    Guide for Hull Survey for New Construction

    GUIDE FOR

    HULL SURVEY FOR NEW CONSTRUCTION

    AUGUST 2007 (Updated July 2011 see next page)

    American Bureau of Shipping

    Incorporated by Act of Legislature of

    the State of New York 1862

    Copyright 2007American Bureau of Shipping

    ABS Plaza

    16855 Northchase Drive

    Houston, TX 77060 USA

  • 8/3/2019 New Construction Survey Guide E-July11

    2/61

    Updates

    July 2011 consolidation includes:

    July 2010 version plus Notice No. 2 and Corrigenda/Editorials

    July 2010 consolidation includes:

    August 2007 version plus Notice No. 1

  • 8/3/2019 New Construction Survey Guide E-July11

    3/61

    ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 iii

    Foreword

    Foreword

    This Guide contains requirements obtained from IACS Unified Requirement, UR Z23 Hull Survey forNew Construction. For the convenience of the users, the various cross-references to the relevant ABS

    Rules and Guides are provided in addition to those for IACS documents. These IACS documents, UR, UI(Unified Interpretation) and Recommendation, are available from www.iacs.org.uk.

    (1 July 2010) The July 2010 update to this Guide incorporates the latest requirements of IACS UI SC234,

    UI LL76, and UI MPC96, regarding initial statutory surveys at new construction. Updates to IACS UR Z23are also incorporated.

    The effective date of this Guide is 1 January 2008 and it is applicable for vessels contracted for construction

    on or after 1 January 2008.

  • 8/3/2019 New Construction Survey Guide E-July11

    4/61

    iv ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007

    Table of Contents

    GUIDE FOR

    HULL SURVEY FOR NEW CONSTRUCTION

    CONTENTS

    1 Scope................................................................................................................... 1

    2 Definitions ........................................................................................................... 1

    2.1 Hull Structure ...................................................................................................1

    2.2 Documents.......................................................................................................12.3 Survey Methods...............................................................................................1

    3 Applications ........................................................................................................ 2

    3.1 Vessel Types....................................................................................................2

    3.2 Statutory Items.................................................................................................2

    3.3 Equipment, Fittings and Appendages..............................................................2

    3.4 Installation and Testing....................................................................................2

    3.5 Locations of Construction ................................................................................2

    4 Qualification and Monitoring of Personnel ...................................................... 2

    5 Survey of the Hull Structure .............................................................................. 3

    5.1 Items to be Surveyed.......................................................................................3

    5.2 Evidence of Survey of Materials and Equipment .............................................3

    6 Review of the Construction Facility .................................................................. 3

    7 Newbuilding Survey Planning ........................................................................... 4

    7.1 Kick-off Meeting ...............................................................................................4

    7.2 Administration and Statutory Requirements ....................................................4

    7.3 Update of Meeting Record...............................................................................4

    7.4 Shipbuilding Quality Standards........................................................................4

    7.5 Attendance by Other Parties............................................................................4

    7.6 Series Ship Production ....................................................................................48 Examination and Test Plan for Newbuilding Activities ................................... 4

    9 Proof of the Consistency of Surveys ................................................................ 5

    9.1 Compliance with Newbuilding Survey Planning...............................................5

    9.2 Audit .................................................................................................................5

    10 Ship Construction File ....................................................................................... 5

    10.1 Responsibility...................................................................................................5

    10.2 Documents to be Included...............................................................................5

  • 8/3/2019 New Construction Survey Guide E-July11

    5/61

    ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 v

    11 Initial Statutory Surveys at New Construction............................................... 23

    11.1 Scope.............................................................................................................23

    11.2 Definitions Used in the Survey Tables...........................................................23

    11.3 Application......................................................................................................23

    11.4 Interpretation of the Survey Requirements ....................................................2311.5 Qualification and Monitoring of Personnel.....................................................24

    11.6 Inspection and test plan for new building activities........................................24

    11.7 Product and Type Approval Certificates ........................................................24

    11.8 Proof of the Consistency of Surveys..............................................................24

    TABLE 1 ........................................................................................................................6

    APPENDIX 1 Survey Tables for Initial Statutory Surveys at New Construction ... 25

    1 Description........................................................................................25

    TABLE 1 Safety Equipment....................................................................26

    TABLE 2 Load Line ................................................................................39

    TABLE 3 MARPOL Annex 1...................................................................42

    APPENDIX 2 Shipyard Review Record ..................................................................... 48

    1 Details of Any Management Systems...............................................48

    2 Construction Facilities.......................................................................48

    2.1 Building Berth (B) or Dock (D) .......................................................48

    2.2 Outfitting Quays............................................................................. 482.3 Main Fabrication and Erection Facilities........................................ 49

    3 Shipyard Control of Qualified Welders..............................................50

    4 Feature of Construction Procedure...................................................50

    5 Quality Control System .....................................................................51

    6 Measures for Safety and Health .......................................................51

    7 Control System of Nondestructive Examination (NDE) ....................52

    8 Quality Control on Production Line...................................................53

    8.1 Preventive Measures for Misuse of Materials................................ 53

    8.2 Shot Blasting/Primer Coating ........................................................53

    8.3 Marking and Cutting (Assembly Work) .......................................... 548.4 Bending and Strain Free................................................................54

    8.5 Control of Welding Procedure ....................................................... 54

    8.6 Treatment of Serious Non-conformities......................................... 55

    8.7 Hydrostatic and Watertight Tests .................................................. 55

  • 8/3/2019 New Construction Survey Guide E-July11

    6/61

    This Page Intentionally Left Blank

  • 8/3/2019 New Construction Survey Guide E-July11

    7/61

    ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 1

    Guide for Hull Survey for New Construction

    1 Scope

    The scope of this Guide includes the following:

    i) Examination of the parts of the vessel covered by the Rules and by applicable statutory regulations

    for hull construction, to obtain appropriate evidence that they have been built in compliance withthe Rules and regulations, taking account of the relevant approved drawings.

    ii) Appraisal of the manufacturing, construction, control and qualification procedures, including welding

    consumables, weld procedures, weld connections and assemblies, with indication of relevant approvaltests.

    iii) Witnessing inspections and tests as required in the Rules applicable for ship construction, including

    materials, welding and assembling, specifying the items to be examined and/or tested and how(e.g., by hydrostatic, hose or leak testing, nondestructive examination, verification of geometry)

    and by whom.

    Appraisal of materials and equipment used for ship construction and their inspection at works is not included in

    this Guide. Details of requirements for hull and machinery steel forgings and castings and for normal and higher

    strength hull structural steel are given in Section 2-1-6, Section 2-1-5 and Sections 2-1-2 and 2-1-3, respectively,of the ABSRules for Materials and Welding (Part 2). Acceptance of these items is verified through the surveyprocess carried out at the manufacturers works and the issuing of the appropriate certificates.

    2 Definitions

    2.1 Hull Structure

    The hull structure is defined as follows:

    i) Hull envelope including all internal and external structures

    ii) Superstructures, deckhouses and casings

    iii) Welded foundations (e.g., main engine seatings)

    iv) Hatch coamings, bulwarks

    v) All penetrations fitted and welded into bulkheads, decks and shell

    vi) The fittings of all connections to decks, bulkheads and shell, such as air pipes and ship side valves all

    ILLC 1966, as amended, items

    vii) Welded attachments to shell, decks and primary members (e.g., crane pedestals, bitts and bollards),but only as regards their interaction on the hull structure

    2.2 Documents

    Referenceto documents also includes electronic transmission or storage.

    2.3 Survey Methods

    Definition of survey methods which the Surveyor is directly involved in: Patrol, Review and Witness:

    2.3.1 Patrol (1 July 2010)

    Patrolis the act of checking on an independent and unscheduled basis that the applicable processes,

    activities and associated documentation of the shipbuilding functions identified in Table 1 continue

    to conform to classification and statutory requirements.

  • 8/3/2019 New Construction Survey Guide E-July11

    8/61

    2 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007

    2.3.2 Review (1 July 2010)

    Review is the act of examining documents in order to determine traceability and identification andto confirm that processes continue to conform to classification and statutory requirements.

    2.3.3 Witness

    Witness is attendance of scheduled survey items as defined within the shipbuilding functions.

    3 Applications

    3.1 Vessel Types

    This Guide covers the survey of all new construction of steel vessels intended for classification and forinternational voyages except for:

    i) Those defined in SOLAS I/3

    ii) High speed craft as defined in Part 1, Section 1 of the ABS Guide for Building and Classing HighSpeed Craft

    iii) Mobile Offshore Drilling Units as defined in Section 1-1-3 of the ABS Rules forConditions ofClassification Offshore Units and Structures

    3.2 Statutory Items (1 July 2010)

    This Guide covers all statutory items relevant to the hull structure and coating (i.e., Load Line and SOLASSafety Construction).

    3.3 Equipment, Fittings and Appendages

    This Guide does not cover the manufacture of equipment, fittings and appendages, regardless of whether

    they are made inside or outside of the shipyard, examples being as follows. Evidence of acceptance shall beprovided by accompanying documentation from class Surveyor at manufacturer and verified at the shipyard :

    i) Hatch covers

    ii) Doors and ramps integral with the shell and bulkheads

    iii) Rudders and rudder stock

    iv) All forgings and castings integral to the hull

    3.4 Installation and Testing

    This Guide applies to the installation into the vessel, welding and testing of:

    i) The items listed in 3.3 above

    ii) Equipment forming part of the watertight and weathertight integrity of the vessel.

    3.5 Locations of Construction (1 July 2010)

    This Guide applies to the hull structures constructed and coatings applied at any of the following:

    i) Shipbuilders facilities

    ii) Subcontractors at the shipbuilders facilities

    iii) Subcontractors at their own facilities or at other remote locations

    4 Qualification and Monitoring of Personnel (1 July 2010)

    The Surveyors are to confirm through patrol, review and witness as defined in 2.3, that the vessels are built

    using approved plans in accordance with the relevant Rules and statutory requirements. The Surveyors are

    to be qualified to be able to carry out the tasks and procedures are to be in place to ensure that their activitiesare monitored. (See Section 1-1-6 of the ABSRules forConditions of Classification.)

