network function virtualization - an insight · nokia : elected at nfv#9 ... oss/bss • nfvi . vnf...

38
© ETSI 2015. All rights reserved NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT Presented by Deepanshu Gautam for Workshop of India-EU Collaboration on Standardisation for Select Technologies – 5/11/2015

Upload: buinga

Post on 24-May-2018

239 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT Presented by Deepanshu Gautam for Workshop of India-EU Collaboration on Standardisation for Select Technologies – 5/11/2015

Page 2: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

BACKGROUND

Page 3: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

PROBLEM STATEMENT AND OBSERVATION

Problem Statement • Complex carrier networks with a large variety of proprietary nodes and hardware

appliances.

• Launching new services is difficult and takes too long, and requires just another variety of box, which needs to be integrated into the existing network and IT environments.

• Operation is expensive, due to existing procure-design-integrate-deploy cycle.

Observation

• Commercial-off-the-shelf IT-platforms allow to host a large variety of applications.

• New virtualization technology allows to abstract underlying hardware, and enables elasticity, scalability and automation.

• Network Technology suppliers already use such technologies, but in a proprietary way.

Page 4: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

VISION Efficient Resource

Utilization

Remote configuration and install

Single design based on commodity

hardware

Reduces OpEX and VapEX.

Reduces system complexities

Multivendor network management

platform

Reduce power consumption

Rapid Time to Market Efficient test and integration bcz of

common infrastructure …. ….

Page 5: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

ETSI NFV INDUSTRY SPECIFICATION GROUP (ISG)

Page 6: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

In the 2 months since NFV#10: • 10 new ISG member companies,

• 71 conference calls and 1 F2F meeting week

In the 32 months since the creation of ISG NFV: • 280 Member companies, (115 ETSI Members, 165 Participant

organisations)

• 1300 people subscribed to the principal NFV mailing list

• 34 Work Items under way, a further 2 NWIs proposed

• Plenary attendance: NFV#1 (165), NFV#2 (285), NFV#3 (242), NFV#4 (355), NFV#5 (260), NFV#6 (258), NFV#7 (303), NFV#8(220), NFV#9 (244), NFV#10 (171)

FACTS

Page 7: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

CURRENT MEMBERSHIP

Page 8: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© All rights reserved

NFV ISG LIFE SPAN

8

October 2012

NFV White Paper Released

at SDN & OpenFlow summit in Germany

February 2013

NFV#1 Kick-off

ETSI headquarter, France Structure decided

April 2013

NFV#2 Santa Clara

ISG WI created for

• E2E architecture, • use cases • requirements • terminology

NFV#3 Bonn

ISG mainly work on the ISG level

documents

July 2013

NFV#4 Sunnyvale

Phase 1 work

continues NFV#5 Malaga

•ISG decided to go for Phase 2

•OPNFV proposed

NFV#6 Okinawa

ISG leadership changes. •AT&T took the chair position •NOC chair changed affiliation

NFV#7 Santa Clara

•Docomo took the ISG vice-

chair position •ISG approves

the Phase 2 mission

statement •IT was decided

that Phase 2 will develop normative

stage 2 (Architecture)

work

NFV#8 Scottsdale

•ISG Phase 2 started

•NFV Phase 1 officially ended.

NFV#9 Prague

•WG chairs and vice

chair elected •Phase 2

progresses

NFV#10 Sanya

ISG decided to make all

working drafts publically available

NFV#11 San Jose •Phase 3 planning started

•Beyond 2016 planning started

NFV#12 Jersey City

October 2013

ISG releases first set of

specifications as a major milestone

• E2E architecture, • use cases • requirements • terminology

February 2014

MANO#1

MANO#2 May 2014

July 2014

November 2014

February 2015

May 2015

July 2015

October 2015

MANO#3 Election of 2 additional ISG vice-chair took

place. HP and ALU took the positions

MANO#4

Phase 1 specifications published

MANO, SWA, REL, INF etc. MANO#5

Chairman

Working Groups INF

SWA MAN

O REL

Expert Group

PER

PoC

SEC

TSC NOC

Chairman

Working Groups

IFA

EVE

TST

REL

SEC

TSC NOC

Phase 3 features proposals starts

flowing

NFV#13

Page 9: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

LEADERSHIP AND STRUCTURE

Chair Vice Chair

Raquel Morera, Verizon

Mehmet Ersue, Nokia

Elected at NFV#9

Page 10: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

MAJOR ISSUES

Page 11: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

NFV Architecture

11

Computing Hardware

Storage Hardware

Network Hardware

Hardware resources

Virtualisation Layer

Virtualised

Infrastructure Manager(s)

