new development-2018 q4 greenwich street south area...77 greenwich st elizabeth berger park trinity...

1
UNDER CONSTRUCTION Liberty St Reconstruction (Infrastructure) Target start 2018 Q4; target completion summer 2020 St. Nicholas Church Construction started 9/2015; target completion TBD 125 Greenwich St (Residential) 70-story, 273 condos, Thames St closed; target completion Fall 2019 74 Trinity Pl (Office/Church) 26-story; floors 0-5: public/community space; 6-8: church staff; 10 and up: office; target completion late 2019/early 2020 77 Greenwich St (Residential/School) AKA 42 Trinity Pl; 35-story, 90 condos, PK-5 school, 7,000 sq ft of retail; target completion 2020 Robert R. Douglass Pedestrian Bridge Target completion late 2019 RECTOR ST CARLISLE ST TRINITY PL THAMES ST MORRIS ST EXCHANGE AL J. P. WARD ST EDGAR ST GREENWICH ST WASHINGTON ST ALBANY ST THAMES ST CEDAR ST 4 3 WEST ST 5 A 2 B E D 125 Greenwich St 1 123 Greenwich St C F 6 Robert R. Douglass Pedestrian Bridge St. Nicholas Church/ Vehicle Security Center 77 Greenwich St Elizabeth Berger Park Trinity Plaza Marriott Downtown Club Quarters Hotel World Center Hotel Holiday Inn China Institute Battery Park City PLANNED American Stock Exchange Building W Hotel 74 Trinity Pl Thames St Arcade Elizabeth Berger Plaza 50 Trinity Pl 110-112 Liberty St Demoliton onging; planned hotel; target completion TBD Thames St Retail Pedestrian Arcade Development Plans TBD; potential plans to close Thames St between Trinity Pl and Broadway to traffic 123 Greenwich St (Retail/Hotel) AKA American Stock Exchange; floors 1-4: 100,000 sq ft retail; 5-29: hotel, 174 rooms; target completion TBD 50 Trinity Pl (Hotel) Aloft Hotel, 29-story, 173 rooms; target completion 2020 Elizabeth Berger Plaza Combining Elizabeth Berger Park with Trinity Plaza, eliminating the slip from Battery Tunnel; target start 2019; target completion TBD Rector St Pedestrian Bridge Will be demolished once Robert R. Douglass Pedestrian Bridge is completed LIBERTY ST Battery Tunnel Garage Trinity Church Site 5/ Albany Plaza Zuccotti Park 50 West Liberty St Reconstruction 110-112 Liberty St Public Plaza Rector St Pedestrian Bridge 2 3 4 1 A B C D E F downtownny.com/real-estate-reports Questions? [email protected] 5 6 New Development-2018 Q4 Greenwich Street South Area

Upload: others

Post on 05-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: New Development-2018 Q4 Greenwich Street South Area...77 Greenwich St Elizabeth Berger Park Trinity Plaza Marriott Downtown Club Quarters Hotel World Center Hotel Holiday Inn China

UNDER CONSTRUCTIONLiberty St Reconstruction (Infrastructure)Target start 2018 Q4; target completion summer 2020

St. Nicholas ChurchConstruction started 9/2015; target completion TBD

125 Greenwich St (Residential)70-story, 273 condos, Thames St closed; target completion Fall 2019

74 Trinity Pl (O�ce/Church)26-story; �oors 0-5: public/community space; 6-8: church sta�; 10 and up: o�ce; target completion late 2019/early 2020

77 Greenwich St (Residential/School)AKA 42 Trinity Pl; 35-story, 90 condos, PK-5 school, 7,000 sq ft of retail; target completion 2020

Robert R. Douglass Pedestrian BridgeTarget completion late 2019

CHU

RCH ST

NEW

ST

ALBANY ST

BATTERY PL

1 PL

RECTOR ST

BK BTRY TNL ET

CARLISLE ST

WEST THAMES ST

TRINITY PL

WASH

ING

TON

ST

GREEN

WICH

ST

THAMES ST

2 PL

MORRIS ST

LIBE

RTY

PL

EXCHANGE AL

BOWLING GRN

J. P. WARD ST

EDGAR ST

MORRIS ST

WEST ST

GREEN

WICH

ST

LIBERTY ST

CEDAR ST

WASH

ING

TON

ST

BATTERY PL

ALBANY ST

THAMES ST

CEDAR ST

4

3

WES

T ST

5

A2

B

E

D

125 Greenwich St

1

123 Greenwich St C

F

6Robert R. Douglass Pedestrian Bridge

St. Nicholas Church/Vehicle Security Center

77 Greenwich St

Elizabeth Berger

Park

Trinity Plaza

Marriott Downtown

Club Quarters Hotel

World Center Hotel

Holiday Inn

ChinaInstitute

BatteryPark City

PLANNED

American Stock Exchange Building W Hotel

74 Trinity Pl

Thames St Arcade

Elizabeth Berger Plaza

50 Trinity Pl

110-112 Liberty StDemoliton onging; planned hotel; target completion TBD

Thames St Retail Pedestrian ArcadeDevelopment Plans TBD; potential plans to close Thames St between Trinity Pl and Broadway to tra�c

123 Greenwich St (Retail/Hotel)AKA American Stock Exchange; �oors 1-4: 100,000 sq ft retail; 5-29: hotel, 174 rooms; target completion TBD

50 Trinity Pl (Hotel)Aloft Hotel, 29-story, 173 rooms; target completion 2020

Elizabeth Berger PlazaCombining Elizabeth Berger Park with Trinity Plaza, eliminating the slip from Battery Tunnel; target start 2019; target completion TBD

Rector St Pedestrian BridgeWill be demolished once Robert R. Douglass Pedestrian Bridge is completed

LIBERTY ST

Battery Tunnel Garage

Trinity Church

Site 5/ Albany Plaza

Zuccotti Park

50 West

Liberty St Reconstruction

110-112 Liberty St

Public Plaza

Rector St Pedestrian Bridge

2

3

4

1 A

B

C

D

E

F

downtownny.com/real-estate-reports

Questions? [email protected]

5

6

New Development-2018 Q4Greenwich Street South Area