    Porirua City District Plan - Draft Proposed Network Utilities Plan

    Change

    Table of Amendments:

    Amendment Title Page reference

    1 Amendments to Part B Significant Resource

    Management Issues2

    2 Chapter C14 Network Utilities deleted in entirety 23 New Network Utilities Chapter 3 - 26

    4 Amendments to Part F: Information to be Supplied 27 - 285 Amendments to Part M: Interpretation 29 - 34

    6 Amendments to Chapter C7 Transport Objectives andPolicies

    35 - 36

    7 Amendments to D1 City Centre Zone Rules and

    Standards37 - 41

    8 Amendments to D2 Industrial Zone Rules and

    Standards42 - 45

    9 Amendments to D3 Suburban Zone Rules and

    Standards

    46 - 51

    10 Amendments to D4 Rural Zone Rules and Standards 52 - 57

    11 Amendments to D4A Judgeford Hills Zone Rules and

    Standards

    58 - 62

    12 Amendments to D4B Recreation Zone Rules and

    Standards

    63 - 66

    13 Amendments to D4C Public Open Space Zone Rules

    and Standards

    67 - 70

    Guide to amendments:Proposed new text is underlined. Text proposed to be deleted is struckthrough. For the

    sake of brevity, only proposed amendments to the content of relevant chapters, parts and

    sections are shown, rather than replicating the entire chapter, part or section.

  • 7/29/2019 Network Utilities PCC draft plan

    2/70

    2

    Amendment 1: Amendments to Part B Significant Resource

    Management Issues

    B11 NETWORK UTILITIESNetwork utilities include such activities as water, gas, and electricity supply,

    telecommunications and sewerage disposal. The City is traversed by two state

    highways, the main trunk line, and the high pressure natural gas line for the Region.

    Some of the Region's largest and most powerful communications facilities are also

    located in the City. In addition to these large utilities, the safe, convenient and

    efficient operation of the City depends on the network utilities which serve all parts of

    the City. Section C14 Chapter NU of the Plan recognises the importance of these

    resources and the need to provide for them while managing their effect on the

    environment.

    Amendment 2: Chapter C14 Network Utilities deleted in entirety

  • 7/29/2019 Network Utilities PCC draft plan

    3/70

    3

    Amendment 3: New Chapter

    NU Network Utilities

    1

    Introduction

    1.1 This chapter outlines the provisions of the District Plan that relate to network utilitieswithin Porirua City. Network utilities provide the infrastructure which enables a

    community to undertake its everyday activities and functions and allows people to

    provide for their social and economic wellbeing, and their health and safety. Network

    utilities which are managed through this Chapter include those defined by way of

    section 166 of the Resource Management Act 1991.

    1.2 The City has a range of important network utilities that serve an important function locally,

    regionally and nationally. The City is traversed by two state highways1, the approved but yet

    to be constructed Transmission Gully Motorway, the National Grid, the main trunk railway

    line2, the regional water supply pipeline and the high pressure natural gas transmission line

    for the Region. Some of Wellington Region's largest and most powerful communications

    facilities are also located in the City.

    1.3 The Regional Policy Statement for the Wellington Region recognises the importance of

    regionally significant infrastructure within the Region, as forming part of national or regional

    networks that enable communities to provide for their social, economic and cultural wellbeing

    and their health and safety. There are a number of network utilities within Porirua that are

    identified as being regionally significant infrastructure in the Regional Policy Statement. The

    Regional Policy Statement requires that the benefits of such regionally significant

    infrastructure be recognised and protected in the District Plan.

    1.4 The Council is required to give effect to any National Policy Statement. The National Policy

    Statement on Electricity Transmission came into force in 2008 and applies to activities

    involving the need to operate, maintain, develop and upgrade the electricity transmission

    network. Its objective is to recognise the national significance of the electricity transmission

    network by facilitating the operation, maintenance and upgrade of the existing transmission

    network and the establishment of new transmission resources to meet the needs of present

    and future generations while: managing the adverse environmental effects of the network;

    and managing the adverse effects of other activities on the network.

    1.5 There are many providers of network utilities within Porirua City including the Council, Crownagencies, the Greater Wellington Regional Council, State Owned Enterprises, trading

    enterprises and private companies. The Council is in itself a major provider of network

    utilities and services, supplying water, sewage and stormwater reticulation, waste disposal

    and roads.

    1.6 Other utilities that are managed through this Chapter because of their nature and function are

    lighthouses, navigation aids, beacons, signal stations and natural hazard emergency warning

    1State Highway 1 and State Highway 58

    2North Island Main Trunk Line

  • 7/29/2019 Network Utilities PCC draft plan

    4/70

    4

    devices and meteorological services3. These other utilities are owned and / or operated by

    Maritime New Zealand, local authorities, or the Meteorological Service in order to provide for

    the health, safety and wellbeing of the local community, region and nation.

    1.7 The successful functioning of the City depends on network utilities. It is therefore very

    important that construction, maintenance and operation of these services be effectivelyprovided for and that the benefits that derive from them are adequately recognised.

    However, network utilities can also have adverse effects resulting from their construction,

    operation or associated maintenance activities.

    1.8 For example, network utilities may typically include buildings, poles, overhead wires, pylons,

    pipes or antennas, which may have an adverse visual impact depending on their location and

    proximity to other land use activities. However, network utilities may also involve few

    structures and have limited visual impact, such as underground power and

    telecommunication lines. Network utilities are also often seen as a necessary and normal part

    of the environment, such as a road.

    1.9 The network utility rules apply where network utility operators do not intend, or are unable,

    to operate under the designation procedures of the Act. They may, however, also be used by

    Council to help assess any notices of new requirement for new designations and outline plans

    for new network utilities on existing designated sites.

    1.10 The provisions in this Chapter apply to network utilities throughout all zones of the City. All

    formed and unformed roads are zoned in the District Plan Maps. The underlying zone

    objectives, policies and rules do not apply to network utilities, including roads, unless

    specifically referred to. City wide rules, such as those relating to historic heritage and

    hazardous substances will still apply.

    2 Resource Management IssuesThere are two key issues in respect of network utilities within the City.

    2.1 Balancing the national, regional and local benefits of network utilities with effects onthe local environment

    An important issue is managing the actual and potential adverse environmental effects arising from

    network utilities while also recognising the key role they play and benefits they have locally,

    regionally and nationally, and to ensure the operational requirements of the network utility

    concerned is not unreasonably restricted. Failing to adequately provide for network utilities may

    result in the desired level of well-being and quality of life not being achieved within the City. This is

    because network utilities provide essential services to peoples homes and businesses, such as

    water, transport means, electricity, gas and telecommunications, and are critical for the effective

    functioning and liveability of the City.

    However, the construction, operation and/or maintenance of network utilities can have adverse

    effects and adversely affect the amenity of areas of the City, as a result of noise, emissions, and

    visual dominance, for example. Some network utilities are relatively large, visually prominent and

    capable of generating significant adverse effects on the surrounding environment. They may also

    3

    The Meteorological Service is a requiring authority for its network operation of a system comprisingtelecommunication links to permit telecommunication and radiocommunication. Therefore, these aspects of

    meteorological service activities and facilities are network utilities.

  • 7/29/2019 Network Utilities PCC draft plan

    5/70

    5

    have potential adverse effects on public health and safety. Adverse effects may only occur at the

    time of construction or installation of the utility, but in some instances may continue throughout its

    operation or during maintenance works. In some cases, it might not be entirely possible to avoid,

    remedy or mitigate all adverse effects associated with a utility, meaning there will be some level of

    adverse effect on the surrounding environment. In such circumstances, there is a need to carefully

    consider both the benefits the utility will provide and the significance of the adverse effects on thesurrounding environment.

    2.2 Managing reverse sensitivity effects on regionally significant network utilitiesThe location, establishment and operation of land use activities in the vicinity of regionally

    significant network utilities may lead to reverse sensitivity effects that have the potential to impact

    upon the effective and efficient operation of such utilities. Reverse sensitivity can occur when

    sensitive activities locate near to or intensify by existing network utilities and seek to constrain the

    operation or expansion of these utilities. This may mean that the local, regional and national

    benefits of those regionally significant network utilities may be compromised. The City has a lot of

    well-established regionally significant network utilities located in close proximity to existing land use

    activities. The Council is predominantly concerned with new more intensive land use activitiesestablishing in proximity to existing regionally significant network utilities that may lead to reverse

    sensitivity effects on those utilities.

    3 Objectives & PoliciesThe following objectives and policies seek to address the two key issues identified above.

    OBJECTIVE

    3.1 To recognise the benefits of regionally significant network utilities and ensure theirfunctions and operations are not unreasonably compromised by other activities.

    POLICIES

    3.1.1 Identify regionally significant network utilities within the City on Council planning

    maps.

