network planning section haryana telecom circle, ambala ... · no. cgmt/hr / nwp-117 / battery...

27
Network Planning Section Haryana Telecom Circle, Ambala Tel.: 0171 2603257 E-mail:-[email protected] No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana Telecom Circle. Sub: - Information regarding Procedure for calculating requirement of Batteries Sets for BSNL Sites (Only CFA Vertical) In reference to BSNL HQ letter 7-1/2014/NWO-CFA/MSE dated 31.7.2014 and in continuation to BSNL HQ letter No. 7-1/2013/NWO-CFA/MSE/Ch III dated 27.7.2015 ( Copies attached ) vide which procedure for calculating requirement of Batteries for replacement and development was conveyed by BSNL Corporate Office. In this regard, it is requested to send the below noted information in the prescribed proforma as under to enable this office for arriving at figure i.e. 1 / 6 th of battery capacity which is to be procured for the year 2016-17. SSA Name of Node/ Exchange Backup time specified (in Hrs) Present Anticipa ted load (in Amp) Existing Battery Capacity (in AH) Date of install ation Battery size required as per above formula (in AH) Proposed size of battery sets to be procured It is requested kindly provide the above detail in excel format to this office on mail [email protected] latest by 17.09.2016 positively. This has got approval of competent authority.

Upload: trinhngoc

Post on 26-Apr-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Network Planning Section

Haryana Telecom Circle, Ambala

Tel.: 0171 – 2603257

E-mail:[email protected]

No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016.

To,

All SSA Heads,

Haryana Telecom Circle.

Sub: - Information regarding Procedure for calculating requirement of Batteries Sets for BSNL

Sites (Only CFA Vertical)

In reference to BSNL HQ letter 7-1/2014/NWO-CFA/MSE dated 31.7.2014 and in continuation

to BSNL HQ letter No. 7-1/2013/NWO-CFA/MSE/Ch III dated 27.7.2015 ( Copies attached ) vide

which procedure for calculating requirement of Batteries for replacement and development was

conveyed by BSNL Corporate Office. In this regard, it is requested to send the below noted

information in the prescribed proforma as under to enable this office for arriving at figure i.e. 1 / 6th

of

battery capacity which is to be procured for the year 2016-17.

SSA

Name of

Node/

Exchange

Backup

time

specified

(in Hrs)

Present

Anticipa

ted load

(in

Amp)

Existing

Battery

Capacity

(in AH)

Date

of

install

ation

Battery size

required as

per above

formula (in

AH)

Proposed size

of battery sets

to be procured

It is requested kindly provide the above detail in excel format to this office on mail

[email protected] latest by 17.09.2016 positively.

This has got approval of competent authority.

Page 2: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

This is regarding the Battery sets requirement for FY 2015-16 in respect of NWP- CFA

vertical BSNL sites.

1. This office has asked from SSAs the battery requirement for FY 2015-16 on BSNL

sites (CFA vertical only) copy of the letter placed at 2/c along with Excel format in

which field units advised to submitted their requirement with consideration of

following points :

a. The battery shall be taken in to the requirement whose life will be expired

on/before 31.03.2017.

b. The requirement shall be submitted in prescribed excel format with approval of

SSA Heads.

c. SSAs are advised to check the balance battery in store/battery in pipeline. The

same shall be deduct from final requirement.

2. After the consideration of above points, the requirement submitted by the SSAs is

as under :-

SSA 200 AH

400 AH

600 AH

1000 AH

1500 AH

2000 AH

3000 AH

4000 AH

5000 AH Total

Placed at

Ambala 12 0 20 26 0 2 0 4 4 68 13/c

Faridabad 0 1 35 10 0 4 0 0 0 50 18/c

Gurgaon 4 6 67 8 0 0 0 0 0 85 22/c

Hisar 0 2 60 22 0 6 2 0 0 92 25/c

Jind 6 13 5 3 0 2 2 0 0 31 5/c

Karnal 2 2 50 17 2 6 2 0 0 81 35/c

Rewari 0 2 2 21 0 7 0 0 0 32 36/c

Rohtak 40 0 9 14 0 5 3 0 0 71 30/c

Sonipat 0 0 15 6 0 1 0 2 0 24 3/c

Total 64 26 263 127 2 33 9 6 4 534

This office has reconcile

SSA Name Placed at First level scrutinize Remarks

Ambala 18/c 19/c Repetition with

previous year &

additional load

checked.

