This rendering is for inspirational purposes only. Image does not reflect the actual BTS building on Research Drive. RESEARCH DRIVE HAVERHILL, MASSACHUSETTS NEW BUILD-TO-SUIT OPPORTUNITY NEW CONSTRUCTION UP TO ± 99,200 SF THE OPPORTUNITY CBRE is pleased to offer a unique opportunity to lease up to ±99,200 SF of build-to-suit space on Research Drive in Haverhill, Massachusetts. The proposed facility can accommodate up to 30 tailboard docks (1 per 3,300 SF) and a tremendous parking ratio of 2 per 1,000 SF. The property is located less than a mile from Interstate 495.

Upload: others

Post on 02-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • This rendering is for inspirational purposes only. Image does not reflect the actual BTS building on Research Drive.

    RESEARCH DRIVEH A V E R H I L L , M A S S A C H U S E T T S

    N E W B U I L D - T O - S U I T O P P O R T U N I T Y

    NEW

    CONSTRUCTION

    UP TO ±99,200 SF

    T H E O P P O R T U N I T Y

    CBRE is pleased to offer a unique opportunity to lease up to ±99,200 SF of build-to-suit space on Research Drive in Haverhill, Massachusetts. The proposed facility can accommodate up to 30 tailboard docks (1 per 3,300 SF) and a tremendous parking ratio of 2 per 1,000 SF. The property is located less than a mile from Interstate 495.

    MATT FUREYAssociate +1 617 912 6973 [email protected]

  • Total Building Size: ±99,200 SF

    Availability: ±41,600-99,200 SF

    − Office: To suit

    Clear Height: 32’ proposed

    Column Spacing: 40' x 40'

    Loading: 30 tailboard docks with levelers (1 per 3,300 SF)

    Parking: 103 spaces (2.0/1,000 SF)

    Land Size: ±6.5 acres

    Sprinkler: ESFR system

    Power: Ample

    Lighting: LED

    Utilities:

    − Water/Sewer: City of Haverhill

    − Gas/Electric: National Grid

    Roof: Rubber membrane

    Zoning: Industrial Business Park

    P R O P O S E D S P E C I F I C A T I O N S

  • F L O O R P L A N | ± 4 1 , 6 0 0 - 9 9 , 2 0 0 S F

    S I T E P L A N

    Sprinkler: ESFR system

    Power: Ample

    Lighting: LED

    Utilities:

    − Water/Sewer: City of Haverhill

    − Gas/Electric: National Grid

    Roof: Rubber membrane

    Zoning: Industrial Business Park

    PROPOSED COLD STORAGE FACILITYHAVERILL, MA 3980

    SITE PLAN

    SCHEME 1

    SD-7SCALE: 1" = 50'-0"

    103 PARKING SPACES

    12 LOADING DOCKS

    12 LOADING DOCKS

    18 LOADING DOCKS

    18 LOADING DOCKS103 PARKING SPACES

    57,600 SFTenant B

    41,600 SFTenant A

  • D I S T A N C E T O : Interstate 495: 0.5 miles Nashua, NH: 24 miles Boston, MA: 33 miles

    146

    18

    3

    495

    97

    STEVE CLANCYExecutive Vice President +1 617 912 7055 [email protected]

    RACHEL MARKSVice President +1 617 912 7009 [email protected]

    MATT FUREYAssociate +1 617 912 6973 [email protected]

    C O N T A C T S

    © 2019 CBRE, Inc. All rights reserved. This information has been obtained from sources believed reliable, but has not been verified for accuracy or completeness. You should conduct a careful, independent investigation of the property and verify all information. Any reliance on this information is solely at your own risk. Photos herein are the property of their respective owners. Use of these images without the express written consent of the owner is prohibited.

    CBRE and the CBRE logo are service marks of CBRE, Inc. All other marks displayed on this document are the property of their respective owners.

    JOHN WILSONExecutive Vice President +1 617 439 7811 [email protected]

    RESEARCH DRIVE