Annual Environmental Report 2008
For
Kingscourt Bricks Ltd. Drumgill
Kingscourt Co. Cavan
IPC Reg. No. P0528-01
By
QED Engineering Ltd. M-TEK Building 2
Armagh Road Monaghan
Tel: 047 72060 Fax: 047 72061
April 2009
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
1
Table of Contents
1. INTRODUCTION 2
2. SUMMARY INFORMATION 2
2.1 Emissions to Atmosphere 2
2.2 Herbage Sampling 3
2.3 Emissions to Surface Water 4
2.4 Waste Management 7
2.5 Resource Consumption 10
2.6 Environmental Complaints & Incidents 10
3. MANAGEMENT OF THE ACTIVITY 11 3.1 Summary of Environmental Objectives & Targets 11 3.2 Report on EMP for 2008 11
3.3 EMP proposal for 2009 12
4. POLLUTION EMISSIONS REGISTER 14 4.1 Report on PER for 2008 14
4.2 PER Proposal 2009 16
5. LICENCE-SPECIFIC REPORTS 17
5.1 Report on Flow Measurement 17
5.2 Noise Monitoring Report 17
5.3 Bund Integrity Testing Report 17
5.4 Septic Tank Inspection 17
5.5 Review of Residuals Management and 17
Quarry Restoration Plan
5.6 Energy Audit 17
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
2
1. Introduction The following AER is submitted for Kingscourt Bricks Ltd, Drumgill, Kingscourt, Co. Cavan (IPPC Licence No. P0528-01). The company manufactures bricks, which deems that they are an activity under Class 13.4 of the IPPC Licensing Regulations. The company was granted an IPC licence on 4
th March 2002.
The Production Director at the site, Mr. Ciaran O’Reilly is responsible for environmental management, and IPC licence compliance. Mr. Noel Duffy is responsible for surface water examinations and water flow/volume measurements. This AER was drawn up following the EPA Guidance Note for Annual Environmental Report, 2000. It reports on the period January to December 2008.
2. Summary Information
2.1 Emissions to Atmosphere There are 2 kilns on the site, which need to be monitored as follows:
Parameter Monitoring Frequency
Analysis Method /Technique
SOx (as SO2) Annually Flue Gas Analyser
Nox (as NO2) Annually Flue Gas Analyser
Chlorides (as HCL) Annually To be agreed with Agency
Fluorides (as HF) Quarterly To be agreed with Agency
Total Particulates Annually Isokinetic/Gravimetric
PM10 Within 12 Months Isokinetic/Gravimetric
In addition, the following volume emissions are set in the licence.
Kiln Max rate/hr m
3/hr
Max rate/day m
3/day
A2-1 (Kiln 1) 11,600 278,400 A2-2 (Kiln 2) 10,100 242,400
During 2008, these emission points were monitored in March, August and October. Results are presented in the following tables.
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
3
Emission from Kiln 1 2008
Parameter 27/03/08mgNm
3
06/08/08 mgNm
3
08/10/08 mgNm
3
Emission Limit Value mgNm
3
4 - - 50
Total Particulates
29 - -
0.004 10.54 5.603 10 Fluoride (as HF)
0.900 -
0.19 - - 30 Chlorides (As HCl) 4.80 - -
Sulphur Dioxide (SO2)
2 - - 500
Nitrogen Oxides (as NO2)
63 - - 100
Max. Volume m
3/hr
7,285.00 4,768.04 4,603.81 10,100
Max. Volume m
3/day
174,840 114,432 110,491.4 242,400
Fluoride emissions from kiln 1 exceeded the emission limit value in August of 2008. The Kiln cycle in Kingscourt brick emmits fluctuating fluoride levels during the various stages of the process. It is unclear as to why the Fluoride emissions were high during the August monitoring event. Fluoride results were within the emission limit value in the following quarter. All other parameters in Kiln 1 were within the emission limits. The fourth quarter monitoring was not undertaken as both kiln 1 and kiln 2 were no longer in operation.
Emission from Kiln 2 2008
Kiln 2 was not monitored in 2008 as it was not in operation.
2.2 Herbage Sampling
Fluorides are released into the environment by ceramic works (kilns) and the fluoride particles can be deposited on the herbage in the vicinity of process plants. Sampling of herbage around the brick site was undertaken monthly in 2008 from Jan-May and following agreement from the EPA (Ref:P0528/01/ak01NH of 23/9/08) a 3-monthly pooled sample was taken between Aug-Sept. Results are presented in the following tables.
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
4
Kingscourt Bricks, Herbage Fluoride Levels, 2008
Sample No.
25/01/2008 mgF/kg
DM
29/02/2008 mgF/Kg
DM
26/03/2008 mgF/Kg
DM
28/04/2008 mgF/Kg
DM
28/05/2008 mgF/Kg
DM
1 52.8 16.5 30.9 22 5
2 31.8 14.6 11.9 13.5 4.8
3 53.4 27.5 14.7 12 4.7
4 28.1 13.8 20.3 10.8 7
5 22.8 25.8 8.9 15.2 62.3
6 20.5 16.3 4 9.7 8.4
7 26.1 11.9 6.7 8.6 6.8
8 28.6 13 6.4 14.1 17.1
9 33 11.6 4.4 8.8 6.7
10 38.4 11.9 5.5 7.4 4.5
11 41.2 11.2 5.4 14 5.9
Sample No.
Pooled Results August September and October 2008
mgF/Kg Dry Matter
1 14.2
2 11.5
3 11.0
5 10
6 9.4
9 9.9
12 8.5
13 7.5
DM = Dry Matter
Long term average fluoride levels in excess of 30mg/kg dry matter can cause problems in cattle. Individual high readings on occasional months are not problematic.
