NEW WESTMINSTER DESIGN PANEL
Tuesday, November 25, 2014 3:00p.m. Committee Room No. 2
AGENDA Page
1.0 ADDITIONS TO AGENDA
2.0 ADOPTION OF MINUTES 3:05pm
2.1 Adoption of the Minutes of Oct 28, 2014 2 3.0 REPORTS AND INFORMATION 4.0 DESIGN REVIEWS 4.1 811 Columbia Street - New Westminster SkyTrain Station upgrades SDP00201 7
A Special Development Permit application has been received for the New Westminster SkyTrain Station. VIA Architecture
5.0 NEW BUSINESS
6.0 UNFINISHED BUSINESS 7.0 CORRESPONDENCE
8.0 NEXT MEETING
December 9, 2014 (in Committee Room No. 2) 9.0 ADJOURNMENT
1
Doc#611303 New Westminster Design Panel Minutes - Draft Page 1 October 28, 2014
NEW WESTMINSTER DESIGN PANEL
Tuesday, October 28, 2014 3:00 p.m. Committee Room No. 2
MINUTES
MEMBERS PRESENT: Cheryl Fu - AIBC Representative Doug Hamming - Acting Chair, AIBC Representative Ken Falk - AIBC Representative Steve Wong - BC Society of Landscape Architects REGRETS: Tom Morton - Chair, Development Industry Representative (UDI) Jay Hiscox - AIBC Representative Keith Ross - BC Society of Landscape Architects GUESTS: Paul Grant - Architect Stefan Schulson - Architect Ken Larsson - Landscape Architect Richard Bernstein - Architect, Mary Chen Yip - Landscape Architect STAFF: Julie Schueck - Heritage and Community Planner Michael Watson - Planning Technician Jim Hurst - Development Planner Lauren Blake - Committee Clerk The meeting was called to order at 3:04 p.m.
1.0 ADDITIONS TO AGENDA
There were no additions.
2
Doc#611303 New Westminster Design Panel Minutes - Draft Page 2 October 23, 2014
2.0 ADOPTION OF MINUTES
2.1 Adoption of the Minutes of August 26, 2014 MOVED and SECONDED
THAT the minutes of the August 26, 2014 meeting of the New Westminster Design Panel be adopted.
CARRIED. All members of the Panel present voted in favour of the motion. 3.0 REPORTS AND INFORMATION There were no items. 4.0 DESIGN REVIEWS
4.1 101 Third Street and 228 Manitoba Street (Urban Academy) OCP00008 HER00031
Julie Schueck, Heritage and Community Planner, and Mike Watson, Planning Technician, summarized the report dated October 28, 2014, regarding applications that have been received for a Heritage Revitalization Agreement (HRA) at 101 Third Street and 228 Manitoba and an Official Community Plan (OCP) amendment at 228 Manitoba Street in order to allow the development of an additional building for Urban Academy. Ms. Schueck noted that the Community Heritage Commission has expressed concern regarding the change of the driveway material and the temporary removal of the historic stone wall.
Paul Grant, Architect, reviewed the project as outlined in the report dated October 28, 2014, noting that the interior partitions are moveable and can be moved in the future as the school grows. With respect to concerns regarding the heritage stone wall, Mr. Grant advised that due to the excavation required for the new parking lot, the stone wall must be removed, noting that the stones would be carefully numbered and stored in order to be reconstructed after the parking lot is complete. In terms of the design of the new building along the Manitoba Street elevation, a granite plinth has been introduced that would maintain the height and characteristic of the heritage wall.
Ken Larsson, Landscape Architect, spoke to the landscaping of the project as outlined in the report dated October 28, 2014. In response to questions from the Panel, Mr. Grant and Mr. Larsson provided the following information:
The wheelchair access ramp to Robson Manor is located at the rear of the property, noting that the new school building would be completely wheel chair accessible; and,
3
Doc#611303 New Westminster Design Panel Minutes - Draft Page 3 October 23, 2014
A cast iron or picket fence could be utilized above the parking entrance instead of the proposed glass guard, as it was noted that a glass guard could appear commercial and difficult to maintain.
Discussion ensued and the Panel noted the following comments:
The elevation on Manitoba Street has been improved; The proposed granite plinth on the Manitoba Street elevation may not
need to be as prominent and, a glass block could also be considered; The south elevation lacks a sub-rhythm without windows and requires
additional relief and definition, and it was suggested that increased setbacks and alternative materials, including glass block and vines, be considered;
The parking entrance appears industrial and differs from the rest of the project and it was suggested that a curved opening and/or different material be considered;
It was suggested that the entrance to the driveway be relocated and the first area of the parking be flipped so that the driveway entry could be more of a gradual curve, however, it was noted that this could negatively impact the open space located above; and,
It was suggested that the walkway from the building be continued to the sidewalk and that the pedestrian zone of the driveway be differentiated with alternative coloured pavers.
MOVED AND SECONDED
THAT the applicant continue to work with Planning staff to further address the above noted comments.
CARRIED. All members of the Panel present voted in favour of the motion.
4.2 200 Nelson’s Crescent DPS00035 Jim Hurst, Development Planner, summarized the report dated October 28, 2014 regarding a Development Permit application that has been received for 200 Nelson’s Crescent in order to allow the development of 137 residential units. Mr. Hurst noted that as residents have expressed concerns regarding the height of the fourth building, the applicant has been permitted to transfer height from the fourth building to the other buildings of the project through the rezoning process. MOVED and SECONDED THAT the correspondence from the Sapperton Resident’s Association dated October 22, 2014 be received for information.
CARRIED. All members of the Panel present voted in favour of the motion.