    3.1.2 Recognise the national, regional and local benefits of regionally significant network

    utilities, including:

    That people and goods can travel to, and from and around the City and

    Region efficiently and safely;

    That community well-being and public health and safety is maintainedthrough the provision of essential services including supply of potable water,

    the collection and transfer of sewage and stormwater, and the provision of

    emergency services;

    People have access to electricity and gas to meet their needs; and

    People have access to telecommunication services.

    3.1.3 Avoid, or as appropriate remedy or mitigate, the potential for any reverse

    sensitivity effects on regionally significant network utilities from incompatible new

    subdivision, use and development occurring under, over, or adjacent to regionally

    significant network utilities.

  • 7/29/2019 Network Utilities PCC draft plan

    6/70

    6

    3.1.4 Ensure the safe and efficient use and development of the Electricity Transmission

    Network by avoiding the location of buildings and structures over a defined size

    and the undertaking of sensitive activities with the Electricity Transmission Yard.

    Explanation

    3.1.2.1 Objective 3.1 seeks to identify the importance of regionally significant networkutilities within the City and to give effect to the Regional Policy Statement. The

    objective and supporting policies are focused on recognising the benefits that these

    regionally significant network utilities have locally, regionally and nationally and

    ensuring that these benefits are protected from incompatible subdivision, use and

    development.

    3.1.2.2 Policy 3.1.1 requires the Council to identify regionally significant network utilities

    within the City on its planning maps. The majority of any new and extensions to

    existing regionally significant network utilities are expected to be identified on

    Council planning maps by network utility operators through a notice of requirementfor designation process.

    3.1.2.3 Policy 3.1.2 outlines some of the benefits that regionally significant network utilities

    provide within the City, regionally and nationally. These are benefits that are to be

    considered in respect of any matter relating to regionally significant network utilities

    3.1.2.4 Policy 3.1.3 requires that any potential reverse sensitivity effects on regionally

    significant network utilities are appropriately managed. The location of

    inappropriate new subdivision, use or development in proximity to existing regionally

    significant network utilities has the potential to compromise the efficient operationand use of the network utility and result in the benefits of that network utility being

    reduced. In addition, the safety and amenity values of community may be adversely

    affected by locating in too close proximity to regionally significant network utilities.

    As the existing regionally significant network utilities in the City are located either

    within established built up areas where the effects of those network utilities are

    known and understood or in rural locations with little development or growth, there

    is no need to manage potential reverse sensitivity effects in those areas beyond

    requiring particular consideration in any application for subdivision. The Electricity

    Transmission Network is specifically recognised through an Electricity Transmission

    Corridor. However, the potential for reverse sensitivity effects may arise when thepattern and density of land use activities changes through the rezoning of land. At

    that time, the Council will seek to introduce new provisions to manage those

    potential reverse sensitivity effects on existing regionally significant network utilities.

    3.1.2.5 Policy 3.1.4 recognises the importance of the National Grid and seeks to ensure that

    actual and potential adverse effects on both the National Grid and on the health and

    safety of the community are appropriately managed through the use of an Electricity

    Transmission Yard. Managing the location of buildings and structures with an

    Electricity Transmission Yard is aimed at providing for the on-going operation and

    maintenance of the Network, which is a matter of national significance under theNational Policy Statement for Electricity Transmission. The on-going operation,

  • 7/29/2019 Network Utilities PCC draft plan

    7/70

    7

    upgrade and maintenance of the existing National Grid is provided for by the

    Resource Management (National Environmental Standards for Electricity

    Transmission Activities) Regulations 2009.

    OBJECTIVE

    3.2 To recognise and provide for the sustainable, secure and efficient use, operation and

    development of network utilities within the City

    POLICIES

    3.2.1 Recognise and provide for the:

    need for new and the upgrading of existing network utilities; and

    technical and operational requirements of network utilities in assessing

    their location, design, development, construction and appearance; and

    benefits that network utilities provide to the economic, social and cultural

    functioning of the City, Region and Nation.

    3.2.2 Enable the efficient construction, installation, operation, upgrading and

    maintenance of network utilities.

    3.2.3 Ensure that the provision and operation of utilities that cross jurisdictional

    boundaries is managed in an integrated manner.

    3.2.4 Encourage the appropriate use of designations for new network utilities and

    extensions to existing network utilities that are not designated.Explanation:

    3.2.5.1 Objective 3.2 requires that the benefits of network utilities that are not regionally

    significant be recognised and provided for. Network utility services form an essential

    part of the Citysphysical resource and provide for the communitys social, cultural

    and economic well-being. They provide essential services to peoples homes and

    businesses, such as water, transport means, electricity, gas and telecommunications

    and are critical for the functioning and liveability of the City. Failing to adequately

    provide for network utilities may result in the desired level of well-being and quality

    of life not being achieved within the City.

    3.2.5.2 Policy 3.2.1 recognises that the provision of new and the upgrading of existing

    network utilities is necessary to meet the needs of City, both now and into the future.

    In considering any proposals for new or upgrades to existing network utilities, the

    technical and operational requirements that may constrain where and how they can

    locate and be designed need to be recognised. In some cases, some level of adverse

    effects may need to be accepted to recognise the necessity for some network utilities

    and meet their operational requirements. This policy also recognises the benefits

    that all network utilities have.

    3.2.5.3 Policy 3.2.2 acknowledges that important role that network utilities have in providing

    for the wellbeing of the Citys community. Network utilities form an essential part of

  • 7/29/2019 Network Utilities PCC draft plan

    8/70

    8

    the efficient functioning of the City and their maintenance and development allows

    their benefits to be realised. There are a range of network utilities that enable

    communities to undertake everyday activities and functions and provide essential

    services to peoples homes and businesses. It is therefore important that the District

    Plan provides for network utilities to be constructed, installed, operated, upgraded

    and maintained.

    3.2.5.4 Policy 3.2.3 reflects that by their nature, most network utilities cross jurisdictional

    boundaries between councils. Cross boundary issues can result for network utility

    providers and for the community, particularly where different councils have different

    rules or processes for how they recognise and provide for network utilities and

    manage their effects. It is important that councils work together in an integrated

    manner both when developing plan provisions and when dealing with proposals for

    new or upgrades to existing network utilities.

    3.2.5.5 Policy 3.2.4 is focussed on encouraging network utility operators, particularly thosewho operate regionally significant network utilities, to use the notice of requirement

    for designation process when they seek to develop new or extend existing network

    utilities. This is particularly encouraged for operators where such new or extended

    network utilities involve restrictions on the use of privately owned land.

    OBJECTIVE

    3.3 To manage any adverse effects on the environment resulting from the design,

    location, operation, upgrading and maintenance of network utilities.

    POLICIES

    3.3.1 Ensure that network utilities are designed, developed, constructed, located,

    operated and maintained to avoid, remedy or mitigate any actual or potential

    adverse effects on the environment.

    3.3.2 Ensure network utilities, in particular those utilities emitting radiofrequency fields

    or electromagnetic radiation, are designed, located, operated and maintained to

    comply with relevant national environmental standards and to meet othernationally recognised standards.

    3.3.3 Enable the co-location or multiple use of network utilities where this is efficient

    and practicable and assists with avoiding, remedying or mitigating adverse effects

    on the environment.

    3.3.4 Require the underground placement of network utilities unless

    there are natural or physical features or structures, or technological and

    operational constraints that makes underground placement impractical;

    they are of a temporary nature and required for emergency purposes orcritical events; and

  • 7/29/2019 Network Utilities PCC draft plan

    9/70

    9

    they are of a nature that they can only operate aboveground.

    3.3.5 Encourage the use of roads as network utility corridors in accordance with the

    National Code of Practice for Utility Operators Access to Transport Corridors.

    3.3.6 Encourage network utility providers to consult with local communities on the

    appropriate placement, location and design of new network utilities.

    Explanation:

    3.3.5.1 Objective 3.3 recognises that the construction, operation and maintenance of

    network utilities can adversely affect the environment and amenity, and seeks to

    manage potential adverse effects, particularly through design and location. This

    recognises that some network utilities are relatively large, visually prominent and

    capable of generating significant effects on the environment. They may also have

    adverse effects on public health and safety. Adverse effects may only occur at thetime of construction or installation of the utility, but in some instances may continue

    throughout its operation or during maintenance works. In some cases, it might not

    be entirely possible to avoid, remedy or mitigate all adverse effects associated with a

    network utility, meaning there will be some level of adverse effect on the surrounding

    environment.

    3.3.5.2 Policy 3.3.1 recognises the importance of managing the design, location, operation

    and maintenance of network utilities and requires that any potential adverse effects

    arising from network utilities are avoided, remedied or mitigated. This policy is

    sufficiently broad to recognise that there are a range of different network utilitieswith different potential adverse effects on the environment. For instance, above

    ground network utilities can have adverse effects including visual, noise, traffic,

    odour and amenity, depending on their size, location, frequency and their scale in

    comparison with the character of a particular environment.