2.3 Emissions to Surface Waters
W1-1 Discharge from sediment lagoon at Quarry Site This emission point requires monthly monitoring for
• Sulphates
• Chloride
• Manganese
• Suspended Solids
• Mineral Oil
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
5
Results – W1-1 Date Sulphates
mg/l SO4
Chloride
mg/l Cl-
Manganese
mg/l Mn
Suspended
Solids
mg/l
Mineral Oil
mg/l
22/01/08 95 23 0.062 146 <0.05
26/02/08 152 35 0.020 7 <0.05
04/03/08 129 34 0.004 13 <0.05
24/04/08 164 37.7 0.0069 <1 <0.05
28/05/08 186 42.1 0.0045 43 <0.05
24/06/08 191 39.8 0.0455 1 <0.05
29/07/08 169 29.3 0.0278 <1 <0.05
19/08/08 57.8 10.7 0.066 35 <0.05
09/09/08 67.2 14 0.0749 23 <0.05
21/10/08 83 13.3 0.0237 8 <0.05
19/11/08 10 15 0.027 <10 <0.01
22/12/08 83 24 0.001 <10 <0.01
Emission
Limit Value
- - - 35 1
Suspended solids exceeded the emission limits in January and May during 2008. This is attributed to high rainfall during those months causing settlement ponds to overflow to the surrounding surface water without adequate settlement, however this is a rare occurrence. All other parameters were within the emission limits.
SW1 – Lagoon at back of site & SW2 – Manhole at front of Brick Manufacturing Plant These emission points require Quarterly Monitoring for
• Sulphates
• Chloride
• Manganese
• Suspended Solids
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
6
Results SW1
Parameter Units 1st Qtr 08 27/03/08
2nd
Qtr 08 24/06/08
3rd
Qtr 08 24/09/08
4th
Qtr 08 21/12/08
Surface water Regs A1 waters
(1989)
Sulphates mg/l SO4
<1 55.6 53.3 68 200
Chloride mg/l Cl-
3 14.5 17.7 21 250
Manganese mg/l Mn
0.0560.0560.0560.056 0.07 0.0998 <0.001 0.05
Suspended Solids
mg/l 6 2 2 <10 50
Results SW2
Parameter Units 1st Qtr 08 27/03/08
2nd
Qtr 08 24/06/08
3rd
Qtr 08 24/09/08
4th
Qtr 08 21/12/08
Surface water Regs A1 waters
(1989)
Sulphates mg/l SO4
13 32.9 10.2 10 200
Chloride mg/l Cl-
24 13.2 19.9 18 250
Manganese mg/l Mn
1.0941.0941.0941.094 0.14 0.261 0.001 0.05
Suspended Solids
mg/l 100 1482 304 <10 50
In the 1
st, 2
nd and 3
rd Quarter 2008 manganese results at both SW1 and SW2 and the
suspended solid result at SW2 were elevated above the I/PV Value set out in the Surface Water Regulations for A1 waters (1989). High manganese levels are attributed to the natural minerals in the area and therefore are not due to any process conducted by Kingscourt brick. High suspended solids levels are attributed to the high rainfall levels during the months which monitoring occurred. All other results are relatively low and consistent.
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
7
2.4 Waste Management Non-Hazardous Waste The following non-hazardous wastes are generated on this site:
Details EWC Waste Carrier Destination
General Skip Waste 20 03 01 Cavan Waste Disposal
WCP/MH/2001/37d
Corranure Landfill
Cavan W0077-02
Plastic 15 01 02 Cavan Waste Disposal
WCP/MH/2001/37d
Cavan Waste
Disposal W0207-01
Cardboard 15 01 01 Cavan Waste Disposal
WCP/MH/2001/37d
Cavan Waste
Disposal W0207-01
Office / Canteen Waste 20 03 01 Cavan Waste Disposal
WCP/MH/2001/37d
Corranure Landfill
Cavan W0077-02
Metal 16 01 18 Cavan Waste Disposal
WCP/MH/2001/37d
& J. Shortt
WCP/MH/2003/73B
Recycled by
Clearway Belfast
WMEX 22/21
Wood 15 01 03 Wilton Waste
WCP235(02)/OY/256/
05
Recycled
Septic Tank Sludge 20 03 04 McBreen
Environmental
Services Ltd.
WCP/MH/2006/17/B
Land spread
Electrical Waste 16 02 14 Cavan Waste Disposal Cavan Waste
Disposal W0207-01
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
8
Skip Waste In 2008 general skip waste was taken off-site and segregated by Cavan Waste Disposal. General waste was sent to landfill and up to 30% is segregated by Cavan Waste Disposal and recycled.
Year Tonnes
2008 14.78
2007 8.8
2006 14.68
2005 12.03
2004 12.1
2003 128.14
2002 40.34 The volume of waste increased by 40% in 2008 compared to 2007 figures. This was due to construction and clean up operations of on site. Plastic & Cardboard Recycling Plastic and cardboard are baled on site. The plastic and cardboard was collected by Cavan Waste Disposal for recycling. There was no baled plastic and cardboard taken off site in 2008.
Waste Material Recycled
Tonnes 2008
Tonnes 2007
Tonnes 2006
Tonnes 2005
Plastic - - 1.16 0.65 Cardboard - - 1.4 0.9
Office / Canteen Waste Office and Canteen waste is deposited in a wheelie bin and collected weekly by Cavan Waste Disposal. It is disposed to landfill, but it is not weighed.
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
9
Metal Waste In 2008 metal waste was taken by Cavan Waste Disposal and J. Shortt for recycling.
The volume of metal waste recycled from 2003 to 2007 was relatively consistent each year but there was a 99% decrease in 2008 due to the decrease in production. Wood Waste In 2008 wood waste was taken by Wilton Waste for recycling.
Year Tonnes
2008 23.94
2007 13.76
2006 31.15
2005 20.66
2004 20.44
2003 15.72 There was a 42% increase in wood waste taken off site in 2008 compared to the previous year; this was due to improved segregation of the waste stream.