4
Doc#611303 New Westminster Design Panel Minutes - Draft Page 4 October 23, 2014
In response to questions from the Panel, Mr. Hurst advised that the lands opposite of the development on Brunette Street will remain industrial, and that the project is located in an area with low pedestrian activity. Richard Bernstein, Architect, reviewed the project as outlined in the report dated October 28, 2014.
Mary Chen Yip, Landscape Architect, spoke to the landscaping of the project as outlined in the report dated October 28, 2014, and provided the following additional information:
The site furniture and trellis feature would have industrial influences; The landscaping would feature gabion walls; A water feature would provide ambient white noise; Hops have been introduced into the landscaping palette to reinforce the
brewery history of the site; and, There would be an edible landscape feature located near the community
garden. In response to questions from the Panel, Mr. Bernstein advised that the townhome units would be connected to the main building and share the underground parking space. Mr. Bernstein clarified that the deck located beside the tower would be shared roof, and that the private townhome decks would not be visible from that deck.
Discussion ensued and the Panel noted the following comments:
The amenity space provides punctuation to Brunette Street; It was suggested that the parking design could be lowered to avoid a full
story of concrete at grade; It was noted that hops can be an aggressive plant material; The exterior of the tower appears chunky and could be addressed through
the material used; It was suggested that an alternative light source be used in the above
grade open air parking area, as fluorescent lighting could be unattractive at night;
It was noted that the amenity area must be well programmed; and, It was suggested that as there is no gate at the top of the garage, the area
be kept secured and well lit.
5.0 NEW BUSINESS There were no items.
5
Doc#611303 New Westminster Design Panel Minutes - Draft Page 5 October 23, 2014
6.0 UNFINISHED BUSINESS There were no items. 7.0 CORRESPONDENCE
There were no items.
8.0 NEXT MEETING
November 25, 2014 in Committee Room No. 2 9.0 ADJOURNMENT
ON MOTION, the meeting was adjourned at 5:12 p.m.
Certified Correct,
______________________________ __________________________ Doug Hamming Lauren Blake Acting Chair Committee Clerk
6
City of New Westminster
R E P O R T
DEVELOPMENT SERVICES DEPARTMENT
To: Members of the New Westminster Design Panel
Date: November 25, 2014
From: Barry Waitt, Senior Planner
File: SDP00201
Subject: New Westminster SkyTrain Upgrades
PURPOSE The City of New Westminster has received a Special Development Permit application for improvements to the New Westminster SkyTrain station. The purpose of this report is to seek comments from the design panel on this application BACKGROUND Applicant / Developer: TransLink Architect: VIA Architecture Zoning: Central Business Districts (Restricted) (C-4C ) OCP Land Use Designation Mixed Use High Density Development Permit Area: Downtown Development Permit Area #1
SITE CONTEXT The New Westminster SkyTrain station is located at 811 Columbia Street, which is also occupied by the new commercial complex, Shops in New West, surrounding the station. Three residential towers facing Carnarvon Street abut the site to the north, while the vacant property at 900 Carnarvon Street is the subject of a rezoning application for a high density, mixed use commercial / multi unit residential development. POLICY CONTEXT OCP Land Use Designation Mixed-Use High Density
mixed-use (commercial and/or residential) throughout Downtown, outside of Columbia Historic Mixed-Use
retail, office, service or residential any combination of the above (can be one or multiple uses)
7
City of New Westminster November 25, 2014 -2-
Doc. #614799 Page 2
Transportation The Downtown Community Plan states that a sustainable transportation system is a vital component of a sustainable community. A sustainable community is one that:
Allows basic mobility and access needs of individuals and communities to be met safely and in a manner consistent with human and environmental health, and with equity within and between generations.
Is affordable, operates efficiently, offers choice of transport mode, and supports a vibrant economy.
Limits emissions, minimizes consumption of resources, and minimizes the use of land and the protection of noise.
Prioritizes the movement of people over vehicles. Within this framework, it is envisioned that by 2031, 60% of all trips in Downtown will use sustainable transport modes. Prioritizing improvements to both New Westminster and Columbia SkyTrain stations is listed as an action in the Downtown Community Plan. Public Art The 2008 Arts Strategy recognizes the important contribution of public art to the quality of the public realm and to city building. The Arts Strategy also recognizes the need for the City of New Westminster to finance the acquisition, conservation and inventory of public art. Public art helps to make buildings, open spaces and neighborhoods attractive and memorable places where people want to visit, live, work and play. The Public Art Policy represents an important tool for securing high quality installations of public art in order to achieve this goal. While the proposed installation of art in the SkyTrain station is not intended for municipally owned space, the policies and objectives of the Arts Strategy are still applicable as the SkyTrain station is a public space. PROPOSAL As the neighbourhood around one of Translink’s busiest stations continues to grow and develop, New Westminster Station requires updates to better meet the needs of SkyTrain customers. The proposed improvements will address acoustics, security, pedestrian flow and aesthetics. The following is a summary of the proposed upgrades:
•Upgrades to existing stairs and replacement of existing escalators to improve accessibility.
8
City of New Westminster November 25, 2014 -3-
Doc. #614799 Page 3
•Replacement of the original south elevator and added openings within the elevator hoistway to increase transparency for patron safety and better improved patron orientation. •Improved station design and visibility with better lighting and installation of new windscreens on the SkyTrain platform level for a safer and improved customer experience. • Installation of new dropped ceiling below the guideway to create a unified concourse and improve acoustic conditions. • Replacement of existing platform ceiling with new removable and replaceable ceiling panels on the underside of the existing canopy to improve acoustic conditions. • Replacement of station speakers for better audibility and safety. • Introduction of glazed guards at stairs and escalators for increased transparency and visibility. • Revisions to the station colour palette to improve compatibility with the adjacent surroundings. Repainting the structural steel to the original Expo Line white palette intended for urban stations.