Faridabad 6/c 7/c

Gurgaon 12/c 13/c

Hisar 8/c 9/c & 23/c

Jind 14/c 15/c

Page 3: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Karnal 16/c 17/c

Rewari 10/c 11/c

Rohtak 4/c 5/c

Sonepat 2/c 3/c

3. BSNL HQ asked the information regarding the installed capacity of Batteries related to

NWO-CFA cell for FY 2015-16 vide letter placed at 20/c and refer the previous letter

placed at 20-1/c to 20-5/c.

4. In reference to point no 3, this office has asked the information of installed capacity of

Batteries related to NWO-CFA cell for FY 2015-16 vide letter placed at 21/c from SSAs

and the summary of information received as under (detail placed at 29/c) :

Installed BTY sets in

SSAs

200 AH

300 AH

400 AH

600 AH

1000 AH

1500 AH

2000 AH

3000 AH

4000 AH

5000 AH

Total

Haryana 288 4 33 735 526 5 146 43 14 19 1813

5. The above detail is to be send BSNL HQ in reference to letter 20/c for procurement process

as “ The battery sets requirement for FY 2015-16 is the 1/6th

of the total installed capacity of

Batteries related to NWO-CFA cell.

6. In the mean time, BSNL HQ revised the guidelines as under

a. “Decentralised of Procurement of Batteries & Power Plants” instead of NWO-CM cell at

BSNL HQ.

b. Back time for VRLA Batteries capt as

i. Urabn area or critical location like Zonal center = 4 Hours

ii. SDCA (Block HQ) = 6 Hours

iii. Rural areas = 10 Hours

iv. Priority should be given to higher node (like Zonal center, MSC, TAX, MSU,

BSC etc) for replacement of batteries. Minutes of HPPC for vetting the requirement of SMF VRLA Battery sets for the FY 2015-16.

Meeting of HPPC of Haryana Telecom Circle was convened on dated ...06.2015 in the

chamber of SrGM(CFA). Network planning cell of Circle Office has submitted the final

requirement of SMF VRLA Battery sets under development and maintenance activities as detailed

in table below, in accordance to the requirement raised by SSAs & final requirement proposed by

network planning section of Haryana Telecomm Circle for the financial year 2015-16. Is given

below in tabular form.

Table No.1

SSA 400 600 1000 2000 5000 Total

AMB 0 2 2 2 0 6

FBD 1 1 2 0 0 4

GRG 0 0 2 2 2 6

HSR 0 8 2 2 0 12

Jind 0 3 5 0 0 8

KRL 4 4 16 2 0 26

REW 0 1 3 2 0 6

RTK 0 2 1 2 1 6

SPT 1 5 6 0 0 12

Page 4: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Total 6 26 39 12 3 86

While working out the requirement of battery sets under development and maintenance

activities following points have been kept in view.

1. Battery sets in pipeline. 2. All the recovered battery sets in working condition will be re-utilized and adjusted in

demand. 3. Back up time for VRLA Batteries

a) in Urban areas and at Critical locations like Zonal Centres(From Where service of multiple circles are affected), it may be kept as 4 Hours.

b) At Block head quarters (SDCA),It may be kept as 6 Hours. c) In Rural areas (Where AC is not available for long period), it may be kept as 10 Hours.

4. While making Procurement of batteries, charging capacity of power plant must be ensured and required energy audit must be done.

5. Priority should be given to higher node(like Zonal Centre,MSC,TAX,MSU,BSC etc) for replacement of batteries. The other nodes (BTSs,RSUs etc.) should be considered thereafter.

6. The requirement of battery sets under maintenance has been taken into account in respect of battery whose life will expire up to 31-03-2016 due to the reason that procurement in each year is processed nearby in the m/o July-August.

RECOMMENDATIONS

After examining the various reports and information put forth by the planning section, the HPPC

is of the opinion that quantity of battery sets shown in above table is reasonable and

recommended for procurement after observing usual departmental formalities.