  • 8/3/2019 New Construction Survey Guide E-July11

    9/61

    ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 3

    5 Survey of the Hull Structure

    5.1 Items to be Surveyed (1 July 2010)

    Table 1 provides a list of surveyable items for the hull structure and coating covered by this Guide, including:

    i) Description of the shipbuilding functions.

    ii) Classification and statutory survey requirements

    iii) Survey method required by the Rules for classification

    iv) Relevant IACS and statutory requirement references

    v) Documentation to be available for the Surveyor during construction.

    The shipbuilder is to provide the Surveyors access to documentation required for classification.This includes documentation retained by the shipbuilder or other third parties.

    The list of documents approved or reviewed by ABS for the specific new construction are asfollows:

    a) Plans and supporting documents

    b) Examination and testing plans

    c) NDE plans

    d) Welding consumable details

    e) Welding procedure specifications

    f) Welding plan or details

    g) Welders qualification records (See 2-4-3/7 of the ABSRules for Materials and Welding)

    h) NDE operators qualification records (See Section 1, subsection 5 of ABS Guide forNondesructive Inspection of Hull Welds)

    vi) Documents to be inserted into the ship construction file. Refer to Section 10 for details.

    vii) A list of specific activities which are relevant to the shipbuilding functions. This list is not exhaustiveand can be modified to reflect the construction facilities or specific vessel type.

    5.2 Evidence of Survey of Materials and Equipment

    Evidence is also to be made available, as required, by the shipbuilder, to the Surveyor whilst the construction

    process proceeds to prove that the material and equipment supplied to the vessel has been built ormanufactured under survey relevant to the Rules and statutory requirements.

    6 Review of the Construction Facility*

    (1 July 2010) ABS is to familiarize itself with the yards production facilities, management processes, and

    safety procedures for consideration in complying with the requirements of Table 1 prior to any steelwork orconstruction taking place in the following circumstances:

    i) Where ABS has no recent experience at the construction facilities (typically after a one year lapse)

    or when significant new infrastructure has been added

    ii) Where there has been a significant management or personnel restructuring having an impact onthe ship construction process

    iii) Or where the shipbuilder contracts to construct a vessel of a different type or substantially different

    in design

    * Note: Reference is made to Appendix 2, Shipyard Review Record, as an example.

  • 8/3/2019 New Construction Survey Guide E-July11

    10/61

    4 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007

    7 Newbuilding Survey Planning

    7.1 Kick-off Meeting (1 July 2010)

    Prior to commencement of surveys forany newbuilding project, ABS is to discuss with the shipbuilder at akick-off meeting the items listed in Table 1. The purpose of the meeting is to agree how the list of specific

    activities shown in Table 1 is to be addressed.

    The meeting is to take into account the shipbuilders construction facilities and vessel type including thelist of proposed subcontractors. A record of the meeting is to be made, based upon the contents of the

    Table (the Table can be used as the record with comments made into the appropriate column).

    If ABS has nominated a Surveyor for a specific newbuilding project, then the Surveyor is to attend thekick-off meeting. The builder is to be asked to agree to undertake ad hoc investigations during construction

    where areas of concern arise and to keep ABS advised of the progress of any investigation.

    Whenever an investigation is undertaken, the builder is to be requested, in principle, to agree to suspendrelevant construction activities if warranted by the severity of the problem.

    7.2 Administration and Statutory RequirementsThe records are to take note of specific published Administration requirements and interpretations ofstatutory requirements.

    7.3 Update of Meeting Record (1 July 2010)

    The shipyard shall be requested to advise of any changes to the activities agreed to at the kick off meetingand these are to be documented. (e.g., if the shipbuilder chooses to use or change subcontractors, or toincorporate any modifications necessitated by changes in production or inspection methods, Rules and

    regulations, structural modifications, or in the event where increased inspection requirements are deemednecessary as a result of a substantial non-conformance or otherwise).

    7.4 Shipbuilding Quality Standards (1 July 2011)

    Shipbuilding quality standards for the hull structure during new construction are to be reviewed and agreedduring the kick-off meeting. Structural fabrication is to be carried out in accordance with the latest versionof IACS Recommendation No. 47 Shipbuilding and Repair Quality Standard, or a recognized fabrication

    standard which has been accepted by ABS prior to the commencement of fabrication/construction. The workis to be carried out in accordance with the Rules and under ABS survey.

    7.5 Attendance by Other Parties

    The kick-off meeting may be attended by other parties, Owner, Administrations, etc., subject to agreement

    by the shipbuilder.

    7.6 Series Ship Production (1 July 2010)

    In the event of series ship production consideration may be given to waiving the requirement for a kickoffmeeting for the second and subsequent ships provided any changes are documented as required in 7.1.

    8 Examination and Test Plan for Newbuilding Activities (1 July 2010)

    The shipbuilder is to provide plans of the items which are intended to be examined and tested. These plansneed not be submitted for approval and examination at the time of the kick-off meeting. They are to include:

    i) Proposals for the examination of completed steelwork (generally referred to as the block plan) and

    are to include details of joining blocks together at the pre-erection and erection stages or at otherrelevant stages

    ii) Proposals for fit up examinations where necessary

    iii) Proposals for testing of the structure (leak and hydrostatic) as well as for all watertight and weathertightclosing appliances

  • 8/3/2019 New Construction Survey Guide E-July11

    11/61

    ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 5

    iv) Proposals for nondestructive examination

    v) Any other proposals specific to the vessel type or to the statutory requirements.

    The plans and any modifications to them are to be submitted to the Surveyors in sufficient time to allowreviewbefore the relevant survey activity commences.

    9 Proof of the Consistency of Surveys9.1 Compliance with Newbuilding Survey Planning

    ABS is to be able to provide evidence (e.g., through records, check lists, inspection and test records, etc.)that its Surveyors have complied with the requirements of the newbuilding survey planning and duly

    participated in the relevant activities shown in the shipbuilders examination and test plans.

    9.2 Audit

    For audit purposes, the information specified in 9.1 is to be made available.

    10 Ship Construction File

    10.1 Responsibility

    The shipbuilder is to deliver documents for the Ship Construction File. In the event that items have beenprovided by another party such as the Owner, and where separate arrangements have been made for documentdelivery which excludes the shipbuilder, that party has the responsibility.

    10.2 Documents to be Included

    It is recognized that the purpose of documents held in the Ship Construction File onboard the vessel, is tofacilitate inspection (survey) and repair and maintenance, and, therefore, is to include in addition to documentslisted in Table 1, but not be limited to:

    i) As-built structural drawings including scantling details, material details, and, as applicable, wastageallowances, location of butts and seams, cross section details and locations of all partial and fullpenetration welds, areas identified for close attention and rudders [Section 7-3-2 of the ABSRulesfor Survey After Construction (Part 7) for Hull Surveys]

    ii) Manuals required for classification and statutory requirements (e.g., loading and stability, bowdoors and inner doors and side shell doors and stern doors operations and maintenance manuals)[3-2-16/27 of the ABSRules for Building and Classing Steel Vessels]

    iii) Ship structure access manual, as applicable

    iv) Copies of certificates of forgings and castings welded into the hull [Sections 2-1-6 and Section2-1-5 of the ABSRules for Materials and Welding (Part 2)]

    v) Details of equipment forming part of the watertight and weathertight integrity of the vessel

    vi) Tank testing plan including details of the test requirements [Section 3-7-1 of the ABS Rules forBuilding and Classing Steel Vessels]

    vii) Corrosion protection specifications [3-2-18/5 of the ABS Rules for Building and Classing SteelVessels]

    viii) Details for the in-water survey, if applicable, information for divers, clearances measurementsinstructions, etc., tank and compartment boundaries [Appendix 7-A-1 of the ABSRules for Survey

    After Construction (Part 7)]

    ix) Docking plan and details of all penetrations normally examined at drydocking [3-1-2/11 and 3-2-2/7of the ABSRules for Building and Classing Steel Vessels and Section 7-4-1 of the ABSRules forSurvey After Construction (Part 7)]

    x) Coating Technical File, for vessels subject to compliance with the IMO Coating PerformanceStandard (PSPC) as a class requirement under the IACS Common Structural Rules. [Section 6 ofthe ABS Guide for The Class Notation Coating Performance Standard (CPS)]

  • 8/3/2019 New Construction Survey Guide E-July11

    12/61

    TABLE

    1(1

    July2011)

    Reference

    Shipbuilding

    Function

    Survey

    Requirements

    for

    Classification

    SurveyMethod

    Requiredfor

    Classification

    ABS

    Rules/Guide(1)

    [IACS

    Reference

    (2,3)]

    Statutory

    Requirements

    andRelevant

    Reference

    Documentation

    Availableto

    Classification

    Surveyorduring

    Construction

    Documentation

    forShip

    Construction

    File

    Specific

    Activities

    ABS

    Proposalsfor

    theProject

    Shipbu

    ildingQualityControlFunction

    1

    Welding

    .1Identify

    consumables

    againstapproved

    list

    .2Verifytemporary

    andpermanent

    storagefacilities

    e.g.,keptdry,

    covered,

    andwhere

    applicable,

    heated

    1.1

    Welding

    Consumables

    Approved

    separatelyatthe

    manufacturer

    Reviewapproval

    statusand

    patrol,verify

    storage,

    handlingand

    treatmentin

    accordancewith

    manufacturer's

    requirements

    Appendix2of

    theRulesfor

    Materialsand

    Welding(Part2

    )

    [URW17]

    Consumable

    specification

    andapproval

    status

    Notrequired

    .3Verifytraceability

    e.g.,random

    batchnumber

    checking

    .1Verifywelder

    qualification

    standard,

    e.g.,classor

    recognized

    standardapprova

    l

    .2Verifywelder

    approvedfor

    weldposition

    1.2

    Welder

    Qualification

    Qualified

    welders

    Reviewofwelder

    certificationand

    patrol

    [Recommend-

    ation47]

    Shipyards

    recordswith

    individual's

    identification

    Notrequired

    .3Verifyvalidity

    ofqualification

    certificate

    6 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007

  • 8/3/2019 New Construction Survey Guide E-July11

    13/61

    TABLE1(con

    tinue

    d)(1

    July2011)

    Reference

    Shipbuilding

    Function

    Survey

    Requirements

    for

    Classification

    SurveyMethod

    Requiredfor

    Classification

    ABS

    Rules/Guide(1)

    [IACS

    Reference

    (2,3)]

    Statutory

    Requirements

    andRelevant

    Reference

    Documentation

    Availableto

    Classification

    Surveyorduring

    Construction

    Documentation

    forShip

    Construction

    File

    Specific

    Activities

    ABS

    Proposalsfor

    theProject

    Allweldjoint

    configurations

    ,

    positionsand

    materialstobe

    coveredbywe

    ld

    procedures

    approvedby

    ABSorby

    anotherIACS

    member

    available

    .1Verifyweld

    procedures

    recordshave

    beenapproved

    andcoverall

    weldprocesses

    andpositionsin

    accordancewith

    classificationor

    recognized

    standards.