Year Tonnes
2008 0.9
2007 8.82
2006 14.69
2005 12.86
2004 13.2
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
10
Electrical Waste There was no electrical waste disposed of in 2008
Year Tonnes
2008 0
2007 0.23 Septic Tank Sludge Septic tank sludge was removed by McBreen Environmental Services Ltd. on 29/01/2007; due to a prolonged closure period in 2008 the septic tank system did not require de-sludging.
2.5 Resource Consumption
Energy Source
Electricity (kWh)
Natural Gas (kWh)
Propane (Litres)
Consumption 2008
1,206,163 23,921,362 0
Consumption 2007
1,790,273 38,248,849 39,078
Consumption 2006
1,709,111 37,341,529 47,532
Consumption 2005
2,230,016 38,357,973 80,266
Consumption 2004
1,932,240 38,055,730 68,167
Consumption 2003
2,723,988 39,327,754 85,646
Electricity consumption decreased by 32% and Natural gas decreased by 37% in comparison to the 2007 figures. This was due to a prolonged closure period during the summer and winter months of 2008.
2.6 Environmental Complaints & Incidents
No complaints of an environmental nature were issued to the site in 2008.
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
11
3. Management of the Activity
3.1 Summary of Objectives and Targets 2009
Objective Target
Increase waste segregation and reduce
the amount of waste going to landfill.
To continue to segregate and improve on
waste management at the site. A further
decrease in the amount of waste going to
landfill.
To ensure the levels of fluoride in the
herbage surrounding the site are within
the limits set.
To monitor herbage levels around the site
and to ensure they do not go above the
Emission Limit Value.
To improve the energy efficiency within
the factory
To carry out air leakage testing and to
continually maintain all ducting through
repairs and replacements. An Energy
audit was carried out by Sustainable
Energy Ireland in 2007 and the
Opportunities for Energy Savings from this
report are currently being implemented.
To obtain ISO14001 certification To begin implementation of IS14001
Environmental Management System in
2009
3.2 Report on EMP of 2008
1. Increasing waste segregation and reduction in the amount of waste going to landfill
The volume of waste disposed to landfill in 2008 increased due to the construction of a new plant and a corresponding clean up operation. The company continued to segregate and recycle Wood, Metal, Plastic, Paper/Cardboard, Bulbs and Batteries in 2008. In 2004 the company joined Repak with the aim of reducing the amount of packaging used and therefore reducing waste generated. Future waste disposal figures should reflect this new waste management strategy which has been implemented.
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
12
2. To ensure the levels of fluoride in the herbage surrounding the site are within the limits set.
In 2008 eight of the herbage sampling locations exceeded the herbage fluoride limit of 30mg/kg between 1-2 times, but the long-term average concentration was within this guide value.
3. To improve the energy efficiency within the factory
In 2008 the company maintenance department regularly inspected all ducting to ensure air leakage was minimal. All ducting will be inspected regularly and repaired and replaced where necessary. Energy consumption figures were dramatically decreased in comparison to 2007 with a decrease in electricity consumption of 32%, a decrease of natural gas consumption of 37%. There was no Propane purchased by the company in 2008. Sustainable Energy Ireland carried out an Energy Survey for the site with the Opportunities for Savings in the report currently being implemented. 3.3 EMP Proposal for 2009 OBJECTIVE 1 Increasing waste segregation and reduction
in the amount of waste going to landfill
TARGET 1
AND IMPLEMENTATION DETAILS
RESPONSIBILITY:
Ciaran O’Reilly
TIMEFRAME: On-going
In 2009 the company will in association with
Repak, continue to focus attention on volumes
of packaging used on this site and the
assessment of measures to reduce this volume.
In addition the company will continue to
segregate and recycle Wood, Metal, Plastic,
Paper/Cardboard, Bulbs, Batteries and waste
Electrical Equipment. The aim is to keep general
waste disposal to landfill at 1 tonne per month
i.e. about 12 tonnes per annum.
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
13
OBJECTIVE 2
To ensure the levels of fluoride in the
herbage surrounding the site are within the
limits set.
TARGET 2
AND IMPLEMENTATION DETAILS
RESPONSIBILITY:
Ciaran O’Reilly
TIMEFRAME: On-going
The company will continue to monitor herbage
in the vicinity of the site for fluoride levels when
the kilns are in operation.
OBJECTIVE 3
To improve the energy efficiency within the
factory
TARGET 3
AND IMPLEMENTATION DETAILS
RESPONSIBILITY:
Ciaran O’Reilly
TIMEFRAME: On-going
In 2008 the company will continue to operate in
a manner which improves energy efficiency.
Objective 4 To introduce the Environmental Management
System 1SO14001
TARGET 4
AND IMPLIMENTATION DETAILS
RESPONSIBILITY:
Ciaran O’Reilly
TIMEFRAME: On-Going
ISO 14001 is the international specification for
an Environmental Management System (EMS).
It specifies requirements for establishing an
environmental policy, determining environmental
aspects and impacts of
products/activities/services, planning
environmental objectives and measurable
targets, implementation and operation of
programs to meet objectives and targets,
checking and corrective action, and
management review. The company will strive to
introduce and implement the policies of the
management system in 2009.
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
14
4. Pollution Release and Transfer Register (PRTR)
4.1 Report on PRTR for 2008
The substances agreed by the EPA for tracking at Kingscourt Bricks were
• Fluorides
• Chlorides
• Sulphur Dioxide
• Nitrogen Dioxide
Input
Product Tonnes 2008
Tonnes 2007
Tonnes 2006
Tonnes 2005
Tonnes 2004
Clay 26,338 46,000 51,697 47,274 50,059 Natural Gas 23,921,362 38,248,849 37,341,529 38,357,973 38,055,730 Molasses 129 141.4 160 132 177 Anthracite 137 100 97 209 182 Manganese Dioxide
25 21 11 44 17
Titanium 2.5 6 6 5 4
Decreased production in 2008 has been reflected in the use of raw materials in 2008. It is envisaged that these figures will be further reduced in 2009.
