new project process – timescalesdn xoserve igt/ agent shipper apply for connection ref ig123 or...

4
New project process – timescales DN DN xoserve xoserve IGT/ IGT/ Agent Agent Shipper Shipper Apply for Apply for connection connection Ref IG123 Ref IG123 OR AG123 OR AG123 Issues quote Issues quote Ref DN123 Ref DN123 Accepts Accepts quote quote Quotes Quotes Developer/ Developer/ UIP for UIP for build build Contracts Contracts with with developer developer Developer Developer Accepts Accepts quote quote Confirms Confirms PSR PSR Contract Contract s with s with shipper shipper Bulk Bulk registra registra tion tion (PSR) (PSR) 5 days if fast track Else 8 days 90 days 90-180 days 5 days Self Self connec connec t DN DN connec connec t Acknowledg Acknowledg e e acceptance acceptance Acknowledge Acknowledge d

Upload: sara-stokes

Post on 18-Dec-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: New project process – timescalesDN xoserve IGT/ Agent Shipper Apply for connection Ref IG123 OR AG123 Issues quote Ref DN123 Accepts quote Quotes Developer/UIP

New project process – timescalesD

ND

Nxo

serv

exo

serv

eIG

T/

IGT

/ A

gen

tA

gen

t

Shi

pp

er

Shi

pp

er

Apply for Apply for connectionconnection

Ref IG123 Ref IG123 OR AG123OR AG123

Issues quoteIssues quote

Ref DN123Ref DN123

Accepts Accepts quotequote

Quotes Quotes Developer/UIDeveloper/UIP for buildP for build

Contracts with Contracts with developerdeveloper

Dev

elo

per

Dev

elo

per

Accepts Accepts quotequote

Confirms PSRConfirms PSR

Contracts Contracts with with shippershipper

Bulk Bulk registration registration (PSR)(PSR)

5 days if fast track

Else 8 days

90 days 90-180 days

5 days

Self Self connectconnect

DN DN connectconnect

Acknowledge Acknowledge acceptanceacceptance

AcknowledgedAcknowledged

Page 2: New project process – timescalesDN xoserve IGT/ Agent Shipper Apply for connection Ref IG123 OR AG123 Issues quote Ref DN123 Accepts quote Quotes Developer/UIP

New project process – timescalesD

ND

Nxo

serv

exo

serv

eS

hipp

erS

hipp

erD

eve

lop

erD

eve

lop

er

Completes Completes connectionconnection

Completes Completes connectionconnection

Self Self connectconnect

DN DN connectconnect

Completion Completion file to DNfile to DN

Completion Completion filefile

A

Completion Completion file receivedfile received

Notified of Notified of meter fitmeter fit

Handover Handover docs docs completedcompleted

Handover Handover docs docs receivedreceived

IGT

/ IG

T/

Age

nt

Age

nt

5 days

Advise Advise planned planned connectionconnection

5 days

AdvisedAdvised

Page 3: New project process – timescalesDN xoserve IGT/ Agent Shipper Apply for connection Ref IG123 OR AG123 Issues quote Ref DN123 Accepts quote Quotes Developer/UIP

New project process – timescales

Updates Updates project to project to completedcompleted

Notifies completed Notifies completed project to xoserveproject to xoserve

Ref DN123Ref DN123

IG123 OR AG123IG123 OR AG123

Retains project Retains project detailsdetails

DN123DN123

IG123 OR AG123IG123 OR AG123

Validates Validates completioncompletion

LiaisonLiaison

Valid?

NN

YY

DN

DN

xose

rve

xose

rve

IGT

/ IG

T/

Age

ntA

gent

Shi

pper

Shi

pper

B

Match project Match project details and add details and add to system with to system with IGT refIGT ref

1 day 2 days

If not found, revisited at D+20

X days TBC

Dev

elop

erD

evel

oper

Page 4: New project process – timescalesDN xoserve IGT/ Agent Shipper Apply for connection Ref IG123 OR AG123 Issues quote Ref DN123 Accepts quote Quotes Developer/UIP

New project process – timescalesD

ND

Nxo

serv

exo

serv

eIG

TIG

TS

hip

pe

rS

hip

pe

r

Completed Completed connectionconnection

Shipper is Shipper is registered userregistered user Group into LMNsGroup into LMNs

Submit D01Submit D01

Ref IG123Ref IG123

Receive D01Receive D01SCOGESSCOGES

X days Max 6 days

First meter fitFirst meter fit

Notified?Notified?

X days

A

B

Dev

elo

per

Dev

elo

per