Public Art is also proposed as part of the upgrades to the SkyTrain station. DISCUSSION A Special Development Permit application has been submitted for an upgrade to the New Westminster SkyTrain station. Improvements to one of the busiest Skytrain stations in the system are proposed in order to improve: the pedestrian flow of the station; integration of the station with the surrounding Shops in New West; station appearance, security and noise attenuation. These positive changes are supportive of the transportation policies of the City. TransLink is proposing to install public art as part of the upgrading of the SkyTrain station. TransLink has met with City staff and presented to the Public Art Advisory Committee and is continuing to work with staff on a collaborative process. A member of the Public Art Advisory Committee will be on the TransLink selection panel. There will also be an opportunity for a range of New Westminster artists to participate by having their art work displayed on the temporary hoarding during construction. NEW WESTMINSTER DESIGN PANEL CONSIDERATIONS Staff would ask the design panel to comment on the following issues regarding this development application:
9
City of New Westminster November 25, 2014 -4-
Doc. #614799 Page 4
1. Will the proposed changes improve the pedestrian flow of the SkyTrain station and its integration with the Shops in New West / Are there other improvements which should be made to address pedestrian flow?
2. Do the proposed changes provide an aesthetic improvement to the SkyTrain station / Are there are other aesthetic improvments which should be made?
3. Will the proposed changes improve the noise levels for residents adjacent to the SkyTrain station / Are there other improvements which should be made to address the acoustics of the SkyTrain operation?
4. Will the proposed changes improve the noise levels from SkyTrain within the Shops In New West / Are there other improvements which could be made to address the noise levels within the Shops in New West?
5. Will the proposed changes improve the security in the SkyTrain station / Are there other improvements which should be make to improve security?
__________________ Barry Waitt Senior Planner
10
APPENDIX A
SITE CONTEXT MAP
11
Skyt
rain
Upg
rade
s at
811
Col
umbi
a St
Th
is m
ap
is a
use
r g
en
era
ted
sta
tic o
utp
ut
fro
m a
n I
nte
rne
t m
ap
pin
g s
ite a
nd
is f
or
refe
ren
ce o
nly
. D
ata
laye
rs t
ha
t a
pp
ea
r o
n t
his
ma
p m
ay
or
ma
y n
ot
be
acc
ura
te,
curr
en
t, o
r o
the
rwis
e r
elia
ble
.
2,4
74
CN
W G
IS S
erv
ice
s
0.1
1:
NA
D_
19
83
_U
TM
_Z
on
e_
10
N
Kilo
me
ters
0.1
00
.06
12
APPENDIX B
DEVELOPMENT PLANS
13
OWNER
DRAWING SET DESCRIPTION
ALL RIGHTS RESERVED BY VIA ARCHITECTURE INCORPORATED. THIS DESIGN IS NOT TOBE USED OR REPRODUCED WITHOUT THE CONSENT OF VIA ARCHITECTURE PLLC.
ISSUE DATE
STRUCTURAL ENGINEERS:
MECHANICAL ENGINEERS:
Fast + Epp 201 - 1672 West 1st Ave,Vancouver, V6J 1G1
AME Group 501 - 134 Abbott St, Vancouver, V6B 2K4
ELECTRICAL ENGINEERS: Applied Engineering 2nd Floor, 1330 Granville St, Vancouver, V6Z 1M7
SOUTH COAST BRTISIH COLUMBIATRANSPORTATION AUTHORITY400 ‐ 287 NELSON'S COURTNEW WESTMINSTER, BC V3L OE7
LIGHTING CONSULTANT: Total Lighting Solutions 301-1444 Alberni S, Vancouver, V6G 2Z4
CODE CONSULTANT: Sereca Fire Consulting 5600 Parkwood Way, Richmond, V6V 2M2
CONSTRUCTABILITY: Graham Construction 7216 Brown Street, Delta, V4G 1G8
TRANSLINK
NEW WESTMINSTER STATIONUPGRADE
NEW WESTMINSTER, BC
SPECIAL DEVELOPMENTPERMIT PACKAGE
15 SEPTEMBER 2014
DRAWING INDEX - CITY PACKAGE
C-00 COVER SHEETC-10 GRADE PLANC-11 CONCOURSE PLANC-12 PLATFORM PLANC-20 EAST/WEST STATION SECTIONSC-21 NORTH/SOUTH STATION SECTIONSC-22 NORTH/SOUTH STATION SECTIONSC-23 WALL SECTIONSC-30 STATION RENDERINGSC-40 SITE PHOTOS
14
UP
UP
ED EEECEBEA
E2
E3
E4
E1
EB1
E2b
E2a
EC1
1
C-21
2
C-21
1
C-22
2
C-22
EXISTING METAL PANELREMOVED & REPLACEDWITH NEW METALPANEL
EXISTING SECURITYSCREEN REMOVED &REPLACED WITH NEWGLASS GUARD
EXISTING HANDRAILREMOVED & REPLACEDWITH NEW S.S. HANDRAIL
EXISTING ESCALATOR & GUARDREMOVED & REPLACED WITHNEW ESCALATOR & GLASSGUARD
EXISTING METAL PANELREMOVED & REPLACED
WITH NEW METAL PANEL
NEW GLAZED OPENING INELEVATOR SHAFT WALLS
EXISTING GUARD/HANDRAILREMOVED & REPLACEDWITH NEW GLASS GUARD& S.S. HANDRAIL
EXISTING ESCALATORREMOVED & REPLACED WITHNEW ESCALATOR & GLASSGUARD
EXISTING METAL MESH PANELSREMOVED & REPLACED WITHGLAZED PANELS
8TH
AV
EN
UE
LOADING BAY AREA
20000 10000 10000 18000 2000 20000
6405
1895
6710
1895
6405
EXISTING OVERHEADDECORATIVE ROOFREMOVED
EXISTING LIGHTFIXTURES & MOUNTINGHARDWARE REMOVED &REPLACED
EXISTING LIGHTFIXTURES &MOUNTING HARDWAREREMOVED &REPLACED
EAST ESCALATOR
EASTPUBLICSTAIR
WEST ESCALATOR
WEST PUBLICSTAIR
JAN.W/C
W/C
NORTHELEVATOR SIMULATION
CREW ROOM
W/CW/CSCR
TRANSFORMER UPS
WORKS
POLICE
EER
A.C./ UPS
EMR
MC
NE
ELY
ST
RE
ET
NEW STAIR NOSINGS AT EACHTREAD, TYP.