    .2Verifyprocedure

    s

    areavailable

    atrelevant

    workstations

    1.3

    Welding

    Mechanical

    Properties

    (Welding

    Procedures)

    ABSwitnesses

    allnewweld

    procedure

    qualification

    testscarriedout

    intheshipyard

    wheneverABS

    issurveyingin

    theshipyard

    Reviewand

    patrol

    2-4-3/5ofthe

    Rulesfor

    Materialsand

    Welding(Part2

    )

    [URW28]

    Approvedweld

    procedure

    specification

    andwelding

    planrelevantto

    thevessel

    projector

    process

    Notrequired

    .3Verifyweld

    proceduresare

    availableforthe

    Surveyors

    reference

    .1Verifycondition

    ofmachinery

    andequipment.

    .2Verifymachines

    arecalibratedby

    appropriatestaf

    f

    .3Verifycalibration

    carriedoutin

    accordancewith

    manufacturer's

    recommendation

    s

    1.3a

    Welding

    Equipment

    Correctly

    calibratedand

    maintained

    Patroland

    review

    Shipbuilders

    maintenanceand

    calibration

    records

    Notrequired

    .4Verifycalibration

    inaccordance

    withmaintenance

    schedule

    ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 7

  • 8/3/2019 New Construction Survey Guide E-July11

    14/61

    TABLE1(con

    tinue

    d)(1

    July2011)

    Reference

    Shipbuilding

    Function

    Survey

    Requirements

    for

    Classification

    SurveyMethod

    Requiredfor

    Classification

    ABS

    Rules/Guide(1)

    [IACS

    Reference

    (2,3)]

    Statutory

    Requirements

    andRelevant

    Reference

    Documentation

    Availableto

    Classification

    Surveyorduring

    Construction

    Documentation

    forShip

    Construction

    File

    Specific

    Activities

    ABS

    Proposalsfor

    theProject

    .1Verifywelding

    areasclean,dry

    ,

    welllit.

    .2Confirmrelevan

    t

    measurestaken

    foranypreor

    postheat

    treatment,drying

    ofsurfacesprior

    towelding

    1.3b

    Welding

    Environment

    Satisfactory

    environment

    Patrol

    [Recommend-

    ation47]

    Notrequired

    .3Confirmshieldin

    g

    gases,fluxes

    protected

    1.3c

    Welding

    Supervision

    Sufficientnumber

    ofskilled

    supervisors

    Patrol

    Pub#14:

    Guidefor

    Nondestructive

    Inspectionof

    HullWelds

    [Recommend-

    ation20and47]

    .1Verify

    supervisionis

    effective

    .1Identify

    workstations

    whereNDEis

    carriedout,e.g.,

    panellinebutt

    welds,castings

    intohullstructure

    1.4

    Welding

    Surface

    Discontinuities

    Substantially

    freefrom

    significant

    indications,

    satisfactory

    profileandsiz

    e

    Visual

    examination,

    surfacedetection

    techniques,

    reviewof

    documentsand

    patrolofoperator

    Pub#14:

    Guidefor

    Nondestructive

    Inspectionof

    HullWelds

    [Recommend-

    ation20and47]

    Shipbuilders

    andrecognized

    standardsand

    Rulesas

    applicable,

    weldingand

    NDEplans,NDE

    reports,operator

    qualifications

    Notrequired

    .2VerifyNDE

    carriedoutin

    accordancewith

    approvedplans

    whereapplicable

    8 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007

  • 8/3/2019 New Construction Survey Guide E-July11

    15/61

    TABLE1(con

    tinue

    d)(1

    July2011)

    Reference

    Shipbuilding

    Function

    Survey

    Requirements

    for

    Classification

    SurveyMethod

    Requiredfor

    Classification

    ABS

    Rules/Guide(1)

    [IACS

    Reference

    (2,3)]

    Statutory

    Requirements

    andRelevant

    Reference

    Documentation

    Availableto

    Classification

    Surveyorduring

    Construction

    Documentation

    forShip

    Construction

    File

    Specific

    Activities

    ABS

    Proposalsfor

    theProject

    .3Verify

    suitabilityof

    NDEmethods

    .4Verifyoperators

    suitablyqualified

    particularlywhere

    sub-contractors

    havebeen

    employed

    .5VerifyNDEis

    carriedout

    accordingtothe

    acceptable

    process

    1.4

    Welding

    Surface

    Discontinuities

    (contd)

    Substantially

    freefrom

    significant

    indications,

    satisfactory

    profileandsiz

    e

    Visual

    examination,

    surfacedetection

    techniques,

    reviewof

    documentsand

    patrolofoperator

    Pub#14:

    Guidefor

    Nondestructive

    Inspectionof

    HullWelds

    [Recommend-

    ation20and47]

    Shipbuilders

    andrecognized

    standardsand

    Rulesas

    applicable,

    weldingand

    NDEplans,NDE

    reports,operator

    qualifications

    Notrequired

    .6ReviewNDE

    records

    .1Identify

    workstations

    whereNDEis

    carriedout,e.g.

    panellinebutt

    welds,castings

    intohullstructure

    .2VerifyNDE

    carriedoutin

    accordancewith

    approvedplans

    whereapplicable

    .3Verifysuitability

    ofNDEmethod

    s

    1.5

    Welding

    Embedded

    Discontinuities

    NDEistobe

    carriedoutby

    qualified

    operatorscapab

    le

    ofensuringthat

    weldsare

    substantiallyfree

    fromsignificant

    indications

    Radiography

    andultrasonic

    testing,review

    ofdocuments

    andpatrolof

    operator,

    examinationof

    films

    Pub#14:

    Guidefor

    Nondestructive

    Inspectionof

    HullWelds

    [Recommend-

    ation20and47]

    Shipbuilders

    andrecognized

    standardsand

    Rulesas

    applicable,

    weldingand

    NDEplans,

    NDEreports,

    operator

    qualifications

    Notrequired

    .4Verifyoperators

    suitablyqualified

    particularlywhere

    sub-contractors

    havebeen

    employed

    ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 9

  • 8/3/2019 New Construction Survey Guide E-July11

    16/61

    TABLE1(con

    tinue

    d)(1

    July2011)

    Reference

    Shipbuilding

    Function

    Survey

    Requirements

    for

    Classification

    SurveyMethod

    Requiredfor

    Classification

    ABS

    Rules/Guide(1)

    [IACS

    Reference

    (2,3)]

    Statutory

    Requirements

    andRelevant

    Reference

    Documentation

    Availableto

    Classification

    Surveyorduring

    Construction

    Documentation

    forShip

    Construction

    File

    Specific

    Activities

    ABS

    Proposalsfor

    theProject

    .5Verifythat

    recordshave

    beencompleted

    andinaccordanc

    e

    withrecognized

    standards,

    e.g.IQIand

    sensitivity

    recorded

    .6Verifythatreports

    andradiographs

    havebeen

    evaluated

    correctlybythe

    shipbuilder.

    Systematic

    reviewof

    radiographs

    carriedoutby

    theSurveyor

    .7Verifyequipmen

    t

    calibration

    satisfactoryandin

    accordancewith

    manufacturers

    andrecognized

    standards

    requirements

    1.5(cont

    d.)

    Welding

    Embedded

    Discontinuities

    (contd.)

    NDEistobe

    carriedoutby

    qualified

    operatorscapab

    le

    ofensuringthat

    weldsare

    substantiallyfree

    fromsignificant

    indications

    Radiography

    andultrasonic

    testing,review

    ofdocuments

    andpatrolof

    operator,

    examinationof

    films

    Pub#14:

    Guidefor

    Nondestructive

    Inspectionof

    HullWelds

    [Recommend-

    ation20and47]

    Shipbuilders

    andrecognized

    standardsand

    Rulesas

    applicable,

    weldingand

    NDEplans,

    NDEreports,

    operator

    qualifications

    Notrequired

    .8VerifyNDEis

    carriedout

    accordingto

    theacceptable

    process

    10 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007

  • 8/3/2019 New Construction Survey Guide E-July11

    17/61

    TABLE1(con

    tinue

    d)(1

    July2011)

    Reference

    Shipbuilding

    Function

    Survey

    Requirements

    for

    Classification

    SurveyMethod

    Requiredfor

    Classification

    ABS

    Rules/Guide(1)

    [IACS

    Reference

    (2,3)]

    Statutory

    Requirements

    andRelevant

    Reference

    Documentation

    Availableto

    Classification

    Surveyorduring

    Construction

    Documentation

    forShip

    Construction

    File

    Specific

    Activities

    ABS

    Proposalsfor

    theProject

    2

    SteelPreparationandFitUp:

    .1Verifystockyard

    storage

    satisfactory

    .2Verifymaterial

    traceability,e.g.

    stamping

    identification

    againstmaterial

    certification,

    archivingof

    records

    .3Verifytransfer

    markingafter

    treatmentline

    .4Verifystandard

    ofshotblasting

    andpriming

    .5Verifysuitability

    ofprimer

    .6Verifythatsteel

    gradescanbe

    identified

    .7Verifymachinery

    adjustedto

    maintainwithin

    IACSor

    manufacturers

    recommendation

    s

    .8Verifyaccuracy

    ofmarkingand

    cutting

    2.1

    Surface

    Preparation,

    Markingand

    Cutting

    Traceabilityand

    acceptabilityo

    f

    material,check

    ofsteelplates

    &

    profilesmateria

    ls

    type,scantling

    identification,

    testingmarks

    Patrol

    [Recommend-

    ation47]

    Material

    certificates,

    shipbuilder's

    marking/cutting

    production

    documentsatthe

    workstage-

    documents

    retainedatthe

    facility

    Notrequired

    .9Verifystorage

    ofpieceparts.

    ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 11

  • 8/3/2019 New Construction Survey Guide E-July11

    18/61

    TABLE1(con

    tinue

    d)(1

    July2011)

    Reference

    Shipbuilding

    Function

    Survey

    Requirements

    for

    Classification

    SurveyMethod

    Requiredfor

    Classification

    ABS

    Rules/Guide(1)

    [IACS

    Reference

    (2,3)]

    Statutory

    Requirements

    andRelevant

    Reference

    Documentation

    Availableto

    Classification

    Surveyorduring

    Construction

    Documentation

    forShip

    Construction

    File

    Specific

    Activities

    ABS

    Proposalsfor

    theProject

    .1Verifythat

    straightening

    processesare

    approvedforthe

    gradeandtype

    ofsteel,e.g.,

    tmcp,z-plate.

    2.2

    Straightening

    Approvalof

    straightening

    methods/

    procedures

    against

    deformation

    Patroland

    review

    [Recommend-

    ation47]

    Recognized

    standards,

    approved

    procedures

    Notrequired

    2.Verifythatplates

    andsectionsare

    withinrecognized

    tolerances

    .1Verifythat

    temperature

    controlis

    exercisedbythe

    operator

    .2Verifythat

    suitablemethods

    oftemperature

    controlare

    availablewhen

    formingspecial

    steelsand

    materials

    2.3

    Forming

    Maintainmaterial

    properties.

    Acceptanceof

    formingmethod

    againstunprop

    er

    deformations

    Patrol

    [Recommend-

    ation47]

    Shipbuilders

    procedurefor

    hotforming

    Notrequired

    .3Verifythat

    formingprocesses

    areacceptable

    2.4

    Conformitywith

    Alignment/Fit

    Up/GapCriteria

    Checkalignme

    nt/

    fitup/gapagain

    st

    reference

    standards

    Patrol

    [Recommend-

    ation47]

    Shipbuilders

    andrecognized

    standardsand

    Rulesas

    applicable

    Notrequired

    .1Verifythe

    processesto

    ensure

    satisfactoryfitup

    andalignmentat

    allworkstations

    12 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007

  • 8/3/2019 New Construction Survey Guide E-July11

    19/61

    TABLE1(con

    tinue

    d)(1

    July2011)

    Reference

    Shipbuilding

    Function

    Survey

    Requirements

    for

    Classification

    SurveyMethod

    Requiredfor

    Classification

    ABS

    Rules/Guide(1)

    [IACS

    Reference

    (2,3)]

    Statutory

    Requirements

    andRelevant

    Reference

    Documentation

    Availableto

    Classification

    Surveyorduring

    Construction

    Documentation

    forShip

    Construction

    File

    Specific

    Activities

    ABS

    Proposalsfor

    theProject

    .2Verify

    thatedge

    preparationsare

    re-instated

    wherelost

    duringfitting

    operations

    2.4(contd)

    Conformitywith

    Alignment/Fit

    Up/GapCriteria

    Checkalignme

    nt/

    fitup/gapagain

    st

    reference

    standards

    Patrol

    [Recommend-

    ation47]

    Shipbuilders

    andrecognized

    standardsand

    Rulesas

    applicable

    Notrequired

    .3Verifyremedial

    proceduresare

    inplaceto

    compensatefor

    widegapsand

    alignment

    deviations

    .1Verifythatthe

    information

    relevanttothe

    latestapproved

    drawingsis

    availableatthe

    workstations

    .2Verifythe

    processesto

    ensure

    satisfactoryfitup

    andalignmentat

    allworkstations

    2.5

    Conformityfor

    CriticalAreas

    withAlignment/

    FitUporWeld

    Configuration

    Checkalignme

    nt/

    fitup/gapagainst

    approved

    drawings

    Patroland

    review

    [Recommend-

    ation47]

    Shipbuilders

    andrecognized

    standardsand

    Rulesas

    applicable,

    approvedplanor

    standard,

    builder'srecords

    Approvedplans

    ofcriticalareas

    ifapplicable

    .3Verifythatedge

    preparationsare

    re-instatedwhere

    lostduringfitting

    operations

    ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 13

  • 8/3/2019 New Construction Survey Guide E-July11

    20/61

    TABLE1(con

    tinue

    d)(1

    July2011)

    Reference

    Shipbuilding

    Function

    Survey

    Requirements

    for

    Classification

    SurveyMethod

    Requiredfor

    Classification

    ABS

    Rules/Guide(1)

    [IACS

    Reference

    (2,3)]

    Statutory

    Requirements

    andRelevant

    Reference

    Documentation

    Availableto

    Classification

    Surveyorduring

    Construction

    Documentation

    forShip

    Construction

    File

    Specific

    Activities

    ABS

    Proposalsfor

    theProject

    2.5(contd)

    Conformityfor

    CriticalAreas

    withAlignment/

    FitUporWeld

    Configuration

    Checkalignme

    nt/

    fitup/gapagainst

    approved

    drawings

    Patroland

    review

    [Recommend-

    ation47]

    Shipbuilders

    andrecognized

    standardsand

    Rulesas

    applicable,

    approvedplanor

    standard,

    builder'srecords

    Approvedplans

    ofcriticalareas

    ifapplicable

    .4Verifyremedial

    procedures

    areinplaceto

    compensatefor

    widegapsand

    alignment

    deviations

    .1Verifythatthe

    information

    relevanttothe

    latestapproved

    drawingsis

    availableatthe

    workstations

    .2Verifythatcorrect

    weldsizeshave

    beenadopted

    .3Verifyoperation

    ofthewelding

    processesatthe

    differentwork

    stagesis

    satisfactory

    .4Verifythatpiec

    e

    partsare

    identifiable

    3

    Steelwork

    Process,(e.g.,sub

    assembly,block,

    grandandmega

    blockassembly,

    pre-erectionand

    erection,closing

    plates)

    Compliance

    withapproved

    drawings,visu

    al

    examinationof

    weldingand

    material,check

    alignmentand

    deformations

    Patrolofthe

    processand

    witnessofthe

    completeditem

    [Recommend-

    ation47]

    Approvedplans,

    shipbuilders

    inspection

    records,

    Shipbuilders

    andrecognized

    standardsand

    Rulesas

    applicable,

    construction

    plan(steelwork

    subdivision)

    .5Verifythatfit

    upsarewithin

    recognized

    tolerances

    14 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007

  • 8/3/2019 New Construction Survey Guide E-July11

    21/61

    TABLE1(con

    tinue

    d)(1

    July2011)

    Reference

    Shipbuilding

    Function

    Survey

    Requirements

    for

    Classification

    SurveyMethod

    Requiredfor

    Classification

    ABS

    Rules/Guide(1)

    [IACS

    Reference

    (2,3)]

    Statutory

    Requirements

    andRelevant

    Reference

    Documentation

    Availableto

    Classification

    Surveyorduring

    Construction

    Documentation

    forShip

    Construction

    File

    Specific

    Activities

    ABS

    Proposalsfor

    theProject

    .6Verifythat

    correctwelding

    requirements

    specifiedin

    reference1of

    thistablehave

    beenadopted

    .7Verifyprocesse

    s

    forclosing

    plates,etc.,are

    acceptable

    3(contd)

    Steelwork

    Process,(e.g.,sub

    assembly,block,

    grandandmega

    blockassembly,

    pre-erectionand

    erection,closing

    plates)

    (contd)

    Compliance

    withapproved

    drawings,visu

    al

    examinationof

    weldingand

    material,check

    alignmentand

    deformations

    Patrolofthe

    processand

    witnessofthe

    completeditem

    [Recommend-

    ation47]

    Approvedplans,

    shipbuilders

    inspection

    records,

    Shipbuilders

    andrecognized

    standardsand

    Rulesas

    applicable,

    construction

    plan(steelwork

    subdivision)

    .8Confirmthat

    steelworkisin

    accordancewith

    theapprovedplan

    .1Verifythat

    recordshave

    beenmaintained

    ofsignificant

    deviationsfrom

    theapproved

    plans,for

    situationssuch

    asmis-cut

    openings,

    re-routingoutfit

    items

    4

    RemedialWork

    andAlteration

    Welding,chec

    k

    against

    deformation,

    alignment

    Reviewrecords

    andwitness

    [Recommend-

    ation47]

    Permanentrecord

    ofshipyard

    surveyableitem

    .2Verifythatall

    deviations

    broughttothe

    attentionofABS

    bytheshipbuilde

    r

    areacceptable

    ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 15

  • 8/3/2019 New Construction Survey Guide E-July11

    22/61

    TABLE1(con

    tinue

    d)(1

    July2011)

    Reference

    Shipbuilding

    Function

    Survey

    Requirements

    for

    Classification

    SurveyMethod

    Requiredfor

    Classification

    ABS

    Rules/Guide(1)

    [IACS

    Reference

    (2,3)]