DGM (CFA) Addl.GM (Fin) GM (CFA) Sr. GM (CM)

Page 2 of 2

Page 5: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

7. Vide BSNL HQ letter no 7-1/2015-NWO-CFA/MSE/Ch.III Dated 07.05.2015 (placed at

31/c) point no 3, Only 1/6th

of the requirement so arrived for each size of Battery (nearest

full integer) can be procured. The calculation for 1/6th

battery sets as under:

BTY Capacity 200 AH

300 AH

400 AH

600 AH

1000 AH

1500 AH

2000 AH

3000 AH

4000 AH

5000 AH

Total

Total 288 4 33 735 526 5 146 43 14 19 1813

1/6th 48 0.66 5.5 122.5 87.66 0.83 24.33 7.16 2.33 3.16 302.2

1/6TH

(Full integer) 48 0 6 122 87 0 24 7 2 3 299

8. It means, 299 battery sets can be consider under CFA vertical for FY 2015-16. 9. The 162 battery sets (HPPC approved) are already rest with MM cell of Haryana for

procurement. Detail of capacity wise as under :

10. Battery sets for HPPC against for the Financial year 2015-16 as under :

Capacity BTY sets

1/6th

299 nos

BTY sets

162 nos

Reaming

BTY sets

200 AH 48 49 0 (-1)

400 AH 6 0 6

600 AH 122 96 26

1000 AH 87 17 70

2000 AH 24 0 24

3000 AH 7 0 7

4000 AH 2 0 2

5000 AH 3 0 3

11. The second level scrutinize on the basis of i. Urabn area or critical location like Zonal center = 4 Hours

ii. SDCA (Block HQ) = 6 Hours

iii. Rural areas = 10 Hours

iv. Priority should be given to higher node (like Zonal center, MSC, TAX, MSU,

BSC etc) for replacement of batteries.

v. Load consideration, discharge rate of Battery sets, effective battery capacity as

per guideline for planning of VRLA BATTERIES vide GL No GL/BAT-04/02

MAR 2007 and sample calculation for switch system (placed at 33/c).

vi. Battery life of 6 years (battery life expired on/before 31-Mar-2016) is

considered.

BTY capacity 200 AH 600 AH 1000 AH Total

Total 49 96 17 162

Page 6: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

12. After apply the above parameters, SSA wise requirement came out as under :

SSA 200 300 400 600 1000 2000 3000 4000 5000 Total

AMB 3 2 0 2 2 2 0 0 0 11

FBD 0 0 1 1 3 0 0 0 0 5

GRG 0 0 0 0 3 2 0 0 2 7

HSR 0 0 0 8 2 2 0 0 0 12

Jind 0 0 0 3 5 0 0 0 0 8

KRL 1 2 4 4 17 2 0 0 0 30

REW 0 0 0 1 3 3 0 0 0 7

RTK 6 4 0 2 1 2 0 0 1 16

SPT 0 0 1 5 6 0 0 0 0 12

Total 10 8 6 26 42 13 0 0 3 108

13. Vide point number 10, 200 AH=10 & 300 AH=8 not to be consider for FY 2015-16,

Capacity BTY sets

1/6th

299 nos

BTY sets

162 nos

Reaming

BTY sets

Requirement

of SSAs

200 AH 48 49 0 0

400 AH 6 0 6 6

600 AH 122 96 26 26

1000 AH 87 17 70 42

2000 AH 24 0 24 13

3000 AH 7 0 7 0

4000 AH 2 0 2 0

5000 AH 3 0 3 3

90

14. Therefore, 90 nos battery sets may be consider for HPPC against FY 2015-16, SSAs wise

detail as under.

SSA 400 600 1000 2000 5000 Total

AMB 0 2 2 2 0 6

FBD 1 1 3 0 0 5

GRG 0 0 3 2 2 7

HSR 0 8 2 2 0 12

Jind 0 3 5 0 0 8

KRL 4 4 17 2 0 27

REW 0 1 3 3 0 7

RTK 0 2 1 2 1 6

SPT 1 5 6 0 0 12

Total 6 26 42 13 3 90

Page 7: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

15. The above list of 90 nos of battery sets follows the following norms

i. Urabn area or critical location like Zonal center = 4 Hours

ii. SDCA (Block HQ) = 6 Hours

iii. Rural areas = 10 Hours

iv. Priority should be given to higher node (like Zonal center, MSC, TAX, MSU,

BSC etc) for replacement of batteries.

v. Load consideration, discharge rate of Battery sets, effective battery capacity as

per guideline for planning of VRLA BATTERIES vide GL No GL/BAT-04/02

MAR 2007 and sample calculation for switch system (placed at 33/c).

vi. Battery life of 6 years (battery life expired on/before 31-Mar-2016) is

considered.

vii. Matching with previous year allotment of battery sets to SSAs.

viii. Battery sets under 1/6th

of the total installed battery sets.

List of battery sets (90 nos) SSA wise against the FY 2015-16 placed at 34/c is

submitted for approval & further processing for HPPC of Haryana circle please.

