draw foreign investors to the country despite the fact that local investors are also shifting their entities abroad.
The TSML mega project worth over $350 million has been sponsored mainly by the Saudi Arabia-based Al Tuwairqi Company (ISPC) and Posco of South Korea. State-of-the-art Direct Reduction Route of Iron (DRRI) making plant would have begun production sooner but the project was put on hold due to a financial crunch. South Korean steel giant, Posco, has invested $16 million to keep this project going.
Rizvi expressed the hope that a revolution of industrial growth is in the offing. He said that TSML is Pakistan’s first private sector integrated environment-friendly steel manufacturing project. Moreover, it will serve as a catalyst for industrial growth in the country as steel is vital to economic development, he said.
He further said that as DRI technology is the latest in the world and is being used in developed and developing countries alike, high quality products can be achieved through it. Furthermore, he said that the technology is environment-friendly.
Rizvi said that the TSML’s DRI plant, after commercial production, would not only meet the country’s steel requirements but would also create job opportunities for technical and skilled labour.
Pakistan’s largest private sector steel mill to begin commercial production from the first week of January 2013, that will cater to both domestic and international market requirements
Government of Iraq has extended a direct Project . Nespak stil l retains its invitation to Nespak for participation in registration with Ministry of Water the process of taking up East Gharaf Resources in Iraq. Nespak was already P r o j e c t . T h e p r o j e c t a i m s a t contemplating entering into Iraq before strengthening the war-torn economy of this direct invitation was received. Iraq by providing sustainable irrigation Recently, Nespak has also been awarded and drainage facilities to about 390,000 three multi-purpose dam projects and acres of land in Nassiriya and Kut t w o i r r i g a t i o n / a g r i c u l t u r e i n Governorates, the area between Tigris Afghanistan. Another war torn country, and Euphrates rivers. Republic of Yemen has already seen the
foot prints of Nespak where it is already Nespak has worked on a number of engaged in a Fisheries and Grain Silos Irrigation Projects in early 1980’s, such Project. Nespak engineers have shown as Euphrates East Drains Project, great courage in not hesitating to go for Saddam Dam Project, North Jazira nation-building in war affected Irrigation and Drainage Project , countries.Rumaitha Irrigation and Drainage
The Punjab government approved six development schemes worth over Rs 2 billion in various sectors of economy including health, agriculture, soil conservation and irrigation. These schemes were approved in the 24th meeting of Provincial Development Working Party of current financial year 2012-13 presided over by the Punjab Planning and Development Board Chairman, Javaid Aslam.
Acting Secretary Planning & Development Punjab Bushra Aman, members of the Planning & Development Board and other senior representatives of the relevant Provincial Departments also attended the meeting.
The approved schemes include:
(a) Up-gradation of DHQ Hospital Chiniot with an estimated cost of Rs 593.684 million.
(b) Construction of new Agricultural Offices Complex , a t Murree Road, and Soi l Conservation, Agricultural Engineering Workshops and Offices at Adyala Road, Rawalpindi at the cost of Rs 464.862 million.
(c) Establishment of THQ-Hospital, Darya Khan, District Bhakkar (Amended) at the cost of Rs 259.418 million.
(d) Widening and Improvement of road from Noorpur Thal to Kaka and Jaura Kalan length 34.00 km in District Khushab at the cost of Rs 282.518 million.
(e) Correcting approach of River Chenab to control Erosive action along its Right Bank opposite RD: 0+000 Muzaffargarh Flood Bund to RD: 131+500 Khangarh Flood Bund in District Muzaffargarh (Revised) at the cost of Rs 433.86 million and (f) Metro Bus Transit System for Lahore-Ferozepur Road Corridor Construction of MBS from Niazi Interchange to Shahdara Mor length=3.0 km (Package-VI) (Revised) at the cost of Rs 11.790 million.