SOUTHELEV.
EXISTING CAB & RAILREMOVEED & REPLACED
MECH.
BUS DRIVERS
SPRINKLERCONTROL
TRASH & LOADING DOCK
SPAGHETTI FACTORY
PUB PATIO
GARAGE ACCESS LANE
NEW STAIR NOSINGS ATEACH TREAD, TYP.
PRELIMINARYNOT FOR CONSTRUCTION
REFERENCE DRAWING
DESCRIPTIONDWG No.DATE
DATE
DATE
DATE
558.8mm x 863.6mm METRIC
DESIGNED
DRAWN
CHECKED
APPROVALSCALEDATE
CONTRACT No.
SUPERSEDES PRINTS OF THIS NUMBER WITH LETTERS PREVIOUS TO
DRAWING No.
SUBCONSULTANTPROJECT No.
PROFESSIONAL SEAL
TLK-DSIZE-SHEET.dwgRev. -
REVISIONS
SCALE AT FULL SIZE (22" x 34" SHEET)
121010 - 01121010 - 01 -
21 JULY 2014 74313
NEW WESTMINSTER STATION RENOVATION100% ISSUED FOR TENDER PACKAGE
50% DETAILED DESIGN SUBMISSION21-05-14 0
90% DETAILED DESIGN SUBMISSION14-07-14 1
100% ISSUED FOR TENDER SUBMISSION 202-08-14
8/13
/20 1
4 2:
35:5
2 P
M
1 : 125
C:\U
ser s
\bpe
ters
on\
Do
c um
ents
\74
313
NW
M S
tatio
n B
a se
Mod
el_b
pete
rson
.rvt
GRADE PLAN
C-10
Checker
Author
Designer
Approver
1 : 125A0210
GRADE PLAN - P1 & P1A1
0 1 5
1:125
2.5
N
DATE BY DESCRIPTION REV
15
DN
DN
ED EEECEBEA
E2
E3
E4
E1
EB1
E2b
E2a
EC1
1
C-21
2
C-21
1
C-22
1
C-22
2
C-22
2
C-22
EXISTING METAL MESH PANELSREMOVED & REPLACED WITHGLAZED PANELS
NORTH EGRESS STAIR
EXISTING ROOF & PORTIONS OFROOF STRUCTURE TO BEREPLACED WITH NEW HIGHERROOF COMPLETE WITH ROOFSAFETY ANCHORS
EXISTING METAL MESH TO BEREMOVED & REPLACED WITH NEWGLAZED INFILL
NORTH PLATFORM
NORTH PUBLIC STAIR
NORTH ESCALATOR
SOUTH PUBLIC STAIR
SOUTH ESCALATOR
SOUTH PLATFORM
EXISTING METAL MESH TO BEREMOVED & REPLACED WITH NEWGLAZED INFILL
EXISTING STOREFRONT REMOVED &REPLACED WITH GLAZEDWINDSCREEN
EXISTINGWINDSCREEN/HANDRAILREMOVED & REPLACEDWITH NEW GLASS GUARD &S.S. HANDRAIL
SOUTH EGRESS STAIR
20000 10000 10000 18000 2000 20000
6405
1895
6710
1895
6405
NORTHELEV.
EXISTING FAREGATEROOF BELOW
PORTION OF EXISTINGFAREGATE ROOF TOBE REMOVED
NEW ALARMEDEGRESS DOOR
SOUTHELEV.
NEW GLAZEDOPENINGS IN
ELEVATOR SHAFTWALLS
EXISTING GUARD TO BEREMOVED & REPLACED WITHHIGHER GUARDS
A0405 1
A0405
4
PRELIMINARYNOT FOR CONSTRUCTION
REFERENCE DRAWING
DESCRIPTIONDWG No.DATE
DATE
DATE
DATE
558.8mm x 863.6mm METRIC
DESIGNED
DRAWN
CHECKED
APPROVALSCALEDATE
CONTRACT No.
SUPERSEDES PRINTS OF THIS NUMBER WITH LETTERS PREVIOUS TO
DRAWING No.
SUBCONSULTANTPROJECT No.
