    SPECIFICATIONS FOR

    ONE (1)

    MID-MOUNT

    AERIAL PLATFORM

    ON A

    CUSTOM FOUR DOOR CHASSIS

    WESTMERE FIRE DISTRICT

    1741 WESTERN AVENUE

    ALBANY, NEW YORK 12203

    NOVEMBER 1, 2013

    POINT OF CONTACT

    COMMISSIONER JOHN LUTZ

    WESTMERE FIRE DISTRICT

    1741 WESTERN AVENUE

    ALBANY, NEW YORK 12203

    TELEPHONE NUMBER 518-727-3325

    E-MAIL:[email protected]

    WITH A COPY [email protected]

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]
  • 8/14/2019 New Truck Specifications

    2/139

    2

    CONTENTS

    GENERAL TERMS AND CONDITIONS ........................................................................................................... 11

    INSTRUCTION TO BIDDERS .......................................................................................................................... 11

    PRE-BID MEETING .................................................................................................................................... 11

    SUBMISSION OF BIDS .................................................................................................................................. 11

    REGULATIONS ............................................................................................................................................. 12

    BIDDER QUALIFICATIONS ............................................................................................................................ 13

    INSURANCE ................................................................................................................................................. 13

    EXCEPTIONS, VARIATIONS OR CLARIFICATIONS ......................................................................................... 14

    GENERAL CONSTRUCTION .......................................................................................................................... 15

    LIABILITY ...................................................................................................................................................... 16

    TAXES .......................................................................................................................................................... 16

    BID PRICE ................................................................................................................................................... 16

    WITHDRAWL OF BID ................................................................................................................................... 16

    DELIVERY ..................................................................................................................................................... 17

    INFORMATION REQUIRED AT DELIVERY ..................................................................................................... 17

    DRAWINGS .................................................................................................................................................. 18

    MATERIALS .................................................................................................................................................. 18

    CERTIFICATIONS .......................................................................................................................................... 18

    SERVICE CENTER REQUIREMENTS .............................................................................................................. 19

    NEW YORK STATE REGISTERED DEALER ...................................................................................................... 20

    PAYMENT TERMS ........................................................................................................................................ 20

    SURETY REQUIREMENTS ............................................................................................................................. 20

    PRE-CONSTRUCTION MEETING(S) .............................................................................................................. 21

    APPARATUS ORIENTATION ......................................................................................................................... 22

    INSPECTION TRIP(S) .................................................................................................................................... 22

    FAMA COMPLIANCE .................................................................................................................................... 22

    APPARATUS WARRANTY ............................................................................................................................. 22

    WARRANTY SECTION .............................................................................................................................. 23

    TRADE IN QUOTE ........................................................................................................................................ 23

    NON-COLLUSIVE BIDDING CERTIFICATION ................................................................................................. 23

  • 8/14/2019 New Truck Specifications

    3/139

    3

    MINIMUM WARRANTY REQUIREMENTS............................................................................................. 25

    APPARATUS DIMEMSIONS ..................................................................................................................... 26

    CHASSIS ....................................................................................................................................................... 26

    BUMPERS ................................................................................................................................................ 27

    CHASSIS FRAME ASSEMBLY ............................................................................................................... 27

    AXLES ..................................................................................................................................................... 28

    REAR AXLES ............................................................................................................................................. 29

    SUSPENSIONS .......................................................................................................................................... 29

    STEERING................................................................................................................................................. 30

    TIRE PRESSURE MONITOR ....................................................................................................................... 30

    TIRES ........................................................................................................................................................ 30

    WHEEL OPTIONS ..................................................................................................................................... 31

    TOW EYES ................................................................................................................................................ 32

    BRAKE SYSTEM ........................................................................................................................................ 32

    AIR BRAKING ABS SYSTEM ................................................................................................................. 34

    AIR HORNS ............................................................................................................................................ 36

    ENGINE/TRANSMISSION PACKAGE .................................................................................................. 37

    ENGINE................................................................................................................................................... 37

    SECONDARY BRAKING ............................................................................................................................. 39

    ENGINE COOLING PACKAGE .................................................................................................................... 40

    FUEL SYSTEMS ......................................................................................................................................... 42

    ALTERNATOR ........................................................................................................................................... 44

    BATTERIES ............................................................................................................................................... 44

    CAB MODEL ................................................................................................................................................. 48

    CAB MOUNTS AND CAB TILT SYSTEM .............................................................................................. 50

    CAB INTERIOR ....................................................................................................................................... 50

    CAB DOORS ........................................................................................................................................... 52

    WINDSHIELD WIPERS .......................................................................................................................... 53

    CAB INSTRUMENTS AND CONTROLS ................................................................................................ 53

    INSTRUMENTATION ON DASH PANEL: ............................................................................................ 54

    HIGH IDLE .............................................................................................................................................. 56

  • 8/14/2019 New Truck Specifications

    4/139

    4

    ELECTRICAL SYSTEM ................................................................................................................................ 57

    LED HEADLIGHTS .................................................................................................................................. 58

    CAB CRASHWORTHINESS REQUIREMENTS ......................................................................................... 59

    CAB ROOF TYPE ........................................................................................................................................... 60

    CAB BADGE PACKAGE ............................................................................................................................. 61

    CAB DOOR ............................................................................................................................................... 61

    CAB STEP OPTIONS .................................................................................................................................. 63

    MIRRORS ................................................................................................................................................. 64

    MISC EXTERIOR CAB ................................................................................................................................ 64

    HANDRAILS ........................................................................................................................................... 65

    STEPS AND HANDRAIL APPROVAL.................................................................................................... 66

    HVAC ........................................................................................................................................................... 66

    SEATS ........................................................................................................................................................... 67

    MAP BOXES ............................................................................................................................................. 70

    MISC INTERIOR CAB .................................................................................................................................... 71

    AIR BAGS ............................................................................................................................................... 71

    CAB ELECTRICAL .......................................................................................................................................... 72

    AUTO-EJECT BATTERY CHARGER RECEPTACLE ............................................................................... 73

    CAB TURN SIGNALS ............................................................................................................................. 74

    MISCELLANEOUS CHASSIS EQUIPMENT............................................................................................... 75

    BODY MODEL .............................................................................................................................................. 75

    AERIAL BODY ............................................................................................................................................... 79

    TRIPLE CROSSLAY HOSE BED .............................................................................................................. 79

    TRAFFIC CONE HOLDER ....................................................................................................................... 80

    COVERS ....................................................................................................................................................... 81

    HOSE BED COVER ................................................................................................................................. 81CROSSLAY COVER................................................................................................................................. 82

    MISCELLANEOUS PUMP PANEL .................................................................................................................. 82

    The Successful bidder shall provide a pump panel layout drawing for approval at the time of the pre-

    construction conference. ............................................................................................................................ 82

    PUMP MODULE ........................................................................................................................................... 83

  • 8/14/2019 New Truck Specifications

    5/139

    5

    WATER TANK ............................................................................................................................................... 84

    BOOSTER TANK .................................................................................................................................... 84

    LADDER STORAGE ....................................................................................................................................... 87

    REAR LADDER STORAGE ..................................................................................................................... 87

    LADDERS .................................................................................................................................................... 88

    MISCELLANEOUS BODY OPTIONS ............................................................................................................... 88

    HOSE BED CAPACITY ............................................................................................................................ 88

    FUEL FILL ................................................................................................................................................ 89

    PUMPS......................................................................................................................................................... 89

    PUMP SYSTEM ...................................................................................................................................... 89

    PRIMING SYSTEM ................................................................................................................................ 91

    PUMP SHIFT .......................................................................................................................................... 91

    PUMP CERTIFICATION ................................................................................................................................. 92

    PUMP CERTIFICATION ......................................................................................................................... 92

    PUMP COOLER ...................................................................................................................................... 93

    MANUAL MASTER DRAIN ................................................................................................................... 95

    TANK TO PUMP .................................................................................................................................... 95

    INTAKES ..................................................................................................................................................... 95

    DISCHARGES AND PRECONNECTS ............................................................................................................... 96

    THREAD TERMINATION ...................................................................................................................... 96

    OUTLETS ................................................................................................................................................ 96

    cAPS AND CHAINS ................................................................................................................................ 97

    PRESSURE GOVERNORS ................................................................................. Error! Bookmark not defined.