Tuwairqi Steel Mills Limited (TSML) To Begin Production From January 2013
Pak Punjab Development
Schemes Worth Rs2bn Approved
Pakistan Consultancy House To Participate In Rebuilding Iraq
Ministry of Water Resources of Government of Iraq extends direct invitation to Nespak
RASTGAR ww .rastgar cow . m
Backhoe Loader
Wheel Excavator
Skid Steer
RASTGAR & COMPANY (PVT.) LIMITED
Rastgar House, 10-A, Hassan Homes, Block-5, Kehkashan, Clifton, Karachi-75600, Pakistan
KARACHI LAHORE ISLAMABAD
Fax: +92 21 3587 0609 Email: [email protected] Web: www.rastgar.com
RASTGAR & CO1 1 1 - 7 2 7 - 7 7 7
Crawler Excavator
NEWS
14 Pakistan Construction & Quarry December 2012 www.pcq.com.pk
Pakistan and South Korea inked two Malakand Pass lies between Dargai-Batkhela agreements for the Malakand Tunnel and is situated at an altitude of 470 metres Construction Project and for development of and 663 metres, respectively.The South water resources infrastructure including Korean government pledged the $78 million dams. The agreement on Malakand Tunnel funding through the Economic Development Construction Project was signed during Co-operat ion Fund (EDCF) for the meeting of President Asif Ali Zardari with Kim construction of Malakand Tunnel project in Yong- Hwan, Chairman Export Import Bank of Khyber Pakhtunkhwa province. The 9.7 km Korea, who called on him at the local hotel in project also includes approach roads on both Seoul, Korea. sides of the tunnel and three bridges.
Under the Malakand Tunnel Loan The initial feasibility study of the tunnel has Agreement, an amount of US $78 million will already been completed by South Korean be provided for the project.The Korea Exim consultants in collaboration with National During the meeting with delegation of K-Bank is an official export credit agency Highway Authority Pakistan, which is also the Water, the President while highlighting providing comprehensive export credit and Project executing agency. The President said investment potential in Pakistan energy guarantee programs to support Korean that it was high time for Pakistan and Korea to sector said that Pakistan was blessed with enterprises in conducting overseas business. take its bilateral trade to new heights while one of the largest coal reserves of over 185 Malakand tunnel will provide a short route exploring the true potential of trade and billion tones, which alone can produce over not only to people of Dir, Malakand and Swat investment existing between the two 100,000 MW of power for 100 years besides and adjacent localities but would also be an countries, urging the business community of huge potential in the hydel, wind and solar easy access to central Asian states, providing the two countries to boost its trade volume power. He called upon Korean Companies to the market access to the country for its from current over $1.5 billion to $ 2 billion in invest in energy sector and help Pakistan products. the next three years. meet the growing energy requirements.
South Korean government to provide $78 million funding through the Economic Development Co-operation Fund (EDCF) for the construction of Malakand Tunnel project in Khyber Pakhtunkhwa province
Pakistan, Korea Ink Deal For Tunnel Project, Water Resources
The Karachi Chamber of Commerce and support to get GSP plus status and fair Pakistan, he proposed to Ambassador.Industry (KCCI) President Muhammad access to EU market.
President KCCI, through Spanish Haroon Agar urged the Ambassador of
He also proposed signing of MoU Ambassador invited Spanish companies Spain, Javier M. Carbajosa Sanchez, to
between KCCI and Barcelona or Madrid t o p a r t i c i p a t e i n KC C I ' s 1 0 t h invite Spanish investors to invest in
International My-Karachi Exhibition to renewable energy solutions as Spain is
be organized in July 2013 whereby an one of the world's leading countries in
International Pavilion is planned for the development and production of
B2B and B2C meetings.Renewable Energy.
He informed that Spain is world-leader Trade relations between Spain and
in renewable energy in wind, solar, etc. Pakistan have maintained an upward
and Spain produces 23 percent energy trend in the last decade. Spanish exports
from renewable sources which is have doubled in last ten years, reaching
highest in Europe. Spanish Cellular 134 million euro in 2011, showing a
phone service provider O2 first cellular steady progress, though still much
service provide in Europe. Asia was journey ahead. Imports enhanced from
traditionally not a commercial priority, 194 million euros in year 2000 to 429
however, Spanish companies are now million in 2011.