PROFESSIONAL SEAL
TLK-DSIZE-SHEET.dwgRev. -
REVISIONS
121010 - 01121010 - 01 -
15 SEPT 2014 74313
NEW WESTMINSTER STATION RENOVATION100% ISSUED FOR TENDER PACKAGE
50% DETAILED DESIGN SUBMISSION21-05-14 0
90% DETAILED DESIGN SUBMISSION14-07-14 1
100% ISSUED FOR TENDER SUBMISSION 215-09-14
9/19
/20 1
4 12
:20:
45 P
M
1 : 125
C:\U
ser s
\bpe
ters
on\
Do
c um
ents
\74
313
NW
M S
tatio
n B
a se
Mod
el_b
pete
rson
.rvt
PLATFORM PLAN
C-12
Checker
Author
Designer
Approver
1 : 125A0210
PLATFORM PLAN - P71
0 1 5
1:125
2.5
N
DATE BY DESCRIPTION REV
16
UP
DN
UP
UP
UP
DNDN
DN
UP
ED EEECEBEA
E2
E3
E4
E1
EB1
E2b
E2a
EC1
1
C-21
2
C-21
1
C-22
2
C-22
EXISTING GUARD/HANDRAILREMOVED & REPLACEDWITH NEW GLASS GUARD &S.S. HANDRAIL
EXISTING ESCALATORREMOVED & REPLACED WITHNEW ESCALATOR & GLASSGUARD
EXISTING METAL MESH PANELSREMOVED & REPLACED WITHGLAZED PANELS
EXISTING LIGHTFIXTURES & MOUNTINGHARDWARE REMOVED& REPLACED
EXISTING LIGHTFIXTURES & MOUNTINGHARDWARE REMOVED& REPLACED
EXISTING METAL PANELAROUND SHAFTS &COLUMNS TO BEREMOVED & REPLACEDWITH NEW METALPANEL & ACCESSHATCH
EXISTING COLUMNSREMOVED
EXISTING ESCALATORREMOVED & REPLACED WITH
NEW ESCALATOR
EXISTING WINDSCREEN/HANDRAILREMOVED & REPLACED WITH NEW
WINDSCREEN & S.S. HANDRAIL
NEW GLAZEDOPENINGS IN
ELEVATOR SHAFTWALLS
EXISTING METAL PANELTO BE REMOVED &
REPLACED WITH NEWMETAL PANEL
EXISTING HANDRAILREMOVED & REPLACED
WITH NEW S.S. HANDRAIL
EXISTING ESCALATOR & GUARDREMOVED & REPLACED WITH
NEW ESCALATOR & GLASSGUARD
NORTHPUBLIC STAIR
NORTH ESCALATOR
EAST PUBLIC STAIR
EAST ESCALATOR
NORTH EGRESS STAIR
SOUTH EGRESS STAIR
SOUTH ESCALATOR
SOUTH PUBLICSTAIR
OPEN TO BELOW
EXISTING DOORS TO BEREMOVED AND REPLACED
WITH NEW GLAZEDELEVATOR DOOR
EXISTING GUARD REMOVED& REPLACED WITH NEW
GLASS GUARD & HANDRAIL
WEST PUBLIC STAIR
WEST ESCALATOR
EXISTING ESCALATORREMOVED & REPLACED WITH
NEW ESCALATOR
6405
1895
6710
1895
6405
20000 10000 10000 18000 2000 20000
CRUCRU
CRUCRU
SOUTHELEV.
SAFEWAY
EXISTING TACTILE SURFACEREMOVED & REPLACED
NEW WALLMOUNTED EECP
NEW STAIR NOSINGS AT EACHTREAD, TYP.
NEW STAIR NOSINGS AT EACHTREAD, TYP.
CRU
CARNARVONPLAZA
SPAGHETTIFACTORY
PUB PATIO
EXISTING OVERHEADDECORATIVE ROOFREMOVED
EXISTING TACTILE SURFACEREMOVED & REPLACED
NEW STAIR NOSINGS AT EACHTREAD, TYP.
EXISTING COILING GRILLEENCLOSURE TO BE REMOVED
A0404 1
A0404 2
A0405 1
PRELIMINARYNOT FOR CONSTRUCTION
REFERENCE DRAWING
DESCRIPTIONDWG No.DATE
DATE
DATE
DATE
558.8mm x 863.6mm METRIC
DESIGNED
DRAWN
CHECKED
APPROVALSCALEDATE
CONTRACT No.
SUPERSEDES PRINTS OF THIS NUMBER WITH LETTERS PREVIOUS TO
DRAWING No.
SUBCONSULTANTPROJECT No.
PROFESSIONAL SEAL
TLK-DSIZE-SHEET.dwgRev. -
REVISIONS
SCALE AT FULL SIZE (22" x 34" SHEET)
121010 - 01121010 - 01 -
15 SEPT 2014 74313
NEW WESTMINSTER STATION RENOVATION100% ISSUED FOR TENDER PACKAGE
50% DETAILED DESIGN SUBMISSION21-05-14 0
90% DETAILED DESIGN SUBMISSION14-07-14 1
100% ISSUED FOR TENDER SUBMISSION 215-09-14
9/19
/20 1
4 12
:18:
36 P
M
1 : 125
C:\U
ser s
\bpe
ters
on\
Do
c um
ents
\74
313
NW
M S
tatio
n B
a se
Mod
el_b
pete
rson
.rvt
CONCOURSE PLAN
C-11
Checker
Author
Designer
Approver
1 : 125A0210
CONCOURSE PLAN - P51
0 1 5
1:125
2.5
N
DATE BY DESCRIPTION REV
17
BUS LOOP LVL P15150
CONCOURSE LVL P511000
ROOF DATUM20523
GRADE LVL P1A6450
EDEE EC EB EAEB1EC1
PLATFORM LVL P716900
1
4
EAST PUBLICSTAIR
1
C-21
2
C-21
3
WEST ESCALATOR
14
BUS LOOP LVL P15150
CONCOURSE LVL P511000
ROOF DATUM20523
GRADE LVL P1A6450
EDEE EC EBEB1EC1
P7 PUBLIC STAIR LANDING16930
1
C-212
C-21
2
C-22
NORTH EGRESS STAIR
NORTH ESCALATOR
131
21
14
PRELIMINARYNOT FOR CONSTRUCTION
REFERENCE DRAWING
DESCRIPTIONDWG No.DATE
DATE
DATE
DATE
558.8mm x 863.6mm METRIC
DESIGNED
DRAWN
CHECKED
APPROVALSCALEDATE
CONTRACT No.