Page 8: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Network Planning Section

Haryana Telecom Circle,Ambala

Tel.: 0171 – 2603257

E-mail :[email protected]

____________________________________________________________________

The meeting of HPPC of Haryana Telecom Circle for requirement of SMF VRLA Battery sets in r/o CFA Vertical for the FY 2015-16 is scheduled to be held in the chamber of Sr.GM(CFA) on dated 10.06.2015 at 11:00 Hrs. All the HPPC members are requested to make it convenient to attend the meeting at scheduled date & time.

(N.K Singla)

AGM (NWP-CFA)

UO Note No: - HR / NWP-117 / Battery Requirement / 2015-16 /37 Date: - 08-06-2015

To

Members of HPPC

O/o CGMT HR Ambala

Haryana Telecom Circle

1. Sr. GM (Trans) 2. Sr GM (CFA)

3. GM (Fin)

4. DGM (CFA)

Page 9: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

This is regarding the Battery requirement under CFA vertical for the financial

Year 2016-17.

1. As per BSNL HQ letter No 7-1/2014/NWO-I-CFA/MSE Dated 16.03.2015 (placed at 20/c) vide which 1/6th of the installed battery capacity shall be

taken as requirement for FY 2015-16. 2. Accordingly the detail of installed battery capacity collected from SSAs and

summarised placed at 28/c.

Page 10: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

3. SSA wise, make wise and Capacity wise summary is placed at 29/c and

also under please.

Installed BTY sets in

SSAs

200 AH

300 AH

400 AH

600 AH

1000 AH

1500 AH

2000 AH

3000 AH

4000 AH

5000 AH

Total

AMB 49 0 6 101 89 0 19 1 2 5 272

FBD 0 0 1 49 34 0 16 0 0 0 100

GRG 8 0 4 133 30 0 7 2 0 2 186

HSR 20 0 4 118 58 0 34 12 4 2 252 Jind 39 0 4 44 52 0 4 6 2 0 151

KRL 20 4 7 160 81 2 21 8 0 0 303

REW 4 0 0 43 80 3 11 4 2 0 147

RTK 119 0 3 41 74 0 17 10 0 8 272

SPT 29 0 4 46 28 0 17 0 4 2 130

Total 288 4 33 735 526 5 146 43 14 19 1813

4. As per BSNL HQ guidelines referred vide point no 2, the calculation for

1/6th of the installed battery capacity shall be taken as requirement for FY 2015-16 is as under please.

BTY Capacity

200 AH

300 AH

400 AH

600 AH

1000 AH

1500 AH

2000 AH

3000 AH

4000 AH

5000 AH

Total

Installed

battery sets

in SSAs

288 4 33 735 526 5 146 43 14 19 1813

1/6 of the

Battery

Sets

48 0.66 5.5 122.5 87.66 0.83333 24.3333 7.16667 2.33333 3.16667 302.2

1/6TH

(Full

integer) 48 1 6 123 88 1 24 7 3 4 305

1/6th as per

requirement

collected

55 0 0 123 88 1 24 7 3 4 305

1/6 th final

BTY sets 55 0 0 144 77 0 21 2 2 4 305

Note: This office has also collected the actual requirement from SSAs and on

the basis of that following adjustment is to be needed to meet the total 1/6th of installed battery sets i.e. 305. a. The battery sets of 300AH=1 & 400AH=6 considered in the 200 AH (7 nos)

due to no requirement of 300AH & 400AH battery sets received from SSA. b. The battery sets for 1000AH=11, 1500AH=1, 2000AH=3, 3000AH=5 &

4000AH=1 (TOTAL 21) are considered in 600AH due to 1/6th battery sets more than actual requirement.

Page 11: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

5. As per above calculation, now only 305 battery sets may be procured under

CFA vertical for FY 2015-16.

6. 162 Battery sets under CFA vertical (HPCC approved) are pending against the FY 2014-15 at the level of MM cell.

7. Requirement of remaining (305-162 = 143) 143 nos of battery sets against

the FY 2015-16 is as under please.