    Statutory

    Requirements

    andRelevant

    Reference

    Documentation

    Availableto

    Classification

    Surveyorduring

    Construction

    Documentation

    forShip

    Construction

    File

    Specific

    Activities

    ABS

    Proposalsfor

    theProject

    .1Confirmthattank

    testingiscarried

    outinaccordanc

    e

    withtheapproved

    plan

    .2Confirmthe

    methodsusedto

    carryoutleak

    testing

    .3Confirmthat

    correcttest

    pressures

    maintainedfor

    leak,hoseand

    hydroandhydro

    -

    pneumatictesting

    issatisfactory

    5

    Tightness

    Testing,

    includingleak

    andhosetesting,

    hydropneumatic

    testing

    Absenceof

    leaks

    Patrolofthe

    processand

    witnessofthe

    test

    Section3-7-1of

    theRulesfor

    Buildingand

    ClassingSteel

    Vessels

    [URS14]

    Reg.II-1/14of

    SOLASas

    amended

    Approvedtank

    testingplan,

    shipbuilders

    inspection

    records

    Approvedtank

    testingplan

    .4Verifythat

    adequaterecords

    ofthetanktesting

    havebeen

    maintained

    .1Confirmthattank

    testingiscarried

    outinaccordanc

    e

    withtheapproved

    plan

    6

    Structural

    Testing

    Structural

    adequacyofth

    e

    design

    Witnesstesting

    Section3-7-1of

    theRulesfor

    Buildingand

    ClassingSteel

    Vessels

    [URS14]

    Reg.II-1/14of

    SOLASas

    amended

    Approvedtank

    testingplan,

    shipbuilders

    inspection

    records

    Approvedtank

    testingplan

    .2Confirmthat

    correcttest

    pressures

    maintainedfor

    testingis

    satisfactory

    16 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007

  • 8/3/2019 New Construction Survey Guide E-July11

    23/61

    TABLE1(con

    tinue

    d)(1

    July2011)

    Reference

    Shipbuilding

    Function

    Survey

    Requirements

    for

    Classification

    SurveyMethod

    Requiredfor

    Classification

    ABS

    Rules/Guide(1)

    [IACS

    Reference

    (2,3)]

    Statutory

    Requirements

    andRelevant

    Reference

    Documentation

    Availableto

    Classification

    Surveyorduring

    Construction

    Documentation

    forShip

    Construction

    File

    Specific

    Activities

    ABS

    Proposalsfor

    theProject

    6(contd)

    Structural

    Testing

    (contd)

    Structural

    adequacyofth

    e

    design

    Witnesstesting

    Section3-7-1of

    theRulesfor

    Buildingand

    ClassingSteel

    Vessels

    [URS14]

    Reg.II-1/14of

    SOLASas

    amended

    Approvedtank

    testingplan,

    shipbuilders

    inspection

    records

    Approvedtank

    testingplan

    .3Verifythat

    adequaterecords

    ofthetanktesting

    havebeen

    maintained

    .1Verifythat

    appliedcoatings

    areapproved

    andreview

    recordsof

    application

    (1July2010)

    Corrosion

    Protection

    Systems(e.g.,

    coatings,

    cathodic

    protection,

    impressed

    current)except

    forcoating

    systemsubject

    toPSPC

    Saltwaterballa

    st

    tankswith

    boundaries

    formedbythe

    hullenvelope,

    andalsobulk

    carrierhold

    internalsurfaces,

    coamingsand

    hatchcovers

    shallhavean

    efficient

    protective

    coating.Safety

    aspectsof

    cathodicsystem

    s

    tobedealtwith

    separately.

    Reviewand

    reporton

    builder'sand

    manufacturer's

    documentation

    3-2-18/5ofthe

    RulesforBuilding

    andClassing

    SteelVessels

    [URZ8andZ9,

    UISC122,

    URF1]

    Reg.II-1/3-2of

    SOLASas

    amended

    Manufacturers

    andbuilders

    specification

    Corrosion

    protection

    specifications

    .2Verifythat

    adequate

    recordshave

    beenmaintained

    andcopiedto

    theshipfile

    7

    (1July2010)

    Applicationof

    Antifouling

    Systems

    Review

    AFSConvention

    Painting

    Specification

    Paint

    Specification

    andMfg.

    Declaration

    .3Verifythat

    adequaterecords

    havebeen

    maintainedand

    copiedtotheship

    constructionfile.

    ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 17

  • 8/3/2019 New Construction Survey Guide E-July11

    24/61

    TABLE1(con

    tinue

    d)(1

    July2011)

    Reference

    Shipbuilding

    Function

    Survey

    Requirements

    for

    Classification

    SurveyMethod

    Requiredfor

    Classification

    ABS

    Rules/Guide(1)

    [IACS

    Reference

    (2,3)]

    Statutory

    Requirements

    andRelevant

    Reference

    Documentation

    Availableto

    Classification

    Surveyorduring

    Construction

    Documentation

    forShip

    Construction

    File

    Specific

    Activities

    ABS

    Proposalsfor

    theProject

    7.1(1July

    2010

    )

    Applicationof

    Protective

    Coatingsfor

    Dedicated

    SeawaterBallast

    Tanksinall

    TypesofShips

    andDouble-Side

    SkinSpacesof

    BulkCarriers

    subjecttoPSPC

    Monitor

    implementatio

    n

    ofthecoating

    inspection

    requirements.

    Patrollingand

    Review

    UISC223,PR3

    4

    Reg.II-1/3-2of

    SOLASas

    amended;

    Coating

    Standard

    Coating

    TechnicalFile

    .1Verifythat

    appliedcoatings

    areapproved

    andreview

    recordsof

    applicationin

    accordancewith

    Chapter7of

    Annexto

    MSC.215(82).

    8

    Installation,WeldingandTestingoftheFollowing:

    .1Confirmleaktes

    t

    ofhatchcovers

    8.1

    HatchCovers

    Tightnessand

    securing

    Witness

    Section3-7-1of

    theRulesfor

    Buildingand

    ClassingSteel

    Vessels

    [URS14]

    Reg.13-14-15

    and16ofILLC

    '66

    Approvedtank

    testingplan,

    shipbuilders

    inspection

    records

    Detailsrequired,

    structural

    drawings

    .2Confirm

    operationand

    securingtest

    .1Confirmleaktest

    .2Confirm

    operationand

    securingtest

    .3Confirmsafety

    deviceoperation

    8.2

    Doorsand

    RampsIntegral

    withtheShell

    andBulkheads

    Tightnessand

    securing

    Witness

    Section3-7-1of

    theRulesfor

    Buildingand

    ClassingSteel

    Vessels

    [URS14]

    Reg.II-1/18of

    SOLASas

    amended;Reg.

    12and21of

    ILLC'66

    Approvedtank

    testingplan,

    shipbuilders

    inspection

    records

    Detailsrequired

    .4Ensurecorrect

    maintenance

    logs/manuals

    suppliedwiththe

    shipconstruction

    file

    18 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007

  • 8/3/2019 New Construction Survey Guide E-July11

    25/61

    TABLE1(con

    tinue

    d)(1

    July2011)

    Reference

    Shipbuilding

    Function

    Survey

    Requirements

    for

    Classification

    SurveyMethod

    Requiredfor

    Classification

    ABS

    Rules/Guide(1)

    [IACS

    Reference

    (2,3)]

    Statutory

    Requirements

    andRelevant

    Reference

    Documentation

    Availableto

    Classification

    Surveyorduring

    Construction

    Documentation

    forShip

    Construction

    File

    Specific

    Activities

    ABS

    Proposalsfor

    theProject

    .1Confirm

    alignmentand

    mountingand

    fittinguptothe

    connectionto

    thetiller

    .2Confirmfunction

    test

    .3Verifyfittingof

    pintlesandall

    securingbolts

    8.3

    Rudders

    Fitting

    Witness

    Section3-7-1of

    theRulesfor

    Buildingand

    ClassingSteel

    Vessels

    [URS14]

    Approvedplan,

    shipbuilders

    inspection

    records

    Detailsrequired,

    structural

    drawings

    .4Verifyallfitup

    recordsincluding

    allclearances

    maintainedand

    placedintoship

    constructionfile

    .1Verifycasting

    andforgings

    againstmaterial

    certificate

    .2Verifythatcorrect

    weldingandfit

    uprequirements

    specifiedin

    reference1,2.4

    and2.5ofthis

    tablehavebeen

    adopted

    8.4

    Forgingsand

    Castings

    Compliance

    withapproved

    drawings,visu

    al

    examinationof

    weldingand

    material,check

    alignmentand

    deformations

    withapproved

    drawings,visu

    al

    examinationof

    weldingand

    material,check

    alignmentand

    deformations

    Patrolofthe

    processand

    witnessofthe

    completeditem

    Sections2-1-6

    and2-1-5of

    theRulesfor

    Materialsand

    Welding(Part2

    )

    [URW7and

    W8]

    Approvedplans,

    shipbuilders

    inspection

    records,

    Shipbuilders

    andrecognized

    standardsand

    Rulesas

    applicable,

    construction

    plan(steelwork

    subdivision)

    Copiesof

    certificatesof

    forgingsand

    castings

    .3Verifythat

    material

    certificatesare

    includedinthe

    shipconstruction

    file

    ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 19

  • 8/3/2019 New Construction Survey Guide E-July11

    26/61

    TABLE1(con

    tinue

    d)(1

    July2011)

    Reference

    Shipbuilding

    Function

    Survey

    Requirements

    for

    Classification

    SurveyMethod

    Requiredfor

    Classification

    ABS

    Rules/Guide(1)

    [IACS

    Reference

    (2,3)]

    Statutory

    Requirements

    andRelevant

    Reference

    Documentation

    Availableto

    Classification

    Surveyorduring

    Construction

    Documentation

    forShip

    Construction

    File

    Specific

    Activities

    ABS

    Proposalsfor

    theProject

    8.4

    Appendages

    Compliance

    withapproved

    drawings,visu

    al

    examinationof

    weldingand

    material,check

    alignmentand

    deformations

    withapproved

    drawings,visu

    al

    examinationof

    weldingand

    material,check

    alignmentand

    deformations

    Patrolofthe

    processand

    witnessofthe

    completeditem

    Sections2-1-6

    and2-1-5of

    theRulesfor

    Materialsand

    Welding(Part2

    )

    [URW7and

    W8]

    Approvedplans,

    shipbuilders

    inspection

    records,

    Shipbuilders

    andrecognized

    standardsand

    Rulesas

    applicable,

    construction

    plan(steelwork

    subdivision)

    Copiesof

    certificatesof

    forgingsand

    castings

    .4Verifythatcorrect

    weldingandfit

    uprequirements

    specifiedin

    reference1,2.4

    and2.5ofthis

    tablehavebeen

    adopted

    .1Verifythatcorrect

    weldingandfit

    uprequirements

    specifiedin

    reference1,2.4

    and2.5ofthis

    tablehavebeen

    adopted

    8.5

    Equipment

    Formingthe

    Watertightand

    Weathertight

    Integrityofthe

    Ship(e.g.,

    overboard

    discharges,air

    pipes,ventilators)

    Tightnessand

    securing

    Witness

    Reg.II-1/19of

    SOLASas

    amended;Reg.