SUPERSEDES PRINTS OF THIS NUMBER WITH LETTERS PREVIOUS TO
DRAWING No.
SUBCONSULTANTPROJECT No.
PROFESSIONAL SEAL
TLK-DSIZE-SHEET.dwgRev. -
REVISIONS
SCALE AT FULL SIZE (22" x 34" SHEET)
121010 - 01121010 - 01 -
15 SEPT 2014 74313
NEW WESTMINSTER STATION RENOVATION100% ISSUED FOR TENDER PACKAGE
50% DETAILED DESIGN SUBMISSION21-05-14 0
90% DETAILED DESIGN SUBMISSION14-07-14 1
100% ISSUED FOR TENDER SUBMISSION 215-09-14
9/19
/20 1
4 12
:26:
08 P
M
As indicated
C:\U
ser s
\bpe
ters
on\
Do
c um
ents
\74
313
NW
M S
tatio
n B
a se
Mod
el_b
pete
rson
.rvt
EAST/WEST STATION SECTIONS
C-20
Checker
Author
Designer
Approver
1 : 125A0500
LONGITUDINAL SECTION @ EAST/WEST ENTRIES1
1 : 100C-23
LONGITUDINAL SECTION @ NORTH ENTRY2
1 CLEAN AND REPAINT STRUCTURAL STEEL ELEMENTS2 CLEAN AND REPAINT PLATFORM ROOF, REPAIR ROOFING,
GUTTERS, FLASHING, ACCESSORIES
3 NEW PERFORATED PREFINISHED REMOVABLE ALUMINUMCEILING PANELS WITH ACOUSTICAL INSULATION PADS
4 NEW GLASS FASCIA13 NEW ROOF ASSEMBLY: THERMOPLASTIC MEMBRANE
ROOFING; PROTECTION BOARD; STL DECK; STL STRUCTURE;CEILING PANELS
14 NEW TEMPERED LAMINATED WINDSCREEN
KEYNOTE LEGEND
DATE BY DESCRIPTION REV
18
DN
DN
ED EEECEBEA
E2
E3
E4
E1
EB1
E2b
E2a
EC1
1
C-21
2
C-21
1
C-22
1
C-22
2
C-22
2
C-22
EXISTING METAL MESH PANELSREMOVED & REPLACED WITHGLAZED PANELS
NORTH EGRESS STAIR
EXISTING ROOF & PORTIONS OFROOF STRUCTURE TO BEREPLACED WITH NEW HIGHERROOF COMPLETE WITH ROOFSAFETY ANCHORS
EXISTING METAL MESH TO BEREMOVED & REPLACED WITH NEWGLAZED INFILL
NORTH PLATFORM
NORTH PUBLIC STAIR
NORTH ESCALATOR
SOUTH PUBLIC STAIR
SOUTH ESCALATOR
SOUTH PLATFORM
EXISTING METAL MESH TO BEREMOVED & REPLACED WITH NEWGLAZED INFILL
EXISTING STOREFRONT REMOVED &REPLACED WITH GLAZEDWINDSCREEN
EXISTINGWINDSCREEN/HANDRAILREMOVED & REPLACEDWITH NEW GLASS GUARD &S.S. HANDRAIL
SOUTH EGRESS STAIR
20000 10000 10000 18000 2000 20000
6405
1895
6710
1895
6405
NORTHELEV.
EXISTING FAREGATEROOF BELOW
PORTION OF EXISTINGFAREGATE ROOF TOBE REMOVED
NEW ALARMEDEGRESS DOOR
SOUTHELEV.
NEW GLAZEDOPENINGS IN
ELEVATOR SHAFTWALLS
EXISTING GUARD TO BEREMOVED & REPLACED WITHHIGHER GUARDS
A0405 1
A0405
4
PRELIMINARYNOT FOR CONSTRUCTION
REFERENCE DRAWING
DESCRIPTIONDWG No.DATE
DATE
DATE
DATE
558.8mm x 863.6mm METRIC
DESIGNED
DRAWN
CHECKED
APPROVALSCALEDATE
CONTRACT No.
SUPERSEDES PRINTS OF THIS NUMBER WITH LETTERS PREVIOUS TO
DRAWING No.
SUBCONSULTANTPROJECT No.
PROFESSIONAL SEAL
TLK-DSIZE-SHEET.dwgRev. -
REVISIONS
121010 - 01121010 - 01 -
15 SEPT 2014 74313
NEW WESTMINSTER STATION RENOVATION100% ISSUED FOR TENDER PACKAGE
50% DETAILED DESIGN SUBMISSION21-05-14 0
90% DETAILED DESIGN SUBMISSION14-07-14 1
100% ISSUED FOR TENDER SUBMISSION 215-09-14
9/19
/20 1
4 12
:20:
45 P
M
1 : 125
C:\U
ser s
\bpe
ters
on\
Do
c um
ents
\74
313
NW
M S
tatio
n B
a se
Mod
el_b
pete
rson
.rvt
PLATFORM PLAN
C-12
Checker
Author
Designer
Approver
1 : 125A0210
PLATFORM PLAN - P71
0 1 5
1:125
2.5
N
DATE BY DESCRIPTION REV
19
E2E3E4 E1E2b E2a
4
1
11
SOUTHPLATFORM
(O.B.)