    PUMP PRESSURE GOVERNOR ............................................................................................................ 99

    TANK-FILL AND PUMP COOLER VALVE CONTROLS...................................................................... 100

    ENFO IV SYSTEM ................................................................................................................................ 101

    GAUGE IC 10 LED TANK LEVEL WATER/PSTANK........................................................................... 101

    ELECTRICAL SYSTEMS ................................................................................................................................ 102

    BATTERY BACKUP SYSTEM ............................................................................................................... 103

    WIRING ................................................................................................................................................ 103

  • 8/14/2019 New Truck Specifications

    6/139

    6

    WIRING PROTECTION ........................................................................................................................ 103

    WIRING CONNECTORS ...................................................................................................................... 104

    120 VOLT RECEPTACLES .................................................................................................................... 104

    NFPA REQUIRED TESTING OF ELECTRICAL SYSTEM .................................................................................. 104

    NFPA REQUIRED DOCUMENTATION .................................................................................................. 105

    WARNING LIGHTS ..................................................................................................................................... 106

    LIGHT BAR(S) ............................................................................................................................................. 106

    WARNING LIGHT PACKAGES ..................................................................................................................... 107

    DIRECTIONAL LIGHT BARS ......................................................................................................................... 108

    SIRENS ....................................................................................................................................................... 108

    DOT LIGHTING ........................................................................................................................................... 109

    LIGHTS-COMPARTMENT, STEP AND GROUND.......................................................................................... 111

    LIGHTS-DECK AND SCENE .......................................................................................................................... 112

    LIGHTS- NON-WARNING ........................................................................................................................... 113

    CONTROLS/SWITCHES ............................................................................................................................... 113

    CAMERAS/INTERCOM ............................................................................................................................... 114

    MISCELLANEOUS ELECTRICAL ................................................................................................................... 115

    GENERATOR .............................................................................................................................................. 115

    TESTING ............................................................................................................................................... 115GENERATOR TEST ...................................................................................................................................... 116

    BREAKER BOXES ........................................................................................................................................ 116

    LIGHTS-BROW 12vdc ............................................................................................................................. 116

    ELECTRIC CORD REELS ............................................................................................................................... 117

    AERIAL MODEL .......................................................................................................................................... 118

    95 MINIMUM MID MOUNT ELEVATING PLATFORM................................................................. 118

    ISO Compliance ......................................................................................................................................... 120

    LOAD LIMITATIONS ........................................................................................................................... 121

    MONITORS ................................................................................................................................................ 121

    DUAL MONITORS ............................................................................................................................... 121

    NOZZLE HOLDERS ............................................................................................................................... 121

    AERIAL WARNING LIGHTS ......................................................................................................................... 122

  • 8/14/2019 New Truck Specifications

    7/139

    7

    AERIAL LIGHTING ...................................................................................................................................... 123

    WATERWAY ............................................................................................................................................... 125

    MISCELLANEOUS AERIAL ELECTRICAL ....................................................................................................... 126

    AERIAL INFORMATION CENTER....................................................................................................... 126

    BREATHING AIR ......................................................................................................................................... 126

    AIR BOTTLE REFILL ............................................................................................................................. 127

    PLATFORM SYSTEMS ................................................................................................................................. 127

    SIGN PLATES .............................................................................................................................................. 128

    AERIAL TESTING ........................................................................................................................................ 128

    AERIAL CERTIFICATION ..................................................................................................................... 129

    MISCELLANEOUS LOOSE EQUIPEMENT .................................................................................................... 131

    EQUIPMENT MOUNTING .................................................................................................................. 131

    SAFETY BELTS/HARNESSES............................................................................................................... 131

    FRAME PAINTING............................................................................................................................... 131

    EXTERIOR PAINT ........................................................................................................................................ 131

    INTERIOR PAINT ........................................................................................................................................ 134

    CAB INTERIOR COLOR ....................................................................................................................... 134

    REAR BODY SCOTCHLITE STRIPING..................................................................................................... 134

    OPTIONS .................................................................................................................................................. 134

    ON-SPOT TIRE CHAINS ...................................................................................................................... 134

    WARRANTY/ STANDARD AND EXTENDED ................................................................................................. 135

    SUPPORT, DELIVERY, INSPECTION, AND MANUALS ................................................................................. 136

    TRAINING ............................................................................................................................................ 136

    APPROVAL DRAWINGS ..................................................................................................................... 136

    OPERATION AND SERVICE MANUALS ............................................................................................ 137

  • 8/14/2019 New Truck Specifications

    8/139

    8

    FIRE APPARATUS SPECIFICATIONS FOR:

    WESTMERE FIRE DISTRICT

    1741 WESTERN AVENUE

    ALBANY, NEW YORK 12203

    Comply: Yes___ No___

  • 8/14/2019 New Truck Specifications

    9/139

    9

    BID FORM

    DATE OF BID OPENING NOVEMBER 15, 2013 6:00PM

    LOCATION:

    1741 WESTERN AVENUE ALBANY, NEW YORK 12203

    BID TITLE:

    CUSTOM MID-MOUNT AERIAL PLATFORM

    SECURITY REQUIRED:

    10% CERTIFIED CHECK OR BID BOND

    Comply: Yes__ No__

  • 8/14/2019 New Truck Specifications

    10/139

    10

    ATTENTION ATTENTION ATTENTION

    FOR YOUR PROTECTION,THIS BID MAY NOT BE ACCEPTABLE WITHOUTCOMPLETING THE FOLLOWING INFORMATION. PLEASE REVIEW YOUR

    BID AND INDICATE BY A CHECK MARK THAT ALL REQUESTED

    INFORMATION HAS BEEN INCLUDED.

    CHECK OFF:

    1. ( ) BID FORM2. ( ) NON-COLLUSION STATEMENT3. ( ) BID BOND OR CERTIFIED CHECK4. ( ) BID SPECIFICATIONS5. ( ) INSTRUCTIONS TO BIDDERS6. ( ) BIDDERS BLUEPRINTS7. ( ) BIDDERS MANUFACTURING SPECIFICATIONS8. ( ) MANUFACTURERS CERTIFIED WARRANTIES9. ( ) REFERENCES10. ( ) EXCEPTION SHEET(S)

    DO NOT SEPARATE OR REMOVE ANY PAGES FROM THIS BID PACKAGE.

    DOING SO MAY RENDER YOUR BID INVALID. PLEASE RETURN THE

    CHECKLIST WITH YOUR BID.

    Comply: Yes__ no__

  • 8/14/2019 New Truck Specifications

    11/139

    11

    GENERAL TERMS AND CONDITIONS

    INSTRUCTION TO BIDDERS

    The intention of these specifications is to specify the basic requirements for

    manufacturing a custom fire apparatus (referred to herein as the apparatus) to

    withstand the continuous use encountered in the emergency firefighting service.

    It is the intent of Westmere Fire District (hereinafter, Purchaser)to award the

    bid to the lowest responsible bidder meeting these specifications. Factors to be

    considered by the Purchaser shall include but not limited to: certified parts

    availability, training, service capability and cost, total life expectancy, safety

    ratings and product reviews and overall reliability and cost Purchaser may decide

    not to accept any bid.

    Questions regarding these specifications shall be submitted in writing to a

    designated representative of the purchaser, written communications maybe in

    letter or e-mail. All responses will be in writing by either letter or e-mail. It is not

    the purpose of these specifications to eliminate any qualified bidder.

    PRE-BID MEETING

    There will be a mandatory pre-bid meeting on Wednesday November 13, 2013 at

    6:00 PM. The meeting will be held at the Westmere Fire Station, 1741 Western

    Avenue, Albany, New York 12203.