concentrating on Asian markets. Major items of imports from Spain were Cooperation can be materialized in the
Chamber of Commerce to enhance machinery, iron and steel products, areas of fashion textiles, banking, exchange of trade information, trade c e r a m i c p r o d u c t s , b o i l e r s , s h i p p i n g , t r a n s p o r t a t i o n , delegations. KCCI can support in t e l e c o m m u n i c a t i o n e q u i p m e n t , pharmaceutical, dairy, fruits etc.organizing single exhibition of Spain in chemicals etc. Pakistan seeks Spain's
Spanish exports to Pakistan have doubled in last ten years, reaching 134 million euro in 2011
Spain Invited To Invest in Pakistan’s Energy Sector
15Pakistan Construction & QuarryDecember 2012
NEWS
www.pcq.com.pk
Two new Sheraton properties are under partners, so the selection process is “Pakistan is a treasure trove of culture, rigorous and comprehensive,” said natural beauty and mouth-watering Antoine, adding that other potential cuisines for world travelers,” says partnership opportunities for other Antoine. A long list of attractions cities are being assessed in terms of ranging from the pristine beaches of long-term viability. Karachi and Balochistan, awe-inspiring
peaks of the Northern Areas, local art THE STARWOOD EXPERIENCE The and handicrafts; to the historic sites of Sheraton Hotels brand is owned and Moenjodaro and Harappa, rolled off his operated by Starwood Hotels and tongue like that of a well-traveled local. Resorts which also owns other world “It is very unfortunate that the image renowned hotel chains such as Four that has become attached with this Points, Westin, W, Le Meridien, Aloft, beautiful country is set in violence and Elements, The Luxury Collection and St unrest,” he said. He highlighted recent
construction in Islamabad. One site is Regis. events such as the Grand Opera, located on the Islamabad-Murree road, According to Antoine Joignant, being a Peshawari Night and food festivals that called Sheraton Golf & Country Club; part of the Starwood group provides an the hotel conducted to attract while the other overlooks the Rawal edge to the Sheraton Karachi over its international travelers and locals alike; Lake in Islamabad. The Sheraton Golf competitors. One key differentiator is pledging grander functions in the & Country Club shall be the most our ability to personalise our services future. He expressed hope that these spectacular property in the country, as it and guest experience through various attractions will play a part in countering has been designed by the same Starwood online tools which allow real- negative international perceptions architects that designed the Atlantis in time tracking of maintenance work and regarding Pakistan.Dubai. This 367-room hotel shall guests' feedback. Antoine Joignant also highlighted that include an 18-hole golf course with As is the norm at most hotels, guests the value for money which guests many other amenities for guests. would previously fill out survey cards at receive in Pakistan is much higher than Sheraton Islamabad shall be a 180- the end of a typical stay which would that provided by hotels in other room hotel primarily catering to then be sent to be compiled by the countries in the region. He admitted business travelers. relevant department. But the system in that the local hotel industry is facing To set up any Sheraton Hotel, the place at Starwood Hotels allows guests tough times given the subdued flow of Company ties up with investors who to offer their feedback online, which is foreign tourists to the country, but he develop properties in line with the then compiled automatically. stressed that occupancy rates have Company's specifications. “Our been on the rise for Sheraton Karachi business model necessitates long-term PAKISTAN: THE DIAMOND IN THE over the past three years.commitment between us and our ROUGH
Sheraton To Create Two New Properties in Pakistan
NEWS
16 Pakistan Construction & Quarry December 2012 www.pcq.com.pk
Oil and Gas Development Company Limited (OGDCL) has made discovery of hydrocarbons at Nashpha in District Kohat of discovered 20 Million Cubic Feet per Day (mmcfd) gas from Khyber- Pakhtunkhawa (KP) in September 2012. During the on-Suleman-I exploratory well located in District Khairpur, Sindh. going financial year the OGDCL has planned to drill 37 wells in the According to OGDCL spokesman, the company is also operating in country.Khewari Block Joint Venture and having working interest of 95
The country has gas reserves of 23 tcf/day. Pakistan”s current percent and Government Holding Pvt Limited (5 percent).domestic gas demand exceeds its production capacity of 4.2
The structure of the Suleman-I was delineated drilled down to the bcf/day by 1.2-1.4 bcf/day, which increases to 2 bcf/day in winter. depth of 4,575 meter. This is the second discovery of hydrocarbons in the current financial year. Earlier, OGDCL had
OGDCL Discovers Gas in Khairpur20 Million Cubic Feet per Day (mmcfd) gas discovered from Suleman-I exploratory well located in District Khairpur, Sindh
Company (NIP) has been established as a special initiative of the Ministry of Production , Government of Pakistan. NIP is a public-private partnership established to develop focused industrial growth in Pakistan by developing world-class industrial parks all over the country.
Board of Directors (BoD) is inclusive of professionals / individuals having exceptional record of services relating to industrial development and represent
The second project of the National non-governmental organizations,
Industrial Parks Development and academia and the business community.