NORTHPLATFORM
(I.B.)
3
14
13
11
E2E3E4 E1E2b E2a
1
NORTH EGRESS STAIR
EAST ESCALATOREAST PUBLIC STAIR
SOUTH EGRESS STAIR
PRELIMINARYNOT FOR CONSTRUCTION
REFERENCE DRAWING
DESCRIPTIONDWG No.DATE
DATE
DATE
DATE
558.8mm x 863.6mm METRIC
DESIGNED
DRAWN
CHECKED
APPROVALSCALEDATE
CONTRACT No.
SUPERSEDES PRINTS OF THIS NUMBER WITH LETTERS PREVIOUS TO
DRAWING No.
SUBCONSULTANTPROJECT No.
PROFESSIONAL SEAL
TLK-DSIZE-SHEET.dwgRev. -
REVISIONS
SCALE AT FULL SIZE (22" x 34" SHEET)
121010 - 01121010 - 01 -
21 JULY 2014 74313
NEW WESTMINSTER STATION RENOVATION100% ISSUED FOR TENDER PACKAGE
50% DETAILED DESIGN SUBMISSION21-05-14 0
90% DETAILED DESIGN SUBMISSION14-07-14 1
100% ISSUED FOR TENDER SUBMISSION 202-08-14
8/13
/20 1
4 2:
38:3
0 P
M
1 : 100
C:\U
ser s
\bpe
ters
on\
Do
c um
ents
\74
313
NW
M S
tatio
n B
a se
Mod
el_b
pete
rson
.rvt
NORTH/SOUTH STATION SECTIONS
C-21
Checker
Author
Designer
Approver
1 : 100C-10
CROSS SECTION @ CARNARVON PLAZA1
1 : 100C-10
CROSS SECTION @ 8TH AVE ENTRY2
1 CLEAN AND REPAINT STRUCTURALSTEEL ELEMENTS
3 NEW PERFORATED PREFINISHEDREMOVABLE ALUMINUM CEILINGPANELS WITH ACOUSTICALINSULATION PADS
4 NEW GLASS FASCIA11 NEW PREFINISHED ALUMINUM
COMPOSITE WALL PANELS
13 NEW ROOF ASSEMBLY:THERMOPLASTIC MEMBRANEROOFING; PROTECTION BOARD; STLDECK; STL STRUCTURE; CEILINGPANELS
14 NEW TEMPERED LAMINATEDWINDSCREEN
KEYNOTE LEGEND
DATE BY DESCRIPTION REV
20
BUS LOOP LVL P15150
CONCOURSE LVL P511000
ROOF DATUM20523
GRADE LVL P1A6450
E2 E3 E4E1 E2bE2a
PLATFORM LVL P716900
3
11
1
4
WEST ESCALATORWEST PUBLIC STAIR
SOUTHPLATFORM
(O.B.)
NORTHPLATFORM
(I.B.)
BUS LOOP LVL P15150
CONCOURSE LVL P511000
ROOF DATUM20523
GRADE LVL P1A6450
E2E3E4 E1E2b E2a
PLATFORM LVL P716900
3
131
4
11
14
SOUTHPLATFORM
(O.B.)
NORTHPLATFORM
(I.B.)
PRELIMINARYNOT FOR CONSTRUCTION
REFERENCE DRAWING
DESCRIPTIONDWG No.DATE
DATE
DATE
DATE
558.8mm x 863.6mm METRIC
DESIGNED
DRAWN
CHECKED
APPROVALSCALEDATE
CONTRACT No.
SUPERSEDES PRINTS OF THIS NUMBER WITH LETTERS PREVIOUS TO
DRAWING No.
SUBCONSULTANTPROJECT No.
PROFESSIONAL SEAL
TLK-DSIZE-SHEET.dwgRev. -
REVISIONS
SCALE AT FULL SIZE (22" x 34" SHEET)
121010 - 01121010 - 01 -
21 JULY 2014 74313
NEW WESTMINSTER STATION RENOVATION100% ISSUED FOR TENDER PACKAGE
50% DETAILED DESIGN SUBMISSION21-05-14 0
90% DETAILED DESIGN SUBMISSION14-07-14 1
100% ISSUED FOR TENDER SUBMISSION 202-08-14
8/13
/20 1
4 2:
39:0
8 P
M
1 : 100
C:\U
ser s
\bpe
ters
on\
Do
c um
ents
\74
313
NW
M S
tatio
n B
a se
Mod
el_b
pete
rson
.rvt
NORTH/SOUTH STATION SECTIONS
C-22
Checker
Author
Designer
Approver
1 : 100A0940
CROSS SECTION @ WEST ENTRY1
1 : 100C-10
CROSS SECTION @ TOP OF NORTH PUBLIC STAIR2
1 CLEAN AND REPAINT STRUCTURAL STEEL ELEMENTS3 NEW PERFORATED PREFINISHED REMOVABLE ALUMINUM CEILING PANELS WITH
ACOUSTICAL INSULATION PADS
4 NEW GLASS FASCIA11 NEW PREFINISHED ALUMINUM COMPOSITE WALL PANELS13 NEW ROOF ASSEMBLY: THERMOPLASTIC MEMBRANE ROOFING; PROTECTION BOARD;
STL DECK; STL STRUCTURE; CEILING PANELS
14 NEW TEMPERED LAMINATED WINDSCREEN
KEYNOTE LEGEND
DATE BY DESCRIPTION REV
21
E2E2a
PLATFORM LVL P716900
FV
250
FV
2375
NEW LIGHT FIXTURE