    SUBMISSION OF BIDS

    BID OPENING WILL BE DECEMBER 1, 2013 AT 6:00PM AT THE OFFICES OF THE

    WESTMERE FIRE DISTRICT, 1741 WESTERN AVENUE ALBANY, NEW YORK 12203

    Only bids submitted on the forms shall be considered. Bids shall be enclosed in a

    sealed envelope plainly marked BID ON NEW MID-MOUNT AERIAL PLATFORM

    bearing the time and date of the bid opening.

    Bidders SHALL submit six (6) copies of their bids including six (6) complete set of

    drawings. In addition to these specifications, each bidder SHALL submit a

  • 8/14/2019 New Truck Specifications

    12/139

    12

    complete and accurate description of their own product, including without

    limitation, size, dimension, type, model, material grade and material thickness of

    their fire apparatus in the form of a detailed bid proposal. Bids will be judged on

    completeness and accuracy in response to these specifications. Any bid proposal

    not complying with these basic minimum specifications may be judged non-

    compliant and may be rejected.

    Returning these specifications without a list of clarifications, exceptions and price

    may be considered non-responsive, incomplete and may be rejected. All bid

    proposals must be bid in the same sequence as these specifications for ease of

    comparison. Any bid proposal not in sequence may be disregarded and rejected.

    Failure to comply with all the conditions mentioned under Instruction to

    Bidder or the failure to conform to these specifications will be reasonable

    cause for rejection of the bid. Any bid not in accordance with these instructions

    or not in the form prescribed, or containing bids not asked for, or not containing

    all statements contained on the said bid form may be rejected.

    All bid forms SHALL be signed by an appropriate officer of the manufacturer of

    the apparatus being bid. Bids signed by a sales representative SHALL be declared

    informal and may be rejected. Each bid SHALL indicate the full business name and

    address of the bidder. Bids by partnerships SHALL furnish the full name of all

    partners and SHALL be signed by the Managing Partner(s). Bids by corporations

    SHALL be followed by the name of the State of Incorporation, and by the

    signature and designation of the President, Vice President or Secretary of the

    Company so long as same has the authority to bind the company. The name of

    each person SHALL also be typed below the signature. All legal entities submitting

    bids SHALL have said bid executed by an individual with legal authority to do so.

    REGULATIONS

    The apparatus SHALL comply with all Federal, State and Local requirements

    pertaining to vehicles used as emergency vehicles at the date required for

    submittal of the bid proposal unless changed by these specifications.

  • 8/14/2019 New Truck Specifications

    13/139

    13

    The delivered apparatus shall have a certified GVWR weight sticker applied to the

    vehicle upon delivery to assure the apparatus meets all requirements pertaining

    to the weight carrying capacity of the vehicle.

    BIDDER QUALIFICATIONS

    Bidders SHALL have in operation a parts and service facility adequate for actively

    engaging in performance of services specified herein.

    Bidders SHALL have previous performance under municipal contract or contracts

    of sufficient and comparable size with other customers.

    Bidders SHALL submit with their bid a list of a minimum of 50 vehicles similar to

    this bid that they have previously manufactured. The complete list of 50 SHALLinclude the current names, addresses and telephone numbers of the purchasers.

    Upon request by Purchaser and assuming same is not deemed confidential

    information.

    Bidders SHALL employ qualified personnel to render prompt, efficient and quality

    service. A certified and notarized statement of financial condition, audited

    financial statements and/or current Dunn and Bradstreet rating may be required

    prior to contract signing.

    Bidders SHALL have been in operations for a minimum of twenty (20) years in the

    manufacturing and/or remanufacture of fire apparatus.

    An inspection of bidders manufacturing facility and local repair facility may be

    required prior to the award of the bid, at which time additional information could

    be requested to verify the bidders responsibility.

    The Bidder SHALL identify the location of the manufacturing and repair facilities.

    INSURANCE

    Bidders SHALL furnish with the bid a certificate of insurance for general liability in

    the amount of $1,000,000 combined with each occurrence with $24,000,000

    excess liability, $25,000,000 aggregate. Insurance policies SHALL be maintained

  • 8/14/2019 New Truck Specifications

    14/139

    14

    for the life of the contract and shall provide a five (5) business days written

    notice before cancellation.

    Life of contract shall be from the date of acceptance by the purchaser and bidder

    and SHALL end with the delivery, acceptance by the purchaser and all correctionsmade by the manufacturer of defects or deficiencies found within one (1) month of

    delivery.

    EXCEPTIONS, VARIATIONS OR CLARIFICATIONS

    All bidders SHALL place an X in the appropriate space provided after each

    section of the specifications, indicating compliance or non-compliance with the

    section of the specifications.

    Exceptions: A bidder SHALL inset a number next to that section which relates to

    the exception.

    Any exception SHALL be clearly defined with details as to the proposed alternative

    referencing the manufacturing and model number where appropriate. A general

    exception cannot be taken for any paragraph. A detailed WRITTEN COMPARISON

    SHALL BE included within the bid for any exception listed. Each exception shall be

    considered by the degree of impact and total effect on the bid. Proposals taking

    total exception to the bid specification SHALL not be consider by the Purchaser.

    The Purchaser SHALL determine which (if any) exceptions are acceptable and this

    determination is final.

    The purchaser SHALL evaluate all bids received for all variations and exceptions to

    these specifications, no matter how slight. If variations are found that are not

    listed as an exception, it may be considered that the bid is non-compliant and

    may be rejected.

    Should the apparatus not comply with all requirements of this document, the

    apparatus SHALL be rejected when delivered. All apparatus SHALL be inspected

    for material, workmanship and compliance with specifications prior to

    acceptance. All items found to be non-compliant SHALL be identified, and the

    Purchaser reserves the right to accept or reject those specific items. The non-

  • 8/14/2019 New Truck Specifications

    15/139

    15

    compliant rejected items SHALL be replaced or reworked to meet the

    requirements of this document at no additional cost to the purchaser.

    GENERAL CONSTRUCTION

    The apparatus SHALL be of the latest type and construction with due

    consideration to symmetrical proportion, the distribution of weight and the

    nature of the load to be carried, and general character of the service to which the

    apparatus shall be subjected when placed in service. The apparatus and all major

    components SHALL be manufactured in the United States of America. NO

    EXCEPTIONS.

    The importance of public safety associated with all firefighting vehicles requires

    that this vehicle meet or exceed the specifications set forth herein. The minimum

    level of quality and design detailed in these specifications are required to meet

    the minimum of 25 year life expectancy of this apparatus.

    To extend the expected service life of the vehicle, the body module(s) shall be

    separate and removable from the chassis frame and be able to be reinstalled on a

    new chassis. The sheet metal material and gauge throughout the specifications

    are considered minimum. Since such materials are available to all manufacturers,

    exceptions to same shall not be accepted. Substitutions of lighter gauge materialshall not be acceptable.

    All parts not specifically mentioned herein, but which are necessary in order to

    finish a complete fire apparatus, shall be furnished and shall conform to the best

    practices known to the fire apparatus industry. All items furnished shall be new

    and unused.

    Details of design, construction and the sizes and weights of the different parts are

    left to the discretion of the manufacturer unless specified or shown.

    The workmanship shall be of the highest quality in the respective field. Special

    consideration shall be given to accessibility of the various components, required

    periodic maintenance operations, ease of operation, and symmetrical

    proportioning of overall apparatus. Because this project requires the integration

  • 8/14/2019 New Truck Specifications

    16/139

    16

    of the new custom fabricated components and related accessories to a new cab,

    chassis and necessary components into a fully integrated and complete

    apparatus.

    Welding shall not be employed in the assembly of the apparatus in a manner thatshall prevent the removal of a major component part(s) for service and/or repair.

    Construction shall be rugged and ample safety factors shall be provided to carry

    loads as specified to meet the road requirements and speed considerations.

    LIABILITY

    The Bidder, if their bid is accepted shall indemnify, defend and hold Purchaser

    harmless from and against any and all suits, costs, expenses, action, or liabilityand assume all liability for any and all claims made against the Purchaser or any

    officials or agents for the use of any patents, process, device or article forming

    any part of the apparatus product liability or any appliance, part or equipment

    furnished under contract.