    17-18-19-20-22-

    23ofILLC'66

    Approvedtank

    testingplan,

    shipbuilders

    inspection

    records

    Detailsrequired

    .2Verify

    compliancewith

    LoadLine

    Convention1966

    asamended(i.e

    .,

    allfittingsin

    accordancewith

    therecordof

    freeboard

    assignment)

    20 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007

  • 8/3/2019 New Construction Survey Guide E-July11

    27/61

    TABLE1(con

    tinue

    d)(1

    July2011)

    Reference

    Shipbuilding

    Function

    Survey

    Requirements

    for

    Classification

    SurveyMethod

    Requiredfor

    Classification

    ABS

    Rules/Guide(1)

    [IACS

    Reference

    (2,3)]

    Statutory

    Requirements

    andRelevant

    Reference

    Documentation

    Availableto

    Classification

    Surveyorduring

    Construction

    Documentation

    forShip

    Construction

    File

    Specific

    Activities

    ABS

    Proposalsfor

    theProject

    4-6-4/9.3.7ofthe

    RulesforBuilding

    andClassing

    SteelVessels

    [URP3]

    .3Verifyairpipes

    ,

    ventsetc.,closing

    deviceare

    approvedtype

    .4Verifymaterial

    certificatesfor

    overboard

    dischargeswhere

    applicable

    Equipment

    Formingthe

    Watertightand

    Weathertight

    Integrityofthe

    Ship(e.g.,

    overboard

    discharges,air

    pipes,ventilators)

    Tightnessand

    securing

    Witness

    Reg.II-1/19of

    SOLASas

    amended;Reg.

    17-18-19-20-22-

    23ofILLC'66

    Approvedtank

    testingplan,

    shipbuilders

    inspection

    records

    Detailsrequired

    .5Verifyrecordof

    freeboard

    assignmentand

    allmaterial

    certificates

    includedinthe

    shipconstruction

    file

    .6Verifyfreeboard

    marksin

    accordancewith

    loadline

    assignment

    8.5(contd)

    FreeboardMarks

    andDraftMarks

    Within

    allowable

    tolerancesand

    in

    accordancewi

    th

    thefreeboard

    assignment

    Witness

    Appendix1-1-A

    1

    oftheRulesfor

    Conditionsof

    Classification

    (Part1)

    [UI-LL4]

    Reg.4-5-6-7

    and8ofILLC

    '66

    Detailsrequired

    .7Verifydraft

    marksin

    accordancewith

    theagreed

    tolerances

    specifiedbythe

    builderunless

    moreonerous

    flagstate

    requirements

    ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 21

  • 8/3/2019 New Construction Survey Guide E-July11

    28/61

    TABLE1(con

    tinue

    d)(1

    July2011)

    Reference

    Shipbuilding

    Function

    Survey

    Requirements

    for

    Classification

    SurveyMethod

    Requiredfor

    Classification

    ABS

    Rules/Guide(1)

    [IACS

    Reference

    (2,3)]

    Statutory

    Requirements

    andRelevant

    Reference

    Documentation

    Availableto

    Classification

    Surveyorduring

    Construction

    Documentation

    forShip

    Construction

    File

    Specific

    Activities

    ABS

    Proposalsfor

    theProject

    .8Verifyprincipal

    dimensionsin

    accordancewith

    recognized

    standard

    Principal

    Dimensions

    Within

    allowable

    tolerances

    Reviewand

    witness

    [Recommend-

    ation47]

    Detailsrequired

    .9Verify

    dimensions

    includedinship

    constructionfile

    8.5(contd)

    Safety

    Construction

    Certification

    Nooutstanding

    imperfections

    or

    defects

    Witness

    Reg.10of

    SOLASas

    amended

    .10Verifythat

    Administration

    requirements

    havebeen

    incorporated

    intothehull

    structure

    Shipbu

    ilder'sname

    Kick-o

    ffMeetingDate

    Project

    RepresentingBuilder

    Project

    Duration

    RepresentingClassSociety

    Notes:

    1

    ABSreferenceddocumentsareavailablefromtheRulesandGuidesDownloadspageofwww.eagle.org.

    2

    IACSreferenceddocumentsa

    reavailablefromwww.iacs.org.uk.

    3

    IACSRecommendationsarenotmandatoryrequirements.

    22 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007

  • 8/3/2019 New Construction Survey Guide E-July11

    29/61

    ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS 2000 23

    11 Initial Statutory Surveys at New Construction (1 July 2010)

    11.1 Scope*

    The scope of this section is to define the requirements for the initial statutory surveys at new construction

    as detailed in IMO Resolution A.997(25), which are not addressed in UR Z23 for the following as applicable:

    i) International Load Line Certificate (1966)

    ii) Cargo Ship Safety Equipment Certificate

    iii) International Oil Pollution Prevention Certificate

    This section only covers the survey activities required and does not cover the technical interpretations of

    the statutory requirements or approval of plans, designs and manuals required by the Regulations.

    This section does not cover the requirements for type approval or certification at vendors works and for

    which evidence of acceptance is to be provided as indicated in the survey tables.

    11.2 Definitions Used in the Survey Tables

    Survey Item: A description of the survey item considered

    Origin of the Requirement: Applicable Statutory Regulation

    Approved Drawings/Documentation: Indicates whether approved drawings/documentation is required

    Conformity Verification: This verification may consist of an examination of the certificate, a check of the

    marks or, for products which require type approval, to verify conformity of the product with the approvedprototype or certification with Flag Administration requirements

    Survey During Construction or Installation: Indicates whether the witness by surveyor of construction andinstallation on board is required

    Tightness Testing: Indicates whether tightness testing is required to be witnessed by the surveyor for

    survey item

    Survey After Construction or Installation: Indicates whether the survey item is examined by the Surveyorafter completion of its construction and installation on board

    Function Test: Indicates whether a survey item or system is to be subjected to a functioning and/orperformance test or trial in the presence of a Surveyor after installation on board

    Onboard Verification of Documentation: Indicates whether the required documentation is to be verified onboard by the surveyor

    Series of Vessels: As defined in section 1-1-4/3.3 of the ABS Rules for Conditions of Classification

    * Note: This section is to be uniformly implemented on ships contracted for construction from 1st July 2010.

    11.3 ApplicationThis applies to all vessels for which the statutory certificates listed in 11.1 are to be issued at new constructionby ABS.

    11.4 Interpretation of the Survey Requirements

    Interpretation of the survey requirements is given in Appendix 1

    Table 1 Safety Equipment

    Table 2 Load Line

    Table 3 MARPOL Annex 1

    Specific flag administration requirements, if any, supersede the requirements contained in this section.

  • 8/3/2019 New Construction Survey Guide E-July11

    30/61

    24 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007

    11.5 Qualification and Monitoring of Personnel

    The surveys required by this section shall be carried out by exclusive ABS surveyors. The surveyors are tobe qualified to be able to carry out the tasks and procedures are to be in place to ensure that their activitiesare monitored.

    11.6 Inspection and test plan for new building activitiesThe shipbuilder is to provide inspection and test plans for the items which are required to be surveyed

    and/or tested prior to the commencement of the surveys and/or test.

    11.7 Product and Type Approval Certificates

    The shipbuilder is to provide product and type approval certificates for the applicable items listed in

    Appendix 1 to be placed onboard.

    11.8 Proof of the Consistency of Surveys

    ABS is to be able to provide evidence, (e.g., through records, check lists, inspection and test records, etc.)that its surveyors have complied with the requirements of this section.

  • 8/3/2019 New Construction Survey Guide E-July11

    31/61

    ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 25

    Appendix 1: Survey Tables for Initial Statutory Surveys at New Construction

    A P P E N D I X 1 Survey Tables for Initial Statutory Surveys atNew Construction (1 July 2010)

    1 Description

    COLUMN 1 A.997(25) Requirements

    COLUMN 2 Survey Item A description of the survey item considered

    COLUMN 3 Origin of the Requirement Applicable Statutory Regulation

    COLUMN 4Correspondence with Approved

    Drawings/DocumentationIndicates whether approved drawings/documentation is required

    COLUMN 5 Conformity Verification

    This verification may consist of an examination of the certificate,a check of the marks or, for type approved products, to verifyconformity of the product with the approved prototype orcertification with National Requirements

    COLUMN 6Survey during construction or

    installationIndicates whether the witness by surveyor of fabrication and

    installation on board is required

    COLUMN 7 Tightness TestingIndicates whether tightness testing is required to be witnessed bythe surveyor for survey item

    COLUMN 8Survey after construction or

    installationIndicates whether the survey item is examined by the Surveyorafter completion of its installation on board and/or

    COLUMN 9 Function Test

    Indicates whether a system is to be subjected to a functioning

    and/or performance test or trial in the presence of a Surveyorafter installation on board

    COLUMN 10Onboard Verification of

    documentation

    Indicates whether the required documentation is to be verified onboard by the surveyor

  • 8/3/2019 New Construction Survey Guide E-July11

    32/61

    T

    ABLE1

    SafetyEquip

    ment(1

    July2010)

    A.9

    97(25)Requirement

    SurveyItem

    Originofthe

    Requirement

    Correspondencewith

    ApprovedDrawings/

    Documentation

    Conformity

    Verification

    InspectionsDuring

    Installation

    InspectionAfter

    Installation

    OnboardVerification

    ofDocumentation

    FunctionTest

    FirePump

    s

    X

    X

    X

    X

    FireMains

    X

    X

    Hydrants

    X

    X

    Hosesand

    Nozzles

    X

    X

    X

    (EI)

    1.1.3.1

    Examiningthefirepumpsandfirema

    inandthedispositionofthe

    hydrants,hosesandnozzlesandthein

    ternationalshoreconnection

    andcheckingthateachfirepump,includingtheemergencyfire

    pump,canbeoperatedseparatelyso

    thattwojetsofwaterare

    producedsimultaneouslyfromdiffer

    enthydrantsatanypartof

    theshipwhilsttherequiredpressureismaintainedinthefiremain

    InternationalShoreConnection

    (SOLAS74/00reg.

