PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry Of Environment, Forest & Climate Change New Delhi OF MALEGAON DOLOMITE MINES Village-Malegaon, Tehsil-Sausar, Dist-Chhindwara, Madhya Pradesh (Area 3.084 Ha; Production Capacity @ 11,565 TPA Dolomite Ore) PROJECT PROPONENT M/S VASUDHA MINERALS & CHEMICALS 173 Pooja residency, D.G. 4, Opposite Vishal Subhagruha, Koradi Road, Mankapur, Nagpur (MS) EIA CONSULTANT Pollution & Ecology Control Services NABET Accredited EIA Consultant May 2016

Upload: hanhi

Post on 15-Apr-2018

220 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

PRE FEASIBILITY REPORT

Submitted to

EXPERT APPRAISAL COMMITTEE (Non Coal Mining)

Ministry Of Environment, Forest & Climate Change

New Delhi

OF

MALEGAON DOLOMITE MINES Village-Malegaon, Tehsil-Sausar, Dist-Chhindwara, Madhya Pradesh

(Area 3.084 Ha; Production Capacity @ 11,565 TPA Dolomite Ore)

PROJECT PROPONENT

M/S VASUDHA MINERALS & CHEMICALS 173 Pooja residency, D.G. 4, Opposite Vishal Subhagruha,

Koradi Road, Mankapur, Nagpur (MS)

EIA CONSULTANT

Pollution & Ecology Control Services

NABET Accredited EIA Consultant

May 2016

Page 2: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

2 M/s Vasudha Minerals & Chemicals

TABLE OF CONTENTS

1. EXECUTIVE SUMMARY ....................................................... … 3-5

2. INTRODUCTION OF THE PROJECT ......................................... 6-7

i Identification of project & project proponent

ii Brief description of nature of the project

iii Need for the project and its important to the country and or

region.

iv

vvvvv

vvvvv

v

vvvvv

vvvvv

vv

Employment Generation (Direct and Indirect) due to the Project

3. PROJECT DESCRIPTION ............................................................. 8-15

i Type of project

ii Location

iii Alternate site

iv Size of magnitude of operation

v Process description

vi Raw materials sources & transportation

vii Resource recycling.

viii Water requirement & supply

ix Waste generation and waste management

x Schematic representation of the feasibility drawing which give

information of EIA purpose.

4. SITE ANALYSIS ....................................................................... 16-19

i Connectivity

ii Land use and Land ownership.

iii Topography (along with map).

iv Existing land use pattern

v Existing infrastructure

vi Soil classification

vii Climate

viii Social infrastructure

5. PLANNING BRIEF .................................................................... 20

i Planning concept

ii Population projection

iii Green belt breakup

iv Infrastructure demand

v Amenities/Facilities.

6. PROPOSED INFRASTRUCTURE ............................................... 21

i Industrial area

ii Residential area

iii Green belt

iv Social infrastructure

v Connectivity

vi Drinking water

Page 3: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

3 M/s Vasudha Minerals & Chemicals

vii Sewerage system

viii Industrial waste management

ix Solid waste management

x Power requirement & supply

7. REHABILITATION AND RESETTLEMENT ............................................................................. 22

8. PROJECT SCHEDULE & COST ESTIMATION ....................................................................... 23

9. ANALYSIS OF PROPOSAL FINAL RECOMMENDATIONS ................................................. 24

ANNEXURE

1. COPY OF ENVIRONMENTAL CLEARANCE LETTER ........................................... 25

2. COORDINATES OF THE BOUNDARY .................................................................. 30

3. ENVIRONMENT MANAGEMENT PLAN ........................................................... 31

4. ESTIMATED PROJECT CAPITAL COST & PRODUCTION COST .................. 33

MAPS

1. PROJECT BOUNDARY MAP

2. LAYOUT MAP

3. GEOGRAPHICAL SECTION

4. CONCEPTUAL SECTION

5. KEY PLAN

Page 4: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

4 M/s Vasudha Minerals & Chemicals

1. EXECUTIVE SUMMARY

This summary presents a brief summary of the Dolomite Mine located at village:Malegaon,

Tehsil: Sausar, Dist: Chhindwara, Madhya pradesh.