    TAXES

    The bid shall not include any Local, State or Federal taxes. The Purchaser shall not

    be liable for any State of Federal mandated tax or program after the sale of this

    apparatus.

    BID PRICE

    The bid price shall be F.O.B. to the purchasers Fire Station (1741 Western

    Avenue, Albany, New York 12203). The price bid by the bidder shall be good for

    one hundred and twenty days (120)from the date of the bid opening.

    WITHDRAWL OF BID

    Bids may be withdrawn by certified mail, or e-mail prior to the time fixed for bid

    opening. Negligence on the part of the bidder in preparing the bid confers no

    right for withdrawal of the bid after it has been opened. Bids may only be

    withdrawn for a unilateral mistake pursuant to New York General Municipal Law

  • 8/14/2019 New Truck Specifications

    17/139

    17

    Section 103. No bidder may withdraw their bid after the time set for the opening

    thereof.

    DELIVERY

    The maximum number of calendar days to complete and deliver the apparatus

    shall not exceed 365 days after the signing of a contract. The manufacturer shall

    state the number of calendar days required to complete and deliver the

    apparatus after the award of the contract. The Manufacturer shall not be held

    liable for delays caused by accidents, strikes or natural disasters, provided

    however that the Manufacturer notifies the Purchasers representative in writing,

    of the occurrence of any delay, such notification to be by certified mail and

    provided within five (5) business days of such occurrence. Verbal notification ISNOT acceptable.

    To insure proper break-in of all components while still under warranty, the

    apparatus SHALL be delivered over the road under its own power. Rail and/or

    truck freight is not acceptable. The apparatus shall be suitably protected against

    damage from road debris while in transit. The apparatus may not be shown or put

    into any shows without express written permission of the Purchaser.

    INFORMATION REQUIRED AT DELIVERY

    At the time of Delivery, Two (2) hard copies plus two (2) CDs of the following

    SHALL be provided to the Purchaser

    1) complete operation and maintenance manuals, covering the complete

    apparatus, including but not limited to chassis manual, lubrication charts, and fire

    equipment service information as supplied by brand name components

    supplier(s) of all equipment supplied by these specifications.

    2) Engine manufacturers current brake horsepower curve, showing the maximum

    no-load governed engine RPM.

    3) Manufacturers record of apparatus construction details including actual

    vehicle weights.

  • 8/14/2019 New Truck Specifications

    18/139

    18

    DRAWINGS

    To assure the Purchaser that the bidder fully understands the scope of the work

    to be performed and is familiar with the project, a set of engineered drawings

    shall be included with the bid. The purpose of these drawings is to assist thePurchaser in evaluation and comparison of all bids received in compliance with

    the specifications. Shop sketches of similar sales drawings shall not be acceptable.

    There shall be NO EXCEPTIONS to this requirement. Omission of drawings shall be

    cause for bid rejection.

    The drawings SHALL depict the proposed apparatus and SHALL show the Front,

    Left side, Right side, Rear, Top Exterior and cab interior views of the proposed

    apparatus and SHALL show all principal dimensions. The drawings SHALL show thelocations of hardware, lights, reels and accessories. The drawings SHALL be

    prepared by the manufacturer using a CAD system to insure accuracy. Before

    construction begins, drawings SHALL be received and approved by an authorized

    representative of the Purchaser. Items shown on the drawings that have been

    accepted by the Purchaser but not in the specifications will be considered as part

    of the specifications.

    MATERIALS

    The materials specifications herein shall be considered an absolute minimum.

    Because all raw materials of the specified type and gauges are available to all

    manufacturers, exceptions will not be taken or permitted. Since all custom

    manufacturers have the ability to shear, break, bend and weld as these

    specifications require, all basic designs specifications stated herein shall be met.

    CERTIFICATIONS

    The proposed apparatus shall meet or exceed (i) all applicable requirements of

    the latest editions of the NFPA standards (unless changes are required by these

    specifications); (ii) Underwriters laboratories Inc. and (iii) all State and Federal

    regulations in effect at the date required for submittal of the bid proposal.

  • 8/14/2019 New Truck Specifications

    19/139

    19

    Parts and service shall be available for a minimum of twenty-five (25) years after

    delivery and acceptance of the apparatus.

    The apparatus proposed shall not be a prototype unit and is an established model

    and design.

    All out of state bidders SHALL provide a certificate of Authority to conduct

    business in the State of New York in accordance with Municipal Law and section

    1301 of the Business Corporation Law.

    The bonding company shall be licensed to do business in the State of New York

    and shall be treasury listed underwriting all bonds which may be reasonably

    requested by the Purchaser (see Surety Requirements below)

    Should Purchaser accept bidders bid, nothing herein shall obligate Purchaser to

    purchase the apparatus.

    By Submission of their bid each bidder agrees to accept the decision of the

    Purchaser without recourse and prejudice.

    SERVICE CENTER REQUIREMENTS

    In order to provide efficient service and support during the life of the apparatus, it

    will be required that the successful bidder and/or authorized manufacturers

    representative shall own and maintain a full service, parts and repair facility in a

    location not more than one hundred(100) milesfrom the end user.

    The manufacturers representative repair facility must be a full time operation.

    Mobile service trucks shall be available in addition to the above facility. The

    bidders service center must providea twenty-four (24) hour emergency call

    number and must provide seven (7) days a week emergency repair service.

    The service facility must be licensed by the State of New York Department of

    Motor Vehicles as a Repair Shop. A copy of this license must be included in the

    bid package.

  • 8/14/2019 New Truck Specifications

    20/139

    20

    NEW YORK STATE REGISTERED DEALER

    The successful bidder must be registered new vehicle dealer with the State of

    New York and must supply at the time of delivery all New York State required

    paperwork, forms etc. for submission to the State of New York to obtain title forthe new vehicle. The dealer will supply their New York State dealers license

    number with the bid package along with a copy of their New York State license

    certificate.

    State the location of the closest authorized and qualified service center meeting

    the above requirements below.

    Name: ___________________________________________________________

    Street: ___________________________________________________________

    City: ___________________ State: ____________________ Zip Code: _______

    Contact: _______________________________ Phone: ( )________________

    PAYMENT TERMS

    Payment for the completed apparatus shall be made in full upon final inspection

    and acceptance. A ten (10) percent retainer will be withheld until all defects and

    discrepancies have been corrected.

    Bidders are requested to submit a payment plan partial payments as the

    apparatus is being manufactured.

    SURETY REQUIREMENTS

    A bid bond in the amount of ten (10) percent of the bid shall be furnished with

    each bidder(s) proposal. A letter of credit shall not be acceptable in lieu of a bond.A performance bond in the amount of one hundred (100%) percent of the total

    contract shall be furnished by the successful bidder, within ten (10) business days

    after signing of a contract. The performance bond must be signed by an

    authorized corporate officer of the manufacturer. A performance bond furnished

    by a local sales representative shall result in cancellation of the bid award and

  • 8/14/2019 New Truck Specifications

    21/139

    21

    rejection of the bid. The surety shall not be liable for any maintenance, warranty,

    or guarantee period in excess of one (1) year.

    The bond company shall have an A. M. Best company of B+ or better to qualify

    as a valid bid or performance bond.

    If the bidder to whom the contract is awarded refuses or neglects to execute, or

    fails to furnish the required one hundred (100%) percent performance bond

    within ten (10) business days after signing of the contract the Bidders deposit

    may be forfeited and shall be retained by the Purchaser as liquidated damages.

    No plea of mistake in such accepted bid shall be available to the bidder for the

    recovery of their deposit or as a defense to any action based upon such accepted

    bid.

    PRE-CONSTRUCTION MEETING(S)

    A pre-construction conference(s) shall be held after the award and prior to actual

    construction of the proposed apparatus. The purpose of the conference(s) is to

    assure complete understanding of the Purchasers advertised specifications and

    the Bidders proposal specifications.The pre-construction meeting will be held at

    the manufacturers factory and/or office, with a minimum of at least the sales

    representative of the manufacturer, project manager, engineering department,

    representatives from the Purchasers apparatus committee, and representative of

    the Purchaser. At the pre-construction conference the manufacturer will provide

    a list of recommended intervals the Purchaser may want to send a representative

    to the factory to look over the work performed up to that point. The Purchaser

    will be advised, in writing, a minimum of ten (10) business days prior to the start

    of construction. Within this ten (10) day notice, the start the Manufacturer will

    send a suggested list of dates for the inspection visits. After the start ofconstruction, every Friday a written description with photographs of the work

    performed that week will be sent to the Purchasers representative via e-mail.