Management Company in Punjab was 75% of the Board members are from the
launched on Tuesday, 18th of December private sector and the remaining 25%
2012.are from the public sector. The company is incorporated under Section 42 of the The project named Sargodha Industrial Companies Ordinance 1984.Park was launched by Chaudhry Anwar
Ali Cheema, federal minister for OBJECTIVES of NIP
production. This is a project of Pakistan Industrial Development Corporation
mTo support rapid industrialization in (PDC) and will be developed by the the country by establishing new create an overall conducive industrial National Industrial Parks Development industrial parks and rehabilitate those environmentand Management Company. that may be handed over by the
mTo provide a platform and act as a Government/Provincial Government(s) Mohsin Syed, regional director (North),
catalyst for industries to increase and to undertake related functionsNational Industrial Parks, said that with
productivitythe establishment of the Sargodha
mTo take necessary steps in attracting Industrial Park, the industrialization mTo promote the creation of jobs by industrialists for setting up their process would speed up and around capitalization on strength of different businesses in the industrial parks20,000 direct jobs would be created. regions by prioritizing type(s) of
mTo promote interaction between the industry prevalent in a particular areaN a t i o n a l I n d u s t r i a l P a r k s industrialists and the government so to D e v e l o p m e n t & M a n a g e m e n t
National Industrial Parks Launches Sargodha Industrial Park
10MW independent power plant will be constructed at Sargodha Industrial Park to provide uninterrupted electricity supply to all the industrial units Construction on Pakistan’s largest refinery has
been completed and it will soon be ready to start producing fuel, its owners, Byco Oil Pakistan have announced. The new 120,000 barrel-per-day facility at Mouza Kund, District Lasbella, will work in tandem with a smaller refinery already operating on the site, and together will be able to produce around 150,000bpd, 55% more than the country’s largest refinery at the moment.
“The milestone, for sure, has been made possible with the sheer hard work of our employees, and cooperation of all our valued contractors. Upon commissioning this refinery, with the blessings of the Almighty, will become the single largest in the country,” commented Byco Oil chief executive Qaiser Jamal.
The refinery will allow the country to boost the amount of motor fuel it produces by taking advantage of its first Isomerisation plant, which was commissioned to work with the refinery.
Construction Of Pakistan’s Largest Refinery Complete
17Pakistan Construction & QuarryDecember 2012
NEWS
www.pcq.com.pk
A German development organisation “bfz that the participating factories from gGmbH” and the Small and Medium Karachi, Lahore, Faisalabad and Sialkot Enterprises Development Authority together have realized energy savings of (Smeda) have initiated a joint project 22,000MW per annum which corresponds America.titled as “ESPIRE” that will enable local to Rs 53 million.
In Pakistan bfz gGmbH, along with Smeda, small and medium sized enterprises The energy services of the ESPIRE project has also obtained cooperation of Pakistan (SMEs) to save about 22,000MW energy shall be disseminated to 150 factories Hosiery Manufacturers Association every year. Smeda Chief Executive Officer until the end of the project in May 2014 (PHMA), Pakistan Readymade Garments Yousaf Naseem Khokhar and Project and the selected factories would be Manufacturers and Exporters Association Coordinator, bfz-Germany Martin Straehle supported to start making energy (PRGMEA), Towel Manufactur-ers revealed this in a joint press conference. conservation part of their work routine by Association of Pakistan (TMA), Federal B Smeda and German organisation’s senior implementing Energy Management Area Association of Trade and Industry officials were also present on the occasion.Systems to be introduced under the (FBATI), North Karachi Association of
A presentation given by bfz officials project. Trade and Industry (NKATI), and Korangi revealed that SMEs can save 9 percent of Association of Trade and Industry (KATI).
Project ESPIRE was started by the their energy costs with investments that Vocational Training and Development Yousaf Naseem Khokhar said that Smeda pay back in less than 3 months. This is the Centres of the Bavarian Employers ” had expanded collaboration with average result achieved in 18 SMEs from Association (bfz) gGmbH ” one of the international development agencies. He t e x t i l e , f o o d p r o c e s s i n g a n d largest private providers of vocational expressed gratitude to bfz for starting pharmaceutical sector in 2012 through training in Germany. The International ESPIRE project in Pakistan and assured of energy saving measures implemented Division of bfz conducts development the full cooperation of SMEDA to ensure its under project ESPIRE funded by German cooperation projects on behalf of World successful implementation.Fe d e r a l M i n i s t r y f o r E c o n o m i c Bank, European Union, and the German Cooperation and Development (BMZ) via government in Asia, Africa and Latin Sequa gGmbH, a bfz official said adding
SMEDA and BFZ Helping SMEs Conserve Energy
140-2, FL., 14th HYUNDAI BLDG.KYE-DONG, JONGNO-GU 110-793
SEOUL KOREA
FORKLIFT
The new master on the job-site!
