new hampshire · 2020. 10. 27. · hi fog marioff major service, eur 6,000 air conditioning works,...

50
NEW HAMPSHIRE

Upload: others

Post on 05-Mar-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 2: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 3: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 4: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 5: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 6: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 7: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 8: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 9: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 10: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 11: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 12: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 13: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 14: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 15: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 16: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 17: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 18: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 19: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 20: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 21: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 22: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 23: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 24: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 25: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 26: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 27: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 28: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 29: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 30: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 31: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 32: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 33: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 34: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 35: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 36: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 37: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 38: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 39: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 40: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 41: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 42: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 43: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 44: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

Page 45: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

[email protected]

73 St James’s Street, SWIA IPH, LondonOffice +44 207 408 1001

Le Mirabel, 4 avenue des Citronniers, MC 98000, MonacoOffice +377 97 98 76 60

SPECIFICATIONS

Name

BuilderYear built (Refit years)TypeClassification

FlagDesignerNaval ArchitectInterior DesignerHull & Superstructure

Cruising SpeedMaximum SpeedRange

Fuel Capacity Fresh Water Capacity Black Water Capacity Grey Water Capacity Lube Oil Capacity Dirty Lube OilSpeed & Fuel Consumptions

NEW HAMPSHIRE (EX POSITIVE CARRY, EX RASSELAS)De Vries Shipyard, Aalsmeer, The Netherlands, hull 6702005, 2017/18Full Displacement, Twin Screw Diesel Motor Yacht Lloyds, 100A1 SSC, YACHT (P), Mono, G6, LMC/UMS, MCA compliantIsle of ManDe Voogt Naval ArchitectsDe Voogt Naval ArchitectsPannagan Designs (RASSELAS)RWD (NEW HAMPSHIRE)

CAPACITIES

12.5 knots16.0 Knots3000 nm @ 16.0 knots4500 nm @ 14.0 knots5800 nm @ 12.5 knots (cruising)138,000 Litres, 36.455 USG32,000 Litres, 8.453 USG1000 Litres, 264 USG (Hamann treatment plant, 1m3)20150 Litres, 5323 USG 4160 litres, 1099 USG3952 litres, 1044 USG16.0 knots maximum, 740 L/hr14.0 knots, 426 L/hr12.5 knots, 300 L/hr(Total consumption includes 40L/hr for generators)

Page 46: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

[email protected]

73 St James’s Street, SWIA IPH, LondonOffice +44 207 408 1001

Le Mirabel, 4 avenue des Citronniers, MC 98000, MonacoOffice +377 97 98 76 60

DIMENSIONS

SLEEPING

Length O. ALength W. LBeamDraft (half load)Draft (full load)Gross TonnageNet TonnageDisplacement

GuestsCrew

EnginesEngine ModelEngine hours

Stabilisers

62 metres / 203’ 5’’54.60 meters / 179’ 1’’11.10 metres / 36’ 5’’3.51 metres / 11’ 6’’3.71 meters / 12’ 2’’1,011 GRT303 NT1063 MT

12 guests in 5 cabins12

MACHINERY

Caterpillar 2 x 2000hp Caterpillar Diesel 3516B DI-TA 2984 KwStarboard, 10255 hours (22/10/2018) SN: S2SOD101Port: 10213 hours (22/10/2018) SN: S2500010Quantum QC-1800, Zero speed at anchor system, Serial: 502537

Page 47: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

[email protected]

73 St James’s Street, SWIA IPH, LondonOffice +44 207 408 1001

Le Mirabel, 4 avenue des Citronniers, MC 98000, MonacoOffice +377 97 98 76 60

ACCOMMODATION

OWNER’S SUITE

Owner

Guest

Crew

Double stateroom with 2 dressing rooms. Ensuite bathroom with bathtub and shower, 2 sinks and 2 toilets.2 x Double cabins with ensuite shower room2 x Double cabins with extra single berth and Pullman berth. Both with ensuite shower rooms.1 x single Nanny cabin with Pullman berth and ensuite shower room.1 x double Captains cabin with ensuite shower room2 x double cabins with pullman berth and ensuite shower room6 x twin upper and lower berth cabins with ensuite shower room

GUEST ACCOMMODATION

GUEST AREAS

Owners suite is located forward on the main deck, decorated in classic dark mahogany wood panelling with modern features. It boasts a superking bed, spacious bathroom, his and hers heads, bidets, shower and tub, underfloor heating and towel rails, sauna, private office, safe and fridge.