    The manufacturer will send a date for the final inspection at the mid-point of

    construction.

  • 8/14/2019 New Truck Specifications

    22/139

    22

    APPARATUS ORIENTATION

    The completed apparatus shall be delivered to the Purchaser with guidelines

    provide to firefighting personnel on operation, care, and maintenance of the

    apparatus at the Purchasers Fire Station. Upon delivery of the apparatus, themanufacturer shall send a qualified and responsible representative employee of

    the manufacturer shall accompany the delivery of the apparatus at the

    Purchasers Fire Station. The representative employee shall remain in the

    community for a reasonable time, but in no case less than seventy two (72) hours

    after the delivery for orientation of the fire department personnel, making normal

    adjustments and mounting equipment that is included as part of the proposal,

    after Westmere Fire District acceptance.

    The apparatus shall be delivered on a Thursday. Friday will be used to inspect the

    apparatus, and accept the apparatus. After acceptance on Friday training can

    begin on Friday and continue through Sunday by the representative employee.

    INSPECTION TRIP(S)

    The purchaser will bear all costs for any and all trips. The manufacturer will make

    recommendations based on phases of construction as to when these trips might

    occur, based on the pre-construction section.

    FAMA COMPLIANCE

    Manufacturer must be a current member of the Fire Apparatus Manufacturers

    Association.

    APPARATUS WARRANTY

    The Manufacturer shall warranty the apparatus for work performed under thespecifications to be well constructed and of good material and free in material,

    workmanship and imperfections under normal firefighting use and service. The

    Manufacturers obligation under this warranty shall be limited to repairing or

    replacement of any part or parts which may prove defective under normal fire

    service use or service within three (3) years of acceptance. Such defective part or

  • 8/14/2019 New Truck Specifications

    23/139

    23

    parts shall be replaced free of charge and without charge for installation to the

    Purchaser. This warranty shall not apply to normal maintenance and repair. Brand

    name components included with the apparatus or warranty of the component

    manufacturer (i.e. representative manufacturer). The apparatus warranty

    commences upon acceptance of the delivery of the apparatus.

    WARRANTY SECTION

    Each bidder shall provide a section in their bid proposal that shall list all

    warrantied items and the length of the warranty. All warranties are to commence

    upon delivery, final inspection and acceptance by the Westmere Fire District.

    TRADE IN QUOTE

    There will be no trade in with this quote.

    NON-COLLUSIVE BIDDING CERTIFICATION

    By submission if this bid, each bidder and each person signing on behalf of any

    bidder certifies and in the case of a joint bid each party hereto certifies as to its

    own organization, under penalty of perjury, that to the best of its knowledge and

    belief:

    1) The prices in this bid have been arrived at independently without collusion,consultation, communication, or agreement for the purpose of restricting

    competition, as to any matter relating to such prices with any other bidder

    or with any competitor.

    2) Unless otherwise required by law, the prices which have been quoted in thebid have not been knowingly disclosed by the bidder and will not

    knowingly, be disclosed by the bidder prior to opening, directly or

    indirectly, to any bidder or to any competitor and;3) No attempt has been made or will be made by the bidder to induce any

    other person, partnership, or corporation to submit a bid for the purpose of

    restricting competition.

    (SIGNATURE PAGE TO FOLLOW)

  • 8/14/2019 New Truck Specifications

    24/139

    24

    Dated: _______________________________

    (Legal name of person, firm or corporation)

    By: __________________________________________

    Title: ________________________________________

    (Bidder)

    Seal of the Corporation:

    Comply: Yes___ No___

  • 8/14/2019 New Truck Specifications

    25/139

    25

    MINIMUM WARRANTY REQUIREMENTS

    1) The entire vehicle shall be the responsibility of the successful bidder. Any component other thanthe bidders own is the responsibility of the bidder in regards to settling service and warranty

    issues.

    2) The manufacturer shall warranty each new apparatus to be free from defects in materials orworkmanship under normal use and service. This warranty shall include the necessary parts and

    labor to affect any required repairs during the two (2) year warranty period from the date of

    acceptance by the Westmere Fire District.

    3) Chassis frame rails and cross members shall be warranted to free from structural defects,cracking or deformation of components for the lifetime of the vehicle.

    4) Cab and Body Structure, including the body sub frame shall be warranted against structuraldefects including cracking, deformation of material and corrosion for a period of ten (10) years.

    5) Each Bidder shall warranty the aerial device including ladder sections, turntable, outriggers, andsub-frame components against defects in material and workmanship for a period of twenty (20)

    years.

    6) The finish paint on the cab, body and aerial tower sections (if painted) shall bewarranted against pealing, cracking, fading and adhesion for a period of seven (7)

    years, without pro-rating for the entire period

    7) Transportation and shipping costs to successfully complete any warranty work on the apparatusshall be the responsibility of the successful manufacturer. Should the apparatus require

    warranty work which cannot be completed within the Westmere Fire District the cost for

    transportation of the apparatus shall be the responsibility of the manufacturer.

    8) Each Manufacturer shall supply specific statements of warranty with their proposal for each ofthese areas and shall note any specific exclusion due to age, mileage or other terms of use.

    9) Should the apparatus be out of service for a period of more than seven (7) consecutive daysincluding weekends to perform any warranty service the amount of out of service time will be

    added to the term of the warranty for the entire apparatus without penalty to the Westmere

    Fire District.

    10)Any component warranty that exceeds the requested warranty time period by the Fire Districtshall be provided at no additional cost.

    11)Any Warranty work conducted on the apparatus shall be documented with a no cost invoice tothe Westmere Fire District outlining the work conducted and any parts that were repaired

    and/or replaced. This documentation shall be supplied within seven (7) working days of any

    completed warranty work.

    Comply: Yes___ No___

  • 8/14/2019 New Truck Specifications

    26/139

    26

    APPARATUS DIMEMSIONS

    Based upon the fire station bay space, structural conditions and street development with in the first due

    response area the Westmere Fire District has established the following minimum and maximum

    dimensions for the proposed new aerial device:

    MINIMUM MAXIMUM

    Wheelbase: 240 inches 260 inches

    Overall Length: 552 inches 576 inches

    Overall Height: 136 inches 140 inches

    Overall Width of Body: 96 inches 100 inches

    Front Bumper Extension: 14 inches 18 inches

    Cab Length: 130 inches 144 inches

    Aerial Tower Operating Height: 95 feet 100 feet

    Aerial Ladder Vertical Reach: 88 feet 94 feet

    Outrigger Spread: 16 feet 18 feet

    Outrigger Jack Penetration: 12 inches 18 inches

    Platform Capacity: 800 pounds 1000 pounds

    Comply: Yes___ No___

    CHASSIS

    The Chassis shall be manufactured in the factory of the bidder. The chassis shall be designed

    and manufactured for heavy duty fire service use with adequate strength and capacity of all

    components for the intended load to be sustained and the type of service required.

    Comply: Yes___ No___

  • 8/14/2019 New Truck Specifications

    27/139

    27

    BUMPERS

    Front Bumper

    The vehicle shall be equipped with a one-piece 12 high wrap around bumper made from 10

    gauge (0.135 nominal) polished stainless steel for corrosion resistance, strength,and longlasting appearance. It shall be mounted directly to the front frame extensions for maximum

    strength. The bumper shall incorporate two (2) stiffening ribs.

    Comply: Yes___ No___

    Bumper Reinforcement Plate

    The bumper shall be mounted to a reinforcement plate constructed of x 10x 70 carbon

    steel. Painted the same color and with the same paint as the chassis.

    Comply: Yes___ No___

    Bumper Extension

    The bumper extension shall be approximately 15 from the face of the cab as required.