M/s Vasudha Minerals & Chemicals , Nagpur, M.S. is holding mining lease over an area of

3.084 Ha in village Malegaon of Chhindwara district, M.P. from a period of 20 years with

effect from 26 January 2006 to 26 January 2026.

The actual production of ore during last 5 years has been 50,800 tonnes as against

1,66,665 tonnes i.e. it has been lower by 1,16,000 tonnes approximately

It is proposed to produce 34337 TPA Dolomite.

The Mining Plan was prepared under Rule 22 of MCR 1960 over an area of 3.084hectares

in village Malegaon of Sausar Tahsil of Chhindwara District of Madhya Pradesh and

approved by the Controller of Mines, (Central Zone) Indian Bureau of Mines, Nagpur vide

letter No. CNW/DOL/MPLN-251/NGP dt 25/05/2007.

The region has good deposits of Dolomite of area is SMS grade and is being dispatched to

steel plants like Bhilai, NECO, Maharashtra Smelters in Drug, Nagpur, Chandrapur and

such other small steel units in Madhya Pradesh, Chhattisgarh and Maharashtra which are

about 300 km from mine head.

Looking at the market demand for Dolomite ore modified mining with a rated capacity of

34337 TPA has been submitted to IBM for approval.

The applied M.L. area over 3.084 hectares is covered within the Survey of India

Toposheet No. 55 K/14 on a scale of 1:50,000 and it lies latitude and longitude of the

center is 21030’36.26”N and 78055’38.20”E.

M/s Vasudha Minerals & Chemicals has initiated all the necessary steps for increase in the

production of Dolomite from Malegaon Dolomite Mines.

The lease area as a high relief on eastern boundary pillars and slopping towards Western,

NE and North. The highest contour is 355 m and lowest contour is 334 m.

During the first 5 years of mining plan, the applicant has drilled one borewell for drinking

water adjoining NW corner of the area, where dolomite was encountered to more than 90

meters. No additional exploration. There has proposal of one borehole in last Scheme of

Mining, which has not been carried out. Mine Production as per Approved Mining Plan: the

mining was proposed by opencast method by forming 3x3m. size. The removal of OB

(soil) and mining of dolomite would be simultaneous.

Page 5: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

5 M/s Vasudha Minerals & Chemicals

The sequence of unit operations in open cast semi mechanized mining consists of

removal of soil and waste material i.e. overburden and dumping at suitable site,

fragmentation of mineral from in-situ formation, excavation, sizing and sorting, loading and

hauling and some other miscellaneous work. Removal of soil and waste material will

carried out using shovel dumper combination and production of Dolomite ore by manual

means. Drilling of shot holes and blasting would be carried out by engaging private

licensed agency.

The Dolomite mine will be developed as Opencast semi- Mechanized Mine for the

production of Dolomite @ 34337 TPA. It is also proposed to obtain recovery of ore from

old dumps. Commercially exploitable Dolomite deposits occur in this proposed mining

lease.

While mining the dolomite, the waste material likely to be generated as shale chips and

chert boulder sand are sorted. The 10% waste from ROM is separately stacked as reject

dumps.

The water requirement of the project is estimated to be 25 m3/day of the water is required

for drinking/domestic purpose. Water requirement for dust suppression (within the lease

and outside the lease in nearby villages), plantation will be met from mine water and from

rainwater collected in mining pit.

The power requirement will be met from adjoining from State electricity board.

Ground water table is expected to be at more than 20-25 m depth from surface level.

The mining will be carried out as per the approved mining plan. During Mining Plan period,

the mining operation will be done by development of semi-mechanized opencast method.

The plantation program will be taken up in the areas in future in a systematic manner and

plantation will be carried out, starting with soil binding grasses and shrubs followed by

larger trees species. Local varieties of plants shall be given predominance along with

introduction of some exotic species.

Uncontaminated topsoil, will be meticulously removed and transported to the non

mineralized zone for future plantation.

Estimated project cost is Rs.40 Lacs. The capital budget for environmental protection

measure is estimated to be Rs.2 Lacs per annum.