Input of Fluoride and Chloride from Clay Samples Please note that no clay samples were taken during 2008 In 2006, two clay samples were taken from the storage shed on the site and sent to ELS for analysis of Fluoride and Chloride content, with the following results.
Clay Sample 1
Clay Sample 2
Fluoride mg/kg F 318 370 Chloride mg/kg CL 261 167
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
15
Based on a clay usage of 26,338 tonnes in 2008, the following fluoride and chloride input is calculated.
Clay Usage Tonnes/year
Clay Usage Kg/year
Fluoride Content mg/kg
Fluoride Content mg/year
Fluoride Content Tonnes/year
26,338 26,338,000 318 8,375,484,000 8.37 (min)
26,338 26,338,000 370 9,745,060,000 9.74 (max)
Clay Usage Tonnes/year
Clay Usage Kg/year
Chloride Content mg/kg
Chloride Content mg/year
Chloride Content Tonnes/year
26,338 26,338,000 261 6,874,218,000 6.87 (max)
26,338 26,338,000 167 4,398,446,000 4.40 (min)
26,338 26,338,000 214 5,636,332,000 5.64 (average)
Output via Two Kiln Stacks on-Site
Kg/Year 2008
Kg/Year 2007
Kg/Year 2006
Kg/Year 2005
Kg/Year 2004
Kg/Year 2003
SO2 81 30 0 3854 4818 0
Nox 2544 2505 4440 46954 16381 16900 Fluorides 224 618 445 609 517 200 Chlorides 117 299 396 133 631 700
Figures are calculated using the average fluoride readings from the Kiln Monitoring events in 2008; March, August and October. The Chloride figures are from the March monitoring event. The NOx & SO2 average readings were also taken from the March monitoring event. Figures are based solely on monitoring at kiln 1 as kiln 2 was not in operation during 2008.
Output via Bricks Please note that fluoride and chloride figures are based on those obtained from brick samples analysed in 2006. Two brick samples were taken from the finished production line and sent to ELS for analysis of Fluoride and Chloride content during 2006, with the following results:
Brick Sample 1
Brick Sample 2
Fluoride mg/kg F 180 78 Chloride mg/kg CL 266 142
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
16
Based on a brick production figure of 25,300 tonnes in 2008, the following fluoride and chloride output is calculated.
Brick
Production Tonnes/year
Brick Production
Kg/year
Fluoride Content mg/kg
Fluoride Content mg/year
Fluoride Content Tonnes/year
25,300 25,300,000 180 4,554,000,000 4.55
25,300 25,300,000 78 1,973,400,000 1.97
Brick Production
Tonnes/year
Brick Production
Kg/year
Chloride Content mg/kg
Chloride Content mg/year
Chloride Content Tonnes/year
25,300 25,300,000 266 6,729,800,000 6.73 (max)
25,300 25,300,000 142 3,592,600,000 3.60 (min)
25,300 25,300,000 204 5,161,200,000 5.16 (average)
Conclusion In 2008, between 8.37 – 9.74 tonnes of Fluoride were input from the clay at Kingscourt Bricks. Between 1.97 – 1.97 tonnes of Fluoride was output in bricks from the site and 0.224 tonnes was emitted to atmosphere via the kiln stacks. Fluoride (as HF) is generated by the reaction of the clay at high temperature in the kilns. In 2008, between 4.40 – 6.87 tonnes of Chloride were input from the clay at Kingscourt Bricks. Between 3.60– 6.73 tonnes of Chloride was output in bricks from the site and 0.117 tonnes was emitted to atmosphere via the kiln stacks. Chloride (as HCL) is generated by the reaction of the clay at high temperature in the kilns. In 2008 81kg of SO2 and 2,544kg of Nitrogen Oxides (as NOx) were emitted from the site via the kiln stacks. In 2007 30kg of SO2 and 2505kg of Nitrogen Oxides (as NOx) were emitted via the stacks.
4.2 PRTR Proposal 2009 The aim is to track usage and generation of Fluorides, Chlorides and Nitrogen Oxides at the site. 1. Calculate the tonnage of raw materials used at the site in 2009 and compare
with previous figures. 2. Take 2 clay samples and analyse for Chlorides and Fluorides. Calculate the
tonnage of chloride and fluoride input via clay in 2009 and compare with previous figures.
3. Take 2 brick samples and analyse for Chlorides and Fluorides. Calculate the tonnage of chloride and fluoride output via bricks in 2009 and compare with previous figures.
4. Calculate the output of Nitrogen Oxide, Chlorides and Fluorides via the kiln stacks from quarterly monitoring results and compare with previous years figures.
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
17
5. Licence-Specific Reports 5.1 Report of Flow Measurement An assessment of water abstraction was carried out in 2008 from the River alongside Kingscourt Bricks, the report is included at the end of this AER.
5.2 Noise Monitoring A Noise Survey Report for 2008 is enclosed at the end of this report.
5.3 Bund Integrity Testing Report The Molasses Bund test was completed in December 2005 and the report was submitted. All other oil tanks on the site were replaced with double skin tanks, which undergo regular visual inspections. The next Bund test is due in 2009.
5.4 Septic Tanks Inspection Report Both septic tanks were inspected and certified in 2004 and a report was previously submitted to the EPA.
5.5 Review of Residuals Management and Quarry Restoration Plan A review of the residuals management and quarry restoration plan was submitted with the 2005 AER and remains unchanged.
5.6 Energy Audit An energy Audit was carried out in 2002, and this report was submitted previously. An energy audit was carried out in 2007 under the auspices of Sustainable Energy Ireland’s ‘Services for Business Programme’.
Noise Survey Report 2008
for
Drumgill Kingscourt Co. Cavan
IPPC Licence No. P0528-01
by
Q.E.D. Engineering Ltd M- TEK Building 2,
Armagh Road, Monaghan,
Co. Monaghan. Tel: 00353 47 72060 Fax: 00353 47 72061
July 2008
Kingscourt Bricks Ltd.