    II-2/10.2FSSCchs.2

    and12)

    (SOLAS74/88

    regs.II-2/4and19)

    X

    X

    (EI)

    1.1.3.2

    Examiningtheprovisionanddispositionofthefireextinguishers

    FireExtin

    guishers

    (SOLAS74/00reg.

    II-2/10.3FSSCch.4)

    (SOLAS74/88reg.

    II-2/6)

    X

    X

    X

    FireFighters'Outfits

    X

    X

    X

    (EI)

    1.1.3.3

    Examiningthefirefightersoutfitsandemergencyescape

    breathingdevicesEEBDs

    EEBDs

    EmergencyEscape

    Breathing

    Devices

    (SOLAS74/00regs.

    II-2/10.10,13.3.4

    and13.4.3FSSC

    ch.3)

    (SOLAS74/88reg.

    II-2/17)

    X

    X

    X

    (EI)

    1.1.3.4

    Checkingtheoperationalreadinessand

    maintenanceoffire-fighting

    systems

    OperationalReadinessand

    MaintenanceofFire-fighting

    System

    (SOLAS74/00reg.

    II2/14)

    (SOLAS74/88

    reg.II-2/21)

    X

    (EI)

    1.1.3.5

    Examiningthefixedfire-fightingsyste

    mforthemachinery,cargo,

    vehicle,specialcategoryandro-rospaces,asappropriate,and

    confirmingthattheinstallationtestshavebeensatisfactorily

    completedandthatitsmeansofoper

    ationareclearlymarked

    FixedFire

    fightingsystems

    (SOLAS74/00regs.

    II-2/10.4,10.5,1

    0.7

    and20.6.1,FSSC

    chs.5to7)

    (SOLAS74/88

    regs.II-2/7and5

    3)

    X

    X

    X

    X

    X

    Appendix 1 Survey Tables for Initial Statutory Surveys at New Construction

    26 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION.2007

  • 8/3/2019 New Construction Survey Guide E-July11

    33/61

  • 8/3/2019 New Construction Survey Guide E-July11

    34/61

    TABLE

    1(con

    tinue

    d)

    Sa

    fetyEquip

    men

    t(1

    July2010)

    A.9

    97(25)Requirement

    SurveyItem

    Originofthe

    Requirement

    Correspondencewith

    ApprovedDrawings/

    Documentation

    Conformity

    Verification

    InspectionsDuring

    Installation

    InspectionAfter

    Installation

    OnboardVerification

    ofDocumentation

    FunctionTest

    FireDetectionandAlarmSystem

    X

    X

    X

    X

    FixedFire

    ExtinguishingSystem

    X

    X

    Structural

    FireProtection

    X

    X

    X

    (EI)1.1.3.1

    0

    Examiningthefireprotectionarrangementsincargo,vehicle

    andro-rospacesandconfirming,asfaraspracticableandas

    appropriate,theoperationofthemea

    nsforclosingthevarious

    openings

    Precautionagainstignitionof

    flammablevapoursinclosed

    vehiclesp

    aces,closedro-ro

    spacesandspecialcategory

    spaces

    (SOLAS74/00regs.

    II-2/10.7,20.2.1,

    20.3and20.6.2)

    (SOLAS74/88reg.

    II-2/53)

    X

    X

    X

    WaterSup

    ply

    X

    X

    SourcesofIgnition

    X

    X

    X

    Detection

    System

    X

    X

    X

    Ventilation

    X

    X

    Bilgesystem

    X

    X

    Personnel

    Protection

    X

    X

    X

    FireExtin

    guishers

    X

    X

    X

    Insulation

    ofMachineryspace

    boundaries

    X

    X

    X

    (EI)1.1.3.1

    1

    Examining,whenappropriate,thespec

    ialarrangementsforcarrying

    dangerousgoods,includingchecking

    theelectricalequipment

    andwiring,theventilation,theprovisionofprotectiveclothing

    andportableappliancesandthetestingofthewatersupply,

    bilgepumpingandanywatersprays

    ystem

    WaterSpr

    aySystem

    (SOLAS74/00reg.

    II-2/19(except

    19.3.8,19.3.10a

    nd

    19.4)FSSCchs.9

    and10)

    (SOLAS74/88reg.

    II-2/54)

    X

    X

    X

    X

    X

    SurvivalC

    raftProvisionand

    Dispositio

    n

    X

    X

    X

    RescueBoatProvisionand

    Dispositio

    n

    X

    X

    X

    (EI)1.1.3.1

    2

    Checkingtheprovisionanddispositionofthesurvivalcraft,

    whereapplicable,marineevacuation

    systemsandrescueboats

    MarineEv

    acuationSystems

    Provision

    andDisposition

    (SOLAS74/88regs.

    III/11to16and31;

    LSACsection6.2)

    X

    X

    X

    (EI)1.1.3.1

    3

    Deploymentof50%oftheMESafte

    rinstallation

    Deployme

    ntofMarine

    EvacuationSystems

    (LSACparagrap

    h

    6.2.2.2)

    X

    Appendix 1 Survey Tables for Initial Statutory Surveys at New Construction

    28 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007

  • 8/3/2019 New Construction Survey Guide E-July11

    35/61

  • 8/3/2019 New Construction Survey Guide E-July11

    36/61

    TABLE

    1(con

    tinue

    d)

    Sa

    fetyEquip

    men

    t(1

    July2010)

    A.9

    97(25)Requirement

    SurveyItem

    Originofthe

    Requirement

    Correspondencewith

    ApprovedDrawings/

    Documentation

    Conformity

    Verification

    InspectionsDuring

    Installation

    InspectionAfter

    Installation

    OnboardVerification

    ofDocumentation

    FunctionTest

    Two-way

    VHFradiotelephone

    apparatus

    X

    X

    X

    (EI)1.1.3.2

    1

    Examiningtheprovisionandstowage

    andcheckingtheoperation

    ofportableonboardcommunications

    equipment,ifprovided,and

    two-wayVHFradiotelephoneappara

    tusandradartransponders

    RadarTra

    nsponders

    (SOLAS74/88regs.

    II-2/12.2andIII/6)

    X

    X

    X

    DistressF

    laresandLine-

    Throwing

    Appliances

    X

    X

    OnboardCommunications

    equipment

    X

    X

    X

    (EI)1.1.3.2

    2

    Examiningtheprovisionandstowageofthedistressflaresand

    theline-throwingappliance,checkingtheprovisionandoperation

    offixedonboardcommunicationsequipment,ifprovided,and

    testingthemeansofoperationofthe

    generalalarmsystem

    GeneralA

    larmSystem

    (SOLAS74/00regs.

    III/6and18;LSAC

    sections3.1,7.1

    and7.2)

    X

    X

    X

    Lifebuoys

    X

    X

    X

    Lifebuoysfittedwithself-igniting

    lights

    X

    X

    X

    Lifebuoys

    fittedwithself-

    activating

    smokesignals

    X

    X

    X

    Lifebuoys

    fittedwithbuoyant

    lines

    X

    X

    X

    Lifejackets

    X

    X

    X

    Immersionsuits

    X

    X

    X

    (EI)1.1.3.2

    3

    Examiningtheprovision,disposition

    andstowageofthe

    lifebuoys,includingthosefittedwith

    self-ignitinglights,self-

    activatingsmokesignalsandbuoyan

    tlines,lifejackets,and

    immersionsuits

    Anti-expo

    suresuits

    (SOLAS74/00regs.

    III/7and32to37;

    LSACsections2.1,

    2.5and3.3)

    X

    X

    X

    Appendix 1 Survey Tables for Initial Statutory Surveys at New Construction

    30 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007

  • 8/3/2019 New Construction Survey Guide E-July11

    37/61

    TABLE

    1(con

    tinue

    d)

    Sa

    fetyEquip

    men

    t(1

    July2010)

    A.9

    97(25)Requirement

    SurveyItem

    Originofthe

    Requirement

    Correspondencewith

    ApprovedDrawings/

    Documentation

    Conformity

    Verification

    InspectionsDuring

    Installation

    InspectionAfter

    Installation

    OnboardVerification

    ofDocumentation

    FunctionTest

    MusterandEmbarkationStation

    Lighting

    X

    X

    AlleywaysandStairways

    Lighting

    X

    X

    ExitsgivingAccesstotheMuster

    andEmba

    rkationStations

    Lighting

    X

    X

    MusterandEmbarkationStation

    Lightingf

    romEmergency

    Sourceof

    Power

    X

    X

    AlleywaysandStairways

    Lightingf

    romEmergency

    Sourceof

    Power

    X

    X

    (EI)1.1.3.2

    4

    Checkingthelightingofthemusterandembarkationstationsand

    thealleyways,stairwaysandexitsgivingaccesstothemuster

    andembarkationstations,includingwhensuppliedfromthe

    emergencysourceofpower

    ExitsgivingAccesstotheMuster

    andEmba

    rkationStations

    Lightingf

    romEmergency

    Sourceof

    Power

    (SOLAS74/88regs.