SSA 200 AH

600 AH

1000 AH

2000 AH

3000 AH

4000 AH

5000 AH Total

AMB 2 7 7 0 2 2 0 20

FBD 0 2 13 2 0 0 0 17

GRG 0 4 0 0 0 0 2 6

HSR 0 7 3 4 0 0 0 14

Jind 0 4 7 0 0 0 0 11

KRL 0 15 12 4 0 0 0 31

REW 0 4 13 7 0 0 0 24

RTK 4 2 2 2 0 0 2 12

SPT 0 3 3 2 0 0 0 8

Total 6 48 60 21 2 2 4 143

8. SSA Wise details of 1/6th of the installed battery i.e. 305 is as under

SSA 200 AH

600 AH

1000 AH

2000 AH

3000 AH

4000 AH

5000 AH Total

AMB 14 33 24 0 2 2 0 75

FBD 0 2 13 2 0 0 0 17

GRG 0 25 0 0 0 0 2 27

HSR 2 28 3 4 0 0 0 37

Jind 5 4 7 0 0 0 0 16

KRL 3 43 12 4 0 0 0 62

REW 0 4 13 7 0 0 0 24

RTK 25 2 2 2 0 0 2 33

SPT 6 3 3 2 0 0 0 14

Total 55 144 77 21 2 2 4 305

In reference to above, the proposed requirement of battery set quantity

of 143 no,s (mentioned in table under point no 8) for F/Y 2015-16 is

submitted for kind consideration and approval please.

If the above proposal is to be agree,

Network Planning Section

Haryana Telecom Circle, Ambala

Tel.: 0171 – 2603257

Fax: 0171-2603708

Page 12: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

E-mail:[email protected]

No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 09-09-2016.

To,

SSA Head Sonepat

Haryana Telecom Circle.

Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for

the FY 2016-17.

Ref. no. S-3/PLG/Exch. Equip./SPT/16-17/IV/52 Dated 01-.09.2016

Kindly refer to your office letter above vide which the revised requirement of Batteries set have

been sent as an annexure. But the said annexure was not enclosed with the letter.

After following the BSNL HQ norms for calculation of requirement of batteries in r/o CFA

Verticals, there are slight changes in the batteries requirement submitted by your SSA which have been

analyzed/corrected as enclosed annexure and in this regards it is again requested to comment on the

revised analyzed requirement and resubmit the enclosed annexure with your comments duly signed

latest by 09.09.2016 forenoon on mail [email protected].

Encl:-As Above

Som Chand

AD(NWP-CFA)

Page 13: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Network Planning Section

Haryana Telecom Circle, Ambala

Tel.: 0171 – 2603257

Fax: 0171-2603708

E-mail:[email protected]

No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 29-08-2016.

To,

SSA Head Sonipat

Haryana Telecom Circle.

Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for

the FY 2016-17.

Requirement in r/o batteries submitted by your SSA in r/o CFA Vertical for FY 2016-17. After

detail examination,a brief summary has been given as annexure

Details of the requirement projected and requirement being considered along with the reasons

for rejection/Capacity change are mentioned in detailed annexure attached.

It is therefore, requested to go through the above details of your SSA. If any there is any

objection in the requirement under consideration then same may be analyzed at SSA level and proposed

changes with justification will be discussed in Circle office as per schedule given below:-

Jind & Sonipat SSA Dated :- 03.09.16

Otherwise, the requirement as shown in annexure will be treated as final.

Page 14: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Network Planning Section

Haryana Telecom Circle, Ambala

Tel.: 0171 – 2603257

Fax: 0171-2603708

E-mail:[email protected]

No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 29-08-2016.

To,

SSA Head Jind

Haryana Telecom Circle.

Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for

the FY 2016-17.

Requirement in r/o batteries submitted by your SSA in r/o CFA Vertical for FY 2016-17. After

detail examination,a brief summary has been given as annexure

Details of the requirement projected and requirement being considered along with the reasons

for rejection/Capacity change are mentioned in detailed annexure attached.

It is therefore, requested to go through the above details of your SSA. If any there is any

objection in the requirement under consideration then same may be analyzed at SSA level and proposed

changes with justification will be discussed in Circle office as per schedule given below:-

Jind & Sonipat SSA Dated :- 03.09.16

Otherwise, the requirement as shown in annexure will be treated as final.

Page 15: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Network Planning Section

Haryana Telecom Circle, Ambala

Tel.: 0171 – 2603257

Fax: 0171-2603708

E-mail:[email protected]

No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 29-08-2016.

To,

SSA Head Karnal

Haryana Telecom Circle.

Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for

the FY 2016-17.

Requirement in r/o batteries submitted by your SSA in r/o CFA Vertical for FY 2016-17. After

detail examination, a brief summary is given below.

Details of the requirement projected and requirement being considered along with the reasons

for rejection/Capacity change are mentioned in detailed annexure attached.

It is therefore, requested to go through the above details of your SSA. If any there is any

objection in the requirement under consideration then same may be analyzed at SSA level and proposed

changes with justification will be discussed in Circle office on 02.09.2016

Otherwise, the requirement as shown in annexure will be treated as final.