TEL: +82 2 746 4505, 4609
FAX: +82 2 746 7444, 7445
WEB: www.hyundai-ce.com
FORKLIFT TRUCKS
Smooth running
Efficient and ergonomically designed
Fast and stable performance
ESPIRE Programme aspires to save 22GWh annually
NEWS
18 Pakistan Construction & Quarry December 2012 www.pcq.com.pk
National Engineering Services Pakistan Limited (NESPAK) won two mega dam projects in Afghanistan after an international open competition, which shows its recognition as a world-class consultant, not only in Pakistan but abroad as well. According to the spokesperson the two multipurpose dam projects, i.e., Bakshabad (Farah Rud) Dam Project and Pashdan Dam Project have been awarded by the Ministry of Energy and Water, Kabul, Afghanistan.
Bakhshabad Dam Project consists of a dam, a powerhouse, appurtenant structures, a barrage 60 Km downstream of the dam, left and right main irrigation canals and irrigation command area. NESPAK will provide services for detailed design, drawings and preparation of bidding documents.
Pashdan Multipurpose Dam Project consists of a rockfill dam and an intake structure, a powerhouse, a weir, head regulators, right and left main canals. NESPAK would provide services for design review and construction supervision of the project works.
NESPAK is a premier engineering consulting firm of Pakistan and winning of projects in Afghanistan shows its commitment to the development of brotherly country despite tense security situation in Afghanistan.
NESPAK Wins 2 Mega Dam Projects In Afghanistan
The government has reinitiated PC-1 for the construction of the a n d f i n a n c i a l l y new ‘Moosa Pak Shaheed Bridge over River Sutlej at Emanawala sustainable level for costing Rs 1.96 billion as part of the Multan Development Package. Multan bound traffic. The Project would be located in the Bahawalpur District of Punjab. The result will be the economic uplift of areas along the route by It focuses primarily on adequate linkage between Uch-Sharif and providing better farm-to-market access.Trinda Muhammad Panah (on N-5) with Multan City and
The project will also facilitate traffic originating from and destined motorway/expressway network of Pakistan.to Balochistan commuting through the National Highway N-70. It
After the construction of the new ‘Moosa Pak Shaheed Bridge over would also entail considerable reduction in distance for traffic River Sutlej at Emanawala’ traffic on N-5 from Karachi to commuting between Karachi and places on N-70 via Bahawalpur. Rawalpindi and Khyber Pakhtonkhwa would use this road. The It envisages construction of a 4-lane 610 meters long bridge across overall objective of the project is to provide adequate road River Sutlej at Emanawal. It will have 2.865 Km and 1.681 Km connection between Uch-Sharif and Jalalpur Pirwala. approach roads on Jalapur and Uch-Sharif sides respectively.
The purpose of the project is to cope with the industrial sector Former Prime Minister Syed Yousaf Raza Gilani on November 16, development and provide a productive and efficient connection 2009 had directed the NHA to undertake construction of with the National Highway system contributing to lower additional bridge parallel to the on-going bridge in Stage-2 under a transportation costs. The Project will streamline communication separate PC-I. The project would be financed through PSDP and through a shorter distance between Multan and Trinda executed by NHA and completed by 2016.Muhammad Panah for traffic commuting between Karachi and Lahore/Rawalpindi/K.P through the proposed motorway, M-4. It will reduce travel time and operating costs to the most economical
The contract for civil works of the satisfaction over the phenomenal 1410MW Tarbela 4th Extension response of the reputed firms from all Project is to be awarded in March 2013, over the world for Tarbela 4th as pre-qualification process of the Extension Project. This over whelming construction firms is almost complete. response reflects their confidence in Wapda Chairman Raghib Shah said this Wapda and government for water and during his visit to the project. He added hydropower projects, he added.that gigantic Tarbela Dam had been
The Tarbela 4th Extension Project is a i n s t r u m e n t a l i n e c o n o m i c part of least-cost power generation development and social uplift of the strategy of Wapda aimed at adding a country since its completion in mid sizeable quantum of electricity to the 1970s.national grid to mitigate power