    Comply: Yes___ No___

    Bumper Gravel Shield

    The extended front bumper gravel shield shall be made of 1/8 (0.125) aluminum tread platematerial as a minimum.

    Comply: Yes___ No___

    CHASSIS FRAME ASSEMBLY

    The chassis frame shall be specifically designed for use on a mid-mount aerial fire apparatus.

    The frame shall be designed to handle the weight and stress of the bidders mid-mount aerial

    apparatus and designed for continual fire service use.

    All the frame pieces shall be painted RED and each piece of the frame shall be painted before

    assembly. The Resistance to Moment Bending (RBM) shall be rated for the bidders apparatus

    specifications.

    The apparatus manufacturer shall supply a full lifetime frame warranty against defects in

    materials and/ or workmanship.

  • 8/14/2019 New Truck Specifications

    28/139

    28

    The custom chassis frame shall have a WHEEL ALIGNMENT in order to achievemaximum

    vehicle road performance and to promote long tire life. The alignment shall conform to the

    manufacturers internal specifications. All wheel lugs nuts and axle U-bolt retainer nuts shall

    be tightened to proper torque at the time of alignment. The wheel alignment documentation

    shall be supplied at the time of delivery.

    Comply: Yes___ No___

    AXLES

    Each bidder shall provide a complete weight analysis with the proposal indicating the estimated front

    and rear axle weights for the loaded vehicle including six (6) personnel, 2500 pounds of Fire District

    supplied equipment together with a full tank of fuel and all bidder supplied equipment as outlined in

    these specifications. This weight analysis will determine the minimum front and rear axle ratings being

    proposed by the bidder. Bids which provide an option for heavier axle ratings will not be considered by

    the Fire District.

    There shall be no exceptions to this requirement.

    Comply: Yes___ No___

    Front Axle

    The vehicle shall utilize Arvin Meritor drop beam front axle with a rated capacity for the

    bidders proposed mid-mount aerial apparatus. The axle shall be hub piloted, 10 stud,

    furnished with oil seals and come complete with assist cylinder, hoses and mounting brackets

    A 2 year/ unlimited miles part and labor axle warranty shall be provided as a standard by Arvin

    Meritor Automotive.

    Comply: Yes___ No___

    Shock Absorbers Front

    Koni Brand shock absorbers sized for the bidders apparatus shall be provided for the front

    axle. The shock absorbers shall be three way adjustable.

    The shocks shall be covered by the manufacturers standard warranty.

    Comply: Yes___ No___

  • 8/14/2019 New Truck Specifications

    29/139

    29

    REAR AXLES

    The vehicle shall utilize an Arvin Meritor rear tandem axle with single reduction hypoid

    gearing. The axle shall be sized for the bidders apparatus. The axles shall be hub piloted, 10

    studs furnished with oil seals.

    A 2 year/ unlimited miles parts labor rear axle shall be provided as standard by Arvin Meritor

    Automotive.

    Comply: Yes___ No___

    Inter-Axle differential Lock

    A Rockwell driver controlled main differential lock shall be supplied. An activation switch shall

    be provided on the drivers dash. It reduces wheel spin-outs by transferring power from the

    slipping wheel to the wheel with traction.

    When used in a tandem axle application, the DCDL will be installed on the rear/rear axle only.

    Comply: Yes___ No___

    SUSPENSIONS

    Front suspension

    The front suspension shall be variable or parabolic tapered minimum 54 long (flat) and 4

    wide. They shall be long life and maintenance free. A minimum of three (3) leafs are required.The front suspension shall be sized and rated for the bidders apparatus.

    Comply: Yes___ No___

    Rear Suspension

    The rear suspension shall be sized and rated for the bidders apparatus. A Raydan

    manufacturing air Link system or a Ridewell Dynalastic rear suspension are acceptable. Air ride

    is the preferred system. Heavy duty shocks shall be used to help reduce tire hops and improve

    stopping. Torque rods shall be used.

    Comply: Yes___ No___

  • 8/14/2019 New Truck Specifications

    30/139

    30

    STEERING

    A heavy duty power steering unit shall be provided; this should be used in conjunction with a

    power assist cylinder. The system shall operate mechanically should the hydraulic system fail.

    Steering column shall have six-position tilt and 2 telescopic adjustment.

    The apparatus shall have minimum cramp angle of 38 degrees, apparatus with cramp angles

    of 43 or 45 degrees are preferred. Each bidder shall supply a turning radius report with their

    proposal to show the inside and outside turning radius as well as the curb to curb turning

    radius of the vehicle being proposed.

    Comply: Yes___ No___

    TIRE PRESSURE MONITOR

    An electronic tire pressure monitoring system shall be provided. The system shall be on all ten

    (10) tires.

    A remote display shall be provided with the system. The remote shall display both tire

    pressure and temperature for each tire and shall be located in the cab. TPM Location to be

    determined at the pre-build conference.

    Comply: Yes___ No___

    TIRES

    The wheels and tires shall conform to the Tire and Rim Association requirements.

    All tires shall have valves stem assessable for checking tire pressure and filling of tires.

    Comply: Yes___ No___

    Front Tires

    The front tires shall be either two (2) Goodyear or Michelin tires. The tires shall have highway

    tread. The tires shall be sized and load range rated for the bidders apparatus.

    Comply: Yes___ No___

  • 8/14/2019 New Truck Specifications

    31/139

    31

    RearTires

    The rear tires shall be eight (8) either Goodyear or Michelin tires. All ten (10) tires shall be

    made by the same manufacturer. The eight (8) rear tires shall have Mud and Snow tread,

    tubeless type. Tires shall be sized and load range rated for the bidders apparatus.

    Comply: Yes___ No___

    WHEEL OPTIONS

    Front Wheels

    The apparatus shall have (2) polished (on outer wheel surface only) Alcoa aluminum disc

    wheels. They shall be forged from one-piece corrosion-resistantaluminum alloy and sized for

    the tires and axle capacities of the bidders apparatus.

    Comply: Yes___ No___

    Front Wheel Trim Package

    The front wheels shall have stainless steel lug nut covers. The front axle shall be covered with

    an American made brand mirror finish, 304L grade, non-corrosive stainless steel universal

    baby moon.

    All stainless steel baby moons shall carry a lifetime warranty plus a 2 year re-buffing policy.

    There shall be two (2) baby moons and twenty (20) lug nut covers.

    Comply: Yes___ No___

    Rear Wheels

    The apparatus shall have eight (8) polished (on outer wheel surface only) Alcoa aluminum disc

    wheels. They shall be forged from one-piece corrosion-resistant aluminum alloy and sized for

    the tires and axle capacities of the bidders apparatus.

    Comply: Yes___ No___

    Rear Wheel Trim package, Tandem Axle

    The rear wheels shall have stainless steel lug nut covers. The rear axle shall be covered with

    American made mirror finish, 304L grade, non-corrosive stainless steel, spring clip band high

    hats, DOT user friendly. All stainless steel high hats shall carry a lifetime warranty and a 2 year

    re-buffing policy. There shall be four (4) high hats and forty (40) lug nut covers.

  • 8/14/2019 New Truck Specifications

    32/139

    32

    Comply: Yes___ No___

    Extra Lug Nut Covers

    The apparatus shall be delivered with four (4) extra lug nut covers matching those provided on

    the apparatus.

    Comply: Yes___ No___

    Mud Flaps

    The apparatus shall have hard rubber mud flaps both front and rear. There shall be NO logos

    on the mud flaps.

    Comply: Yes___ No___

    TOW EYES

    Front Tow Hooks

    There shall be two (2) front tow hooks with 3 diameter eyes chrome plated attached directly

    to the chassis frame.

    Comply: Yes___ No___

    Rear Tow Eyes

    There shall be two (2) rear tow eyes with 3 diameter holes attached directly to the chassis

    frame rail and shall be chromate acid etched for superior corrosion resistance and painted to

    match the chassis.

    Comply: Yes___ No___

    BRAKE SYSTEM

    Front Brakes

    The front axle shall have disc brakes sized for the bidders apparatus. Arvin Meritor DiscPlus is

    the preferred brand.