In addition there are various places of worship/ tourist place and historical places exists in

15 Km radius of the project, but these are located more than 10 km radius

There is no National Park, Wildlife sanctuary, defense installation or sensitive area located

within 15 km radius of the mine.

Page 6: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

6 M/s Vasudha Minerals & Chemicals

The enhance production shall be carried out after obtaining all statutory permissions and

shall be carried out as per approved modified mining scheme.

Page 7: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

7 M/s Vasudha Minerals & Chemicals

2. INTRODUCTION OF THE PROJECT / BACKGROUND

INFORMATION.

i) Identification of Project and Project Proponent

M/s Vasudha Minerals & Chemicals , Chhindwara, M.P. is holding mining lease over

an area of 3.084 hectares in village Malegaon of Chhindwara district, M.P. for a period

of 10 years with effect from 23 January 1996 to 22 January 2006. The tenwal by 20

years was granted by Govt. of M.P. vide letter no. 360/2006 112/2dt. 13/09/2007.

Mining lease for Dolomite ore over an area of 3.084 Hectares in village: Malegaon ,

District: Chhindwara, M.S. Vasudha Minerals & Chemicals, Chhindwara vide Govt. of

Madhya Pradesh vide letter no. order No. 360/2006 112/2dt. 13/09/2007 for a period of

20 years. The said lease was executed by the lessee on 23/01/1996.

Environmental Clearance for this mine has to be obtained under EIA Notification 2006.

ii) Brief description of nature of the project

M/s Vasudha Minerals & Chemicals has proposed expansion in production from

existing mine at village: Malegaon, Tehsil: Sausar, Dist: Chhindwara, Madhya pradesh.

The Mining Plan was prepared under Rule 24 A of MCR 1960 over an area of 3.084

hectares in village Malegaon of Sausar tahsil of Chhindwara District of Madhya

pradesh and approved by the Controller of Mines, (Central Zone) Indian Bureau of

Mines, Nagpur vide letter No. CNW/DOL/MPLM-251/NGP dt 15/05/2012. This Mining

Plan is valid up to 5 years i.e. up to March ending 2017.

The mining lease was granted to M/s Vasudha Minerals from 23/01/1996 to

22/01/2006 for 10 years. The renewal by 20 years was granted by Govt. of Madhya

Pradesh vide letter no. 360/2006 dt.13.09.2007.

iii) Need for the project and its important to the country and or region.

Dolomite is one of the major mineral deposits occurring in the Indian sub-continent. It has

played a great role in development of civilization and industrialization. The occurrence of

Dolomite ore in the proposed area is proved by the way of exploration and its production

has important role in the steel industries. The M.L. area over 3.084 Ha is covered within

the Survey of India toposheet No. 55 K/4. The capacity of the proposed Dolomite mine to

cater the need of Dolomite plant is 34337 MTPA. The region, where the project is situated

is mostly dependant on agriculture and other mining industry. The development of mining

Page 8: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

8 M/s Vasudha Minerals & Chemicals

in the area is directly and indirectly going to contribute in increasing employment,

infrastructure, communication, and socioeconomic infrastructure.

iv) Employment Generation (Direct and Indirect) due to the project.

The mine will directly employ about 20 workers. There will be also employment generation

in secondary and tertiary sectors. It is proposed to employ the local population wherever

possible in the proposed project activities.

Page 9: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

9 M/s Vasudha Minerals & Chemicals

3. PROJECT DESCRIPTION

i) Type of project including interlinked and Interdependent project, if any.

The proposed enhance of production of Dolomite by opencast/underground mining and

dump mining @ 34337 MTPA by opencast mine. There is no interlinked project with this

mine.

ii) Location (map showing general location, specific location, and project

boundary & project site layout) with coordinates.

Figure 1 gives the general and specific location of Malegaon Dolomite Mines. The lease

area is about 62 km from Nagpur via Saoner by NH-7 for Malegaon village, there is

bifurcation from Kelvad and it is connected by tar road and party by murrum road. The lease

is located about 7 km north east of Kelvad Township.