SSA Capacity Battery Projected Battery consider

Karnal 200 AH 2 1

Karnal 400 AH 2 0

Karnal 600 AH 50 20

Karnal 1000 AH 17 8

Karnal 1500 AH 2 0

Karnal 2000 AH 6 3

Karnal 3000 AH 2 0

Karnal 4000 AH 0 0

Karnal 5000 AH 0 0

Total 81 32

Page 16: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Network Planning Section

Haryana Telecom Circle, Ambala

Tel.: 0171 – 2603257

Fax: 0171-2603708

E-mail:[email protected]

No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 29-08-2016.

To,

SSA Head Ambala

Haryana Telecom Circle.

Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for

the FY 2016-17.

Requirement in r/o batteries submitted by your SSA in r/o CFA Vertical for FY 2016-17. After

detail examination, a brief summary is given below.

SSA Capacity Battery Projected Battery consider

Ambala 200 AH 12 7

Ambala 400 AH 0 0

Ambala 600 AH 20 8

Ambala 1000 AH 22 10

Ambala 2000 AH 2 6

Ambala 3000 AH 0 0

Ambala 4000 AH 2 1

Ambala 5000 AH 4 0

Total 62 32

Details of the requirement projected and requirement being considered along with the reasons

for rejection/Capacity change are mentioned in detailed annexure attached.

It is therefore, requested to go through the above details of your SSA. If any there is any

objection in the requirement under consideration then same may be analyzed at SSA level and proposed

changes with justification will be discussed in Circle office on 02.09.2016

Otherwise, the requirement as shown will be presented to HPCC for further consideration.

S.K Kakkar

DGM(NWP-CFA)

Page 17: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Network Planning Section

Haryana Telecom Circle, Ambala

Tel.: 0171 – 2603257

Fax: 0171-2603708

E-mail:[email protected]

No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 09-08-2016.

To,

SSA Head Ambala

Haryana Telecom Circle.

Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for

the FY 2016-17.

Ref:-S-3/Plg/Exch. Equipment/SPT/16-17/IV/26 Dated 05.07.16

Kindly refer to your office letter mentioned above under reference vide which Battery

requirement in r/o NWP-CFA Vertical have been submitted. While analyzing the requirement of your

SSA following shortcomings have been noticed.

Total Requirement

Submitted

Under Consideration Not Considered Remarks

Mentioned below

1) Most of the location Battery required is not justified as per load of the exchange, needs to be

reviewed .

2) Almost in all the location under details of equipment column only RSU and RSU+BTS is

mentioned no detail of equipment is given.

3) The sites where scrapping Memo and Estimate No. is written as under process, the same

should be submitted early.

It is once again requested to review the battery requirement as submitted and remove the

shortcomings and submit the requirement latest by 12.08.16, otherwise the battery shown under

consideration will only be treated.

Som Chand

AD(NWP-CFA)

Page 18: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Network Planning Section

Haryana Telecom Circle, Ambala

Tel.: 0171 – 2603257

Fax: 0171-2603708

E-mail:[email protected]

No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 09-08-2016.

To,

SSA Head Sonipat

Haryana Telecom Circle.

Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for

the FY 2016-17.

Ref:-S-3/Plg/Exch. Equipment/SPT/16-17/IV/26 Dated 05.07.16

Kindly refer to your office letter mentioned above under reference vide which Battery

requirement in r/o NWP-CFA Vertical have been submitted. While analyzing the requirement of your

SSA following shortcomings have been noticed.

Total Requirement

Submitted

Under Consideration Not Considered Remarks

Mentioned below

4) Battery required is not justified as per load of the exchange, needs to be reviewed .

5) Almost in all the location under details of equipment column only RSU and RSU+BTS is

mentioned no detail of equipment is given.

6) The sites where scrapping Memo and Estimate No. is written as under process, the same

should be submitted early.

It is once again requested to review the battery requirement as submitted and remove the

shortcomings and submit the requirement latest by 12.08.16, otherwise the battery shown under

consideration will only be treated.

Som Chand

AD(NWP-CFA)

Page 19: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Network Planning Section

Haryana Telecom Circle, Ambala

Tel.: 0171 – 2603257

Fax: 0171-2603708

E-mail:[email protected]

No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 09-08-2016.

To,

SSA Head Jind

Haryana Telecom Circle.

Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for

the FY 2016-17.