    3.3.5.3 Policy 3.3.2 recognises that some network utilities may adversely affect health and

    safety. For example, telecommunication facilities generate radio frequency emissions

    which may have detrimental effects on health. Electricity transmission/distribution

    can generate electromagnetic fields (EMF) which may be a risk to health. It also

    generates the risk of electrocution. Other possible health and safety risks are

    accidental spillage or leakage of hazardous substances from gas or petroleum

    pipelines, explosions from gas or petroleum pipelines; accidental overflow from

    sewage pump stations, and flooding from damaged/inoperative stormwater systems.

    Chemicals used in conjunction with some network utilities, such as water treatment

    plants for example, also pose a risk if an accidental spill occurs. There are a number

    of national and international standards that are external to the District Plan but that

    must be complied with, including the Resource Management (National

    Environmental Standards for Telecommunication Facilities) Regulations 2008, the

    New Zealand Electrical Code of Practice and the International Commission on Non-

    Ionising Radiation Protection (ICNIRP) Guidelines.

  • 7/29/2019 Network Utilities PCC draft plan

    10/70

    10

    3.3.5.4Policy 3.3.3 recognises that the co-location and co-siting of network utilities may

    provide environmental benefits in terms of reduced visual impacts and consolidation

    of network utilities in existing areas thereby reducing adverse effects on amenity by

    reducing the need for more network utility structures. While co-location is

    encouraged it needs to be understood that technical requirements will generally

    mean that associated structures may need to be taller or bulkier to avoid interference

    between the two or more providers, such as radio-frequency bands. It is also

    recognised that co-location is not always possible due to operational issues such as

    radiofrequency interference, electrical interference, lease arrangements and

    structural capacity.

    3.3.5.5 Policy 3.3.4 requires the underground placement of network utilities unless particular

    circumstances apply. The adverse visual effects of certain network utilities can often be

    managed by putting the services underground. This is the required approach for those

    network utilities, such as those with cables that can be located underground. For those

    network utility structures that need to be located aboveground, particular attentionshould be given to their design, location and minimising of any adverse visual effects as

    outlined in Policy 3.3.1. This can be achieved in a number of ways including screening,

    careful placement, size and appearance and applying different activity status. In

    particular, the underground placement of electricity and telecommunications lines in

    the City Centre, Industrial and Suburban Zones is required by only providing for

    aboveground lines in particular defined situations and through different activity status,

    which recognises the higher level of amenity sought in the Citys urban areas.

    3.3.5.6New above ground lines and their associated supporting structures in areas that do not

    have existing above ground lines are generally considered to be unacceptable withinthe City. However it is recognised that particular consideration needs to be given to the

    efficient use of resources and that there are situations where placing lines underground

    is, or may be, impracticable.

    3.3.5.7Policy 3.3.5 promotes the use of the road corridor for the location of network utilities,

    in line with the National Code of Practice for Utility Operators Access to Transport

    Corridors. Locating network utilities in the road can assist to minimise the adverse

    effects of network utilities on amenity and other values as these locations generally

    have a range of existing network utilities and are less sensitive to new network

    utilities. However, the effects of these activities require some management to ensure

    conflicts with the primary function of the road corridor and with each other are

    avoided.

    3.3.5.8 Policy 3.3.6 encourages network utility operators to engage with the local community

    when they are considering the location, placement and design of new network

    utilities. In some cases, engaging early with the community about a proposed new

    network utility may result in an alternative more appropriate location to be identified

    that both meets the needs of the network utility operator and addresses any

    concerns that the community may have.

  • 7/29/2019 Network Utilities PCC draft plan

    11/70

    11

    4 MethodsThe following District Plan methods will give effect to the above objectives and policies:

    4.1 Planning Maps that identify the location of both designated and undesignatedregionally significant network utilities within the District.

    4.2 Regulatory Assessment Framework that includes rules and matters of control anddiscretion to guide assessment of the construction, operation, upgrading and

    maintenance of network utilities and subdivision that occurs in proximity to regionally

    significant network utilities. The framework utilises permitted, controlled, restricted

    discretionary, discretionary and non-complying activity status and specific matters of

    control and discretion to assess and manage the actual and potential adverse effects.

    4.3 Plan change(s) to introduce new provisions to manage reverse sensitivity effects onregionally significant infrastructure where there are pressures for new or

    intensification of existing development in proximity to regionally significantinfrastructure.

    4.4 Encourage designations for new network utilities and extensions to existing networkutilities that are not currently designated.

    4.5 Information requirements for certificates of compliance and resource consents fornetwork utilities.

    4.6 Administer, monitor and enforce compliance with the Resource Management(National Environmental Standards for Telecommunication Facilities) Regulations 2008

    and the Resource Management (National Environmental Standards for Electricity

    Transmission Activities) Regulations 2009.

    4.7 Advice notes identifying the relevant national and international codes and standardsthat also apply to network utilities in addition to the District Plans Regulatory

    Assessment Framework.

    4.8 Monitoring and review of the District Plan network utility provisions to assist inassessing the effectiveness of the network utilities provisions in the Plan.

    Other non-District Plan methods that will give effect to the above objectives and policies

    include:

    4.9 Compliance with relevant national and international codes and standards that alsoapply to network utilities.

    4.10 Education of and building relationships with network utility providers.4.11 Encouraging network utility providers to engage with the local community when

    considering new network utilities within the City.

  • 7/29/2019 Network Utilities PCC draft plan

    12/70

    12

    5 Anticipated Environmental OutcomesThe following environmental outcomes are anticipated in respect of network utilities:

    5.1 Network utilities are able to operate, upgrade and expand as required to provide safe,effective and efficient services to the City

    5.2 The Porirua community is able to provide for its social, economic, cultural andenvironmental wellbeing.

    5.3 Potential conflicts between regionally significant network utilities and incompatibledevelopment, use and subdivision are avoided

    5.4 The health and safety of Poriruas community is not adversely affected by theconstruction, operation, upgrading and maintenance of network utilities.

    5.5 Adverse effects from network utilities on amenity and the environment areappropriately avoided, remedied or mitigated.

  • 7/29/2019 Network Utilities PCC draft plan

    13/70

    13

    6 Rules6.1 Network UtilitiesThe following rules apply to all network utilities, as defined in the Interpretation Chapter, and with the exception of rules applying to noise,

    earthworks, heritage and urban vegetation, these rules override all zone rules. For the avoidance of doubt, the electricity transmission yard

    and electricity transmission corridor do not apply to network utilities.

    Rule

    Number

    Rule Zone Standards Activity Status Matters of Control or

    DiscretionAll Utilities

    NU6.1.1 The removal of existing network utilities,including any existing associated

    structures

    All Permitted

    NU6.1.2 The operation and maintenance ofexisting network utilities

    All Permitted

    NU 6.1.3 The minor upgrading of electricity and

    telecommunication lines

    All Permitted

    NU 6.1.4 The upgrading of all other network

    utilities, excluding:

    Electricity transmission lines above110kV; and

    Gas distribution and transmission

    pipelines at a pressure exceeding

    2000 kilopascals

    All Permitted

    NU6.1.5 The upgrading, including replacement, ofan existing network utility that is not a

    permitted activity

    All Restricteddiscretionary

    9.2, 9.3, 9.4, 9.5, 9.6, 9.7,

    9.8, 9.9, 9.10, 9.11, 9.12,

    9.13, 9.14, 9.15, 9.16

    NU6.1.6 Subdivision for the purpose ofaccommodating any network utility

    All Controlled 8.1, 8.2, 8.3, 8.5, 8.6, 8.7,8.10, 8.12

  • 7/29/2019 Network Utilities PCC draft plan

    14/70

    14

    Rule

    Number

    Rule Zone Standards Activity Status Matters of Control or

    Discretion

    NU6.1.7 Cabinets and other network utilitystructures not otherwise listed in this

    table

    All 7.1, 7.2.4, 7.3.4,7.4.1, 7.4.9

    Permitted

    NU6.1.8 Network utilities located within existing

    buildings

    All Permitted

    NU6.1.9 All network utilities that are nototherwise listed as a permitted,

    controlled, restricted discretionary or

    non-complying activity

    All 7.1 Discretionary

    NU6.1.10 All network utilities which do not complywith the permitted activity standards for

    radiofrequency and electro-magnetic

    fields

    All Non-

    complying

    Underground utilities

    NU6.1.11 The construction, development,operation and maintenance of new

    underground network utilities, except

    for:

    Electricity transmission lines above110kV; and

    gas distribution and transmissionpipelines at a pressure exceeding

    2000 kilopascals

    All 7.1 Permitted

    Radiocommunication, Telecommunications and Electricity distribution and transmission