VNF Manager(s)

NFV Orchestrato

r

OSS/BSS

NFVI

VNF 3

VNF 1

Execution reference points Main NFV reference points Other reference points

Virtual Computing

Virtual Storage

Virtual Network

NFV Management and Orchestration

EM 2

EM 3

EM 1

Or-Vi

Or-Vnfm

Vi-Vnfm

Os-Ma

Ve-Vnfm

Nf-Vi

Vn-Nf

Vl-Ha

Service, VNF and

Infrastructure Description

VNF 2

VNF

Virtualised Infrastructure

Manager (VIM)

NFVI

Execution reference points

Main NFV reference points

EM

VNF Catalogu

e

Or-Vi

Ve-Vnfm-vnf

Ve-Vnfm-em

Os-Ma-nfvo

Nf-Vi

Vn-Nf

NFV Orchestrator (NFVO)

NFV-MANO

OSS/BSS

NFVI Resourc

es

Or-Vnfm

Vi-Vnfm

NFV Instanc

es

Other reference points

NS Catalogu

e

VNF Manager (VNFM)

• NS Lifecycle Management • NS Lifecycle Change Notifications • NS Descriptor Management • NS Performance Management • NS Fault Management

Network Service

• VNF Package Management • VNF Image Management • VNF Lifecycle Management • VNF Lifecycle Operation Granting • VNF Lifecycle Change Notifications • VNF Configuration Management • VNF Performance Management • VNF Fault Management

VNF

• vResource Catalog Management • vResource Capacity Management • vResource Performance Management • vResource Fault Management • vResource Management

Virtual Resource

• NFVI Compute Management • NFVI Networking Management • NFVI Storage Management • NFVI Hypervisor Management

NFVI

Page 12: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

NFV LAYERS VIEW

12

NFV Infrastructure (NFVI)

Compute Storage

Network HW Resources

Virtualization Layer Virtualization SW

Virtual Compute

Virtual Storag

e

Virtual Network Virtual

Resources

Network Service

VNF VNFFG VNF

VNF PNF

Logical Links

Logical Abstractions

End Point

End Point

E2E Network Service

VNF Forwarding Graph (including Service Chain)

VNF Instances

VNF VNF VNF SW Instances

VNF VNF : Virtualized Network Function PNF : Virtualized Network Function

Page 13: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

MANO DESCRIPTORS

13

NSD

Id

Vendor

Version

vnfd

Vnffgd

Vld

Lifecycle_event

Vnf_depedency

Monitoring_parameters

Deployment_flavour

Auto_scale_policy

CP

pnfd

VNFD

vendor descriptor_version

version vdu

virtual_link connection_point

lifecycle_event dependency

monitoring_parameter deployment_flavour

auto_scale_policy manifest_file

manifest_file_security

VDU

id vm_image

computation_requirement virtual_memory_resource_element

virtual_network_bandwidth_resource lifecycle_event

constraint high_availability

scale_in_out vnfc

monitoring_parameter id

vm_image

vnfc

id connection_point

VNFFGD

Id Vendor

Descriptor_version Version

Constituent_vnf Cp Nfp

Depedent_virtual_link Number

_of_endpoints number_of_virtual_lin

k

VLD

Id Vendor Version

Root_requirements Leaf_requirements

Qos connection

Connectivity_type Test_access

NFP

Id policy

connection

Page 14: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

VNF LCM OPTIONS

14

VNF LCM in direct Mode VNF LCM in in-direct Mode

• VNFM talk to VIM, for resource management, directly after getting a permission (granting) form NFVO for particular LCM operation.

• VNFM talk to VIM, for resource management, via NFVO even after getting a permission (granting) form NFVO for particular LCM operation.

Pending Issues: • Is granting always needed?

• What bout cases where LCM request is received by NFVO in first place. • Can granting be “delegated”

Page 17: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

IFA012 (app & services running on top)

17

Details of 'DGS/NFV-IFA012' Work Item

This work item will entail work to specify the interface(s) and the corresponding requirements that comprise the Os-Ma-nfvo reference point as currently defined in the GS NFV-MAN 001 regarding applications/services on top of Network Services (NS).

• Life cycle management of Services (applications/services on top of NS).