    The brakes shall be covered by the manufacturers standard warrant which is three (3) years,

    unlimited mileage and parts only.

  • 8/14/2019 New Truck Specifications

    33/139

    33

    Comply: Yes___ No___

    Rear Brakes

    The rear axles shall be equipped with S-cam brakes with cast brake drums. The rear axle

    brakes shall be furnished with automatic slack adjusters. Apparatus manufacturer may use

    Disc brakes on the rear. Arvin Meritor is the preferred manufacturer. The brakes shall be sized

    for the bidders apparatus.

    A three (3) year/unlimited miles and three (3) year labor rear brake warranty shall be provided

    by the manufacturer. The warranty shall include bushings, seals and cams.

    Comply: Yes___ No___

    Brake System

    The apparatus shall be equipped with air operated brakes. The system shall meet or exceed

    the design and performance requirements of current FMVSS-121 and test requirements of

    current NFPA 1901 standards.

    Each wheel shall have a separate brake chamber. A dual treadle valve shall split the braking

    power between the front and rear systems.

    The air system shall be provided with a rapid build-up feature, designed to meet current NFPA

    1901 requirements. The apparatus shall not be required to have a separate on board electrical

    air compressor or shoreline hookup to meet this requirement.

    Six (6) supply tanks shall be provided. One (1) air reservoir shall serve as a wet tank, with an

    automatic drain valve installed. A minimum of one (1) tank shall be supplied for each of the

    front and rear axles. The total air system shall carry a sufficient volume of air to comply with

    FMVSS-121. The bidder shall size the tanks for their apparatus. All other air tanks shall have a

    manual drain valve.

    Two (2) air pressure needle gauges, for air brake pressure, with warning light and buzzer shall

    be installed at the drivers instrument panel.

    Accessories plumbed from the air system shall go through a pressure protection valve and to a

    manifold so the if any of the accessories fail they shall not interfere with the air brake system.

    All air reservoirs shall be attached to the frame with stainless steel clamps and hardware. Each

    air reservoir shall be provided with a stainless steel pull cable extended to the side of the body

    to permit personnel to drain the air tanks from a single location.

  • 8/14/2019 New Truck Specifications

    34/139

    34

    Comply: Yes___ No___

    AIR BRAKING ABS SYSTEM

    A Wabco ABS system shall be provided to improve vehicle stability and control by reducing

    wheel lock up during braking. This braking system shall be fitted to axles and all electrical

    connections shall be environmental

    The system shall constantly monitor wheel behavior during braking. Sensors on each wheel

    transmit wheel speed data to an electronic processor, which shall sense approaching wheel

    lock and instantly modulate brake pressure up to 5 times per second to prevent wheel lock

    up. Each wheel shall be individually controlled. To improve field performance, the system shall

    be equipped with a dual circuit design. The system circuits shall be configured in a diagonal

    pattern. Should a malfunction occur, that circuit shall revert to normal braking action. A

    warning light at the drivers instrument panel shall indicate malfunction to the operator.

    The system shall consist of a sensor clip, sensor, electronic control unit and solenoid control

    valve. The sensor clip shall hold the sensor in close proximity to the tooth wheel. An inductive

    sensor consisting of a permanent magnet with a round pole pin and coil shall produce an

    alternating current with a frequency proportional to wheel speed. The unit shall be sealed,

    corrosion resistant and protected from electro-magnetic interference. The electronic control

    unit shall monitor the speed of each wheel sensor and microcomputer shall evaluate in

    milliseconds wheel slip. A deviation shall be corrected by cyclical brake application and

    release. If a malfunction occurs, the circuit shall signal the operator and the malfunctioning

    half of the system shall shut down. The system is installed in a diagonal pattern for side to side

    control. The system shall ensure that each wheel is braked in optimum efficiency up to five (5)

    times a second.

    The system shall also interface with the application of the auxiliary engine, exhaust or

    driveline brakes to prevent wheel lock.

    To improve trouble shooting the system, provisions in the system for an optional diagnostic

    tester shall be provided. The system shall test itself each time the vehicle is started and a dash

    mounted light shall go out once the vehicle is moving above 4 MPH.

    A 3 year/300,000 mile parts and labor anti-locking brake system (ABS) warranty shall be

    provided as standard.

    Comply: Yes___ No___

  • 8/14/2019 New Truck Specifications

    35/139

    35

    Air Compressor

    The air compressor shall be a minimum 18.7 CFM engine driven Wabco.

    Comply: Yes___ No___

    Automatic Slip Response

    The anti-locking braking system shall be provided with six (6) sensors. The system shall be

    supplied with Automatic Slip Response (ASR). The ASR controls slip under acceleration.

    Comply: Yes___ No___

    ASR Switch

    An on/off switch for the automatic Slip Resistance shall be provided on the dash. This shall

    allow the driver to override the computer and turn the ASR on when at a higher speed for

    better traction in deep snow or mud.

    Comply: Yes___ No___

    Electronic Stability Control

    The apparatus shall have an Electronic Stability Control System.

    Comply: Yes___ No___

    Parking Brake

    A four wheel parking brake system shall be provided. The parking brake control shall be on the

    dash panel within easy reach of the driver.

    Comply: Yes___ No___

    Air Dryer

    The Chassis air system shall be equipped with an air dryer to remove moisture from the air in

    order to help prevent the air lines from freezing in cold weather and prolong the life of the

    braking system components. The air dryer shall be properly sized for the bidders apparatus.

    Comply: Yes___ No___

  • 8/14/2019 New Truck Specifications

    36/139

    36

    AirInlet

    A 1/4 brass quick release air inlet with a male connection shall be provided. The inlet shall

    allow a shoreline air hose to be connected to the vehicle, discharging air directly into the wet

    tank of the air brake system. It shall be located driver door jamb.

    Comply: Yes___ No___

    Isolated Air Reservoir

    The system shall have an additional minimum 1738 cu. In. isolated reservoir. The supply side

    of the reservoir shall be equipped with a check valve and an 85 PSI pressure protective valve.

    Specified options shall be plumbed to the isolated air tank.

    Comply: Yes___ No___

    Auxiliary Air Tank Plumbing

    The auxiliary air tank shall be plumbed to the following optional accessories, if equipped:

    Chassis air horns, brake system air outlet, air reel, light tower, and or customer/dealer

    supplied pneumatic add-on(s).

    Comply: Yes___ No___

    Air Lines

    Air brake lines shall be constructed of color coded nylon tubing routed in a manner to protect

    them from damage. Brass fittings shall be provided.

    Comply: Yes___ No___

    AIR HORNS

    Two (2) Grover 2040 Stuttertone rectangular, chrome plated, air horns shall be recessed

    mounted, one (1) each side behind the perforated grille of the bumper. A floor mounted

    switch for the air horns shall also be provided on the offices side.

    A pressure protection valve shall be installed to prevent the air brake system from being

    depleted of air pressure.

    Comply: Yes___ No___

  • 8/14/2019 New Truck Specifications

    37/139

    37

    ENGINES AND TRANSMISSIONS

    Transmission Selector

    An Allison Touch Pad shift selector shall be mounted to the right of the driver on the engine

    cover accessible to the driver. The shift position indicator shall be indirectly lit for after darkoperation. A transmission temperature gauge with warning light and buzzer shall be installed

    on the cab instrument panel.

    Comply: Yes___ No___

    Vehicle Speed

    The maximum speed shall be limited to 60 MPH as required by NFPA 1901. The preferred

    method of controlling maximum speed is electronically.

    Comply: Yes___ No___

    ENGINE/TRANSMISSION PACKAGE

    ENGINE

    The apparatus shall be a Cummins Diesel ISX 12

    500 Horsepower,

    Six (6) cylinders,

    Variable Geometry Turbocharged.

    Charged air cooled (CAC) 4-cycle diesel

    Cummins XPI high pressure fuel injection system

    Fuel Cooler (when equipped with a fire pump)

    729 cu. In. displacement

    500 gross BHP at 1800 RPM and a peak torque of 1645 lb. ft. at 1200 rpm.