Location of

Mine

Figure 1: Location of Mine

Page 10: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

10 M/s Vasudha Minerals & Chemicals

The area proposed for mining lease is 62 Km. away from Nagpur district head quarter. It

falls in Survey of India Toposheet no. 55 K/4. The latitude and longitude of the center is

21030’36.26”N and 79055’38.20”E.

District &

State

Tahsil Village Khasara No. Area in Ha. Ownership &

Land use

Chhindwara

Madhya

pradesh

Sausar Malegaon Part of 105 3.084 Govt. Revenue

land.

Map 1 gives the project boundary of 3.084 Ha on Surface Plan and showing geographical

teachers of the mining lease area. The coordinates of the boundary are given in

Annexure 2.

iii) Details of alternate sites considered and the basis of selecting the proposed

site, particularly the environmental consideration gone into should be

highlighted.

Mining is a site specific and has to be undertaken at the place of the occurrence of the

mineral and hence no alternative sites explored.

iv) Size or magnitude of operation.

The proposed mining Lease Area is 3.084Ha with Production capacity of

Dolomite 34337 MTPA.

v) Project description with process details (a schematic diagram/ flow chart

showing the project layout, components of the project etc. should be given).

Geology of the area as dealt in mine plan has been considered for the study and relevant

portions are reproduced below

Regional Geology : The regional geological picture as per GSI District Resource

Map of Chindwara, has been the famous Sausar series with manganese ore. However

there has been the following rock type of gnessic complexat bottom followed by Tirodi

group and Sausar group of rocks of Proterozoic to Palaeo Meaxozoic age. The

Lohangi and Chorbaoli Formations are prevailing. There has been no dolomitic

formation indicated in rock types, however marble, calc granite are indicated under

Lohangi and Chorbaoli formations. The stratigraphic sequence is as below.

Page 11: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

11 M/s Vasudha Minerals & Chemicals

Age Groups/Series Formations Rock Type

Palaeo to Meso proterozoic

Sausar Series Lohangi & Chorbaoli

Marble, Calc granulite schist etc. with Mn ore

Tirodi Series Gnessic complex

-- Quartz veins, Pink gneissic granites, Amphibolite

Local Geology of the Mine: the lease area is almost entirely covered by dolomite

from top of hillocks down the pit working and ground level. There is a thin soil cover of 1m

on pit tops and could be seen in pit section and NE and southern part of area, at present

non-mining areas shows soil cover. the pit section shows the following sequence.

Soil ---- 1m

Chert boulders

Dolomite ----- from top to hills to ground level, below soil

Phyllites Layers------very thin

Reserves :

Total recoverable reserves available in the area are as under;

1. In situ Proved reserves (UNFC 111) ………… 388,557Tonnes

2. In situ Probable reserves (UNFC 112) ………… 618,037Tonnes

There is every possibility of increase in the reserves due to dipping ore body and

continuation further towards strike direction due east which has not been taken in to

account for the present. This would also be proved by further drilling some more

boreholes in the dip and strike direction.

Quality of Dolomite :

CaCO3 - 52.58 to 53.84%

MgCO3 - 42.22 to 44.03%

SiO2 - 1.28 to 1.63%

Lo - 45.52 to 46.58%

Mining Method:

The mining activities will be commenced by opencast method.

Page 12: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

12 M/s Vasudha Minerals & Chemicals

Year wise production;

As the Dolomite produced from this area is not for captive use, production of Dolomite

would be sold to different consuming industries. The proposed production during the

modification period of mining plan during the year 2011-12 to December 2015-16 is given

below;

Year ROM

cu.m.

Generation

of Waste

cu.m.

Generation of mineral

rejects and mining losses

cu.m.

Production

of dolomite

cu.m.

2006-07 447 22 45 380

2007-08 1882 94 188 1600

2008-09 2352 118 334 2000

2009-10 2352 118 334 2000

2010-11 2352 118 334 2000

Total 9385 470 935 7980

At present the working is in progress in one large pit by developing the complete section of

ore body by removing the overburden by shovel dumper combination by OTFM means

and production, sorting etc. is by manual means.

Considering the proposed production the pit configuration would be as shown in the

Conceptual Section given at Map-4 and development plan and proceed further towards

south in depth and eastwards along the strike direction to achieve the required production.

