NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

Upload: egbert-mckenzie

Post on 28-Dec-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

NEWCONSTRUCTION REGULATIONS

7 February 2014

Master Builders KwaZulu-Natal | masterbuilders.co.za

Page 2: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

HISTORIC OVERVIEW

1941 – Factories Building & Works Act 1983 – MOS Act1993 – OHS Act 2003 – Construction Regulations2014 – New Construction Regulations

Master Builders KwaZulu-Natal | masterbuilders.co.za

Page 3: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

OHS ActCONSTRUCTION REGULATIONS

What was new then? (2003) What is new now? (2014)

Master Builders KwaZulu-Natal | masterbuilders.co.za

Page 4: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

CONSTRUCTION REGULATIONS

“Agent”Person who acts as a representative of the client

Master Builders KwaZulu-Natal | masterbuilders.co.za

Page 5: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

CONSTRUCTION REGULATIONS

“Client”Person for whom the construction work is performed.

Master Builders KwaZulu-Natal | masterbuilders.co.za

Page 6: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

CONSTRUCTION REGULATIONS

“Contractor”Employer who performs construction work for the client and includes a principle contractor.

Master Builders KwaZulu-Natal | masterbuilders.co.za

Page 7: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

CONSTRUCTION REGULATIONS

“Competent Person”Person having the knowledge, training, experience and qualifications specific to the work.

Master Builders KwaZulu-Natal | masterbuilders.co.za

Page 8: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

CONSTRUCTION REGULATIONS

“Designer”Persons who prepare a design, checks and approves a design, an architect or engineer contribute to or responsible for a design, surveyor specifying specs, interior designer, shop-fitter or landscape architect.

Master Builders KwaZulu-Natal | masterbuilders.co.za

Page 9: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

CONSTRUCTION REGULATIONS

“Health and Safety Specification” (Client)

Documented specification of all OHS requirements pertaining to the associated construction work to ensure the health and safety of all persons.

Master Builders KwaZulu-Natal | masterbuilders.co.za

Page 10: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

CONSTRUCTION REGULATIONS

“Health and Safety Plan” (Contractor)

Documented plan which addresses hazards identified and include safe work procedures to mitigate reduce or control the hazards identified.

Master Builders KwaZulu-Natal | masterbuilders.co.za

Page 11: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

WHAT’S IS NEW NOW?

Page 12: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

“Construction Manager”

• Principal Contractor to appoint• Competent person – one per site

Page 13: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

“Construction Work Permit”

• Client to apply – 30 days before• 180 days, 1800 person days• CIDB 6 – R13M

Page 14: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

“Fall Risk”

• Any potential to fall from or into

Page 15: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

“Temporary Works”

• Falsework, formwork, supportwork, scaffold, shoring

Page 16: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

Scope of Application

“These regulations, shall apply to any persons involved in construction work.”

Page 17: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

Application for Permit

Client to apply for permit 30 days before intended construction Annexure 1 Site specific number Must be displayed at entrance of site

Page 18: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

Application for Permit (cont.)

Permit will only be issued if: Baseline risk assessment for project Site specific Health & Safety Specification

Page 19: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

Client Duties

Baseline Risk Assessment Project Specific OHS Specification Provide designer with OHS Specification Ensure designer take spec into

consideration Specification to be included in tender PC made adequate provision for OHS PC necessary competencies & resources

Page 20: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

Client Duties (Cont.)

PC is registered with compensation PC is registered with UIF Appoint PC in writing Approve PC OHS Plan (before

construction) Copy of PC OHS Plan available PC Plan implemented and maintained Regular Audits (at least 30)

Page 21: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

Client Duties (Cont.)

Provided PC copy of audit within 7 days Stop PC if not in accordance with OHS

Plan Notify PC of any changes & provide

recourses Report to DoL any incident resulted in a

fatality or permanent disability Full report on Incident Measures for improvement to be

implemented within 30 days.

Page 22: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

AGENT

Client must appoint OHS Agent 5(5) Client may appoint OHS Agent 5(6)

Agent registered with SACPCMP as Pr. CHSA

Agent act on behalf of the Client

Page 23: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

Management and Supervision

PC must appoint Construction Manager PC may appoint assistant Const. Manager

Const. Manager must appoint Supervisor Contractor may appoint assistant Supervisor

Contractor must appoint part time or full time Safety Officer (registered with SACPCMP)

Page 24: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

Fall Protection

Fall Risk Position (fall from or into) Plan must include the process for the

evaluation of the employees medical fitness necessary to work at a fall risk position

Rescue Plan No Physiological Evaluation required!

Page 25: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

Cranes

Risk assessment and method statement for Tower Cranes developed and applied.

Wind forces, Wind speed detection devices, Audible warning, Bearing capacity of ground

Page 26: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za

Medical Certificate of Fitness

Contractor must ensure all employees have a medical certificate of fitness specific to the work performed.

Issued by OHMP in the form of Annexure 3

Page 27: NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za