    The engine shall meet all 2009 NFPA 1901 standards and shall meet all 2013 EPA emission

    standards.

    The Cummins diesel ISX model shall be sized to the bidders apparatus requirements.

  • 8/14/2019 New Truck Specifications

    38/139

    38

    Comply: Yes___ No___

    Starter

    A 12 volt starter shall be provided, controlled by a switch on the drivers side cab dash.

    Comply: Yes___ No___

    Transmission

    The apparatus shall utilize a Generation IV Allison EVS 4000 five (5) or six (6) speed automatic

    transmission. If a six (6) speed transmission is used it shall be programmed five (5) speed, sixth

    gear locked out, for fire apparatus vocation, in concert with the specified engine.

    A transmission oil temperature gauge with warning light and buzzer shall be installed on the

    cab instrument panel to warn the driver of high oil temperatures that may damage thetransmission. A diagnostic reader port connection shall also be provided. The dipstick handle

    is to be dipped in a rubber coating for ease in checking oil level when hot.

    The transmission shall be equipped with a fluid level sensor (FLS) system, providing direct

    feedback of transmission oil level information to the operator.

    The transmission shall use a TranSynd Synthetic transmission fluid or approved equal meeting

    the Allison specification.

    The apparatus transmission shall be equipped with a liquid-to-liquid remote mounted

    transmission cooler, to ensure proper cooling of the transmission when the vehicle is

    stationary (no air flow).

    The transmission shall contain two (2) engine driven PTO openings. The automatic

    transmission shall be equipped with a power lock up device. The transmission lock up shall

    prevent down shifting of the transmission when engine speed is decreased during pump

    operations, thereby maintaining a constant gear ratio. Transmission lock up shall be

    automatically activated when placing pump in gear. The transmission lock up shall be

    automatically deactivated when disengaging pump for normal road operation.

    A 5-year unlimited miles parts and labor warranty shall be provided by the transmission

    manufacturer.

    The Transmission should be provided with an aggressive downshift provisions.

    Ratings: Max Input (HP) 600

  • 8/14/2019 New Truck Specifications

    39/139

    39

    Max input (Torque) 1850 (lb ft)

    Max turbine (Torque) 2600 (lb ft)

    The gear ratios shall be as follows:

    1st- 3.51:1

    2nd

    - 1.91:1

    3rd

    - 1.43:1

    4th

    - 1.00:1

    5th

    - 0.74:1

    Reverse 4.80:1 or 5.00:1

    Comply: Yes___ No___

    Transmission Cooler

    The cooling system shall include a liquid to liquid transmission cooler capable of cooling the

    heat generated from the transmission. When a transmission retarder is selected, the cooler

    shall have an increased capacity to handle the additional heat load.

    Comply: Yes___ No___

    SECONDARY BRAKING

    Jacobs Engine Brake

    One (1) Jacobs Engine Brake shall be installed to assist in slowing and controlling the vehicle as

    required by NFPA 1901 for vehicles with gross vehicle weight ratings (GVWR) of 36,000

    pounds. or greater. An on-off control switch and a high-medium-low selector switch shall be

    mounted in the cab accessible to the driver.

    When activated, the Jacobs engine brake shall cut off the flow of fuel to the cylinders and

    alter the timing of the exhaust valves. This shall transform the engine into a high-pressure air

    compressor, driven by the wheels, and the horsepower absorbed by the engine in this mode

    shall slow the apparatus. The selector switch allows the driver to select the amount of

    retarding power.

  • 8/14/2019 New Truck Specifications

    40/139

    40

    When the on-off switch is in the on position, the engine brake shall be automatically applied

    whenever the accelerator is in the idle position and the automatic transmission is in the lock-

    up mode. If the accelerator is depressed or the on-off switch is in the off position, the

    engine brake shall immediately release and allow the engine to return to its normal function.

    When the on-off switch is in the on position and the engine brake is automatically applied

    the apparatus stop light shall come on and a message light shall come on, on the instrument

    panel.

    Comply: Yes___ No___

    ENGINE COOLING PACKAGE

    Cooling System

    The cooling system shall be designed to keep the engine properly cooled under all conditionsof road and pumping operations. The cooling system shall be designed and tested to meet or

    exceed the engine and transmission manufacturers requirements, and EPA regulations.

    The complete cooling system shall be mounted in a manner to isolate the system from

    vibration and stress. The individual cores shall be mounted in a manner to allow expansion

    and contraction at various rates without inducing stress to the adjoining core(s).

    The cooling system shall comprise of a charge air cooler to radiator package that provides the

    maximum cooling capacity for the specified engine as well as serviceability. The main

    components shall include a surge tank, a charge air cooler, bolted to the top of the radiator tomaximize cooling, recirculation shields, a shroud, a fan and required tubing. All components

    shall consist of an individually sealed system.

    Comply: Yes___ No___

    Grille

    The front of the cab shall be equipped with a stainless steel grille with sufficient area to allow

    proper airflow into the cooling system and engine compartment.

    Comply: Yes___ No___

    Radiator

    The radiator shall be a design and size to meet or exceed the engine and transmission

    manufacturers requirements. The radiator shall be constructed entirely of aluminum.

  • 8/14/2019 New Truck Specifications

    41/139

    41

    There shall be a drain valve (cock) at the lowest point of the aluminum cooling system, to

    maximize draining of the system. A system sight glass shall be included for quick fluid level

    assessment.

    Comply: Yes___ No___

    Silicone Hoses

    All radiator and heater hoses shall be silicone. All radiator hose clamps shall be either spring

    loaded stainless steel constant torque hose clamps or pressure compensating band clamps, on

    all hoses diameter and larger. All radiator hoses shall be routed, loomed and secured so as

    to provide maximum protection from chafing, crushing or contact with other moving parts.

    Recirculation shields shall be installed where required to prevent heated air from reentering

    the cooling package and affecting performance.

    Comply: Yes___ No___

    Coolant

    The cooling system shall be filled with a 50/50 mix. The coolant makeup shall contain water

    and antifreeze/coolant to prevent the coolant from freezing to a temperature of minus 40 ( -

    40) degrees F.

    Comply: Yes___ No___

    Surge Tank (coolant recovery)

    The cooling system shall be equipped with an aluminum surge tank. The surge tank shall

    house a low coolant probe and sight glass to monitor the coolant level. Low coolant shall be

    alarmed with the check engine light. The surge tank shall be equipped with a dual seal cap

    that meets the engine manufacturers pressure requirements, and system design

    requirements.

    The tank shall allow for expansion and to remove entrained air from the system. There shall

    also be an extended fill neck to prevent system overfill and encroachment of expansion airspace. Baffling shall be installed in the tank to prevent agitated coolant from being drawn into

    the engine cooling system.

    Comply: Yes___ No___

  • 8/14/2019 New Truck Specifications

    42/139

    42

    Charge Air Cooler System

    The system shall include a charge air cooler system to ensure adequate cooling of the

    turbocharged air for proper engine operation and maximum performance.

    Comply: Yes___ No___

    Charge Air Cooler Hoses

    Charge air cooler hoses shall be made from high-temperature, wire-reinforced silicone to

    withstand the extremely high temperatures and pressures of the turbocharged air. The hoses

    shall incorporate a flexible hump section to allow motion and misalignment of the engine

    relative to the charge air cooler. Charge air cooler hose clamps shall be a heavy-duty, constant

    torque, t-bolt clamps to ensure proper sealing under all temperatures in order to keep dust

    and other contaminants out of the engine intake air stream and protect the engine.

    Comply: Yes___ No___

    Fan and Shroud

    The fan shall be the proper size for the bidders apparatus cooling system. The fan shall be an

    eleven (11) blade for maximum airflow and dynamic balance. It shall be made of either nylon

    or composite material for strength and corrosion resistance. The fan shall be installed with

    Grade 8 hardware which has been treated with thread lock sealant for additional security.

    A fan shroud and recirculation shield system shall be used to ensure air that has passedthrough the radiator in not drawn through again.

    Comply: Yes___ No___

    Fan Clutch

    A fan clutch shall be provided that shall allow the cooling fan to ope