Conceptual plan: The mining operation by means of opencast method will be continued

Conceptual plan at the end of the 20 year and at the end of lease period is prepared.

At the end of first five years: At the end of first five years, about 17000 m2 area would be

covered under mining pit. Total, 2500 m2 of area will be required to accommodate 16738

m3 of waste rock and waste material from ore zone will be generated, keeping in view the

production target of about 34337 tonnes yearly during the modified plan period up to 2016-

17. The ore to overburden ratio will be 1:9.5

Area covered under plantation considering 25 plants per year would be about 1125 m2

along the southern boundary of lease area in barrier zone of 7.5 M.

Page 13: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

13 M/s Vasudha Minerals & Chemicals

The details of production & development, afforestation etc. during the modified mining plan

period is tabulated below;

At the end of Conceptual period:

After taking the production of about 50,800 tonnes during the modified plan period from

the estimated quantity of 1,66,665 tonnes about 1,15,865 tonnes of Dolomite ore remain to

be exploited from the proved, probable and float ore reserves will be available as on

01.04.2017. The area will be further explored by drilling and the reserves will be re-

assessed in the year 2015-16 but considering the present reserves about 17000 M2 area

would be covered under mining pit and 2500 M2 area would be required to accommodate

the waste rock and waste material. As these dumps would be utilized for reclamation of

mined out land during the conceptual period the dumping pattern would be simple.

The ultimate pit limit has been shown in the conceptual section and UPL depth would be

333 mRL. For plantation 1125 m2 area would be required considering 25 plants per year

up to this plan period and 1125 m2 in the conceptual period i.e. up to the next scheme

period considering the present estimated reserves and proposed production of about

34337 tonnes annually.

Post Mining Land use pattern: The waste material generation would be about 90% of

the total excavation including overburden and soil cover. These wastes would be used for

reclamation of worked out are in future. Most of the area worked out would be reclaimed

with slight depression. Over this reclaimed land plantation will be carried out to enhance

the environment.

Final slope of faces: Final slope of faces: before closing and reclaiming the mined out

land would be 90 % so that maximum ore can be recovered. Ultimate dump capacity & its

design.

Marketing /End Use : Dolomite of area is SMS grade and is being dispatched to steel

plants like Bhilai, NECO, Maharashtra Smelters in Drug, Nagpur, Chandrapur and such

Generation

soil in m3

Generation

of waste

material in

m3

Excavation

of ROM in

tones

Generation

of waste

from ROM

in tones

Production

of Dolomite

@ 90% in

tones

Area

under

plantation

in m2

Dolomite

: waste

ratio

Nil 6666.5 166665 16665 150000 1125 1:10

Page 14: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

14 M/s Vasudha Minerals & Chemicals

other small steel units in Madhya Pradesh, Chhatishgarh and Maharashtra which are

about 300 km from min head.

Mine Drainage

There is no water regime near to these mines and there are no chances of any

flooding, etc. The rain water as on date run down from the natural slopes. There may

be some accumulation of water in rain season; these waters will be pumped outside

lease area by suitable capacity pumps of 5HP.

From the hydrological conditions prevailing in the surrounding area the water level in

the proposed area is about 20-25 mt. below the general ground surface as such the

problem of mine drainage would not be faced while mining of Dolomite up to 7.5 mts.

depth. Generally the parent rocks phyllite and quartz mica schist are not good aquifer

hence the seepage of underground water in the mining pit will be less.

The mine water due to seepage and the rain water accumulated during monsoon in the

pits would be pumped out by means diesel operated pump and drained out through

gravity drainage.

vi) Raw material along with estimated quantity, likely source marketing area of

final products, mode of transport of raw material and Finished product.

Material will be transported mostly by road from the mine to the consumer industries as it

is economical and speedy for short distances.

vii) Resource optimization / recycling and reuse envisaged in the project, if

any, should be briefly outlined.

Not envisage in this project.

viii) Availability of water its source, Energy / power requirement and source

should be given.

The water requirement of the project is estimated to be 25 m3/day of the water is required

for drinking/domestic purpose. Water requirement for dust suppression (within the lease

and outside the lease in nearby villages), plantation and vehicle washing will be met from

mine water and from rainwater collected in mining pit. The power requirement will be met

from MSEB grid.