“ B e n e f i t s o f t h e p ro j e c t w i l l shortages and improving the ratio of significantly increase, as electricity low-priced hydel electricity in the generation capacity of Tarbela Hydel overall system to stabilise the power Power Station will rise to 4888MW tariff. On completion, Tarbela 4th from the existing 3478MW with Extension Project will provide about implementation of its 4th extension, 3.84 billion units of electricity to the for which World Bank is providing national grid every year. Annual $840 million.” benefits of the project have been
estimated at more than Rs.30 billion. Dilating upon the pace of work, the The project will pay back its cost in a chairman said that pre-qualification short span of just three years.process of the firms for electro-mechanical works of the project will also be completed in the shortest p o s s i b l e t i m e . H e e x p r e s s e d
Tarbela Dam Extension Project
Electricity generation capacity of Tarbela Hydel Power Station to rise from 3478MW to 4888MW
Moosa Pak Shaheed Bridge Again On The Cards
NESPAK has been awared Bakshabad (Farah Rud) Dam Project and Pashdan Dam Project by the Ministry of Energy and Water, Kabul, Afghanistan
Moosa Pak Shaheed Bridge to be constructed over River Sutlej costing Rs 1.96 billion
NEWS
19Pakistan Construction & QuarryDecember 2012www.pcq.com.pk
Federal Minister for Communications Dr. Arbab Alamgir Khan Khalil With the completion of this highway, links between Punjab and has said that Taxila-Khanpur-Haripur Highway would boost trade, Khyber Pakhtunkhwa will be strengthened that will improve trade tourism and industry in the area and facilitate the people in their and business activities in both the provinces.travel. He expressed these views at the ground breaking ceremony of
The road network of a country determines its overall progress and the the rehabilitation and upgradation of Taxila-Khanpur-Haripur Ministry of Communications is working under the National Trade Highway.Corridor Programme that will boost economic development of the
The ground breaking was performed by Prime Minister Raja Pervaiz whole region.Ashraf. The main feature of the highway is that its seven-kilometers
Under the National Trade Corridor Programme, progress is being part is in the Punjab while 36 kilometers is in the Khyber made to set up an efficient, swift, and world standard highway Pakhtunkhwa and this project has cost Rs 2854 million.network so that a quality communication facility is provided to the
This 43 kilometer highway starts at Taxila on Peshawar Rawalpindi future trade traffic. In this connection, work is in progress on projects National Highway and reaches Khanpur and Haripur and serves an such as North-South Expressway, Motorway System, Gwadar Port important link between Punjab and Khyber Pakhtunkhwa. This road and Upgradation of Karakoram Highway.was federalized in 2010 and declared a national highway.
Foundation Wind Energy-I Limited and a r e b e i n g f i n a n c e d b y A s i a n H e s a i d t h a t t h e E n g i n e e r i n g , Foundation Wind Energy-II (Pvt) Development Bank and Is lamic Procurement and Commissioning (EPC) Limited entered into an Implementation Development Bank and syndicate of Contractor of both the projects is with a Agreement (IA) with the Government of local banks led by National Bank of consortium comprising M/s Nordex Pakistan for the establishment of two Pakistan. Germany & M/s Descon Engineering wind power projects of 50 MW each, in Limited, Pakistan. Both the projects are
The debt financing, which is 75percent Gharo, Sindh. Formal Financial Close of being installed with a cumulative of forty of the project cost, is purely Sharia the two wind power projects would be Nordex Wind Turbines each having a
done, shortly. capacity of 2.5 MW. The combined total energy output of both the projects in
Foundation Wind Energy Limited- I and approx. 288 Gwh per annum.Foundation Wind Energy Limited- II are two independent subsidiaries of a He said that the two projects were prestigious national organization, Fauji targeting to have their Energy Purchase Foundation. Agreement, signed in December 2012
a n d a c h i e v e f i n a n c i a l c l o s u r e The agreement was signed by Brig. Dr. immediately thereafter. Financing Ghulfam Alam (Retd), Member Board / agreement was signed in May, 2012. The Project Director of the two power completion period, of each project, is 15 project entities, on behalf of Foundation month from Financial Close, and both Wind Energy-I Ltd. and Foundation the projects are being targeted to be Wind Energy II Ltd. and Mr. Arif operational during second quarter of Alauddin, CEO AEDB, on behalf of the 2014.Compliant and is the first of its kind in Government of Pakistan.