• Monitoring/Tracing (e. g. concerning services).

• Flexible/dynamic service orchestration including creation and modification (e. g. orchestration, launching of a service and adaptation of running services.

What is on-top??

On-top may imply: • Grouping:

• Having an existing NS grouped with the “application/service” on top.

• Full (entire NS) and partial (few VNF of a NS) grouping is possible

• Grouping may imply dependencies between NS and “application/service” on-top.

Page 18: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

NFV STANDARDIZATION AND DEPLOYMENTS

Page 19: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

STAKEHOLDERS

• Vendors: providing solutions/products • VNF/Network Service Vendors

• Converting their existing NFs into VNF/NS

• NFV Hardware vendors (NFV COTS)

• Provide an efficient COTS which can meet integrated hardware in terms of efficiency.

• NFV MANO vendor

• Providing multivendor NFV network management system.

• Legacy NMS (EM, OSS/BSS) vendor

• Saving the current investments

• Network Operators: deploying provided solutions/products • No-vendor lock-in

• Reducing OpEx

• Reducing CpEx

• Service Providers: consuming NFV service and providing further service to end-users • VNFaaS, NFVIaaS

• End Users

• No impact

Page 21: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

RELATED SDO AND TECHNOLOGIES

21

Category

NFV 3GPP TMF OASI

S IETF DMTF OMG OpenSt

ack OPNFV OpenMA

NO OpenDayl

ight

Business Layer

Business Processing ZOOM BPEL BPMN

Modeling Modeling IFA (MANO)

SID TOSC

A YANG Project

Policy Policy Management

IFA(MANO)

ZOOM NFV-RG

Architecture

Interface/APIs

IFA (MANO,

SWA) SA5

OMI, ODE

CAMP

CIMI Projects OpenDayli

ght

Orchestration

IFA (MANO)

FMSS (Service

Chaining) ZOOM SFC

NFV-RG Heat

OpenMANO

OpenDaylight

VNFM IFA (MANO,SWA, INF)

SA5 ZOOM Projects OpenDayli

ght

NFVI OpenStack

Projects OpenDayli

ght

Reliability Reliability/ Resiliency

REL VNFPool

Page 22: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

NFV PHASED DEPLOYMENTS

22

NFV is considered to be a disruptive technology. Specially, it is expected to change the way

current networks is being managed.

The multi-vendor management and orchestration objective of NFV need to

controlled. Smooth migration is required. Phase 1 Phase 2

Phase 3 Phase 4 Final Phase

Standardized Interface

Page 23: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

NFV OPEN SOURCE

Page 24: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

Launched 30 Sep 2014

Speed up implementation of NFV

Create a carrier grade Open Source Ecosystem

OPNFV (OPEN PLATFORM FOR NFV)

Website: https://www.opnfv.org/ Wiki: https://wiki.opnfv.org/ OPNFV Arno: https://www.opnfv.org/arno

Page 25: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

OPNFV Project Pipeline

OPNFV CONTND…

For details: https://wiki.opnfv.org/ Next OPNFV release (in discussion) now is called “OPNFV Brahmaputra release aka B release”

Page 27: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

SDN Vs. NFV

Page 28: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved © ETSI 2015. All rights reserved

WHAT ARE THEY?

NFV enables executing existing network functions on virtual machine where as, SDN separate control flow from data flow.

SDN Applied

NFV Applied

Managed Router Service

Page 29: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

PLACEMENT IN ETSI NFV ARCHITECTURE

29

SDN Controller

SDN vSwitch

SDN vSwirch

OpenFlow

The most obvious NFV construct related with SDN would be NFPs (network forwarding path aka service chain) included in VNFFG. SDN could be used to configure vSwitch to forward the traffic as per a particular NFP.

Page 30: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

SOME USEFUL POINTERS

NFV Public page

• http://www.etsi.org/technologies-clusters/technologies/nfv

NFV published Specifications

• http://www.etsi.org/technologies-clusters/technologies/nfv

All NFV working drafts are publically accessible

• http://docbox.etsi.org/ISG/NFV/Open/Drafts/

NFV PoC updates

• http://www.etsi.org/technologies-clusters/technologies/nfv/nfv-poc

NFV Liaison Matrix

• https://portal.etsi.org/TBSiteMap/NFV/NFVLiaisonMatrix.aspx

Page 31: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

NFV FUTURE PLANNING

Page 32: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

RELEASE 2016 TIMELINE

32

Feature based 2016

Release

Page 33: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

FEATURE PROPOSAL SUBMITTED

33

Total 24 feature proposal were submitted for 2016 release.