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
1
Table of Contents
1. Introduction 2 2. Methodology and Instrumentation 2 3. Results 3 4. Discussion 5
5. Conclusion 6 Appendix 1: Location of Noise Readings Certificates of Calibration of Noise Meters
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
2
1. Introduction Daytime and night time noise levels were measured at Kingscourt Bricks Ltd. at the boundary and at noise sensitive locations on the 23
rd and 24
th July 2008, as required
under Condition 8 of the company’s IPPC Licence No. P0528-01. Daytime noise measurements were taken at 5 locations along the site boundary: B-1 to B-5. Day and night time noise measurements were taken at two noise sensitive locations: NSL1 & NSL2. These two locations were deemed to be closest to the site and noise levels here are directly comparable to the IPPC licence daytime noise limit of 55dBA and night time noise limit of 45dBA. A map showing the sampling locations is presented in Appendix 1.
2. Methodology and Instrumentation Daytime noise monitoring was carried out by Patricia Murtagh, BSc, MSc, Diploma in Acoustics and Noise Control and Brona Keating, BSc of Q.E.D Engineering Limited on 24
th July 2008. Night time monitoring was carried out by Patricia Murtagh on 23
rd July
2008. 1. Noise levels were measured using a Castle GA123 Integrated Datalogging Octave
Band Sound Level Meter, Serial No. 036015 and microphone Serial No. 27101. This meter was last calibrated on 29/04/08. A GA607 Dual Level Calibrator, Serial No. 036023 was used to calibrate the sound level meter and this was last calibrated on 20/02/08.
2. Rion NA-27 Real Time 1/1, 1/3 Octave Band Logging SLM, Serial No. 00380685. This meter was last calibrated on 14/05/08. A GA607 Dual Level Calibrator, Serial No. 036341 was used to calibrate the sound level meter and this was last calibrated on 12/05/08.
Certificates of calibration of both noise meters are provided at the end of the report. Both instruments were calibrated before measurement to 94dB and were checked after measurements also and were found to be working satisfactory. Weather conditions during the day monitoring were calm and sunny. During the night-time monitoring weather conditions were dry, cloudy and very calm. A standard windshield was used on both instruments during the survey. Noise monitoring at the boundary locations took place for five minutes in duration for LAeq, LA90 & LA10, while both day and night-time noise monitoring at the NSL’s took place for thirty minutes in duration for LAeq. LAeq, LA90 & LA10. All the daytime monitoring took place between 10.00 -12.30 and the night time monitoring took place between 22.00-23.00.
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
3
3. Results
3.1 Ambient Noise Measurements 24/07/08
Emission Point Ref
No.
Location Comments LAeq
dBA 5
mins
LA90
dBA 5
mins
LA10
dBA 5
mins
B1 Front of Site beside entrance gate
Factory audible, some non-site traffic passing this monitoring location 55 44 57
B2 Front corner of site at brick in-fill area
Factory audible, some non-site traffic passing this monitoring location 56 41 61
B3 Side of site beside raw materials shed
Factory fan audible, also some traffic on road adjoining the site audible 59 57 59
B4 Back of site close to old quarry
Site forklift audible, factory fan audible. 51 48 52
B5 Side of site – brick storage area
Lorry in close proximity to this location, traffic audible on main road 50 48 51
3.2 Noise Sensitive Locations
Emission Point
Ref. No.
Location Time LAeq
dBA 30 mins
LA90
dBA 30 mins
LA10
dBA 30 mins
Tonal/
Day 24/7/18 9.27-9.57
60 41 59 Tonal @ 50Hz NSL 1
House across road from site entrance Night 23/7/18
22.06-22.36 59 39 54 Tonal @
20Hz
Day 24/7/08 10.02-10.32
58 41 60 No NSL 2
House beside site at LHS of site entrance Night 23/7/08
22.08-22.40 56 41 55 Tonal @
20Hz
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
4
Details of the 1/3 octave readings are provided in the next table:
1/3 Octave Noise Readings at Kingscourt Bricks 23rd
and 24th
07/08
Daytime Night time Day time Night time
NSL1 NSL1 NSL2 NSL2
Hz dB (linear) dB (linear) dB (linear) dB (linear)
12.5 43.5 50.3 54.3 51.4
16 49.6 48.7 53.3 48.6
20 47 54.4 52.7 59.5
25 42.2 47.3 60 52.1
31.5 48 46.8 61.9 48.6
40 46.9 44.7 52.7 51.4
50 53.9 42 63.3 51.5
63 46.9 41.5 60.6 43.4
80 48.6 40.7 56.3 40
100 45.2 42.7 48.4 43.1
125 42.8 43.6 55.5 43.9
160 44 39.7 53.6 39.2
200 39.5 34.7 53.7 40.2
250 40.8 35.1 49.9 37.6
315 39.8 36.6 43.7 39.7
400 39.3 33.1 41.3 37.1
500 40.4 35 41.3 40.2
630 42.3 31.7 38.7 37.7
800 38.9 35.4 42.8 37.8
KHz 1 38.8 38 45.8 42.4
1.25 36.2 37.3 43.2 41.2
1.6 30.5 31.3 40.5 37.8
2 30.3 26.9 40.2 34.5
2.5 27.2 23 39.1 29.2
3.15 25.6 23.3 39.2 23
4 23.9 20.4 38.4 19.7
5 22.5 21.7 35 20.2
6.3 22.2 16 28.1 16.7
8 25.2 15.5 25 16.1
10 15.5 14.7 18.8 13.7
12.5 14.7 10.7
14.7 10.7
The Environmental Noise Standard ISO1996-2 details that a prominent tonal component may be detected in one-third octave spectra if the level of a one-third octave band exceeds the level of the adjacent bands by 5dB or more. This occurs above at NSL1 Daytime @ 50Hz and at NSL1 and NSL2 Night-time, both @ 20Hz.