    II-1/43andIII/11)

    X

    X

    NavigationLights

    X

    X

    X

    X

    (EI)1.1.3.2

    5

    Examiningtheprovisionandpositioningandcheckingthe

    operationof,asappropriate,thenavigationlights,shapesand

    soundsignallingequipment

    Shapesan

    dSoundssignalling

    equipment

    (International

    Regulationsfor

    Preventing

    CollisionsatSea

    (COLREG)inforce,

    regs.20to24,27

    to30and33)

    X

    X

    X

    (EI)1.1.3.2

    6

    Checkingthattheminimumsafedistancesfromthesteeringand

    standardmagneticcompassesforall

    electricalequipmentare

    compliedwith

    Bridge

    (SOLAS74/00regs.

    V/17and19)

    X

    (EI)1.1.3.2

    7

    Checkingtheelectromagneticcompa

    tibilityofelectricaland

    electronicequipmentonorinthevic

    inityofthebridge

    Bridge

    (SOLAS74/00reg.

    V/17)

    X

    X

    Appendix 1 Survey Tables for Initial Statutory Surveys at New Construction

    ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 31

  • 8/3/2019 New Construction Survey Guide E-July11

    38/61

    TABLE

    1(con

    tinue

    d)

    Sa

    fetyEquip

    men

    t(1

    July2010)

    A.9

    97(25)Requirement

    SurveyItem

    Originofthe

    Requirement

    Correspondencewith

    ApprovedDrawings/

    Documentation

    Conformity

    Verification

    InspectionsDuring

    Installation

    InspectionAfter

    Installation

    OnboardVerification

    ofDocumentation

    FunctionTest

    (EI)1.1.3.2

    8

    Checking,asappropriate,theprovisionandoperationofthe

    followingshipbornenavigationalsystemsequipment

    Navigation

    Equipment:Magnetic

    Compass

    X

    X

    (EI)1.1.3.2

    8

    .1

    Themagneticcompass,includingexaminingthesighting,movement,

    illuminationandapylorusorcompassbearingdevice

    NavigationEquipment:Pylorus

    orCompassBearingDevice

    (SOLAS74/00reg.

    V/19)

    X

    X

    NavigationEquipment:ECDIS

    includingback-uparrangements

    X

    X

    (EI)1.1.3.2

    8

    .2

    Nauticalchartsandnauticalpublicationsnecessaryfortheintended

    voyageareavailableandhavebeenupdated,and,whereelectronic

    systemsareused,theelectronicchartshavebeenupdatedand

    therequiredback-upsystemisprovidedandupdated

    NauticalC

    hartsandNautical

    Publicatio

    ns

    (SOLAS74/00reg.

    V/19)

    X

    (EI)1.1.3.2

    8

    .3

    Globalnavigationsatellitesystemreceiverorterrestrialradio

    navigationsystem

    NavigationEquipment:GNSS

    receiver

    X

    X

    (EI)1.1.3.2

    8

    .4

    Soundreceptionsystem,whenbridgeistotallyenclosed

    NavigationEquipment:Sound

    Reception

    System

    X

    X

    (EI)1.1.3.2

    8

    .5

    Meansofcommunicationtoemergencysteeringposition,where

    provided

    NavigationEquipment:Means

    ofcommu

    nicationwith

    Emergenc

    ySteeringPosition

    X

    X

    X

    (EI)1.1.3.2

    8

    .6

    Sparemagneticcompass

    NavigationEquipment:Spare

    Magnetic

    Compass

    X

    X

    (EI)1.1.3.2

    8

    .7

    Daylightsignallinglamp

    NavigationEquipment:

    DaylightSignallingLamp

    X

    X

    (EI)1.1.3.2

    8

    .8

    Echosoundingdevice

    NavigationEquipment:Echo-

    soundingDevice

    X

    X

    Appendix 1 Survey Tables for Initial Statutory Surveys at New Construction

    32 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007

  • 8/3/2019 New Construction Survey Guide E-July11

    39/61

    TABLE

    1(con

    tinue

    d)

    Sa

    fetyEquip

    men

    t(1

    July2010)

    A.9

    97(25)Requirement

    SurveyItem

    Originofthe

    Requirement

    Correspondencewith

    ApprovedDrawings/

    Documentation

    Conformity

    Verification

    InspectionsDuring

    Installation

    InspectionAfter

    Installation

    OnboardVerification

    ofDocumentation

    FunctionTest

    (EI)1.1.3.2

    8

    .9

    Radarreflector

    NavigationEquipment:Radar

    Reflector

    X

    X

    (EI)1.1.3.2

    8

    .10

    Radar(s),includingexaminingthewaveguideandcablerunsfor

    routeingandprotectionandthedisplayunitconfirminglighting,

    correctoperationofallcontrols,and

    functions

    NavigationEquipment:Radar

    Installations

    X

    X

    X

    NavigationEquipment:

    Electronic

    PlottingAid

    X

    X

    (EI)1.1.3.2

    8

    .11

    Electronicplottingaid,automatictrackingaidorautomaticradar

    plottingaidasappropriate,usingthe

    appropriatetestfacilities

    NavigationEquipment:

    AutomaticTrackingaid(s)or

    AutomaticRadarPlottingAid

    X

    X

    (EI)1.1.3.2

    8

    .12

    Speedanddistancemeasuringdevices"throughthewater"and

    "overtheground"

    NavigationEquipment:Speed

    andDistancemeasuringDevice

    X

    X

    (EI)1.1.3.2

    8

    .13

    Transmittingheadingdeviceprovidingheadinginformationto

    radar,plottingaidsandautomaticidentificationsystem

    equipmentandvoyagedatarecorder

    NavigationEquipment:

    TransmittingHeadingDevice

    X

    X

    (EI)1.1.3.2

    8

    .14

    Automaticidentificationsystem

    NavigationEquipment:AIS

    Automatic

    IdentificationSystem

    X

    X

    NavigationEquipment:Gyro

    Compass

    X

    X

    (EI)1.1.3.2

    8

    .15

    Gyrocompass,includingexaminingthealignmentofthemaster

    andallrepeaters

    NavigationEquipment:Gyro

    CompassRepeaters

    X

    X

    (EI)1.1.3.2

    8

    .16

    Rudderangleindicator

    NavigationEquipment:Rudder

    AngleInd

    icator

    X

    X

    Appendix 1 Survey Tables for Initial Statutory Surveys at New Construction

    ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 33

  • 8/3/2019 New Construction Survey Guide E-July11

    40/61

    TABLE

    1(con

    tinue

    d)

    Sa

    fetyEquip

    men

    t(1

    July2010)

    A.9

    97(25)Requirement

    SurveyItem

    Originofthe

    Requirement

    Correspondencewith

    ApprovedDrawings/

    Documentation

    Conformity

    Verification

    InspectionsDuring

    Installation

    InspectionAfter

    Installation

    OnboardVerification

    ofDocumentation

    FunctionTest

    (EI)1.1.3.2

    8

    .17

    Propellerrateofrevolutionindicator

    NavigationEquipment:

    PropellerrateofRevolution

    Indicator

    X

    X

    (EI)1.1.3.2

    8

    .18

    Propeller,operationalmode,thrust,a

    ndpitchindicator

    NavigationEquipment:

    Variable-Pitchpropellerpitch

    andoperationalmodeindicator

    X

    X

    (EI)1.1.3.2

    8

    .19

    Rate-of-turnindicator

    NavigationEquipment:Rateof

    TurnIndicator

    X

    X

    (EI)1.1.3.2

    8

    .20

    Headingortrackcontrolsystem

    NavigationEquipment:

    Headingo

    rTrackControl

    System

    X

    X

    (EI)1.1.3.2

    9

    Checkingfortheprovisionandoperationofthevoyagedatarecorder

    VDRVoyageDataRecorder

    (SOLAS74/00reg.

    V/20)

    X

    X

    (EI)1.1.3.3

    1

    Checkingnavigationbridgevisibility

    NavigationBridgeVisibility

    (SOLAS74/00reg.

    V/22)

    X

    (EI)1.1.3.3

    2

    Checkingtheprovisionand,asappro

    priate,thedeploymentor

    operationofthepilotladdersandhoists/pilottransferarrangements

    Pilotladdersandhoists/pilot

    transferar

    rangements

    (SOLAS74/00reg.

    V/23)

    X

    X

    X

    X

    DeckFoam

    System:FoamTanks

    X

    X

    DeckFoamSystem:Monitors

    X

    X

    X

    DeckFoam

    System:Applicators

    X

    X

    X

    (EI)1.1.4.1

    Checkingthedeckfoamsystem,includingthesuppliesoffoam

    concentrate,andtestingthattheminim

    umnumberofjetsofwater

    attherequiredpressureinthefiremain

    isobtained(see(EI)1.1.3.1)

    whenthesystemisinoperation

    DeckFoamSystem:Foam

    Concentra

    tes

    (SOLAS74/00reg.

    II-2/10.8;FSSC

    ch.15)

    (SOLAS74/88reg.

    II-2/61)

    X

    (EI)1.1.4.2

    Examiningtheinertgassystemandinparticular:

    CargoTan

    kProtection:Venting

    (SOLAS74/00reg.

    II-2/4.5.5;FSSC

    ch.15)

    (SOLAS74/88reg.

    II-2/62)

    X

    X

    Appendix 1 Survey Tables for Initial Statutory Surveys at New Construction

    34 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007

  • 8/3/2019 New Construction Survey Guide E-July11

    41/61

    TABLE

    1(con

    tinue

    d)

    Sa

    fetyEquip

    men

    t(1

    July2010)

    A.9

    97(25)Requirement

    SurveyItem

    Originofthe

    Requirement

    Correspondencewith

    ApprovedDrawings/

    Documentation

    Conformity

    Verification

    InspectionsDuring

    Installation

    InspectionAfter

    Installation

    OnboardVerification

    ofDocumentation

    FunctionTest

    (EI)1.1.4.2

    .

    1

    Examiningexternallyforanysignof

    gasoreffluentleakage

    SignsofG

    asorEffluentLeakage

    X

    X

    (EI)1.1.4.2

    .

    2

    Confirmingtheproperoperationofb

    othinertgasblowers

    InertGasBlowers

    X

    (EI)1.1.4.2

    .

    3

    Observingtheoperati