Four guest cabins and a guest/nanny cabin are located on the lower deck, like the master cabin they too are furnished dark mahogany wood panels with modern features. Two cabins boast an additional bunk and pullman. All 4 cabins have a superking bed, en-suite marble bathroom, head and bidet.

Main Dining Salon – located on the main deck, which is furnished in dark mahogany, with modern fixtures, comprises of a spacious 12 seating dining table.Main Salon – also on the main deck and furnished in dark mahogany panels with modern fixtures, comprises of a spacious lounge with a TV and fireplace. Main Deck Aft – The main deck aft boasts two comfortable built in seating areas, of which one has an extendable dining table.Sky Lounge – is located on the Bridge Deck, boasting comfortable sofas, a bar with 4 rotating barstools, TV and entertainment system.Bridge Deck Aft – The bridge deck aft has a 12-seating dining table with chairs and a built in seating/lounging area.Sun Deck Forward – Spacious built in loungersSun Deck Dining – 12 seating dining table and very well protected from the weather.Sun Deck Jacuzzi/Aft – this outside area boasts a jacuzzi, sun loungers and sofasLazarette – Beach club with sofas

Page 48: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

[email protected]

73 St James’s Street, SWIA IPH, LondonOffice +44 207 408 1001

Le Mirabel, 4 avenue des Citronniers, MC 98000, MonacoOffice +377 97 98 76 60

DECK

Complete paint works; painted in Palma by Pinmar using Awl grip. EUR 1,500,000

Teak deck sanding; decks completely sanded back to a smooth finish. EUR 30,000

Seating areas; all exterior seating foams replaced and new sunbrella material used to cover. EUR 75,000

Sun deck table turned 90 degrees and extended to comfortably seat 14 guests. EUR 85,000

Sun deck large teak tops on both port and starboard sides replaced. EUR 30,000

Exterior tables & varnished furniture fresh coat of varnish applied through a spray application. EUR 40,000

Antifouling; hauled twice in the last two and a half years, two separate applications of antifouling applied, the last being applied in May 2018, guaranteed to October 2019. EUR 95,000

GMDSS and UHF radios replaced, the mf/hf radio replaced, the SAT C replaced, and a completely new digital UHF radio system installed. EUR 70,000

Below is a summary of the works carried out since purchase in May 2016. A total of nearly Euro 8,000,000. A Full list is available on the long specification.

AV/IT & ELECTRICAL UPGRADE

Miscellaneous works; changing of exterior double glazed glass that had blown, polishing of anchor pockets, new backlit names, creating a beach club, new wind protectors for bridge deck aft, replacement of deck covers, teak replacement, bike storage, all to the value exceeding EUR 140,000.

Full IT upgrade – all documented. New Wi-Fi points added to increase speed around the yacht, a new corporate server installed, all computers and printers replaced, new wiring added for faster speeds, new security and firewall software installed, EUR 300,000

AV upgrade; all new 4k TV’s installed in all guest areas and cabins, Kaleidoscope server, a Blue Ray vault, Crestron programming running on iPads, EUR 340,000

Security system; 4 new cameras in heavily used areas, operated from bridge, crew mess and engine room. The cameras can all be moved and all have a zoom function. Computers have also been installed in areas to allow for their use, EUR 30,000

Electrical upgrades; slowly worked through the yacht in a systematic way to make penetrations connections terminated correctly and general tidying up of the electrical system EUR 40,000

Page 49: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

[email protected]

73 St James’s Street, SWIA IPH, LondonOffice +44 207 408 1001

Le Mirabel, 4 avenue des Citronniers, MC 98000, MonacoOffice +377 97 98 76 60

INTERIOR UPGRADES

Metrica (Germany) carried out all the interior works with no expense spared. The owners have spent over 2.2 million Euros on the interior upgrades.