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
5
4. Discussion
4.1 Ambient Noise Measurements Ambient noise measurements were taken at 5 boundary locations around the site. Looking at each individual location and the results of the LA90 and LA10, the following was found: B1 at the main site entrance had an LAeq reading of 55dBA. The difference of 13dBA between the LA10 reading of 57dBA and the LA90 reading of 44dBA indicates a lot of intermittent noise at this location, caused by traffic passing on the main road. B2 at the front corner of site had an LAeq reading of 56dBA. The difference of 20dBA between the LA10 reading of 61dBA and the LA90 reading of 41dBA again indicates a lot of intermittent noise at this location, caused by passing traffic on the main road. B3 at the side of the site had an LAeq reading of 59dBA. The difference of 2dBA between the LA10 reading of 59dBA and the LA90 reading of 57dBA indicates very little intermittent noise at this location, so this noise level is fairly consistent and generated by the production process within the buildings. B4 at the back of the site had an LAeq reading of 51dBA. The difference of 4dBA between the LA10 reading of 52dBA and the LA90 reading of 48dBA indicates some intermittent noise at this location provided by site traffic (forklift). Production process machinery was audible at this monitoring location. B5 at the side of the site had an LAeq reading of 50dBA. The difference of 3dBA between the LA10 reading of 51dBA and the LA90 reading of 48dBA indicates very little intermittent noise was present at this location, so this noise level is fairly consistent here. A lorry was loading near this location.
4.2 Noise Sensitive Locations Two noise sensitive locations were measured as part of the noise survey. NSL1 is located across the road from the site and had an LAeq daytime reading of 60dBA. The difference of 18dBA between the LA10 reading of 59dBA and the LA90 reading of 41dBA indicates a lot of intermittent noise at this location. This was provided by traffic noise along the main road. Given that the LA90 was 41dBA at this location it can be reasonably assumed that noise emanating from the factory would produce an LAeq of similar magnitude at the house, in the absence of traffic. Therefore noise from the factory will not impact on this noise sensitive location, as readings fall well below the 55dBA daytime noise limit set in the IPPC licence. Tonal noise at 50Hz was recorded at this noise sensitive location during the day, but this is attributed to traffic on the main road. No impulsive noise was audible at this location. NSL1 also had an LAeq night time reading of 59dBA. The significant difference of 15dBA between the LA10 reading of 54dBA and the LA90 reading of 39dBA again indicates a lot of intermittent noise at this location. This was provided by traffic noise along the main road. Given that the LA90 was 39dBA at this location it can be reasonably assumed that noise emanating from the factory would produce an LAeq of similar magnitude at the house, in the absence of traffic. Therefore noise from the factory will not impact on this noise sensitive location, as readings fall below the 45dBA night time noise limit set in the IPPC licence. Tonal noise at 20Hz was recorded at this noise sensitive location during the night. Sound below the frequency wave of 20Hz is termed infrasound and is below the normal threshold of hearing so the source of this
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
6
tone is unknown (e.g. could be from power lines) but as very little factory noise was audible it was not from site operations. No impulsive noise was audible at this location. NSL2 is the house beside the site. This location had a daytime LAeq reading of 58dBA. The difference of 19dBA between the LA10 reading of 60dBA and the LA90 reading of 41dBA indicates a lot of intermittent noise levels at this location. This was provided by traffic along the main road. Given that the LA90 was 41dBA at this location it can be reasonably assumed that noise emanating from the factory would produce an LAeq of similar magnitude at the house, in the absence of traffic. Therefore noise from the factory will not impact on this noise sensitive location, as readings fall well below the 55dBA daytime noise limit set in the IPPC licence. No impulsive or tonal noise was audible at this location during the day. NSL2 had a night time LAeq reading of 56dBA. The difference of 14dBA between the LA10 reading of 55dBA and the LA90 reading of 41dBA indicates a lot of intermittent noise levels at this location, again provided by traffic along the main road. Given that the LA90 was 41dBA at this location it can be reasonably assumed that noise emanating from the factory would produce an LAeq of similar magnitude at the house, in the absence of traffic. Therefore noise from the factory will not impact on this noise sensitive location, as readings fall below the 45dBA night time noise limit set in the IPPC licence. Tonal noise at 20Hz was recorded at this noise sensitive location during the night. Sound below the frequency wave of 20Hz is termed infrasound and is below the normal threshold of hearing so the source of this tone is unknown (e.g. could be from power lines) but as very little factory noise was audible it was not from site operations. No impulsive noise was audible at this location.
5. Conclusion All background (LA90) noise readings at Noise Sensitive Locations are below the IPPC Daytime limit of 55dB(A) and the night time limit of 45dB(A). No complaints relating to noise have been issued to the company in the past year. The next noise survey for the site is due in 2009.
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
7
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
8
Certificate of Calibration for Castle GA123 Noise Meter
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
9
Certificate of Calibration of Castle Calibrator
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
10
Certificate of Calibration of Rion NA-27 Noise Meter
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
11
Certificate of Calibration of Rion Calibrator
Usage
SW1= Back of Site Flow-yes/no
SW2=Front of Site Colour-Clear, Cloudy.
W-1 = Quarry ( Lagoon) Odour-Yes/No or scumed
Week No Location Flow Colour Odour Comments Flow.MS-1.
River
Height
Meters
River Width
in MtrComments
Water Pump
Meter M³.