Pakistan. The remaining 25 percent of He said that FFC Wind Energy Limited
the project cost is being financed via M a n a g i n g D i re c t o r o f t h e t wo (FFCEL) has already established a equity investment, arranged by Fauji companies, Lt Gen. Muhammad Mustafa 50MW Wind project, which is ready to be Foundation group (Fauji Foundation and Khan (Retd) speaking on the occasion commissioned during the current Fauji Fertilizer Bin Qasim Ltd), CapAsia briefed about the projects. He informed month.Singapore and Tapal Group Karachi.that the two wind farms having total
project cost of approx. US $ 251 Million
Taxila-Khanpur-Haripur Highway To Boost Trade & TourismThe 43 kilometer highway starts at Taxila on Peshawar Rawalpindi National Highway and reaches Khanpur and Haripur and serves as an important link between Punjab and Khyber Pakhtunkhwa
100 MW To Be Added By Two Wind Power ProjectsTwo wind power projects of 50 MW each to be established
in Gharo, Sindh
The Federal government has granted permission to six foreign airlines to operate from Sialkot International Airport, as per Sialkot International Airport ‘s(SIAL) Chairman Muhammad Hanif Khan. The SIAL chairman said that the foreign airlines including Oman, Etihad, Air Arabia, Qatar, fly Dubai and Emirates would soon start foreign flights from Sialkot Airport and these airlines would operate 27 flights weekly from Sialkot to various destinations as a result of which Sialkot International Airport would become the busiest airport of the country. Hanif Khan said the business community of Sialkot visualized the importance of international airport at Sialkot to cater the need of handling of export and import cargo without wasting much time besides ensuring travelling facility to the business community of Sialkot, Gujranwala and Gujrat and overseas Pakistani. Currently, Pakistan International Airline and Shaheen Air are operating 27 flights weekly from Sialkot International Airport and catering to the need of passengers successfully. He pointed out that currently Qatar Airways operating two cargo flights weekly from Sialkot. He said that the airways had handled over 6,866 tonnes of cargo during 2010-11 and 6,000 tonnes cargo in the current year so far from the airport. The SIAL chief claimed that the operation of Sialkot airport had lessened travelling difficulties not only of the business community but also overseas Pakistani of Sialkot, Gujranwala and Gujrat (golden triangle). It is to be noted that a large number of overseas Pakistani belonging to Daska, Pasrur, Sambrial, Narowal, Wazirabad and many other adjoining areas are travelling from Sialkot International Airport.
NEWS
21Pakistan Construction & QuarryDecember 2012www.pcq.com.pk
DRILLING PRODUCTS
AND SOLUTIONS:
Button Bits
Drill Tubes
Valved Hammer
Hyper Hammer
Hyper 301S Hyper Hammer
Recirculation Hammer
Eccentric Overburden System
Concentric Overburden System
Large Diameter Hammer
[U.K] LTD
RASTGAR & CO. (PVT.) LIMITEDRastgar House, 10-A, Hassan Homes, Block-5, Kehkashan, Clifton, Karachi-75600, Pakistan
KARACHI LAHORE ISLAMABAD
Fax: +9 2 21 35 870609 Em ail: [email protected] Web: www.rastgar.com
RASTGAR & CO1 1 1 - 7 2 7 - 7 7 7
Frontier Works Organisation (FWO), today’s tunnelling and mining; telecommunication; regions.most versatile and vibrant construction firm, construction of residential and industrial
FWO in collaboration with Chinese & Turkish was established on 31 October 1966 to infrastructure and proved its unmatched company is constructing Gomal Zam Dam for wrought a miracle and carve out a modern qualitative and quantitative capabilities.power generation, flood protection and highway, the Karakoram Highway, across crags
In 1991, FWO was called upon to participate in irrigation. It is a project of national significance and crevices of the highest mountain ranges of the reconstruction phase of Kuwait, after the and is being constructed in the most difficult the world.Gulf war, and was given to clear 3000 square conditions in SWA area. The 133 M high dam is
It was towards the completion stage of KKH kilometers of highly mined area, litered with almost in the completion phase.that the Government analysed the large quantity of ammunition left behind by
FWO possesses over 100 qualified and tremendous potential of FWO in carrying out the withdrawing Iraqi Army. FWO cleared the experienced engineers (including 2 Phd’s and civil engineering projects in difficult and area in a record time of just 16 months, ahead 30 Msc’s ) and managers of Grade-I and II inhospitable areas and decided not only to of other construction firms of USA, UK, France, covering all disciplines of civil, electrical, keep FWO in existence, but also to expand its Egypt, and Bangladesh. Similarly, in 2006, FWO mechanical, communication and geo-tech tentacles throughout the country. constructed a road from Torkham to Jalalabad engineering. In addition, about 4300 middle (Afghanistan) in the most hostile and difficult