Bridge bar; the bridge deck salon was converted from a lounge into a modern bar which matches the original woodwork of the yacht. Includes a new carpet and a teak & holly varnished floor. EUR 470,000

New Tai Ping carpet EUR 207,000

Teak floor in bridge deck corridor taken out and replaced with hand designed teak and holly floor. It is now one continuous floor from the bridge to the bar, giving greater depth to the corridor, EUR 18,000

New owners office; the ante room leading into the master suite, transformed from an empty room into an office, accompanying the desk is a hidden fridge and safe both behind doors and a printer on a sliding shelf. EUR 162,000

Owner’s stateroom multiple modifications completed. Including a new headboard, new marble on the counter tops, a lifting vanity table, new sofa’s, new wardrobes with sliding rails, and extra power sockets installed, EUR 140,000

New stainless/Corian galley which included the installation of 2 x steam ovens, 2 x dishwashers, a deep fat fryer, 8 induction tops, one conventional oven, 2 warming drawers placed under the counter, a fridge and freezer and an

electrically operated overhead plate warmer that lowers when needed. EUR 345,000

Chroming; all light fittings, door furniture, electrical sockets, cupboard furniture, fire heads, fiddles, rails, bridge fittings that were gold have been replaced with chrome. EUR 290,000

Bridge alterations; redesign of the seating has transformed the bridge into a guest area EUR 90,000

Wood touch ups; using the best interior touch up artists in Europe over the past three winters. EUR 85,000

New electrical blinds installed in all guests areas, including the bridge deck bar, main salon, captain’s cabin, owner’s cabin, and all guest cabins. EUR 105,000

New guest mirrors; every mirror was replaced and due to the complex design of the chamfered edge this was a project in itself. EUR 28,000

Crew mess and crew cabin upgrades; all mattresses replaced, all crew mirrors replaced, toilets replaced, crew privacy curtains installed, crew mess seating replaced, all carpets changed, crew TV and AV upgraded, new crew seats purchased, new crew towels and linen. EUR 45,000

New guest area lighting; all outdated lights in the guest areas were changed and installed. EUR 85,000

Page 50: NEW HAMPSHIRE · 2020. 10. 27. · Hi fog marioff major service, EUR 6,000 Air conditioning works, EUR 210,000 Stabiliser major service plus new shaft, EUR 106,000 Capstan and windlass

N E W H A M P S H I R E

[email protected]

73 St James’s Street, SWIA IPH, LondonOffice +44 207 408 1001

Le Mirabel, 4 avenue des Citronniers, MC 98000, MonacoOffice +377 97 98 76 60

ENGINEERING

A total of more than 2.7 million Euros

New anchor gypsies, EUR 56,000Passarella removal, overhaul & service, EUR 21,000Stern door removal, overhaul & service, EUR 65,000Engine room corrosion repair and repaint, EUR 20,000Main engine & gearbox service and overhaul, EUR 947,000Generator major service and overhaul, EUR 250,000Main and emergency switchboard, EUR 40,000Atlas shore power unit overhaul, EUR 29,000Rolls Royce steering gear service, EUR 59,000Hi fog marioff major service, EUR 6,000Air conditioning works, EUR 210,000Stabiliser major service plus new shaft, EUR 106,000Capstan and windlass service, EUR 48,000Fresh water system, EUR 30,000Tender cranes and beam cranes, EUR 25,000Sliding doors and fire doors, EUR 25,000Refrigeration plant, EUR 15,000

Bow thruster service, EUR 32,000Ship’s side valves, EUR 20,000Fire and bilge pumps, EUR 50,000Soft mount replacementsBellow replacementShips batteries replacementBlack and grey system overhaul