    NU6.1.12 Masts with or without associated

    antennasCity CentreIndustrialRural

    Judgeford Hills

    Recreation

    7.1, 7.2.1, 7.2.2,

    7.3.1, 7.3.2, 7.4.1,

    7.4.2, 7.4.3, 7.4.5

    Permitted

  • 7/29/2019 Network Utilities PCC draft plan

    15/70

    15

    Rule

    Number

    Rule Zone Standards Activity Status Matters of Control or

    Discretion

    NU6.1.13 Masts with or without associated aerials

    and antennas located in a Suburban

    Shopping Centre Area

    Suburban 7.1, 7.2.1, 7.2.2,

    7.3.1, 7.3.2, 7.4.1,

    7.4.2, 7.4.3, 7.4.4

    Permitted

    NU6.1.14 Masts with or without associated aerials

    and antennas

    SuburbanOpen Space

    7.1 Restricted

    discretionary9.2, 9.5, 9.6, 9.7, 9.8, 9.9,

    9.10, 9.11, 9.12, 9.13, 9.16,

    9.22, 9.27

    NU6.1.15 Antenna and support structure attached

    to buildingsAll 7.1, 7.2.3, 7.3.3,

    7.4.6, 7.4.7, 7.4.8

    Permitted

    NU6.1.16 Masts, with or without associated

    antennas that do not comply with the

    permitted activity standards

    City CentreIndustrialRural

    Judgeford Hills

    Recreation,

    Suburban

    Shopping

    Centre Area

    7.1 Restricted

    discretionary9.1, 9.2, 9.3, 9.4, 9.6, 9.7,

    9.8, 9.9, 9.10, 9.11, 9.12,

    9.13, 9.16, 9.22, 9.27

    NU6.1.17 Antenna attached to buildings that do not

    comply with the permitted activity

    standards

    All 7.1 Restricted

    discretionary

    9.1, 9.2, 9.4, 9.5, 9.6, 9.7,

    9.8, 9.9, 9.10, 9.11, 9.12,

    9.13, 9.23, 9.27

    NU6.1.18 The installation of new above groundlines, excluding electricity transmission

    lines above 110kV.

    RuralJudgeford Hills

    Open Space

    7.1, 7.2.1, 7.3.4,

    7.4.1, 7.4.3, 7.4.5

    and

    Rule D4C2.1,

    Disturbance withinan ecological site in

    the Open Space

    Zone

    Permitted

    NU6.1.19 Minor above ground lines All zones 7.1, 7.2.1, 7.4, 7.5.1 Permitted

    NU6.1.20 Temporary above ground lines andassociated support structures

    All 7.1, 7.2.1, 7.4, 7.5.2 Permitted

  • 7/29/2019 Network Utilities PCC draft plan

    16/70

    16

    Rule

    Number

    Rule Zone Standards Activity Status Matters of Control or

    Discretion

    NU6.1.21 An interim above ground line andassociated support structures

    All 7.1, 7.2.1, 7.4, 7.5.3 Restricteddiscretionary

    9.7, 9.8, 9.10, 9.25, 9.26

    NU6.1.22 New or additional above ground lines thatare not permitted activities and

    Are situated on road; and

    Utilise existing line support structures

    All Restricteddiscretionary

    9.7, 9.8, 9.10 9.18, 9.19,

    9.20, 9.21, 9.27

    NU6.1.23 New or additional above ground lines thatare not permitted, restricted discretionary

    or discretionary activities

    All Non-complying

    NU6.1.24 New lines (above ground and

    underground) and support structures for

    conveying electricity at a voltage above

    110kV

    All 7.1 Discretionary

    NU6.1.25 New and upgraded transformers,

    substations and switching stations

    distributing electricity and ancillary

    buildings

    All 7.1 Discretionary

    Gas distribution and transmission

    NU6.1.26 Underground gas distribution and

    transmission pipelines at a pressure

    exceeding 2000 kilopascals, including

    aerial crossings of bridges, structures or

    streams, and ancillary equipment,including compressor compounds with

    compressor houses

    All Discretionary

    Water, wastewater and stormwater

    NU6.1.27 Pump stations not exceeding 50m2 in

    area, aerial crossings of bridges,

    structures or rivers and streams, and

    ancillary equipment, that are associated

    All Permitted

  • 7/29/2019 Network Utilities PCC draft plan

    17/70

    17

    Rule

    Number

    Rule Zone Standards Activity Status Matters of Control or

    Discretion

    with underground pipelines for conveying

    water, wastewater and stormwater

    NU6.1.28 Water reservoirs not exceeding 100m2

    and 8m heightAll Controlled 8.3, 8.4, 8.5, 8.6, 8.12

    NU6.1.29 Water reservoirs that are not a controlled

    activity

    All Restricteddiscretionary

    9.2, 9.5, 9.6, 9.7, 9.8, 9.9,

    9.10, 9.11, 9.12, 9.27

    NU6.1.30 Water and wastewater treatment plants All Discretionary

    Meteorological Activities

    NU6.1.31 Meteorological enclosures and buildings

    not exceeding 30m2

    in area; automatic

    weather stations and anemometer masts,

    voluntary observer sites and associated

    microwave links

    All 7.1, 7.2.5, 7.4.1,

    7.4.9

    Permitted

    NU6.1.32 Meteorological enclosures and buildings

    and anemometer masts that do not

    comply with the permitted activity

    standards

    All 7.1 Restricteddiscretionary

    9.1, 9.2, 9.3, 9.5, 9.6, 9.7,

    9.8, 9.9, 9.10, 9.11, 9.12,

    9.13, 9.27

    Roading and traffic and transport structures

    NU6.1.33 Traffic control signals and devices, light

    and decorative poles and associated

    structures and fittings, post boxes,

    landscaped gardens, artworks and

    sculptures, bus stops and shelters, phone

    boxes, public toilets, road furniture andinfrastructure located within the road

    reserve

    All Permitted

    NU6.1.34 Network utility activities and structures in

    the road reserve provided for by

    legislation and Council bylaws

    All Permitted

    NU6.1.35 The construction of new roads and the City Centre, Discretionary

  • 7/29/2019 Network Utilities PCC draft plan

    18/70

    18

    Rule

    Number

    Rule Zone Standards Activity Status Matters of Control or

    Discretion

    construction or diversions of alterations

    to the course of existing roads, but

    excluding any such construction works

    which are part of a subdivision

    Industrial,

    Suburban,

    Recreation,

    Rural

    NU6.1.36 The construction, creation, subdivision

    and vesting of roads generally in

    accordance with those shown on the

    Structure Plan that comply with the

    Controlled Activity Standards whether or

    not as part of a subdivision

    Judgeford Hills Controlled 8.7, 8.8, 8.9, 8.10, 8.11

    NU6.1.37 The construction, creation, subdivision

    and vesting of roads generally in

    accordance with those shown on the

    Structure Plan that does not comply with

    the Controlled Activity Standards

    whether or not as part of a subdivision

    Judgeford Hills RestrictedDiscretionary

    9.7, 9.9, 9.12, 9.14, 9.15,

    9.27

    NU6.1.38 The construction of new roads and the

    construction or diversions of alterations

    to the course of existing roads, but

    excluding any such construction works

    which are part of a subdivision

    Open Space Non-

    complying

    Miscellaneous

    NU6.1.39 Lighthouses, beacons and navigational

    aids not otherwise provided for

    All 7.1 Permitted

    NU6.1.40 Extreme adverse weather and tsunami

    warning devices, provided that any

    devices shall be no greater than 2.5m by

    1.5m and 4m in height (when measured

    from the point of attachment)

    All 7.1 Permitted

    NU6.1.41 Trig stations All 7.1 Permitted

  • 7/29/2019 Network Utilities PCC draft plan

    19/70

    19

    Notes:

    Resource Management Regulations National Environmental Standards

    The operation, maintenance, upgrading, relocation or removal of an electricity transmission line and ancillary structures that existed prior to

    14 January 2010 is largely controlled by the Resource Management (National Environmental Standards for Electricity Transmission Activities )

    Regulations 2009, separate to this District Plan.

    The installation and operation of telecommunications facilities (antennas attached to existing structures and cabinets in the road reserve) is

    largely controlled by the Resource Management (National Environmental Standards for Telecommunications Facilities) Regulations 2008,

    separate to this District Plan. It also controls all radio-frequency emissions from telecommunication facilities through specific exposure

    standards.

    Porirua City Council is responsible for enforcing these standards. For clarification, where there is conflict or perceived conflict between the

    provisions of this Plan and the requirements of the NESs identified above, the provisions of the NES shall apply.

    The National Environmental Standards are available for viewing at www.mfe.govt.nz and at Porirua City Council offices.

    Other Relevant Regulations

    Compliance with the New Zealand Electrical Code of Practice 34:2001 is mandatory for buildings, earthworks and mobile plants within close

    proximity to all electricity lines.