20/01/2008 Sw1 Yes Clear No Left 0.7
Sw2 Yes Cloudy No Center0.5
W1 Yes Cloudy No Right 0•15
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes Clear No 0.2
Sw2 Yes Cloudy No Center0.5
W1 Yes Clear No 0.5
River clean and fast
flowing2
the flood has
changed the
corse of the
river
36,11628/01/2008
All
comments
relate to
looking up
river against
flow
Kingscourt Bricks-Weekly Examination of Water 2008
Surface Water River Water
Weather very wet
causing heavy run off2.7 River in flood 35,932
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
1
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes Clear no 0.2
Sw2 No Center0.3
W1 No 0.5
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 yes Clear No 0.2
Sw2 yesClay and
brick StainNo Center0.4
W1 yes 0.5
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 yes No No 0
Sw2 No Center0.4
W1 No 0.5
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 yes No No 0
Sw2 No Center0.3
W1 No 0.5
2
the flood has
changed the
corse of the
river
36,22704/02/2008
River clean and fast
flowing. Weather
blustery with snow
showers
1.5
11/02/2008
River clay stained and
fast flowing. Weather
Wet
2
the flood has
changed the
corse of the
river
36,335
the flood has
changed the
corse of the
river
36,432
25/02/2008 River clean 1.5
the flood has
changed the
corse of the
river
36,547
18/02/2008River clean and fast
flowing. Weather Wet
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
2
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 0
Sw2 Yes No No Center0.6
W1 No 0.4
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No
Sw2 Yes No No
W1 No
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 20cm on rt
Sw2 Yes No No 40cm cent
W1 Yes No No 15cm left
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 20cm on rt
Sw2 Yes No No 40cm cent
W1 No 15cm left
31/03/2008River clean and very
clear
20/03/2008 River clean and clean Not reading 2.5
10/03/2008River clean and
flowing.well
03/03/2008River clean and
flowing.well 1.5
G Flemming
working on
river bsnk
36,681
Not reading 2.5
G Flemming
working on
river bsnk
36,817
New bridge in
place36,993
Minows
returnedto
river
37,153
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
3
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 20cm on rt
Sw2 Yes No No 40cm cent
W1 No 15cm left
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 20cm on rt
Sw2 Yes No No 40cm cent
W1 No 15cm left
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 30cm on rt
Sw2 No No No 40cm cent
W1 No 15cm left
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 20cm on rt
Sw2 Yes No No 40cm cent
W1 No 15cm left
Sunny by day
Frost by night37,35414/04/2008
River clean and very
clear Not reading 2.5
Not reading 2Sunny by day
Frost by night
Weather dry
and frosty37,28507/04/2008
River clean and very
clear Not reading 2.5
37,432
28/04/2008water very slow and
dirty algi groth.Not reading 2.5
Dry /with
some
showers
37,590
21/04/2008River algi groth and
clear
water very slow and dirty algi groth.river checked up and down stream .Found clear above the bridge and clear below the wier.
Algi groth put down to slow water flow rate.
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
4
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 20cm on rt
Sw2 No No No 40cm cent
W1 No 15cm left
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 20cm on rt
Sw2 No No No 40cm cent
W1 No 15cm left
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 20cm on rt
Sw2 No No No 40cm cent
W1 No 15cm left
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 20cm on rt
Sw2 No No No 40cm cent
W1 No 15cm left
05/05/2008 River looking dirty Not reading 2.5
Showery but
not shown as
increase in
river rate
37,722
River looking dirtyAlgi groth remains as past 2 weeks.river checked up and down stream .Found clear above the
bridge and clear below the wier. Algi groth put down to slow water flow rate.
12/05/2008 River looking dirty Not reading 2.5 Dry 37,833
37,941
Sw 1 always flowing. Traced the sorce to find why and discovered overflow from Vacuum thanh running. Recirc to be fitted to vacuum thanh returning to main
water thank .
26/05/2008River looking dirty/ Algi
starting to break up
The Meter is
reading 0.8
0n left 0.3
reading in
centre 0.1 rt
2.5 Dry/ Showery 38,083
19/05/2008 River looking dirty DryNot reading 2.5
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
5
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 No No No 20cm on rt
Sw2 No No No 40cm cent
W1 No 15cm left
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 No No No 10cm
Sw2 yes No like
stagnant 20cm
W1 No 10cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 No No No 10cm
Sw2 yes No no 20cm
W1 No 10cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 No No No 10cm
Sw2 yes No no 20cm
W1 No 10cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 10cm
Sw2 yes No no 20cm
W1 Yes Red No 10cm
Not reading 2.5 Dry/ Showery 38,143
Plant shut for installing new machines. No water usage ,No Quarry work.
9.06.08River looking dirty/ Algi
still present2
river very
slow and dirty
algi groth.
38,225
02/06/2008River looking dirty/ Algi
starting to break up
16.06.08 Algi still present 2
Dirty algi
groth. On
bottom
23.06.08 Algi still growing 2
Dirty algi
groth. On
bottom
floow water in river but
still algi2
Dirty algi
groth. On
bottom
38,320
38,403
38,469
No river water used water from wheel wash used
30.06.08
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
6
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 10cm
Sw2 yes No no 20cm
W1 Yes Red No 10cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 No No No 10cm
Sw2 yes No no 20cm
W1 No no No 10cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 No No No 10cm
Sw2 yes No no 10cm
W1 No no No 30cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 15cm
Sw2 yes No no 15cm
W1 Yes Red No 40cm
The Meter is
reading 0.5
0n left no
reading in
centre or rt
The Meter is
reading 0.8
0n left 0.3
reading in
centre 0.1 rt
28.07.08River coloured with
mud2
Heavy rain.
Very little
river water
used
38,822
38,649
21.07.08
River in good
conditionSmall amount
of algi
2
River clean.
