Page 1: New Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 - Strategic... · 2016. 5. 9. · Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy

0 Humility | Entrepreneurship | Teamwork and Relationships | Deliver the Promise | Learning | Social Responsibility | Respect for Individual

0

56

113

0

102

179

226

0

26

247

168

0

33

158

207

Strategic Partnership with

Tenaga Nasional Berhad

09 May 2016

Page 2: New Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 - Strategic... · 2016. 5. 9. · Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy

1 Humility | Entrepreneurship | Teamwork and Relationships | Deliver the Promise | Learning | Social Responsibility | Respect for Individual

0

56

113

0

102

179

226

0

26

247

168

0

33

158

207

DISCLAIMER

The materials being shown in this presentation is solely for information and not to be reproduced, retransmitted, further distributed to any other person or published, in whole or

in part, for any other purpose.

These materials have been prepared by GMR Infrastructure Limited (the "Company") solely to be used for this presentation. No representations or warranties, express or

implied, are made by the Company or its subsidiaries (collectively, the “Group”) or any of their respective members, directors, officers or employees or any other person as to,

and no reliance should be placed on, its fairness, accuracy, completeness or correctness of the information or opinions presented or contained in these materials and have not

been independently verified.

It is not the intention to provide a complete or comprehensive analysis of the financial or trading positions or prospects of the Company or the Group. None of the Company or

the Group or any of its directors, officers, employees, agents, affiliates, advisers or representatives accepts any liability whatsoever from any loss howsoever arising from any

information or opinions information or opinions presented or contained in these materials or otherwise arising in connection with these materials. The information and opinions

presented or contained in these materials are provided as on the date of this presentation and are subject to change without notice and the accuracy of the information is not

guaranteed.

This presentation is for information purposes only and is not and does not constitute or form part of any offer, invitation or recommendation to purchase or subscribe for any

securities and no part of it shall form the basis of or be relied upon in connection with any contract, commitment or investment decision in relation thereto. This presentation

may not be used or relied upon by any other party, or for any other purpose, and may not be reproduced, disseminated or quoted without the prior written consent of the

Company. This presentation should not be relied upon as the basis of an investment decision in securities of the Company or the Group.

The distribution of this presentation in certain jurisdictions may be restricted by law and persons who come into possession of this presentation should observe any such

applicable restrictions. The Company or its Group cannot be held liable for distribution of the presentation by the investors who come into possession of the presentation or for

non compliance with applicable laws or restrictions.

This presentation and the discussion that follows may contain “forward looking statements” relating to the Company or the Group. These forward looking statements, which

may include statements relating to future results of operation, financial condition, business prospects, plans and objectives, are based on the current beliefs, assumptions,

expectations, estimates, and projections of the directors and management of the Company about the business, industry and markets in which GMR Infrastructure the Group

operates. These statements are not guarantees of future performance, and are subject to known and unknown risks, uncertainties, and other factors, some of which are

beyond the Company’s or the Group’s control and difficult to predict, that could cause actual results, performance or achievements to differ materially from those in the forward

looking statements. Such statements are not, and should not be construed, as a representation as to future performance or achievements of the Group. In particular, such

statements should not be regarded as a projection of future performance of the Company or the Group. It should be noted that the actual performance or achievements of the

Company and the Group may vary significantly from such statements.

Page 3: New Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 - Strategic... · 2016. 5. 9. · Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy

2 Humility | Entrepreneurship | Teamwork and Relationships | Deliver the Promise | Learning | Social Responsibility | Respect for Individual

0

56

113

0

102

179

226

0

26

247

168

0

33

158

207

Background

• Structural issues & headwinds in the Power sector are getting gradually addressed through Government’s

recent reform initiatives like UDAY, e-RLNG bid scheme, Coal rationalisation policy, etc. Also domestic coal

production scenario has improved significantly

• GMR Energy Ltd. (GEL) has been committed to protecting the interests of all its stakeholders

o It has completed all its under construction projects viz. 3,000 MW of coal based projects and 768 MW

of gas based project

o Post commissioning of these projects, GEL has been focused on stabilizing the projects and improving

the profitability of the projects

o Also, GEL has received favourable tariff orders in the past few months improving its visibility of cash

flows and profitability

• GMR has always forged long term partnership with best-in-class strategic & financial institutions across its

businesses including Fraport, MAHB, Temasek, IDFC, Kuwait Investment Authority, etc.

o Now, it has been able to induct a financially sound & reputed international strategic partner in its

Energy business

Proposed investment of USD 300 mn by Tenaga Nasional Berhad (Tenaga) for 30% equity

interest in a select portfolio of GEL

Page 4: New Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 - Strategic... · 2016. 5. 9. · Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy

3 Humility | Entrepreneurship | Teamwork and Relationships | Deliver the Promise | Learning | Social Responsibility | Respect for Individual

0

56

113

0

102

179

226

0

26

247

168

0

33

158

207

GMR Infrastructure

Ltd

GMR Energy Ltd

Kamalanga Power

Plant- 1,400MW

Warora Power Plant-

600MW

Vemagiri Power

Plant- 388MW

Gujarat Solar Plant-

25MW Bajoli Holi Hydro

Project- 180MW

Upper Karnali Hydro

Project- 900MW

Upper Marsyagadi

Hydro Project-

600MW

Alaknanda Hydro

Project- 300MW

Thermal

(Coal & Gas)

Renewable

(Hydro & Solar)

Chhattisgarh Power

Plant – 1,370MW Other Power Assets

Indonesia coal mines

Other Assets

Maru & Aravalli

Transmission

Private Equity

Investors

Operational Under Construction Under Development

93.5%*

6.5%

Rajahmundhry

Power Plant- 768MW

* Includes both direct & indirect holding

Kamalanga Power Plant includes 350MW of Unit 4 which is under development

Current Structure of GMR Energy

Barge Plant- 235MW

Page 5: New Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 - Strategic... · 2016. 5. 9. · Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy

Humility | Entrepreneurship | Teamwork and Relationships | Deliver the Promise | Learning | Social Responsibility | Respect for Individual

About the Transaction

Page 6: New Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 - Strategic... · 2016. 5. 9. · Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy

5 Humility | Entrepreneurship | Teamwork and Relationships | Deliver the Promise | Learning | Social Responsibility | Respect for Individual

0

56

113

0

102

179

226

0

26

247

168

0

33

158

207

Overview • Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy for 30% stake on a

fully diluted basis

Structure

• Investment by Tenaga would be in select portfolio of assets of GEL

o Selected assets would be in Portfolio A (depicted in Slide 6)

o Assets included in Portfolio B (depicted in Slide 6) will include Chhattisgarh and Rajahmundry Power plants

− Tenaga has right to invest in Chhattisgarh and other assets at the Fair Market Value (FMV) any time

within the next 5 years

o Indonesian coal mines would remain outside of GEL since Tenaga does not want to take exposure in

commodities

GEL Valuation • Equity Value of USD 1 bn (~Rs 6,665 cr1)

Key Terms &

Conditions

• Proceeds from the transaction (~Rs 2,000 cr) to be used for corporate debt servicing

• All convertible instruments (Private Equity players) to be converted into equity shares prior to the transaction

• GMR would remain the majority shareholder

• Subject to conditions customary to a transaction of this nature including applicable regulatory approvals from

Malaysia and India, applicable lender consents, restructuring of GEL including carve out of assets, etc

Assuming an INR/ USD exchange rate of 66.65

Broad Terms of the Transaction

Page 7: New Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 - Strategic... · 2016. 5. 9. · Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy

6 Humility | Entrepreneurship | Teamwork and Relationships | Deliver the Promise | Learning | Social Responsibility | Respect for Individual

0

56

113

0

102

179

226

0

26

247

168

0

33

158

207

Revised Structure of GMR Energy

GMR Infrastructure

Ltd

GMR Energy Ltd

Kamalanga Power

Plant- 1,400MW

Warora Power Plant-

600MW

Barge Plant- 235MW

Gujarat Solar

Plant- 25MW

Bajoli Holi Hydro

Project- 180MW

Upper Karnali Hydro

Project- 900MW

Upper Marsyagadi

Hydro Project- 600MW

Alaknanda Hydro

Project- 300MW

Thermal

(Coal & Gas)

Renewable

(Hydro & Solar)

Chhattisgarh Power

Plant – 1370MW

Rajahmundry Power

Plant – 768MW

Other Assets

Other Power

Assets

Indonesia coal

mines

Excluded Assets

Maru & Aravalli

Transmission

Portfolio A – Tenaga is investing in this portfolio Portfolio B – Right to invest within 5 years

Tenaga Private Equity

Investors

52%*

18% 30%

* Includes both direct & indirect holding

Kamalanga Power Plant includes 350MW of Unit 4 which is under development

Operational Under Construction Under Development

Vemagiri Power

Plant- 388MW

Page 8: New Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 - Strategic... · 2016. 5. 9. · Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy

7 Humility | Entrepreneurship | Teamwork and Relationships | Deliver the Promise | Learning | Social Responsibility | Respect for Individual

0

56

113

0

102

179

226

0

26

247

168

0

33

158

207

Bajoli Holi

(180 MW / Hydro)

Alaknanda

(300 MW / Hydro)

Upper Marsyangdi

(600 MW / Hydro)