    Compliance with the Electricity (Hazards from Trees) Regulations 2003 is mandatory for tree trimming and planting in proximity to electricity

    transmission and distribution lines.

    To discuss works, including tree planting, near electrical lines especially within 20m of those lines, contact the line operator.

    Porirua City Council is not responsible for enforcing these standards.

    7 Standards

    7.1 Health and Safety

    All permitted utilities shall comply with the following standards:

  • 7/29/2019 Network Utilities PCC draft plan

    20/70

    20

    (a) The maximum exposure levels shall not exceed the levels specified in NZS 2772:1999 Radiofrequency Fields Maximum exposure levels

    3kHz to 300 GHz.

    Maximum exposure levels shall be 3 kHz to 300 GHz in areas normally accessible to the public.

    (b) Network utilities that emit electro-magnetic fields shall comply with the relevant International Commission on Non-Ionising Radiation

    Protection (ICNIRP) Guidelines.

    Note:The Resource Management (National Environmental Standards for Telecommunications Facilities) Regulations 2008, separate to this

    District Plan controls all radio-frequency emissions from telecommunication facilities through specific exposure standards.

    7.2 Maximum Height

    The maximum height of any utility structure listed in the table below shall include any antenna and support structures.

    Rule Utility City Centre Industrial Suburban Rural Judgeford

    Hills

    Open Space Recreation

    7.2.1 Masts, antennas,

    lines and single-pole

    support structures

    (single provider)

    20m 25m 12m

    15m in

    Suburban

    Shopping

    Centre Areas

    15m 15m 12m 12m

    7.2.2 Masts and antennas(two or more

    providers)

    25m 30m 12m

    15m in

    Suburban

    Shopping

    Centre Areas

    20m 15m 12m 12m

  • 7/29/2019 Network Utilities PCC draft plan

    21/70

    21

    Rule Utility City Centre Industrial Suburban Rural Judgeford

    Hills

    Open Space Recreation

    7.2.3 Maximum height of

    an antenna and

    support structure

    attached to a

    building

    5m 5m 3.5m 3.5m 3.5m 3.5m 3.5m

    7.2.4 Cabinets, andnetwork utility

    structures, that are

    not otherwise

    provided for

    3.5m 3.5m 3.5m 3.5m 3.5m 3.5m 3.5m

    7.2.5 Anemometer masts 15m 30m 12m 15m 15m 12m 12m

    7.3 Maximum Size and Diameter

    Rule Utility City Centre Industrial Suburban Rural Judgeford

    Hills

    Open Space Recreation

    7.3.1 Masts (single

    provider)

    Antenna

    located within

    a horizontal

    diameter

    circle of

    750mm

    Antenna

    located with a

    horizontal

    circle of 5m

    1.5m

    diameter of

    Antenna

    located within

    a horizontal

    circle of

    750mm

    Diameter of

    Antenna

    located within

    a horizontal

    circle of

    750mm

    Diameter of

    Antenna

    located within

    a horizontal

    circle of

    750mm

    Diameter of

    Antenna

    located within

    a horizontal

    circle of

    750mm

    Diameter of

    Antenna

    located within

    a horizontal

    circle of

    750mm

    Diameter of

  • 7/29/2019 Network Utilities PCC draft plan

    22/70

    22

    Rule Utility City Centre Industrial Suburban Rural Judgeford

    Hills

    Open Space Recreation

    Diameter of

    mast

  • 7/29/2019 Network Utilities PCC draft plan

    23/70

    23

    7.4 Separation distance and setbacks

    7.4.1 All network utilities and associated structures shall comply with the relevant Riparian setback for the Zone

    The following table applies to lines, masts and associated antenna and aerials that are not located in the road reserve:

    Rule Zone Setback

    7.4.2 Industrial No less than 10m from a boundary in the Suburban Zone

    7.4.3 Rural and

    Judgeford Hills

    No less than 10m from any property boundary

    Under 15m in height - no less than 20m from the c losest wall of a dwelling (excluding balconies and decks)

    Over 15m in height no less than 50m from the closest wall of a dwelling (excluding balconies and decks)

    7.4.4 Suburban Where located in a Suburban Shopping Centre Area, no less than 10m from a boundary in the Suburban Zone.

    No less than 10m from a boundary in the Suburban and Rural Zone.

    7.4.5 Open Space and

    Recreation

    No less than 10m from any boundary in the Suburban or Rural Zone

    The following table applies to antenna attached to buildings:

    Rule Zone Setback

    7.4.6 Industrial No less than 5m from a boundary in the Suburban Zone

    7.4.7 Rural, Judgeford No less than 10m from any property boundary

  • 7/29/2019 Network Utilities PCC draft plan

    24/70

    24

    Rule Zone Setback

    Hills

    7.4.8 Suburban, Open

    Space, Recreation

    No less than 20m from the closest wall of a dwelling (excluding balconies and decks)

    7.4.9 Any cabinet or other network utility structure that is not located within the road reserve shall comply with the relevant minimum yard setback

    for the zone it is located within.

    7.4 Specific standards for above ground lines

    7.5.1 The line shall be located within a structure or entirely within 2 metres of any structure (excluding any other line) or provide an above ground

    connection to a site (including any connection to a building within that site) from an existing above ground line provided that no more than

    one new support structure is required for that connection.

    7.5.2 The line(s) shall be in place for no longer than six calendar months from the date of erection until its removal.

    7.5.3 The line(s) must be located on unformed road to provide services to sites accessed off the unformed road and shall be in place for no longer

    than two years from the date of erection until its removal.

  • 7/29/2019 Network Utilities PCC draft plan

    25/70

    25

    8 Matters of Control (Controlled Activities)Matters that the Council has limited the exercise of control over are as follows:

    8.1 Control is limited to:(1) Site design, frontage and area;

    (2) Legal and physical access to the lots;

    (3) Risks to public health and safety;

    (4) Design and external appearance;

    (5) Earthworks;

    (6) Landscaping and screening;

    (7) Traffic and parking management;

    (8) Noise;

    (9) The route of the road;(10) The imposition of financial contributions in accordance with Part E of this Plan;

    (11) The design and construction of the road, including safety, traffic engineering,

    landscaping and noise mitigation measures;

    (12) Any adverse effects on an ecological or heritage site

    9 Matters of Discretion (Restricted Discretionary Activities)9.1 Matters that the Council has restricted the exercise of discretion over are as follows:

    (1) The degree, extent and effects of the non-compliance with the Permitted Activity

    Standards(2) Risks to public health and safety

    (3) The maximum height of the mast and area of diameter of any antenna

    (4) The maximum height, area or diameter of any antenna

    (5) Design and external appearance

    (6) Any effect on heritage and cultural values

    (7) Visual effects including impacts on:

    The residential and recreational use of land in the vicinity of the proposed utility;

    The existing character, landscape, streetscape and amenity values of the locality;

    The extent to which the proposal will be visible from residences, key public places,

    public viewing points, the coast, and significant recreational areas;(8) The extent to which the structure will adversely affect landscape values or will detract

    from the amenity of the area in which it is to be situated or any nearby area.

    (9) Amenity effects, including noise, vibration, odour, dust, earthworks and lighting

    (10) Cumulative effects, including cumulative effects associated with existing utilities

    (11) Any potential interference with public use and enjoyment of the land

    (12) Measures to mitigate the bulk and scale of the utility, including screening, colour and

    finish treatment, earth mounding and / or planting, viewing distances, the location of

    support structures.

    (13) Whether the size and scale of the proposal is generally compatible with other

    development in the area.

  • 7/29/2019 Network Utilities PCC draft plan

    26/70

    26

    (14) Any adverse effects on traffic and pedestrian safety including sight lines and the

    visibility of traffic signage;

    (15) The extent to which alternative locations, routes or other options have been

    appropriately considered.

    (16) The extent to which the proposed utility may adversely affect or interfere with the

    operation of other utilities or land uses in the vicinity.

    (17) The extent to which the location of new or additional overhead lines will have an

    impact on:

    Amenity values of the area, including rural and suburban amenity

    Areas of landscape or open space values

    Streetscape

    (18) The number and thickness of lines, height above ground and relationship to existing

    lines and associated structures;

    (19) The cumulative length of the line, including any previous extensions of the line;

    (20) The extent to which there are difficult ground conditions, technical or financial

    constraints that make compliance impracticable

    (21) The impact of non-rural activities on the rural environment

    (22) The extent to which it is technically, economically and practically reasonable for the

    masts or antennas can be co-sited with similar structures or other buildings

    (23) Where antennas are proposed to be sited on the top of a building, the extent to which

    they can be designed or screened so that they form an integral part of the total

    building design.

    (24) Rehabilitation of the site following any construction or future maintenance period

    (25) The duration of an interim line

    (26) The provision of a bond or a surety for any future undergrounding of an interim line

    (27) The extent to which the affected persons / community has been consulted with.

