new commercial account - santee cooper · 2020. 9. 22. · exact service location (provide...

1
Yes - No Mondays - Fridays (Except Holidays) Apt/Unit/Lot # Zip Code State City Street Address No Yes Yes No No Yes All accounts require a deposit based on the two highest consecutive billing periods at the new service location, but no less than $200. The deposit will remain on the account for the life of the account. Business and Service Location Information Business Name: Type of Business: Have you ever had a business account with Santee Cooper? Service Start Date: If yes, what was the Account Number? New Service Address: Within City Limits?: Approximate square footage of building: sq. ft Previous Business at this location (if known): Daytime Telephone: Contact Name: Would you like to receive e-mails on our programs and services? Email Address: Exact Service Location (provide directions): Building Inspection Completed: Building Inspection is required for: 1. All new construction 2. Any changes to electrical service 3. All new commercial accounts & change of tenants Street Address Apt/Unit/Lot # City State Zip Code Mailing Address: Billing Location (if different than Service Location) Country Social Security #: Federal ID #: - - - I further understand that I may only change this rate once every 12 months. NOTE: Accounts disconnected prior to one year are subject to unfulfilled contract. In the event that my account is determined by Santee Cooper to need a demand meter (demand expected to exceed 50 KW in any three months of a 12 month period), I request to be billed on the following rate: (check one) General Service Seasonal (GV) General Service (GB) Name of Company Representative: Representative's Signature: Date: ACCOUNT ID: SA ID: I hereby apply to Santee Cooper for electric service in accordance with "Terms and Conditions" and applicable rate schedules. Copies may be obtained at retail offices or online at: www.santeecooper.com/CommRates All meter hubs need to be properly marked (e.g., unit number, lot number, street number, etc.). Santee Cooper is not responsible for marking meter bases. Meters will not be set in the meter bases that are known to be incorrectly marked or not marked at all. Terms and Conditions 1. One working day if only a meter is needed. 2. Two working days if only a meter and overhead service connection is needed. 3. Ten working days if installation of overhead service is needed. 4. Fourteen working days is installation of underground service is needed. Service Time Frame SC0921i (02/21/2019) (FS) Please select your Santee Cooper Retail Office for mailing information: Please complete the W-9 form and return with this application. NEW COMMERCIAL ACCOUNT

Upload: others

Post on 06-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NEW COMMERCIAL ACCOUNT - Santee Cooper · 2020. 9. 22. · Exact Service Location (provide directions): Building Inspection Completed: Building Inspection is required for: 1. All

Yes -No

Mondays - Fridays (Except Holidays)

Apt/Unit/Lot #

Zip CodeStateCity

Street Address

NoYes

Yes No

NoYes

All accounts require a deposit based on the two highest consecutive billing periods at the new service location, but no less than $200. The deposit will remain on the account for the life of the account.

Business and Service Location Information

Business Name: Type of Business:

Have you ever had a business account with Santee Cooper?Service Start Date: If yes, what was the

Account Number?

New Service Address:

Within City Limits?: Approximate square footage of building: sq. ft

Previous Business at this location (if known):

Daytime Telephone: Contact Name:

Would you like to receive e-mails on our programs and services?Email Address:

Exact Service Location (provide

directions):

Building Inspection Completed:

Building Inspection is required for: 1. All new construction 2. Any changes to electrical service 3. All new commercial accounts & change of tenants

Street Address Apt/Unit/Lot #

City State Zip CodeMailing Address:

Billing Location (if different than Service Location)

Country

Social Security #:

Federal ID #:

- -

-

I further understand that I may only change this rate once every 12 months.

NOTE: Accounts disconnected prior to one year are subject to unfulfilled contract.

In the event that my account is determined by Santee Cooper to need a demand meter (demand expected to exceed 50 KW in any three months of a 12 month period), I request to be billed on the following rate: (check one)

General Service Seasonal (GV)

General Service (GB)

Name of Company Representative:

Representative's Signature:

Date:

ACCOUNT ID:SA ID:

I hereby apply to Santee Cooper for electric service in accordance with "Terms and Conditions" and applicable rate schedules. Copies may be obtained at retail offices or online at: www.santeecooper.com/CommRates

All meter hubs need to be properly marked (e.g., unit number, lot number, street number, etc.). Santee Cooper is not responsible for marking meter bases. Meters will not be set in the meter bases that are known to be incorrectly marked or not marked at all.

Terms and Conditions

1. One working day if only a meter is needed. 2. Two working days if only a meter and overhead service connection is

needed. 3. Ten working days if installation of overhead service is needed. 4. Fourteen working days is installation of underground service is needed.

Service Time Frame

SC0921i (02/21/2019) (FS)

Please select your Santee Cooper Retail Office for mailing information:

Please complete the W-9 form and return with this application.

NEW COMMERCIAL ACCOUNT