Page 15: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

15 M/s Vasudha Minerals & Chemicals

ix) Quantity of waste to be generated (liquid and solid) and scheme for their

Management /disposal.

There is no liquid effluent generation from the proposed mine. There will be hardly any

waste rock during the mining. If at all any waste material/rock is encountered during

mining upto ultimate depth, the quantity the same will be negligible. It will be dumped

on the non mineralized area and shall be biologically reclaimed.

x) Schematic representation of the feasibility drawing which give information

of EIA purpose.

The EIA will include an assessment of the potential impacts envisaged as an effect of

the project, during the operation of the mine. The assessment will be based on a

consideration of the individual components of the project.

Page 16: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

16 M/s Vasudha Minerals & Chemicals

4. SITE ANALYSIS

i) Connectivity.

The lease area is about 54 km from Nagpur via Saoner by NH-7 for Malegaon village,

there is bifurcation from Kelvad and it is connected by tar road and party by murrum road.

The lease is located about 7 km north east of Kelvad Township.

ii) Land use and Land ownership.

As per the administrative records the Land use of the Mine is as given below.

District &

State

Tahsil Village Khasara No. Area in Ha. Ownership &

Land use

Chhindwara

Madhya

pradesh

Sausar Malegaon Part of105 3.0844 Govt. Revenue

land.

iii) Topography (along with map).

The proposed area is a more or less plain terrain gently slopping in nature. The general

slope of the surrounding area is towards south-west direction, The general ground level of

334 m MSL. The surface map showing contours is enclosed as Map 2.

iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies

(including area under CRZ), shortest distances from the periphery of the

project to periphery of the forest, national park, wild life sanctuary, eco

sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case

of notified industrial area, a copy of the Gazette notification should be given.

A Key Plan showing landuse and shortest distance from forest and other features is

enclosed as Map 5. A brief summary of the features in 10 Km buffer zone is

tabulated below;

Sr.

No.

No.

Description Detail

1 Reserves Forest Malegaon RF - 0.5 Km

2 Nearest National Highway NH –7 - 8 Km

3 Nearest State Highway Sausar – Tumsar SH - 0.5 Km

Page 17: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

17 M/s Vasudha Minerals & Chemicals

v) Existing Infrastructure.

Water supply in most of the villages is available. Latrine facility, Waste Water disposal,

garbage disposal were available is some villages. While educational facilities & health

facilities are available in most of the villages. There is well established road connection.

vi) Soil classification.

Soil is the most important feature of physiography, the formation of which largely depends

upon the topography rock types and drainage. The cropping pattern in the area is

governed by the thickness of soil mantle, its texture and constancy. The soils of Sausar

tehsil are of various types. Each type covering a well-defined tract which displays cropping

pattern of totally different level. The soil of the tehsil is well defined and conductive for

growing crops of various kinds. The numerous varieties of soils known by many local

names they are grouped under the representative classes.

vii) Climatic data from secondary sources.

The climate of the area is tropical. The rainfall data has been collected from Chhindwara

Tehsil Office. The temperature and humidity has been collected from Nagpur

Meteorological Station. The climate of this district, which is similar to neighboring districts of

north Deccan, is characterized by a hot summer and general dryness except during the

southwest monsoon season. The cold season from December to February is followed by

the hot season from March to May. The period from June to September is the southwest

monsoon season and October and November form the post monsoon period.

Rainfall : The normal annual rainfall at Sausar is 1090 mm. it is reported that July and

August are the rainiest months in the area.

Temperature : The trend of temperature of the area shows that hot season commences

by about the beginning of March when temperature begins to rise rapidly. May is the

4 Nearest Railway Station Sawanga - 5 Km

5 Nearest Airport Nagpur - 48 km

6 Nearest Major city Nagpur - 43 Km

7 District Head Quarter Nagpur - 43Km

8 Nearest River / Dam Kanhan Nadi 1 Km

9 National Park, Wild Life Sanctuary, Eco

Sensitive areas

None within 15 Km

Page 18: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

18 M/s Vasudha Minerals & Chemicals

hottest month when the mean daily minimum temperature is about 250C with the onset of

monsoon season in the middle of June; day temperature drops appreciably and

throughout the monsoon season. (June September) the weather is pleasant. After

withdrawal of monsoon by the middle of October, both day and night temperature

decreases progressively. January is usually the coldest month of the year, with the mean

daily minimum temperature is about 120C, the minimum temperature during winter may

sometimes come down to 70C or below.