    10 Assessment Criteria of Discretionary ActivitiesIn considering an application for a discretionary activity, the Councils discretion is

    unrestricted. The Council shall consider any relevant matter with particular regard to the

    objectives and policies of the Plan. In addition, the Council shall have particular regard to

    the relevant matters outlined in Rule NU9 Matters of Discretion (Restricted Discretionary

    Activities).

    When considering resource consent applications for the development and upgrading ofunderground network utility activities that are a discretionary activity, the Council may also

    consider the following matters:

    The appropriateness of the network utility in the proposed location;

    Any alternative locations proposed;

    With regard to pipelines, the nature of any liquid or substance carried;

    With regard to pipelines, the probability of a rupture, and any adverse effects on the

    environment caused by a rupture to the pipe;

    The extent to which the work is able to be conveniently accommodated underground

    without adversely affecting existing underground utility services or seriously limiting the

    opportunity for additional underground network services in the future; The nature of the subsoil.

  • 7/29/2019 Network Utilities PCC draft plan

    27/70

    27

    Amendment 4: Amendments to Part F: Information to be supplied

    F7.2 Information Schedule 2

    Information requirements for subdivision applications

    In the case of land:

    fronting a State Highway,

    fronting a railway line,

    located within an electricity transmission yard

    located within 20m of a gas transmission line,

    evidence that the proposed subdivision has been discussed with Transit New

    Zealand the relevant network utility provider and the outcome of the

    discussions. For the balance area of the subdivider's property, where there is

    potential for further, future subdivision which may have implications for future

    services, roading and development, indicative information relating to all of the

    above matters.

    F7.3 Information Schedule 3

    Additional information requirements relating to applications for restricted

    discretionary activities

    As appropriate to the nature of the activity:

    Network utilities:

    All applications relating to network utilities must provide relevant information

    to address all the relevant matters of discretion set out for the relevant

    activity.

    F7.4 Information Schedule 4

    Additional information requirements for applications for certificates of

    compliance, controlled activities (except subdivisions), discretionary and non-

    complying activities and plan change requests.

    Network Utilities:

    Permitted Activities: Plans and information that demonstrate compliance with

    the permitted activity standards.

    Controlled Activities: All applications relating to network utilities must provide

    relevant information to address all the relevant matters of control.

  • 7/29/2019 Network Utilities PCC draft plan

    28/70

    28

    Discretionary Activities: All applications relating to network utilities must

    provide relevant information to address all the matters of discretion that apply

    to restricted discretionary activities.

  • 7/29/2019 Network Utilities PCC draft plan

    29/70

    29

    Amendment 5: Amendments to Part M Interpretation

    Antenna

    Any device, including any aerial, dish or panel that receives or transmits radiocommunication

    or telecommunication signals. This includes that antennas mountings (including any supportstructure or head arrangement) and radio frequency unit or similar device, but excludes any

    mast. The diameter or area of an antenna means:

    (a) In relation to any panel antenna or any other type of antenna that has a length and a

    width, the area measured by calculating the largest surface area;

    (b) In relation to any other antenna, the diameter measured by taking the cross-section of

    the widest part of the antenna.

    The mountings of any antenna and any radiofrequency equipment or similar device shall not

    be included in the measurement of area of diameter of each antenna, provided that the

    radiofrequency unit or similar device is smaller in area or diameter than the antenna itself.

    Note: any antenna only need meet the area or diameter measurement, as appropriate to the

    type of antenna and the measurement is of each individual antenna and is not a cumulative

    measurement.

    An antenna does not include:

    Devices used in amateur radio configurations

    Devices used only for television reception; and

    Any other devices less than 1.5m2

    in area

    Cabinet

    Means a box-shaped structure which houses radio and telecommunication equipment,

    electrical equipment, equipment associated with the continued operation of network

    utilities and includes single transformers and associated switching gear distributing

    electricity at a voltage up to, and including, 100KV.

    Electricity Transmission Corridor

    Means the area located within:

    32m of a 110kV transmission line

    37m of a 220kV transmission line

    measured either side of the centreline of the transmission line, as depicted in Diagram 1.

    Electricity Transmission Yard

    Means:

    - the area located 12 metres either side of the centreline of an electricity transmission

    line

    - the area located 12 metres in any direction from the edge of an electricity

    transmission pole or tower

    as depicted in Diagram 1.

    Except where the site is subject to a consent notice or easement that provides for a lesser

    separation distance from an electricity transmission line. In such circumstances, the

    separation distances contained in the consent notice or easement shall apply.

  • 7/29/2019 Network Utilities PCC draft plan

    30/70

    30

    Diagram 1: Electricity Transmission Yard and Electricity Transmission corridor

    Extended Above Ground Line

    Means any line, and required support structure(s), that is:

    (a) Placed above ground in road where there are no existing underground lines; and

    (b) Provides a connection between existing overhead lines in a non-rural zone area to

    future above ground lines in the rural zone area; and

    (c) Has a maximum length of 100 metres within the non-rural zone.

    Explanation

    This definition provides for a short overhead span into the rural area from an existing

    overhead line.

    Infrastructure

    Structures and networks which are publicly owned and are available for use by the public.

    This includes roads, rail, and water, sewerage and stormwater reticulation comprising the

    pipes, pumps and treatment works.

    Interim Above Ground Line

    Means any line, and required support structure(s), that is to be placed above ground on

    unformed road for a duration which does not exceed 2 years. This duration starts from the

    date of the above ground roll out of the line.

  • 7/29/2019 Network Utilities PCC draft plan

    31/70

    31

    Explanation

    This definition encompasses interim above ground lines and related support structures, which

    are otherwise non-complying activities, that are required or are intended to provide an

    interim above ground telecommunication or electricity conveyance service along an unformed

    road to any site/s. Upon formation of the unformed road or at the expiry of the consent

    period the interim line will be placed underground or removed.

    Activities specifically contemplated by this definition are:

    Lines on unformed road that are intended to provide a connection to services, such as

    reservoirs or mobile phone sites, which are legally accessed off that unformed road.

    Line

    Means a wire or wires or conductor of any kind (including a fibre optic or other cable) used or

    intended to be used for telecommunication; or the conveyance of electricity and includes any

    insulator, casing, minor fixture, tunnel or other equipment or material used or intended to be

    used for supporting, enclosing, surrounding, or protecting any such wire or conductor; butexcludes any pole, support structure, pole mounted transformer, above ground substation,

    cabinet, ground based access point, aerial, antenna or antenna feed lines erected within a

    site.

    Means line as defined in Section 2(1A) of the Telecommunications Act 1987 and Section 2 of

    the Electricity Act 1992

    Explanation

    The definition of line encompasses physical lines only. It does not extend to including any non

    physical line such as a visual line of sight required for the transmission of informat ion or data

    by radiofrequency eg by licensed Radio Amateurs.

    Mast

    Any mast, pole, tower or similar structure which is fixed to the ground specifically designed to

    carry aerials or antenna including any attachments, designed to facilitate the operation of a

    network utility the transmission of telecommunication and radiocommunication signals.

    Minor Upgradingmeans an increase in the carrying capacity, efficiency or security of electricity and

    telecommunication lines, which utilise the existing or replacement support structures and

    includes:(1) the reconductoring of the line with higher capacity conductors; and

    (2) the resagging of conductors; and

    (3) the addition of longer and more efficient insulators; and

    (4) the replacement of any existing line of greater than 30mm diameter with another line

    of the same diameter or less; and the replacement of an existing line that is 30mm in

    diameter or less with another line that is not more than 30mm in diameter.

    (4) A support structure replacement within a similar location as the support structure

    that is to be replaced; and

    (5) The addition of earthwires, which may contain telecommunication lines, earthpeaks

    and lightning rods; and(6) The addition of electrical or telecommunication fittings; and

  • 7/29/2019 Network Utilities PCC draft plan

    32/70

    32

    (7) Tower replacement in the same location or within the existing alignment of the

    transmission line corridor; and

    (8) The replacement of existing cross arms, including with cross arms of an alternative

    design; and

    (9) An increase in tower height to achieve compliance with the clearance distances

    specified in NZECP34:2001.

    Minor upgrading shall not include:

    (i) Increasing the carrying capacity of existing structures

    (ii) Any increase in the voltage of the line unless the line was originally constructed to

    operate at the higher voltage but has been operating at a reduced voltage.

    (iii) Any increase in any individual wire, cable, or other similar conductor to a diameter

    that exceeds 30mm, or

    (iv) The bundling together of any wire, cable, or other similar conductor so that the

    bundle exceeds 30mm in diameter

    (v) The addition of any new circuits, lines or utility structures.

    Note: The Resource Management (National Environmental Standards for Electricity

    Transmission Activities) Regulations 2009 applies to the existing national grid, and

    applies to all transmission lines that were operational, or able to be operated, on 14

    January 2010.