Upper Karnali

(900 MW / Hydro)

Warora

(600 MW / Coal)

Kakinada

(235 MW / Gas)

Kamalanga

(1,050 MW / Coal)

Vemagiri

(388 MW / Gas)

Solar Plant

(25 MW)

Operational Assets

Projects Under Construction

Projects Under Development

Legends:

Portfolio A – Balanced Mix of Operational & Pipeline Projects

Kamalanga

(350 MW / Coal)

• Operating capacity of ~2,300 MW comprising 5 assets

o Warora – 600 MW coal based plant strategically located in

the high growth oriented western region of Maharashtra

o Kamalanga – 1,050 MW coal based plant strategically

located close to the coal belt of Odisha

o Vemagiri – 388 MW gas based plant

o Barge – 235 MW barge mounted gas based plant

o Gujarat Solar – 25 MW solar power plant located at Patan

• Additional pipeline capacity of ~2,330 MW comprising 5

under construction / development assets

o Kamalanga Unit 4 – 350MW extension of Kamalanga

o Bajoli Holi – 180 MW hydro facility on the River Ravi

o Upper Karnali – 900 MW hydro project on the river Karnali

o Upper Marsyangdi – 600 MW hydro project on the river

Marsyangdi

o Alaknanda – 300 MW hydro project on the Alaknanda River

Balanced mix of Coal (2,000 MW), Gas (623 MW) and Renewable energy - Hydro (1,980 MW)

& Solar (25 MW)

Page 9: New Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 - Strategic... · 2016. 5. 9. · Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy

8 Humility | Entrepreneurship | Teamwork and Relationships | Deliver the Promise | Learning | Social Responsibility | Respect for Individual

0

56

113

0

102

179

226

0

26

247

168

0

33

158

207

Project Location Fuel Capacity (MW) COD

Chhattisgarh Raipur Coal 1,370 Unit 1 – Nov 2015

Unit 2 – Mar 2016

Rajahmundry Rajahmundry Gas 768 Unit 1 – Oct 2015

Unit 2 – Oct 2015

Total 2,138

• Tenaga would have a right to invest in these assets anytime within the next five years

• Adds further strategic value to the portfolio by adding ~2,000 MW of operating capacity and increase its total

portfolio to over 6,700 MW

Portfolio B - Right to Invest in Additional ~2,000 MW of Capacity

Page 10: New Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 - Strategic... · 2016. 5. 9. · Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy

Humility | Entrepreneurship | Teamwork and Relationships | Deliver the Promise | Learning | Social Responsibility | Respect for Individual

Merits of the Partnership

Page 11: New Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 - Strategic... · 2016. 5. 9. · Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy

10 Humility | Entrepreneurship | Teamwork and Relationships | Deliver the Promise | Learning | Social Responsibility | Respect for Individual

0

56

113

0

102

179

226

0

26

247

168

0

33

158

207

Merits of the Partnership

1

3

Strong synergies from the strategic partnership with Tenaga

Strengthening of Balance Sheet

Attractiveness of GMR Energy from a value unlocking perspective

2 Strong visibility of cash flows from operational portfolio

4

Highlights the strength and resilience of the Group 5

Page 12: New Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 - Strategic... · 2016. 5. 9. · Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy

11 Humility | Entrepreneurship | Teamwork and Relationships | Deliver the Promise | Learning | Social Responsibility | Respect for Individual

0

56

113

0

102

179

226

0

26

247

168

0

33

158

207

(Year ending Aug’15, USD bn)

Mcap (as on 09 May’16) 20.0

Shareholders equity 11.3

Total borrowings 5.9

Total Fixed Assets 21.6

Revenue 10.3

EBITDA 3.3

Net Profit 1.5

STRONG FINANCIAL POSITION

• Tenaga is the largest electricity utility in Malaysia and one of the largest power companies in Southeast Asia. Its core businesses span the entire value chain of electricity production and supply encompassing Generation, Transmission and Distribution

• Total installed capacity of 10,818 MW with more than 50% market share of the Malaysian grid’s generation capacity & over 8.9 mn customers serving a peak load of ~17,000 MW

• Significant operational experience in managing and operating power assets with 6 thermal power plants, 3 large hydro plants and supporting O&M of three independent power producers (IPPs)

• Key Shareholders o Khazanah Nasional Berhad (~30%), o Employees Provident Fund Boards (~17%), o Foreign Investors (~23%)

OVERVIEW OF TENAGA NASIONAL BERHAD

OPERATIONAL OVERVIEW

Gas 48.1%

Coal 40.1%

Hydro 11.6%

Others 0.1%

10,818 MW

Strong Synergies from the Strategic Partnership with Tenaga (1/2) 1

Page 13: New Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 - Strategic... · 2016. 5. 9. · Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy

12 Humility | Entrepreneurship | Teamwork and Relationships | Deliver the Promise | Learning | Social Responsibility | Respect for Individual

0

56

113

0

102

179

226

0

26

247

168

0

33

158

207

• Partnership between one of the largest integrated utilities and an established player in the Indian Power sector will be a force multiplier to create one of the most valuable companies

• Tenaga’s presence across the power value chain viz. generation, transmission and distribution increases the bandwidth of GEL to capture future opportunities

• Rich experience of Tenaga in Operating & Maintaining thermal power plants will help GEL in achieving operational excellence in its thermal assets

• Tenaga’s experience in successfully developing hydro projects will strengthen implementation of our hydro projects

• Creation of GMR Energy platform will facilitate rerating of the Energy business leading to wider sources of funds at competitive terms

Strong Synergies from the Strategic Partnership with Tenaga (2/2) 1

All future investments in Indian Power sector would be through this platform

Page 14: New Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 - Strategic... · 2016. 5. 9. · Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy

13 Humility | Entrepreneurship | Teamwork and Relationships | Deliver the Promise | Learning | Social Responsibility | Respect for Individual

0

56

113

0

102

179

226

0

26

247

168

0

33

158

207

13

GEL has more than 80% of its capacity contracted under long-term PPAs ensuring

high visibility of cash flows

The key operational assets of GEL are largely contracted under long term PPAs

• Warora is fully contracted with 3 PPAs to Dadra & Nagar Haveli, Maharashtra and Tamil Nadu

• Kamalanga's ~85% capacity is contracted through 3 PPAs to Haryana, Bihar and Odisha

• Vemagiri – 388 MW is fully contracted with Andhra Pradesh

Majority of the capacity contracted under long term PPAs

600 1,050 235 Capacity (MW)

100% 85%

100% 100%

15%

100%

Warora Kamalanga Barge Vemagiri Solar

% PPAs % Remaining

Long term PPAs 83%

Remaining 17%

Details of Power Offtake Operational Projects

388 25

Strong Visibility on Cash Flows from Operational Portfolio 2

Page 15: New Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 - Strategic... · 2016. 5. 9. · Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy

14 Humility | Entrepreneurship | Teamwork and Relationships | Deliver the Promise | Learning | Social Responsibility | Respect for Individual

0

56

113

0

102

179

226

0

26

247

168

0

33

158

207

• Primary proceeds from Tenaga’s investment will be used for corporate debt servicing

o Reduction of GMR consolidated corporate debt by ~30%

o Savings of ~Rs 250 cr of interest expense on an annual basis

o Strengthening of the Balance Sheet

o Provides GEL with greater flexibility for future inorganic acquisitions and organic developments

• Convertible preference shares (CCPS) issued by GEL to Private Equity Investors would

be converted into Equity

* Unaudited company estimate as on 31 March 2016 & does not include FCCBs of Rs 2,000 cr

Repayment through

proceeds from Tenaga

~Rs 2,000 cr

GIL Consolidated

Corporate Loans *

Rs 6,375 cr

Balance Corporate

Loans

~Rs 4,375 cr

Strengthening the Balance Sheet

Primary capital infusion at GEL strengthens its balance sheet

3

Page 16: New Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 - Strategic... · 2016. 5. 9. · Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy

15 Humility | Entrepreneurship | Teamwork and Relationships | Deliver the Promise | Learning | Social Responsibility | Respect for Individual

0

56

113

0

102

179

226

0

26

247

168

0

33

158

207

Key Merits of the Partnership

Highlights the

Strength and

Resilience of

the Group

4

Attractiveness

of GMR

Energy from a

value

unlocking

perspective

5

• Induction of a strong strategic partner provides renewed impetus to GEL

• Given the attractiveness of GMR Energy post the investment, it will have an opportunity

to unlock value at an appropriate time

• Proceeds from any value unlocking route would provide additional impetus to the overall

Group

• GMR Group has been focused on protecting the interests of the shareholders and

lenders. The Group raised

o Rs 1,477 cr QIP in July 2014

o Rs 1,402 cr Rights Issue in April 2015

o USD 300 mn Long Term FCCB from Kuwait Investment Authority in

December 2015

• Investment by Tenaga demonstrates the ability of the GMR Group to induct

strategic partner and reaffirms the long term value & potential of its Energy

business

Page 17: New Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 - Strategic... · 2016. 5. 9. · Primary investment of $300m (~Rs 2,000 cr) by Tenaga Nasional Berhad in GMR Energy

Humility | Entrepreneurship | Teamwork and Relationships | Deliver the Promise | Learning | Social Responsibility | Respect for Individual

Thank You