For the last 46 years FWO has left its imprints, and lower level technicians and operators security environment.bringing prosperity to utterly backward and spcialised in their own fields. With efficient forgotten areas from the sun burnt plateaus of FWO has also promptly responded during work force, flexible organisation and a large Balochistan to lush green dales of Swat and natural calamity. May it be devastating floods pool of modern construction equipment and Chitral and from the deserts of Sindh to snow of 1992, earthquake of October 2005, Attabad machinery FWO is capable of undertaking any capped Siachin. Over these years FWO has landslide in Gilgit-Baltistan and super floods of construction assignment at short notice worked in diversified fields to include 2010 which left the whole nation in state of anywhere in Pakistan. FWO, motto “Striving d e v e l o p m e n t o f c o m m u n i c a t i o n shock and grief. FWO men and machines for Excellence” amply speaks of the continued infrastructure like construction of roads, started road construction and clearance in efforts to deliver the best.railway lines and airfields; irrigation like earthquake and flood affected areas and construction of dams, canals and barrages; opened the road network which facilitated the power projects like thermal and hydal; rescue activities and approach to difficult
Pakistan’s Construction Organization Celebrates 47 Years Of Excellence
Sialkot Goes International
22 Pakistan Construction & Quarry December 2012 www.pcq.com.pk
CONSTRUCTIONPAKISTAN
& QUARRY
MONTHLY MAGAZINE
Engine Driven WeldersFull Range
From: 6.6 kW (9 HP) To: 45.6 kW (62.1 HP)
RASTGAR www.rastgar.com
RASTGAR & CO. (PVT.) LIMITEDRastgar House, 10-A, Hassan Homes, Block-5, Kehkashan, Clifton, Karachi-75600, Pakistan
KARACHI LAHORE ISLAMABAD
Fax: +92 21 35870609 Email: [email protected] Web: www.rastgar.com
RASTGAR & CO1 1 1 - 7 2 7 - 7 7 7
Pakistan Construction & Quarry: The only magazine on the construction and quarry industry of Pakistan. The magazine is ?Circulation: Senior and middle levels of Major a coffee table essential for everyone associated with the Pakistani contracting companies eg: NESPAK, FWO, construction industry. CDA, LDA, DHA, NLC, Wapda, SNGPL, SSGC, and
KPT etc.PCQ provides a unique opportunity to the major players of the construction industry for showcasing State-of-the-art ?PCQ fills long existing gap in specialized technical technical advances in construction Equipment, Materials, journals category in Pakistan.Services and Techniques. Manufacturers can now also effortlessly introduce their top notch varieties in products and ?PCQ brings together buyers sellers of construction merchandise to their niche clientele. The magazine provides machinery, construction tooling and technology, a promising platform for Construction machinery construction services, cement and mining manufacturer, buyers, sellers, contractors, consultants, professionals, tender publishers and readers.construction companies, architects etc. Most importantly, it provides an opportunity for B2B alliances, leveraging their ?PCQ caters to the needs of worldwide machinery mutual strengths to the regional corporate world. manufacturing companies.
Since its inception this year, PCQ has already attracted keen ?PCQ serves as a Link between the local and the global participation and interest from the Construction Industry. It is market targeting Pakistan.an ideal way to explore Construction business and identify investment opportunities, in turn encouraging various ?Circulated globally in countries like USA, UK, Housing & Construction companies from the sector to Germany, Holland, Brazil, Italy, China, Korea, Japan participate and seize the numerous opportunities. etc.
ADVERTISE FOR RESULTS
IN
Phone: +92 51 4305087
Email: [email protected]
www.pcq.com.pk
CONSTRUCTIONPAKISTAN
& QUARRY
ABOUT US
High Performance Low Investment Cost
and
much more.....!!!
Versatility !!!!
Rua Bororó, 401 - Vila Maria Helena
Indaiatuba/SP Cep:13335-360
Brazil
Tel: +19 3825 6530 / 3875 6555
Factory - [email protected]
Equipmentfor
All Types of Drilling
www.wolf.com.br
Manual Air Paving Breaker
Hand Held Rock Drill
MW-654 6L
Air Drifters - Top Hammer
MW-131LS
MW-40
because
Your Satisfaction is Our Priority
C200TS-24
Releases Extra Energy14%for Compressed Air
www.compair.com
P.O. Box 61146, Office 503, JAFZA 16Jebel Ali Freezone, Dubai United Arab EmiratesTel: 971 4 8811744 Fax: 971 4 8811898Email: [email protected]
Gardner Denver FZE