    National grid

    Means national grid as defined in the Resource Management (National Environmental

    Standards for Electricity Transmission Activities) Regulations, 2009.

    Network Utility

    Means any activity undertaken by a network utility operator as defined in the s166 of the

    RMA, relating to:

    (i) Distribution or transmission by pipeline of natural or manufactured gas, petroleum,

    biofuel or geothermal energy, or

    (ii) Telecommunication as defined in section 5 of the Telecommunications Act 2001; or

    radiocommunications as defined in section (2)(1) of the Radiocommunications Act

    1989, or

    (iii) Transformation, transmission, or distribution of electricity the provision, operation and

    maintenance of works for the conveyancing of electricity, as defined in section 2 of theElectricity Act 1992, or

    (iv) The distribution of water for supply including irrigation, or

    (v) Sewerage or drainage reticulation, or

    (vi) Construction, and operation and maintenance of roads and railway lines, or

    (vii) Construction, The operation and maintenance of an airport as defined by the Airport

    Authorities Act 1966, including the provision of any approach control service within

    the meaning of the Civil Aviation Act 1990, or

    (viii) the provision of any approach control service within the meaning of the Civil Aviation

    Act 1990, or

    (viii)(ix) Undertaking a project or work described as a 'network utility operation' by regulationsmade under the Resource Management Act 1991, or

  • 7/29/2019 Network Utilities PCC draft plan

    33/70

    33

    (x) Meteorological activities

    and includes:

    Lighthouses, navigation aids, and beacons, signal and trig stations and natural hazard

    emergency warning devices and ancillary structures,

    Meteorological services, and

    all associated structures.; and

    (b) any incidental activity in relation to the network utility including without limitation,

    the operation, maintenance and upgrading of the network utility.

    Network utility structure

    Means any structure associated with a network utility and includes pipes, valves, meters,

    regulator stations, transformers (other than pole mounted transformers), substations (other

    than overhead substations), compressor stations, pumping stations, navigational aids,

    meteorological installations, containers, cabinets, and similar structures. It does not include

    cabinets, lines, antennas and masts.

    Regionally significant network utilities includes:

    pipelines for the distribution or transmission of natural or manufactured gas or

    petroleum

    strategic telecommunications facilities, as defined in section 5 of the

    Telecommunications Act 2001

    strategic radio communications facilities, as defined in section 2(1) of the Radio

    Communications Act 1989

    the national electricity grid, as defined by the Electricity Governance Rules 2003

    facilities for the generation and transmission of electricity where it is supplied to the

    network, as defined by the Electricity Governance Rules 2003

    the local authority water supply network and water treatment plants

    the local authority wastewater and stormwater networks, systems and wastewater

    treatment plants

    the Strategic Transport Network, as defined in the Wellington Regional Land

    Transport Strategy 2010-2040

    Sensitive Activity

    Means the following activities:

    Residential

    The accommodation or care of people

    Pre-school, primary, intermediate or secondary school

    Temporary Above Ground Line

    Means any line, and required support structure/s, that is to be placed above ground for a

    temporary duration which does not exceed 6 calendar months. This duration starts from the

    date of the above ground roll out of the line.

    Explanation

    This definition encompasses temporary above ground lines and related support structures,

    which are not otherwise permitted activities, that are required or are intended to provide a

    temporary above ground telecommunication or electricity conveyance service to any site/s.

  • 7/29/2019 Network Utilities PCC draft plan

    34/70

    34

    Activities specifically contemplated by this definition are: emergency or alternative above

    ground lines that are required to service a site or area on a temporary basis. The 6 month

    duration commences on the date on the roll out of the line itself. The duration also covers the

    period within which the service shall be removed.

    Transmission Line

    Means transmission line as defined in the Resource Management (National Environmental

    Standards for Electricity Transmission Activities) Regulations, 2009.

    Upgrading

    As it applies to network utilities, other than electricity or telecommunication lines, means the

    replacement, repair or renewal of existing network utilities but does not extend to any

    increase in height or size or change in location whereby such work would not comply with a

    permitted activity standard or any condition of a resource consent for that network utility.

  • 7/29/2019 Network Utilities PCC draft plan

    35/70

    35

    Amendment 6: Amendments to Chapter C7 Transport Objectives

    and Policies

    C7 TRANSPORT

    The transportation network is a significant resource in its own right. The function ofthe transportation network varies considerably throughout the City. The State

    Highway is predominantly a through route with transport efficiency as the main

    measure of its sustainable management. The measure of sustainable use of industrial

    roads is more one of convenience for heavy traffic than the actual volume of traffic.

    For many suburban and rural roads the efficiency and convenience of the road must

    be balanced against the effects of road use e.g. noise and traffic, on the amenity of the

    suburban and rural areas. Considerable research has been undertaken on the effect of

    the transportation network on suburban amenity in those areas where there are high

    levels of through traffic. The effect of activities on efficient traffic flows and the effect

    of traffic on amenity are major aspects of the consideration of effects of activitiesthroughout the City. This section sets an overall framework for the management of

    transportation issues and is complemented by transportation, traffic and parking

    provisions in the sections of the Plan dealing with each of the seven zones of the City.

    Roads are also a network utility as defined under the Resource Management Act. The

    State Highway Network is also identified as being regionally significant infrastructure

    in the Regional Policy Statement and the Council is required to recognise its benefits

    and protect it from incompatible activities and reverse sensitivity effects. Chapter NU

    of the Plan addresses how effects from the construction, operation and maintenance

    of roads and how activities on roads are managed and how the state highway network

    is recognised and protected from reverse sensitivity effects.

    C7.1.1 Policy

    To use a roading hierarchy as the basis for the management of the effects of traffic

    on adjacent activities, and the effects of activities on the transportation network.

    Explanation

    A roading hierarchy sets out the factors e.g. length, width, traffic volume, which define

    a road as being in a certain category. The management policies which follow are thenbased on these categories.

    Method of Implementation

    A Roading Hierarchy has been included in Part H of the Plan. District Plan rulesprovide

    direction on how the future development of the transportation network will be

    managed, with new roads that are created as part of a subdivision being a controlled

    activity and any other new roads, including diversions of or alterations to existing

    roads, being a discretionary activity. Rules have also been used to control access to

    roads where there is a significant prospect of the cumulative effect of new activities

    resulting in a demand for the upgrading of the road, beyond what is necessary. Thisapplies particularly in the Rural Zone. The general provisions of the Hierarchy e.g.

  • 7/29/2019 Network Utilities PCC draft plan

    36/70

    36

    widths and design speeds, will also be used in conjunction with the financial

    contribution part of the Plan in determining the extent of roading needed in

    conjunction with a development or subdivision.

    Principal Reasons

    A roading hierarchy indicates the relative importance of roads within the City

    according to their function in terms of access and distribution at a city, and regional

    level. The network comprises strategic, arterial and local roads designed and managed

    to meet their particular function and needs.

    The provision of a hierarchy will assist the process of promoting an efficient road

    transportation network, by providing an indication of the relative importance of each

    road, against which the effects of land use and development can be ascertained. The

    function of a road is one of the key factors to be considered when deciding on the

    acceptability of the effects of an activity for which a resource consent has been sought.

  • 7/29/2019 Network Utilities PCC draft plan

    37/70

    37

    Amendment 7: Amendments to D1 City Centre Zone Rules and

    Standards

    D1.1 CITY CENTRE ZONE RULES

    D1.1.1 Permitted activities

    Any one or more of the following are permitted activities:

    (ii) Network utilities which exist at the time of notification of this plan.

    (iii) New network utilities excluding lines for conveying electricity at a

    voltage above 110kV, or with a design capacity above 100MVA per

    circuit.

    Provided that:

    (a) Where a structure is involved it has a floor area not exceeding

    50m2 and a height not exceeding 7.5m; and

    (b) Where a mast, aerial; pole or support structure is concerned, it

    does not exceed 15 metres in height, or 2 metres in diameter;

    and

    (c) Where new or additional lines are involved they are:

    located underground; or

    located within a structure or entirely within 2 metres of

    any structure, excluding any other line; or

    solely for the provision of streetlighting; or

    for the provision of an above ground connection to a site,

    including any connection to a building within that site,

    from an existing above ground line provided that no

    more than one new support structure is required for that

    connection; or

    solely for decorative lighting purposes; or

    a temporary above ground line; or

    specifically provided for in the definition of minor

    upgrading.

    (iv) The operation and maintenance of all roads.

  • 7/29/2019 Network Utilities PCC draft plan

    38/70

    38

    D1.1.2 Controlled activities

    Any one or more of the following are controlled activities:

    (i) The construction of new roads and the construction of diversions or

    alterations to the course of existing roads but excluding any suchconstruction works which are part of a subdivision.