Ref:-CP-06/JD/2014-15 Dated 12.07.16

Kindly refer to your office letter mentioned above under reference vide which Battery

requirement in r/o NWP-CFA Vertical have been submitted. While analyzing the requirement of your

SSA following shortcomings have been noticed.

Total Requirement

Submitted

Under Consideration Not Considered Remarks

31 4 27 Mentioned below

7) Battery required is not justified as per load of the exchange for e.g at S.No. 2 Gatuali

Exchange load of exchange given is 10 A and battery required is 400A.

8) Almost in all the location details of equipment in exchange is not given whereas it is

specially desired to submit the details of existing equipment.

9) The sites where scrapping Memo and Estimate No. is written as under process, the same

should be submitted early.

It is once again requested to review the battery requirement as submitted and remove the

shortcomings and submit the requirement latest by 12.08.16, otherwise the battery shown under

consideration will only be treated.

Som Chand

AD(NWP-CFA)

Page 20: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

this office letter of even no. dated 21.06.2016 followed by reminder letter dated 14.07.2016

vide which it was requested to submit the requirement of Battery Sets in r/o CFA segment under

Development and Maintenance for the FY 2016-17.Even after a lapse of last date your SSA have not

submitted the requirement.

Due to non submission of requirement this office is unable to process the requirement of other

SSAs whose have submitted the requirement timely, this is causing delay in whole process due to non

submission by your SSA. Therefore, it is once again requested to submit the requirement as per

prescribed Performa with in two days from the date of issue of this letter via email at

[email protected].

Som Chand

AD(NWP-CFA)

Page 21: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Network Planning Section

Haryana Telecom Circle, Ambala

Tel.: 0171 – 2603257

Fax: 0171-2603708

E-mail:[email protected]

Reminder letter-2

No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 02-08-2016.

To,

SSA Heads FBD/KRL/RTK

Haryana Telecom Circle.

Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for

the FY 2016-17.

Kindly refer to this office letter of even no. dated 21.06.2016 followed by reminder letter dated

14.07.2016 vide which it was requested to submit the requirement of Battery Sets in r/o CFA segment

under Development and Maintenance for the FY 2016-17.Even after a lapse of last date your SSA have

not submitted the requirement.

Due to non submission of requirement this office is unable to process the requirement of other

SSAs whose have submitted the requirement timely, this is causing delay in whole process due to non

submission by your SSA. Therefore, it is once again requested to submit the requirement as per

prescribed Performa with in two days from the date of issue of this letter via email at

[email protected].

Som Chand

AD(NWP-CFA)

Page 22: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Network Planning Section

Haryana Telecom Circle, Ambala

Tel.: 0171 – 2603257

Fax: 0171-2603708

E-mail:[email protected]

No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 /6 Dated: 14-07-2016.

To,

All SSA Heads,

Haryana Telecom Circle.

Sub: - Installation of New Batteries Sets where LVD in Power Plants is available.

This is regarding the Installation of new Batteries at sites where LVD is available in power

plants so that New Battery may remain healthy during their life time. In case of missing/ faulty LVDs

chances of healthy battery going faulty may increase.

It becomes the responsibility of the SSA to keep the batteries in healthy environment and in

case of non compliance of the instructions as stated above, the responsibility of concerned person may

kindly be fixed.

Encl:- As Above.

Som Chand

AD(NWP-CFA)

Network Planning Section

Haryana Telecom Circle, Ambala

Page 23: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Tel.: 0171 – 2603257

Fax: 0171-2603708

E-mail:[email protected]

No. CGMT/HR / NWP-117 / Battery Correspondence/ Dated: 28-07-2016.

To,

All SSA Heads,

Haryana Telecom Circle.

Sub: - Battery sets lying in Store and its utilization thereof:-.

Your Kind attention is drawn towards the battery sets lying in store unutilized .In this regard,

following information is required in the below prescribed Performa to be submitted so that batteries

sets may be effectively utilized.

S.No SSA Capacity

of

Battery

in Store

(In AH)

Quantity of

Battery

Date of

receiving

in Store

Pertaining to

CFA/CM/other

Vertical

Action

plan to

Utilize the

spare

battery

Target

date to

Utilize.

The above information has been desired by Worthy CGMT Haryana during the weekly meeting

held on 28.07.2016.Hence the above information may be reached to this office by mail at

[email protected] latest by 02.08.2016 i.e before next meeting scheduled at 04.08.2016.

S.K Kakkar

DGM(NWP-CFA)

Page 24: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Network Planning Section

Haryana Telecom Circle, Ambala

Tel.: 0171 – 2603257

Fax: 0171-2603708

E-mail:[email protected]

Reminder letter

No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 /6 Dated: 14-07-2016.