30%

18%

11%

7%

7%

7%

4% 4%

4% 4%

4% Contributions

AT&T

Huawei

HP

DT

DoCoMo

PTP

Page 34: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

FEATURE PROPOSAL RECOMMENDED BY TSC Listed in TSC recommendation NOT listed in TSC

recommendation Withdrawn/Merged

“New Features”: FTR002 (CHRG) FTR003 (NFV_SECM) FTR007 (POLICY) FTR008 (SEC4SNC) FTR013 (VEMOSS) FTR016 (VNF_PHOTO) FTR017 (NFV_M&Ms) FTR019 (SWUP) FTR030 (NFVWAN) FTR031 (CONF&IOP) FTR004 (REAL-TIME) FTR011 (NFVI_PATH_TEST) FTR018 (NFV_FM) NFV039 (INTENT)

“Extensions“: FTR001 (IM-NFV) FTR010 (NFVO_ARCH) FTR026 (HWENV) FTR035 (FASTSWITCH) FTR023 (VNFCON)

FTR005 (DM-NFV) FTR012 (HWMET) FTR027 (PLACEMENT) FTR029 (MARKETPLACE) FTR033 (G-VNFM) FTR036 (PAAS) FTR037 (BBF-MSBN)

FTR006 (IOT-5G) FTR020 (NFVI-EndPoints) FTR021 (NFVI-EndPoints) FTR022 (NFVI-EndPoints) FTR024 (WAN services) FTR025 (WAN control services) FTR028 (MAN-REL) FTR032 (Lightweight Containers) FTR009 (VNFM_ARCH)

Research Agenda: FTR004 (REAL-TIME) FTR014 (DEVOPS) FTR015 (PNF2VNF) FTR034 (VCONF)

Page 35: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

FEATURE MAPPINGTO WGs

NFV-IM (FTR001)

IFA

CHRG (FTR002)

IFA

NFV_SECM (FTR003) SEC, IFA

Work Item set to update published

GS(s)

POLICY (FTR007)

IFA

SEC4SNC (FTR008) SEC, IFA

VEMOSS (FTR013)

IFA

NFV_M&M (FTR017)

IFA, SEC, REL

VNF_PHOTO (FTR016)

TST, IFA, SEC

INTENT (FTR039) EVE, IFA

PATH_TEST (FTR011)

TST

NFVO_ARCH (FTR010)

IFA

NFV_FM (FTR018)

REL

SWUP (FTR019)

REL, TST, IFA, SEC

CONF&IOP (FTR031)

TST

HWENV (FTR026)

EVE, SEC, REL

NFVWAN (FTR030)

IFA

VNFCON (FTR023)

EVE

FASTSWITCH (FTR035)

IFA

Features

Building Blocks

REAL-TIME (FTR004) EVE, IFA

Work Item set for feature related normative work

Work Item set to cover Stage 3

Work Item set for feature related

informative work Work Item set to update published

GS(s)

Work Item set for feature related normative work

Work Item set to cover Stage 3

Work Item set for feature related

informative work

EVE IFA REL TST SEC

To derive work items

Extensions

NFV Information Modelling

Charging, Billing and Accounting

Security Management

Policy Management

End-to-End Management

Testing Continuous Integration

Service and Network Service Orchestration

Transition into NFV and

Integration

New Technologies

Fault Management Acceleration

Page 36: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

STEPS AHEAD

1. Refine the document on endorsed features 2. Request the NOC to recommend priorities for the endorsed

features 3. Identify sources for work item definitions – By the end of

November 4. The TSC will prepare work-item guidelines according to these

sources 5. Work-item proposal collection – Deadline: two weeks before

NFV#13 6. Discuss and approve the WID proposals at NFV#13

Page 37: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

© ETSI 2015. All rights reserved

• Whether ISG NFV should continue

• Whether ISG should do Stage 3 work • Whether to use open source based stage 3

work

• Whether to use conventional specification based stage 3 work

BEYOND 2016

Page 38: NETWORK FUNCTION VIRTUALIZATION - AN INSIGHT · Nokia : Elected at NFV#9 ... OSS/BSS • NFVI . VNF 3. VNF 1 ... monitoring_parameter. deployment_flavour. auto_scale_policy. manifest_file

Thank you!

© ETSI 2015. All rights reserved