network design & construction overview. 93% fibre coverage 2 indicative map
TRANSCRIPT
![Page 1: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/1.jpg)
Network Design & Construction Overview
![Page 2: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/2.jpg)
93% Fibre Coverage
2
Indicative map
![Page 3: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/3.jpg)
93% Fibre + 4% Wireless
3
Indicative map
![Page 4: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/4.jpg)
93% Fibre + 4% Wireless + 3% Satellite
4
Christmas Island
Cocos Island
Norfolk Island
Lord Howe Island
By 2020
Indicative map
![Page 5: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/5.jpg)
Building the NBN – Release 2
• ACT Gungahlin
• NSW Riverstone (Sydney), Coffs Harbour Minnamurra/Kiama Downs (First
Release) Armidale (First Release)
• Queensland Brisbane (inner north), Springfield
Lakes, Toowoomba Townsville (First Release)
• Northern Territory Casuarina
• South Australia Modbury, Prospect Seaford/McLaren Vale (First
Release)• Victoria
Bacchus Marsh, South Morang Brunswick
• Western Australia Victoria Park (Perth), Geraldton,
Mandurah
![Page 6: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/6.jpg)
Network Design & Physical Infrastructure Representation
![Page 7: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/7.jpg)
Street furniture - fibre distribution hub
7
Dimensions of FDH CabinetHeight - 111cmWidth – 54cmDepth – 34cm
![Page 8: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/8.jpg)
Network Dimensions
![Page 9: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/9.jpg)
9
![Page 10: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/10.jpg)
![Page 11: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/11.jpg)
Full-Scale Construction @ ‘Volume Roll-Out’
• Roll-out over approximately 9.5 years
• NBN expected to pass over 12 million premises
when rollout completed
• Almost 6,000 premises forecast to be passed per
day during peak rollout
• Projected direct construction workforce of 15,000 to
20,000 FTEs at the peak of construction
• Construction will occur concurrently in metropolitan,
regional, and rural areas
• It will be Australia's first national wholesale-only,
open access broadband network
• Network will be capable of providing peak speeds of
up to 1 Gigabyte per second to 93% of Australian
premises and 12 megabits per second to the
remaining 7% of premises, through a
satellite/wireless solution
NBN is different
• The NBN roll-out will involve multiple projects
of a like nature over a substantial period of
time
• There is significant scope to leverage
learnings and drive improvements as we go
• We have a unique opportunity to evolve /
define construction delivery characteristics
![Page 12: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/12.jpg)
• Fibre network
• Limited to a few states and concentrated in high-density urban areas (not regional/rural)
• 18m homes past
• 6m premises connected
• Roll-out over 5 years
• Fibre, wireless & satellite• Coverage in metro, rural and remote Australia• National roll-out• 12m + premises connected• Roll-out over 9.5 years
NBN CoIndicative
Verizon
To put this into further perspective…
12
![Page 13: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/13.jpg)
Fibre based NBN Plan Summary - Singapore compared with Australia
• Govt Funding S$1 billion A$37.5 billion (est)
• Public Contribution No – Govt Grants Yes – Public Contribution expected
•• Premises Coverage 95% 100%
• Notable Differences City State Sprawling low density suburbs
• Structural Requirements Three way separation Two-way separation of optical infrastructure wholesale and retail wholesale and retail operations (TBD)? operations
• Timeframe and/or completion Completion in 2012 9.5 years (est)
![Page 14: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/14.jpg)
Outline of Average Design & Construction
14
Month- 1 2 3 4 5 6 7 8 9 10 11 12Detailed DesignRemediation CIS
Construction
Testing
Activation
On average a 12 months process per Fibre Serving Area Module (FSAM)
![Page 15: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/15.jpg)
Coff’s Build
15
5 Fibre Serving Area Modules (FSAM)
FSAM Detail Design Remediation Construction Testing Activation
1 Q4’11 Q1’12 Q1’12 Q4’12 Q4’122 Q4’11 Q1’12 Q1’12 Q4’12 Q3’12
3 Q2’12 Q3’12 Q4’12 Q2’13 Q2’13
4 Q2’12 Q3’12 Q4’12 Q2’13 Q2’13
5 Q2’12 Q3’12 Q4’12 Q2’13 Q2’13
![Page 16: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/16.jpg)
Fixed Wireless Roll Out
• Ericsson appointed to design, build and operate Fixed Wireless Network
• First Release scheduled for completion mid 2012
• 14,000 Premises covered by mid 2012
• 283,000 Premises covered by mid June 2013
• Roll-out scheduled for completion mid 2015
• To cover 4% or roughly 500,000 premises
Five Fixed Wireless First Release Areas:• Geraldton• Toowoomba• Darwin• Tamworth• Ballarat
![Page 17: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/17.jpg)
Mobile Wireless and Fixed Wireless
Mobile - variable number and type of devices - variable cell boundaries
Fixed wireless - single type of device, fixed number of connections - 12Mbps cell boundary
![Page 18: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/18.jpg)
Fixed Wireless – How it works
Mod
CustomerActiveEquipment
Premises
LTEModem(Mod)
Pitt
Backhaul Network
Ducted Fibre
Gateway
DW
DM
WirelessBase
Station
SA
EG
W
Key Characteristics• LTE technology will be used as part of the Fixed Wireless roll
out. LTE is often referred to as “4G”.• Unlike 3G, LTE is designed purely for data (e.g. voice is
handled as data).
![Page 19: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/19.jpg)
Fixed Wireless – Coverage to the Premise
19
Key Characteristics• Signal send and received between
telecommunication facility and Fixed External antenna installed on outside of premise. Routed via Ethernet cable to an internal wall mounted indoor unit
![Page 20: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/20.jpg)
Premise Installation
![Page 21: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/21.jpg)
At the customer premises....
Example of an Outdoor Antenna
Example of an Indoor unit (Network Termination Device, NTD)
![Page 22: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/22.jpg)
Fibre installation to premises
- Premise control device
![Page 23: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/23.jpg)
![Page 24: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/24.jpg)
![Page 25: Network Design & Construction Overview. 93% Fibre Coverage 2 Indicative map](https://reader038.vdocument.in/reader038/viewer/2022110304/55189d35550346991f8b4709/html5/thumbnails/25.jpg)
EXAMPLE ONLY: NTD (Indoor)