new sustainable water management and the net zero water …files.meetup.com/1444602/brendle ncre nzw...

28
Sustainable Water Management and the Net Zero Water Initiative July 19, 2016

Upload: others

Post on 24-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

Sustainable Water Management and the Net Zero Water Initiative

July 19, 2016

Page 2: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

Recent NCRES Water Talk

Nov. 17BreWater: Making More Beer with Less Water

Feb. 16Intro to the Water-Energy Nexus

Mar. 15The Energy Water Nexus: Choices in Energy Generation

Page 3: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

Who is Brendle Group?

Page 4: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

What is Net Zero Water?

A pioneering, grassroots initiative focused on planning for and achieving water neutrality.

Water Neutral:

Using only as much water as falls on a site and eliminating all water quality impacts from the site.

Page 5: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

Why this Initiative? Why Now?

• Starts with what is available to inform what is needed

• Recognizes the importance of sustainable water management, especially in the face of climate change

• Considers quantity AND quality

• Fills a gap – less developed frameworks/tools (builds on net zero climate and energy trends)

• Creates an action plan for reducing impact –developing a footprint is only the first step

Page 6: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

History and Context

2011-2013Idea incubated at Brendle Group

Fall 2013 Initiative launched at Net Zero Cities

Fall 2014Phase 1 development & fundraising complete

Winter 2015Introduced Building Scale Toolkit

August 2015Launched Building Scale Toolkit

September 2015

Net Zero Water Month

Page 7: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

Net Zero Water ConsortiumProject Team

Program Sponsors

Technical Advisory Group

Page 8: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

NZW Planning Toolkit – Building Scale

Page 9: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less
Page 10: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

TOOLKIT ORIENTATION/DEMO

Page 11: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

Case Study 1: BG Headquarters

• Site: 13,000 sq ft

• Building: 5,000 sq ft

• Built in 1985

• Renovated in 2010

• Certified LEED Gold

• Water conserving landscape, end-use fixtures, and appliances

• Permeable pavement and rain gardens for stormwater management

Page 12: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

Case Study 2: The Alliance Center

• Site: 15,000 sf

• Building: 41,000 sf

• Built in 1908

• Renovated in 2004

• Certified as LEED Gold

• Water conserving end-use fixtures

and appliances

Page 13: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

Case Study 3: New Belgium Brewing

• Site: 2.1 million sf; Building: 205,000 sf

• Goal to reduce water consumption to 3.5 barrels of

water per barrel of beer this year (2014 = 3.96:1)

Page 14: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

• Step 1: Analysis Parameters

• Step 2: Land Use/Land Cover (soils, site areas)

• Step 3: Precipitation (average and dry conditions)

• Step 4: Water Use (indoor/outdoor)

• Step 5: Water Use – Annual Growth

• Step 6-8: Water, Stormwater, and Energy Cost

Page 15: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

Case Study Water Footprints

21

475

630.18

0.43

0.0

0.1

0.2

0.3

0.4

0.5

0

100

200

300

400

500

BG Headquarters Alliance Center

QU

ALI

TY (

PO

UN

DS)

QU

AN

TITY

(G

ALL

ON

S)

THO

USA

ND

S

Indoor Outdoor Total Phosphorus

Page 16: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

Case Study Water Footprints

475800

1,100

8

13

0

5

10

15

20

25

0

500

1,000

1,500

2,000

2,500

BG Headquarters Alliance Center New Belgium

QU

ALI

TY (

PO

UN

DS)

QU

AN

TITY

(G

ALL

ON

S)

THO

USA

ND

S

Indoor Outdoor Total Phosphorus Phosphorous - Retention Ponds & Bioswales

Page 17: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

Case Study Water Footprints

29

54

33

8

13

0

5

10

15

20

25

0

50

100

150

200

250

BG Headquarters Alliance Center New Belgium

QU

ALI

TY (

PO

UN

DS)

QU

AN

TITY

(G

ALL

ON

S)

MIL

LIO

NS

Indoor Outdoor

Process - Beer Process - Wastewater

Process - Net Consumed Total Phosphorus

Phosphorous - Retention Ponds & Bioswales

Page 18: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

• Step 1: Vision Statement

• Step 2-3: Water Supply/Quantity Targets

• Step 4-5: Water Quality Targets

• Step 6: Milestones

Page 19: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

Quantity• Average and dry year conditions• Total site area• Total building area• Total roof areaQuality• Previous site conditions• Local water quality target• Pre-development conditions

Goal Options

Page 20: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

Reduce use & stormwater impact

• 50 percent below baseline in 2016

• 80 percent below baseline in 2018

• Achieve NZW goal in 2020

– Dry Year Harvestable Rainwater target for quantity

– Pre-development Condition target for quality

BG Headquarters Vision and Goals

Page 21: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

Alliance Center Goal Options

83%

12%

41%

6%

0

50

100

150

200

250

300

350

400

450

500

Baseline Avg-Bldg Avg-Roof Dry-Bldg Dry-Roof

QU

AN

TITY

(G

ALL

ON

S)

THO

USA

ND

S

Page 22: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

New Belgium Goal Options

74%

58%66%

0

5

10

15

20

25

30

35

40

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

2,000

Indoor/OutdoorBaseline

Dry-Roof + Process (NetConsumed)

Avg-Site NBB Goal (3.5gal/gal)

MIL

LIO

NS

QU

AN

TITY

(G

ALL

ON

S)

THO

USA

ND

S

Page 23: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

• Input Dashboard: Selecting Strategies

• Refining Reduction Strategies

– Indoor Water Efficiency

– Outdoor Water Efficiency

– Water Supply and Reuse

– Water Quality

– Trading Credits

Page 24: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

Brendle Group Reduction Strategies: Quantity

Page 25: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

Brendle Group Reduction Strategies: Quality

Page 26: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less
Page 27: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

What’s Next for Net Zero Water?

• Building Scale Toolkit Is available for Free Download at: brendlegroup.com/water/netzerowater/buildingtoolkit

• Encourage distribution/use of building-scale toolkit and implementation of NZW concepts

• Further development of the building-scale

toolkit and the NZW concept at other scales

Page 28: New Sustainable Water Management and the Net Zero Water …files.meetup.com/1444602/Brendle NCRE NZW Presentation.pdf · 2016. 7. 20. · Nov. 17 BreWater: Making More Beer with Less

CONTACT INFORMATION

Brendle Group Water Practice Area Lead & NZW Planning Toolkit Project ManagerBecky FedakBrendle [email protected]

brendlegroup.com/water/netzerowater

bit.ly/NetZeroWater