Humidity : The relative humidity is generally high i.e. about 90% in the monsoon of July,

August and September. The area frequently comes under the grip of heat waves from the

west and north during the months of April and May and the relative humidity in the

afternoon during the passage of such dry heat waves fall below 20%

Winds : Winds are generally light to moderate with some increase in speed in the latter

part of the summer season and the monsoon months. During the monsoon season winds

are mostly from directions between southwest and northwest. In the period from October

to December the winds are mainly northerly to northwesterly in the mornings and

northeasterly to easterly in the afternoons. In January winds from directions between north

and northeast are common in the mornings and from northeast, east and southeast in the

afternoons. While the winds in the mornings in February and March are as in January, the

afternoon winds become variable. In the rest of the summer season winds are mostly from

directions between west and northwest.

viii) Social Infrastructure available.

Education : Education is a basic requirement for every human being. The governments

should utilize its entire recourses in a rational manner to encourage people to become literate

to some extent since educated persons are assets ho help in proper development of the

country. In the Sausar Tehsil, there are number of primary, middle and Higher secondary

school and colleges.

Hospital : There are number of Hospital, dispensaries, primary health centre and Sub

primary health centre available in that tehsil.

Transport : The transport facilities in the tehsil are well developed and wide spread.

State or national highway link most of the urban areas.

Communication: Communication facilities go a long way in information collection and its

dissemination in an effective and speedy manner. In the modern society, the roll of the

Page 19: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

19 M/s Vasudha Minerals & Chemicals

facilities in the socioeconomic development of the society is very well recognized.

Communication facility help in the flow of information from one place to another in shortest

time, thus helping administration and corporate managers to take crucial decisions relating

to daily functioning of administration and business dealings in shortest possible time. The

importance of developed communication network for the common men judged from the fact

that in rural areas. All communication facility like as phone, fax, printer, scanner,

computer etc are available in Sausar tehsil.

Page 20: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

20 M/s Vasudha Minerals & Chemicals

5. PLANNING BRIEF

i) Planning Concept (type of Industries, facilities, transportation etc) Town and

country planning/ Development authority Classification.

The mining will be carried out as per the approved mining plan. During Mining Plan period,

the mining operation will be done by development of mechanized opencast method. The

statutory provisions for the development of mine shall be followed to ensure safe mining

practices and conservation of mineral. During the course of mining protection and

conservation of natural resources and protection of environment will be ensured.

ii) Population Projection.

The mine will provide direct employment to nearly 20 workers. The local persons will be

given preference in employment for mine and Dolomite plant as per their eligibility.

Necessary training will be given to train the unemployed youths of the nearby villages. The

indirect employment opportunities will automatically created with the click of Dolomite plant

and mining industry in the region.

iii) Land use planning (breakup along with green belt etc.).

The landuse for the mining lease will be strictly followed as per the approved mining plan.

iv) Assessment of Infrastructure Demand (physical & social).

The proposed mining will require roads for the transport of the mineral besides it will require

manpower to operate the proposed mine.

v) Amenities/Facilities.

These include community toilets, drinking water facilities like public stand posts.

Page 21: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

21 M/s Vasudha Minerals & Chemicals

6. PROPOSED INFRASTRUCTURE

i) Industrial area (processing area).

No processing of Dolomite is proposed.

ii) Residential Area (Non processing Area).

None

iii) Green Belt.

It is proposed to undertake plantation of local tree species within these leases also.

iv) Social Infrastructure.

Under Corporate Social Responsibility (CSR) the felt needs of the nearby villages are

identified and accordingly social infrastructures are developed as per the CSR policy of the

Govt. of Madhya Pradesh.

v) Connectivity (Traffic and Transportation Road/Rail/Metro/Water ways etc.)