To,

All SSA Heads,

Haryana Telecom Circle.

Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for

the FY 2016-17.

Kindly refer to this office letter of even no. dated 21.06.2016 (Copy Enclosed) vide which it

was requested to submit the requirement of Battery Sets in r/o CFA segment under Development and

Maintenance for the FY 2016-17 latest by 28.06.2016 but till date only Sonipat & Jind SSAs have

submitted the requirement (though detail of scrapping memo number is incomplete from both of

SSAs Jind & Sonipat. It is noted that without scrapping memo number, requirement of Battery

sets not be considered).

Therefore, it is once again requested to submit the requirement as per prescribed Performa latest

20.07.2016 for assessing the requirement for Batteries under CFA Vertical is already delayed.

Requirement should be submitted on mail at [email protected].

Encl:- As Above.

Som Chand

AD(NWP-CFA)

Page 25: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Network Planning Section

Haryana Telecom Circle, Ambala

Tel.: 0171 – 2603257

Fax: 0171-2603708

E-mail:[email protected]

No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 /2 Dated: 21-06-2016.

To,

All SSA Heads,

Haryana Telecom Circle.

Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for

the FY 2016-17.

Kindly arrange to submit the requirement of Battery Sets under Development and Maintenance

for the FY 2016-17 in r/o NWP-CFA as per Annexure 1 & 2 (Enclosed) to [email protected].

BSNL HQ already issued guideline for calculating Battery Capacity requirement for

replacement vide letter No. 7-1-2014-NWO-CFA/MSE dated 31-7-2014 and Revision of back up time

and policy for procurement of VRLA batteries contained in BSNL Hq letter No. 7-1-2013-NWO-

CFA/MSE (Ch.II) dated 14-3-2014 (Copies enclosed) should be followed for submission of

requirement.

While furnishing the requirement following points should be ensured:-

1. The format of Excel file is not to be changed.

2. The quantity submitted under maintenance, has been worked out only against Battery sets which

are expired & going to be life expire before 31.03.2017.

3. Requirement should be submitted with the approval of SSA Head.

4. Requirement should be submitted in the format enclosed as Annexure 1, &2

5. Requirement should be submitted latest by 28-6-2016, failure of which no reminder will be

issued and requirement will be treated as Nil at your own risk and responsibility.

6. The batteries may be listed only CFA vertical.

7. Estimate numbers should be provided for battery requirement under replacement &

development.

8. A certificate is to be given that all batteries already received have been fully utilized and at

present no battery is lying with SSA Store.

Page 26: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Encl :

1. BSNL HQ letters referred above.

2. Annexure 1,2

S.K Kakkar

DGM(NWP-CFA)

Page 27: Network Planning Section Haryana Telecom Circle, Ambala ... · No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016. To, All SSA Heads, Haryana ... Gurgaon

Annexure-1

File No.: - Dated ..................

To

DGM (CFA)

O/o CGMT, Haryana Telecom Circle,

Ambala - 133001

Sub: - Requirement in r/o CFA Battery Sets under Development and Maintenance for the FY

2016-17.

The following is the consolidated requirement of Battery Sets under Development and

Maintenance for the FY 2016-17 in r/o NWP-CFA. (Refer detail attached and emailed as attachment

MS Excel file as annexure 1-3).

Battery

Capacity

Requirement

Under Dev.

Requirement

Under Mtce.

Total

Requirement

Remarks if any

A B C D=B+C E

Certified that:

(i) The procedure for calculating requirement of Batteries for replacement contained in

BSNL Hq letter No. 7-1-2014-NWO-CFA/MSE dated 31-7-2014 and Revision of back

up time and policy for procurement of VRLA batteries contained in BSNL Hq letter No.

7-1-2013-NWO-CFA/MSE (Ch.II) dated 14-3-2014 have been followed.

(ii) The quantity submitted under maintenance, has been worked out only against Battery

sets which are expired & going to be expire before 31.03.2017.

(iii) The detail estimate for all the batteries have been completed and provided in the detailed

annexure

(iv) The all batteries already received, have been fully utilized and at present no battery is

lying with SSA Store.

(v) It is certified that the above requirement of batteries is for BSNL Sites only in respect to

NWP-CFA vertical.

(vi) The above requirement has duly approved by IFA of SSA & SSA Head.

Name ________________

Designation________________

Email ____________________

Mobile Number_____________