NEW LIGHT FIXTURE
EQ
EQ
EQ
NEW WINDSCREENGLASS CONNECTION, TYP
PREFINISHED PERFORATED REMOVABLE ALUMINUM CEILING PANELS W/ ACOUSTICAL INSULATION PADS
NEW FLASHING
2700
CLE
AR
AB
OV
E F
F
210
1250
PREFINISHED PERFORATEDREMOVABLE ALUMINUMCEILING PANELS W/ACOUSTICAL INSULATIONPADS
TEMPERED LAMINATEDGLASS
REPLACE EXISTINGCARRIER RAIL WITHSTAINLESS STEEL PIPE
REFURBISH & REPAINTEXISTING CARRIER RAIL
ROOF DATUM20523
E1
PLATFORM LVL P716900
2
C-20
NEW STRUCTURAL STLPER STRUCTURAL
EXISTING CONCSTRUCTURE
NEW REPLACABLE NON-SLIP NOSINGS TYP ALLTREADS
NEW SST HANDRAIL
EXISTING RUNNEL
EXISTING PRECAST TREADS
FALL PROTECTIONANCHOR @ STRUCTURALMEMBER, TYP
LIGHT FIXTURE PERELECTRICAL
NEW TEMPEREDLAMINATED OPAQUEGLAZING
EXISTING STRUCTURAL STL
REPLACE EXISTINGESCALATOR W/ NEWESC. CONFIRM DIMS W/MANUFACTURER
PRELIMINARYNOT FOR CONSTRUCTION
REFERENCE DRAWING
DESCRIPTIONDWG No.DATE
DATE
DATE
DATE
558.8mm x 863.6mm METRIC
DESIGNED
DRAWN
CHECKED
APPROVALSCALEDATE
CONTRACT No.
SUPERSEDES PRINTS OF THIS NUMBER WITH LETTERS PREVIOUS TO
DRAWING No.
SUBCONSULTANTPROJECT No.
PROFESSIONAL SEAL
TLK-DSIZE-SHEET.dwgRev. -
REVISIONS
SCALE AT FULL SIZE (22" x 34" SHEET)
121010 - 01121010 - 01 -
21 JULY 2014 74313
NEW WESTMINSTER STATION RENOVATION100% ISSUED FOR TENDER PACKAGE
50% DETAILED DESIGN SUBMISSION21-05-14 0
90% DETAILED DESIGN SUBMISSION14-07-14 1
100% ISSUED FOR TENDER SUBMISSION 202-08-14
8/13
/20 1
4 2:
39:5
1 P
M
1 : 20
C:\U
ser s
\bpe
ters
on\
Do
c um
ents
\74
313
NW
M S
tatio
n B
a se
Mod
el_b
pete
rson
.rvt
WALL SECTIONS
C-23
Checker
Author
Designer
Approver
1 : 20
PLATFORM WALL SECTION2
1 : 20
NORTH ENTRY WALL SECTION21
DATE BY DESCRIPTION REV
22
PRELIMINARYNOT FOR CONSTRUCTION
REFERENCE DRAWING
DESCRIPTIONDWG No.DATE
DATE
DATE
DATE
558.8mm x 863.6mm METRIC
DESIGNED
DRAWN
CHECKED
APPROVAL SCALEDATE
CONTRACT No.
SUPERSEDES PRINTS OF THIS NUMBER WITH LETTERS PREVIOUS TO
DRAWING No.
SUBCONSULTANTPROJECT No.
PROFESSIONAL SEAL
TLK-DSIZE-SHEET.dwgRev. -
REVISIONS
121010 - 01121010 - 01 -
74313
NEW WESTMINSTER STATION RENOVATION
7/21
/20 1
49:
14:1
5AM
C:\U
ser s
\abr
yan\
Doc
umen
ts\7
4313
NW
MS
tatio
nBa
seM
odel
_abr
yan.
rvt
Checker
Author
Designer
Approver
DATE BY DESCRIPTION REV CITY OF NEW WESTMINSTER REVIEW PACKAGE
21 JULY 2014
C-30
RENDERED VIEWS
VIEW FROM CONCOURSE (LOOKING WEST)
VIEW FROM CARNARVON PLAZA
VIEW FROM PLATFORM (LOOKING EAST)
23
PRELIMINARYNOT FOR CONSTRUCTION
REFERENCE DRAWING
DESCRIPTIONDWG No.DATE
DATE
DATE
DATE
558.8mm x 863.6mm METRIC
DESIGNED
DRAWN
CHECKED
APPROVAL SCALEDATE
CONTRACT No.
SUPERSEDES PRINTS OF THIS NUMBER WITH LETTERS PREVIOUS TO
DRAWING No.
SUBCONSULTANTPROJECT No.
PROFESSIONAL SEAL
TLK-DSIZE-SHEET.dwgRev. -
REVISIONS
121010 - 01121010 - 01 -
74313
NEW WESTMINSTER STATION RENOVATION
7/21
/20 1
49:
14:1
5AM
C:\U
ser s
\abr
yan\
Doc
umen
ts\7
4313
NW
MS
tatio
nBa
seM
odel
_abr
yan.
rvt
Checker
Author
Designer
Approver
DATE BY DESCRIPTION REV CITY OF NEW WESTMINSTER REVIEW PACKAGE
21 JULY 2014
C-40
SITE PHOTOS
STREET VIEW FROM CARNARVON PLAZASTREET VIEW FROM 8TH AVE (NORTH)
STREET VIEW FROM 8TH STREET (SOUTH)
24