River deep
on far side
38,717
14.07.08 Small amount of algi 2 River clean
No river water used water from wheel wash used
Re Start of production
07.07.08 River Clear 2River clearing
well38,562
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
7
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 10cm
Sw2 yes No no 10cm
W1 No No No 30cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 10cm
Sw2 yes No no 10cm
W1 Yes No No 40cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 10cm
Sw2 yes No no 10cm
W1 No No No 40cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 10cm
Sw2 yes No no 10cm
W1 No No No 40cm
Left side of
river deep38,12925.08.08
Note that water from
SW1 is overflow from
Vacuum Pump.and as
such is only river water
The Meter is
not giving a
reading2
The Meter is
not giving a
reading
The Meter is
reading 0.5
0n left 0.2
reading in
centre 0.0 rt
The Meter is
reading 0.3
0n left 0.1
reading in
centre 0.0 rt
38,05318.08.08
Note that water from
SW1 is overflow from
Vacuum Pump.and as
such is only river water
2Left side of
river deep
11.08.08
Note that water from
SW1 is overflow from
Vacuum Pump
2Left side of
river deep38,990
04.08.08 River fair 2 little river
water used38,916
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
8
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes RED No 15cm
Sw2 yes No no 15cm
W1 Yes Red No 50cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes RED No 15cm
Sw2 yes Coloured no 15cm
W1 Yes Red No 50cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 10cm
Sw2 yes No no 10cm
W1 No No No 40cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 10cm
Sw2 yes No no 10cm
W1 No No No See below
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes No No 10cm
Sw2 yes No no 10cm
W1 Yes Red No 40cm
Storm/ Surface water used for factory
Water on Rt side of river flows in reverse
29.09.08Clear Water discharge
to Pond at factory
The Meter is
reading 0.3
0n left 0.0
reading in
centre 0.0 rt
2Left side of
river deep 384,194
Storm/ Surface water used for factory as last week
22.09.08
Small amount of Clear
in water discharge to
Pond
The Meter is
reading 0.3
0n left 0.0
reading in
centre 0.0 rt
2Left side of
river deep 38,416
Storm/ Surface water used for factory as last week
015.09.08Clear Water discharge
to Pond
The Meter is
reading 0.5
0n left 0.3
reading in
centre 0.0 rt
2Left side of
river deep 38,323
Storm/ Surface water used for factory
The Meter is
reading 0.8
0n left 0.3
reading in
centre 0.2 rt
08.09.08Discharge from pond
clear
The Meter is
reading 0.8
0n left 0.3
reading in
centre 0.2 rt
2
Left side of
river deep
River in
Flood.
38,235
01.09.08
Small amount of
colour in water
discharge to pond
2Left side of
river deep.38,191
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
9
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes Coloured No 10cm
Sw2 yes Coloured no 20cm
W1 Yes Red No 50cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes Clear No 10cm
Sw2 yes Clear no 20cm
W1 No No No 50cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes Clear No 10cm
Sw2 yes Clear no 20cm
W1 No No No 50cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes Clear No 10cm
Sw2 yes Clear no 20cm
W1 No No No 50cm
Storm/ Surface water used for factory
Storm/ Surface water used for factory
27.10.08
Clear Water discharge
to Pond at factory
from vacuum pump
The Meter is
reading 0.5
0n left 0.0
reading in
centre 0.0 rt
2.1
River clear.
Weather very
wet
38,821
Storm/ Surface water used for factory
20.10.08
Clear Water discharge
to Pond at factory
from vacuum pump
The Meter is
reading 0.5
0n left 0.0
reading in
centre 0.0 rt
2.1 River clear 38,768
Storm/ Surface water used for factory
13.10.08Clear Water discharge
to Pond at factory
The Meter is
reading 0.5
0n left 0.0
reading in
centre 0.0 rt
2.1 River clear 38,684
06.10.08
Coloured Water
discharge to Pond at
factory
The Meter is
reading 0.8
0n left 0.5
reading in
centre 0.0 rt
2.1
Left side of
river deep
River in
Flood.
38,570
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
10
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes Clear No 10cm
Sw2 yes Clear no 20cm
W1 No No No 50cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes Clear NoThe Meter is
reading 0.6 10cm 2.1
Good flow in
river. Poor
Sw2 yes Clear no 20cm
W1 Yes No No 50cm
Storm/ Surface water used for factory
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes Clear NoThe Meter is
reading 0.6 10cm 2.1
Any reading
from Rt side
Sw2 yes Clear no 15cm
W1 No No No 50cm
Storm/ Surface water used for factory
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes Clear NoThe Meter is
reading 0.8 10cm 2.1
Any reading
from Rt side
Sw2 yes Clear no 15cm
W1 Yes Red No 50cm
Discharge to river
clearStorm/ Surface water used for factory
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes Clear No 10cm
Sw2 yes Clear no 15cm 39,885
W1 Yes Red No 50cm
Discharge to river
clearStorm/ Surface water used for factory
Weather wet
River muddy
39,763
17.11.08Discharge to lagoon
coloured.
24.11.08Discharge to lagoon
coloured.
The Meter is
reading 0.9
0n left 0.0
reading in
centre 0.3 rt
2.1
39,620
10.11.08 Quarry Pump off
39,531
Storm/ Surface water used for factory
10.11.08
Quarry Pump on.
Discharge from lagoon
clear
38,93603.11.08 Quarry Pump off
The Meter is
reading 0.5
0n left 0.0
reading in
centre 0.0 rt
2.1
Good flow in
river. Poor
weather
condition
Kingscourt Bricks Ltd. Drumgill, Kingscourt, Co. Cavan IPC Reg. No. P0528-01 Annual Environmental Report 2008
Prepared by: Q.E.D. Engineering Ltd, M-TEK Building 2, Armagh Road, Monaghan Tel: 047 72060, Fax: 047 72061
11
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes Clear No 10cm
Sw2 yes Clear no 15cm 40,063
W1 nop no No 50cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes Clear No 10cm
Sw2 yes Clear no 15cm 40,183
W1 No no No 50cm
Week No Location Flow Colour Odour Comments Flow.MS-1.River
Height
River Width
in MtrComments
Water Pump
Meter M³.
Sw1 Yes Clear No 10cm
Sw2 yes Clear no 15cm 40,223
W1 No no No 50cm
Factory closed for winter
Storm/ Surface water used for factory
15.12.08 No Discharge
The Meter is
reading 0.7
0n left 0.0
reading in
centre 0.1 rt
2.1Weather wet
River Clear
Storm/ Surface water used for factory
08.12.08 No Discharge
The Meter is
reading 0.7
0n left 0.0
reading in
centre 0.1 rt
2.1Weather wet
River Clear
01.12.08 No Discharge
The Meter is
reading 0.7
0n left 0.0
reading in
centre 0.1 rt
2.1Weather wet