Well established

vi) Drinking Water management (Source & Supply of water)

Drinking water for the workers will be met from the borewell within the mining lease.

Drinking water arrangement for the nearby villages under Corporate Social Responsibility

(CSR) will be also made.

vii) Sewerage System. None proposed

viii) Industrial Waste Management. Not required

ix) Solid Waste Management. None

x) Power Requirement & Supply / Source.

Through electricity board

Page 22: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

22 M/s Vasudha Minerals & Chemicals

7. REHABILITATION AND RESETTLEMENT (R & R ) PLAN

i) Policy to be adopted (central/state) in respect of the project affected person

including home oustees, land oustees and landless laborers (a brief outline to

be given.)

Not Applicable

Page 23: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

23 M/s Vasudha Minerals & Chemicals

8. PROJECT SCHEDULE & COST ESTIMATES

The capital budget for environmental protection measure is estimated to be Rs.40 Lacs .

Environment Management Plan is given in Annexure-3.

i) Likely date of start of construction and likely date of completion (Time schedule for the project to be given.)

The mining operations shall be carried out after obtaining all statutory permissions and

shall be carried out as per approved mining plan.

ii) Estimated project cost along with analysis in terms of economic viability of the project.

The estimated project cost is Rs. 40.00 Lacs.

The cost of production of Dolomite is estimated to be Rs 1200/- per tonne while the sale value

of the saleable Dolomite at the current price is around Rs 1800/- per tonne. Hence the project

is economically viable.

Page 24: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

24 M/s Vasudha Minerals & Chemicals

9. ANALYSIS OF PROPOSAL FINAL RECOMMENDATIONS

i) Financial and social benefits with special emphasis on the benefit to the local

people including tribal population, if any, in the area.

The liberalization of the Indian economy has catapulted the Indian industry into new realms of

development through global thinking and related progress. The policies of Government on

economic development have given various subsidies like slashing import duties and

provisions for the Indian industry to grow indigenously, also there are clearly spelled

guidelines for environmental management. The project under consideration aims to contribute

in the national objective of economy and ecology developing hand in hand. The region, where

the project is situated is mostly dependant on agriculture forest and mineral resources where

Dolomite has a major share. The development of mining in the area is directly and indirectly

going to contribute in increasing employment, infrastructure, communication, and

socioeconomic infrastructure. It is proposed to employ the local population wherever possible

in the proposed project activities directly or indirectly. The proposed Dolomite mine would

naturally have implications on the neighborhood with reference to socio-economic aspects of

society, environmental attributes such as land, water, air, aesthetics, flora and fauna. In

assessing the environmental impact, collection, collation and interpretation of baseline data is

of prime importance. Environmental impact analysis and assessment, which is required for

every industrial project, should preferably be carried out at the planning stage itself.

In compliance with the environmental procedure the environmental clearance application is

made. Necessary scientific studies will be undertaken as per the guidelines set by the Ministry

of Environment and Forests (MoEF) and prescribed Terms of Reference. The

suggestions/recommendations of all the experts, competent authorities, and government

officials are being sought for the impacts of the proposed project. Views and guidance of the

local residents, community based organizations, social organizations are extremely important

in order to devise a full proof Environment Management Plan for the proposed mining project

and also mitigate the damages caused due to the project. Allocation of necessary funds,

manpower and machinery will be made to for the protection and conservation of all the

components of environment. It is ensured that all mandatory clearances will be sought from

respective competent authorities before operating the proposed Dolomite Mine.

Page 25: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

25 M/s Vasudha Minerals & Chemicals

Page 26: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

26 M/s Vasudha Minerals & Chemicals

Page 27: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

27 M/s Vasudha Minerals & Chemicals

Page 28: New Delhi OF MALEGAON DOLOMITE MINESenvironmentclearance.nic.in/writereaddata/Online/TOR/11...PRE FEASIBILITY REPORT Submitted to EXPERT APPRAISAL COMMITTEE (Non Coal Mining) Ministry

Pre Feasibility Report: Malegaon Dolomite Mines

28 M/s Vasudha Minerals & Chemicals