    The matters over which the Council reserves control for the purpose of

    assessment are:

    (a) the route of the road;

    (b) earthworks;

    (c) the imposition of financial contributions in accordance with Part

    E of this plan.

    Note: Earthworks may also require consent under the Proposed

    Regional Soil Plan.

    (ii) Subdivision which complies with the controlled activity standards for

    subdivision.

    The matters over which Council reserves control for the purpose of

    assessment are:

    (a) the design and layout of the subdivision including any new roadsor the diversion or alteration to the course of any existing roads;

    (b) earthworks;

    (c) the imposition of financial contributions in accordance with Part

    E of this plan;

    (d) the imposition of conditions in accordance with section 220 of

    the RMA.;

    (e) The design and layout of the subdivision where any lot may

    affect the safe and effective operation and maintenance of and

    access to regionally significant network utilities located on or in

    proximity to the site;

    (f) The outcome of consultation with the owner or operator of

    regionally significant network utilities located on or in proximity

    to the site.

    Note: Earthworks may also require consent under the Proposed

    Regional Soil Plan.

  • 7/29/2019 Network Utilities PCC draft plan

    39/70

    39

    (iii) Subdivision which complies with the controlled activity standards for

    subdivision.

    The matters over which Council reserves control for the purpose of

    assessment are:

    (a) the design and layout of the subdivision;

    (b) the imposition of financial contributions in accordance with Part

    E of this plan;

    (c) the imposition of conditions in accordance with s220 of the

    RMA.;

    (d) The design and layout of the subdivision where any lot may

    affect the safe and effective operation and maintenance of and

    access to regionally significant network utilities located on or inproximity to the site.

    (e) The outcome of consultation with the owner or operator of

    regionally significant network utilities located on or in proximity

    to the site.

    D1.1.3 Restricted discretionary activities

    Any one or more of the following are restricted discretionary activities:

    (v) An interim above ground line.

    The Council restricts the exercise of its discretion to the following

    matters:

    (a) The duration of the interim line,

    (b) Visual effects on landscapes including sensitive landscape areas

    such as coastal areas and panoramic public viewpoints,

    (c) Cumulative visual effects

    (d) The provision for a bond or a surety for any future under

    grounding of the interim above ground line.

    (vi) An extended above ground line.

    The Council restricts the exercise of its discretion to the following

    matters:

    (a) The character of the surrounding streetscape;

    (b) Visual effects on streetscape,

  • 7/29/2019 Network Utilities PCC draft plan

    40/70

    40

    (c) Visual effects on landscapes including sensitive landscape areas

    such as coastal areas and panoramic public viewpoints,

    (d) The numbers and thickness of lines, height above ground and

    relationship to existing lines and associated structures,

    (e) The cumulative length of the line, including any previous

    extensions of the line,

    (f) Cumulative visual effects,

    (g) The physical practicality and cost of locating lines under ground,

    (h) The interface between a rural and a non-rural environment.

    (vii) New or additional above ground lines that are not permitted activities

    and that

    Are situated on road; and

    Utilise existing support structures that are used by existing

    telecommunication or electricity above ground services.

    The Council restricts the exercise of its discretion to the following

    matters:

    (a) Visual effects on streetscapes,

    (b) Visual effects on landscapes including sensitive landscape areas such

    as coastal areas and panoramic public viewpoints,

    (c) The numbers and thickness of lines; height above ground and

    relationship to existing lines and associated structures,

    (d) Cumulative visual effects,

    (e) The physical practicality and cost of locating lines underground.

    D1.1.4 Discretionary activities

    Any one or more of the following are discretionary activities:

    (v) The replacement or upgrade of an existing support structure for a line,

    that is not a permitted activity.

    D1.1.5 Non-complying activities

    Any one or more of the following are non-complying activities:

    (iv) New or additional above ground lines that are not permitted orrestricted discretionary activities and that:

  • 7/29/2019 Network Utilities PCC draft plan

    41/70

    41

    Are located in road with no existing above ground lines;

    and

    Require the construction of two or more support

    structures.

    Explanation

    Rule D1.1.5 (iv) controls the development of any new or additional above

    ground line services, involving two or more support structures, within roads

    with no existing above ground lines. Such activities are generally incompatible

    with the amenity and character of areas where there are no existing above

    ground lines, and should generally be avoided. New or additional above ground

    lines involving the construction of no more than one new support pole, such as

    at the end of an existing above ground line network where it adjoins a road

    with no existing above ground lines shall be assessed as a full discretionaryactivity under Rule D1.1.4.

  • 7/29/2019 Network Utilities PCC draft plan

    42/70

    42

    Amendment 8: Amendments to D2 Industrial Zone Rules and

    Standards

    D2.1 Industrial Zone Rules

    D2.1.1 Permitted activities

    Any one or more of the following are permitted activities:

    (ii) Network utilities which exist at the time of notification of this plan.

    (iii) New network utilities excluding lines for conveying electricity at a

    voltage above 110kv, or with a design capacity above 100MVA per

    circuit.

    Provided that

    (a) Where a structure is involved it has a floor area not exceeding

    50m2 and a height not exceeding 7.5m; and

    (b) Where a mast, aerial, pole or support structure is concerned, it

    does not exceed 20 metres in height, or 2 metres in diameter;

    and

    (c) Where new or additional lines are involved they are:

    located underground; or

    located within a structure or entirely within 2 metres of

    any structure, excluding any other line; or

    solely for the provision of streetlighting; or

    for the provision of an above ground connection to a site,

    including any connection to a building within that site,

    from an existing above ground line provided that no

    more than one new support structure is required for thatconnection; or

    solely for decorative lighting purposes; or

    a temporary above ground line; or

    specifically provided for in the definition of minor

    upgrading.

    (iv) The operation and maintenance of all roads.

  • 7/29/2019 Network Utilities PCC draft plan

    43/70

    43

    D2.1.2 Controlled activities

    Any one or more of the following are controlled activities:

    (i) The construction of new roads and the construction of diversions or

    alterations to the course of existing roads but excluding any suchconstruction works which are part of a subdivision.

    The matters over which Council reserves control for the purpose of

    assessment are:

    (a) the route of the road;

    (b) earthworks;

    (c) the imposition of financial contributions in accordance with Part

    E of this plan.

    Note: Earthworks may also require consent under the Proposed

    Regional Soil Plan.

    (ii) Subdivision which complies with the controlled activity standards for

    subdivision.

    The matters over which Council reserves control for assessment are:

    (a) the design and layout of the subdivision, including any new

    roads or the diversion or alteration to the course of any existingroads;

    (b) earthworks;

    (c) the imposition of financial contributions in accordance with Part

    E of this plan;

    (d) the imposition of conditions in accordance with s220 of the

    RMA.;

    (e) The design and layout of the subdivision where any lot may

    affect the safe and effective operation and maintenance of and

    access to regionally significant network located on or in

    proximity to the site.

    (f) The outcome of consultation with the owner or operator of

    regionally significant network utilities located on or in proximity

    to the site.

    Note: Earthworks may also require consent under the Proposed

    Regional Soil Plan.

  • 7/29/2019 Network Utilities PCC draft plan

    44/70

    44

    D2.1.3 Restricted discretionary activities

    The following are restricted discretionary activities:

    (ii) An interim above ground line.

    The Council restricts the exercise of its discretion to the following

    matters:

    (a) The duration of the interim line,

    (b) Visual effects on landscapes including sensitive landscape areas

    such as coastal areas and panoramic public viewpoints,

    (c) Cumulative visual effects,

    (d) The provision for a bond or a surety for any future undergrounding of the interim above ground lines.

    (iii) An extended above ground line.

    The Council restrict the exercise of its discretion to the following

    matters:

    (a) The character of the surrounding streetscape,

    (b) Visual effects on streetscape,

    (c) Visual effect on landscapes including sensitive landscape areas

    such as coastal areas and panoramic public viewpoints,

    (d) The number and thickness of lines, height above ground and

    relationship to existing lines and associated structures,

    (e) The cumulative length of the line, including any previous

    extensions of the line,

    (f) Cumulative visual effects,

    (g) The physical practicality and cost of locating lines under ground,

    (h) The interface between a rural and non-rural environment.

    (iv) New or additional above ground lines that are not permitted activities,

    and that:

    (a) Are situated on road; and

    (b) Utilise existing support structures that are used by existing

    telecommunication or electricity above ground services.

  • 7/29/2019 Network Utilities PCC draft plan

    45/70

    45

    The Council restricts the exercise of its discretion to the following

    matters:

    (a) Visual effects on streetscapes,

    (b) Visual effects on landscapes including sensitive landscape areassuch as coastal areas and panoramic public viewpoints,

    (c) The numbers and thickness of lines, height above ground and

    relationship to existing lines and associated structures,

    (d) Cumulative visual effects,

    (e) The physical practicality and cost of locating lines underground.

    D2.1.4 Discretionary activities

    Any one